{"id":107987,"date":"2026-10-23T22:14:44","date_gmt":"2026-10-23T22:14:44","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=107987"},"modified":"2026-10-23T22:15:40","modified_gmt":"2026-10-23T22:15:40","slug":"teljes-gyartasi-koltseg","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/","title":{"rendered":"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>A teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g az adott id\u0151szakban felhaszn\u00e1lt k\u00f6zvetlen anyagok k\u00f6lts\u00e9g\u00e9nek, a k\u00f6zvetlen munkaer\u0151k\u00f6lts\u00e9gnek \u00e9s a felmer\u00fclt gy\u00e1rt\u00e1si \u00e1ltal\u00e1nos k\u00f6lts\u00e9geknek az \u00f6sszege.<\/strong> Az id\u0151szak v\u00e9g\u00e9n m\u00e9g befejezetlen termel\u00e9s k\u00f6lts\u00e9g\u00e9t is tartalmazza, nem csup\u00e1n a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz term\u00e9kek\u00e9t.<\/p>\n\n\n<p>A sz\u00e1m\u00edt\u00e1s k\u00e9plete:<\/p>\n\n\n<p><strong>Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g = Felhaszn\u00e1lt k\u00f6zvetlen anyagok k\u00f6lts\u00e9ge + K\u00f6zvetlen munkaer\u0151k\u00f6lts\u00e9g + Gy\u00e1rt\u00e1si \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek<\/strong><\/p>\n\n\n<p>A h\u00e1rom sz\u00e1mot egyszer\u0171 \u00f6sszeadni. A l\u00e9nyegi feladat annak biztos\u00edt\u00e1sa, hogy mindh\u00e1rom ugyanarra a h\u00f3napra \u00e9s ugyanarra a gy\u00e1rt\u00e1si k\u00f6rre vonatkozzon, \u00e9s egyetlen k\u00f6lts\u00e9get se sz\u00e1moljunk el k\u00e9tszer. \u00cdgy megv\u00e1laszolhat\u00f3 a sz\u00e1m\u00edt\u00e1s m\u00f6g\u00f6tt \u00e1ll\u00f3 k\u00e9rd\u00e9s: az\u00e9rt dr\u00e1gult a gy\u00e1rt\u00e1s, mert t\u00f6bbe ker\u00fcltek a felhaszn\u00e1lt er\u0151forr\u00e1sok, mert t\u00f6bbet haszn\u00e1ltunk fel bel\u0151l\u00fck, vagy mert a munka nem a tervek szerint haladt?<\/p>\n\n\n<p>A SkyPlanner APS seg\u00edt \u00f6sszekapcsolni ezt a p\u00e9nz\u00fcgyi k\u00e9rd\u00e9st a gy\u00e1rt\u00e1s val\u00f3s helyzet\u00e9vel. A gy\u00e1rt\u00e1si feladatok id\u0151nyilv\u00e1ntart\u00e1sai, valamint a r\u00f6gz\u00edtett termel\u00e9si \u00e9s anyagfelhaszn\u00e1l\u00e1si adatok pontosabb k\u00e9pet adnak a t\u00f6rt\u00e9ntekr\u0151l. A mesters\u00e9ges intelligenci\u00e1val k\u00e9sz\u00fcl\u0151, k\u00f6z\u00f6sen haszn\u00e1lt gy\u00e1rt\u00e1si \u00fctemterv seg\u00edt kezelni azokat az \u00f6sszehangol\u00e1si probl\u00e9m\u00e1kat, amelyek elker\u00fclhet\u0151 v\u00e1rakoz\u00e1st \u00e9s a feladatsorok folytonos jav\u00edtgat\u00e1s\u00e1t okozz\u00e1k. \u00cdgy a kifizetett kapacit\u00e1s nagyobb r\u00e9sze ford\u00edthat\u00f3 a teljes\u00edtend\u0151 megrendel\u00e9sekre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hozza k\u00f6z\u00f6s alapra a h\u00e1rom k\u00f6lts\u00e9g\u00f6sszetev\u0151t<\/h2>\n\n\n<p>V\u00e1lasszon egy besz\u00e1mol\u00e1si id\u0151szakot, p\u00e9ld\u00e1ul egy napt\u00e1ri h\u00f3napot, \u00e9s hat\u00e1rozza meg, mely \u00fczemre vagy termel\u00e9si ter\u00fcletre terjedjen ki. Gy\u0171jtse \u00f6ssze az id\u0151szak k\u00e9szletmozg\u00e1sait, a termel\u00e9s munkaid\u0151-nyilv\u00e1ntart\u00e1sait \u00e9s a kapcsol\u00f3d\u00f3 \u00fczemi k\u00f6lts\u00e9geket. A felmer\u00fclt k\u00f6lts\u00e9gekkel sz\u00e1moljon, a megfelel\u0151 id\u0151beli elhat\u00e1rol\u00e1sokat is figyelembe v\u00e9ve, ne egyszer\u0171en a h\u00f3nap sor\u00e1n kifizetett sz\u00e1ml\u00e1kat adja \u00f6ssze.<\/p>\n\n\n<p>A k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1s szab\u00e1lyait egyeztesse a p\u00e9nz\u00fcgyi csapattal, \u00e9s alkalmazza \u0151ket k\u00f6vetkezetesen. Ez a sz\u00e1m\u00edt\u00e1s vezet\u0151i szempontb\u00f3l mutatja be a gy\u00e1rt\u00e1si tev\u00e9kenys\u00e9get; a jogszab\u00e1lyok szerinti k\u00e9szlet\u00e9rt\u00e9kel\u00e9s tov\u00e1bbi korrekci\u00f3kat ig\u00e9nyelhet. A havi \u00f6sszehasonl\u00edt\u00e1s akkor hasznos, ha a vizsg\u00e1lt k\u00f6r \u00e1lland\u00f3 marad, \u00e9s nem v\u00e1ltoztatjuk meg a besorol\u00e1st, valah\u00e1nyszor kedvez\u0151tlennek t\u0171nik egy sz\u00e1m.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00f6zvetlen anyagok: a felhaszn\u00e1l\u00e1ssal sz\u00e1moljon, ne az \u00f6sszes beszerz\u00e9ssel<\/h3>\n\n\n<p>A k\u00f6zvetlen anyagok azok az alapanyagok \u00e9s alkatr\u00e9szek, amelyek egy\u00e9rtelm\u0171en hozz\u00e1rendelhet\u0151k a gy\u00e1rtott term\u00e9kekhez: p\u00e9ld\u00e1ul a burkolathoz felhaszn\u00e1lt f\u00e9mlemez vagy az abba be\u00e9p\u00edtett v\u00e1s\u00e1rolt alkatr\u00e9szek.<\/p>\n\n\n<p>Ha a vizsg\u00e1lt k\u00e9szlet kiz\u00e1r\u00f3lag ilyen k\u00f6zvetlen anyagokat tartalmaz:<\/p>\n\n\n<p><strong>Felhaszn\u00e1lt k\u00f6zvetlen anyagok k\u00f6lts\u00e9ge = K\u00f6zvetlen anyagok nyit\u00f3k\u00e9szlet\u00e9nek \u00e9rt\u00e9ke + Nett\u00f3 beszerz\u00e9s \u2212 K\u00f6zvetlen anyagok z\u00e1r\u00f3k\u00e9szlet\u00e9nek \u00e9rt\u00e9ke<\/strong><\/p>\n\n\n<p>K\u00e9szlet\u00e9rt\u00e9kekkel sz\u00e1moljon, ne csup\u00e1n mennyis\u00e9gekkel, \u00e9s v\u00e9gig ugyanazt az \u00e9rt\u00e9kel\u00e9si m\u00f3dszert alkalmazza. A nett\u00f3 beszerz\u00e9sben vegye figyelembe a kapcsol\u00f3d\u00f3 vissz\u00e1rut, engedm\u00e9nyeket \u00e9s beszerz\u00e9si k\u00f6lts\u00e9geket. Ha a vizsg\u00e1lt k\u00e9szlet k\u00f6zvetett \u00fczemi anyagokat is tartalmaz, azok felhaszn\u00e1l\u00e1s\u00e1t vonja le a k\u00f6zvetlen anyagk\u00f6lts\u00e9gb\u0151l, \u00e9s helyette az \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek k\u00f6z\u00e9 sorolja.<\/p>\n\n\n<p>Egy anyagsz\u00e1ll\u00edtm\u00e1ny be\u00e9rkez\u00e9se \u00f6nmag\u00e1ban m\u00e9g nem jelent t\u00e1rgyhavi gy\u00e1rt\u00e1si anyagfelhaszn\u00e1l\u00e1st. Ha az anyag a h\u00f3nap v\u00e9g\u00e9n m\u00e9g az alapanyagrakt\u00e1rban van, a z\u00e1r\u00f3k\u00e9szlet levon\u00e1s\u00e1val kiker\u00fcl a sz\u00e1m\u00edt\u00e1sb\u00f3l. Ugyanakkor a t\u00e1rgyh\u00f3napban felhaszn\u00e1lt anyagot kor\u00e1bban is beszerezhett\u00e9k.<\/p>\n\n\n<p>Egyeztesse a k\u00e9szletmozg\u00e1sokat a termel\u00e9snek kiadott \u00e9s onnan visszav\u00e9telezett anyagokkal, valamint a nyilv\u00e1ntartott vesztes\u00e9gekkel. A selejt nem t\u0171nhet el az elsz\u00e1mol\u00e1sb\u00f3l csak az\u00e9rt, mert nem lett bel\u0151le megfelel\u0151 k\u00e9szterm\u00e9k. A rendk\u00edv\u00fcli vesztes\u00e9geket elk\u00fcl\u00f6n\u00edtve mutassa ki a megfelel\u0151 sz\u00e1mviteli kezel\u00e9s \u00e9s az \u00fczemi kivizsg\u00e1l\u00e1s \u00e9rdek\u00e9ben, ne sz\u00e1molja el \u0151ket \u00e9szrev\u00e9tlen\u00fcl hasznos anyagfelhaszn\u00e1l\u00e1sk\u00e9nt.<\/p>\n\n\n<p>A SkyPlanner lehet\u0151v\u00e9 teszi, hogy a dolgoz\u00f3k a gy\u00e1rt\u00e1si feladat r\u00f6gz\u00edt\u00e9sekor jelents\u00e9k a hib\u00e1s darabokat, \u00e9s azok anyagfelhaszn\u00e1l\u00e1s\u00e1t is figyelembe veszi. \u00cdgy a hib\u00e1s darabok k\u00f6lts\u00e9ge a megfelel\u0151 darabok mellett is l\u00e1that\u00f3 marad. A felhaszn\u00e1l\u00e1si nyilv\u00e1ntart\u00e1sokat a t\u00e9nylegesen elv\u00e9gzett munk\u00e1val vesse \u00f6ssze; egy v\u00e1ltozatlan anyagjegyz\u00e9k \u00f6nmag\u00e1ban nem magyar\u00e1zza meg, mi\u00e9rt kellett egy adott gy\u00e1rt\u00e1si t\u00e9telhez t\u00f6bb anyag.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00f6zvetlen munkaer\u0151: a munka\u00f3r\u00e1khoz a megfelel\u0151 k\u00f6lts\u00e9get rendelje<\/h3>\n\n\n<p>A k\u00f6zvetlen munkaer\u0151k\u00f6lts\u00e9g a gy\u00e1rt\u00e1si feladatokon k\u00f6zvetlen\u00fcl dolgoz\u00f3k k\u00f6lts\u00e9ge. A gyakorlatban \u00edgy sz\u00e1m\u00edthat\u00f3 ki:<\/p>\n\n\n<p><strong>K\u00f6zvetlen munkaer\u0151k\u00f6lts\u00e9g = A (K\u00f6zvetlen munka\u00f3r\u00e1k \u00d7 Alkalmazand\u00f3 \u00f3r\u00e1nk\u00e9nti munkaer\u0151k\u00f6lts\u00e9g) szorzatok \u00f6sszege<\/strong><\/p>\n\n\n<p>El\u0151sz\u00f6r munkav\u00e1llal\u00f3nk\u00e9nt vagy azonos \u00f3rak\u00f6lts\u00e9g\u0171 csoportonk\u00e9nt sz\u00e1molja ki a k\u00f6lts\u00e9get, majd adja \u00f6ssze az eredm\u00e9nyeket. Ne csak az alapb\u00e9rt vegye figyelembe, hanem a bels\u0151 szab\u00e1lyok szerint a k\u00f6zvetlen munkaer\u0151h\u00f6z rendelt munk\u00e1ltat\u00f3i k\u00f6lts\u00e9geket is, p\u00e9ld\u00e1ul a b\u00e9rhez kapcsol\u00f3d\u00f3 k\u00f6zterheket \u00e9s juttat\u00e1sokat. A t\u00fal\u00f3rap\u00f3tl\u00e9kokat kezelje k\u00f6vetkezetesen, \u00e9s a feladatok munkaid\u0151-nyilv\u00e1ntart\u00e1sait egyeztesse a b\u00e9rsz\u00e1mfejt\u00e9ssel, hogy a kifizetett termel\u00e9si munkaid\u0151 teljes eg\u00e9sz\u00e9ben szerepeljen az elsz\u00e1mol\u00e1sban.<\/p>\n\n\n<p>A dolgoz\u00f3k munka\u00f3r\u00e1ival sz\u00e1moljon, ne a megrendel\u00e9s \u00e1tfut\u00e1si idej\u00e9vel. Ha k\u00e9t ember egy \u00f3r\u00e1n \u00e1t dolgozik, az k\u00e9t munka\u00f3r\u00e1t jelent. Egy g\u00e9p egy\u00f3r\u00e1s, fel\u00fcgyelet n\u00e9lk\u00fcli m\u0171k\u00f6d\u00e9se nem felt\u00e9tlen\u00fcl jelent egy \u00f3ra k\u00f6zvetlen munk\u00e1t. A t\u00f6bb feladatot kiszolg\u00e1l\u00f3 fel\u00fcgyelet, karbantart\u00e1s \u00e9s m\u00e1s \u00fczemi t\u00e1mogat\u00f3 munka \u00e1ltal\u00e1ban a k\u00f6zvetett munkaer\u0151k\u00f6lts\u00e9gek k\u00f6z\u00e9 tartozik, ha gazdas\u00e1gosan nem rendelhet\u0151 hozz\u00e1 egy-egy gy\u00e1rt\u00e1si feladathoz.<\/p>\n\n\n<p>A SkyPlanner id\u0151nyilv\u00e1ntart\u00e1sai a t\u00e9nyleges munkav\u00e9gz\u00e9st a dolgoz\u00f3hoz \u00e9s a gy\u00e1rt\u00e1si feladathoz kapcsolj\u00e1k. A tervezett \u00e9s t\u00e9nyleges adatokat \u00f6sszehasonl\u00edt\u00f3 jelent\u00e9s a tervezett id\u0151tartamokat a t\u00e9nyleges gy\u00e1rt\u00e1si id\u0151kkel veti \u00f6ssze. \u00cdgy van honnan elindulni a t\u00fall\u00e9p\u00e9s kivizsg\u00e1l\u00e1s\u00e1hoz, miel\u0151tt azt felt\u00e9telezn\u00e9, hogy az \u00f3rab\u00e9r okozza a probl\u00e9m\u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Gy\u00e1rt\u00e1si \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek: az \u00fczemi h\u00e1tt\u00e9r k\u00f6lts\u00e9geit csak egyszer sz\u00e1molja el<\/h3>\n\n\n<p>A gy\u00e1rt\u00e1si \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek a termel\u00e9s k\u00f6zvetett k\u00f6lts\u00e9geit foglalj\u00e1k magukban: az \u00fczem b\u00e9rleti d\u00edj\u00e1t, a gy\u00e1rt\u00f3berendez\u00e9sek \u00e9rt\u00e9kcs\u00f6kken\u00e9s\u00e9t, a k\u00f6z\u00f6s k\u00f6z\u00fczemi k\u00f6lts\u00e9geket, a karbantart\u00e1st, valamint a k\u00f6zvetett anyag- \u00e9s munkaer\u0151k\u00f6lts\u00e9geket. Az \u00e9rt\u00e9kes\u00edt\u00e9si \u00e9s az \u00e1ltal\u00e1nos v\u00e1llalatir\u00e1ny\u00edt\u00e1si k\u00f6lts\u00e9gek nem tartoznak ebbe a gy\u00e1rt\u00e1sik\u00f6lts\u00e9g-sz\u00e1m\u00edt\u00e1sba.<\/p>\n\n\n<p>Egy lez\u00e1rt id\u0151szak \u00f6sszk\u00f6lts\u00e9g\u00e9nek meg\u00e1llap\u00edt\u00e1s\u00e1hoz a kijel\u00f6lt \u00fczemi k\u00f6rben t\u00e9nylegesen felmer\u00fclt \u00e1ltal\u00e1nos k\u00f6lts\u00e9geket adja \u00f6ssze. Ha a gy\u00e1rt\u00e1si feladatokra m\u00e1r el\u0151re meghat\u00e1rozott p\u00f3tl\u00e9kkulccsal sz\u00e1moltak el \u00e1ltal\u00e1nos k\u00f6lts\u00e9get, az \u00edgy felosztott \u00f6sszeget egyeztesse a t\u00e9nyleges \u00e1ltal\u00e1nos k\u00f6lts\u00e9ggel. Ne adja hozz\u00e1 a teljes t\u00e9nyleges \u00e1ltal\u00e1nos k\u00f6lts\u00e9get olyan feladatk\u00f6lts\u00e9gekhez, amelyek azt m\u00e1r tartalmazz\u00e1k.<\/p>\n\n\n<p>Akkor is k\u00f6vetkezetes feloszt\u00e1si m\u00f3dszerre van sz\u00fcks\u00e9g, amikor <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-altalanos-koltsegek\/\">az \u00e1ltal\u00e1nos k\u00f6lts\u00e9geket egyes term\u00e9kekre vagy megrendel\u00e9sekre osztja fel<\/a>. Ez m\u00e1s feladat, mint az \u00fczem t\u00e1rgyhavi \u00f6sszk\u00f6lts\u00e9g\u00e9nek meghat\u00e1roz\u00e1sa: el\u0151sz\u00f6r tiszt\u00e1zza, mit tartalmaz a felosztand\u00f3 k\u00f6lts\u00e9g, majd d\u00f6ntse el, hogyan terhelje azt az egyes gy\u00e1rt\u00e1si feladatokra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u00e9lda a teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9gre: egy h\u00f3nap tev\u00e9kenys\u00e9ge<\/h2>\n\n\n<p>Vegy\u00fcnk egy gy\u00e1rt\u00f3v\u00e1llalkoz\u00e1st, amely \u00e9ppen a gy\u00e1rt\u00e1si k\u00f6lts\u00e9gek havi z\u00e1r\u00e1s\u00e1t v\u00e9gzi. Alapanyagk\u00e9szlete k\u00f6zvetlen anyagokat \u00e9s k\u00f6zvetett \u00fczemi anyagokat egyar\u00e1nt tartalmaz. Az al\u00e1bbi \u00f6sszegek szeml\u00e9ltet\u0151 jelleg\u0171ek, \u00e9s amerikai doll\u00e1rban \u00e9rtend\u0151k.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u00d6sszetev\u0151<\/th><th>T\u00e1rgyhavi sz\u00e1m\u00edt\u00e1s<\/th><th>K\u00f6lts\u00e9g<\/th><\/tr><\/thead><tbody><tr><td>\u00d6sszes anyagfelhaszn\u00e1l\u00e1s<\/td><td>24 000 $ nyit\u00f3k\u00e9szlet + 86 000 $ nett\u00f3 beszerz\u00e9s \u2212 30 000 $ z\u00e1r\u00f3k\u00e9szlet<\/td><td>80 000 $<\/td><\/tr><tr><td>Felhaszn\u00e1lt k\u00f6zvetlen anyagok k\u00f6lts\u00e9ge<\/td><td>80 000 $ anyagfelhaszn\u00e1l\u00e1s \u2212 5 000 $ k\u00f6zvetett anyag, amely az \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek k\u00f6z\u00f6tt szerepel<\/td><td>75 000 $<\/td><\/tr><tr><td>K\u00f6zvetlen munkaer\u0151k\u00f6lts\u00e9g<\/td><td>1 200 munka\u00f3ra \u00d7 30 $ \u00f3r\u00e1nk\u00e9nti k\u00f6lts\u00e9g, a hozz\u00e1rendelt munk\u00e1ltat\u00f3i terhekkel egy\u00fctt<\/td><td>36 000 $<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek<\/td><td>5 000 $ k\u00f6zvetett anyagk\u00f6lts\u00e9g + 12 000 $ k\u00f6zvetett munkaer\u0151k\u00f6lts\u00e9g + 9 000 $ b\u00e9rleti d\u00edj + 6 000 $ k\u00f6z\u00fczemi k\u00f6lts\u00e9g + 8 000 $ \u00e9rt\u00e9kcs\u00f6kken\u00e9s + 4 000 $ karbantart\u00e1s<\/td><td>44 000 $<\/td><\/tr><tr><td>Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g<\/td><td>75 000 $ + 36 000 $ + 44 000 $<\/td><td>155 000 $<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az 80 000 $ \u00f6sszeg\u0171 anyagfelhaszn\u00e1l\u00e1s sora k\u00f6zbens\u0151 sz\u00e1m\u00edt\u00e1si l\u00e9p\u00e9s, nem pedig a v\u00e9g\u00f6sszeghez hozz\u00e1adand\u00f3 \u00fajabb k\u00f6lts\u00e9g. Az ebben foglalt 5 000 $ k\u00f6zvetett anyagk\u00f6lts\u00e9g egyszer szerepel az \u00f6sszes\u00edt\u00e9sben, az \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek k\u00f6z\u00f6tt. A 30 $ \u00f3r\u00e1nk\u00e9nti munkaer\u0151k\u00f6lts\u00e9g m\u00e1r tartalmazza a k\u00f6zvetlen munkaer\u0151h\u00f6z rendelt munk\u00e1ltat\u00f3i k\u00f6lts\u00e9geket, ez\u00e9rt ezeket m\u00e1shol nem szabad \u00fajra hozz\u00e1adni.<\/p>\n\n\n<p>Az eredm\u00e9ny azt jelenti, hogy <strong>a h\u00f3nap sor\u00e1n 155 000 $ gy\u00e1rt\u00e1si k\u00f6lts\u00e9g mer\u00fclt fel<\/strong>. Nem azt jelenti, hogy a v\u00e1llalkoz\u00e1s 155 000 $ \u00e9rt\u00e9k\u0171 anyagot v\u00e1s\u00e1rolt, 155 000 $ \u00f6nk\u00f6lts\u00e9g\u0171 k\u00e9szterm\u00e9ket \u00e1ll\u00edtott el\u0151, vagy 155 000 $ \u00f6nk\u00f6lts\u00e9g\u0171 term\u00e9ket \u00e9rt\u00e9kes\u00edtett.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u00fcl\u00f6n\u00edtse el a felmer\u00fclt k\u00f6lts\u00e9get az elk\u00e9sz\u00fclt \u00e9s az \u00e9rt\u00e9kes\u00edtett term\u00e9kek \u00f6nk\u00f6lts\u00e9g\u00e9t\u0151l<\/h2>\n\n\n<p>A t\u00e1rgyhavi munka egy r\u00e9sze befejezetlen maradhat. A h\u00f3napban elk\u00e9sz\u00fclt term\u00e9kek egy r\u00e9sze pedig m\u00e9g rakt\u00e1ron lehet. Ezek a k\u00e9szletv\u00e1ltoz\u00e1sok magyar\u00e1zz\u00e1k, mi\u00e9rt t\u00e9r el egym\u00e1st\u00f3l a teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g, az elk\u00e9sz\u00fclt term\u00e9kek \u00f6nk\u00f6lts\u00e9ge \u00e9s az \u00e9rt\u00e9kes\u00edtett term\u00e9kek \u00f6nk\u00f6lts\u00e9ge.<\/p>\n\n\n<p>Az el\u0151z\u0151 p\u00e9ld\u00e1t folytatva tegy\u00fck fel, hogy a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/befejezetlen-termeles\/\">befejezetlen termel\u00e9s<\/a> nyit\u00f3\u00e9rt\u00e9ke 20 000 $, z\u00e1r\u00f3\u00e9rt\u00e9ke pedig 25 000 $. Ha nincs m\u00e1s \u00e9rt\u00e9kel\u00e9si korrekci\u00f3:<\/p>\n\n\n<p><strong>Elk\u00e9sz\u00fclt term\u00e9kek \u00f6nk\u00f6lts\u00e9ge = Befejezetlen termel\u00e9s nyit\u00f3\u00e9rt\u00e9ke + Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g \u2212 Befejezetlen termel\u00e9s z\u00e1r\u00f3\u00e9rt\u00e9ke<\/strong><\/p>\n\n\n<p><strong>20 000 $ + 155 000 $ \u2212 25 000 $ = 150 000 $<\/strong><\/p>\n\n\n<p>\u00cdgy 150 000 $ ker\u00fcl \u00e1t a k\u00e9szterm\u00e9kek \u00e1llom\u00e1ny\u00e1ba. A befejezetlen termel\u00e9s \u00e9rt\u00e9k\u00e9nek n\u00f6veked\u00e9se magyar\u00e1zza, hogy a befejezett termel\u00e9s \u00f6nk\u00f6lts\u00e9ge mi\u00e9rt alacsonyabb a t\u00e1rgyh\u00f3napban felmer\u00fclt k\u00f6lts\u00e9gn\u00e9l.<\/p>\n\n\n<p>Tegy\u00fck fel tov\u00e1bb\u00e1, hogy a k\u00e9szterm\u00e9kek nyit\u00f3k\u00e9szlet\u00e9nek \u00e9rt\u00e9ke 18 000 $, a z\u00e1r\u00f3k\u00e9szlet\u00e9 pedig 23 000 $:<\/p>\n\n\n<p><strong>\u00c9rt\u00e9kes\u00edtett term\u00e9kek \u00f6nk\u00f6lts\u00e9ge = K\u00e9szterm\u00e9kek nyit\u00f3k\u00e9szlet\u00e9nek \u00e9rt\u00e9ke + Elk\u00e9sz\u00fclt term\u00e9kek \u00f6nk\u00f6lts\u00e9ge \u2212 K\u00e9szterm\u00e9kek z\u00e1r\u00f3k\u00e9szlet\u00e9nek \u00e9rt\u00e9ke<\/strong><\/p>\n\n\n<p><strong>18 000 $ + 150 000 $ \u2212 23 000 $ = 145 000 $<\/strong><\/p>\n\n\n<p>A gy\u00e1rt\u00e1si tev\u00e9kenys\u00e9g \u00e9rt\u00e9kel\u00e9s\u00e9hez az id\u0151szak 155 000 $ \u00f6sszk\u00f6lts\u00e9g\u00e9t haszn\u00e1lja. Ha azt vizsg\u00e1lja, milyen \u00e9rt\u00e9k ker\u00fclt a k\u00e9szterm\u00e9kk\u00e9szletbe, a befejezett term\u00e9kek 150 000 $ k\u00f6lts\u00e9g\u00e9b\u0151l induljon ki. A brutt\u00f3 eredm\u00e9ny \u00e9rt\u00e9kel\u00e9sekor az \u00e9rt\u00e9kes\u00edtett term\u00e9kek 145 000 $ k\u00f6lts\u00e9g\u00e9t vesse \u00f6ssze a hozz\u00e1juk tartoz\u00f3 \u00e1rbev\u00e9tellel. Ha k\u00f6zvetlen\u00fcl az e havi teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9get vonn\u00e1 le az \u00e1rbev\u00e9telb\u0151l, \u00f6sszekevern\u00e9 a gy\u00e1rt\u00e1si tev\u00e9kenys\u00e9get olyan term\u00e9kek \u00e9rt\u00e9kes\u00edt\u00e9s\u00e9vel, amelyek nem felt\u00e9tlen\u00fcl azonosak az adott h\u00f3napban gy\u00e1rtottakkal.<\/p>\n\n\n<p>Ez a k\u00fcl\u00f6nbs\u00e9gt\u00e9tel az egys\u00e9gk\u00f6lts\u00e9gekn\u00e9l is fontos. Ha v\u00e1ltozik a befejezetlen termel\u00e9s \u00e1llom\u00e1nya, f\u00e9lrevezet\u0151 lehet a havi teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9get az elk\u00e9sz\u00fclt darabsz\u00e1mmal elosztani. \u00d6sszehasonl\u00edthat\u00f3 term\u00e9kekb\u0151l \u00e1ll\u00f3, befejezett gy\u00e1rt\u00e1si t\u00e9teln\u00e9l a t\u00e9telre elsz\u00e1molt gy\u00e1rt\u00e1si k\u00f6lts\u00e9get ossza el az elk\u00e9sz\u00fclt, megfelel\u0151 min\u0151s\u00e9g\u0171 darabok sz\u00e1m\u00e1val. Elt\u00e9r\u0151 term\u00e9kek eset\u00e9n ink\u00e1bb az egyes rendel\u00e9sek vagy term\u00e9kcsal\u00e1dok kisz\u00e1m\u00edtott k\u00f6lts\u00e9geit hasonl\u00edtsa \u00f6ssze, ne tekintsen minden k\u00e9szterm\u00e9ket egyen\u00e9rt\u00e9k\u0171nek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Der\u00edtse ki, mi\u00e9rt ker\u00fclt a v\u00e1rtn\u00e1l t\u00f6bbe egy gy\u00e1rt\u00e1si t\u00e9tel<\/h2>\n\n\n<p>A magasabb havi \u00f6sszk\u00f6lts\u00e9g nem jelent automatikusan rosszabb hat\u00e9konys\u00e1got. Lehet, hogy t\u00f6bb term\u00e9k k\u00e9sz\u00fclt, vagy nagyobb r\u00e1ford\u00edt\u00e1st ig\u00e9nyelt a term\u00e9k\u00f6sszet\u00e9tel. A teljes\u00edtm\u00e9ny vizsg\u00e1lat\u00e1hoz a t\u00e9nyleges felhaszn\u00e1l\u00e1st vesse \u00f6ssze a t\u00e9nylegesen elk\u00e9sz\u00fclt, megfelel\u0151 min\u0151s\u00e9g\u0171 term\u00e9kekhez el\u0151ir\u00e1nyzott anyagmennyis\u00e9ggel \u00e9s munkaid\u0151vel.<\/p>\n\n\n<p>Vegy\u00fcnk egy ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si t\u00e9telt, amelyb\u0151l 100 megfelel\u0151 min\u0151s\u00e9g\u0171 k\u00e9sz\u00fcl\u00e9kh\u00e1z k\u00e9sz\u00fcl. Ehhez a kibocs\u00e1t\u00e1shoz az elfogadott norma 200 kg anyagot \u00e9s 10 k\u00f6zvetlen munka\u00f3r\u00e1t ir\u00e1nyoz el\u0151. A m\u0171szaki k\u00f6vetelm\u00e9nyek \u00e9s az elv\u00e9gzend\u0151 gy\u00e1rt\u00e1si feladatok nem v\u00e1ltoztak.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>R\u00e1ford\u00edt\u00e1s<\/th><th>El\u0151ir\u00e1nyzott r\u00e1ford\u00edt\u00e1s 100 megfelel\u0151 darabra<\/th><th>T\u00e9nyleges r\u00e1ford\u00edt\u00e1s 100 megfelel\u0151 darabra<\/th><th>K\u00f6zvetlen t\u00f6bbletk\u00f6lts\u00e9g<\/th><\/tr><\/thead><tbody><tr><td>Anyag<\/td><td>200 kg \u00d7 5 $\/kg = 1 000 $<\/td><td>220 kg \u00d7 5,50 $\/kg = 1 210 $<\/td><td>210 $<\/td><\/tr><tr><td>K\u00f6zvetlen munka<\/td><td>10 munka\u00f3ra \u00d7 30 $\/munka\u00f3ra = 300 $<\/td><td>12 munka\u00f3ra \u00d7 32 $\/munka\u00f3ra = 384 $<\/td><td>84 $<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az anyagk\u00f6lts\u00e9g t\u00fall\u00e9p\u00e9se k\u00e9t r\u00e9szre bonthat\u00f3:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\u00c1relt\u00e9r\u00e9s hat\u00e1sa:<\/strong> 220 kg t\u00e9nyleges felhaszn\u00e1l\u00e1s \u00d7 (5,50 $ \u2212 5 $) = 110 $.<\/li><li><strong>Felhaszn\u00e1l\u00e1si elt\u00e9r\u00e9s hat\u00e1sa:<\/strong> (220 kg t\u00e9nyleges felhaszn\u00e1l\u00e1s \u2212 200 kg el\u0151ir\u00e1nyzott mennyis\u00e9g) \u00d7 5 $ = 100 $.<\/li><\/ul>\n\n\n<p>A 110 $ elt\u00e9r\u00e9s az anyag\u00e9rt\u00e9kel\u00e9s, a beszerz\u00e9si felt\u00e9telek vagy a beszerz\u00e9si \u00e1r vizsg\u00e1lat\u00e1ra ir\u00e1ny\u00edtja a figyelmet. A 100 $ elt\u00e9r\u00e9s a t\u00f6bbletfelhaszn\u00e1l\u00e1s okaira mutat r\u00e1: a szab\u00e1si anyagkihozatalra, a selejtre, az ut\u00f3munk\u00e1ra vagy m\u00e1s gy\u00e1rt\u00e1si okra. A t\u00e9nyleges 5,50 $ a felhaszn\u00e1lt anyagra elsz\u00e1molt k\u00f6lts\u00e9g, nem felt\u00e9tlen\u00fcl a legut\u00f3bbi besz\u00e1ll\u00edt\u00f3i \u00e1raj\u00e1nlat szerinti \u00e1r.<\/p>\n\n\n<p>A munkak\u00f6lts\u00e9g elt\u00e9r\u00e9se hasonl\u00f3an bonthat\u00f3 fel:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\u00d3rad\u00edjelt\u00e9r\u00e9s hat\u00e1sa:<\/strong> 12 t\u00e9nyleges munka\u00f3ra \u00d7 (32 $ \u2212 30 $) = 24 $.<\/li><li><strong>Id\u0151elt\u00e9r\u00e9s hat\u00e1sa:<\/strong> (12 t\u00e9nyleges munka\u00f3ra \u2212 10 el\u0151ir\u00e1nyzott munka\u00f3ra) \u00d7 30 $ = 60 $.<\/li><\/ul>\n\n\n<p>Ellen\u0151rizze, hogy t\u00fal\u00f3ra vagy a beosztott dolgoz\u00f3k \u00f6sszet\u00e9tele miatt v\u00e1ltozott-e az \u00f3rad\u00edj. A t\u00f6bblet\u00f3r\u00e1k ok\u00e1t az \u00e1t\u00e1ll\u00e1sok, a megism\u00e9telt munk\u00e1k \u00e9s a gy\u00e1rt\u00e1si feladatokhoz f\u0171z\u00f6tt megjegyz\u00e9sek alapj\u00e1n vizsg\u00e1lja. Az id\u0151r\u00e1ford\u00edt\u00e1s elt\u00e9r\u00e9se megmutatja, hol \u00e9rdemes keresni az okot, de \u00f6nmag\u00e1ban nem bizony\u00edtja, hogy a g\u00e9pkezel\u0151 nem dolgozott hat\u00e9konyan.<\/p>\n\n\n<p>Ezek egy\u00fcttesen <strong>294 $ k\u00f6zvetlen t\u00f6bbletk\u00f6lts\u00e9get<\/strong> magyar\u00e1znak meg, m\u00e9g az \u00e1ltal\u00e1nos k\u00f6lts\u00e9gek vizsg\u00e1lata el\u0151tt. Elt\u00e9r\u0151 int\u00e9zked\u00e9seket is indokolnak. Az anyag\u00e1r lealkud\u00e1sa nem jav\u00edtja a rossz szab\u00e1si anyagkihozatalt, az \u00f3rab\u00e9r cs\u00f6kkent\u00e9se pedig nem oldja meg, ha a gy\u00e1rt\u00e1si feladatok \u00fajra meg \u00fajra egy megel\u0151z\u0151 m\u0171veletre v\u00e1rnak. Ha a t\u00e9telre el\u0151re meghat\u00e1rozott \u00e1ltal\u00e1nosk\u00f6lts\u00e9g-kulccsal sz\u00e1moltak el k\u00f6lts\u00e9get, az \u00edgy felosztott \u00e9s a t\u00e9nyleges \u00e1ltal\u00e1nos k\u00f6lts\u00e9g k\u00f6z\u00f6tti elt\u00e9r\u00e9st k\u00fcl\u00f6n vizsg\u00e1lja, ne keverje a k\u00f6zvetlen k\u00f6lts\u00e9gek itt bemutatott elt\u00e9r\u00e9sei k\u00f6z\u00e9.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A k\u00f6lts\u00e9gek okainak felt\u00e1r\u00e1s\u00e1b\u00f3l legyen jobb gy\u00e1rt\u00e1si terv<\/h2>\n\n\n<p>Ha m\u00e1r l\u00e1that\u00f3 az ok, ott avatkozzon be, ahol az felmer\u00fclt. Anyag\u00e1rprobl\u00e9m\u00e1n\u00e1l a beszerz\u00e9st \u00e9s a m\u0171szaki el\u0151\u00edr\u00e1sokat kell vizsg\u00e1lni. A t\u00fal sok selejt folyamatfejleszt\u00e9st vagy min\u0151s\u00e9g\u00fcgyi int\u00e9zked\u00e9st ig\u00e9nyel. Ha viszont a fizetett munkaid\u0151 az\u00e9rt v\u00e9sz el, mert a munkav\u00e9gz\u00e9s felt\u00e9telei nem egyszerre \u00e1llnak rendelkez\u00e9sre, \u00e9s folyton \u00e1t kell \u00fctemezni, akkor <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">a munk\u00e1t \u00f6sszehangol\u00f3 gy\u00e1rt\u00e1si terv<\/a> jelenti a megold\u00e1st.<\/p>\n\n\n<p>Gondoljon a k\u00e9sz\u00fcl\u00e9kh\u00e1zakra, amelyek v\u00e1g\u00e1son, hajl\u00edt\u00e1son \u00e9s \u00f6sszeszerel\u00e9sen mennek kereszt\u00fcl. Az \u00f6sszeszerel\u00e9shez rendelkez\u00e9sre \u00e1llnak a dolgoz\u00f3k, de a hajl\u00edtott alkatr\u00e9szek m\u00e9g nincsenek k\u00e9szen. A m\u0171vezet\u0151 \u00e1trendezi a feladatok sorrendj\u00e9t, k\u00e9s\u0151bb pedig a k\u00e9s\u00e9sben l\u00e9v\u0151 t\u00e9telt csak t\u00fal\u00f3r\u00e1val lehet a kisz\u00e1ll\u00edt\u00e1sra elk\u00e9sz\u00edteni. A probl\u00e9ma nem egyszer\u0171en az, hogy dr\u00e1ga egy munka\u00f3ra, hanem az, hogy a sz\u00fcks\u00e9ges m\u0171veletek \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sok id\u0151ben nem voltak \u00f6sszehangolva.<\/p>\n\n\n<p>A SkyPlanner \u00fctemez\u00e9sre szolg\u00e1l\u00f3 mesters\u00e9ges intelligenci\u00e1ja, az Arcturus a munka\u00e1llom\u00e1sok, m\u0171szakok, dolgoz\u00f3k, m\u0171veleti id\u0151tartamok, f\u00fcgg\u0151s\u00e9gek \u00e9s priorit\u00e1sok alapj\u00e1n \u00f6sszehangolt \u00fctemtervet sz\u00e1m\u00edt ki. Ha az anyagell\u00e1t\u00e1st is figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa is befoly\u00e1solja a sz\u00e1m\u00edt\u00e1st. \u00d6n adja meg a priorit\u00e1sokat, \u00e9s z\u00e1rol\u00e1sokkal r\u00f6gz\u00edti a d\u00f6nt\u00e9seit; az Arcturus ezek alapj\u00e1n kisz\u00e1m\u00edtja az id\u0151z\u00edt\u00e9st, amely a Gantt-diagramon jelenik meg.<\/p>\n\n\n<p>\u00cdgy a gy\u00e1rt\u00e1stervez\u0151 \u00f6sszehangolhatja a k\u00e9sz\u00fcl\u00e9kh\u00e1zak gy\u00e1rt\u00e1si \u00fatvonal\u00e1t a hajl\u00edt\u00e1si \u00e9s \u00f6sszeszerel\u00e9si kapacit\u00e1s\u00e9rt verseng\u0151 t\u00f6bbi rendel\u00e9ssel, ahelyett, hogy minden er\u0151forr\u00e1s feladatsor\u00e1t k\u00fcl\u00f6n-k\u00fcl\u00f6n jav\u00edtgatn\u00e1. Ha v\u00e1ltoznak a k\u00f6r\u00fclm\u00e9nyek, a k\u00f6z\u00f6s terv \u00fajrasz\u00e1m\u00edt\u00e1sa l\u00e1that\u00f3v\u00e1 teszi a k\u00e9s\u0151bbi munk\u00e1kra gyakorolt hat\u00e1st. Kevesebb id\u0151 megy el k\u00fcl\u00f6n list\u00e1k karbantart\u00e1s\u00e1ra, a fizetett kapacit\u00e1s pedig az elker\u00fclhet\u0151 v\u00e1rakoz\u00e1s helyett a sz\u00fcks\u00e9ges rendel\u00e9sek teljes\u00edt\u00e9s\u00e9t szolg\u00e1lhatja.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1sban el\u00e9rt eredm\u00e9nyek mellett az \u00fczleti hat\u00e1st is ellen\u0151rizze. A t\u00fal\u00f3ra elker\u00fcl\u00e9se cs\u00f6kkentheti a kiad\u00e1sokat. Ha ugyanabban a fizetett m\u0171szakban egy tov\u00e1bbi sz\u00fcks\u00e9ges rendel\u00e9s is elk\u00e9sz\u00fcl, azzal hasznos kapacit\u00e1s keletkezik, m\u00e9g ha a b\u00e9rk\u00f6lts\u00e9g nem is v\u00e1ltozik. Mindkett\u0151 \u00e9rt\u00e9kes, de p\u00e9nz\u00fcgyileg nem ugyanazt jelenti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott az \u00f6sszehangolt \u00fctemez\u00e9s a Mamecn\u00e9l?<\/h3>\n\n\n<p>A kever\u00e9stechnikai berendez\u00e9seket \u00e9s b\u00e9rgy\u00e1rt\u00e1sban cs\u00facstechnol\u00f3gi\u00e1j\u00fa term\u00e9keket gy\u00e1rt\u00f3 <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">Mamec<\/a> kor\u00e1bban pap\u00edralap\u00fa munkalapok \u00e9s az ERP-rendszer tervez\u00e9si funkci\u00f3i seg\u00edts\u00e9g\u00e9vel hat\u00e1rozta meg t\u00f6bb ezer, egym\u00e1st\u00f3l f\u00fcgg\u0151 gy\u00e1rt\u00e1si rendel\u00e9s priorit\u00e1s\u00e1t. A teljes terhel\u00e9st neh\u00e9z volt \u00e1tl\u00e1tni, a priorit\u00e1sok k\u00e9zi meghat\u00e1roz\u00e1sa pedig megterhelte a termel\u00e9sir\u00e1ny\u00edt\u00e1st.<\/p>\n\n\n<p>A v\u00e1llalat \u00f6sszekapcsolta a SkyPlanner rendszer\u00e9t az Oscar ERP rendszerrel, \u00e9s mesters\u00e9ges intelligenci\u00e1val t\u00e1mogatott, v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9st vezetett be, amelyben minden \u00e9rintett ugyanazt a munkatervet l\u00e1tja. Besz\u00e1mol\u00f3juk szerint cs\u00f6kkent a munka\u00e1llom\u00e1sok \u00e1ll\u00e1sideje, \u00e9rezhet\u0151en kisebb lett a tervez\u00e9si munkateher, \u00e9s re\u00e1lisabb\u00e1 v\u00e1ltak az \u00e1tfut\u00e1si id\u0151k. Mivel a g\u00e9pkezel\u0151k tudj\u00e1k, mi lesz a k\u00f6vetkez\u0151 feladat, a hossz\u00fa g\u00e9pi ciklusok alatt el\u0151k\u00e9sz\u00edthetik a soron k\u00f6vetkez\u0151 munk\u00e1t.<\/p>\n\n\n<p>Ez a tapasztalat megmutatja, hogyan seg\u00edthet a k\u00f6lts\u00e9gek \u00e1ttekint\u00e9se a gy\u00e1rt\u00e1s jav\u00edt\u00e1s\u00e1ban: megb\u00edzhat\u00f3bb\u00e1 tehet\u0151 a munk\u00e1k sorrendje, \u00e9s hat\u00e9konyabban haszn\u00e1lhat\u00f3 ki a megl\u00e9v\u0151 kapacit\u00e1s. \u00c9rdemes teh\u00e1t a saj\u00e1t \u00fczemben is felt\u00e1rni az \u00f6sszehangol\u00e1s hi\u00e1ny\u00e1b\u00f3l ered\u0151 vesztes\u00e9geket, nem csup\u00e1n a havi \u00f6sszk\u00f6lts\u00e9g r\u00e9szek\u00e9nt elfogadni \u0151ket.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hozzon egy k\u00f6lts\u00e9gt\u00fall\u00e9p\u00e9si p\u00e9ld\u00e1t a SkyPlanner bemutat\u00f3j\u00e1ra<\/h2>\n\n\n<p>V\u00e1lassza a SkyPlanner rendszer\u00e9t, ha a gy\u00e1rt\u00e1s t\u00e9nyadatait egy megval\u00f3s\u00edthat\u00f3, k\u00f6z\u00f6s \u00fctemtervvel szeretn\u00e9 \u00f6sszekapcsolni, hogy a m\u00falt havi k\u00f6lts\u00e9gek okainak felt\u00e1r\u00e1sa seg\u00edtse a k\u00f6vetkez\u0151 rendel\u00e9sek jobb v\u00e9grehajt\u00e1s\u00e1t. A SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3, \u00edgy a megl\u00e9v\u0151 rendszerei mellett fejlesztheti a gy\u00e1rt\u00e1s\u00fctemez\u00e9st.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon mag\u00e1val egy ism\u00e9tl\u0151d\u0151 rendel\u00e9st: az el\u0151ir\u00e1nyzott anyagmennyis\u00e9get, a t\u00e9nyleges felhaszn\u00e1l\u00e1st, a tervezett \u00e9s t\u00e9nyleges munkar\u00e1ford\u00edt\u00e1st, valamint az \u00e9rintett er\u0151forr\u00e1sokon v\u00e9gighalad\u00f3 gy\u00e1rt\u00e1si \u00fatvonalat. Ezen a p\u00e9ld\u00e1n kereszt\u00fcl besz\u00e9lj\u00fck \u00e1t, hol keletkezett a k\u00f6lts\u00e9gt\u00fall\u00e9p\u00e9s, \u00e9s hogyan v\u00e1ltoztatn\u00e1 meg a munk\u00e1t egy m\u00e1sik \u00fctemez\u00e9s. Ha el\u0151bb ink\u00e1bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s A teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g az adott id\u0151szakban felhaszn\u00e1lt k\u00f6zvetlen anyagok k\u00f6lts\u00e9g\u00e9nek, a k\u00f6zvetlen munkaer\u0151k\u00f6lts\u00e9gnek \u00e9s a felmer\u00fclt gy\u00e1rt\u00e1si \u00e1ltal\u00e1nos k\u00f6lts\u00e9geknek az \u00f6sszege. Az id\u0151szak v\u00e9g\u00e9n m\u00e9g befejezetlen termel\u00e9s k\u00f6lts\u00e9g\u00e9t is tartalmazza, nem csup\u00e1n a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz term\u00e9kek\u00e9t. A sz\u00e1m\u00edt\u00e1s &#8230; <a title=\"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/\" aria-label=\"Read more about Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":108005,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-107987","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s<\/title>\n<meta name=\"description\" content=\"Sz\u00e1m\u00edtsa ki a havi gy\u00e1rt\u00e1si k\u00f6lts\u00e9get, k\u00fcl\u00f6n\u00edtse el a k\u00e9sz \u00e9s eladott term\u00e9kek\u00e9t\u0151l, \u00e9s t\u00e1rja fel az anyag- vagy munkak\u00f6lts\u00e9g-t\u00fall\u00e9p\u00e9s ok\u00e1t.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s\" \/>\n<meta property=\"og:description\" content=\"Sz\u00e1m\u00edtsa ki a havi gy\u00e1rt\u00e1si k\u00f6lts\u00e9get, k\u00fcl\u00f6n\u00edtse el a k\u00e9sz \u00e9s eladott term\u00e9kek\u00e9t\u0151l, \u00e9s t\u00e1rja fel az anyag- vagy munkak\u00f6lts\u00e9g-t\u00fall\u00e9p\u00e9s ok\u00e1t.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T22:14:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T22:15:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1821\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s\",\"datePublished\":\"2026-10-23T22:14:44+00:00\",\"dateModified\":\"2026-10-23T22:15:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/\"},\"wordCount\":3892,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-manufacturing-cost-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/\",\"name\":\"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-manufacturing-cost-hero.png\",\"datePublished\":\"2026-10-23T22:14:44+00:00\",\"dateModified\":\"2026-10-23T22:15:40+00:00\",\"description\":\"Sz\u00e1m\u00edtsa ki a havi gy\u00e1rt\u00e1si k\u00f6lts\u00e9get, k\u00fcl\u00f6n\u00edtse el a k\u00e9sz \u00e9s eladott term\u00e9kek\u00e9t\u0151l, \u00e9s t\u00e1rja fel az anyag- vagy munkak\u00f6lts\u00e9g-t\u00fall\u00e9p\u00e9s ok\u00e1t.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-manufacturing-cost-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-manufacturing-cost-hero.png\",\"width\":1821,\"height\":1024,\"caption\":\"Metal blanks, an enclosure, gloves and tools beneath shared factory lighting illustrate manufacturing cost inputs.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/teljes-gyartasi-koltseg\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s","description":"Sz\u00e1m\u00edtsa ki a havi gy\u00e1rt\u00e1si k\u00f6lts\u00e9get, k\u00fcl\u00f6n\u00edtse el a k\u00e9sz \u00e9s eladott term\u00e9kek\u00e9t\u0151l, \u00e9s t\u00e1rja fel az anyag- vagy munkak\u00f6lts\u00e9g-t\u00fall\u00e9p\u00e9s ok\u00e1t.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/","og_locale":"hu_HU","og_type":"article","og_title":"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s","og_description":"Sz\u00e1m\u00edtsa ki a havi gy\u00e1rt\u00e1si k\u00f6lts\u00e9get, k\u00fcl\u00f6n\u00edtse el a k\u00e9sz \u00e9s eladott term\u00e9kek\u00e9t\u0151l, \u00e9s t\u00e1rja fel az anyag- vagy munkak\u00f6lts\u00e9g-t\u00fall\u00e9p\u00e9s ok\u00e1t.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T22:14:44+00:00","article_modified_time":"2026-10-23T22:15:40+00:00","og_image":[{"width":1821,"height":1024,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s","datePublished":"2026-10-23T22:14:44+00:00","dateModified":"2026-10-23T22:15:40+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/"},"wordCount":3892,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/","name":"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png","datePublished":"2026-10-23T22:14:44+00:00","dateModified":"2026-10-23T22:15:40+00:00","description":"Sz\u00e1m\u00edtsa ki a havi gy\u00e1rt\u00e1si k\u00f6lts\u00e9get, k\u00fcl\u00f6n\u00edtse el a k\u00e9sz \u00e9s eladott term\u00e9kek\u00e9t\u0151l, \u00e9s t\u00e1rja fel az anyag- vagy munkak\u00f6lts\u00e9g-t\u00fall\u00e9p\u00e9s ok\u00e1t.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png","width":1821,"height":1024,"caption":"Metal blanks, an enclosure, gloves and tools beneath shared factory lighting illustrate manufacturing cost inputs."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/teljes-gyartasi-koltseg\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png",1821,1024,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero.png",1821,1024,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-manufacturing-cost-hero-360x202.png",360,202,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g: sz\u00e1m\u00edt\u00e1s \u00e9s \u00e9rtelmez\u00e9s A teljes gy\u00e1rt\u00e1si k\u00f6lts\u00e9g az adott id\u0151szakban felhaszn\u00e1lt k\u00f6zvetlen anyagok k\u00f6lts\u00e9g\u00e9nek, a k\u00f6zvetlen munkaer\u0151k\u00f6lts\u00e9gnek \u00e9s a felmer\u00fclt gy\u00e1rt\u00e1si \u00e1ltal\u00e1nos k\u00f6lts\u00e9geknek az \u00f6sszege. Az id\u0151szak v\u00e9g\u00e9n m\u00e9g befejezetlen termel\u00e9s k\u00f6lts\u00e9g\u00e9t is tartalmazza, nem csup\u00e1n a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz term\u00e9kek\u00e9t. A sz\u00e1m\u00edt\u00e1s&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/107987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=107987"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/107987\/revisions"}],"predecessor-version":[{"id":108078,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/107987\/revisions\/108078"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/108005"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=107987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=107987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=107987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}