{"id":105706,"date":"2026-10-22T05:45:06","date_gmt":"2026-10-22T05:45:06","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105706"},"modified":"2026-10-22T05:46:11","modified_gmt":"2026-10-22T05:46:11","slug":"selejtarany-a-gyartasban","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/","title":{"rendered":"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A t\u00e9tel elk\u00e9sz\u00fclt, de a rendel\u00e9s m\u00e9g nincs k\u00e9sz. Az ellen\u0151rz\u00e9sen jav\u00edthatatlan alkatr\u00e9szeket selejteztek ki, az anyagot m\u00e1r felhaszn\u00e1lt\u00e1k, a vev\u0151 pedig tov\u00e1bbra is a teljes mennyis\u00e9get v\u00e1rja p\u00e9ntekre.<\/p>\n\n\n<p><strong>A selejtar\u00e1ny a gy\u00e1rt\u00e1sban azt mutatja meg, hogy egy meghat\u00e1rozott gy\u00e1rt\u00e1si mennyis\u00e9g h\u00e1ny sz\u00e1zal\u00e9k\u00e1t selejtezik ki v\u00e9glegesen ahelyett, hogy rendeltet\u00e9sszer\u0171 haszn\u00e1latra megfelel\u0151nek min\u0151s\u00edten\u00e9k.<\/strong> \u00d6sszehasonl\u00edthat\u00f3 darabok lez\u00e1rt csoportj\u00e1ra a k\u00f6vetkez\u0151k\u00e9ppen sz\u00e1m\u00edthat\u00f3 ki:<\/p>\n\n\n<p><strong>Selejtar\u00e1ny (%) = V\u00e9glegesen selejtezett darabok sz\u00e1ma \u00f7 Ugyanazon gy\u00e1rt\u00e1si csoport \u00f6sszes darabsz\u00e1ma \u00d7 100<\/strong><\/p>\n\n\n<p>A nevez\u0151 a megfelel\u0151nek min\u0151s\u00edtett \u00e9s a selejtezett darabokat egyar\u00e1nt tartalmazza. Az ut\u00f3munk\u00e1val sikeresen jav\u00edtott alkatr\u00e9szek a megfelel\u0151 term\u00e9kek k\u00f6z\u00e9 tartoznak, nem a v\u00e9gleges selejt k\u00f6z\u00e9.<\/p>\n\n\n<p>A megb\u00edzhat\u00f3 sz\u00e1zal\u00e9kos mutat\u00f3 seg\u00edt felismerni a visszat\u00e9r\u0151 vesztes\u00e9get. A vesztes\u00e9g kezel\u00e9s\u00e9hez az anyagk\u00e9szlet adatait is pontos\u00edtani kell, \u00e9s helyet kell tal\u00e1lni az esetleges p\u00f3tl\u00e1snak. A SkyPlanner a hib\u00e1s darabok r\u00f6gz\u00edt\u00e9s\u00e9vel t\u00e1mogatja a selejtjelent\u00e9st, \u00e9s be\u00e1ll\u00edtott anyagk\u00f6vet\u00e9s eset\u00e9n ezek anyagfelhaszn\u00e1l\u00e1s\u00e1t is figyelembe veszi. Mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u00e9se ezut\u00e1n seg\u00edt a p\u00f3tl\u00e1shoz j\u00f3v\u00e1hagyott m\u0171veleteket a m\u00e1r v\u00e1llalt rendel\u00e9sekkel k\u00f6z\u00f6s \u00fctemtervbe illeszteni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A selejtar\u00e1nyt a v\u00e9gleges min\u0151s\u00edt\u00e9sb\u0151l sz\u00e1m\u00edtsa, ne minden sikertelen ellen\u0151rz\u00e9sb\u0151l<\/h2>\n\n\n<p>Vegy\u00fcnk egy 1 000 megmunk\u00e1lt alkatr\u00e9szb\u0151l \u00e1ll\u00f3 t\u00e9telt. K\u00f6vesse v\u00e9gig az eredeti darabokat az ellen\u0151rz\u00e9sen \u00e9s az enged\u00e9lyezett ut\u00f3munk\u00e1kon, am\u00edg mindegyik v\u00e9gleges min\u0151s\u00edt\u00e9st nem kap:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Az eredeti t\u00e9tel v\u00e9gleges min\u0151s\u00edt\u00e9se<\/th><th>Darabsz\u00e1m<\/th><th>Elsz\u00e1mol\u00e1s a v\u00e9gleges selejtar\u00e1nyban<\/th><\/tr><\/thead><tbody><tr><td>Els\u0151re megfelel\u0151nek min\u0151s\u00edtett<\/td><td>920<\/td><td>Megfelel\u0151 term\u00e9k<\/td><\/tr><tr><td>Ut\u00f3munka ut\u00e1n megfelel\u0151nek min\u0151s\u00edtett<\/td><td>30<\/td><td>Megfelel\u0151 term\u00e9k, a t\u00f6bbletmunka k\u00fcl\u00f6n r\u00f6gz\u00edtve<\/td><\/tr><tr><td>V\u00e9glegesen selejtezett<\/td><td>50<\/td><td>A selejtar\u00e1ny sz\u00e1ml\u00e1l\u00f3ja<\/td><\/tr><tr><td>Eredeti darabsz\u00e1m \u00f6sszesen<\/td><td>1 000<\/td><td>Nevez\u0151<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A v\u00e9gleges selejtar\u00e1ny <strong>50 \u00f7 1 000 \u00d7 100 = 5%<\/strong>. A megfelel\u0151nek min\u0151s\u00edtett alkatr\u00e9szek sz\u00e1ma 950, \u00edgy a v\u00e9gs\u0151 kihozatal 95%.<\/p>\n\n\n<p>Az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/\">els\u0151re megfelelt darabok ar\u00e1nya<\/a> m\u00e1s k\u00e9rd\u00e9sre ad v\u00e1laszt. Csak a jav\u00edt\u00e1s n\u00e9lk\u00fcl elfogadott 920 alkatr\u00e9sz felelt meg els\u0151re, \u00edgy az eredm\u00e9ny <strong>92% FPY<\/strong>. A fennmarad\u00f3 8% nem mind selejt: 30 darabot siker\u00fclt jav\u00edtani. Az ut\u00f3munka id\u0151t vesz ig\u00e9nybe, de nem felt\u00e9tlen\u00fcl ig\u00e9nyel \u00fajabb teljes el\u0151gy\u00e1rtm\u00e1nyt, \u00e9s nem felt\u00e9tlen\u00fcl teszi t\u00f6nkre az eredeti alkatr\u00e9szt.<\/p>\n\n\n<p>Ha az 50 selejtes darabot a 950 megfelel\u0151nek min\u0151s\u00edtett darabbal osztjuk el, k\u00f6r\u00fclbel\u00fcl 5,26%-ot kapunk, nem pedig az eredeti gy\u00e1rt\u00e1si mennyis\u00e9gb\u0151l elveszett 5%-ot. A selejt \u00e9s a megfelel\u0151 term\u00e9kek ar\u00e1nya k\u00fcl\u00f6n k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1si c\u00e9lra hasznos lehet, de ennek megfelel\u0151en kell megnevezni. Ne hasonl\u00edtsa \u00f6ssze a teljes gy\u00e1rt\u00e1si mennyis\u00e9ghez viszony\u00edtott selejt sz\u00e1zal\u00e9kos ar\u00e1ny\u00e1val.<\/p>\n\n\n<p>A p\u00f3tl\u00e1sk\u00e9nt gy\u00e1rtott darabok gy\u00e1rt\u00e1s\u00e1t tartsa elk\u00fcl\u00f6n\u00edthet\u0151en nyilv\u00e1n. Ezek \u00faj darabok, nem az eredeti t\u00e9telen v\u00e9gzett tov\u00e1bbi ellen\u0151rz\u00e9sek. Ha ezeket is tartalmaz\u00f3 \u00f6sszes\u00edtett eredm\u00e9nyt k\u00f6z\u00f6l, ugyanabba a vizsg\u00e1lt csoportba sz\u00e1m\u00edtsa bele a p\u00f3tl\u00e1s megfelel\u0151 darabjait \u00e9s az esetlegesen keletkez\u0151 tov\u00e1bbi selejtet is.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hat\u00e1rozzon meg k\u00f6vetkezetesen alkalmazhat\u00f3 sz\u00e1ml\u00e1l\u00e1si szab\u00e1lyokat<\/h2>\n\n\n<p>A m\u00e9r\u00e9s egy\u00e9rtelm\u0171 meghat\u00e1roz\u00e1s\u00e1val elker\u00fclhet\u0151, hogy a mutat\u00f3 puszt\u00e1n az\u00e9rt v\u00e1ltozzon, mert az egyik m\u0171szak m\u00e1sk\u00e9pp r\u00f6gz\u00edti a hib\u00e1kat, mint a m\u00e1sik. Miel\u0151tt \u00e9rtelmezn\u00e9 a trendet, \u00e1llapodjanak meg a term\u00e9kcsoportban, a vizsg\u00e1lt folyamatszakaszban, az elsz\u00e1mol\u00e1s alapj\u00e1ban \u00e9s a v\u00e9gleges min\u0151s\u00edt\u00e9s szab\u00e1ly\u00e1ban.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A selejtet ahhoz a gy\u00e1rt\u00e1si mennyis\u00e9ghez rendelje, amelyb\u0151l sz\u00e1rmazik<\/h3>\n\n\n<p>Kiindul\u00e1sk\u00e9nt v\u00e1lasszon olyan nyomon k\u00f6vethet\u0151 t\u00e9telt vagy rendel\u00e9si mennyis\u00e9get, amelynek v\u00e9gleges min\u0151s\u00edt\u00e9sei marad\u00e9ktalanul egyeztethet\u0151k. Ha az ellen\u0151rz\u00e9s vagy az ut\u00f3munka t\u00f6bb napig tart, a ma selejtezett darabok sz\u00e1m\u00e1t a ma gy\u00e1rt\u00e1sba adott darabok sz\u00e1m\u00e1val elosztva k\u00fcl\u00f6nb\u00f6z\u0151 csoportokat keverhet \u00f6ssze.<\/p>\n\n\n<p>A rendszeres id\u0151szaki jelent\u00e9sekhez hat\u00e1rozza meg, hogyan rendelik az id\u0151szakokhoz a k\u00e9s\u0151bb meghozott d\u00f6nt\u00e9seket, \u00e9s hogyan jelen\u00edtik meg a m\u00e9g nem lez\u00e1rt mennyis\u00e9geket. Ha 20 alkatr\u00e9sz m\u00e9g min\u0151s\u00edt\u00e9si d\u00f6nt\u00e9sre v\u00e1r, az sem igazoltan megfelel\u0151 term\u00e9knek, sem v\u00e9gleges selejtnek nem sz\u00e1m\u00edt. Ezeket t\u00fcntesse fel f\u00fcgg\u0151ben l\u00e9v\u0151k\u00e9nt, \u00e9s a csoport lez\u00e1r\u00e1sakor v\u00e9gleges\u00edtse az eredm\u00e9nyt. Ne hagyja ki \u0151ket \u00e9szrev\u00e9tlen\u00fcl az\u00e9rt, hogy kedvez\u0151bb legyen a sz\u00e1zal\u00e9kos \u00e9rt\u00e9k.<\/p>\n\n\n<p>A kijel\u00f6lt folyamathat\u00e1ron minden eredeti darabot csak egyszer sz\u00e1moljon el. A megmunk\u00e1l\u00e1sn\u00e1l selejtezett alkatr\u00e9sz att\u00f3l m\u00e9g nem lesz k\u00e9t selejtes darab, hogy a v\u00e9gellen\u0151rz\u00e9si jelent\u00e9sben is megeml\u00edtik. Egy alkatr\u00e9sz t\u00f6bb hib\u00e1ja is csak egy elveszett darabot jelent, b\u00e1r a kivizsg\u00e1l\u00e1sn\u00e1l minden egyes hiba sz\u00e1m\u00edthat.<\/p>\n\n\n<p>A m\u0171veletszint\u0171 \u00e9s a teljes gy\u00e1rt\u00e1si \u00fatvonalra vonatkoz\u00f3 eredm\u00e9nyeket k\u00fcl\u00f6n kell meghat\u00e1rozni. A megmunk\u00e1l\u00e1s selejtar\u00e1ny\u00e1nak alapja az adott m\u0171veletbe bel\u00e9p\u0151 darabsz\u00e1m; a teljes folyamatra sz\u00e1m\u00edtott ar\u00e1ny az eredeti gy\u00e1rt\u00e1si csoportot k\u00f6veti v\u00e9gig az \u00fatvonal\u00e1n. A m\u0171veletenk\u00e9nti sz\u00e1zal\u00e9kok \u00f6sszead\u00e1s\u00e1b\u00f3l nem kapunk megb\u00edzhat\u00f3, eg\u00e9sz \u00fczemre \u00e9rv\u00e9nyes selejtar\u00e1nyt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00fcl\u00f6n\u00edtse el a v\u00e9gleges selejtet, az ut\u00f3munk\u00e1t \u00e9s az anyaghullad\u00e9kot<\/h3>\n\n\n<p>A sikertelen ellen\u0151rz\u00e9s azt jelzi, hogy d\u00f6nteni kell az alkatr\u00e9sz tov\u00e1bbi sors\u00e1r\u00f3l. Ut\u00f3munk\u00e1ra ker\u00fclhet, visszatarthatj\u00e1k kivizsg\u00e1l\u00e1sra, vagy v\u00e9glegesen selejtezhetik. Ezt a k\u00fcl\u00f6nbs\u00e9get a KPI alapj\u00e1ul szolg\u00e1l\u00f3 nyilv\u00e1ntart\u00e1sokban is \u0151rizze meg.<\/p>\n\n\n<p>A nem megfelel\u0151 term\u00e9keket a folyamatb\u00f3l v\u00e1rhat\u00f3an keletkez\u0151 hullad\u00e9kt\u00f3l is k\u00fcl\u00f6n\u00edtse el. A forg\u00e1cs, a v\u00e1g\u00e1si hullad\u00e9k \u00e9s az ind\u00edt\u00e1skor felhaszn\u00e1lt anyag akkor is r\u00e9sze lehet egy anyagvesztes\u00e9gi mutat\u00f3nak, ha minden k\u00e9sz alkatr\u00e9sz megfelel az ellen\u0151rz\u00e9sen. Ha ezeket a darabsz\u00e1m alap\u00fa selejtsz\u00e1mba keverj\u00fck, az eredm\u00e9ny nehezen \u00e9rtelmezhet\u0151v\u00e9 v\u00e1lik.<\/p>\n\n\n<p>Ha az anyagselejtet t\u00f6meg alapj\u00e1n m\u00e9ri, a sz\u00e1m\u00edt\u00e1s sz\u00e1ml\u00e1l\u00f3j\u00e1ban \u00e9s nevez\u0151j\u00e9ben is t\u00f6meg szerepeljen. Vegy\u00fcnk p\u00e9ld\u00e1ul egy lez\u00e1rt v\u00e1g\u00e1si sorozatot, amelybe 500 kg anyag ker\u00fclt be: ebb\u0151l 40 kg-ot selejtnek min\u0151s\u00edtettek, a fennmarad\u00f3 460 kg-ot pedig hasznos term\u00e9kk\u00e9nt sz\u00e1molt\u00e1k el. Az anyagselejt ar\u00e1nya <strong>40 \u00f7 500 \u00d7 100 = 8%<\/strong>. Jelezze, hogy a selejt a szok\u00e1sos v\u00e1g\u00e1si hullad\u00e9kot, a rendellenes hib\u00e1k miatt kies\u0151 anyagot vagy mindkett\u0151t tartalmazza-e, az \u00fajra felhaszn\u00e1lhat\u00f3 marad\u00e9kokat \u00e9s a m\u00e9g feldolgoz\u00e1s alatt \u00e1ll\u00f3 anyagot pedig k\u00fcl\u00f6n sz\u00e1molja el.<\/p>\n\n\n<p>Ez a 8% nem hasonl\u00edthat\u00f3 \u00f6ssze k\u00f6zvetlen\u00fcl a t\u00e9tel darabsz\u00e1m alapj\u00e1n sz\u00e1m\u00edtott 5%-os selejtar\u00e1ny\u00e1val. A k\u00e9t mutat\u00f3 elt\u00e9r\u0151 vesztes\u00e9get \u00edr le. Egy neh\u00e9z selejtes \u00f6ntv\u00e9ny j\u00f3val nagyobb hat\u00e1ssal lehet az anyagfelhaszn\u00e1l\u00e1sra, mint egy kism\u00e9ret\u0171 selejtes szerelv\u00e9ny.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mennyis\u00e9geket \u00f6sszes\u00edtsen, ne elt\u00e9r\u0151 alap\u00fa sz\u00e1zal\u00e9kokat<\/h3>\n\n\n<p>Azonos alapon m\u00e9rt, \u00f6sszehasonl\u00edthat\u00f3 term\u00e9kekn\u00e9l az oszt\u00e1s el\u0151tt adja \u00f6ssze a selejtezett mennyis\u00e9geket \u00e9s az \u00f6sszes mennyis\u00e9get. Elt\u00e9r\u0151 t\u00e9telnagys\u00e1gok eset\u00e9n ne a t\u00e9telek sz\u00e1zal\u00e9kos \u00e9rt\u00e9keinek egyszer\u0171 \u00e1tlag\u00e1t vegye.<\/p>\n\n\n<p>A k\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9kek adatait k\u00fcl\u00f6n is jelen\u00edtse meg, ha az anyag\u00e9rt\u00e9k\u00fck, a gy\u00e1rt\u00e1si \u00fatvonaluk vagy a selejtez\u00e9s k\u00f6vetkezm\u00e9nyei elt\u00e9rnek. Az \u00fczemi \u00e1tlag puszt\u00e1n att\u00f3l is cs\u00f6kkenhet, hogy t\u00f6bbet gy\u00e1rtottak egy k\u00f6nnyen el\u0151\u00e1ll\u00edthat\u00f3 term\u00e9kb\u0151l. Miel\u0151tt arra k\u00f6vetkeztetne, hogy javult a folyamat, az ar\u00e1ny mellett vizsg\u00e1lja meg a m\u00f6g\u00f6ttes mennyis\u00e9geket, a term\u00e9k\u00f6sszet\u00e9telt \u00e9s a vesztes\u00e9g k\u00f6lts\u00e9g\u00e9t is.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sz\u00e1mszer\u0171s\u00edtse a vesztes\u00e9g \u00e9rt\u00e9k\u00e9t<\/h2>\n\n\n<p>A selejtar\u00e1ny a mennyis\u00e9get mutatja, nem a teljes p\u00e9nz\u00fcgyi k\u00f6vetkezm\u00e9nyt. A t\u00f6bb m\u0171velet ut\u00e1n selejtezett alkatr\u00e9szre m\u00e1r t\u00f6bb munk\u00e1t ford\u00edtottak, mint arra, amelyet m\u00e9g a megmunk\u00e1l\u00e1s megkezd\u00e9se el\u0151tt selejteztek.<\/p>\n\n\n<p>T\u00e9rj\u00fcnk vissza a p\u00e9ld\u00e1ban szerepl\u0151 50 selejtes alkatr\u00e9szhez. Tegy\u00fck fel, hogy mindegyikben $12 \u00e9rt\u00e9k\u0171 anyag van, \u00e9s a selejtez\u00e9sig darabonk\u00e9nt $8 feldolgoz\u00e1si k\u00f6lts\u00e9g mer\u00fclt fel. Az anyagvesztes\u00e9g <strong>$600<\/strong>, a felhalmozott feldolgoz\u00e1si k\u00f6lts\u00e9g pedig <strong>$400<\/strong>. Ha a selejt anyag\u00e1nak hasznos\u00edt\u00e1s\u00e1b\u00f3l selejtezett darabonk\u00e9nt $2 t\u00e9r\u00fcl meg, az ezen az egyszer\u0171s\u00edtett alapon elsz\u00e1molt nett\u00f3 vesztes\u00e9g:<\/p>\n\n\n<p><strong>50 \u00d7 ($12 + $8 \u2212 $2) = $900<\/strong><\/p>\n\n\n<p>A selejtez\u00e9sig felmer\u00fclt k\u00f6lts\u00e9geket a saj\u00e1t k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1si szab\u00e1lyai szerint sz\u00e1molja el. Az \u00fajrahasznos\u00edt\u00e1sb\u00f3l megt\u00e9r\u00fcl\u0151 \u00e9rt\u00e9k cs\u00f6kkentheti a nett\u00f3 p\u00e9nz\u00fcgyi vesztes\u00e9get, de a selejtes alkatr\u00e9szeket nem teszi \u00fajra kisz\u00e1ll\u00edthat\u00f3 term\u00e9kk\u00e9, \u00e9s a r\u00e1juk ford\u00edtott gy\u00e1rt\u00e1si id\u0151t sem adja vissza.<\/p>\n\n\n<p>A m\u00e1r bek\u00f6vetkezett vesztes\u00e9get k\u00fcl\u00f6n\u00edtse el a p\u00f3tl\u00e1s j\u00f6v\u0151beni k\u00f6lts\u00e9g\u00e9t\u0151l. A p\u00f3tl\u00f3 darabok gy\u00e1rt\u00e1s\u00e1hoz tov\u00e1bbi anyag \u00e9s m\u0171veletek sz\u00fcks\u00e9gesek. Ezt a j\u00f6v\u0151beni munk\u00e1t ne sz\u00e1molja el k\u00e9tszer \u00fagy, hogy a teljes k\u00f6lts\u00e9get tartalmaz\u00f3 vesztes\u00e9g\u00f6sszegbe \u00e9s egy k\u00fcl\u00f6n p\u00f3tl\u00e1si becsl\u00e9sbe is belefoglalja, an\u00e9lk\u00fcl hogy tiszt\u00e1zn\u00e1 az elsz\u00e1mol\u00e1s hat\u00e1rait.<\/p>\n\n\n<p>Az azonnali d\u00f6nt\u00e9shez azonos\u00edtsa, mi v\u00e1ltozik: p\u00e9ld\u00e1ul sz\u00fcks\u00e9g van-e t\u00f6bbletanyag-beszerz\u00e9sre, t\u00fal\u00f3r\u00e1ra, k\u00fcls\u0151 megmunk\u00e1l\u00e1sra vagy soron k\u00edv\u00fcli fuvarra. A felszabadul\u00f3 g\u00e9pid\u0151 akkor is \u00e9rt\u00e9kes lehet, ha nem cs\u00f6kkenti azonnal a b\u00e9rkifizet\u00e9seket vagy a g\u00e9phez kapcsol\u00f3d\u00f3 fizet\u00e9si k\u00f6telezetts\u00e9geket. T\u00falbecs\u00fcli az eredm\u00e9nyt, ha minden elker\u00fclt selejtk\u00f6lts\u00e9get azonnali p\u00e9nzmegtakar\u00edt\u00e1snak tekint.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A hi\u00e1ny p\u00f3tl\u00e1s\u00e1ra k\u00e9sz\u00edtsen teljes\u00edthet\u0151 gy\u00e1rt\u00e1si tervet<\/h2>\n\n\n<p>A p\u00e9ld\u00e1ban az 1 000 eredeti darabb\u00f3l csak 950 megfelel\u0151 alkatr\u00e9sz k\u00e9sz\u00fclt. Ha a vev\u0151nek 1 000 darabra van sz\u00fcks\u00e9ge, \u00e9s nincs megfelel\u0151 k\u00e9szlet, m\u00e9g 50 j\u00f3 darabot kell el\u0151\u00e1ll\u00edtani. Ez nemcsak min\u0151s\u00e9gi eredm\u00e9ny, hanem a sz\u00e1ll\u00edt\u00e1s teljes\u00edt\u00e9s\u00e9t \u00e9rint\u0151 d\u00f6nt\u00e9si helyzet is.<\/p>\n\n\n<p>El\u0151sz\u00f6r tiszt\u00e1zza, hogy t\u00e9nylegesen milyen anyag \u00e1ll rendelkez\u00e9sre a p\u00f3tl\u00e1shoz. Ezut\u00e1n hagyja j\u00f3v\u00e1 a p\u00f3tl\u00e1s gy\u00e1rt\u00e1si \u00fatvonal\u00e1t, mennyis\u00e9g\u00e9t \u00e9s a sz\u00fcks\u00e9ges ellen\u0151rz\u00e9seket. Re\u00e1lis m\u0171veleti id\u0151kkel sz\u00e1moljon, \u00e9s vegye figyelembe a be\u00e1ll\u00edt\u00e1sokat is. Ha tov\u00e1bbi kihozatali vesztes\u00e9g v\u00e1rhat\u00f3, egy\u00e9rtelm\u0171en hat\u00e1rozza meg a gy\u00e1rt\u00e1si r\u00e1hagy\u00e1st ahelyett, hogy minden p\u00f3tl\u00f3 darabot eleve megfelel\u0151nek felt\u00e9telezne.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy a j\u00f3v\u00e1hagyott p\u00f3tl\u00e1s darabonk\u00e9nt hat perc megmunk\u00e1l\u00e1st ig\u00e9nyel, \u00e9s ebben a szeml\u00e9ltet\u0151 p\u00e9ld\u00e1ban nem sz\u00e1molunk tov\u00e1bbi selejttel. Az 50 alkatr\u00e9szhez <strong>300 perc, azaz \u00f6t \u00f3ra megmunk\u00e1l\u00e1si id\u0151<\/strong> sz\u00fcks\u00e9ges, ezen fel\u00fcl pedig m\u00e9g a be\u00e1ll\u00edt\u00e1s \u00e9s az ellen\u0151rz\u00e9s idej\u00e9vel is sz\u00e1molni kell. Ha a g\u00e9pen a k\u00f6vetkez\u0151 m\u0171velet sz\u00fcks\u00e9ges kezd\u00e9s\u00e9ig csak h\u00e1rom szabad \u00f3ra van, a p\u00f3tl\u00e1s a tervezett m\u00f3don nem f\u00e9r el rajta.<\/p>\n\n\n<p>Ha a p\u00f3tl\u00e1st egy nem hivatalos s\u00fcrg\u0151s feladatlist\u00e1ra teszi, azzal csak elrejti az \u00fctk\u00f6z\u00e9st; a hi\u00e1nyz\u00f3 kapacit\u00e1st nem teremti meg. El kell d\u00f6nteni, hogy bevonhat\u00f3-e m\u00e1sik alkalmas g\u00e9p, indokolt-e t\u00f6bbletkapacit\u00e1s biztos\u00edt\u00e1sa, \u00e1thelyezhet\u0151-e m\u00e1sik rendel\u00e9s, vagy m\u00f3dos\u00edtani kell-e egy v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kapcsolja \u00f6ssze az anyagfelhaszn\u00e1l\u00e1st \u00e9s a p\u00f3tl\u00e1s \u00fctemez\u00e9s\u00e9t a SkyPlanner rendszer\u00e9ben<\/h3>\n\n\n<p>A SkyPlanner lehet\u0151v\u00e9 teszi, hogy a g\u00e9pkezel\u0151k a selejtet <strong>hib\u00e1s darabk\u00e9nt jelents\u00e9k a gy\u00e1rt\u00e1si feladat id\u0151m\u00e9r\u0151j\u00e9nek le\u00e1ll\u00edt\u00e1sakor<\/strong>. Be\u00e1ll\u00edtott anyagk\u00f6vet\u00e9s eset\u00e9n az anyagfelhaszn\u00e1l\u00e1s a hib\u00e1s darabokhoz felhaszn\u00e1lt anyagot is tartalmazza, \u00e9s ennek megfelel\u0151en friss\u00fclnek a k\u00e9szletegyenlegek. Ez seg\u00edt elker\u00fclni, hogy a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si feladat olyan el\u0151gy\u00e1rtm\u00e1nyokra \u00e9p\u00fclj\u00f6n, amelyeket m\u00e1r felhaszn\u00e1ltak a selejtes alkatr\u00e9szekhez.<\/p>\n\n\n<p>Ha p\u00e9ld\u00e1ul t\u00edz el\u0151gy\u00e1rtm\u00e1nyb\u00f3l nyolc megfelel\u0151 darab k\u00e9sz\u00fcl, mert kett\u0151t selejteznek, akkor az anyagnyilv\u00e1ntart\u00e1sban t\u00edz el\u0151gy\u00e1rtm\u00e1ny felhaszn\u00e1l\u00e1s\u00e1nak kell szerepelnie, nem nyolc\u00e9nak. Ebben az esetben a k\u00e9t hib\u00e1s darab igazoltan v\u00e9gleges selejt. A v\u00e9gleges selejtet m\u00e9r\u0151 KPI egyeztet\u00e9sekor k\u00fcl\u00f6n\u00edtse el a jav\u00edthat\u00f3 alkatr\u00e9szeket \u00e9s a min\u0151s\u00e9g\u00fcgyi d\u00f6nt\u00e9sre v\u00e1r\u00f3, z\u00e1rolt t\u00e9teleket. A min\u0151s\u00e9gi ellen\u0151rz\u00e9sen nem megfelel\u0151nek tal\u00e1lt darabok \u00f6sszes\u00edtett mennyis\u00e9ge \u00f6nmag\u00e1ban m\u00e9g nem mutatja meg az egyes alkatr\u00e9szek v\u00e9gleges sors\u00e1t.<\/p>\n\n\n<p>Ezut\u00e1n vegye fel a p\u00f3tl\u00e1shoz j\u00f3v\u00e1hagyott m\u0171veleteket a SkyPlanner <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">k\u00f6z\u00f6s gy\u00e1rt\u00e1si \u00fctemterv\u00e9be<\/a>. <strong>A SkyPlanner mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151je, az Arcturus a be\u00e1ll\u00edtott kapacit\u00e1s, a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek \u00e9s a priorit\u00e1sok alapj\u00e1n sz\u00e1m\u00edtja ki, hov\u00e1 illeszthet\u0151k be.<\/strong> A Gantt-id\u0151vonalon az \u00edgy kialakul\u00f3 sorrend \u00e9s a befejez\u00e9si id\u0151pontok az ugyanazokat az er\u0151forr\u00e1sokat haszn\u00e1l\u00f3 t\u00f6bbi rendel\u00e9ssel egy\u00fctt l\u00e1that\u00f3k. Ha az anyagell\u00e1t\u00e1st is figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa is befoly\u00e1solja a sz\u00e1m\u00edt\u00e1st.<\/p>\n\n\n<p>Az \u00f6t\u00f3r\u00e1s p\u00f3tl\u00f3 gy\u00e1rt\u00e1sn\u00e1l m\u00e9g a p\u00f3tl\u00e1s hat\u00e1ridej\u00e9nek v\u00e1llal\u00e1sa el\u0151tt \u00e1ttekintheti, hogyan hat az a h\u00e1tral\u00e9v\u0151 m\u0171veletekre \u00e9s a t\u00f6bbi vev\u0151i megrendel\u00e9sre. A priorit\u00e1sokr\u00f3l \u00e9s a m\u00f3dos\u00edt\u00e1s ellen v\u00e9dett \u00fctemez\u00e9si d\u00f6nt\u00e9sekr\u0151l \u00d6n rendelkezik. Az Arcturus elv\u00e9gzi az \u00f6sszef\u00fcgg\u0151 \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat, \u00edgy nem kell k\u00e9zzel \u00fajra \u00f6ssze\u00e1ll\u00edtania minden \u00e9rintett g\u00e9p feladatsorrendj\u00e9t.<\/p>\n\n\n<p>Ez\u00e9rt lehet hasznos k\u00f6vetkez\u0151 l\u00e9p\u00e9s a SkyPlanner haszn\u00e1lata, ha a selejt rendszeresen megzavarja a termel\u00e9st: a r\u00f6gz\u00edtett vesztes\u00e9g, a felhaszn\u00e1lt anyag \u00e9s a m\u00e9g elv\u00e9gzend\u0151 munka egyar\u00e1nt beker\u00fcl a tervez\u00e9sbe. Nem maradnak k\u00fcl\u00f6n\u00e1ll\u00f3 adatok, amelyeket a min\u0151s\u00e9g\u00fcgynek, a rakt\u00e1rnak \u00e9s a m\u0171vezet\u0151nek k\u00e9s\u0151bb kell \u00f6sszeegyeztetnie. A SkyPlanner ny\u00edlt REST API seg\u00edts\u00e9g\u00e9vel b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3, \u00edgy a megl\u00e9v\u0151 rendel\u00e9si \u00e9s min\u0151s\u00e9g\u00fcgyi nyilv\u00e1ntart\u00e1sok is az \u00f6sszekapcsolt munkafolyamat r\u00e9szei maradhatnak.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott az Eskomatic m\u0171k\u00f6d\u00e9s\u00e9n az anyagell\u00e1t\u00e1s jobb \u00e1tl\u00e1that\u00f3s\u00e1ga?<\/h3>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/eskomatic\/\">b\u00e9rforg\u00e1csol\u00e1ssal foglalkoz\u00f3 Eskomatic<\/a> kor\u00e1bban nagyr\u00e9szt k\u00e9zzel \u00e1ll\u00edtotta \u00f6ssze a feladatsorrendeket egy r\u00e9gebbi ERP- \u00e9s termel\u00e9sir\u00e1ny\u00edt\u00e1si rendszerben. Az anyagell\u00e1t\u00e1sr\u00f3l rendelkez\u00e9sre \u00e1ll\u00f3 korl\u00e1tozott inform\u00e1ci\u00f3 miatt el\u0151fordulhatott, hogy a hi\u00e1nyok csak r\u00f6viddel a gy\u00e1rt\u00e1si feladat tervezett kezd\u00e9se el\u0151tt der\u00fcltek ki.<\/p>\n\n\n<p>A SkyPlanner megl\u00e9v\u0151 ERP-rendszerhez kapcsol\u00e1s\u00e1val a v\u00e1llalat \u00e1ttekinthet\u0151bb feladatsorrendet kapott a Gantt-diagramon, l\u00e1that\u00f3v\u00e1 v\u00e1ltak az anyaghi\u00e1nyok, \u00e9s a rendszer automatikusan \u00fctemezi a kapacit\u00e1sok terhel\u00e9s\u00e9t. Az Eskomatic besz\u00e1mol\u00f3ja szerint pontosabban tudj\u00e1k meghat\u00e1rozni a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s ritk\u00e1bban \u00e1ll le a termel\u00e9s anyaghi\u00e1ny miatt.<\/p>\n\n\n<p>Tapasztalatuk j\u00f3l mutatja, mi a gyakorlati haszna annak, ha a munk\u00e1k sorrendj\u00e9t \u00f6sszehangolj\u00e1k az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1val: kevesebb meglepet\u00e9s \u00e9ri \u0151ket a gy\u00e1rt\u00e1s ind\u00edt\u00e1sakor, \u00e9s megalapozottabb hat\u00e1rid\u0151t adhatnak a vev\u0151nek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cs\u00f6kkentse a selejtet az igazolt kiv\u00e1lt\u00f3 ok megsz\u00fcntet\u00e9s\u00e9vel<\/h2>\n\n\n<p>Nincs olyan selejtar\u00e1ny, amely minden gy\u00e1rt\u00e1si folyamatban elfogadhat\u00f3nak sz\u00e1m\u00edtana. M\u00e1sk\u00e9nt jelentkeznek a vesztes\u00e9gek egy adott term\u00e9k ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1s\u00e1ra kialak\u00edtott folyamatn\u00e1l, egy \u00faj term\u00e9k bevezet\u00e9sekor \u00e9s egy nagy \u00e9rt\u00e9k\u0171 munkadarab megmunk\u00e1l\u00e1si folyamat\u00e1ban. A c\u00e9lt \u00f6sszehasonl\u00edthat\u00f3 gy\u00e1rt\u00e1si adatok, a vev\u0151i k\u00f6vetelm\u00e9nyek \u00e9s a hib\u00e1k k\u00f6vetkezm\u00e9nyei alapj\u00e1n hat\u00e1rozza meg, ne egy \u00e1ltal\u00e1nosnak tekintett hat\u00e1r\u00e9rt\u00e9k, p\u00e9ld\u00e1ul 5% alapj\u00e1n.<\/p>\n\n\n<p>A selejtar\u00e1ny alapj\u00e1ul szolg\u00e1l\u00f3 nyilv\u00e1ntart\u00e1sokb\u00f3l induljon ki annak eld\u00f6nt\u00e9s\u00e9hez, hogy mit \u00e9rdemes kivizsg\u00e1lni. Ahol rendelkez\u00e9sre \u00e1llnak a sz\u00fcks\u00e9ges adatok, csoportos\u00edtsa a vesztes\u00e9geket term\u00e9k, m\u0171velet, anyagt\u00e9tel \u00e9s igazolt ok szerint. A probl\u00e9m\u00e1kat az elveszett mennyis\u00e9g, a k\u00f6lts\u00e9g \u00e9s a sz\u00e1ll\u00edt\u00e1sra gyakorolt hat\u00e1s alapj\u00e1n rangsorolja: nem felt\u00e9tlen\u00fcl a legnagyobb selejthalom jelenti a legs\u00fcrget\u0151bb termel\u00e9si probl\u00e9m\u00e1t.<\/p>\n\n\n<p>Az int\u00e9zked\u00e9seket a felt\u00e1rt t\u00e9nyekhez igaz\u00edtsa:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Ism\u00e9tl\u0151d\u0151 m\u00e9rethib\u00e1k:<\/strong> ellen\u0151rizze a szersz\u00e1m \u00e1llapot\u00e1t, a befog\u00f3k\u00e9sz\u00fcl\u00e9keket, a korrekci\u00f3s \u00e9rt\u00e9keket \u00e9s a technol\u00f3giai be\u00e1ll\u00edt\u00e1sokat annak a konkr\u00e9t k\u00f6vetelm\u00e9nynek a t\u00fckr\u00e9ben, amely nem teljes\u00fclt.<\/li><li><strong>Egy anyagt\u00e9teln\u00e9l \u00f6sszpontosul\u00f3 vesztes\u00e9gek:<\/strong> vizsg\u00e1lja meg a be\u00e9rkez\u0151 anyagot \u00e9s a besz\u00e1ll\u00edt\u00f3i dokument\u00e1ci\u00f3t, miel\u0151tt a g\u00e9pet vagy a g\u00e9pkezel\u0151t tenn\u00e9 felel\u0151ss\u00e9.<\/li><li><strong>Indul\u00e1skor vagy \u00e1t\u00e1ll\u00e1skor keletkez\u0151 hib\u00e1s darabok:<\/strong> a teljes sorozat elind\u00edt\u00e1sa el\u0151tt ellen\u0151rizze a g\u00e9pbe\u00e1ll\u00edt\u00e1st \u00e9s az els\u0151 darab j\u00f3v\u00e1hagy\u00e1s\u00e1t.<\/li><li><strong>M\u0171veletek k\u00f6z\u00f6tt keletkez\u0151 s\u00e9r\u00fcl\u00e9sek:<\/strong> a s\u00e9r\u00fcl\u00e9s hely\u00e9n vizsg\u00e1lja meg az anyagmozgat\u00e1st, a t\u00e1rol\u00e1st \u00e9s a munkadarabok v\u00e9delm\u00e9t.<\/li><\/ul>\n\n\n<p>Jel\u00f6lj\u00f6n ki felel\u0151st a helyesb\u00edt\u0151 int\u00e9zked\u00e9shez, \u00e9s a k\u00f6vetkez\u0151, \u00f6sszehasonl\u00edthat\u00f3 gy\u00e1rt\u00e1si t\u00e9teleket is ugyanazon \u00e1tv\u00e9teli szab\u00e1lyok szerint ellen\u0151rizze. A kor\u00e1bbi ellen\u0151rz\u00e9s m\u00e1r a hiba forr\u00e1s\u00e1nak megsz\u00fcntet\u00e9se el\u0151tt is seg\u00edthet elker\u00fclni, hogy tov\u00e1bbi \u00e9rt\u00e9kn\u00f6vel\u0151 m\u0171veleteket v\u00e9gezzen egy m\u00e1r hib\u00e1s alkatr\u00e9szen. Nem jelent javul\u00e1st, ha az alacsonyabb ar\u00e1ny csup\u00e1n az enyh\u00e9bb ellen\u0151rz\u00e9sb\u0151l vagy a nyilv\u00e1ntart\u00e1sb\u00f3l kimaradt hib\u00e1s darabokb\u00f3l ad\u00f3dik.<\/p>\n\n\n<p>A min\u0151s\u00e9g jav\u00edt\u00e1sa a k\u00f6vetkez\u0151 vesztes\u00e9get el\u0151zi meg. A re\u00e1lis anyag- \u00e9s kapacit\u00e1sterv a m\u00e1r bek\u00f6vetkezett vesztes\u00e9g kezel\u00e9s\u00e9ben seg\u00edt. Ha mindk\u00e9t ter\u00fcleten folyamatosan haladnak az int\u00e9zked\u00e9sek, a sz\u00e1zal\u00e9kos mutat\u00f3 val\u00f3ban a jobb termel\u00e9sir\u00e1ny\u00edt\u00e1st szolg\u00e1lja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e9zze meg, hogyan hat egy elutas\u00edtott gy\u00e1rt\u00e1si t\u00e9tel a k\u00f6vetkez\u0151 sz\u00e1ll\u00edt\u00e1sra<\/h2>\n\n\n<p>Hozza el egy k\u00f6zelm\u00faltbeli v\u00e9gleges selejtez\u00e9s adatait a SkyPlanner bemutat\u00f3j\u00e1ra: az eredeti \u00e9s az elfogadott mennyis\u00e9get, a felhaszn\u00e1lt anyagot, a p\u00f3tl\u00e1shoz j\u00f3v\u00e1hagyott m\u0171veleteket \u00e9s egy \u00e9rintett vev\u0151i megrendel\u00e9st.<\/p>\n\n\n<p>E p\u00e9lda alapj\u00e1n vizsg\u00e1lja meg egy konkr\u00e9t helyre\u00e1ll\u00edt\u00e1si terv lehet\u0151s\u00e9geit. Vegye sz\u00e1m\u00edt\u00e1sba a hi\u00e1nyz\u00f3 anyagot, \u00fctemezze a munk\u00e1t a megl\u00e9v\u0151 v\u00e1llal\u00e1sok figyelembev\u00e9tel\u00e9vel, \u00e9s tekintse \u00e1t, milyen sz\u00e1ll\u00edt\u00e1si d\u00f6nt\u00e9seket kell m\u00e9rlegelni, m\u00e9g miel\u0151tt a vev\u0151nek kellene r\u00e1k\u00e9rdeznie.<\/p>\n\n\n<p><strong><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a><\/strong>, hogy \u00e1tbesz\u00e9lhess\u00fck az \u00d6n gy\u00e1rt\u00e1s\u00e1t, vagy ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <strong><a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner dem\u00f3adatokkal felt\u00f6lt\u00f6tt v\u00e1ltozat\u00e1t<\/a><\/strong>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get A t\u00e9tel elk\u00e9sz\u00fclt, de a rendel\u00e9s m\u00e9g nincs k\u00e9sz. Az ellen\u0151rz\u00e9sen jav\u00edthatatlan alkatr\u00e9szeket selejteztek ki, az anyagot m\u00e1r felhaszn\u00e1lt\u00e1k, a vev\u0151 pedig tov\u00e1bbra is a teljes mennyis\u00e9get v\u00e1rja p\u00e9ntekre. A selejtar\u00e1ny a gy\u00e1rt\u00e1sban azt mutatja &#8230; <a title=\"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/\" aria-label=\"Read more about Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":105729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-105706","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get<\/title>\n<meta name=\"description\" content=\"A selejt nem csak anyagvesztes\u00e9g. Sz\u00e1m\u00edtsa ki pontosan a selejtar\u00e1nyt, vegye sz\u00e1mba az elveszett k\u00e9szletet, \u00e9s illessze a p\u00f3tl\u00e1st re\u00e1lis sz\u00e1ll\u00edt\u00e1si tervbe.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get\" \/>\n<meta property=\"og:description\" content=\"A selejt nem csak anyagvesztes\u00e9g. Sz\u00e1m\u00edtsa ki pontosan a selejtar\u00e1nyt, vegye sz\u00e1mba az elveszett k\u00e9szletet, \u00e9s illessze a p\u00f3tl\u00e1st re\u00e1lis sz\u00e1ll\u00edt\u00e1si tervbe.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T05:45:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T05:46:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:46:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/\"},\"wordCount\":3717,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/\",\"name\":\"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:46:11+00:00\",\"description\":\"A selejt nem csak anyagvesztes\u00e9g. Sz\u00e1m\u00edtsa ki pontosan a selejtar\u00e1nyt, vegye sz\u00e1mba az elveszett k\u00e9szletet, \u00e9s illessze a p\u00f3tl\u00e1st re\u00e1lis sz\u00e1ll\u00edt\u00e1si tervbe.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/selejtarany-a-gyartasban\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get","description":"A selejt nem csak anyagvesztes\u00e9g. Sz\u00e1m\u00edtsa ki pontosan a selejtar\u00e1nyt, vegye sz\u00e1mba az elveszett k\u00e9szletet, \u00e9s illessze a p\u00f3tl\u00e1st re\u00e1lis sz\u00e1ll\u00edt\u00e1si tervbe.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/","og_locale":"hu_HU","og_type":"article","og_title":"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get","og_description":"A selejt nem csak anyagvesztes\u00e9g. Sz\u00e1m\u00edtsa ki pontosan a selejtar\u00e1nyt, vegye sz\u00e1mba az elveszett k\u00e9szletet, \u00e9s illessze a p\u00f3tl\u00e1st re\u00e1lis sz\u00e1ll\u00edt\u00e1si tervbe.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T05:45:06+00:00","article_modified_time":"2026-10-22T05:46:11+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:46:11+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/"},"wordCount":3717,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/","name":"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:46:11+00:00","description":"A selejt nem csak anyagvesztes\u00e9g. Sz\u00e1m\u00edtsa ki pontosan a selejtar\u00e1nyt, vegye sz\u00e1mba az elveszett k\u00e9szletet, \u00e9s illessze a p\u00f3tl\u00e1st re\u00e1lis sz\u00e1ll\u00edt\u00e1si tervbe.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","width":1776,"height":999,"caption":"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/selejtarany-a-gyartasban\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Selejtar\u00e1ny a gy\u00e1rt\u00e1sban: sz\u00e1m\u00edtsa ki a t\u00e9nyleges vesztes\u00e9get A t\u00e9tel elk\u00e9sz\u00fclt, de a rendel\u00e9s m\u00e9g nincs k\u00e9sz. Az ellen\u0151rz\u00e9sen jav\u00edthatatlan alkatr\u00e9szeket selejteztek ki, az anyagot m\u00e1r felhaszn\u00e1lt\u00e1k, a vev\u0151 pedig tov\u00e1bbra is a teljes mennyis\u00e9get v\u00e1rja p\u00e9ntekre. A selejtar\u00e1ny a gy\u00e1rt\u00e1sban azt mutatja&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=105706"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105706\/revisions"}],"predecessor-version":[{"id":105768,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105706\/revisions\/105768"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/105729"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=105706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=105706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=105706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}