{"id":110497,"date":"2026-10-26T01:45:18","date_gmt":"2026-10-26T01:45:18","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110497"},"modified":"2026-10-26T01:46:19","modified_gmt":"2026-10-26T01:46:19","slug":"spagetti-diagram","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/","title":{"rendered":"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Els\u00e9t\u00e1lni az ellen\u0151rz\u0151asztalhoz nem t\u0171nik nagy \u00fcgynek. Ahogy elhozni m\u00e9g egy t\u00e1rol\u00f3ed\u00e9nyt vagy visszamenni egy szersz\u00e1m\u00e9rt sem. Ha azonban egy teljes gy\u00e1rt\u00e1si feladat sor\u00e1n v\u00e9gigk\u00f6veti ezeket az utakat, kider\u00fclhet, hogy a munka \u00fajra meg \u00fajra a munka\u00e1llom\u00e1son k\u00edv\u00fcl folytat\u00f3dik, olyan okokb\u00f3l, amelyeket eddig senki sem k\u00e9rd\u0151jelezett meg.<\/p>\n\n\n<p>A spagetti diagram ezeket a fizikai mozg\u00e1sokat teszi l\u00e1that\u00f3v\u00e1. Az alaprajzra felrajzolt vonalak megmutatj\u00e1k, merre halad t\u00e9nylegesen az ember vagy az anyag, bele\u00e9rtve az ism\u00e9telt utakat, a ker\u00fcl\u0151ket \u00e9s a visszat\u00e9r\u00e9seket is. Az igazi eredm\u00e9ny nem egy rendezettebb rajz, hanem annak felismer\u00e9se, hogy mely utakon \u00e9rdemes v\u00e1ltoztatni, \u00e9s a v\u00e1ltoztat\u00e1s k\u00f6nnyebb\u00e9 vagy gyorsabb\u00e1 teszi-e a munk\u00e1t.<\/p>\n\n\n<p>Ha m\u00e1r igazolta a fejleszt\u00e9s eredm\u00e9ny\u00e9t, a SkyPlanner APS seg\u00edt a gy\u00e1rt\u00e1sban is hasznos\u00edtani annak hat\u00e1s\u00e1t. A friss\u00edtett m\u0171veleti id\u0151knek \u00e9s a j\u00f3v\u00e1hagyott munka\u00e1llom\u00e1s-hozz\u00e1rendel\u00e9seknek ugyanabban az \u00fctemtervben van a hely\u00fck, mint az ezeket az er\u0151forr\u00e1sokat haszn\u00e1l\u00f3 t\u00f6bbi rendel\u00e9snek, nem pedig egy k\u00fcl\u00f6n fejleszt\u00e9si jelent\u00e9sben.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi az a spagetti diagram?<\/h2>\n\n\n<p>A spagetti diagram egy szem\u00e9ly, anyag vagy t\u00e1rgy munkater\u00fcleten bel\u00fcl megtett fizikai \u00fatj\u00e1t r\u00f6gz\u00edti. Spagetti\u00e1br\u00e1nak vagy spagettit\u00e9rk\u00e9pnek is nevezik. Az elrendez\u00e9si rajzon a vonalak a t\u00e9nyleges \u00fatvonalat k\u00f6vetik, a mozg\u00e1sok sorrendj\u00e9t pedig nyilak vagy sorsz\u00e1mok jel\u00f6lik. Nev\u00e9t az ism\u00e9tl\u0151d\u0151 \u00e9s egym\u00e1st \u00e1tfed\u0151 \u00fatvonalakr\u00f3l kapta.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1sban p\u00e9ld\u00e1ul annak vizsg\u00e1lat\u00e1ra haszn\u00e1lhat\u00f3, hogy a g\u00e9pkezel\u0151 mi\u00e9rt hagyja el \u00fajra meg \u00fajra a g\u00e9pet, egy alkatr\u00e9sz mi\u00e9rt keresztezi t\u00f6bbsz\u00f6r ugyanazt a k\u00f6zleked\u0151utat, vagy az anyagmozgat\u00f3 mi\u00e9rt t\u00e9r vissza folyton ugyanarra a t\u00e1rol\u00f3helyre.<\/p>\n\n\n<p>A vizsg\u00e1lt k\u00e9rd\u00e9shez v\u00e1lasszon eszk\u00f6zt. A folyamat\u00e1bra a tev\u00e9kenys\u00e9gek \u00e9s d\u00f6nt\u00e9sek sorrendj\u00e9t mutatja be. Az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/\">\u00e9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s<\/a> t\u00e1gabb \u00f6sszef\u00fcgg\u00e9sben vizsg\u00e1lja az anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1st, a k\u00e9szleteket \u00e9s a v\u00e1rakoz\u00e1st is bele\u00e9rtve. A spagetti diagram a fizikailag megtett utat vizsg\u00e1lja. Funkcion\u00e1lis elrendez\u00e9s\u0171 m\u0171helyben \u00e9s gy\u00e1rt\u00f3cell\u00e1n bel\u00fcl egyar\u00e1nt haszn\u00e1lhat\u00f3.<\/p>\n\n\n<p>A felrajzolt \u00fatvonal r\u00e1mutathat arra, hol \u00e9rdemes a k\u00e9s\u00e9sek ok\u00e1t keresni, de a vonalak nem m\u00e9rik az eltelt id\u0151t, \u00e9s nem bizony\u00edtj\u00e1k, hol van a gy\u00e1rt\u00e1s sz\u0171k keresztmetszete. Ezeket a megfigyel\u00e9seket k\u00fcl\u00f6n r\u00f6gz\u00edtse a diagram mellett.<\/p>\n\n\n<h2 class=\"wp-block-heading\">El\u0151bb v\u00e1lassza ki a megfigyelend\u0151 utat, csak ut\u00e1na rajzoljon<\/h2>\n\n\n<p>Olyan konkr\u00e9t probl\u00e9m\u00e1b\u00f3l induljon ki, amely j\u00f3l megfigyelhet\u0151: p\u00e9ld\u00e1ul az ellen\u0151rz\u00e9s miatt ism\u00e9tl\u0151d\u0151 utakb\u00f3l egy adott megmunk\u00e1l\u00e1si m\u0171velet sor\u00e1n, ne pedig abb\u00f3l, hogy \u201et\u00fal sok a mozg\u00e1s a gy\u00e1rban\u201d.<\/p>\n\n\n<p>Ha a j\u00e1rk\u00e1l\u00e1st, a keresg\u00e9l\u00e9st vagy a munka megszak\u00edt\u00e1sait vizsg\u00e1lja, egy szem\u00e9lyt k\u00f6vessen. Ha azt szeretn\u00e9 meg\u00e9rteni, hogyan jut el az anyag egyik helyr\u0151l a m\u00e1sikra, az anyagot k\u00f6vesse. Ez k\u00e9t k\u00fcl\u00f6nb\u00f6z\u0151 n\u00e9z\u0151pont: az alkatr\u00e9sz a g\u00e9p mellett maradhat, mik\u00f6zben a g\u00e9pkezel\u0151 elmegy onnan, az anyagmozgat\u00f3 pedig egyetlen \u00fat sor\u00e1n t\u00f6bb alkatr\u00e9szt is sz\u00e1ll\u00edthat.<\/p>\n\n\n<p>Hat\u00e1rozzon meg egy\u00e9rtelm\u0171 kezd\u0151- \u00e9s v\u00e9gpontot. G\u00e9pkezel\u0151n\u00e9l ez tarthat az els\u0151 nyersdarab elhozatal\u00e1t\u00f3l a k\u00e9sz sorozat kijel\u00f6lt helyre rak\u00e1s\u00e1ig. Anyagn\u00e1l az el\u0151k\u00e9sz\u00edt\u00e9si ter\u00fclet elhagy\u00e1s\u00e1t\u00f3l a k\u00f6vetkez\u0151 m\u0171velethez val\u00f3 meg\u00e9rkez\u00e9sig. R\u00f6gz\u00edtse a term\u00e9kcsal\u00e1dot, a sorozatnagys\u00e1got, a m\u0171szakot \u00e9s a l\u00e9nyeges munkak\u00f6r\u00fclm\u00e9nyeket, hogy az \u00fatvonal a k\u00f6r\u00fclm\u00e9nyeivel egy\u00fctt legyen \u00e9rtelmezhet\u0151.<\/p>\n\n\n<p>Egy hosszan v\u00e1rakoz\u00f3 alkatr\u00e9sz mellett nem kell eg\u00e9sz nap ott \u00e1llnia a megfigyel\u0151nek. R\u00f6gz\u00edtse az \u00e9rkez\u00e9sek \u00e9s t\u00e1voz\u00e1sok id\u0151pontj\u00e1t, figyelje meg az \u00e1tsz\u00e1ll\u00edt\u00e1sokat, a v\u00e1rakoz\u00e1si id\u0151szakokat pedig k\u00fcl\u00f6n tartsa nyilv\u00e1n. Ha egy k\u00e9s\u0151bbi \u00e1tsz\u00e1ll\u00edt\u00e1st m\u00e1r a k\u00f6vetkez\u0151, \u00f6sszehasonl\u00edthat\u00f3 sorozaton figyel meg, jelezze ezt a cser\u00e9t. Ne mutasson be t\u00f6bb k\u00fcl\u00f6nb\u00f6z\u0151 utat \u00fagy, mintha egyetlen alkatr\u00e9szt k\u00f6vetett volna folyamatosan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hogyan k\u00e9sz\u00edtsen spagetti diagramot az \u00fczemben?<\/h2>\n\n\n<p>Sz\u00fcks\u00e9ge lesz egy haszn\u00e1lhat\u00f3 alaprajzv\u00e1zlatra, valamilyen eszk\u00f6zre a mozg\u00e1sok r\u00f6gz\u00edt\u00e9s\u00e9hez, \u00e9s \u00f3r\u00e1ra azokhoz a megfigyel\u00e9sekhez, amelyeknek az idej\u00e9t is m\u00e9rni szeretn\u00e9. Kezdetnek a pap\u00edr praktikus megold\u00e1s; a digit\u00e1lis rajz is hasznos, ha nem vonja el a figyelm\u00e9t a munk\u00e1r\u00f3l.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. K\u00e9sz\u00edtse el\u0151 az alaprajzot \u00e9s a megfigyel\u00e9st<\/h3>\n\n\n<p>Jel\u00f6lje a munka\u00e1llom\u00e1sokat, t\u00e1rol\u00f3helyeket, ellen\u0151rz\u00e9si ter\u00fcleteket, ajt\u00f3kat, k\u00f6zleked\u0151utakat \u00e9s az \u00fatvonalat meghat\u00e1roz\u00f3 akad\u00e1lyokat. Ellen\u0151rizze, hogy a v\u00e1zlat a jelenlegi elrendez\u00e9st mutatja-e. Ismert m\u00e9retar\u00e1ny vagy lem\u00e9rt \u00fatvonalhosszak alapj\u00e1n k\u00e9s\u0151bb t\u00e1vols\u00e1got is sz\u00e1molhat. Egy hozz\u00e1vet\u0151leges, m\u00e9r\u00e9sek n\u00e9lk\u00fcli v\u00e1zlat seg\u00edti a megbesz\u00e9l\u00e9st, de pontos t\u00e1vols\u00e1gadatokat nem alapoz meg.<\/p>\n\n\n<p>Ismertesse a c\u00e9lt az \u00e9rintettekkel: a munkav\u00e9gz\u00e9s k\u00f6r\u00fclm\u00e9nyeit szeretn\u00e9k jav\u00edtani, nem az embereket rangsorolni aszerint, mennyit gyalogolnak. Egyeztesse a csapattal a megfigyel\u00e9s m\u00f3dj\u00e1t, \u00e9s tartsa be a telephely bel\u00e9p\u00e9sre \u00e9s adatr\u00f6gz\u00edt\u00e9sre vonatkoz\u00f3 el\u0151\u00edr\u00e1sait. Maradjon t\u00e1vol a m\u0171k\u00f6d\u0151 berendez\u00e9sekt\u0151l \u00e9s a j\u00e1rm\u0171vek \u00fatvonal\u00e1t\u00f3l.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \u00dagy rajzolja fel a mozg\u00e1sokat, ahogyan t\u00e9nylegesen t\u00f6rt\u00e9nnek<\/h3>\n\n\n<p>Jel\u00f6lje a kezd\u0151pontot, r\u00f6gz\u00edtse az id\u0151pontot, majd k\u00f6vesse a kiv\u00e1lasztott szem\u00e9lyt vagy anyagot. Minden mozg\u00e1st a t\u00e9nylegesen haszn\u00e1lt \u00fat ment\u00e9n rajzoljon be, a berendez\u00e9seket megker\u00fclve, a val\u00f3s \u00e1tj\u00e1r\u00f3kon kereszt\u00fcl. Ne helyettes\u00edtsen egy k\u00e9nyelmetlen ker\u00fcl\u0151t olyan egyenes vonallal, amelyen \u00f6n szerint haladni lehetne.<\/p>\n\n\n<p>Nyilakkal \u00e9s sorsz\u00e1mokkal tegye k\u00f6vethet\u0151v\u00e9 a mozg\u00e1sok sorrendj\u00e9t. Az oda- \u00e9s visszautat k\u00fcl\u00f6n sz\u00e1molja, az ugyanazon a k\u00f6zleked\u0151\u00faton ism\u00e9tl\u0151d\u0151 utakat is bele\u00e9rtve. T\u00f6bb szem\u00e9ly vagy anyag megfigyel\u00e9sekor haszn\u00e1ljon k\u00fcl\u00f6n lapokat vagy j\u00f3l elk\u00fcl\u00f6n\u00edthet\u0151 vonalakat, hogy ne keletkezzen \u00e1ttekinthetetlen vonalhalmaz.<\/p>\n\n\n<p>Megfigyel\u00e9s k\u00f6zben ne adjon tan\u00e1csot a dolgoz\u00f3nak egy jobb \u00fatvonalhoz. A k\u00e9rd\u00e9seket jegyezze fel a k\u00e9s\u0151bbi megbesz\u00e9l\u00e9sre. K\u00fcl\u00f6nben el\u0151fordulhat, hogy a jelenlegi m\u00f3dszer helyett m\u00e1r a saj\u00e1t javaslat\u00e1t m\u00e9ri.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Jegyezze fel minden \u00fat c\u00e9lj\u00e1t<\/h3>\n\n\n<p>A s\u0171r\u0171 vonalhalmaz megmutatja, hol ism\u00e9tl\u0151dik a mozg\u00e1s. A jegyzetekb\u0151l der\u00fcl ki, hogy mi\u00e9rt. Egy hi\u00e1nyz\u00f3 szersz\u00e1mot hozott el a dolgoz\u00f3, el\u0151\u00edrt m\u00e9r\u00e9st v\u00e9gzett, \u00fcres t\u00e1rol\u00f3ed\u00e9nyt keresett, vagy inform\u00e1ci\u00f3t ellen\u0151rz\u00f6tt?<\/p>\n\n\n<p>A v\u00e1zlat mellett vezessen r\u00f6vid feljegyz\u00e9st a mozg\u00e1sokr\u00f3l:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Adat<\/th><th>Mit r\u00f6gz\u00edtsen?<\/th><\/tr><\/thead><tbody><tr><td>Honnan hov\u00e1<\/td><td>T\u00e9nyleges helyek \u00e9s ir\u00e1ny, a rajz sorsz\u00e1mozott mozg\u00e1saihoz kapcsolva<\/td><\/tr><tr><td>Gyakoris\u00e1g<\/td><td>Minden \u00e1thalad\u00e1s a megfigyelt gy\u00e1rt\u00e1si feladat vagy ciklus sor\u00e1n<\/td><\/tr><tr><td>T\u00e1vols\u00e1g<\/td><td>A t\u00e9nylegesen megtett \u00fat hossza \u00e9s a m\u00e9r\u00e9s m\u00f3dja<\/td><\/tr><tr><td>C\u00e9l<\/td><td>Mit \u00e9rt el az \u00fattal, \u00e9s mi\u00e9rt volt r\u00e1 sz\u00fcks\u00e9g<\/td><\/tr><tr><td>Id\u0151 \u00e9s megszak\u00edt\u00e1s<\/td><td>A megfigyelt halad\u00e1si vagy v\u00e1rakoz\u00e1si id\u0151, valamint az, hogy le\u00e1llt-e k\u00f6zben a termel\u00e9s<\/td><\/tr><tr><td>K\u00f6r\u00fclm\u00e9nyek<\/td><td>Term\u00e9k, mennyis\u00e9g, m\u0171szak \u00e9s az utat befoly\u00e1sol\u00f3 rendk\u00edv\u00fcli esem\u00e9nyek<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ennyi m\u00e1r elegend\u0151 ahhoz, hogy megk\u00fcl\u00f6nb\u00f6ztessen egy hossz\u00fa, de sz\u00fcks\u00e9ges sz\u00e1ll\u00edt\u00e1st egy r\u00f6vid \u00fatt\u00f3l, amelyet valamilyen hi\u00e1ny miatt kell \u00fajra megtenni. Miel\u0151tt eld\u00f6nten\u00e9, mi okozta a nem egy\u00e9rtelm\u0171 mozg\u00e1sokat, besz\u00e9lje \u00e1t \u0151ket azzal, aki a munk\u00e1t v\u00e9gezte.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Figyelje meg a l\u00e9nyeges ism\u00e9tl\u0151d\u00e9seket<\/h3>\n\n\n<p>Egyetlen megfigyel\u00e9s megmutathatja az \u00fatvonalat, de azt nem, hogy mennyire k\u00f6vetkezetesen ism\u00e9tl\u0151dik. Figyeljen meg tov\u00e1bbi teljes ism\u00e9tl\u0151d\u00e9seket, \u00e9s r\u00f6gz\u00edtse az elt\u00e9r\u00e9seket is. Az els\u0151 darab ellen\u0151rz\u00e9s\u00e9t, az ut\u00e1np\u00f3tl\u00e1s\u00e9rt megtett utat \u00e9s a visszat\u00e9r\u0151 szersz\u00e1mkeres\u00e9st nem szabad azonos gyakoris\u00e1g\u00fa tev\u00e9kenys\u00e9gk\u00e9nt kezelni.<\/p>\n\n\n<p>Nincs olyan \u00e1ltal\u00e1nosan \u00e9rv\u00e9nyes ciklussz\u00e1m, amely minden vizsg\u00e1latot megb\u00edzhat\u00f3v\u00e1 tesz. T\u00e9rjen ki azokra az elt\u00e9r\u00e9sekre, amelyek befoly\u00e1solhatj\u00e1k a d\u00f6nt\u00e9s\u00e9t: m\u00e1s sorozatnagys\u00e1gra, egy m\u00e1sik term\u00e9k \u00fatvonal\u00e1ra vagy egy elt\u00e9r\u0151 anyagell\u00e1t\u00e1ssal dolgoz\u00f3 m\u0171szakra. Ha egy meghib\u00e1sod\u00e1s hat\u00e1rozza meg a megfigyel\u00e9s nagy r\u00e9sz\u00e9t, ezt jelezze, ne az \u00edgy kapott utat tekintse tipikusnak.<\/p>\n\n\n<p>A t\u00e1vols\u00e1g kisz\u00e1m\u00edt\u00e1s\u00e1hoz szorozza meg minden \u00fatszakasz m\u00e9rt hossz\u00e1t a megfigyelt \u00e1thalad\u00e1sok sz\u00e1m\u00e1val, majd adja \u00f6ssze az eredm\u00e9nyeket. Az \u00f6sszes\u00edtett \u00e9rt\u00e9k mellett a gyakoris\u00e1g \u00e9s a c\u00e9l is maradjon l\u00e1that\u00f3. Ezek gyakran t\u00f6bbet seg\u00edtenek a megfelel\u0151 v\u00e1ltoztat\u00e1s kiv\u00e1laszt\u00e1s\u00e1ban, mint \u00f6nmag\u00e1ban a teljes t\u00e1vols\u00e1g.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ne csak a leghosszabb vonalat n\u00e9zze, a mozg\u00e1sok ok\u00e1t is vizsg\u00e1lja<\/h2>\n\n\n<p>Kezdje az ism\u00e9tl\u0151d\u0151 utakkal, \u00e9s keresse meg, mivel lehetne megsz\u00fcntetni az okukat. A szersz\u00e1mkeres\u00e9sre az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/5s-modszer\/\">5S<\/a> \u00e9s egy k\u00f6z\u00f6sen kijel\u00f6lt, haszn\u00e1lati helyhez k\u00f6zeli t\u00e1rol\u00f3hely lehet a megold\u00e1s. Ha hi\u00e1nyz\u00f3 csomagol\u00f3anyag\u00e9rt kell visszamenni, ut\u00e1np\u00f3tl\u00e1si szab\u00e1lyra lehet sz\u00fcks\u00e9g. Egyikhez sem kell felt\u00e9tlen\u00fcl g\u00e9pet \u00e1thelyezni.<\/p>\n\n\n<p>A m\u0171veletek k\u00f6z\u00f6tti hossz\u00fa anyagmozgat\u00e1s m\u00e1s k\u00e9rd\u00e9seket vet fel: elv\u00e9gezhet\u0151-e a m\u0171velet j\u00f3v\u00e1hagyott m\u00f3don egy k\u00f6zelebbi munka\u00e1llom\u00e1son, v\u00e1ltoztathat\u00f3-e az el\u0151k\u00e9sz\u00edt\u00e9s helye, vagy a sz\u00e1ll\u00edt\u00e1s m\u00e1r most is t\u00f6bb gy\u00e1rt\u00e1si feladatot szolg\u00e1l ki hat\u00e9konyan? Nem biztos, hogy meg\u00e9ri ler\u00f6vid\u00edteni a fizikai utat, ha ett\u0151l egy m\u00e1sik term\u00e9kcsal\u00e1d gy\u00e1rt\u00e1sa nehezebb\u00e9 v\u00e1lik.<\/p>\n\n\n<p>Az egym\u00e1st keresztez\u0151 vonalakat is vizsg\u00e1land\u00f3 k\u00e9rd\u00e9sk\u00e9nt kezelje. Azt mutatj\u00e1k, hogy az \u00fatvonalak k\u00f6z\u00f6s ter\u00fcletet haszn\u00e1lnak, nem felt\u00e9tlen\u00fcl azt, hogy az emberek egyszerre \u00e9rkeznek oda. Figyelje meg, mikor akad\u00e1lyozz\u00e1k t\u00e9nylegesen egym\u00e1st, \u00e9s a ter\u00fclet felel\u0151seivel egy\u00fctt tekintse \u00e1t az elrendez\u00e9st. A r\u00f6videbb, de a hozz\u00e1f\u00e9r\u00e9st akad\u00e1lyoz\u00f3 \u00fatvonal nem jelent javul\u00e1st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u00e9lda: \u00fajra meg \u00fajra az ellen\u0151rz\u0151asztalhoz<\/h3>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy g\u00e9pkezel\u0151t, aki egy sorozat tart\u00f3konzolt munk\u00e1l meg. A diagram ism\u00e9tl\u0151d\u0151 utakat mutat a g\u00e9pt\u0151l a k\u00f6z\u00f6s ellen\u0151rz\u0151asztalig, onnan vissza a g\u00e9phez, majd \u00e1t a k\u00f6zleked\u0151\u00fat t\u00faloldal\u00e1ra, hogy visszategye a m\u00e9r\u0151eszk\u00f6zt. Az asztalt egy m\u00e1sik term\u00e9kcsal\u00e1dhoz is haszn\u00e1lj\u00e1k.<\/p>\n\n\n<p>K\u00e9zenfekv\u0151 javaslat, hogy az ellen\u0151rz\u00e9s ker\u00fclj\u00f6n a g\u00e9p mell\u00e9. El\u0151sz\u00f6r azonban k\u00fcl\u00f6n\u00edtse el, mi\u00e9rt van sz\u00fcks\u00e9g az egyes utakra. Ha a munka\u00e1llom\u00e1son rendelkez\u00e9sre \u00e1ll egy gy\u00e1rt\u00e1sk\u00f6zi ellen\u0151rz\u00e9sre j\u00f3v\u00e1hagyott m\u00e9r\u0151eszk\u00f6z, el\u0151fordulhat, hogy nem kell t\u00f6bb\u00e9 ism\u00e9telten elmenni \u00e9rte \u00e9s visszavinni, mik\u00f6zben a v\u00e9gellen\u0151rz\u00e9s tov\u00e1bbra is a k\u00f6z\u00f6s ellen\u0151rz\u0151asztaln\u00e1l marad. Ha a m\u00e9r\u00e9shez csak az ellen\u0151rz\u0151asztaln\u00e1l rendelkez\u00e9sre \u00e1ll\u00f3 berendez\u00e9sre vagy k\u00f6r\u00fclm\u00e9nyekre van sz\u00fcks\u00e9g, az \u00e1thelyez\u00e9s m\u00e1r m\u00e1s d\u00f6nt\u00e9st ig\u00e9nyel.<\/p>\n\n\n<p>Egyeztesse a m\u00f3dszert a g\u00e9pkezel\u0151vel \u00e9s a min\u0151s\u00e9g\u00fcgyi csapattal, majd pr\u00f3b\u00e1lj\u00e1k ki a j\u00f3v\u00e1hagyott elrendez\u00e9st. Ellen\u0151rizze, hogy tov\u00e1bbra is megfelel\u0151en v\u00e9gzik-e az ellen\u0151rz\u00e9st, hogyan v\u00e1ltozik a g\u00e9pkezel\u0151 id\u0151r\u00e1ford\u00edt\u00e1sa, \u00e9s hogy a m\u00e1sik term\u00e9kcsal\u00e1d gy\u00e1rt\u00e1s\u00e1hoz sz\u00fcks\u00e9ges eszk\u00f6z\u00f6k \u00e9s felt\u00e9telek tov\u00e1bbra is hozz\u00e1f\u00e9rhet\u0151k-e.<\/p>\n\n\n<p>Nem puszt\u00e1n az a k\u00e9rd\u00e9s, hogy r\u00f6videbb lett-e a berajzolt \u00fatvonal. Hanem az, hogy ugyanazt az el\u0151\u00edrt munk\u00e1t kevesebb elker\u00fclhet\u0151 mozg\u00e1ssal v\u00e9gzik-e el, an\u00e9lk\u00fcl, hogy a probl\u00e9m\u00e1t egy m\u00e1sik gy\u00e1rt\u00e1si feladatra h\u00e1r\u00edtan\u00e1k.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ellen\u0151rizze az eredm\u00e9nyt, miel\u0151tt megtakar\u00edt\u00e1sr\u00f3l besz\u00e9l<\/h2>\n\n\n<p>A javasolt \u00fatvonalat kezelje k\u00fcl\u00f6n a megfigyelt jelenlegi \u00e1llapott\u00f3l. A j\u00f3v\u00e1hagyott v\u00e1ltoztat\u00e1s bevezet\u00e9se ut\u00e1n ism\u00e9telje meg a megfigyel\u00e9st \u00f6sszehasonl\u00edthat\u00f3 munk\u00e1n, azonos kezd\u0151- \u00e9s v\u00e9gpontokkal. R\u00f6gz\u00edtse, ha v\u00e1ltozott a sorozatnagys\u00e1g, a term\u00e9k vagy valamely k\u00f6r\u00fclm\u00e9ny, hogy az \u00f6sszehasonl\u00edt\u00e1s \u00e9rtelmezhet\u0151 maradjon.<\/p>\n\n\n<p>Hasonl\u00edtsa \u00f6ssze a megtett t\u00e1vols\u00e1got \u00e9s az utak gyakoris\u00e1g\u00e1t, majd vizsg\u00e1lja meg az eredeti probl\u00e9ma szempontj\u00e1b\u00f3l fontos mutat\u00f3kat: a g\u00e9pkezel\u0151 id\u0151r\u00e1ford\u00edt\u00e1s\u00e1t, a g\u00e9pi munka megszak\u00edt\u00e1sait, a sorban \u00e1ll\u00e1st vagy az elk\u00e9sz\u00fcl\u00e9shez sz\u00fcks\u00e9ges id\u0151t. A r\u00f6videbb gyalogl\u00e1si t\u00e1vols\u00e1g \u00f6nmag\u00e1ban is hasznos eredm\u00e9ny. Ez azonban nem jelenti automatikusan azt, hogy a m\u0171velet id\u0151tartama is ugyanennyivel cs\u00f6kken.<\/p>\n\n\n<p>Ha a g\u00e9pkezel\u0151 kor\u00e1bban az automatikus megmunk\u00e1l\u00e1si ciklus k\u00f6zben gyalogolt, a v\u00e1ltoztat\u00e1s r\u00e9v\u00e9n t\u00f6bb figyelmet ford\u00edthat az el\u0151k\u00e9sz\u00edt\u00e9sre vagy egy m\u00e1sik feladatra, an\u00e9lk\u00fcl, hogy a g\u00e9pi ciklus r\u00f6vid\u00fclne. Ha viszont a g\u00e9p kor\u00e1bban a kezel\u0151 visszat\u00e9r\u00e9s\u00e9re v\u00e1rt, a g\u00e9p foglalts\u00e1gi idej\u00e9re gyakorolt hat\u00e1s elt\u00e9r\u0151 lehet. M\u00e9r\u00e9ssel \u00e1llap\u00edtsa meg, melyik helyzet \u00e1ll fenn.<\/p>\n\n\n<p>Hasonl\u00f3k\u00e9ppen, az egyik munka\u00e1llom\u00e1son el\u00e9rt id\u0151megtakar\u00edt\u00e1s nem garant\u00e1lja a kor\u00e1bbi kisz\u00e1ll\u00edt\u00e1st, ha a rendel\u00e9s egy k\u00e9s\u0151bbi, m\u00e1s rendel\u00e9sekkel k\u00f6z\u00f6s m\u0171veletn\u00e9l tov\u00e1bbra is v\u00e1rakozik. A diagram seg\u00edts\u00e9g\u00e9vel jav\u00edtsa az \u00fatvonalat, de miel\u0151tt r\u00f6videbb \u00e1tfut\u00e1si id\u0151t vagy p\u00e9nz\u00fcgyi eredm\u00e9nyt \u00edg\u00e9rne, vizsg\u00e1lja meg a t\u00e1gabb folyamatot is.<\/p>\n\n\n<p>Jel\u00f6lje ki az elfogadott m\u00f3dszer felel\u0151s\u00e9t, friss\u00edtse a vonatkoz\u00f3 utas\u00edt\u00e1sokat, \u00e9s \u00e1llapodjanak meg a k\u00f6vetkez\u0151 ellen\u0151rz\u00e9s id\u0151pontj\u00e1ban. En\u00e9lk\u00fcl fokozatosan vissza\u00e1llhat a r\u00e9gi gyakorlat, mik\u00f6zben a fejleszt\u00e9si jelent\u00e9s m\u00e9g mindig a tervezett eredm\u00e9nyt mutatja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vezesse \u00e1t az igazolt v\u00e1ltoz\u00e1st a gy\u00e1rt\u00e1si \u00fctemtervbe<\/h2>\n\n\n<p>A fejleszt\u00e9s \u00e9rt\u00e9ke tov\u00e1bb n\u0151, ha a k\u00f6vetkez\u0151 rendel\u00e9seket m\u00e1r a t\u00e9nylegesen megv\u00e1ltozott munkav\u00e9gz\u00e9s alapj\u00e1n tervezik. Ha egy m\u0171velet val\u00f3ban kevesebb id\u0151t vesz ig\u00e9nybe, a r\u00e9gi id\u0151tartam megtart\u00e1sa kihaszn\u00e1lhat\u00f3 kapacit\u00e1st rejt el. Ha azonban a pr\u00f3ba csak a gyalogl\u00e1st cs\u00f6kkentette, mik\u00f6zben a g\u00e9pi ciklus v\u00e1ltozatlan maradt, a g\u00e9pre \u00fctemezett m\u0171velet ler\u00f6vid\u00edt\u00e9se nem l\u00e9tez\u0151 kapacit\u00e1st teremtene a tervben.<\/p>\n\n\n<p>A SkyPlanner rendszerben val\u00f3s id\u0151tartamokkal, a v\u00e9grehajt\u00e1sra alkalmas munka\u00e1llom\u00e1sokkal \u00e9s f\u00fcgg\u0151s\u00e9gekkel hat\u00e1rozhatja meg a folyamatl\u00e9p\u00e9seket. Az Arcturus, a rendszer \u00fctemez\u00e9st v\u00e9gz\u0151 mesters\u00e9ges intelligenci\u00e1ja a be\u00e1ll\u00edtott kapacit\u00e1s, m\u0171szakok \u00e9s priorit\u00e1sok alapj\u00e1n helyezi el a munk\u00e1t a <a href=\"https:\/\/skyplanner.ai\/hu\/funkciok\/\">k\u00f6z\u00f6s gy\u00e1rt\u00e1si \u00fctemtervben<\/a>. A tervez\u00e9si d\u00f6nt\u00e9seket \u00d6n ir\u00e1ny\u00edtja, az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat pedig az Arcturus v\u00e9gzi.<\/p>\n\n\n<p>A tart\u00f3konzol gy\u00e1rt\u00e1s\u00e1nak p\u00e9ld\u00e1j\u00e1ban az igazolt hat\u00e1st vezesse \u00e1t a tervez\u00e9sbe, ne mag\u00e1t a r\u00f6videbb vonalat. Ez lehet p\u00e9ld\u00e1ul egy m\u00f3dos\u00edtott m\u0171veleti id\u0151. Ha m\u00e1s gy\u00e1rt\u00e1si m\u0171veletsort vagy munka\u00e1llom\u00e1s-hozz\u00e1rendel\u00e9st hagytak j\u00f3v\u00e1, azt is sz\u00fcks\u00e9ges lehet friss\u00edteni. Ellen\u0151rizze \u00e9s hagyja j\u00f3v\u00e1 az \u00e9rintett tervez\u00e9si adatokat, majd sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet, hogy l\u00e1ssa, hogyan illeszkedik a munka a t\u00f6bbi rendel\u00e9shez.<\/p>\n\n\n<p>\u00cdgy kevesebbet kell k\u00e9zzel m\u00f3dos\u00edtani az egyes g\u00e9pek feladatsorain, \u00e9s tiszt\u00e1bban l\u00e1that\u00f3, hogyan hat a fejleszt\u00e9s a sz\u00e1ll\u00edt\u00e1sra. A megmunk\u00e1l\u00e1sn\u00e1l felszabadul\u00f3 id\u0151s\u00e1v csak akkor hasznos, ha a k\u00f6vetkez\u0151 m\u0171velet \u00e9s annak er\u0151forr\u00e1sai is k\u00e9pesek kezelni az \u00edgy alakul\u00f3 anyag\u00e1raml\u00e1st. Azt pedig tov\u00e1bbra is a munka\u00e1llom\u00e1sok m\u0171szakbeoszt\u00e1sa hat\u00e1rozza meg, hogy mikor \u00e1ll rendelkez\u00e9sre kapacit\u00e1s.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00f6z\u00f6s \u00e1ttekint\u00e9ssel k\u00f6nnyebb kezelni a gy\u00e1rt\u00e1si v\u00e1ltoz\u00e1sokat<\/h3>\n\n\n<p>A kever\u00e9stechnol\u00f3gi\u00e1val \u00e9s cs\u00facstechnol\u00f3giai b\u00e9rgy\u00e1rt\u00e1ssal foglalkoz\u00f3 Mamec kor\u00e1bban a pap\u00edron r\u00f6gz\u00edtett sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k alapj\u00e1n rangsorolta az egym\u00e1st\u00f3l f\u00fcgg\u0151 munkalapokat, an\u00e9lk\u00fcl, hogy megb\u00edzhat\u00f3 \u00f6sszk\u00e9pe lett volna a termel\u00e9sr\u0151l. A SkyPlanner bevezet\u00e9se k\u00f6z\u00f6s \u00fctemez\u00e9st \u00e9s val\u00f3s idej\u0171 r\u00e1l\u00e1t\u00e1st adott a munk\u00e1ra.<\/p>\n\n\n<p>\u00dcgyf\u00e9lbesz\u00e1mol\u00f3j\u00e1ban a Mamec arr\u00f3l sz\u00e1mol be, hogy \u00e9rezhet\u0151en cs\u00f6kkent a tervez\u00e9si munka terhe, \u00e9s k\u00f6nnyebb\u00e9 v\u00e1lt a gy\u00e1rt\u00e1si m\u0171veletsor v\u00e1ltoz\u00e1sainak kezel\u00e9se az \u00fcgyf\u00e9lig\u00e9nyekre \u00e9p\u00fcl\u0151 term\u00e9kfejleszt\u00e9s sor\u00e1n. A csapat kisebb r\u00e1ford\u00edt\u00e1ssal tudja felm\u00e9rni a hat\u00e1sokat, \u00e9s megb\u00edzhat\u00f3bban tudja megmondani az \u00fcgyfeleknek, mit lehet v\u00e1llalni.<\/p>\n\n\n<p>Ez a tapasztalat j\u00f3l mutatja az \u00f6sszef\u00fcgg\u00e9seket kezel\u0151 terv \u00e9rt\u00e9k\u00e9t, amikor v\u00e1ltozik a gy\u00e1rt\u00e1s. A saj\u00e1t fejleszt\u00e9s alapja azonban tov\u00e1bbra is a munka megfigyel\u00e9se \u00e9s az eredm\u00e9nyek ellen\u0151rz\u00e9se. <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">A Mamec besz\u00e1mol\u00f3ja a SkyPlanner haszn\u00e1lat\u00e1r\u00f3l<\/a> bemutatja, hogyan kezelhet\u0151k a gyakorlatban az ebb\u0151l ad\u00f3d\u00f3 k\u00f6lcs\u00f6n\u00f6s f\u00fcgg\u0151s\u00e9gek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kezdje egy \u00fatvonallal \u00e9s egy kipr\u00f3b\u00e1l\u00e1sra \u00e9rdemes v\u00e1ltoztat\u00e1ssal<\/h2>\n\n\n<p>V\u00e1lasszon egy rendszeresen megtett utat, amelynek sz\u00fcks\u00e9gess\u00e9g\u00e9t a csapat m\u00e1r most is megk\u00e9rd\u0151jelezi. Rajzolja fel a t\u00e9nyleges mozg\u00e1st, t\u00e1rja fel az utak okait, \u00e9s pr\u00f3b\u00e1ljon ki egy v\u00e1ltoztat\u00e1st a munk\u00e1t v\u00e9gz\u0151 koll\u00e9g\u00e1kkal. Ezut\u00e1n a t\u00e9nyleges eredm\u00e9nyt hasonl\u00edtsa \u00f6ssze a kiindul\u00f3 \u00e1llapottal, ne csak a javasolt rajzot.<\/p>\n\n\n<p>Ha a fejleszt\u00e9s m\u00f3dos\u00edtja a m\u0171veleti id\u0151ket, a v\u00e9grehajt\u00e1sra alkalmas er\u0151forr\u00e1sokat vagy a gy\u00e1rt\u00e1si m\u0171veletsort, a SkyPlanner seg\u00edts\u00e9g\u00e9vel vezesse \u00e1t a friss\u00edtett adatokat a k\u00f6z\u00f6s gy\u00e1rt\u00e1si tervbe. \u00cdgy kevesebb id\u0151t t\u00f6lt a feladatsorok \u00fajb\u00f3li \u00f6ssze\u00e1ll\u00edt\u00e1s\u00e1val, \u00e9s t\u00f6bbet azzal, hogy a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st a rendel\u00e9sek teljes\u00edt\u00e9s\u00e9re ford\u00edtsa.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon egy j\u00f3v\u00e1hagyott id\u0151tartam- vagy m\u0171veletsor-v\u00e1ltoztat\u00e1st, valamint az azonos er\u0151forr\u00e1sokat haszn\u00e1l\u00f3 t\u00f6bbi rendel\u00e9st. Ez k\u00e9zzelfoghat\u00f3 kiindul\u00f3pont ahhoz, hogy l\u00e1ssa, hogyan hat a v\u00e1ltoztat\u00e1s a terv\u00e9re. Ha el\u0151bb az \u00fctemez\u00e9si k\u00f6rnyezetet szeretn\u00e9 megismerni, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se Els\u00e9t\u00e1lni az ellen\u0151rz\u0151asztalhoz nem t\u0171nik nagy \u00fcgynek. Ahogy elhozni m\u00e9g egy t\u00e1rol\u00f3ed\u00e9nyt vagy visszamenni egy szersz\u00e1m\u00e9rt sem. Ha azonban egy teljes gy\u00e1rt\u00e1si feladat sor\u00e1n v\u00e9gigk\u00f6veti ezeket az utakat, kider\u00fclhet, hogy a munka \u00fajra meg \u00fajra &#8230; <a title=\"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/\" aria-label=\"Read more about Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":110515,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-110497","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se<\/title>\n<meta name=\"description\" content=\"Sok az \u00fczemi j\u00e1rk\u00e1l\u00e1s? K\u00e9sz\u00edtsen spagetti diagramot, teszteljen jobb \u00fatvonalat, \u00e9s \u00e9p\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet az igazolt id\u0151megtakar\u00edt\u00e1sra.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se\" \/>\n<meta property=\"og:description\" content=\"Sok az \u00fczemi j\u00e1rk\u00e1l\u00e1s? K\u00e9sz\u00edtsen spagetti diagramot, teszteljen jobb \u00fatvonalat, \u00e9s \u00e9p\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet az igazolt id\u0151megtakar\u00edt\u00e1sra.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T01:45:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T01:46:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1824\" \/>\n\t<meta property=\"og:image:height\" content=\"1026\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se\",\"datePublished\":\"2026-10-26T01:45:18+00:00\",\"dateModified\":\"2026-10-26T01:46:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/\"},\"wordCount\":3534,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/spaghetti-diagram-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/\",\"name\":\"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/spaghetti-diagram-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T01:45:18+00:00\",\"dateModified\":\"2026-10-26T01:46:19+00:00\",\"description\":\"Sok az \u00fczemi j\u00e1rk\u00e1l\u00e1s? K\u00e9sz\u00edtsen spagetti diagramot, teszteljen jobb \u00fatvonalat, \u00e9s \u00e9p\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet az igazolt id\u0151megtakar\u00edt\u00e1sra.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/spaghetti-diagram-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/spaghetti-diagram-manufacturing-hero.png\",\"width\":1824,\"height\":1026,\"caption\":\"Repeated travel between a machining station, an inspection bench and a gauge rack in a spaghetti diagram.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/spagetti-diagram\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se","description":"Sok az \u00fczemi j\u00e1rk\u00e1l\u00e1s? K\u00e9sz\u00edtsen spagetti diagramot, teszteljen jobb \u00fatvonalat, \u00e9s \u00e9p\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet az igazolt id\u0151megtakar\u00edt\u00e1sra.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/","og_locale":"hu_HU","og_type":"article","og_title":"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se","og_description":"Sok az \u00fczemi j\u00e1rk\u00e1l\u00e1s? K\u00e9sz\u00edtsen spagetti diagramot, teszteljen jobb \u00fatvonalat, \u00e9s \u00e9p\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet az igazolt id\u0151megtakar\u00edt\u00e1sra.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T01:45:18+00:00","article_modified_time":"2026-10-26T01:46:19+00:00","og_image":[{"width":1824,"height":1026,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se","datePublished":"2026-10-26T01:45:18+00:00","dateModified":"2026-10-26T01:46:19+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/"},"wordCount":3534,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/","name":"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png","datePublished":"2026-10-26T01:45:18+00:00","dateModified":"2026-10-26T01:46:19+00:00","description":"Sok az \u00fczemi j\u00e1rk\u00e1l\u00e1s? K\u00e9sz\u00edtsen spagetti diagramot, teszteljen jobb \u00fatvonalat, \u00e9s \u00e9p\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet az igazolt id\u0151megtakar\u00edt\u00e1sra.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png","width":1824,"height":1026,"caption":"Repeated travel between a machining station, an inspection bench and a gauge rack in a spaghetti diagram."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/spagetti-diagram\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png",1824,1026,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero.png",1824,1026,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/spaghetti-diagram-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Spagetti diagram a gy\u00e1rt\u00e1sban: a t\u00e9nyleges \u00fat felt\u00e9rk\u00e9pez\u00e9se Els\u00e9t\u00e1lni az ellen\u0151rz\u0151asztalhoz nem t\u0171nik nagy \u00fcgynek. Ahogy elhozni m\u00e9g egy t\u00e1rol\u00f3ed\u00e9nyt vagy visszamenni egy szersz\u00e1m\u00e9rt sem. Ha azonban egy teljes gy\u00e1rt\u00e1si feladat sor\u00e1n v\u00e9gigk\u00f6veti ezeket az utakat, kider\u00fclhet, hogy a munka \u00fajra meg \u00fajra&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110497","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=110497"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110497\/revisions"}],"predecessor-version":[{"id":110560,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110497\/revisions\/110560"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/110515"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=110497"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=110497"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=110497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}