{"id":110589,"date":"2026-10-26T03:51:55","date_gmt":"2026-10-26T03:51:55","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110589"},"modified":"2026-10-26T03:52:54","modified_gmt":"2026-10-26T03:52:54","slug":"ciklikus-leltarozas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/","title":{"rendered":"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A k\u00e9szletnyilv\u00e1ntart\u00e1s szerint az alkatr\u00e9szek rendelkez\u00e9sre \u00e1llnak. A g\u00e9pkezel\u0151 kinyitja a t\u00e1rol\u00f3t, \u00e9s kider\u00fcl, hogy nincs benne el\u00e9g a gy\u00e1rt\u00e1si feladat befejez\u00e9s\u00e9hez. A rakt\u00e1r keresg\u00e9l, a beszerz\u00e9s s\u00fcrg\u0151sen pr\u00f3b\u00e1lja p\u00f3tolni a hi\u00e1nyt, a gy\u00e1rt\u00e1stervez\u0151 pedig \u00fajra \u00f6ssze\u00e1ll\u00edtja az \u00fctemtervet, amely m\u00e9g az alkatr\u00e9szek megl\u00e9t\u00e9vel sz\u00e1molt.<\/p>\n\n\n<p>A ciklikus lelt\u00e1roz\u00e1s seg\u00edt kor\u00e1bban felismerni az ilyen elt\u00e9r\u00e9seket. Nem kell megv\u00e1rni a teljes rakt\u00e1r lelt\u00e1roz\u00e1s\u00e1t: a kijel\u00f6lt k\u00e9szleteket rendszeresen megsz\u00e1molj\u00e1k, kivizsg\u00e1lj\u00e1k az elt\u00e9r\u00e9seket, \u00e9s kijav\u00edtj\u00e1k az azokat okoz\u00f3 folyamat hib\u00e1it. Az el\u0151ny nem csup\u00e1n egy pontosabb k\u00e9szletjelent\u00e9s. Kevesebb gy\u00e1rt\u00e1si d\u00f6nt\u00e9s \u00e9p\u00fcl olyan anyagra, amely csak a nyilv\u00e1ntart\u00e1sban l\u00e9tezik.<\/p>\n\n\n<p>A jav\u00edtott adatoknak a gy\u00e1rt\u00e1si tervbe is el kell jutniuk. A SkyPlanner APS \u00f6sszekapcsolja az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t az azokt\u00f3l f\u00fcgg\u0151 rendel\u00e9sekkel, g\u00e9pekkel \u00e9s m\u0171szakokkal. \u00cdgy a tervez\u0151 an\u00e9lk\u00fcl reag\u00e1lhat a hi\u00e1nyra, hogy minden feladatsort k\u00e9zzel kellene \u00fajra \u00f6ssze\u00e1ll\u00edtania.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a ciklikus lelt\u00e1roz\u00e1s?<\/h2>\n\n\n<p>A ciklikus lelt\u00e1roz\u00e1s sor\u00e1n a k\u00e9szlet kijel\u00f6lt r\u00e9szeit el\u0151re tervezett, ism\u00e9tl\u0151d\u0151 rendben fizikailag megsz\u00e1molj\u00e1k. A megsz\u00e1molt mennyis\u00e9get az ugyanahhoz a cikkhez, t\u00e1rhelyhez, k\u00e9szletst\u00e1tuszhoz \u00e9s id\u0151ponthoz tartoz\u00f3 nyilv\u00e1ntartott mennyis\u00e9ggel hasonl\u00edtj\u00e1k \u00f6ssze, majd az esetleges elt\u00e9r\u00e9seket kivizsg\u00e1lj\u00e1k \u00e9s rendezik.<\/p>\n\n\n<p>A lelt\u00e1roz\u00e1si program sorra veheti a t\u00e1rhelyeket, a cikkcsoportokat vagy az egyes cikkekhez \u00e9s t\u00e1rhelyekhez tartoz\u00f3 k\u00e9szletrekordokat. Egyes k\u00e9szleteket gyakrabban ellen\u0151riznek, mert az ottani hib\u00e1k nagyobb p\u00e9nz\u00fcgyi vagy termel\u00e9si kock\u00e1zattal j\u00e1rnak. A c\u00e9l a folyamatos, rendszeres ellen\u0151rz\u00e9s, nem pedig az alkalmi keresg\u00e9l\u00e9s, amikor a hi\u00e1ny m\u00e1r le\u00e1ll\u00edtotta a munk\u00e1t.<\/p>\n\n\n<p>H\u00e1rom, egym\u00e1shoz kapcsol\u00f3d\u00f3 tev\u00e9kenys\u00e9get \u00e9rdemes megk\u00fcl\u00f6nb\u00f6ztetni:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A folyamatos k\u00e9szletnyilv\u00e1ntart\u00e1s<\/strong> a bev\u00e9telez\u00e9sek, kiad\u00e1sok, felhaszn\u00e1l\u00e1sok \u00e9s egy\u00e9b tranzakci\u00f3k alapj\u00e1n vezeti az aktu\u00e1lis k\u00e9szletegyenleget. Azt mutatja meg, hogy a rendszer szerint mennyi k\u00e9szlet van.<\/li><li><strong>A ciklikus lelt\u00e1roz\u00e1s<\/strong> az \u00e9v sor\u00e1n fizikai sz\u00e1ml\u00e1l\u00e1ssal ellen\u0151rzi a kijel\u00f6lt k\u00e9szletrekordokat. Seg\u00edt felt\u00e1rni az elmaradt tranzakci\u00f3kat, a hib\u00e1s mennyis\u00e9geket \u00e9s m\u00e1s elt\u00e9r\u00e9seket, am\u00edg a nyomok m\u00e9g frissek.<\/li><li><strong>A teljes k\u00f6r\u0171 fizikai lelt\u00e1roz\u00e1s<\/strong> egy kiv\u00e1lasztott id\u0151pontban ellen\u0151rzi a meghat\u00e1rozott k\u00e9szletk\u00f6r eg\u00e9sz\u00e9t. A ciklikus lelt\u00e1roz\u00e1s ezzel szemben kisebb r\u00e9szekre bontva v\u00e9gzi az ellen\u0151rz\u00e9st, nem egyetlen alkalomra \u00f6sszpontos\u00edtja azt.<\/li><\/ul>\n\n\n<p>A nyilv\u00e1ntartott k\u00e9szletegyenleg \u00f6nmag\u00e1ban nem bizony\u00edtja a fizikai k\u00e9szlet megl\u00e9t\u00e9t. Ugyan\u00edgy a ciklikus lelt\u00e1roz\u00e1si program sem helyettes\u00edti automatikusan a v\u00e1llalat p\u00e9nz\u00fcgyi besz\u00e1mol\u00e1si vagy k\u00f6nyvvizsg\u00e1lati k\u00f6vetelm\u00e9nyeinek teljes\u00edt\u00e9s\u00e9t. Ezeket a k\u00f6vetelm\u00e9nyeket ett\u0151l az operat\u00edv ellen\u0151rz\u00e9si rutint\u00f3l f\u00fcggetlen\u00fcl kell tiszt\u00e1zni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">El\u0151sz\u00f6r k\u00fcl\u00f6n\u00edtse el a k\u00e9szletelt\u00e9r\u00e9st a bels\u0151 anyagell\u00e1t\u00e1s probl\u00e9m\u00e1j\u00e1t\u00f3l<\/h2>\n\n\n<p>Ha egy alkatr\u00e9sz nincs a munka\u00e1llom\u00e1son, az nem felt\u00e9tlen\u00fcl jelenti azt, hogy hib\u00e1s a k\u00e9szletnyilv\u00e1ntart\u00e1s. Lehet, hogy m\u00e9g a nyilv\u00e1ntartott rakt\u00e1ri t\u00e1rhely\u00e9n v\u00e1r a bels\u0151 kisz\u00e1ll\u00edt\u00e1sra. Ilyenkor az a k\u00e9rd\u00e9s, <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/pfep\/\">hogyan jut el az anyag a felhaszn\u00e1l\u00e1s hely\u00e9re<\/a>, nem pedig az, hogy mekkora mennyis\u00e9get kell le\u00edrni a k\u00e9szletb\u0151l.<\/p>\n\n\n<p>A mennyis\u00e9gek \u00f6sszehasonl\u00edt\u00e1sa el\u0151tt gy\u0151z\u0151dj\u00f6n meg arr\u00f3l, hogy azonos k\u00e9szletk\u00f6rt vizsg\u00e1l. Az \u00e9p\u00fclet teljes k\u00e9szlete nem hasonl\u00edthat\u00f3 \u00f6ssze k\u00f6zvetlen\u00fcl egyetlen, gy\u00e1rt\u00f3sor melletti t\u00e1rol\u00f3 tartalm\u00e1val. A gy\u00e1rt\u00e1si feladathoz m\u00e1r kiadott k\u00e9szletet nem szabad \u00fajra kiadatlan rakt\u00e1ri k\u00e9szletk\u00e9nt sz\u00e1mba venni. A min\u0151s\u00e9g\u00fcgyi felszabad\u00edt\u00e1sra v\u00e1r\u00f3 alkatr\u00e9szek fizikailag megvannak, de ett\u0151l m\u00e9g nem haszn\u00e1lhat\u00f3k fel a gy\u00e1rt\u00e1sban.<\/p>\n\n\n<p>Ha az \u00f6sszehasonl\u00edt\u00e1s val\u00f3ban elt\u00e9r\u00e9st mutat, k\u00f6vesse vissza azokat a tranzakci\u00f3kat \u00e9s anyagkezel\u00e9si l\u00e9p\u00e9seket, amelyek az elt\u00e9r\u00e9st okozhatt\u00e1k:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Lehets\u00e9ges ok<\/th><th>Mit kell ellen\u0151rizni?<\/th><\/tr><\/thead><tbody><tr><td>Hib\u00e1s mennyis\u00e9ggel k\u00f6nyvelt bev\u00e9telez\u00e9s<\/td><td>Vesse \u00f6ssze a sz\u00e1ll\u00edtm\u00e1nyt, az \u00e1tv\u00e9teli ellen\u0151rz\u00e9st \u00e9s a k\u00f6nyvelt bev\u00e9telez\u00e9st.<\/td><\/tr><tr><td>A doboz \u00e9s a darab m\u00e9rt\u00e9kegys\u00e9g \u00f6sszekever\u00e9se<\/td><td>Ellen\u0151rizze a beszerz\u00e9si, t\u00e1rol\u00e1si \u00e9s felhaszn\u00e1l\u00e1si m\u00e9rt\u00e9kegys\u00e9geket, valamint az \u00e1tv\u00e1lt\u00e1sokat.<\/td><\/tr><tr><td>Anyagmozgat\u00e1s a nyilv\u00e1ntartott t\u00e1rhely m\u00f3dos\u00edt\u00e1sa n\u00e9lk\u00fcl<\/td><td>Ellen\u0151rizze a kiindul\u00e1si \u00e9s a c\u00e9lt\u00e1rhelyet, valamint az \u00e1tt\u00e1rol\u00e1si tranzakci\u00f3t.<\/td><\/tr><tr><td>A t\u00e9nyleges felhaszn\u00e1l\u00e1s elt\u00e9r a nyilv\u00e1ntartott\u00f3l<\/td><td>Vizsg\u00e1lja meg az anyagkiad\u00e1s m\u00f3dj\u00e1t, az anyagjegyz\u00e9k mennyis\u00e9geit, a selejtet \u00e9s a visszav\u00e9telez\u00e9seket.<\/td><\/tr><tr><td>Hasonl\u00f3 alkatr\u00e9szek vagy elt\u00e9r\u0151 rev\u00edzi\u00f3k \u00f6sszekever\u00e9se<\/td><td>Ellen\u0151rizze a c\u00edmk\u00e9ket, az azonos\u00edt\u00f3kat \u00e9s a t\u00e1rol\u00f3k t\u00e9nyleges tartalm\u00e1t.<\/td><\/tr><tr><td>S\u00e9r\u00fclt vagy z\u00e1rolt k\u00e9szlet felhaszn\u00e1lhat\u00f3k\u00e9nt kezel\u00e9se<\/td><td>Vesse \u00f6ssze a k\u00e9szlet t\u00e9nyleges \u00e1llapot\u00e1t a nyilv\u00e1ntartott felhaszn\u00e1lhat\u00f3s\u00e1g\u00e1val.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ezek az ellen\u0151rz\u00e9sek elt\u00e9r\u0151 int\u00e9zked\u00e9sekhez vezetnek. A fegyelmezettebb \u00e1ru\u00e1tv\u00e9tel nem jav\u00edtja ki a hib\u00e1san megadott felhaszn\u00e1l\u00e1si mennyis\u00e9get, \u00e9s a t\u00f6bbletk\u00e9szlet beszerz\u00e9se sem p\u00f3tolja az elmaradt \u00e1tt\u00e1rol\u00e1si k\u00f6nyvel\u00e9st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hat\u00e1rozza meg, mit \u00e9s milyen gyakran sz\u00e1molnak meg<\/h2>\n\n\n<p>Kezdje egy j\u00f3l kezelhet\u0151 termel\u00e9si ter\u00fclettel vagy anyagcsoporttal, ahol az elt\u00e9r\u00e9sek t\u00e9nyleges fennakad\u00e1st okoznak. Jel\u00f6lj\u00f6n ki felel\u0151st, biztos\u00edtson elk\u00fcl\u00f6n\u00edtett id\u0151t a feladatra, \u00e9s hat\u00e1rozza meg egy\u00e9rtelm\u0171en a felt\u00e1rt probl\u00e9m\u00e1k rendez\u00e9s\u00e9nek menet\u00e9t. Hasznosabb egy kisebb k\u00f6rre kiterjed\u0151 rendszeres ellen\u0151rz\u00e9s, amelynek sor\u00e1n rendezik is a felt\u00e1rt elt\u00e9r\u00e9seket, mint egy hossz\u00fa lelt\u00e1rlista, amelyn\u00e9l senkinek sincs ideje kivizsg\u00e1lni az elt\u00e9r\u00e9seket.<\/p>\n\n\n<p>A sz\u00e1ml\u00e1l\u00e1s gyakoris\u00e1g\u00e1t t\u00f6bb szempont alapj\u00e1n hat\u00e1rozza meg. A felhaszn\u00e1l\u00e1s \u00e9rt\u00e9ke a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletek-abc-elemzese\/\">k\u00e9szletek ABC-elemz\u00e9s\u00e9vel<\/a> seg\u00edthet kijel\u00f6lni a p\u00e9nz\u00fcgyi ellen\u0151rz\u00e9s s\u00falypontjait. A tranzakci\u00f3k gyakoris\u00e1ga \u00e9s a kor\u00e1bbi elt\u00e9r\u00e9sek megmutatj\u00e1k, hol v\u00e1lhat gyorsan pontatlann\u00e1 a nyilv\u00e1ntart\u00e1s. Tov\u00e1bbi szempont a termel\u00e9s szempontj\u00e1b\u00f3l bet\u00f6lt\u00f6tt kritikus szerep: egy olcs\u00f3 v\u00e1s\u00e1rolt alkatr\u00e9sz hi\u00e1nya is megakaszthat egy dr\u00e1ga \u00f6sszeszerel\u00e9st.<\/p>\n\n\n<p>Ne vegyen \u00e1t olyan \u00e1ltal\u00e1nos szab\u00e1lyt, amely szerint minden A cikket havonta, minden C cikket pedig \u00e9vente kell megsz\u00e1molni. A gyakoris\u00e1got a saj\u00e1t kock\u00e1zatokhoz, valamint a sz\u00e1ml\u00e1l\u00e1sra \u00e9s a kivizsg\u00e1l\u00e1sra rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151h\u00f6z igaz\u00edtsa. Ford\u00edtson t\u00f6bb figyelmet azokra a t\u00e9telekre, ahol ism\u00e9tl\u0151dnek a hib\u00e1k, majd vizsg\u00e1lja meg, hogy a kiv\u00e1lt\u00f3 ok megsz\u00fcntet\u00e9s\u00e9vel megb\u00edzhat\u00f3bb\u00e1 v\u00e1lt-e a nyilv\u00e1ntart\u00e1s.<\/p>\n\n\n<p>A t\u00e1rhelyenk\u00e9nti lelt\u00e1roz\u00e1s megk\u00f6nny\u00edtheti a fizikai munk\u00e1t, mert a k\u00f6zeli k\u00e9szleteket egy\u00fctt veszi sorra. A cikkenk\u00e9nti lelt\u00e1roz\u00e1s pedig seg\u00edt egy alkatr\u00e9sz k\u00e9szlet\u00e9t t\u00f6bb t\u00e1rhelyen is nyomon k\u00f6vetni. B\u00e1rmelyiket v\u00e1lasztja, \u00fagy hat\u00e1rozza meg a lefedetts\u00e9get, hogy a nehezen hozz\u00e1f\u00e9rhet\u0151 t\u00e1rhelyek, a lassan forg\u00f3 cikkek \u00e9s a v\u00e1ratlanul \u00fcres t\u00e1rol\u00f3k se maradjanak ki a programb\u00f3l. Ha egy t\u00e1rol\u00f3 \u00fcres, de a nyilv\u00e1ntart\u00e1s pozit\u00edv k\u00e9szletet mutat, az felt\u00e1rt elt\u00e9r\u00e9s, nem pedig ok a sz\u00e1ml\u00e1l\u00e1s kihagy\u00e1s\u00e1ra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ciklikus lelt\u00e1roz\u00e1si elj\u00e1r\u00e1s az elt\u00e9r\u00e9sek rendez\u00e9s\u00e9re<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Hat\u00e1rozza meg a lelt\u00e1roz\u00e1s k\u00f6r\u00e9t<\/h3>\n\n\n<p>Azonos\u00edtsa a cikket \u00e9s a t\u00e1rhelyet, valamint a v\u00e1llalatn\u00e1l haszn\u00e1lt sarzs-, rev\u00edzi\u00f3- \u00e9s k\u00e9szletst\u00e1tusz szerinti megk\u00fcl\u00f6nb\u00f6ztet\u00e9seket. Adja meg a k\u00e9szletnyilv\u00e1ntart\u00e1si m\u00e9rt\u00e9kegys\u00e9get, \u00e9s azt is, hogyan kell sz\u00e1mba venni a bontatlan csomagok tartalm\u00e1t, illetve a megkezdett t\u00e1rol\u00f3kban megmaradt mennyis\u00e9get. A lehat\u00e1rol\u00e1s legyen annyira egy\u00e9rtelm\u0171, hogy a sz\u00e1ml\u00e1l\u00e1st m\u00e1s is meg tudja ism\u00e9telni.<\/p>\n\n\n<p>A kijel\u00f6lt k\u00f6r\u00f6n bel\u00fcl v\u00e1ratlanul tal\u00e1lt k\u00e9szletet is vegye sz\u00e1mba. Ha csak a list\u00e1ra nyomtatott cikkeket ellen\u0151rzi, egy nem r\u00f6gz\u00edtett bev\u00e9telez\u00e9s vagy egy rossz helyre ker\u00fclt alkatr\u00e9sz \u00e9szrev\u00e9tlen maradhat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Hat\u00e1rozza meg egy\u00e9rtelm\u0171en a k\u00e9szletmozg\u00e1sok elhat\u00e1rol\u00e1s\u00e1nak id\u0151pontj\u00e1t<\/h3>\n\n\n<p>A fizikai sz\u00e1ml\u00e1l\u00e1snak \u00e9s a rendszerben szerepl\u0151 k\u00e9szletegyenlegnek ugyanarra az id\u0151pontra kell vonatkoznia. Ellenkez\u0151 esetben a sz\u00e1ml\u00e1l\u00e1s k\u00f6zben v\u00e9gzett, egy\u00e9bk\u00e9nt szab\u00e1lyosan r\u00f6gz\u00edtett kit\u00e1rol\u00e1s is hi\u00e1nynak t\u0171nhet.<\/p>\n\n\n<p>Egy kisebb k\u00eds\u00e9rleti bevezet\u00e9sn\u00e9l a legegyszer\u0171bb megold\u00e1s az lehet, ha a kijel\u00f6lt t\u00e1rhelyen r\u00f6vid id\u0151re sz\u00fcneteltetik a k\u00e9szletmozg\u00e1sokat. Ha a munk\u00e1nak folytat\u00f3dnia kell, meghat\u00e1rozott elj\u00e1r\u00e1ssal r\u00f6gz\u00edtse a sz\u00e1ml\u00e1l\u00e1s alatti bev\u00e9telez\u00e9seket, kit\u00e1rol\u00e1sokat \u00e9s \u00e1tt\u00e1rol\u00e1sokat, majd egyeztesse azok id\u0151pontj\u00e1t. T\u00e1j\u00e9koztassa az anyagkezel\u00e9st v\u00e9gz\u0151 munkat\u00e1rsakat arr\u00f3l, hogy mit sz\u00e1molnak, \u00e9s ki enged\u00e9lyezi a kiv\u00e9teleket. A kijel\u00f6lt k\u00f6rt kell ellen\u0151rz\u00e9s alatt tartani, nem felt\u00e9tlen\u00fcl az eg\u00e9sz rakt\u00e1rt lez\u00e1rni.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. A v\u00e1rt mennyis\u00e9gt\u0151l f\u00fcggetlen\u00fcl v\u00e9gezze a sz\u00e1ml\u00e1l\u00e1st<\/h3>\n\n\n<p>Ahol ez megoldhat\u00f3, a sz\u00e1ml\u00e1l\u00e1st v\u00e9gz\u0151 szem\u00e9ly kezdetben ne l\u00e1ssa a nyilv\u00e1ntartott k\u00e9szletegyenleget. A t\u00e9nylegesen megsz\u00e1molt mennyis\u00e9get k\u00e9rje t\u0151le, ne a k\u00e9perny\u0151n l\u00e1that\u00f3 sz\u00e1m meger\u0151s\u00edt\u00e9s\u00e9t.<\/p>\n\n\n<p>A t\u00e1rol\u00f3 t\u00e9nyleges tartalm\u00e1t ellen\u0151rizze, ne csak a c\u00edmk\u00e9j\u00e9t. R\u00f6gz\u00edtse a sz\u00e1ml\u00e1l\u00e1s id\u0151pontj\u00e1t, a m\u00e9rt\u00e9kegys\u00e9get, a t\u00e1rhelyet \u00e9s a sz\u00e1ml\u00e1l\u00e1st v\u00e9gz\u0151 szem\u00e9lyt, valamint a tiszt\u00e1zand\u00f3 azonos\u00edt\u00f3kat vagy a figyelmet ig\u00e9nyl\u0151 s\u00e9r\u00fclt csomagol\u00e1st. Ha t\u00f6megm\u00e9r\u00e9st vagy m\u00e1s k\u00f6zvetett m\u00f3dszert alkalmaz, ellen\u0151rizze a m\u00f3dszert, \u00e9s azt is, hogy alkalmas-e az adott anyag sz\u00e1ml\u00e1l\u00e1s\u00e1ra.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. V\u00e9gezzen \u00fajrasz\u00e1ml\u00e1l\u00e1st, \u00e9s egyeztesse az elt\u00e9r\u00e9seket<\/h3>\n\n\n<p>A k\u00e9szletegyenleg m\u00f3dos\u00edt\u00e1sa el\u0151tt ellen\u0151rizze a cikket, a m\u00e9rt\u00e9kegys\u00e9get, a t\u00e1rhelyet \u00e9s az id\u0151beli elhat\u00e1rol\u00e1st. Jelent\u0151s vagy megmagyar\u00e1zatlan elt\u00e9r\u00e9s eset\u00e9n egy m\u00e1sik szem\u00e9ly v\u00e9gezzen f\u00fcggetlen \u00fajrasz\u00e1ml\u00e1l\u00e1st. Ezut\u00e1n vizsg\u00e1lja meg a sz\u00e1ml\u00e1l\u00e1s k\u00f6r\u00fcli bev\u00e9telez\u00e9seket, \u00e1tt\u00e1rol\u00e1sokat, gy\u00e1rt\u00e1si anyagkiad\u00e1sokat, felhaszn\u00e1l\u00e1sokat, visszav\u00e9telez\u00e9seket \u00e9s selejtez\u00e9seket.<\/p>\n\n\n<p>Ne ism\u00e9telj\u00e9k addig a sz\u00e1ml\u00e1l\u00e1st, am\u00edg valaki a v\u00e1rt eredm\u00e9nyt nem kapja. \u0150rizze meg az els\u0151 sz\u00e1ml\u00e1l\u00e1s eredm\u00e9ny\u00e9t \u00e9s az azt k\u00f6vet\u0151en \u00f6sszegy\u0171jt\u00f6tt bizony\u00edt\u00e9kokat. Ha a mennyis\u00e9gi elt\u00e9r\u00e9st a sz\u00e1ml\u00e1l\u00e1s id\u0151pontja ut\u00e1ni szab\u00e1lyos k\u00e9szletmozg\u00e1s magyar\u00e1zza, ezt a mozg\u00e1st egyeztesse, ne k\u00f6nyveljen miatta tov\u00e1bbi k\u00e9szletkorrekci\u00f3t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Hagyja j\u00f3v\u00e1 a megfelel\u0151 korrekci\u00f3t<\/h3>\n\n\n<p>V\u00e1lassza k\u00fcl\u00f6n a sz\u00e1ml\u00e1l\u00e1si eredm\u00e9ny r\u00f6gz\u00edt\u00e9s\u00e9t a k\u00e9szletm\u00f3dos\u00edt\u00e1s enged\u00e9lyez\u00e9s\u00e9t\u0151l. A j\u00f3v\u00e1hagy\u00e1si felel\u0151ss\u00e9geket \u00e9s a magasabb szint\u0171 d\u00f6nt\u00e9st ig\u00e9nyl\u0151 k\u00fcsz\u00f6b\u00e9rt\u00e9keket a cikk \u00e9rt\u00e9k\u00e9hez \u00e9s termel\u00e9si kock\u00e1zat\u00e1hoz igaz\u00edtsa.<\/p>\n\n\n<p>R\u00f6gz\u00edtse az elfogadott mennyis\u00e9get, az elt\u00e9r\u00e9st, annak ok\u00e1t, a j\u00f3v\u00e1hagy\u00f3t \u00e9s az al\u00e1t\u00e1maszt\u00f3 bizony\u00edt\u00e9kokat. A t\u00e9nyleges hib\u00e1t jav\u00edtsa: a t\u00e9ves t\u00e1rol\u00f3hely vagy k\u00e9szletst\u00e1tusz helyesb\u00edt\u00e9s\u00e9hez m\u00e1s tranzakci\u00f3ra lehet sz\u00fcks\u00e9g, mint a mennyis\u00e9g m\u00f3dos\u00edt\u00e1s\u00e1hoz. M\u00f3dos\u00edt\u00e1s r\u00f6gz\u00edt\u00e9se el\u0151tt ellen\u0151rizze, nem maradt-e el valamely eredeti k\u00e9szletmozg\u00e1s k\u00f6nyvel\u00e9se, nehogy egy k\u00e9s\u0151bbi bev\u00e9telez\u00e9s vagy felhaszn\u00e1l\u00e1s k\u00f6nyvel\u00e9se m\u00e9g egyszer korrig\u00e1lja ugyanazt az elt\u00e9r\u00e9st.<\/p>\n\n\n<p>Ha egy igazolt hi\u00e1ny vesz\u00e9lyezteti a folyamatban l\u00e9v\u0151 munk\u00e1t, halad\u00e9ktalanul \u00e9rtes\u00edtse a gy\u00e1rt\u00e1stervez\u0151t. A sz\u00e1ll\u00edt\u00e1si kock\u00e1zat ne maradjon rejtve addig sem, am\u00edg a kiv\u00e1lt\u00f3 ok hosszabb vizsg\u00e1lata zajlik.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Jav\u00edtsa ki a hib\u00e1t okoz\u00f3 folyamatot<\/h3>\n\n\n<p>A j\u00f3v\u00e1hagyott k\u00e9szletm\u00f3dos\u00edt\u00e1s helyreteszi az aktu\u00e1lis nyilv\u00e1ntart\u00e1st. Azt azonban nem magyar\u00e1zza meg, mi\u00e9rt keletkezett a hiba, \u00e9s az ism\u00e9tl\u0151d\u00e9s\u00e9t sem akad\u00e1lyozza meg.<\/p>\n\n\n<p>Jel\u00f6lj\u00f6n ki felel\u0151st \u00e9s hat\u00e1rid\u0151t a helyesb\u00edt\u0151 int\u00e9zked\u00e9shez. Sz\u00fcks\u00e9g lehet p\u00e9ld\u00e1ul az \u00e1ru\u00e1tv\u00e9teli ellen\u0151rz\u00e9s m\u00f3dos\u00edt\u00e1s\u00e1ra, egy m\u00e9rt\u00e9kegys\u00e9g-\u00e1tv\u00e1lt\u00e1s jav\u00edt\u00e1s\u00e1ra, a selejt r\u00f6gz\u00edt\u00e9s\u00e9re ann\u00e1l a m\u0171veletn\u00e9l, ahol keletkezik, vagy a fel nem haszn\u00e1lt alkatr\u00e9szek rakt\u00e1rba t\u00f6rt\u00e9n\u0151 visszav\u00e9telez\u00e9s\u00e9nek rendez\u00e9s\u00e9re. A folyamat k\u00f6vetkez\u0151 v\u00e9grehajt\u00e1sa ut\u00e1n ellen\u0151rizze \u00fajra az \u00e9rintett k\u00e9szletet. A m\u00e9rce az, hogy visszat\u00e9r-e az elt\u00e9r\u00e9s, nem pedig az, hogy siker\u00fclt-e lek\u00f6nyvelni a m\u00f3dos\u00edt\u00e1st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. A gy\u00e1rt\u00e1s\u00fctemez\u00e9s m\u00e1r a jav\u00edtott k\u00e9szletadatokra \u00e9p\u00fclj\u00f6n<\/h3>\n\n\n<p>Gondoskodjon arr\u00f3l, hogy a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1s eljusson abba a rendszerbe, amely az anyagadatokat szolg\u00e1ltatja a gy\u00e1rt\u00e1si \u00fctemtervhez. Ezut\u00e1n vizsg\u00e1lja fel\u00fcl az adott anyagot felhaszn\u00e1l\u00f3 rendel\u00e9seket, azok priorit\u00e1s\u00e1t \u00e9s a m\u00e1s munk\u00e1kkal k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1saikat.<\/p>\n\n\n<p>A k\u00e9szlet\u00e9rt felel\u0151s csapat pontosabb kiindul\u00f3 mennyis\u00e9get \u00e1llap\u00edtott meg. A gy\u00e1rt\u00e1stervez\u0151nek azonban egy m\u00e1sik k\u00e9rd\u00e9sre is v\u00e1laszt kell kapnia: <strong>mit tudunk most legy\u00e1rtani, milyen sorrendben, \u00e9s hogyan v\u00e1ltoznak a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k?<\/strong><\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u00e9lda: a lelt\u00e1roz\u00e1s lez\u00e1rult, de k\u00e9t rendel\u00e9shez tov\u00e1bbra is kellenek az alkatr\u00e9szek<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3t, amelynek nyilv\u00e1ntart\u00e1sa szerint 120 felhaszn\u00e1lhat\u00f3 k\u00e9sz\u00fcl\u00e9kh\u00e1z van a rakt\u00e1rban. K\u00e9t soron k\u00f6vetkez\u0151 rendel\u00e9shez egyenk\u00e9nt 60 darabra van sz\u00fcks\u00e9g. Az ellen\u0151rz\u00f6tt k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt v\u00e9gzett sz\u00e1ml\u00e1l\u00e1s 90 darabot tal\u00e1l, \u00e9s egy f\u00fcggetlen \u00fajrasz\u00e1ml\u00e1l\u00e1s is meger\u0151s\u00edti ezt a mennyis\u00e9get.<\/p>\n\n\n<p>A csapat ellen\u0151rzi, hogy a k\u00e9sz\u00fcl\u00e9kh\u00e1zakat nem helyezt\u00e9k-e \u00e1t m\u00e1sik t\u00e1rol\u00f3helyre, vagy nem adt\u00e1k-e m\u00e1r ki \u0151ket. Kider\u00fcl, hogy az elt\u00e9r\u00e9st kor\u00e1bban, anyagmozgat\u00e1s sor\u00e1n elt\u00e1vol\u00edtott s\u00e9r\u00fclt k\u00e9sz\u00fcl\u00e9kh\u00e1zak okozz\u00e1k, amelyekr\u0151l nem r\u00f6gz\u00edtettek selejtez\u00e9si tranzakci\u00f3t. A j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1s 90 darabra \u00e1ll\u00edtja a felhaszn\u00e1lhat\u00f3 k\u00e9szletet, a csapat pedig egy\u00e9rtelm\u0171en kijel\u00f6li, ki felel a j\u00f6v\u0151ben a k\u00e9szletb\u0151l t\u00f6rt\u00e9n\u0151 kivon\u00e1sok r\u00f6gz\u00edt\u00e9s\u00e9\u00e9rt.<\/p>\n\n\n<p>Ezzel az aktu\u00e1lis mennyis\u00e9gi elt\u00e9r\u00e9st rendezt\u00e9k. Ett\u0151l azonban m\u00e9g nem lesz elegend\u0151 k\u00e9sz\u00fcl\u00e9kh\u00e1z mindk\u00e9t rendel\u00e9shez: az egy\u00fcttes sz\u00fcks\u00e9glet tov\u00e1bbra is 120 darab. A beszerz\u00e9s megvizsg\u00e1lja az ut\u00e1np\u00f3tl\u00e1s lehet\u0151s\u00e9geit, a gy\u00e1rt\u00e1stervez\u0151 pedig eld\u00f6nti, melyik v\u00e1llal\u00e1s \u00e9lvez els\u0151bbs\u00e9get.<\/p>\n\n\n<p>Az \u00e9rintett rendel\u00e9s \u00e1t\u00fctemez\u00e9se nem csup\u00e1n az anyaglist\u00e1t \u00e9rinti. Megmunk\u00e1l\u00e1si \u00e9s szerel\u00e9si m\u0171veletei ugyanazokat az er\u0151forr\u00e1sokat haszn\u00e1lj\u00e1k, mint m\u00e1s rendel\u00e9sek m\u0171veletei, k\u00f6zt\u00fck olyanok is, amelyekhez nem kellenek ezek a k\u00e9sz\u00fcl\u00e9kh\u00e1zak. A jav\u00edtott k\u00e9szletadat ez\u00e9rt t\u00f6bb munkasorrendet \u00e9s sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t is megv\u00e1ltoztathat. Ilyenkor takar\u00edt meg k\u00e9zi tervez\u00e9si munk\u00e1t, ha a k\u00e9szletadatok egy <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">k\u00f6z\u00f6s gy\u00e1rt\u00e1si \u00fctemtervhez<\/a> kapcsol\u00f3dnak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az els\u0151 sz\u00e1ml\u00e1l\u00e1s eredm\u00e9ny\u00e9t m\u00e9rje, ne csak a jav\u00edtott k\u00e9szletadatot<\/h2>\n\n\n<p>A k\u00e9szletpontoss\u00e1got egy\u00e9rtelm\u0171en meg kell hat\u00e1rozni. A nyilv\u00e1ntart\u00e1s pontoss\u00e1g\u00e1nak gyakorlati m\u00e9r\u00e9s\u00e9hez sz\u00e1molja meg, h\u00e1ny ellen\u0151rz\u00f6tt cikk\u2013t\u00e1rol\u00f3hely p\u00e1rn\u00e1l egyezett az els\u0151 sz\u00e1ml\u00e1l\u00e1s eredm\u00e9nye a nyilv\u00e1ntartott mennyis\u00e9ggel. Ezt ossza el az \u00f6sszes ellen\u0151rz\u00f6tt cikk\u2013t\u00e1rol\u00f3hely p\u00e1r sz\u00e1m\u00e1val, \u00e9s az eredm\u00e9nyt adja meg sz\u00e1zal\u00e9kban. R\u00f6gz\u00edtse, hogy az egyez\u00e9s pontos azonoss\u00e1got vagy egy el\u0151re elfogadott t\u0171r\u00e9shat\u00e1ron bel\u00fcli elt\u00e9r\u00e9st jelent-e, \u00e9s ezt a meghat\u00e1roz\u00e1st k\u00f6vetkezetesen alkalmazza.<\/p>\n\n\n<p>A pontoss\u00e1g m\u00e9r\u00e9s\u00e9hez a m\u00f3dos\u00edt\u00e1s el\u0151tti sz\u00e1ml\u00e1l\u00e1s eredm\u00e9ny\u00e9t haszn\u00e1lja. A csak az \u00f6sszes elt\u00e9r\u00e9s kijav\u00edt\u00e1sa ut\u00e1n k\u00e9sz\u00edtett jelent\u00e9s elfedi azt az \u00e1llapotot, amelyet a sz\u00e1ml\u00e1l\u00e1s t\u00e9nylegesen felt\u00e1rt.<\/p>\n\n\n<p>A sz\u00e1zal\u00e9kos \u00e9rt\u00e9ket a rendezetlen elt\u00e9r\u00e9sekkel, az ism\u00e9tl\u0151d\u0151 okokkal, a lelt\u00e1roz\u00e1s lefedetts\u00e9g\u00e9vel \u00e9s az anyagprobl\u00e9m\u00e1k miatti termel\u00e9smegszak\u00edt\u00e1sokkal egy\u00fctt \u00e9rt\u00e9kelje. A magas \u00f6sszes\u00edtett eredm\u00e9ny elfedheti egyetlen kritikus alkatr\u00e9sz hi\u00e1ny\u00e1t. Ugyan\u00edgy a kock\u00e1zatalap\u00fa lelt\u00e1roz\u00e1si program, amely sz\u00e1nd\u00e9kosan a probl\u00e9m\u00e1s cikkeket ellen\u0151rzi, nem ad torz\u00edtatlan becsl\u00e9st az \u00fczem teljes k\u00e9szletnyilv\u00e1ntart\u00e1s\u00e1nak pontoss\u00e1g\u00e1r\u00f3l.<\/p>\n\n\n<p>A kedvez\u0151 tendencia az, ha kevesebb a visszat\u00e9r\u0151 hiba \u00e9s a v\u00e1ratlan probl\u00e9ma a gy\u00e1rt\u00e1si feladatok tervezett ind\u00edt\u00e1sakor, nem pedig puszt\u00e1n az, ha t\u00f6bb lelt\u00e1roz\u00e1st v\u00e9geznek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u00e9sz\u00edtsen megval\u00f3s\u00edthat\u00f3 tervet a jav\u00edtott k\u00e9szletadatokb\u00f3l a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha csapata m\u00e1r meg tudja \u00e1llap\u00edtani az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t, de m\u00e9g t\u00fal sok id\u0151t t\u00f6lt azzal, hogy ezt \u00f6sszehangolja a rendel\u00e9sekkel, \u00e9s \u00fajra \u00f6ssze\u00e1ll\u00edtsa a g\u00e9pek munkasorrendj\u00e9t. A SkyPlanner ezeket a d\u00f6nt\u00e9seket egyetlen gy\u00e1rt\u00e1si \u00fctemtervben fogja \u00f6ssze.<\/p>\n\n\n<p>A term\u00e9khez kapcsolt anyagok a hozz\u00e1 tartoz\u00f3 rendel\u00e9si t\u00e9telekn\u00e9l is megjelennek. A k\u00e9szletadatok integr\u00e1ci\u00f3n kereszt\u00fcl vagy a SkyPlanner Warehouse modulj\u00e1ban tarthat\u00f3k karban. Ha az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az Arcturus, a SkyPlanner \u00fctemez\u0151 mesters\u00e9ges intelligenci\u00e1ja a munka\u00e1llom\u00e1sok kapacit\u00e1sa, a m\u0171szakok, a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek \u00e9s a be\u00e1ll\u00edtott szab\u00e1lyok mellett az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1val is sz\u00e1mol.<\/p>\n\n\n<p>Miut\u00e1n a j\u00f3v\u00e1hagyott k\u00e9szletm\u00f3dos\u00edt\u00e1s beker\u00fclt ezekbe a tervez\u00e9si adatokba, sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet, \u00e9s tekintse \u00e1t az eredm\u00e9nyt a Gantt-diagramon. L\u00e1thatja, hogyan illeszkedik az \u00e9rintett munka a t\u00f6bbi rendel\u00e9s k\u00f6z\u00e9, ahelyett, hogy minden er\u0151forr\u00e1s munkasorrendj\u00e9t k\u00fcl\u00f6n kellene szerkesztenie. A priorit\u00e1sokr\u00f3l \u00d6n d\u00f6nt, az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1st az Arcturus v\u00e9gzi. Ez kevesebb k\u00e9zi egyeztet\u00e9st jelent, \u00e9s kor\u00e1bban l\u00e1that\u00f3v\u00e1 teszi, mely sz\u00e1ll\u00edt\u00e1si v\u00e1llal\u00e1sok ig\u00e9nyelnek figyelmet.<\/p>\n\n\n<p>A SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3. Tartsa meg az \u00e1ru\u00e1tv\u00e9telhez, a lelt\u00e1roz\u00e1shoz \u00e9s a k\u00e9szletelt\u00e9r\u00e9sek j\u00f3v\u00e1hagy\u00e1s\u00e1hoz haszn\u00e1lt, m\u0171k\u00f6d\u00e9s\u00e9hez ill\u0151 munkafolyamatot, az ennek sor\u00e1n karbantartott anyagadatokat pedig kapcsolja \u00f6ssze a r\u00e9szletes gy\u00e1rt\u00e1s\u00fctemez\u00e9ssel. A lelt\u00e1roz\u00e1s a t\u00e9nyleges k\u00e9szletet ellen\u0151rzi; a SkyPlanner abban seg\u00edt, hogy kezelje az eredm\u00e9ny termel\u00e9si k\u00f6vetkezm\u00e9nyeit.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott az Eskomatic m\u0171k\u00f6d\u00e9s\u00e9n az anyagell\u00e1totts\u00e1g jobb \u00e1tl\u00e1that\u00f3s\u00e1ga?<\/h3>\n\n\n<p>A b\u00e9rmegmunk\u00e1l\u00e1ssal foglalkoz\u00f3 Eskomatic kor\u00e1bban egy r\u00e9gebbi termel\u00e9sir\u00e1ny\u00edt\u00e1si k\u00f6rnyezetben, nagyr\u00e9szt k\u00e9zzel \u00f6ssze\u00e1ll\u00edtott munkasorrendekre t\u00e1maszkodott. Mivel az anyagok \u00e1llapota kev\u00e9ss\u00e9 volt \u00e1tl\u00e1that\u00f3, el\u0151fordulhatott, hogy egy hi\u00e1ny csak k\u00f6zvetlen\u00fcl a gy\u00e1rt\u00e1si feladat tervezett ind\u00edt\u00e1sa el\u0151tt der\u00fclt ki.<\/p>\n\n\n<p>Miut\u00e1n a SkyPlannert \u00f6sszekapcsolt\u00e1k a megl\u00e9v\u0151 ERP rendszerrel, a csapat vizu\u00e1lisan k\u00f6vethette a munkasorrendet, automatikusan \u00fctemezhette a kapacit\u00e1sok terhel\u00e9s\u00e9t, \u00e9s jobban \u00e1tl\u00e1tta az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t. <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/eskomatic\/\">Az Eskomatic besz\u00e1mol\u00f3ja szerint<\/a> kevesebb az anyaghi\u00e1ny miatti termel\u00e9sle\u00e1ll\u00e1s, \u00e9s pontosabban tudj\u00e1k meghat\u00e1rozni a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket. Tapasztalatuk megmutatja, mi\u00e9rt \u00e9rdemes \u00f6sszekapcsolni az anyagadatokat az \u00fctemez\u00e9ssel ahelyett, hogy a gy\u00e1rt\u00e1stervez\u0151nek az utols\u00f3 pillanatban kellene megold\u00e1st tal\u00e1lnia az ezekb\u0151l ad\u00f3d\u00f3 probl\u00e9m\u00e1kra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kezdje egyetlen visszat\u00e9r\u0151 elt\u00e9r\u00e9ssel<\/h2>\n\n\n<p>V\u00e1lasszon egy olyan alkatr\u00e9szt, amelyet rendszeresen keresni kell, vagy amelyb\u0151l v\u00e1ratlanul hi\u00e1ny mutatkozik. Hat\u00e1rozza meg, mire terjed ki a sz\u00e1ml\u00e1l\u00e1s, az ellen\u0151rz\u00e9s idej\u00e9n fel\u00fcgyelje a k\u00e9szletmozg\u00e1sokat, vizsg\u00e1lja ki az elt\u00e9r\u00e9st, \u00e9s jel\u00f6lj\u00f6n ki felel\u0151st a helyesb\u00edt\u0151 int\u00e9zked\u00e9shez. Ezut\u00e1n k\u00f6vesse v\u00e9gig, hogyan \u00e9rinti a rendelkez\u00e9sre \u00e1ll\u00f3 mennyis\u00e9g j\u00f3v\u00e1hagyott v\u00e1ltoz\u00e1sa az alkatr\u00e9szt ig\u00e9nyl\u0151 rendel\u00e9seket.<\/p>\n\n\n<p>Ha ezt az utols\u00f3 l\u00e9p\u00e9st a gyakorlatban is szeretn\u00e9 l\u00e1tni, <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">foglaljon SkyPlanner-bemutat\u00f3t<\/a>. Hozzon p\u00e9ld\u00e1t egy vitatott anyagk\u00e9szletre, az alkatr\u00e9szt felhaszn\u00e1l\u00f3 rendel\u00e9sekre \u00e9s azokra a g\u00e9pekre, amelyeket ezek a rendel\u00e9sek m\u00e1s munk\u00e1kkal k\u00f6z\u00f6sen haszn\u00e1lnak. \u00cdgy az egyeztet\u00e9snek konkr\u00e9t c\u00e9lja lesz: megmutatni, hogyan v\u00e1lhatnak a jav\u00edtott anyagadatok a csapata sz\u00e1m\u00e1ra haszn\u00e1lhat\u00f3 gy\u00e1rt\u00e1si tervv\u00e9. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner megold\u00e1s\u00e1t bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se A k\u00e9szletnyilv\u00e1ntart\u00e1s szerint az alkatr\u00e9szek rendelkez\u00e9sre \u00e1llnak. A g\u00e9pkezel\u0151 kinyitja a t\u00e1rol\u00f3t, \u00e9s kider\u00fcl, hogy nincs benne el\u00e9g a gy\u00e1rt\u00e1si feladat befejez\u00e9s\u00e9hez. A rakt\u00e1r keresg\u00e9l, a beszerz\u00e9s s\u00fcrg\u0151sen pr\u00f3b\u00e1lja p\u00f3tolni a hi\u00e1nyt, a gy\u00e1rt\u00e1stervez\u0151 pedig \u00fajra \u00f6ssze\u00e1ll\u00edtja &#8230; <a title=\"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/\" aria-label=\"Read more about Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":110607,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-110589","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se<\/title>\n<meta name=\"description\" content=\"Pap\u00edron van k\u00e9szlet, m\u00e9gis \u00e1ll a gy\u00e1rt\u00e1s? Ciklikus lelt\u00e1roz\u00e1ssal rendezze az elt\u00e9r\u00e9seket, \u00e9s a jav\u00edtott k\u00e9szletadatokkal tervezze a termel\u00e9st.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se\" \/>\n<meta property=\"og:description\" content=\"Pap\u00edron van k\u00e9szlet, m\u00e9gis \u00e1ll a gy\u00e1rt\u00e1s? Ciklikus lelt\u00e1roz\u00e1ssal rendezze az elt\u00e9r\u00e9seket, \u00e9s a jav\u00edtott k\u00e9szletadatokkal tervezze a termel\u00e9st.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T03:51:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T03:52:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:52:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/\"},\"wordCount\":4091,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/\",\"name\":\"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:52:54+00:00\",\"description\":\"Pap\u00edron van k\u00e9szlet, m\u00e9gis \u00e1ll a gy\u00e1rt\u00e1s? Ciklikus lelt\u00e1roz\u00e1ssal rendezze az elt\u00e9r\u00e9seket, \u00e9s a jav\u00edtott k\u00e9szletadatokkal tervezze a termel\u00e9st.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ciklikus-leltarozas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se","description":"Pap\u00edron van k\u00e9szlet, m\u00e9gis \u00e1ll a gy\u00e1rt\u00e1s? Ciklikus lelt\u00e1roz\u00e1ssal rendezze az elt\u00e9r\u00e9seket, \u00e9s a jav\u00edtott k\u00e9szletadatokkal tervezze a termel\u00e9st.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/","og_locale":"hu_HU","og_type":"article","og_title":"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se","og_description":"Pap\u00edron van k\u00e9szlet, m\u00e9gis \u00e1ll a gy\u00e1rt\u00e1s? Ciklikus lelt\u00e1roz\u00e1ssal rendezze az elt\u00e9r\u00e9seket, \u00e9s a jav\u00edtott k\u00e9szletadatokkal tervezze a termel\u00e9st.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T03:51:55+00:00","article_modified_time":"2026-10-26T03:52:54+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:52:54+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/"},"wordCount":4091,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/","name":"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:52:54+00:00","description":"Pap\u00edron van k\u00e9szlet, m\u00e9gis \u00e1ll a gy\u00e1rt\u00e1s? Ciklikus lelt\u00e1roz\u00e1ssal rendezze az elt\u00e9r\u00e9seket, \u00e9s a jav\u00edtott k\u00e9szletadatokkal tervezze a termel\u00e9st.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","width":1672,"height":941,"caption":"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ciklikus-leltarozas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Ciklikus lelt\u00e1roz\u00e1s a gy\u00e1rt\u00e1sban: a k\u00e9szletelt\u00e9r\u00e9sek rendez\u00e9se A k\u00e9szletnyilv\u00e1ntart\u00e1s szerint az alkatr\u00e9szek rendelkez\u00e9sre \u00e1llnak. A g\u00e9pkezel\u0151 kinyitja a t\u00e1rol\u00f3t, \u00e9s kider\u00fcl, hogy nincs benne el\u00e9g a gy\u00e1rt\u00e1si feladat befejez\u00e9s\u00e9hez. A rakt\u00e1r keresg\u00e9l, a beszerz\u00e9s s\u00fcrg\u0151sen pr\u00f3b\u00e1lja p\u00f3tolni a hi\u00e1nyt, a gy\u00e1rt\u00e1stervez\u0151 pedig \u00fajra \u00f6ssze\u00e1ll\u00edtja&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=110589"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110589\/revisions"}],"predecessor-version":[{"id":110652,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110589\/revisions\/110652"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/110607"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=110589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=110589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=110589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}