{"id":108661,"date":"2026-10-24T10:44:53","date_gmt":"2026-10-24T10:44:53","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108661"},"modified":"2026-10-24T10:45:49","modified_gmt":"2026-10-24T10:45:49","slug":"termeles-felfuttatasa","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/","title":{"rendered":"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Az \u00faj gy\u00e1rt\u00f3soron elk\u00e9sz\u00fcltek az els\u0151 megfelel\u0151 alkatr\u00e9szek. Az \u00e9rt\u00e9kes\u00edt\u00e9s m\u00e1r sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t k\u00e9r az els\u0151 teljes rendel\u00e9sre. A csapat k\u00f6zben m\u00e9g a be\u00e1ll\u00edt\u00e1sokat finom\u00edtja, a g\u00e9pkezel\u0151ket tan\u00edtja be, \u00e9s azt m\u00e9ri fel, val\u00f3j\u00e1ban mennyi id\u0151t vesz ig\u00e9nybe a munka. A megl\u00e9v\u0151 rendel\u00e9s\u00e1llom\u00e1nyt pedig tov\u00e1bbra is teljes\u00edteni kell.<\/p>\n\n\n<p><strong>A termel\u00e9s felfuttat\u00e1sa az indul\u00f3 gy\u00e1rt\u00e1st\u00f3l a sz\u00fcks\u00e9ges mennyis\u00e9get \u00e9s min\u0151s\u00e9get stabilan, megism\u00e9telhet\u0151en biztos\u00edt\u00f3 termel\u00e9sig tart\u00f3 \u00e1tmenet.<\/strong> \u00daj term\u00e9k vagy folyamat bevezet\u00e9s\u00e9t, illetve \u00faj gy\u00e1rt\u00f3sor vagy gy\u00e1r \u00fczembe helyez\u00e9s\u00e9t k\u00f6vetheti. A feladat nem egyszer\u0171en a gyors\u00edt\u00e1s: \u00fagy kell n\u00f6velni a kibocs\u00e1t\u00e1st, hogy k\u00f6zben ne \u00edg\u00e9rj\u00fcnk olyan kapacit\u00e1st, amelyet a termel\u00e9s m\u00e9g nem igazolt a gyakorlatban.<\/p>\n\n\n<p>A j\u00f3l haszn\u00e1lhat\u00f3 felfuttat\u00e1si terv minden mennyis\u00e9gi n\u00f6vel\u00e9st m\u00e9rt eredm\u00e9nyekhez \u00e9s rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sokhoz k\u00f6t. A SkyPlanner APS seg\u00edt k\u00f6z\u00f6s gy\u00e1rt\u00e1si \u00fctemtervbe foglalni a bevezet\u00e9s feladatait \u00e9s a megl\u00e9v\u0151 rendel\u00e9seket, majd az \u00fctemtervet a t\u00e9nyleges id\u0151ig\u00e9nyekhez \u00e9s kapacit\u00e1shoz igaz\u00edtani. \u00cdgy kevesebb id\u0151t kell az egym\u00e1ssal verseng\u0151 tervek \u00f6sszehangol\u00e1s\u00e1ra ford\u00edtania, \u00e9s megalapozottabban tehet \u00edg\u00e9retet a k\u00f6vetkez\u0151 vev\u0151nek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A c\u00e9lk\u00e9nt kit\u0171z\u00f6tt gy\u00e1rt\u00e1si sebess\u00e9g m\u00e9g nem jelent sz\u00e1ll\u00edthat\u00f3 mennyis\u00e9get<\/h2>\n\n\n<p>A g\u00e9p n\u00e9vleges sebess\u00e9ge azt mutatja meg, mire k\u00e9pes meghat\u00e1rozott k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt. Arr\u00f3l viszont nem \u00e1rul el semmit, hogy az \u00faj folyamattal h\u00e1ny megfelel\u0151 term\u00e9ket lehet j\u00f6v\u0151 p\u00e9ntekig kisz\u00e1ll\u00edtani.<\/p>\n\n\n<p>A felfuttat\u00e1s sor\u00e1n az elt\u00e9r\u00e9st okozhatja a be\u00e1ll\u00edt\u00e1sok finom\u00edt\u00e1sa, a kezdeti hosszabb ciklusid\u0151, az ellen\u0151rz\u00e9s, az alkatr\u00e9szhi\u00e1ny vagy az, hogy egy tapasztalt g\u00e9pkezel\u0151nek kell seg\u00edtenie a betanul\u00f3 koll\u00e9g\u00e1t. Egyes elk\u00e9sz\u00fclt darabok m\u00e9g min\u0151s\u00e9g\u00fcgyi d\u00f6nt\u00e9sre v\u00e1rhatnak. Ha az els\u0151 m\u0171veletn\u00e9l t\u00f6bb alkatr\u00e9sz k\u00e9sz\u00fcl, azzal lehet, hogy csak a k\u00f6vetkez\u0151 m\u0171velet el\u0151tt v\u00e1rakoz\u00f3 mennyis\u00e9g n\u0151.<\/p>\n\n\n<p>H\u00e1rom mutat\u00f3t kezeljen k\u00fcl\u00f6n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>C\u00e9lk\u00e9nt kit\u0171z\u00f6tt termel\u00e9si r\u00e1ta:<\/strong> az egys\u00e9gnyi id\u0151 alatt tart\u00f3san el\u00e9rni k\u00edv\u00e1nt kibocs\u00e1t\u00e1s a meg\u00e1llapodott term\u00e9k\u00f6sszet\u00e9tel \u00e9s \u00fczemi k\u00f6r\u00fclm\u00e9nyek mellett.<\/li><li><strong>Igazolt termel\u00e9si r\u00e1ta:<\/strong> a folyamat sor\u00e1n egy meghat\u00e1rozott gy\u00e1rt\u00e1si id\u0151szakban t\u00e9nylegesen el\u00e9rt kibocs\u00e1t\u00e1s, a l\u00e9tsz\u00e1m, a megszak\u00edt\u00e1sok \u00e9s a min\u0151s\u00e9gi eredm\u00e9nyek r\u00f6gz\u00edt\u00e9s\u00e9vel.<\/li><li><strong>Sz\u00e1ll\u00edthat\u00f3 mennyis\u00e9g:<\/strong> azok a k\u00e9szterm\u00e9kek, amelyek v\u00e1rhat\u00f3an a kisz\u00e1ll\u00edt\u00e1s el\u0151tt v\u00e9gighaladnak a teljes gy\u00e1rt\u00e1si \u00fatvonalon, \u00e9s megfelelnek az el\u0151\u00edrt felszabad\u00edt\u00e1si felt\u00e9teleknek.<\/li><\/ul>\n\n\n<p>Egy r\u00f6vid gy\u00e1rt\u00e1si pr\u00f3ba, amelyn\u00e9l a m\u00e9rn\u00f6k\u00f6k is a g\u00e9p mellett \u00e1llnak, hasznos tapasztalatot ad. Ez azonban nem ugyanaz, mint a szok\u00e1sos m\u0171szakokban is megism\u00e9telhet\u0151 kibocs\u00e1t\u00e1s. Ugyan\u00edgy a gy\u00e1rt\u00e1sind\u00edt\u00e1s m\u00e9rf\u00f6ldk\u00f6v\u00e9nek el\u00e9r\u00e9se sem jelenti automatikusan a felfuttat\u00e1s v\u00e9g\u00e9t.<\/p>\n\n\n<p>A tervez\u00e9s k\u00e9rd\u00e9se teh\u00e1t eg\u00e9szen konkr\u00e9t: ez a csapat ezen a gy\u00e1rt\u00e1si \u00fatvonalon mekkora mennyis\u00e9get tud az adott hat\u00e1rid\u0151re lesz\u00e1ll\u00edtani a m\u00e1r elv\u00e1llalt munk\u00e1k mellett?<\/p>\n\n\n<h2 class=\"wp-block-heading\">A felfuttat\u00e1si tervet d\u00f6nt\u00e9sekre \u00e9p\u00edtse, ne egyenletesen emelked\u0151 g\u00f6rb\u00e9re<\/h2>\n\n\n<p>El\u0151sz\u00f6r hat\u00e1rozza meg a c\u00e9lt. R\u00f6gz\u00edtse a term\u00e9ket \u00e9s annak rev\u00edzi\u00f3j\u00e1t, az id\u0151szakonk\u00e9nt elv\u00e1rt kibocs\u00e1t\u00e1st, a tervezett m\u0171szakokat \u00e9s l\u00e9tsz\u00e1mot, a min\u0151s\u00e9gi k\u00f6vetelm\u00e9nyeket \u00e9s a k\u00f6lts\u00e9gelv\u00e1r\u00e1sokat. A tervezett term\u00e9k\u00f6sszet\u00e9telt is vegye figyelembe: att\u00f3l, hogy a gy\u00e1rt\u00f3sor a legegyszer\u0171bb v\u00e1ltozattal teljes\u00edti a c\u00e9lt, a vev\u0151k \u00e1ltal v\u00e1s\u00e1rolt \u00f6sszet\u00e9tellel m\u00e9g nem felt\u00e9tlen\u00fcl fogja.<\/p>\n\n\n<p>Ezut\u00e1n a c\u00e9lb\u00f3l kiindulva, visszafel\u00e9 haladva tervezze meg a k\u00f6vetkez\u0151 d\u00f6nt\u00e9si pontot. Ne abb\u00f3l induljon ki, hogy a kibocs\u00e1t\u00e1s minden h\u00e9ten egyenletesen n\u0151. Hat\u00e1rozza meg, mit kell igazolnia a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si pr\u00f3b\u00e1nak, \u00e9s ki enged\u00e9lyezheti a mennyis\u00e9g n\u00f6vel\u00e9s\u00e9t. Az al\u00e1bbi feloszt\u00e1s gyakorlati d\u00f6nt\u00e9si keret, nem pedig minden ipar\u00e1gra \u00e9rv\u00e9nyes j\u00f3v\u00e1hagy\u00e1si rendszer.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Szakasz<\/th><th>Mit kell igazolnia a gy\u00e1rt\u00e1si pr\u00f3b\u00e1nak?<\/th><th>D\u00f6nt\u00e9s a mennyis\u00e9g n\u00f6vel\u00e9se el\u0151tt<\/th><\/tr><\/thead><tbody><tr><td>Az els\u0151 ellen\u0151rz\u00f6tt gy\u00e1rt\u00e1si pr\u00f3ba el\u0151k\u00e9sz\u00edt\u00e9se<\/td><td>A tervezett pr\u00f3b\u00e1hoz rendelkez\u00e9sre \u00e1ll a meg\u00e1llapodott rev\u00edzi\u00f3, gy\u00e1rt\u00e1si \u00fatvonal, anyag, szersz\u00e1m, utas\u00edt\u00e1s \u00e9s szem\u00e9lyzet<\/td><td>K\u00e9szen \u00e1ll a csapat a pr\u00f3ba elv\u00e9gz\u00e9s\u00e9re \u00e9s az \u00e9rt\u00e9kelhet\u0151 adatok gy\u0171jt\u00e9s\u00e9re?<\/td><\/tr><tr><td>A folyamat igazol\u00e1sa kis sorozattal<\/td><td>A folyamattal megfelel\u0151 term\u00e9k k\u00e9sz\u00edthet\u0151; l\u00e1that\u00f3k a t\u00e9nyleges id\u0151k, a vesztes\u00e9gek \u00e9s a megoldatlan probl\u00e9m\u00e1k<\/td><td>Min kell v\u00e1ltoztatni a gy\u00e1rt\u00e1si pr\u00f3ba megism\u00e9tl\u00e9se el\u0151tt?<\/td><\/tr><tr><td>Mennyis\u00e9gn\u00f6vel\u00e9s a szok\u00e1sos termel\u00e9st t\u00fckr\u00f6z\u0151 k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt<\/td><td>Nagyobb sorozatokkal vagy tov\u00e1bbi m\u0171szakokban is megism\u00e9telhet\u0151 az eredm\u00e9ny rendk\u00edv\u00fcli t\u00e1mogat\u00e1s n\u00e9lk\u00fcl<\/td><td>Teljes\u00edthet\u0151 a k\u00f6vetkez\u0151 mennyis\u00e9g a t\u00e9nyleges er\u0151forr\u00e1sokkal \u00e9s a felszabad\u00edt\u00e1si k\u00f6vetelm\u00e9nyek betart\u00e1s\u00e1val?<\/td><\/tr><tr><td>\u00c1tad\u00e1s a norm\u00e1l termel\u00e9snek<\/td><td>A sz\u00fcks\u00e9ges kibocs\u00e1t\u00e1s megism\u00e9telhet\u0151, a felel\u0151ss\u00e9gi k\u00f6r\u00f6k egy\u00e9rtelm\u0171ek, a fennmarad\u00f3 probl\u00e9m\u00e1k a szok\u00e1sos szab\u00e1lyoz\u00e1si \u00e9s ellen\u0151rz\u00e9si elj\u00e1r\u00e1sokkal kezelhet\u0151k<\/td><td>Kezelhet\u0151 m\u00e1r a munka a szok\u00e1sos gy\u00e1rt\u00e1stervez\u00e9s keret\u00e9ben?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Minden m\u00e9g nem teljes\u00fclt felt\u00e9telhez jel\u00f6lj\u00f6n ki n\u00e9v szerint felel\u0151st, \u00e9s hat\u00e1rozza meg a k\u00f6vetkez\u0151 fel\u00fclvizsg\u00e1lat id\u0151pontj\u00e1t. A termel\u00e9snek, a m\u0171szaki ter\u00fcletnek, a min\u0151s\u00e9g\u00fcgynek, a beszerz\u00e9snek \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9snek k\u00f6z\u00f6s k\u00e9pre van sz\u00fcks\u00e9ge arr\u00f3l, mi \u00e1ll k\u00e9szen, \u00e9s mi korl\u00e1tozza m\u00e9g a kibocs\u00e1t\u00e1st. A sz\u00fcks\u00e9ges biztons\u00e1gi, folyamat- \u00e9s vev\u0151i j\u00f3v\u00e1hagy\u00e1sok tov\u00e1bbra is a v\u00e1llalat bevezet\u00e9si elj\u00e1r\u00e1sainak r\u00e9sz\u00e9t k\u00e9pezik; ezeket a gy\u00e1rt\u00e1si \u00fctemterv nem helyettes\u00edti.<\/p>\n\n\n<p>A felfuttat\u00e1sra nem adhat\u00f3 minden helyzetben haszn\u00e1lhat\u00f3, \u00e1ltal\u00e1nos id\u0151tartam. M\u00e1s tanul\u00e1si folyamatot ig\u00e9nyel egy term\u00e9kv\u00e1ltozat bevezet\u00e9se egy bev\u00e1lt gy\u00e1rt\u00e1si \u00fatvonalon, \u00e9s m\u00e1st egy \u00faj gy\u00e1r\u00e9, m\u00e9g nem ismert berendez\u00e9sekkel. A hat\u00e1rid\u0151ket a sz\u00fcks\u00e9ges munk\u00e1hoz \u00e9s az igazoland\u00f3 eredm\u00e9nyekhez igaz\u00edtsa, majd m\u00f3dos\u00edtsa a felfuttat\u00e1s v\u00e1rhat\u00f3 menet\u00e9t, ha ezek a felt\u00e9telez\u00e9sek megv\u00e1ltoznak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A pr\u00f3b\u00e1kat \u00e9s a megl\u00e9v\u0151 rendel\u00e9seket k\u00f6z\u00f6s er\u0151forr\u00e1stervben kezelje<\/h2>\n\n\n<p>A k\u00fcl\u00f6n kezelt bevezet\u00e9si terv az\u00e9rt is t\u0171nhet megval\u00f3s\u00edthat\u00f3nak, mert kimondatlanul olyan er\u0151forr\u00e1sokkal sz\u00e1mol, amelyeket a norm\u00e1l termel\u00e9s m\u00e1r lek\u00f6t\u00f6tt. Miel\u0151tt visszaigazoln\u00e1 a bevezet\u00e9skor sz\u00e1ll\u00edtand\u00f3 mennyis\u00e9geket, tervezze egy\u00fctt az ugyanazok\u00e9rt az er\u0151forr\u00e1sok\u00e9rt verseng\u0151 munk\u00e1kat.<\/p>\n\n\n<p>A k\u00f6vetkez\u0151 sorozathoz hat\u00e1rozza meg a m\u0171veletek sorrendj\u00e9t \u00e9s az alkalmas munka\u00e1llom\u00e1sokat. A kiforrott gy\u00e1rt\u00e1s c\u00e9lciklusideje helyett haszn\u00e1ljon kifejezetten a kezdeti gy\u00e1rt\u00e1sra meghat\u00e1rozott id\u0151tartamot. Sz\u00e1moljon az \u00e1t\u00e1ll\u00e1ssal \u00e9s minden ismert t\u00f6bbletmunk\u00e1val. Ha az els\u0151 sorozatokn\u00e1l tov\u00e1bbi ellen\u0151rz\u00e9sre vagy egy m\u0171velet megism\u00e9tl\u00e9s\u00e9re van sz\u00fcks\u00e9g, rendeljen ehhez id\u0151t \u00e9s felel\u0151st, ne rejtse el egy \u00e1ltal\u00e1nos tartal\u00e9kban.<\/p>\n\n\n<p>A kev\u00e9sb\u00e9 nyilv\u00e1nval\u00f3 ig\u00e9nyek is sz\u00e1m\u00edtanak. Egy pr\u00f3ba \u00fagy is lek\u00f6thet egy termel\u0151g\u00e9pet, hogy k\u00f6zben nem k\u00e9sz\u00fcl \u00e9rt\u00e9kes\u00edthet\u0151 term\u00e9k. A betan\u00edt\u00e1s a tanul\u00f3 mellett azt a tapasztalt g\u00e9pkezel\u0151t is ig\u00e9nybe veheti, aki egy\u00e9bk\u00e9nt m\u00e1sik gy\u00e1rt\u00e1si feladaton dolgozna. Az a m\u00e9rn\u00f6k, akire k\u00e9t pr\u00f3b\u00e1n\u00e1l is sz\u00fcks\u00e9g van, nem lehet egyszerre mindk\u00e9t helyen. A pr\u00f3basorozathoz m\u00e9g elegend\u0151 lehet a rendelkez\u00e9sre \u00e1ll\u00f3 anyag, a k\u00f6vetkez\u0151 mennyis\u00e9gi l\u00e9pcs\u0151h\u00f6z viszont m\u00e1r nem.<\/p>\n\n\n<p>A k\u00f6vetkez\u0151 tervezett mennyis\u00e9gn\u00e9l ellen\u0151rizze az al\u00e1bbiakat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesi-kapacitastervezes\/\">t\u00e9nyleges munkarendet \u00e9s az ahhoz rendelkez\u00e9sre \u00e1ll\u00f3 szem\u00e9lyzetet<\/a>, bele\u00e9rtve a tervezett kies\u0151 id\u0151szakokat;<\/li><li>az ugyanezekre az er\u0151forr\u00e1sokra m\u00e1r elv\u00e1llalt rendel\u00e9seket;<\/li><li>a gy\u00e1rt\u00e1si pr\u00f3b\u00e1kat, az \u00e1t\u00e1ll\u00e1si munk\u00e1kat \u00e9s az ismert ut\u00f3munk\u00e1t;<\/li><li>az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9geket;<\/li><li>a k\u00e9s\u0151bbi ellen\u0151rz\u00e9s, \u00f6sszeszerel\u00e9s, csomagol\u00e1s \u00e9s felszabad\u00edt\u00e1s id\u0151z\u00edt\u00e9s\u00e9t.<\/li><\/ul>\n\n\n<p>Az ismert munk\u00e1khoz konkr\u00e9t id\u0151ket foglaljon le, a bizonytalans\u00e1gra pedig tudatosan tervezzen tartal\u00e9kot. Ne sz\u00e1molja el k\u00e9tszer ugyanazt a vesztes\u00e9get: ha a kezdeti gy\u00e1rt\u00e1sra megadott id\u0151 m\u00e1r tartalmaz egy visszat\u00e9r\u0151 megszak\u00edt\u00e1st, azt ne vonja le m\u00e9g egyszer a rendelkez\u00e9sre \u00e1ll\u00f3 \u00f3r\u00e1kb\u00f3l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u00e9lda: mi\u00e9rt lesz a 100 darabos c\u00e9lb\u00f3l 54 darabos sz\u00e1ll\u00edt\u00e1s?<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3t, amely egy \u00faj, forg\u00e1csol\u00e1ssal k\u00e9sz\u00fcl\u0151 h\u00e1z gy\u00e1rt\u00e1s\u00e1t vezeti be. A v\u00e9gs\u0151 c\u00e9l h\u00e1zank\u00e9nt hat perc, a kezdeti gy\u00e1rt\u00e1si eredm\u00e9nyek alapj\u00e1n azonban jelenleg t\u00edz perccel lehet tervezni. A megmunk\u00e1l\u00f3k\u00f6zpontban m\u00e1r bej\u00e1ratott term\u00e9kek is k\u00e9sz\u00fclnek.<\/p>\n\n\n<p>Az els\u0151 bevezet\u00e9si sorozathoz a csapat a k\u00f6vetkez\u0151k\u00e9ppen tervezi a k\u00f6z\u00f6sen haszn\u00e1lt g\u00e9p idej\u00e9t a kisz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ig.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>A megmunk\u00e1l\u00f3k\u00f6zpont idej\u00e9nek felhaszn\u00e1l\u00e1sa<\/th><th>\u00d3ra<\/th><\/tr><\/thead><tbody><tr><td>Igazolt g\u00e9pid\u0151, amelyhez szem\u00e9lyzet is rendelkez\u00e9sre \u00e1ll<\/td><td>40<\/td><\/tr><tr><td>Megl\u00e9v\u0151 vev\u0151i rendel\u00e9sek, az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt<\/td><td>\u221224<\/td><\/tr><tr><td>M\u0171szaki pr\u00f3b\u00e1kra k\u00fcl\u00f6n lefoglalt id\u0151<\/td><td>\u22124<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1s az \u00faj gy\u00e1rt\u00e1si sorozatra<\/td><td>\u22122<\/td><\/tr><tr><td>Az \u00faj sorozat gy\u00e1rt\u00e1s\u00e1ra fennmarad\u00f3 id\u0151<\/td><td>10<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>T\u00edz \u00f3ra alatt 600 perc jut a sorozat gy\u00e1rt\u00e1s\u00e1ra. A jelenlegi, t\u00edzperces tervez\u00e9si id\u0151vel ez <strong>60 h\u00e1z<\/strong> elk\u00e9sz\u00edt\u00e9s\u00e9t teszi lehet\u0151v\u00e9, nem 100-\u00e9t. A hatperces c\u00e9l\u00e9rt\u00e9kkel sz\u00e1molva ugyanez az id\u0151s\u00e1v 100 darabra t\u0171nne elegend\u0151nek, m\u00e9g a min\u0151s\u00e9gi vesztes\u00e9gek figyelembev\u00e9tele el\u0151tt.<\/p>\n\n\n<p>Tegy\u00fck fel tov\u00e1bb\u00e1, hogy a 60 h\u00e1zb\u00f3l hatot min\u0151s\u00e9g\u00fcgyi d\u00f6nt\u00e9sig visszatartanak a kisz\u00e1ll\u00edt\u00e1st\u00f3l. A terv \u00edgy <strong>54 felszabad\u00edtott h\u00e1z<\/strong> sz\u00e1ll\u00edt\u00e1s\u00e1t teszi lehet\u0151v\u00e9 a hat\u00e1rid\u0151ig. A p\u00e9ld\u00e1ban felt\u00e9telezz\u00fck, hogy az anyagok \u00e9s a g\u00e9pkezel\u0151k rendelkez\u00e9sre \u00e1llnak, a k\u00e9s\u0151bbi ellen\u0151rz\u00e9st \u00e9s csomagol\u00e1st pedig \u00fagy \u00fctemezt\u00e9k, hogy a kisz\u00e1ll\u00edt\u00e1s el\u0151tt befejez\u0151djenek. A hat visszatartott darabon ebben az id\u0151ablakban nem v\u00e9geznek tov\u00e1bbi forg\u00e1csol\u00e1st.<\/p>\n\n\n<p>A jelenlegi terv teh\u00e1t nem fedez egy 100 darab h\u00e1zra sz\u00f3l\u00f3 ig\u00e9nyt. \u00c9rdemes ink\u00e1bb kisebb els\u0151 sz\u00e1ll\u00edt\u00e1sr\u00f3l, k\u00e9s\u0151bbi hat\u00e1rid\u0151r\u0151l, megfelel\u0151 l\u00e9tsz\u00e1mmal biztos\u00edtott tov\u00e1bbi megmunk\u00e1l\u00e1si id\u0151r\u0151l vagy j\u00f3v\u00e1hagyott alternat\u00edv gy\u00e1rt\u00e1si \u00fatvonalr\u00f3l egyeztetni. Ha az \u00faj term\u00e9k gy\u00e1rt\u00e1s\u00e1t a megl\u00e9v\u0151 rendel\u00e9sek el\u00e9 sorolja, azzal megv\u00e1ltozhat, hogy melyik vev\u0151 kap kevesebbet, de a hi\u00e1ny nem sz\u0171nik meg.<\/p>\n\n\n<p>A r\u00f6videbb ciklusid\u0151k k\u00e9s\u0151bb jav\u00edthatnak ezen. Am\u00edg azonban a tervezett k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt nem ism\u00e9telhet\u0151k meg megb\u00edzhat\u00f3an, fejleszt\u00e9si c\u00e9lk\u00e9nt kezelje \u0151ket, ne m\u00e1r \u00e9rt\u00e9kes\u00edtett kapacit\u00e1sk\u00e9nt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A SkyPlanner seg\u00edts\u00e9g\u00e9vel tervezze meg re\u00e1lisan a bevezet\u00e9s k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si sorozat\u00e1t<\/h2>\n\n\n<p>A SkyPlanner \u00e9ppen ezen a ponton teszi k\u00f6nnyebben kezelhet\u0151v\u00e9 a termel\u00e9s felfuttat\u00e1s\u00e1t. Nem kell k\u00fcl\u00f6n friss\u00edtenie a bevezet\u00e9s \u00fctemterv\u00e9t, majd egyenk\u00e9nt helyreigaz\u00edtania a g\u00e9pekre v\u00e1r\u00f3 feladatok sorrendj\u00e9t: az \u00faj munk\u00e1t a megl\u00e9v\u0151 rendel\u00e9s\u00e1llom\u00e1nnyal k\u00f6z\u00f6s, <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">er\u0151forr\u00e1sokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1si \u00fctemtervbe<\/a> illesztheti.<\/p>\n\n\n<p>Hat\u00e1rozza meg az \u00faj term\u00e9k m\u0171veleteit, a v\u00e9grehajt\u00e1sukra alkalmas munka\u00e1llom\u00e1sokat \u00e9s az id\u0151tartamokat, majd \u00e1ll\u00edtsa be a munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151ket \u00e9s a priorit\u00e1sokat. Vegye fel a pr\u00f3bagy\u00e1rt\u00e1s feladatait \u00e9s azokat a tov\u00e1bbi m\u0171veleteket is, amelyekhez kapacit\u00e1st kell \u00fctemezni. A SkyPlanner \u00fctemez\u0151 mesters\u00e9ges intelligenci\u00e1ja, az Arcturus a be\u00e1ll\u00edtott er\u0151forr\u00e1sok, f\u00fcgg\u0151s\u00e9gek \u00e9s szab\u00e1lyok alapj\u00e1n sz\u00e1m\u00edtja ki a m\u0171veletek sorrendj\u00e9t. Az \u00edgy \u00fctemezett munka a Gantt-diagramon l\u00e1that\u00f3.<\/p>\n\n\n<p>A h\u00e1zak gy\u00e1rt\u00e1s\u00e1nak bevezet\u00e9sekor ennek gyakorlati el\u0151nye, hogy a megmunk\u00e1land\u00f3 t\u00e9telt a m\u00e1r megl\u00e9v\u0151 rendel\u00e9sekkel \u00e9s a t\u00e9tel k\u00e9s\u0151bbi m\u0171veleteivel egy\u00fctt l\u00e1tja. Ha j\u00f3v\u00e1hagy egy tov\u00e1bbi, megfelel\u0151 l\u00e9tsz\u00e1mmal biztos\u00edtott m\u0171szakot, vagy m\u00f3dos\u00edt egy priorit\u00e1st, sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet, \u00e9s a vev\u0151i hat\u00e1rid\u0151 visszaigazol\u00e1sa el\u0151tt tekintse \u00e1t az \u00f6sszes \u00e9rintett munk\u00e1ra gyakorolt hat\u00e1st. A priorit\u00e1sokkal \u00e9s z\u00e1rol\u00e1sokkal \u00d6n d\u00f6nti el, mely v\u00e1llal\u00e1sokat v\u00e9di; az Arcturus e kereteken bel\u00fcl v\u00e9gzi el az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat.<\/p>\n\n\n<p>\u00cdgy nem kell minden \u00e9rintett m\u0171veletet \u00fajra \u00e9s \u00fajra k\u00e9zzel \u00e1thelyeznie. A bevezet\u00e9sr\u0151l hozott d\u00f6nt\u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s sz\u00e1m\u00e1ra is jobban haszn\u00e1lhat\u00f3v\u00e1 v\u00e1lik: a javasolt sz\u00e1ll\u00edt\u00e1s egy konkr\u00e9t m\u0171veletsorhoz kapcsol\u00f3dik, nem csup\u00e1n a felfuttat\u00e1s k\u00fcl\u00f6n kezelt c\u00e9l\u00e9rt\u00e9k\u00e9hez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Optimista id\u0151becsl\u00e9sek helyett t\u00e1maszkodjon a gy\u00e1rt\u00e1s m\u00e9rt adataira<\/h3>\n\n\n<p>A SkyPlanner rendszerben megadhatja a m\u0171veletek id\u0151tartam\u00e1t, valamint az \u00e1t\u00e1ll\u00e1shoz \u00e9s a m\u0171velet lez\u00e1r\u00e1s\u00e1hoz sz\u00fcks\u00e9ges id\u0151t. Az id\u0151napl\u00f3k \u00e9s a jelent\u00e9sek visszajelz\u00e9st adnak ahhoz, hogy eld\u00f6nthesse, a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si sorozatn\u00e1l is indokolt-e ugyanazt a becsl\u00e9st haszn\u00e1lni. A Tervezett \u00e9s t\u00e9nyleges id\u0151k jelent\u00e9s a tervezett id\u0151tartamokat a t\u00e9nyleges gy\u00e1rt\u00e1si id\u0151vel hasonl\u00edtja \u00f6ssze.<\/p>\n\n\n<p>Egy val\u00f3ban \u00faj term\u00e9kn\u00e9l induljon a rendelkez\u00e9sre \u00e1ll\u00f3 folyamatismeretre alapozott, egy\u00e9rtelm\u0171en r\u00f6gz\u00edtett becsl\u00e9ssel. Minden \u00e9rdemi gy\u00e1rt\u00e1si sorozat ut\u00e1n vizsg\u00e1lja meg a terv \u00e9s a t\u00e9nyleges eredm\u00e9ny elt\u00e9r\u00e9s\u00e9t. A t\u00f6bbletid\u0151t egyszeri szersz\u00e1mkorrekci\u00f3, rendszeresen sz\u00fcks\u00e9ges \u00e1t\u00e1ll\u00e1si feladat vagy olyan megmunk\u00e1l\u00e1si sebess\u00e9g okozta, amellyel a k\u00f6vetkez\u0151 t\u00e9teln\u00e9l is sz\u00e1molni kell? Ennek megfelel\u0151en m\u00f3dos\u00edtsa az \u00e9rintett becsl\u00e9st vagy a h\u00e1tral\u00e9v\u0151 munk\u00e1t, majd sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet.<\/p>\n\n\n<p>A SkyPlanner kor\u00e1bbi adatokra alapozott id\u0151becsl\u00e9st is t\u00e1mogat, ha rendelkez\u00e9sre \u00e1llnak a kor\u00e1bbi rendel\u00e9sek adatai. Ha egy term\u00e9knek m\u00e9g nincs ilyen el\u0151zm\u00e9nye, haszn\u00e1lja \u00e9s tartsa naprak\u00e9szen a saj\u00e1t becsl\u00e9s\u00e9t, am\u00edg a r\u00f6gz\u00edtett teljes\u00edtm\u00e9nyadatok megalapozott\u00e1 nem teszik annak fel\u00fclvizsg\u00e1lat\u00e1t.<\/p>\n\n\n<p>A c\u00e9lid\u0151 maradjon fejleszt\u00e9si c\u00e9l, a gy\u00e1rt\u00e1si \u00fctemterv pedig a jelenleg indokolhat\u00f3 becsl\u00e9ssel sz\u00e1moljon. M\u00e1sk\u00fcl\u00f6nben a terv javul\u00e1st mutathat akkor is, ha az \u00fczemben val\u00f3j\u00e1ban semmi sem javult.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A v\u00e1ltoztat\u00e1sokat a teljes gy\u00e1rt\u00e1ssal \u00f6sszhangban kezelje<\/h3>\n\n\n<p>A bevezet\u00e9s sor\u00e1n egy k\u00e9s\u0151 alkatr\u00e9sz vagy egy kies\u0151 m\u0171szak nemcsak az \u00faj term\u00e9ket \u00e9rintheti. Ha enged\u00e9lyezve van az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s, a r\u00f6gz\u00edtett anyagell\u00e1t\u00e1si adatok is beker\u00fclnek az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sba. Az \u00fajrasz\u00e1m\u00edtott terv ugyan\u00edgy t\u00fckr\u00f6zheti a kapacit\u00e1s \u00e9s a priorit\u00e1sok v\u00e1ltoz\u00e1s\u00e1t is.<\/p>\n\n\n<p>A SkyPlanner a ny\u00edlt REST API r\u00e9v\u00e9n b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3, \u00edgy a gy\u00e1rt\u00e1s\u00fctemez\u00e9s jav\u00edt\u00e1s\u00e1hoz nem kell lecser\u00e9lnie az \u00fczleti nyilv\u00e1ntart\u00e1sait kezel\u0151 rendszereket. Az \u00e9rt\u00e9ket egy olyan k\u00f6z\u00f6s terv adja, amely k\u00f6veti a bevezet\u00e9s v\u00e1ltoz\u00f3 k\u00f6r\u00fclm\u00e9nyeit \u00e9s a megl\u00e9v\u0151 v\u00e1llal\u00e1sokat \u2013 nem pedig egy \u00fajabb, k\u00e9zzel szinkronban tartand\u00f3 \u00fctemterv.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Azokat a mutat\u00f3kat tekintse \u00e1t, amelyek befoly\u00e1solj\u00e1k a k\u00f6vetkez\u0151 d\u00f6nt\u00e9st<\/h2>\n\n\n<p>A felfuttat\u00e1s \u00e1ttekint\u00e9se gy\u00e1rt\u00e1si d\u00f6nt\u00e9ssel z\u00e1ruljon, ne puszt\u00e1n egy jelent\u00e9ssel arr\u00f3l, hogy a kibocs\u00e1t\u00e1s elmarad a tervezett felfut\u00e1si g\u00f6rb\u00e9t\u0151l. Haszn\u00e1ljon kev\u00e9s, k\u00f6vetkezetesen defini\u00e1lt mutat\u00f3t, \u00e9s mindegyikhez kapcsoljon int\u00e9zked\u00e9st.<\/p>\n\n\n<p><strong>A felszabad\u00edtott, megfelel\u0151 darabok mennyis\u00e9ge a tervezett mennyis\u00e9ghez viszony\u00edtva<\/strong> megmutatja, hogy teljes\u00edthet\u0151-e a vev\u0151nek tett v\u00e1llal\u00e1s. Az elk\u00e9sz\u00fclt, de m\u00e9g fel nem szabad\u00edtott k\u00e9szletet k\u00fcl\u00f6n jelen\u00edtse meg. M\u00e1sk\u00fcl\u00f6nben a n\u00f6vekv\u0151 k\u00e9szlet azt a l\u00e1tszatot keltheti, hogy a sz\u00e1ll\u00edt\u00e1s teljes\u00edt\u00e9se is el\u0151rehalad.<\/p>\n\n\n<p><strong>A tervezett \u00e9s a t\u00e9nyleges m\u0171veleti id\u0151 \u00f6sszevet\u00e9se<\/strong> megmutatja, hol kell korrig\u00e1lni az \u00fctemtervet. Az \u00e1t\u00e1ll\u00e1si, megmunk\u00e1l\u00e1si \u00e9s v\u00e1rakoz\u00e1si id\u0151t annyira k\u00fcl\u00f6n\u00edtse el, hogy az elt\u00e9r\u00e9s oka azonos\u00edthat\u00f3 legyen. Att\u00f3l, hogy sok id\u0151 telt el, m\u00e9g nem felt\u00e9tlen\u00fcl dolgozott lassan a g\u00e9p: lehet, hogy a t\u00e9tel anyagra vagy ellen\u0151rz\u00e9sre v\u00e1rt.<\/p>\n\n\n<p><strong>Az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/\">els\u0151re megfelelt darabok ar\u00e1nya<\/a> \u00e9s az ut\u00f3munkaig\u00e9ny<\/strong> megmutatja, hogy a nagyobb gy\u00e1rt\u00e1si mennyis\u00e9g t\u00f6bb ism\u00e9telt munk\u00e1t eredm\u00e9nyez-e. Az els\u0151re megfelelt darabok ar\u00e1ny\u00e1t az el\u0151\u00edrt ellen\u0151rz\u00e9seken ut\u00f3munka n\u00e9lk\u00fcl megfelelt darabok h\u00e1nyadak\u00e9nt hat\u00e1rozza meg, egy\u00e9rtelm\u0171en r\u00f6gz\u00edtett vizsg\u00e1lt sokas\u00e1ggal \u00e9s m\u00e9r\u00e9si ponttal. Az ismert ut\u00f3munk\u00e1t \u00fctemezze be, ne abb\u00f3l induljon ki, hogy k\u00e9s\u0151bb majd valahov\u00e1 bef\u00e9r.<\/p>\n\n\n<p><strong>A kibocs\u00e1t\u00e1st jelenleg korl\u00e1toz\u00f3 er\u0151forr\u00e1s<\/strong> megmutatja, hol n\u00f6velhet\u0151 beavatkoz\u00e1ssal az elk\u00e9sz\u00fclt term\u00e9kek mennyis\u00e9ge. Ahogy a csapat jav\u00edtja a teljes\u00edtm\u00e9nyt, a korl\u00e1t a megmunk\u00e1l\u00e1sr\u00f3l az ellen\u0151rz\u00e9sre helyez\u0151dhet \u00e1t. A kor\u00e1bbi m\u0171veletek t\u00f6bbletkibocs\u00e1t\u00e1sa nem el\u0151rel\u00e9p\u00e9s, ha csak egy k\u00e9s\u0151bbi, m\u00e1r t\u00falterhelt m\u0171velet v\u00e1rakoz\u00f3 t\u00e9teleit gyarap\u00edtja.<\/p>\n\n\n<p><strong>A k\u00f6vetkez\u0151 mennyis\u00e9gi l\u00e9pcs\u0151 felt\u00e9teleinek megl\u00e9te<\/strong> az adott l\u00e9p\u00e9shez sz\u00fcks\u00e9ges l\u00e9tsz\u00e1mra, anyagokra, szersz\u00e1mokra \u00e9s j\u00f3v\u00e1hagy\u00e1sokra terjed ki. Egy sikeres nappali m\u0171szak nem bizony\u00edtja, hogy a k\u00f6vetkez\u0151 m\u0171szak m\u00e1s szem\u00e9lyzettel is meg tudja ism\u00e9telni ugyanazt.<\/p>\n\n\n<p>Az adatok \u00e1ttekint\u00e9se ut\u00e1n d\u00f6nts\u00f6n a mennyis\u00e9g n\u00f6vel\u00e9s\u00e9r\u0151l, a jelenlegi szint megism\u00e9tl\u00e9s\u00e9r\u0151l, a tervezett mennyis\u00e9g cs\u00f6kkent\u00e9s\u00e9r\u0151l vagy az \u00e9rintett munka sz\u00fcneteltet\u00e9s\u00e9r\u0151l. R\u00f6gz\u00edtse a k\u00f6vetkez\u0151 d\u00f6nt\u00e9s felt\u00e9tel\u00e9t. Ha egy probl\u00e9ma m\u00f3dos\u00edtja a v\u00e1rhat\u00f3 sz\u00e1ll\u00edt\u00e1st, friss\u00edtse az \u00fctemtervet, \u00e9s k\u00f6z\u00f6lje a m\u00f3dos\u00edtott v\u00e1llal\u00e1st, am\u00edg m\u00e9g van id\u0151 m\u00e1s megold\u00e1sban meg\u00e1llapodni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A felfuttat\u00e1s v\u00e9g\u00e9re alak\u00edtson ki ism\u00e9telhet\u0151 gy\u00e1rt\u00e1st biztos\u00edt\u00f3 tervet<\/h2>\n\n\n<p>Ne puszt\u00e1n a legut\u00f3bbi sikeres t\u00e9tel alapj\u00e1n nyilv\u00e1n\u00edtsa lez\u00e1rtnak a bevezet\u00e9st. Ellen\u0151rizze, hogy a tervezett term\u00e9k\u00f6sszet\u00e9tel \u00e9s m\u0171szakrend mellett tart\u00f3san biztos\u00edthat\u00f3-e a sz\u00fcks\u00e9ges felszabad\u00edtott mennyis\u00e9g, a terv sz\u00e1mol-e a visszat\u00e9r\u0151 vesztes\u00e9gekkel, \u00e9s a norm\u00e1l termel\u00e9s felel\u0151sei a bevezet\u00e9si csapat folyamatos beavatkoz\u00e1sa n\u00e9lk\u00fcl is tudj\u00e1k-e ir\u00e1ny\u00edtani a munk\u00e1t.<\/p>\n\n\n<p>Adja \u00e1t a naprak\u00e9sz gy\u00e1rt\u00e1si \u00fatvonalakat \u00e9s id\u0151tartamokat, az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/munkautasitas-keszitese\/\">aktu\u00e1lis munkautas\u00edt\u00e1sokat<\/a>, a felel\u0151ss\u00e9gi k\u00f6r\u00f6ket \u00e9s a m\u00e9g h\u00e1tral\u00e9v\u0151 teend\u0151ket. A bevezet\u00e9s hivatalos lez\u00e1r\u00e1sa ut\u00e1n is hasonl\u00edtsa \u00f6ssze a tervet a t\u00e9nyleges teljes\u00edtm\u00e9nnyel. Nem az \u00fcnnep\u00e9lyes z\u00e1r\u00f3d\u00e1tum a l\u00e9nyeg, hanem az olyan gy\u00e1rt\u00e1s, amelyre a mindennapi sz\u00e1ll\u00edt\u00e1si v\u00e1llal\u00e1sok biztons\u00e1ggal alapozhat\u00f3k.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hozza el \u00faj term\u00e9ke \u00e9s rendel\u00e9s\u00e1llom\u00e1nya adatait egy SkyPlanner-bemutat\u00f3ra<\/h2>\n\n\n<p>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha az \u00faj term\u00e9k bevezet\u00e9se \u00e9s a norm\u00e1l termel\u00e9s ugyanazok\u00e9rt az er\u0151forr\u00e1sok\u00e9rt verseng, \u00fctemterveik \u00f6sszehangol\u00e1sa pedig m\u00e1r k\u00e9zi munk\u00e1t ig\u00e9nyel. A mesters\u00e9ges intelligenci\u00e1val k\u00e9sz\u00edtett k\u00f6z\u00f6s \u00fctemterv, az \u00e1ttekinthet\u0151 m\u0171veletsorrend, valamint a tervezett \u00e9s t\u00e9nyleges id\u0151k \u00f6sszevet\u00e9s\u00e9b\u0151l kapott visszajelz\u00e9s gyakorlati seg\u00edts\u00e9get ny\u00fajt ahhoz, hogy a felfuttat\u00e1s k\u00f6vetkez\u0151 l\u00e9p\u00e9s\u00e9r\u0151l hozott d\u00f6nt\u00e9st az \u00fczemben is v\u00e9gre lehessen hajtani.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozza el az \u00faj term\u00e9k gy\u00e1rt\u00e1si \u00fatvonal\u00e1t, a jelenlegi id\u0151becsl\u00e9seket, valamint a legterheltebb er\u0151forr\u00e1saira m\u00e1r v\u00e1llalt rendel\u00e9sek adatait. E konkr\u00e9t helyzet alapj\u00e1n besz\u00e9lhetj\u00fck \u00e1t, hogyan f\u00e9r be az els\u0151 t\u00e9tel, mit v\u00e1ltoztat a mennyis\u00e9g n\u00f6vel\u00e9se, \u00e9s milyen sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket tesz lehet\u0151v\u00e9 az \u00edgy kialakul\u00f3 \u00fctemterv. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner megold\u00e1s\u00e1t dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen Az \u00faj gy\u00e1rt\u00f3soron elk\u00e9sz\u00fcltek az els\u0151 megfelel\u0151 alkatr\u00e9szek. Az \u00e9rt\u00e9kes\u00edt\u00e9s m\u00e1r sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t k\u00e9r az els\u0151 teljes rendel\u00e9sre. A csapat k\u00f6zben m\u00e9g a be\u00e1ll\u00edt\u00e1sokat finom\u00edtja, a g\u00e9pkezel\u0151ket tan\u00edtja be, \u00e9s azt m\u00e9ri fel, val\u00f3j\u00e1ban mennyi id\u0151t vesz ig\u00e9nybe a munka. A &#8230; <a title=\"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/\" aria-label=\"Read more about Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":108679,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-108661","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen<\/title>\n<meta name=\"description\" content=\"\u00daj term\u00e9k, megb\u00edzhat\u00f3 sz\u00e1ll\u00edt\u00e1s: a termel\u00e9s felfuttat\u00e1sa igazodjon a val\u00f3s gy\u00e1rt\u00e1si id\u0151kh\u00f6z, a k\u00e9pzett dolgoz\u00f3khoz \u00e9s a kapacit\u00e1st m\u00e1r lek\u00f6t\u0151 rendel\u00e9sekhez.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen\" \/>\n<meta property=\"og:description\" content=\"\u00daj term\u00e9k, megb\u00edzhat\u00f3 sz\u00e1ll\u00edt\u00e1s: a termel\u00e9s felfuttat\u00e1sa igazodjon a val\u00f3s gy\u00e1rt\u00e1si id\u0151kh\u00f6z, a k\u00e9pzett dolgoz\u00f3khoz \u00e9s a kapacit\u00e1st m\u00e1r lek\u00f6t\u0151 rendel\u00e9sekhez.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T10:44:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T10:45:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen\",\"datePublished\":\"2026-10-24T10:44:53+00:00\",\"dateModified\":\"2026-10-24T10:45:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/\"},\"wordCount\":4023,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-ramp-up-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/\",\"name\":\"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-ramp-up-hero.png\",\"datePublished\":\"2026-10-24T10:44:53+00:00\",\"dateModified\":\"2026-10-24T10:45:49+00:00\",\"description\":\"\u00daj term\u00e9k, megb\u00edzhat\u00f3 sz\u00e1ll\u00edt\u00e1s: a termel\u00e9s felfuttat\u00e1sa igazodjon a val\u00f3s gy\u00e1rt\u00e1si id\u0151kh\u00f6z, a k\u00e9pzett dolgoz\u00f3khoz \u00e9s a kapacit\u00e1st m\u00e1r lek\u00f6t\u0151 rendel\u00e9sekhez.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-ramp-up-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-ramp-up-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A trial housing progresses to a small production batch and a packed crate ready for delivery.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termeles-felfuttatasa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen","description":"\u00daj term\u00e9k, megb\u00edzhat\u00f3 sz\u00e1ll\u00edt\u00e1s: a termel\u00e9s felfuttat\u00e1sa igazodjon a val\u00f3s gy\u00e1rt\u00e1si id\u0151kh\u00f6z, a k\u00e9pzett dolgoz\u00f3khoz \u00e9s a kapacit\u00e1st m\u00e1r lek\u00f6t\u0151 rendel\u00e9sekhez.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/","og_locale":"hu_HU","og_type":"article","og_title":"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen","og_description":"\u00daj term\u00e9k, megb\u00edzhat\u00f3 sz\u00e1ll\u00edt\u00e1s: a termel\u00e9s felfuttat\u00e1sa igazodjon a val\u00f3s gy\u00e1rt\u00e1si id\u0151kh\u00f6z, a k\u00e9pzett dolgoz\u00f3khoz \u00e9s a kapacit\u00e1st m\u00e1r lek\u00f6t\u0151 rendel\u00e9sekhez.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T10:44:53+00:00","article_modified_time":"2026-10-24T10:45:49+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen","datePublished":"2026-10-24T10:44:53+00:00","dateModified":"2026-10-24T10:45:49+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/"},"wordCount":4023,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/","name":"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png","datePublished":"2026-10-24T10:44:53+00:00","dateModified":"2026-10-24T10:45:49+00:00","description":"\u00daj term\u00e9k, megb\u00edzhat\u00f3 sz\u00e1ll\u00edt\u00e1s: a termel\u00e9s felfuttat\u00e1sa igazodjon a val\u00f3s gy\u00e1rt\u00e1si id\u0151kh\u00f6z, a k\u00e9pzett dolgoz\u00f3khoz \u00e9s a kapacit\u00e1st m\u00e1r lek\u00f6t\u0151 rendel\u00e9sekhez.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png","width":1672,"height":941,"caption":"A trial housing progresses to a small production batch and a packed crate ready for delivery."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termeles-felfuttatasa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-ramp-up-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Termel\u00e9s felfuttat\u00e1sa: csak teljes\u00edthet\u0151t \u00edg\u00e9rjen Az \u00faj gy\u00e1rt\u00f3soron elk\u00e9sz\u00fcltek az els\u0151 megfelel\u0151 alkatr\u00e9szek. Az \u00e9rt\u00e9kes\u00edt\u00e9s m\u00e1r sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t k\u00e9r az els\u0151 teljes rendel\u00e9sre. A csapat k\u00f6zben m\u00e9g a be\u00e1ll\u00edt\u00e1sokat finom\u00edtja, a g\u00e9pkezel\u0151ket tan\u00edtja be, \u00e9s azt m\u00e9ri fel, val\u00f3j\u00e1ban mennyi id\u0151t vesz ig\u00e9nybe a munka. A&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/108661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=108661"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/108661\/revisions"}],"predecessor-version":[{"id":108724,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/108661\/revisions\/108724"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/108679"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=108661"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=108661"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=108661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}