{"id":108843,"date":"2026-10-24T14:53:53","date_gmt":"2026-10-24T14:53:53","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108843"},"modified":"2026-10-24T14:54:58","modified_gmt":"2026-10-24T14:54:58","slug":"kereslet-elorejelzes","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/","title":{"rendered":"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">14<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>A gy\u00e1rt\u00e1sban a kereslet-el\u0151rejelz\u00e9s azt becs\u00fcli meg, hogy a vev\u0151knek milyen term\u00e9kekre, mekkora mennyis\u00e9gben \u00e9s mikor lesz sz\u00fcks\u00e9g\u00fck.<\/strong> A kor\u00e1bbi keresleti adatokat a v\u00e1rhat\u00f3 v\u00e1ltoz\u00e1sokr\u00f3l sz\u00f3l\u00f3 inform\u00e1ci\u00f3kkal \u00f6tv\u00f6zi, \u00edgy k\u00f6z\u00f6s kiindul\u00f3pontot ad a beszerz\u00e9si \u00e9s gy\u00e1rt\u00e1si d\u00f6nt\u00e9sekhez.<\/p>\n\n\n<p>Egy j\u00f3l haszn\u00e1lhat\u00f3 el\u0151rejelz\u00e9s seg\u00edt felk\u00e9sz\u00fclni an\u00e9lk\u00fcl, hogy minden lehets\u00e9ges elad\u00e1sra k\u00e9szletet gy\u00e1rtana. A hib\u00e1k \u00e9s a felt\u00e9telez\u00e9sek fel\u00fclvizsg\u00e1lata seg\u00edt eld\u00f6nteni, mit \u00e9rdemes most v\u00e1llalni, \u00e9s mi v\u00e1rhat m\u00e9g. Az el\u0151rejelz\u00e9s a kereslettervez\u00e9s egyik r\u00e9sze; ez a t\u00e1gabb folyamat a piaci inform\u00e1ci\u00f3k \u00e1ttekint\u00e9s\u00e9t \u00e9s a keresleti terv k\u00f6z\u00f6s elfogad\u00e1s\u00e1t is mag\u00e1ban foglalja.<\/p>\n\n\n<p>A gyakorlatban k\u00e9t feladatot kell megoldani: a d\u00f6nt\u00e9shez kell\u0151en megb\u00edzhat\u00f3an megbecs\u00fclni a keresletet, majd olyan gy\u00e1rt\u00e1si tervet k\u00e9sz\u00edteni, amellyel megval\u00f3s\u00edthat\u00f3 a v\u00e1lasztott v\u00e1laszl\u00e9p\u00e9s. A SkyPlanner APS elv\u00e9gzi a gy\u00e1rt\u00e1si d\u00f6nt\u00e9sekhez sz\u00fcks\u00e9ges r\u00e9szletes \u00fctemez\u00e9st, \u00edgy a d\u00f6nt\u00e9sek v\u00e1ltoz\u00e1sakor nem kell g\u00e9penk\u00e9nt \u00fajra \u00f6ssze\u00e1ll\u00edtania a feladatsorrendeket.<\/p>\n\n\n<p>Az al\u00e1bbiakban bemutatjuk, hogyan k\u00e9sz\u00edtse el az el\u0151rejelz\u00e9st, \u00e9rt\u00e9kelje a hib\u00e1j\u00e1t, \u00e9s haszn\u00e1lja fel a gyakorlatban.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. Hat\u00e1rozza meg, milyen d\u00f6nt\u00e9st kell t\u00e1mogatnia az el\u0151rejelz\u00e9snek<\/h2>\n\n\n<p>A d\u00f6nt\u00e9sb\u0151l induljon ki, ne az el\u0151rejelz\u00e9si modellb\u0151l. M\u00e1s r\u00e9szletess\u00e9gre van sz\u00fcks\u00e9g egy hossz\u00fa \u00e1tfut\u00e1si idej\u0171 term\u00e9k anyagainak lek\u00f6t\u00e9s\u00e9hez, a k\u00f6vetkez\u0151 havi k\u00e9szletre gy\u00e1rt\u00e1s meghat\u00e1roz\u00e1s\u00e1hoz \u00e9s egy \u00fajabb m\u0171szak bevezet\u00e9s\u00e9nek m\u00e9rlegel\u00e9s\u00e9hez.<\/p>\n\n\n<p>Az adatgy\u0171jt\u00e9s el\u0151tt r\u00f6gz\u00edtsen n\u00e9gy dolgot:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Az el\u0151rejelz\u00e9s t\u00e1rgya:<\/strong> k\u00e9szterm\u00e9k, term\u00e9kcsal\u00e1d vagy m\u00e1s, egy\u00e9rtelm\u0171en meghat\u00e1rozott tervez\u00e9si t\u00e9tel.<\/li><li><strong>A m\u00e9rt\u00e9kegys\u00e9g:<\/strong> darab, csomag, kilogramm vagy m\u00e1s, k\u00f6vetkezetesen haszn\u00e1lt fizikai mennyis\u00e9g. Az \u00e1rbev\u00e9tel \u00f6nmag\u00e1ban elfedheti az \u00e1rak \u00e9s a term\u00e9k\u00f6sszet\u00e9tel v\u00e1ltoz\u00e1sait.<\/li><li><strong>Az id\u0151szak:<\/strong> mikor van sz\u00fcks\u00e9g\u00fck a vev\u0151knek a term\u00e9kre. Ahol az adatok lehet\u0151v\u00e9 teszik, k\u00f6vetkezetesen a vev\u0151 \u00e1ltal k\u00e9rt id\u0151pontot vegye alapul.<\/li><li><strong>Az id\u0151horizont:<\/strong> mennyivel el\u0151re kell d\u00f6ntenie, figyelembe v\u00e9ve a beszerz\u00e9si \u00e9s gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151ket.<\/li><\/ul>\n\n\n<p>Ha az anyagot n\u00e9gy h\u00e9ttel a felhaszn\u00e1l\u00e1s el\u0151tt le kell k\u00f6tnie, nem elegend\u0151 egy olyan el\u0151rejelz\u00e9s, amely csak egy h\u00e9tre el\u0151re t\u0171nik pontosnak. A n\u00e9gy h\u00e9ttel kor\u00e1bban k\u00e9sz\u00fclt becsl\u00e9st \u00e9rt\u00e9kelje, hiszen a beszerz\u00e9snek t\u00e9nylegesen abb\u00f3l kell dolgoznia.<\/p>\n\n\n<p>A tervez\u00e9s r\u00e9szletess\u00e9g\u00e9t a d\u00f6nt\u00e9shez igaz\u00edtsa. Egy term\u00e9kcsal\u00e1d el\u0151rejelz\u00e9se seg\u00edthet egy k\u00e9s\u0151bbi m\u0171szak sz\u00fcks\u00e9gess\u00e9g\u00e9nek felm\u00e9r\u00e9s\u00e9ben, de nem mondja meg a beszerz\u00e9snek, melyik v\u00e1ltozatspecifikus alkatr\u00e9szt v\u00e1s\u00e1rolja meg. Ugyanakkor ha minden ritk\u00e1n rendelt v\u00e1ltozatra k\u00fcl\u00f6n el\u0151rejelz\u00e9s k\u00e9sz\u00fcl, abb\u00f3l t\u00f6bb zaj sz\u00e1rmazhat, mint hasznos inform\u00e1ci\u00f3. \u00dcgyeljen arra, hogy a term\u00e9kcsal\u00e1d \u00f6sszmennyis\u00e9ge \u00e9s annak cikkszint\u0171 feloszt\u00e1sa \u00f6sszhangban maradjon, \u00e9s vizsg\u00e1lja meg, hogy az \u00f6sszet\u00e9tel v\u00e1ltoz\u00e1sai befoly\u00e1solj\u00e1k-e az anyag- vagy kapacit\u00e1ssz\u00fcks\u00e9gletet.<\/p>\n\n\n<p>K\u00e9szletre gy\u00e1rt\u00e1sn\u00e1l az el\u0151rejelz\u00e9sek a k\u00e9szletfelt\u00f6lt\u00e9si d\u00f6nt\u00e9seket t\u00e1mogatj\u00e1k. Rendel\u00e9sre gy\u00e1rt\u00e1sn\u00e1l a v\u00e9gleges megrendel\u00e9sek alapj\u00e1n ind\u00edthat\u00f3 a t\u00e9nyleges gy\u00e1rt\u00e1s, az el\u0151rejelz\u00e9sek pedig a k\u00f6z\u00f6sen haszn\u00e1lt kapacit\u00e1s \u00e9s a hossz\u00fa \u00e1tfut\u00e1si idej\u0171 anyagok, alkatr\u00e9szek el\u0151k\u00e9sz\u00edt\u00e9s\u00e9t seg\u00edthetik. Att\u00f3l, hogy van el\u0151rejelz\u00e9se, m\u00e9g nem kell bizonytalan \u00e9rt\u00e9kes\u00edt\u00e9sre k\u00e9szterm\u00e9kk\u00e9szletet gy\u00e1rtania.<\/p>\n\n\n<p>Az \u00e9rt\u00e9kes\u00edt\u00e9si c\u00e9lt kezelje k\u00fcl\u00f6n. A c\u00e9l azt mutatja meg, mennyit szeretne eladni a v\u00e1llalat; az el\u0151rejelz\u00e9s pedig azt, hogy jelenleg mekkora vev\u0151i ig\u00e9nyre sz\u00e1m\u00edt. Ha az el\u0151rejelz\u00e9st a gy\u00e1r jelenlegi kapacit\u00e1s\u00e1hoz igaz\u00edtva cs\u00f6kkenti, azzal nem oldja meg, csak elrejti az esetlegesen kiel\u00e9g\u00edtetlen kereslet probl\u00e9m\u00e1j\u00e1t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. \u00c1ll\u00edtson \u00f6ssze a vev\u0151i ig\u00e9nyeket t\u00fckr\u00f6z\u0151 keresleti adatsort<\/h2>\n\n\n<p>Haszn\u00e1ljon cikksz\u00e1m \u00e9s id\u0151szak szerinti, egys\u00e9ges keresleti mennyis\u00e9geket tartalmaz\u00f3 adatsort. Az ERP kisz\u00e1ll\u00edt\u00e1si kimutat\u00e1sa j\u00f3 kiindul\u00f3pont lehet, de ellen\u0151rizze, hogy a benne szerepl\u0151 d\u00e1tumok \u00e9s mennyis\u00e9gek val\u00f3j\u00e1ban mit jelentenek.<\/p>\n\n\n<p>A k\u00e9sedelmes sz\u00e1ll\u00edt\u00e1sok gyakori csapd\u00e1t jelentenek. Ha az egyik h\u00e9tre k\u00e9rt mennyis\u00e9get csak a k\u00f6vetkez\u0151 h\u00e9ten sz\u00e1ll\u00edtj\u00e1k ki, az els\u0151 h\u00e9t kereslete gyeng\u00e9nek, a m\u00e1sodik\u00e9 szokatlanul er\u0151snek t\u0171nhet. Ha azt szeretn\u00e9 el\u0151re jelezni, mikorra kell rendelkez\u00e9sre \u00e1llnia a term\u00e9knek, lehet\u0151s\u00e9g szerint a vev\u0151 \u00e1ltal k\u00e9rt id\u0151szakot haszn\u00e1lja. \u00cdgy a modell nem a saj\u00e1t sz\u00e1ll\u00edt\u00e1si k\u00e9sedelmeket tanulja meg keresleti mint\u00e1zatk\u00e9nt.<\/p>\n\n\n<p>Az \u00e9rt\u00e9kes\u00edt\u00e9ssel \u00e9s a termel\u00e9s\u00e9rt felel\u0151s koll\u00e9g\u00e1kkal k\u00f6z\u00f6sen ellen\u0151rizze a m\u00faltbeli adatokat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Jav\u00edtsa a duplik\u00e1lt rekordokat, rendezze a m\u00e9rt\u00e9kegys\u00e9g-\u00e1tv\u00e1lt\u00e1sokat \u00e9s a term\u00e9kk\u00f3dok v\u00e1ltoz\u00e1sait. A vissz\u00e1rut \u00e9s a lemond\u00e1sokat az okuknak megfelel\u0151en sz\u00e1molja el, ne tekintsen minden korrekci\u00f3t \u00faj negat\u00edv keresletnek.<\/li><li>Tartsa meg azokat az id\u0151szakokat, amikor val\u00f3ban nulla volt a kereslet. A hi\u00e1nyz\u00f3 adat nem jelent automatikusan null\u00e1t, a rendel\u00e9s n\u00e9lk\u00fcli hetek t\u00f6rl\u00e9se pedig felfel\u00e9 torz\u00edthatja a becsl\u00e9st.<\/li><li>Jel\u00f6lje a k\u00e9szlethi\u00e1nyokat, az eloszt\u00e1si \u00e9s kapacit\u00e1skorl\u00e1toz\u00e1sokat. Ha 60 darabot sz\u00e1ll\u00edtottak ki, mik\u00f6zben a vev\u0151k 100 darabot k\u00e9rtek, az nem bizony\u00edtja, hogy a kereslet csak 60 darab volt. Ahol rendelkez\u00e9sre \u00e1llnak, haszn\u00e1lja a r\u00f6gz\u00edtett, nem teljes\u00edtett ig\u00e9nyeket; az elveszett keresletre vonatkoz\u00f3 becsl\u00e9seket pedig jel\u00f6lje becsl\u00e9sk\u00e9nt.<\/li><li>Azonos\u00edtsa az akci\u00f3kat, az egyszeri szerz\u0151d\u00e9seket, a term\u00e9kbevezet\u00e9seket \u00e9s a kivezetett term\u00e9keket. \u0150rizze meg a nyers adatokat, \u00e9s dokument\u00e1lja, mi\u00e9rt m\u00f3dos\u00edtja a modellez\u00e9shez haszn\u00e1lt adatsort.<\/li><\/ul>\n\n\n<p>\u00c1br\u00e1zolja az \u00edgy kapott mennyis\u00e9gek id\u0151beli alakul\u00e1s\u00e1t. Keressen \u00e1lland\u00f3 keresleti szintet, tart\u00f3s n\u00f6veked\u00e9st vagy cs\u00f6kken\u00e9st, visszat\u00e9r\u0151 szezon\u00e1lis cs\u00facsokat \u00e9s hossz\u00fa sz\u00fcneteket a rendel\u00e9sek k\u00f6z\u00f6tt. Ezek a mint\u00e1zatok seg\u00edtenek kiv\u00e1lasztani, mely m\u00f3dszereket \u00e9rdemes tesztelni.<\/p>\n\n\n<p>Ne k\u00e9sz\u00edtsen \u00f6n\u00e1ll\u00f3 el\u0151rejelz\u00e9st minden alkatr\u00e9szre, ha azok sz\u00fcks\u00e9glet\u00e9t a bel\u0151l\u00fck k\u00e9sz\u00fcl\u0151 term\u00e9kek terve hat\u00e1rozza meg. Ezt a f\u00fcgg\u0151 ig\u00e9nyt az anyagjegyz\u00e9k alapj\u00e1n v\u00e9gzett anyagsz\u00fcks\u00e9glet-sz\u00e1m\u00edt\u00e1snak kell levezetnie. Ellenkez\u0151 esetben ugyanarra a beszerz\u00e9si k\u00e9rd\u00e9sre egym\u00e1snak ellentmond\u00f3 v\u00e1laszok sz\u00fclethetnek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. Igaz\u00edtsa az el\u0151rejelz\u00e9si m\u00f3dszert a keresleti mint\u00e1zathoz<\/h2>\n\n\n<p>Nincs olyan m\u00f3dszer, amely minden gy\u00e1rtott term\u00e9khez a legjobb lenne. Induljon ki egy egyszer\u0171 alapm\u00f3dszerb\u0151l, majd vizsg\u00e1lja meg, hogy egy m\u00e1sik m\u00f3dszer jobb d\u00f6nt\u00e9sekhez vezet-e.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Keresleti helyzet<\/th><th>Javasolt kiindul\u00f3pont<\/th><th>Mit \u00e9rdemes ellen\u0151rizni?<\/th><\/tr><\/thead><tbody><tr><td>Viszonylag \u00e1lland\u00f3 kereslet<\/td><td>A k\u00f6zelm\u00falt adataib\u00f3l sz\u00e1m\u00edtott mozg\u00f3\u00e1tlag vagy egyszer\u0171 exponenci\u00e1lis sim\u00edt\u00e1s<\/td><td>Az \u00e1tlagol\u00e1si id\u0151ablak \u00fagy sim\u00edtja-e ki a zajt, hogy k\u00f6zben nem fedi el a val\u00f3di v\u00e1ltoz\u00e1st<\/td><\/tr><tr><td>Visszat\u00e9r\u0151 szezon\u00e1lis kereslet<\/td><td>Az el\u0151z\u0151 \u00f6sszehasonl\u00edthat\u00f3 szezon viszony\u00edt\u00e1si alapk\u00e9nt; szezon\u00e1lis el\u0151rejelz\u00e9si modell<\/td><td>V\u00e1ltozott-e az \u00fcnnepek id\u0151z\u00edt\u00e9se, a munkanapok sz\u00e1ma vagy a term\u00e9kk\u00edn\u00e1lat<\/td><\/tr><tr><td>Tart\u00f3s trend<\/td><td>A trendet kezel\u0151 modell, p\u00e9ld\u00e1ul trenddel kieg\u00e9sz\u00edtett exponenci\u00e1lis sim\u00edt\u00e1s<\/td><td>Folytat\u00f3dik-e a n\u00f6veked\u00e9s, vagy a term\u00e9k k\u00f6zeledik az \u00e9retts\u00e9gi szakaszhoz<\/td><\/tr><tr><td>M\u00e9rhet\u0151 t\u00e9nyez\u0151kkel \u00f6sszef\u00fcgg\u0151 kereslet<\/td><td>Regresszi\u00f3 vagy megfelel\u0151 g\u00e9pi tanul\u00e1si modell<\/td><td>A befoly\u00e1sol\u00f3 t\u00e9nyez\u0151kr\u0151l sz\u00f3l\u00f3 inform\u00e1ci\u00f3k val\u00f3ban rendelkez\u00e9sre \u00e1llnak-e az el\u0151rejelz\u00e9s k\u00e9sz\u00edt\u00e9sekor<\/td><\/tr><tr><td>Sok nulla kereslet\u0171 id\u0151szak, alkalmank\u00e9nti rendel\u00e9sekkel<\/td><td>Szakaszos keresletre kidolgozott elj\u00e1r\u00e1s, p\u00e9ld\u00e1ul Croston-t\u00edpus\u00fa m\u00f3dszer<\/td><td>Hogyan teljes\u00edt a m\u00f3dszer az ut\u00e1np\u00f3tl\u00e1si id\u0151horizonton, nem csup\u00e1n azt n\u00e9zve, hogy helyesen jelzi-e el\u0151re az egyes rendel\u00e9s n\u00e9lk\u00fcli heteket<\/td><\/tr><tr><td>Kev\u00e9s m\u00faltbeli adattal rendelkez\u0151 \u00faj term\u00e9k<\/td><td>Hasonl\u00f3 term\u00e9kek adatai, valamint az \u00e9rt\u00e9kes\u00edt\u00e9s \u00e9s a vev\u0151k struktur\u00e1lt becsl\u00e9sei<\/td><td>A bevezet\u00e9s felt\u00e9telez\u00e9sei, a megl\u00e9v\u0151 term\u00e9kek kereslet\u00e9nek \u00e1tterel\u0151d\u00e9se \u00e9s az, hogy milyen gyorsan \u00e9p\u00fclnek be a t\u00e9nyleges keresletb\u0151l szerzett tapasztalatok<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az egyszer\u0171 exponenci\u00e1lis sim\u00edt\u00e1s nagyobb s\u00falyt ad a frissebb megfigyel\u00e9seknek, de alapv\u00e1ltozata nem modellezi a trendet vagy a szezonalit\u00e1st. A Croston-t\u00edpus\u00fa m\u00f3dszerek a nem nulla mennyis\u00e9geket \u00e9s a k\u00f6z\u00f6tt\u00fck eltelt id\u0151t figyelembe v\u00e9ve kezelik a szakaszos keresletet; a k\u00f6vetkez\u0151 rendel\u00e9s bizonytalans\u00e1g\u00e1t azonban nem sz\u00fcntetik meg.<\/p>\n\n\n<p>A mozg\u00f3\u00e1tlag szeml\u00e9ltet\u00e9s\u00e9hez tegy\u00fck fel, hogy az elm\u00falt h\u00e1rom h\u00e9t kereslete 80, 100 \u00e9s 120 darab volt. A h\u00e1romhetes mozg\u00f3\u00e1tlag alapj\u00e1n a k\u00f6vetkez\u0151 h\u00e9t el\u0151rejelz\u00e9se:<\/p>\n\n\n<p><strong>El\u0151rejelz\u00e9s = (80 + 100 + 120) \u00f7 3 = 100 darab.<\/strong><\/p>\n\n\n<p>Ez a sz\u00e1m\u00edt\u00e1s k\u00f6nnyen elmagyar\u00e1zhat\u00f3, de egy val\u00f3di n\u00f6vekv\u0151 trendet k\u00e9sve k\u00f6vethet. H\u00e1rom megfigyel\u00e9s a sz\u00e1m\u00edt\u00e1s menet\u00e9t mutatja be, nem azt bizony\u00edtja, hogy a m\u00f3dszer megfelel\u0151 az adott term\u00e9khez.<\/p>\n\n\n<p>A lehets\u00e9ges m\u00f3dszereket egyszer\u0171 viszony\u00edt\u00e1si alapokkal hasonl\u00edtsa \u00f6ssze: a legut\u00f3bbi megfigyelt kereslettel, szezon\u00e1lis cikkekn\u00e9l pedig az el\u0151z\u0151 \u00f6sszehasonl\u00edthat\u00f3 szezon\u00e1lis id\u0151szakkal. Egy \u00f6sszetettebb modell alkalmaz\u00e1s\u00e1t a tan\u00edt\u00e1shoz nem haszn\u00e1lt adatokon el\u00e9rt jobb eredm\u00e9nynek vagy a jobb \u00fczemi d\u00f6nt\u00e9seknek kell indokolniuk, nem a hangzatos elnevez\u00e9s\u00e9nek.<\/p>\n\n\n<p>Az akci\u00f3kra vagy gazdas\u00e1gi mutat\u00f3kra t\u00e1maszkod\u00f3 modellnek a j\u00f6v\u0151re n\u00e9zve is re\u00e1lis bemeneti adatokra van sz\u00fcks\u00e9ge. Ha olyan inform\u00e1ci\u00f3kkal teszteli, amelyek az el\u0151rejelz\u00e9s id\u0151pontj\u00e1ban m\u00e9g nem \u00e1lltak rendelkez\u00e9sre, a modell jobbnak t\u0171nik ann\u00e1l, mint amilyen a gyakorlatban lehetett volna. Egy el\u0151rejelz\u00e9sre j\u00f3l haszn\u00e1lhat\u00f3 \u00f6sszef\u00fcgg\u00e9s \u00f6nmag\u00e1ban m\u00e9g nem bizony\u00edtja, hogy a befoly\u00e1sol\u00f3 t\u00e9nyez\u0151 megv\u00e1ltoztat\u00e1sa meghat\u00e1rozott m\u00e9rt\u00e9k\u0171 \u00e9rt\u00e9kes\u00edt\u00e9si n\u00f6veked\u00e9st okoz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. Eg\u00e9sz\u00edtse ki az el\u0151rejelz\u00e9st \u00fczleti ismeretekkel, de \u0151rizze meg az alapv\u00e1ltozatot<\/h2>\n\n\n<p>A m\u00faltbeli adatokb\u00f3l nem der\u00fcl ki minden. El\u0151fordulhat, hogy egy vev\u0151 le\u00e1ll\u00e1st jelentett be, egy forgalmaz\u00f3 \u00faj telephelyet nyit, vagy egy term\u00e9k egy kor\u00e1bbi modellt v\u00e1lt fel.<\/p>\n\n\n<p>A statisztikai alap-el\u0151rejelz\u00e9s maradjon l\u00e1that\u00f3, \u00e9s minden \u00fczleti szempont\u00fa korrekci\u00f3t k\u00fcl\u00f6n r\u00f6gz\u00edtsen. Adja meg a mennyis\u00e9get, az \u00e9rintett id\u0151szakot, az indokot, a felel\u0151st \u00e9s a fel\u00fclvizsg\u00e1lat d\u00e1tum\u00e1t. Miel\u0151tt egy hat\u00e1st hozz\u00e1adna az el\u0151rejelz\u00e9shez, ellen\u0151rizze, hogy a modell vagy egy m\u00e1sik korrekci\u00f3 nem sz\u00e1mol-e m\u00e1r vele.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy az alap-el\u0151rejelz\u00e9s egy k\u00f6zelg\u0151 h\u00e9tre 100 darab. Az \u00e9rt\u00e9kes\u00edt\u00e9s bizony\u00edt\u00e9kkal t\u00e1masztja al\u00e1, hogy egy \u00faj vev\u0151t\u0151l tov\u00e1bbi 20 darabnyi kereslet v\u00e1rhat\u00f3, amely a kor\u00e1bbi becsl\u00e9sben m\u00e9g nem szerepel. A fel\u00fclvizsg\u00e1lt el\u0151rejelz\u00e9s \u00edgy 120 darab lesz. Ha a vev\u0151 egy m\u00e1sik term\u00e9kr\u0151l t\u00e9r \u00e1t erre, annak a term\u00e9knek az el\u0151rejelz\u00e9s\u00e9t is m\u00f3dos\u00edtsa, ne tiszta n\u00f6veked\u00e9sk\u00e9nt r\u00f6gz\u00edtse az \u00e1trendez\u0151d\u00e9st.<\/p>\n\n\n<p>\u00cdgy a fel\u00fclvizsg\u00e1lat konkr\u00e9t k\u00e9rd\u00e9sekre adhat v\u00e1laszt: jelentkezett-e a t\u00f6bbletkereslet, melyik id\u0151szakban, \u00e9s jav\u00edtott-e a k\u00e9zi korrekci\u00f3 az el\u0151rejelz\u00e9sen? Hosszabb t\u00e1von hasonl\u00edtsa \u00f6ssze az alap-el\u0151rejelz\u00e9s \u00e9s a korrig\u00e1lt el\u0151rejelz\u00e9s hib\u00e1j\u00e1t. Tartsa meg azokat a korrekci\u00f3kat, amelyek \u00faj inform\u00e1ci\u00f3t adnak hozz\u00e1; vizsg\u00e1lja meg azokat, amelyek rendre csak optimist\u00e1bb\u00e1 teszik a becsl\u00e9st.<\/p>\n\n\n<p>Bizonytalan term\u00e9kbevezet\u00e9s vagy nagy szerz\u0151d\u00e9s eset\u00e9n \u0151rizzen meg egy alapforgat\u00f3k\u00f6nyvet, valamint egy hihet\u0151 magasabb \u00e9s alacsonyabb kereslet\u0171 v\u00e1ltozatot, a hozz\u00e1juk tartoz\u00f3 felt\u00e9telez\u00e9sekkel egy\u00fctt. Ezek tervez\u00e9si forgat\u00f3k\u00f6nyvek, nem statisztikailag kalibr\u00e1lt el\u0151rejelz\u00e9si intervallumok. Seg\u00edts\u00e9g\u00fckkel hat\u00e1rozza meg, mely d\u00f6nt\u00e9sek v\u00e1ltozn\u00e1nak: p\u00e9ld\u00e1ul az anyagfoglal\u00e1s, egy tov\u00e1bbi m\u0171szak bevezet\u00e9se vagy a k\u00e9szterm\u00e9kk\u00e9szlet fel\u00e9p\u00edt\u00e9s\u00e9r\u0151l sz\u00f3l\u00f3 d\u00f6nt\u00e9s k\u00e9s\u0151bbre halaszt\u00e1sa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. A d\u00f6nt\u00e9s szempontj\u00e1b\u00f3l relev\u00e1ns \u00e1tfut\u00e1si id\u0151h\u00f6z igaz\u00edtva m\u00e9rje az el\u0151rejelz\u00e9si hib\u00e1t<\/h2>\n\n\n<p>Minden kiadott el\u0151rejelz\u00e9st mentsen el a kiad\u00e1s d\u00e1tum\u00e1val, a c\u00e9lid\u0151szakkal, a cikksz\u00e1mmal \u00e9s a verzi\u00f3val egy\u00fctt. Amikor ismertt\u00e9 v\u00e1lik a t\u00e9nyleges kereslet, azzal a v\u00e1ltozattal hasonl\u00edtsa \u00f6ssze, amely a d\u00f6nt\u00e9s meghozatalakor rendelkez\u00e9sre \u00e1llt, ne a k\u00f6zvetlen\u00fcl a sz\u00e1ll\u00edt\u00e1s el\u0151tt k\u00e9sz\u00fclt legut\u00f3bbi m\u00f3dos\u00edt\u00e1ssal.<\/p>\n\n\n<p>A m\u00f3dszer kiv\u00e1laszt\u00e1s\u00e1hoz v\u00e9gezzen visszatesztel\u00e9st m\u00faltbeli adatokon. Illessze a m\u00f3dszert kiz\u00e1r\u00f3lag az adott kor\u00e1bbi id\u0151pontban el\u00e9rhet\u0151 inform\u00e1ci\u00f3kra, k\u00e9sz\u00edtse el az el\u0151rejelz\u00e9st a sz\u00fcks\u00e9ges id\u0151horizontra, majd l\u00e9ptesse el\u0151re az adatlez\u00e1r\u00e1s id\u0151pontj\u00e1t, \u00e9s ism\u00e9telje meg az elj\u00e1r\u00e1st. Ez a g\u00f6rd\u00fcl\u0151 kiindul\u00f3pont\u00fa vizsg\u00e1lat a t\u00e9nylegesen megoldand\u00f3 feladatot teszteli, an\u00e9lk\u00fcl, hogy k\u00e9s\u0151bbi megfigyel\u00e9sek ker\u00fcln\u00e9nek a kor\u00e1bbi el\u0151rejelz\u00e9sek bemen\u0151 adatai k\u00f6z\u00e9.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u00e9lda az el\u0151rejelz\u00e9si hib\u00e1ra<\/h3>\n\n\n<p>Tegy\u00fck fel, hogy egy term\u00e9k el\u0151rejelz\u00e9s\u00e9t n\u00e9gy c\u00e9lh\u00e9tre \u00e9rt\u00e9keli. Az al\u00e1bbi t\u00e1bl\u00e1zat minden sor\u00e1ban az adott c\u00e9lh\u00e9tre <strong>n\u00e9gy h\u00e9ttel kor\u00e1bban kiadott<\/strong>, elmentett el\u0151rejelz\u00e9s szerepel. Az el\u0151jeles hib\u00e1t itt az el\u0151rejelz\u00e9s \u00e9s a t\u00e9nyleges kereslet k\u00fcl\u00f6nbs\u00e9gek\u00e9nt sz\u00e1m\u00edtjuk, teh\u00e1t a pozit\u00edv \u00e9rt\u00e9k t\u00falbecsl\u00e9st jelez.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>C\u00e9lh\u00e9t<\/th><th>Elmentett el\u0151rejelz\u00e9s<\/th><th>T\u00e9nyleges kereslet<\/th><th>El\u0151jeles hiba<\/th><th>Abszol\u00fat hiba<\/th><\/tr><\/thead><tbody><tr><td>1. h\u00e9t<\/td><td>110<\/td><td>100<\/td><td>+10<\/td><td>10<\/td><\/tr><tr><td>2. h\u00e9t<\/td><td>110<\/td><td>120<\/td><td>\u221210<\/td><td>10<\/td><\/tr><tr><td>3. h\u00e9t<\/td><td>110<\/td><td>80<\/td><td>+30<\/td><td>30<\/td><\/tr><tr><td>4. h\u00e9t<\/td><td>110<\/td><td>100<\/td><td>+10<\/td><td>10<\/td><\/tr><tr><td>\u00d6sszesen<\/td><td>440<\/td><td>400<\/td><td>+40<\/td><td>60<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az eredm\u00e9ny k\u00fcl\u00f6nb\u00f6z\u0151 oldalait h\u00e1rom mutat\u00f3val \u00edrhatjuk le:<\/p>\n\n\n<p><strong>\u00c1tlagos abszol\u00fat hiba (MAE) = az abszol\u00fat hib\u00e1k \u00f6sszege \u00f7 az id\u0151szakok sz\u00e1ma = 60 \u00f7 4 = heti 15 darab.<\/strong><\/p>\n\n\n<p>A MAE a term\u00e9k m\u00e9rt\u00e9kegys\u00e9g\u00e9ben, k\u00f6nnyen \u00e9rtelmezhet\u0151 m\u00f3don mutatja meg a jellemz\u0151 hibanagys\u00e1got. Azt nem jelzi, hogy az el\u0151rejelz\u00e9s ink\u00e1bb t\u00fal- vagy alulbecs\u00fcli a keresletet.<\/p>\n\n\n<p><strong>S\u00falyozott abszol\u00fat sz\u00e1zal\u00e9kos hiba (WAPE) = az abszol\u00fat hib\u00e1k \u00f6sszege \u00f7 a t\u00e9nyleges kereslet \u00f6sszege \u00d7 100 = 60 \u00f7 400 \u00d7 100 = 15%.<\/strong><\/p>\n\n\n<p>Ezekn\u00e9l a nemnegat\u00edv keresleti mennyis\u00e9gekn\u00e9l a WAPE az \u00f6sszes\u00edtett kereslethez viszony\u00edtja az abszol\u00fat hib\u00e1t. Ez nem azt jelenti, hogy minden h\u00e9t el\u0151rejelz\u00e9si hib\u00e1ja 15%-on bel\u00fcl maradt, vagy hogy 85% val\u00f3sz\u00edn\u0171s\u00e9ggel ki tudja el\u00e9g\u00edteni a keresletet.<\/p>\n\n\n<p><strong>\u00c1tlagos el\u0151jeles hiba, azaz torz\u00edt\u00e1s = az el\u0151jeles hib\u00e1k \u00f6sszege \u00f7 az id\u0151szakok sz\u00e1ma = 40 \u00f7 4 = heti +10 darab.<\/strong><\/p>\n\n\n<p>A megadott el\u0151jel-konvenci\u00f3 szerint az el\u0151rejelz\u00e9s \u00e1tlagosan t\u00falbecs\u00fclte a keresletet. A n\u00e9gy h\u00e9t sor\u00e1n \u00f6sszesen 40 darabbal, vagyis a teljes t\u00e9nyleges kereslet 10%-\u00e1val haladta meg azt. Az \u00f6sszes\u00edt\u00e9sben a t\u00falbecsl\u00e9sek \u00e9s az alulbecsl\u00e9sek kiolthatj\u00e1k egym\u00e1st, ez\u00e9rt a torz\u00edt\u00e1s \u00f6nmag\u00e1ban nem \u00edrja le a hiba nagys\u00e1g\u00e1t.<\/p>\n\n\n<p>Ez a n\u00e9gy sor a mutat\u00f3k szeml\u00e9ltet\u00e9s\u00e9re szolg\u00e1l, nem elegend\u0151 az el\u0151rejelz\u00e9s megb\u00edzhat\u00f3s\u00e1g\u00e1nak ellen\u0151rz\u00e9s\u00e9hez. V\u00e9gezzen annyi g\u00f6rd\u00fcl\u0151 visszatesztel\u00e9st, hogy azok lefedj\u00e9k a term\u00e9kre jellemz\u0151 szezonalit\u00e1st, rendel\u00e9si mint\u00e1zatokat \u00e9s v\u00e1ltoz\u00e1sokat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ker\u00fclje a f\u00e9lrevezet\u0151 pontoss\u00e1gi mutat\u00f3kat<\/h3>\n\n\n<p>A MAPE minden id\u0151szak abszol\u00fat hib\u00e1j\u00e1t az adott id\u0151szak t\u00e9nyleges kereslet\u00e9vel osztja el. Nulla t\u00e9nyleges keresletn\u00e9l nem \u00e9rtelmezhet\u0151, nulla k\u00f6zel\u00e9ben pedig instabil, ez\u00e9rt ritk\u00e1n jelentkez\u0151 term\u00e9kkereslet eset\u00e9n nem c\u00e9lszer\u0171 alap\u00e9rtelmezett mutat\u00f3k\u00e9nt haszn\u00e1lni.<\/p>\n\n\n<p>A WAPE sz\u00e1m\u00edt\u00e1s\u00e1ban szerepelhetnek nulla kereslet\u0171 id\u0151szakok, de ha az \u00f6sszes t\u00e9nyleges kereslet nulla, a mutat\u00f3 nem \u00e9rtelmezhet\u0151. A nevez\u0151je a volumennel is v\u00e1ltozik: n\u00f6vekv\u0151 kereslet mellett a sz\u00e1zal\u00e9kos \u00e9rt\u00e9k akkor is javulhat, ha a darabban m\u00e9rt hiba nem cs\u00f6kkent. \u00c9rt\u00e9kelje a MAE \u00e9s a torz\u00edt\u00e1s mellett, \u00e9s ugyanazokon a tesztid\u0151szakokon vesse \u00f6ssze az egyszer\u0171 alap-el\u0151rejelz\u00e9s eredm\u00e9ny\u00e9vel is.<\/p>\n\n\n<p>A term\u00e9kcsal\u00e1d \u00f6sszes\u00edtett adatai elfedhetik, hogy az egyik v\u00e1ltozat kereslet\u00e9t tart\u00f3san t\u00falbecs\u00fclik, m\u00edg a m\u00e1sik\u00e9t alulbecs\u00fclik. Ne csak az \u00f6sszes\u00edtett \u00e1tlagot vizsg\u00e1lja, hanem azokat a term\u00e9keket is, amelyek vesz\u00e9lyeztetik a vev\u0151k kiszolg\u00e1l\u00e1s\u00e1t, dr\u00e1ga k\u00e9szletet eredm\u00e9nyeznek vagy kritikus er\u0151forr\u00e1sokat terhelnek.<\/p>\n\n\n<p>Nincs \u00e1ltal\u00e1nosan elfogadhat\u00f3 el\u0151rejelz\u00e9si hibasz\u00e1zal\u00e9k. Egy 15 darabos hiba m\u00e1s k\u00f6vetkezm\u00e9nyekkel j\u00e1r egy olcs\u00f3, gyakran haszn\u00e1lt alkatr\u00e9szn\u00e9l, mint egy lassan forg\u00f3 k\u00e9szre szerelt term\u00e9kn\u00e9l. Az el\u0151rejelz\u00e9st a hi\u00e1ny \u00e9s a t\u00f6bblet k\u00f6lts\u00e9ge, az ut\u00e1np\u00f3tl\u00e1si \u00e1tfut\u00e1si id\u0151 \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 beavatkoz\u00e1si lehet\u0151s\u00e9gek alapj\u00e1n \u00e9rt\u00e9kelje. A tartal\u00e9kokr\u00f3l a bizonytalans\u00e1g \u00e9s a kiszolg\u00e1l\u00e1si szab\u00e1lyzat alapj\u00e1n d\u00f6nts\u00f6n; ne adja hozz\u00e1 egyszer\u0171en a MAE \u00e9rt\u00e9k\u00e9t minden gy\u00e1rt\u00e1si mennyis\u00e9ghez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">6. Az el\u0151rejelz\u00e9s alapj\u00e1n hozzon gy\u00e1rt\u00e1si d\u00f6nt\u00e9st<\/h2>\n\n\n<p>A fel\u00fclvizsg\u00e1lt el\u0151rejelz\u00e9s a vev\u0151i kereslet becsl\u00e9se. A gy\u00e1rt\u00e1si mennyis\u00e9gr\u0151l k\u00fcl\u00f6n kell d\u00f6nteni, figyelembe v\u00e9ve a visszaigazolt rendel\u00e9seket, a felhaszn\u00e1lhat\u00f3 k\u00e9szletet, a m\u00e1r betervezett gy\u00e1rt\u00e1si bev\u00e9telez\u00e9seket \u00e9s a fenntartani k\u00edv\u00e1nt k\u00e9szletszintet.<\/p>\n\n\n<p>Ne sz\u00e1molja el k\u00e9tszer ugyanazt a keresletet. Ha az el\u0151rejelz\u00e9s 120 darab, \u00e9s ebb\u0151l 70 darabot m\u00e1r visszaigazolt rendel\u00e9sek fednek le, akkor az azonos id\u0151szakra vonatkoz\u00f3 egyszer\u0171 el\u0151rejelz\u00e9s-felhaszn\u00e1l\u00e1si szab\u00e1ly szerint 50 darabnyi el\u0151rejelzett kereslet marad rendel\u00e9s n\u00e9lk\u00fcl. A teljes kereslet tov\u00e1bbra is 120, nem 190 darab. Az \u00d6n\u00f6k t\u00e9nyleges szab\u00e1lyzata elt\u00e9r\u0151 d\u00e1tumok vagy keresleti kateg\u00f3ri\u00e1k k\u00f6z\u00f6tt is lehet\u0151v\u00e9 teheti az el\u0151rejelz\u00e9s felhaszn\u00e1l\u00e1s\u00e1t.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy 30 darab felhaszn\u00e1lhat\u00f3 k\u00e9szterm\u00e9k van rakt\u00e1ron, az id\u0151szak v\u00e9g\u00e9re 10 darabot szeretne megtartani, \u00e9s gy\u00e1rt\u00e1sb\u00f3l nem v\u00e1rhat\u00f3 tov\u00e1bbi bev\u00e9telez\u00e9s. A 120 darabos kereslet fedez\u00e9s\u00e9hez javasolt gy\u00e1rt\u00e1si mennyis\u00e9g <strong>100 darab: 120 + 10 \u2212 30<\/strong>. Ez azt felt\u00e9telezi, hogy a k\u00e9szlet \u00e9s az elk\u00e9sz\u00fcl\u0151 term\u00e9kek m\u00e1r az \u00e1ltaluk fedezend\u0151 kereslet esed\u00e9kess\u00e9ge el\u0151tt rendelkez\u00e9sre \u00e1llnak.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/master-production-schedule\/\">gy\u00e1rt\u00e1si f\u0151terv<\/a> hat\u00e1rozza meg ezeket a cikkszint\u0171 mennyis\u00e9geket \u00e9s a rendelkez\u00e9sre \u00e1ll\u00e1s d\u00e1tumait. Az <a href=\"\/hu\/forrasok\/mrp-rovid-utmutato\/\">MRP<\/a> kisz\u00e1m\u00edtja a j\u00f3v\u00e1hagyott gy\u00e1rt\u00e1si mennyis\u00e9gekhez sz\u00fcks\u00e9ges anyagokat \u00e9s alkatr\u00e9szeket. Sem az el\u0151rejelz\u00e9s, sem a k\u00e9szletegyenleg nem bizony\u00edtja, hogy az \u00fczemnek van elegend\u0151 kapacit\u00e1sa az id\u0151ben t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1shoz.<\/p>\n\n\n<p>Tegy\u00fck fel p\u00e9ld\u00e1ul, hogy a 100 darab gy\u00e1rt\u00e1s\u00e1hoz darabonk\u00e9nt 0,2 g\u00e9p\u00f3ra \u00e9s k\u00e9t \u00f3ra \u00e1t\u00e1ll\u00e1s sz\u00fcks\u00e9ges: ez <strong>22 \u00f3ra<\/strong> terhel\u00e9st jelent a kritikus g\u00e9pen. M\u00e1s v\u00e1llal\u00e1sok m\u00e1r 20 \u00f3r\u00e1t lek\u00f6tnek rajta, mik\u00f6zben az el\u0151\u00edrt befejez\u00e9si hat\u00e1rid\u0151ig csak 40 \u00f3ra \u00e1ll rendelkez\u00e9sre. A javasolt terhel\u00e9s \u00edgy 42 \u00f3ra. Meg kell oldani a k\u00e9t\u00f3r\u00e1s kapacit\u00e1shi\u00e1nyt, megfelel\u0151 alternat\u00edv er\u0151forr\u00e1st kell v\u00e1lasztani, vagy m\u00f3dos\u00edtani kell valamelyik v\u00e1llal\u00e1st.<\/p>\n\n\n<p>Ne cs\u00f6kkentse a vev\u0151i kereslet el\u0151rejelz\u00e9s\u00e9t 110-re puszt\u00e1n az\u00e9rt, hogy a g\u00e9p terhel\u00e9se belef\u00e9rjen a kapacit\u00e1sba. A kereslet becsl\u00e9se maradjon l\u00e1that\u00f3, \u00e9s k\u00fcl\u00f6n d\u00f6nts\u00f6n arr\u00f3l, hogyan kezeli a fedezeti hi\u00e1nyt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dctemezze a d\u00f6nt\u00e9sb\u0151l ad\u00f3d\u00f3 gy\u00e1rt\u00e1si feladatokat a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>Ha az el\u0151rejelz\u00e9s v\u00e1ltoz\u00e1sa miatt m\u00f3dos\u00edt egy gy\u00e1rt\u00e1si v\u00e1llal\u00e1st, az \u00fctemez\u00e9si feladat t\u00f6bb g\u00e9pet \u00e9s rendel\u00e9st is \u00e9rinthet. Egy \u00faj t\u00e9tel beilleszt\u00e9se hat\u00e1ssal van az ut\u00e1na k\u00f6vetkez\u0151 m\u0171veletekre, a g\u00e9pekn\u00e9l m\u00e1r v\u00e1rakoz\u00f3 feladatokra \u00e9s az ezekt\u0151l f\u00fcgg\u0151 sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151kre.<\/p>\n\n\n<p><strong>A SkyPlanner APS ezeket a feladatokat <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">egyetlen k\u00f6z\u00f6s er\u0151forr\u00e1s-\u00fctemtervben<\/a> fogja \u00f6ssze.<\/strong> Hat\u00e1rozza meg a munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151ket, a m\u0171veleti l\u00e9p\u00e9seket \u00e9s azok id\u0151tartam\u00e1t, majd priorit\u00e1sokkal \u00e9s z\u00e1rol\u00e1sokkal ir\u00e1ny\u00edtsa a tervet. Az Arcturus, a SkyPlanner \u00fctemez\u0151 mesters\u00e9ges intelligenci\u00e1ja a be\u00e1ll\u00edtott kapacit\u00e1s, az alkalmas er\u0151forr\u00e1sok \u00e9s a m\u0171veleti f\u00fcgg\u0151s\u00e9gek alapj\u00e1n sz\u00e1m\u00edtja ki a gy\u00e1rt\u00e1si feladatok hely\u00e9t az \u00fctemtervben. A Gantt-n\u00e9zet megmutatja az \u00edgy kialakul\u00f3 sorrendet \u00e9s a befejez\u00e9si d\u00e1tumokat.<\/p>\n\n\n<p>A javasolt 100 darab legy\u00e1rt\u00e1s\u00e1n\u00e1l ez \u00f6sszekapcsolja a megmunk\u00e1l\u00e1si ig\u00e9nyt a gy\u00e1rt\u00e1si \u00fatvonal t\u00f6bbi m\u0171velet\u00e9vel \u00e9s az ugyanazokat az er\u0151forr\u00e1sokat haszn\u00e1l\u00f3 m\u00e1s feladatokkal. Megvizsg\u00e1lhatja, hogy egy j\u00f3v\u00e1hagyott m\u0171szakm\u00f3dos\u00edt\u00e1ssal vagy a priorit\u00e1s megv\u00e1ltoztat\u00e1s\u00e1val elk\u00e9sz\u00fclhet-e a munka a sz\u00fcks\u00e9ges id\u0151pontra, an\u00e9lk\u00fcl, hogy minden \u00e9rintett g\u00e9p feladatsor\u00e1t k\u00e9zzel kellene \u00f6sszehangolnia.<\/p>\n\n\n<p>Ha az anyagell\u00e1totts\u00e1got figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az Arcturus a kezd\u00e9si id\u0151pontok kisz\u00e1m\u00edt\u00e1sakor a k\u00e9szletet \u00e9s a be\u00e9rkez\u0151 anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t is figyelembe veszi. A beszerz\u00e9sek v\u00e1rhat\u00f3 sz\u00e1ll\u00edt\u00e1si d\u00e1tumai a v\u00e1rhat\u00f3 rendelkez\u00e9sre \u00e1ll\u00e1st jelzik; a k\u00e9szlet a bev\u00e9telez\u00e9s visszaigazol\u00e1sakor friss\u00fcl. \u00d6nmag\u00e1ban nem el\u00e9g, hogy egy g\u00e9p elvileg szabad, ha az anyag m\u00e9g nem \u00e1ll rendelkez\u00e9sre, vagy az el\u0151z\u0151 m\u0171velet m\u00e9g nem k\u00e9sz\u00fclt el.<\/p>\n\n\n<p>Az el\u0151rejelz\u00e9ssel \u00e9s a k\u00e9szlet-ut\u00e1np\u00f3tl\u00e1ssal kapcsolatos d\u00f6nt\u00e9sek maradjanak a kereslettervez\u00e9si folyamatban vagy az ERP-rendszerben. A SkyPlanner nem hoz l\u00e9tre automatikusan gy\u00e1rt\u00e1si feladatokat az el\u0151rejelz\u00e9sekb\u0151l; az \u00d6n \u00e1ltal l\u00e9trehozott vagy integr\u00e1ci\u00f3n kereszt\u00fcl \u00e1tadott gy\u00e1rt\u00e1si munk\u00e1t \u00fctemezi. <strong>A SkyPlanner ny\u00edlt REST API-j\u00e1n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3<\/strong>, \u00edgy megtarthatja azt a rendszert, amelyben ezeket a d\u00f6nt\u00e9seket meghozza, mik\u00f6zben jav\u00edthatja a d\u00f6nt\u00e9sek alapj\u00e1n v\u00e9gzett gy\u00e1rt\u00e1si feladatok r\u00e9szletes \u00fctemez\u00e9s\u00e9t \u00e9s v\u00e9grehajt\u00e1s\u00e1t.<\/p>\n\n\n<p>Ez\u00e9rt \u00e9rdemes a SkyPlanner mellett d\u00f6nteni, ha a kereslet v\u00e1ltoz\u00e1sa \u00fajra \u00e9s \u00fajra k\u00e9zi \u00fctemez\u00e9st tesz sz\u00fcks\u00e9gess\u00e9: a tervez\u0151k hat\u00e1rozz\u00e1k meg, mi a fontos, az Arcturus pedig kisz\u00e1m\u00edtja, milyen sorrendben k\u00f6vess\u00e9k egym\u00e1st a feladatok az egyes er\u0151forr\u00e1sokon, hogy a d\u00f6nt\u00e9sek megval\u00f3suljanak.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott a gyorsabb \u00e1t\u00fctemez\u00e9s a Fredman Operations m\u0171k\u00f6d\u00e9s\u00e9ben?<\/h3>\n\n\n<p>Az \u00e9lelmiszerrel biztons\u00e1gosan \u00e9rintkez\u0151 konyhai \u00e9s csomagol\u00f3term\u00e9keket gy\u00e1rt\u00f3 finn <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/fredman-operations\/\">Fredman Operations<\/a> kor\u00e1bban k\u00e9zzel hat\u00e1rozta meg a feladatok priorit\u00e1s\u00e1t, an\u00e9lk\u00fcl, hogy pontosan l\u00e1tta volna, mikor szabadulnak fel a g\u00e9pek, \u00e9s mekkora kapacit\u00e1s \u00e1ll rendelkez\u00e9sre az egyes m\u0171szakokban. Egy s\u00fcrg\u0151s \u00e1t\u00fctemez\u00e9s ak\u00e1r egy \u00f3r\u00e1t vagy m\u00e9g t\u00f6bbet is ig\u00e9nybe vehetett.<\/p>\n\n\n<p>A SkyPlanner bevezet\u00e9s\u00e9vel \u00f6sszekapcsolt\u00e1k az L7 \u00e9s LTR rendszereket, a kapacit\u00e1sok \u00e9s a feladatok pedig k\u00f6z\u00f6s Gantt-n\u00e9zetbe ker\u00fcltek. Az \u00fcgyf\u00e9l besz\u00e1mol\u00f3ja szerint a teljes rendel\u00e9s\u00e1llom\u00e1ny el\u0151rehoz\u00e1s\u00e1ra vonatkoz\u00f3 k\u00e9r\u00e9s megval\u00f3s\u00edthat\u00f3s\u00e1g\u00e1t \u00f3r\u00e1kig tart\u00f3 k\u00e9zi sz\u00e1mol\u00e1s helyett m\u00e1sodpercek alatt ellen\u0151rzik. A csapat kevesebb t\u00fal\u00f3r\u00e1r\u00f3l \u00e9s az \u00fctemterv v\u00e1ltoz\u00e1saira adott gyorsabb reakci\u00f3kr\u00f3l is besz\u00e1mol.<\/p>\n\n\n<p>Itt az a l\u00e9nyeges el\u0151ny, hogy m\u00e9g id\u0151ben felm\u00e9rhet\u0151, hogyan \u00e9rinti egy megv\u00e1ltozott ig\u00e9ny a gy\u00e1rt\u00e1si feladatokat \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00edgy marad id\u0151 a sz\u00fcks\u00e9ges l\u00e9p\u00e9sekre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hangolja \u00f6ssze az el\u0151rejelz\u00e9st \u00e9s a gy\u00e1rt\u00e1s v\u00e1laszl\u00e9p\u00e9seit<\/h2>\n\n\n<p>Igaz\u00edtsa a fel\u00fclvizsg\u00e1latok gyakoris\u00e1g\u00e1t a d\u00f6nt\u00e9sekhez. Az \u00faj keresleti adatok be\u00e9rkez\u00e9sekor friss\u00edtse az alap-el\u0151rejelz\u00e9st, az \u00e9rt\u00e9kes\u00edt\u00e9ssel k\u00f6z\u00f6sen vizsg\u00e1lja meg a jelent\u0151s elt\u00e9r\u00e9seket, \u00e9s k\u00f6vesse az archiv\u00e1lt el\u0151rejelz\u00e9s hib\u00e1j\u00e1t az egyes d\u00f6nt\u00e9sekhez sz\u00fcks\u00e9ges \u00e1tfut\u00e1si id\u0151nek megfelel\u0151 el\u0151rejelz\u00e9si id\u0151t\u00e1von. Ne hagyja, hogy a rutinszer\u0171 m\u00f3dos\u00edt\u00e1sok \u00e9szrev\u00e9tlen\u00fcl fel\u00fcl\u00edrj\u00e1k azokat a v\u00e1llal\u00e1sokat, amelyek teljes\u00edt\u00e9s\u00e9re a gy\u00e1rt\u00e1s m\u00e1r k\u00e9sz\u00fcl.<\/p>\n\n\n<p>Ha egy egyeztetett v\u00e1ltoztat\u00e1s m\u00f3dos\u00edtja a gy\u00e1rtand\u00f3 mennyis\u00e9get vagy a rendelkez\u00e9sre \u00e1ll\u00e1s d\u00e1tum\u00e1t, friss\u00edtse a gy\u00e1rt\u00e1si feladatokat, \u00e9s vizsg\u00e1lja fel\u00fcl az er\u0151forr\u00e1sokon val\u00f3 \u00fctemez\u00e9s\u00fcket. \u00cdgy a beszerz\u00e9s, a gy\u00e1rt\u00e1s \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s egys\u00e9ges k\u00e9pet kap arr\u00f3l, mi v\u00e1ltozott, \u00e9s mi sz\u00e1ll\u00edthat\u00f3 az \u00faj helyzetben.<\/p>\n\n\n<p>Ha szeretn\u00e9 l\u00e1tni, hogyan kezelheti ezeket a v\u00e1laszl\u00e9p\u00e9seket kevesebb k\u00e9zi tervez\u00e9ssel, <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">foglaljon SkyPlanner-bemutat\u00f3t<\/a>. Hozzon egy p\u00e9ld\u00e1t az el\u0151rejelz\u00e9s v\u00e1ltoz\u00e1sa ut\u00e1n meghat\u00e1rozott gy\u00e1rt\u00e1si mennyis\u00e9gre, a hozz\u00e1 tartoz\u00f3 gy\u00e1rt\u00e1si \u00fatvonalra \u00e9s azokra az id\u0151pontokra, amikorra a term\u00e9keknek rendelkez\u00e9sre kell \u00e1llniuk. Ezek az adatok gyakorlati kiindul\u00f3pontot adnak annak \u00e1ttekint\u00e9s\u00e9hez, hogyan hat a d\u00f6nt\u00e9s a k\u00f6z\u00f6sen haszn\u00e1lt kapacit\u00e1sra \u00e9s a t\u00f6bbi v\u00e1llal\u00e1sra. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner szoftvert dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3 Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3 A gy\u00e1rt\u00e1sban a kereslet-el\u0151rejelz\u00e9s azt becs\u00fcli meg, hogy a vev\u0151knek milyen term\u00e9kekre, mekkora mennyis\u00e9gben \u00e9s mikor lesz sz\u00fcks\u00e9g\u00fck. A kor\u00e1bbi keresleti adatokat a v\u00e1rhat\u00f3 v\u00e1ltoz\u00e1sokr\u00f3l sz\u00f3l\u00f3 inform\u00e1ci\u00f3kkal \u00f6tv\u00f6zi, \u00edgy k\u00f6z\u00f6s kiindul\u00f3pontot ad a beszerz\u00e9si \u00e9s gy\u00e1rt\u00e1si d\u00f6nt\u00e9sekhez. Egy j\u00f3l haszn\u00e1lhat\u00f3 el\u0151rejelz\u00e9s &#8230; <a title=\"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/\" aria-label=\"Read more about Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":108861,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-108843","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3<\/title>\n<meta name=\"description\" content=\"Haszn\u00e1lhat\u00f3 kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: v\u00e1lasszon m\u00f3dszert, m\u00e9rje a hib\u00e1t, \u00e9s alak\u00edtsa a v\u00e1ltoz\u00f3 keresletet teljes\u00edthet\u0151 gy\u00e1rt\u00e1si v\u00e1llal\u00e1sokk\u00e1.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3\" \/>\n<meta property=\"og:description\" content=\"Haszn\u00e1lhat\u00f3 kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: v\u00e1lasszon m\u00f3dszert, m\u00e9rje a hib\u00e1t, \u00e9s alak\u00edtsa a v\u00e1ltoz\u00f3 keresletet teljes\u00edthet\u0151 gy\u00e1rt\u00e1si v\u00e1llal\u00e1sokk\u00e1.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T14:53:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T14:54:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"24 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3\",\"datePublished\":\"2026-10-24T14:53:53+00:00\",\"dateModified\":\"2026-10-24T14:54:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/\"},\"wordCount\":4812,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/\",\"name\":\"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"datePublished\":\"2026-10-24T14:53:53+00:00\",\"dateModified\":\"2026-10-24T14:54:58+00:00\",\"description\":\"Haszn\u00e1lhat\u00f3 kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: v\u00e1lasszon m\u00f3dszert, m\u00e9rje a hib\u00e1t, \u00e9s alak\u00edtsa a v\u00e1ltoz\u00f3 keresletet teljes\u00edthet\u0151 gy\u00e1rt\u00e1si v\u00e1llal\u00e1sokk\u00e1.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A magnifying glass examines groups of machined rings beside pale outlines representing future demand.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kereslet-elorejelzes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3","description":"Haszn\u00e1lhat\u00f3 kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: v\u00e1lasszon m\u00f3dszert, m\u00e9rje a hib\u00e1t, \u00e9s alak\u00edtsa a v\u00e1ltoz\u00f3 keresletet teljes\u00edthet\u0151 gy\u00e1rt\u00e1si v\u00e1llal\u00e1sokk\u00e1.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/","og_locale":"hu_HU","og_type":"article","og_title":"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3","og_description":"Haszn\u00e1lhat\u00f3 kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: v\u00e1lasszon m\u00f3dszert, m\u00e9rje a hib\u00e1t, \u00e9s alak\u00edtsa a v\u00e1ltoz\u00f3 keresletet teljes\u00edthet\u0151 gy\u00e1rt\u00e1si v\u00e1llal\u00e1sokk\u00e1.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T14:53:53+00:00","article_modified_time":"2026-10-24T14:54:58+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"24 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3","datePublished":"2026-10-24T14:53:53+00:00","dateModified":"2026-10-24T14:54:58+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/"},"wordCount":4812,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/","name":"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","datePublished":"2026-10-24T14:53:53+00:00","dateModified":"2026-10-24T14:54:58+00:00","description":"Haszn\u00e1lhat\u00f3 kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: v\u00e1lasszon m\u00f3dszert, m\u00e9rje a hib\u00e1t, \u00e9s alak\u00edtsa a v\u00e1ltoz\u00f3 keresletet teljes\u00edthet\u0151 gy\u00e1rt\u00e1si v\u00e1llal\u00e1sokk\u00e1.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","width":1672,"height":941,"caption":"A magnifying glass examines groups of machined rings beside pale outlines representing future demand."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kereslet-elorejelzes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3 Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Kereslet-el\u0151rejelz\u00e9s a gy\u00e1rt\u00e1sban: gyakorlati \u00fatmutat\u00f3 A gy\u00e1rt\u00e1sban a kereslet-el\u0151rejelz\u00e9s azt becs\u00fcli meg, hogy a vev\u0151knek milyen term\u00e9kekre, mekkora mennyis\u00e9gben \u00e9s mikor lesz sz\u00fcks\u00e9g\u00fck. A kor\u00e1bbi keresleti adatokat a v\u00e1rhat\u00f3 v\u00e1ltoz\u00e1sokr\u00f3l sz\u00f3l\u00f3 inform\u00e1ci\u00f3kkal \u00f6tv\u00f6zi, \u00edgy k\u00f6z\u00f6s kiindul\u00f3pontot ad a beszerz\u00e9si \u00e9s gy\u00e1rt\u00e1si d\u00f6nt\u00e9sekhez. Egy j\u00f3l haszn\u00e1lhat\u00f3 el\u0151rejelz\u00e9s&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/108843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=108843"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/108843\/revisions"}],"predecessor-version":[{"id":108906,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/108843\/revisions\/108906"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/108861"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=108843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=108843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=108843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}