{"id":105520,"date":"2026-10-22T01:38:15","date_gmt":"2026-10-22T01:38:15","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105520"},"modified":"2026-10-22T01:39:27","modified_gmt":"2026-10-22T01:39:27","slug":"ertekaram-terkepezes","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/","title":{"rendered":"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; \u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Egy alkatr\u00e9sz megmunk\u00e1l\u00e1sa mind\u00f6ssze perceket vehet ig\u00e9nybe, mik\u00f6zben napokat v\u00e1r arra, hogy tov\u00e1bbjusson. A m\u0171veletek sorrendj\u00e9nek felrajzol\u00e1s\u00e1b\u00f3l kider\u00fcl, merre halad. Az \u00e9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s pedig abban seg\u00edt, hogy meg\u00e9rts\u00fck, mi\u00e9rt tart ilyen sok\u00e1ig az \u00fatja.<\/p>\n\n\n<p><strong>Az \u00e9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s (VSM) olyan lean m\u00f3dszer, amely megjelen\u00edti a term\u00e9k vev\u0151h\u00f6z juttat\u00e1s\u00e1hoz sz\u00fcks\u00e9ges anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1st, bele\u00e9rtve a k\u00f6zben v\u00e9gzett munk\u00e1t, a k\u00e9szleteket \u00e9s a k\u00e9sedelmeket is.<\/strong> Felt\u00e9rk\u00e9pezz\u00fck a jelen\u00e1llapotot, megtervez\u00fcnk egy jobb j\u00f6v\u0151\u00e1llapotot, \u00e9s meg\u00e1llapodunk az el\u00e9r\u00e9s\u00e9hez sz\u00fcks\u00e9ges v\u00e1ltoztat\u00e1sokban.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1sban dolgoz\u00f3 csapat sz\u00e1m\u00e1ra a hasznos eredm\u00e9ny egy d\u00f6nt\u00e9s: melyik v\u00e1ltoztat\u00e1s jav\u00edtja a vev\u0151 fel\u00e9 tart\u00f3 \u00e1raml\u00e1st? Ehhez olykor a gy\u00e1rt\u00e1si folyamaton kell v\u00e1ltoztatni, p\u00e9ld\u00e1ul r\u00f6vid\u00edteni az \u00e1t\u00e1ll\u00e1st. M\u00e1skor nem szabad elind\u00edtani azokat a gy\u00e1rt\u00e1si feladatokat, amelyek csak a v\u00e1rakoz\u00f3 sort n\u00f6veln\u00e9k. Ha a probl\u00e9m\u00e1t a k\u00f6z\u00f6s er\u0151forr\u00e1sok\u00e9rt verseng\u0151 rendel\u00e9sek okozz\u00e1k, a SkyPlanner APS az egyeztetett m\u0171veletekb\u0151l \u00e9s priorit\u00e1sokb\u00f3l <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">\u00f6sszehangolt gy\u00e1rt\u00e1si \u00fctemtervet<\/a> k\u00e9sz\u00edt, \u00edgy ritk\u00e1bban kell k\u00e9zzel \u00fajrarendezni ezeket a sorokat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit mutat meg az \u00e9rt\u00e9k\u00e1ramt\u00e9rk\u00e9p, amit a folyamat\u00e1bra nem?<\/h2>\n\n\n<p>A folyamat\u00e1bra le\u00edrhatja a sorrendet: v\u00e1g\u00e1s, alak\u00edt\u00e1s, \u00f6sszeszerel\u00e9s, kisz\u00e1ll\u00edt\u00e1s. Az \u00e9rt\u00e9k\u00e1ramt\u00e9rk\u00e9p ezt a sorrendet \u00f6sszekapcsolja az \u00e1raml\u00e1st meghat\u00e1roz\u00f3 k\u00f6r\u00fclm\u00e9nyekkel. Mennyi munka v\u00e1rakozik? Milyen gyakran k\u00fcld utas\u00edt\u00e1sokat a termel\u00e9stervez\u00e9s? A m\u0171vezet\u0151 az \u00fctemtervet k\u00f6veti, vagy a s\u00fcrg\u0151s feladatok k\u00fcl\u00f6n list\u00e1j\u00e1t?<\/p>\n\n\n<p>A t\u00e9rk\u00e9p h\u00e1rom n\u00e9z\u0151pontot egyes\u00edt:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Anyag\u00e1raml\u00e1s:<\/strong> a folyamatok, k\u00e9szlett\u00e1rol\u00e1si helyek \u00e9s anyagmozg\u00e1sok a kiv\u00e1lasztott kiindul\u00f3pontt\u00f3l a vev\u0151 fel\u0151li v\u00e9gpontig.<\/li><li><strong>Inform\u00e1ci\u00f3\u00e1raml\u00e1s:<\/strong> a rendel\u00e9sek, \u00fctemtervek, k\u00e9szletfelt\u00f6lt\u00e9si jelz\u00e9sek \u00e9s egy\u00e9b utas\u00edt\u00e1sok, amelyek meghat\u00e1rozz\u00e1k az egyes folyamatok teend\u0151it.<\/li><li><strong>Id\u0151adatok \u00e9s m\u0171k\u00f6d\u00e9si adatok:<\/strong> az \u00e1raml\u00e1st magyar\u00e1z\u00f3 feldolgoz\u00e1si id\u0151k, \u00e1t\u00e1ll\u00e1sok, rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151, min\u0151s\u00e9gi adatok, k\u00e9szletek \u00e9s k\u00e9sedelmek.<\/li><\/ul>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-utvonal\/\">technol\u00f3giai \u00fatvonal<\/a> azt \u00edrja le, hogyan kell legy\u00e1rtani a term\u00e9ket. Az \u00e9rt\u00e9k\u00e1ramt\u00e9rk\u00e9p azt vizsg\u00e1lja, hogyan teljes\u00edt jelenleg a teljes \u00e9rt\u00e9k\u00e1ram, \u00e9s hogyan kellene a j\u00f6v\u0151ben m\u0171k\u00f6dnie. Azokat a tev\u00e9kenys\u00e9geket is szerepeltess\u00fck, amelyek nem teremtenek \u00e9rt\u00e9ket a vev\u0151 sz\u00e1m\u00e1ra: kihagy\u00e1sukkal \u00e9ppen azokat a fejleszt\u00e9si lehet\u0151s\u00e9geket rejten\u00e9nk el, amelyeket fel szeretn\u00e9nk t\u00e1rni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. V\u00e1lasszunk egy term\u00e9kcsal\u00e1dot, \u00e9s hat\u00e1roljuk le egy\u00e9rtelm\u0171en a vizsg\u00e1latot<\/h2>\n\n\n<p>Olyan term\u00e9kekkel kezdj\u00fck, amelyek hasonl\u00f3 feldolgoz\u00e1si l\u00e9p\u00e9seken mennek kereszt\u00fcl, \u00e9s hasonl\u00f3 er\u0151forr\u00e1sokat haszn\u00e1lnak. Egy egyszer\u0171 term\u00e9k\u2013folyamat m\u00e1trix megmutathatja, mely term\u00e9kek tartoznak \u00f6ssze. Ne tegy\u00fck fel az \u00fczem \u00f6sszes term\u00e9k\u00e9t az els\u0151 t\u00e9rk\u00e9pre csak az\u00e9rt, mert mindegyik \u00e1tmegy a kisz\u00e1ll\u00edt\u00e1son.<\/p>\n\n\n<p>Olyan term\u00e9kcsal\u00e1dot v\u00e1lasszunk, amelyn\u00e9l \u00e9rdemi probl\u00e9m\u00e1t kell megoldani: hossz\u00fa a sz\u00e1ll\u00edt\u00e1si \u00e1tfut\u00e1si id\u0151, t\u00fal sok a befejezetlen termel\u00e9s, visszat\u00e9r\u0151 anyaghi\u00e1ny akad\u00e1lyozza az \u00f6sszeszerel\u00e9st, vagy rendszeres a s\u00fcrget\u00e9s. Vonjunk be olyan koll\u00e9g\u00e1kat, akik ismerik a gy\u00e1rt\u00e1st, a tervez\u00e9st, az anyagell\u00e1t\u00e1st \u00e9s a min\u0151s\u00e9g\u00fcgyet. Elt\u00e9r\u0151 n\u00e9z\u0151pontjaik seg\u00edtenek meg\u00e9rteni, mi\u00e9rt akad el a munka a r\u00e9szlegek k\u00f6z\u00f6tt.<\/p>\n\n\n<p>\u00cdrjuk r\u00e1 a t\u00e9rk\u00e9pre a vizsg\u00e1lat hat\u00e1rait. P\u00e9ld\u00e1ul: \u201eIsm\u00e9tl\u0151d\u0151en gy\u00e1rtott burkolatok term\u00e9kcsal\u00e1dja, a be\u00e9rkez\u0151 el\u0151gy\u00e1rtm\u00e1nyokt\u00f3l a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz k\u00e9szterm\u00e9kekig.\u201d R\u00f6gz\u00edts\u00fck a vev\u0151i ig\u00e9nyt, a term\u00e9k\u00f6sszet\u00e9telt \u00e9s a megfigyel\u00e9si id\u0151szakot. Ha a rendel\u00e9sr\u00f6gz\u00edt\u00e9s vagy egy k\u00fcls\u0151 kezel\u00e9s e hat\u00e1rokon k\u00edv\u00fcl jelent\u0151s k\u00e9sedelmet okoz, jel\u00f6lj\u00fck a kapcsol\u00f3d\u00e1si pontot, \u00e9s vizsg\u00e1ljuk meg, ne pedig hallgat\u00f3lagosan nulla id\u0151vel sz\u00e1moljunk.<\/p>\n\n\n<p>A sokf\u00e9le term\u00e9ket m\u0171helyrendszerben gy\u00e1rt\u00f3 \u00fczemek is alkalmazhatj\u00e1k a VSM-et. V\u00e1lasszunk egy jellemz\u0151 term\u00e9kcsal\u00e1dot vagy egy jellemz\u0151 mint\u00e1zatot k\u00f6vet\u0151 technol\u00f3giai \u00fatvonalat, r\u00f6gz\u00edts\u00fck a l\u00e9nyeges elt\u00e9r\u00e9seket, \u00e9s azonos\u00edtsuk a m\u00e1s term\u00e9kcsal\u00e1dokkal k\u00f6z\u00f6sen haszn\u00e1lt g\u00e9peket. Egy k\u00e9tperces \u00e9s egy nyolc\u00f3r\u00e1s feladat \u00e1tlaga lehet, hogy egyiket sem \u00edrja le el\u00e9g j\u00f3l ahhoz, hogy megalapozzon egy v\u00e1ltoztat\u00e1st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. J\u00e1rjuk v\u00e9gig a jelenlegi \u00e1raml\u00e1st, \u00e9s gy\u0171jts\u00fcnk t\u00e9nyleges adatokat<\/h2>\n\n\n<p>K\u00f6vess\u00fck v\u00e9gig az anyag \u00fatj\u00e1t az \u00fczemben azokkal a koll\u00e9g\u00e1kkal, akik a munk\u00e1t v\u00e9gzik. Ha a kisz\u00e1ll\u00edt\u00e1st\u00f3l visszafel\u00e9 haladunk, k\u00f6nnyebben megl\u00e1thatjuk, mire van sz\u00fcks\u00e9ge az egyes folyamatoknak az el\u0151tt\u00fck l\u00e9v\u0151t\u0151l. Rajzoljuk fel a t\u00e9nyleges sorrendet, sz\u00fcks\u00e9g szerint felt\u00fcntetve az alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1st, az ut\u00f3munk\u00e1ra visszaker\u00fcl\u0151 t\u00e9telek \u00fatj\u00e1t \u00e9s a k\u00e9szlett\u00e1rol\u00e1si helyeket. Az ERP nyilv\u00e1ntart\u00e1s\u00e1t kieg\u00e9sz\u00edt\u0151 adatforr\u00e1sk\u00e9nt haszn\u00e1ljuk, ne annak bizony\u00edt\u00e9kak\u00e9nt, hogy az \u00fczemben minden pontosan a dokument\u00e1ci\u00f3 szerint zajlik.<\/p>\n\n\n<p>Minden folyamatr\u00f3l \u00e9s a k\u00f6zt\u00fck l\u00e9v\u0151 szakaszokr\u00f3l gy\u0171jts\u00fcnk elegend\u0151 inform\u00e1ci\u00f3t a teljes\u00edtm\u00e9ny meg\u00e9rt\u00e9s\u00e9hez:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Mit r\u00f6gz\u00edts\u00fcnk?<\/th><th>Mi\u00e9rt fontos?<\/th><\/tr><\/thead><tbody><tr><td>M\u00e9rt ciklusid\u0151 vagy feldolgoz\u00e1si id\u0151, a m\u00e9rt\u00e9kegys\u00e9ggel \u00e9s a vonatkoztat\u00e1si mennyis\u00e9ggel egy\u00fctt<\/td><td>Elk\u00fcl\u00f6n\u00edti a t\u00e9nyleges munkav\u00e9gz\u00e9st a v\u00e1rakoz\u00e1ssal t\u00f6lt\u00f6tt id\u0151t\u0151l.<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1si id\u0151, valamint a t\u00e9nyleges gy\u00e1rt\u00e1si \u00e9s tov\u00e1bb\u00edt\u00e1si t\u00e9telnagys\u00e1gok<\/td><td>Megmutatja, hogy az \u00e1t\u00e1ll\u00e1sok vagy a teljes t\u00e9tel elk\u00e9sz\u00fclt\u00e9re val\u00f3 v\u00e1rakoz\u00e1s befoly\u00e1solj\u00e1k-e az \u00e1raml\u00e1st.<\/td><\/tr><tr><td>Rendelkez\u00e9sre \u00e1ll\u00f3 munkaid\u0151, m\u0171szakok, l\u00e9tsz\u00e1m \u00e9s az er\u0151forr\u00e1sok k\u00f6z\u00f6s haszn\u00e1lata<\/td><td>Seg\u00edt meg\u00e9rteni, mi\u00e9rt alakulhat ki hossz\u00fa v\u00e1rakoz\u00f3 sor egy l\u00e1tsz\u00f3lag gyors m\u0171velet el\u0151tt is.<\/td><\/tr><tr><td>K\u00e9szletmennyis\u00e9gek \u00e9s a k\u00e9szletek st\u00e1tusza<\/td><td>Megk\u00fcl\u00f6nb\u00f6zteti a felhaszn\u00e1lhat\u00f3 k\u00e9szletet a hi\u00e1nyos, selejtes vagy z\u00e1rolt anyagokt\u00f3l.<\/td><\/tr><tr><td>Min\u0151s\u00e9gi vesztes\u00e9gek \u00e9s ut\u00f3munka<\/td><td>L\u00e1that\u00f3v\u00e1 teszi az ism\u00e9telten elv\u00e9gzett munk\u00e1t \u00e9s az \u00e1raml\u00e1s megszakad\u00e1sait.<\/td><\/tr><tr><td>Jellemz\u0151 rendel\u00e9sek be\u00e9rkez\u00e9si, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontjai<\/td><td>Ellen\u0151rizhet\u0151v\u00e9 teszi a t\u00e9nyleges v\u00e1rakoz\u00e1si id\u0151t \u00e9s a kijel\u00f6lt szakaszon val\u00f3 \u00e1thalad\u00e1s idej\u00e9t.<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si utas\u00edt\u00e1sok forr\u00e1sa, gyakoris\u00e1ga \u00e9s c\u00edmzettje<\/td><td>Felt\u00e1rja, hogyan ind\u00edtj\u00e1k el a munk\u00e1t, \u00e9s hogyan v\u00e1ltoznak a priorit\u00e1sok.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>T\u00fcntess\u00fck fel az adatok d\u00e1tum\u00e1t, forr\u00e1s\u00e1t \u00e9s meghat\u00e1roz\u00e1suk alapj\u00e1t. Egyetlen reggeli k\u00e9szletsz\u00e1ml\u00e1l\u00e1s csak pillanatk\u00e9p; az ism\u00e9telt megfigyel\u00e9sekb\u0151l sz\u00e1rmaz\u00f3, reprezentat\u00edv \u00e1tlag megb\u00edzhat\u00f3bban t\u00e1masztja al\u00e1, hogy egy \u00e1llapot rendszeresen fenn\u00e1ll. Ha a term\u00e9kek k\u00f6z\u00f6tt jelent\u0151s elt\u00e9r\u00e9sek vannak, adjunk meg tartom\u00e1nyt, vagy bontsuk sz\u00e9t a term\u00e9kcsal\u00e1dot, ne rejts\u00fck el a k\u00fcl\u00f6nbs\u00e9geket egyetlen sz\u00e1m m\u00f6g\u00e9.<\/p>\n\n\n<p>K\u00e9rdezz\u00fck meg a g\u00e9pkezel\u0151t, mi d\u00f6nti el, melyik gy\u00e1rt\u00e1si feladat k\u00f6vetkezik. Ha a v\u00e1lasz egy telefonh\u00edv\u00e1s, ezt az utas\u00edt\u00e1st is jel\u00f6lj\u00fck, m\u00e9g akkor is, ha a hivatalos folyamatban \u201enapi ERP-\u00fctemterv\u201d szerepel. Gyakran ezen a ponton kezd a t\u00e9rk\u00e9p magyar\u00e1zatot adni a k\u00e9sedelemre ahelyett, hogy csup\u00e1n megjelen\u00edten\u00e9 azt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. Egy\u00fctt \u00e1br\u00e1zoljuk az anyag\u00e1raml\u00e1st, az utas\u00edt\u00e1sokat \u00e9s az id\u0151vonalat<\/h2>\n\n\n<p>A vev\u0151t \u00e9s a besz\u00e1ll\u00edt\u00f3t helyezz\u00fck a t\u00e9rk\u00e9p sz\u00e9leire, k\u00f6z\u00e9j\u00fck pedig sorrendben a f\u0151 folyamatokat. Adjuk hozz\u00e1 a k\u00e9szlett\u00e1rol\u00e1si helyeket, a mennyis\u00e9geket \u00e9s az anyagmozg\u00e1sokat jelz\u0151 \u00f6sszek\u00f6ttet\u00e9seket. A folyamatok f\u00f6l\u00f6tt mutassuk be, hogyan jutnak el a vev\u0151i ig\u00e9nyek a tervez\u00e9shez, majd az utas\u00edt\u00e1sok a gy\u00e1rt\u00e1sba. A vonatkoz\u00f3 folyamatadatokat az egyes folyamatok al\u00e1, az id\u0151l\u00e9pcs\u0151t pedig a t\u00e9rk\u00e9p alj\u00e1ra tegy\u00fck.<\/p>\n\n\n<p>Haszn\u00e1ljuk a megszokott VSM-jeleket, \u00e9s adjunk hozz\u00e1juk r\u00f6vid jelmagyar\u00e1zatot, hogy mindenki ugyan\u00fagy \u00e9rtelmezze \u0151ket. A folyamatdoboz egy folyamatot jel\u00f6l, a k\u00e9szleth\u00e1romsz\u00f6g pedig t\u00e1rolt anyagot vagy befejezetlen termel\u00e9st. Az anyag\u00e1raml\u00e1si nyilak a mozg\u00e1st mutatj\u00e1k. Az inform\u00e1ci\u00f3\u00e1raml\u00e1si nyilak az utas\u00edt\u00e1sokat jel\u00f6lik; ahol fontos megk\u00fcl\u00f6nb\u00f6ztetni a k\u00e9zi \u00e9s az elektronikus kommunik\u00e1ci\u00f3t, haszn\u00e1ljunk elt\u00e9r\u0151 vonalt\u00edpusokat. Az adatdobozban szerepelnek a m\u0171k\u00f6d\u00e9si adatok, a kaizen-vill\u00e1m pedig egy javasolt fejleszt\u00e9st jel\u00f6l.<\/p>\n\n\n<p>A j\u00f6v\u0151\u00e1llapot t\u00e9rk\u00e9p\u00e9n a szupermarket jele szab\u00e1lyozottan ut\u00e1np\u00f3tolt k\u00e9szletet jel\u00f6l, a FIFO-s\u00e1v pedig olyan meghat\u00e1rozott kapcsolatot, ahol az els\u0151k\u00e9nt be\u00e9rkez\u0151 t\u00e9tel t\u00e1vozik el\u0151sz\u00f6r. Ezek a jelek elfogadott m\u0171k\u00f6d\u00e9si szab\u00e1lyokat jelen\u00edtsenek meg, ne puszt\u00e1n a dobozok d\u00edsz\u00edt\u0151 \u00f6sszek\u00f6t\u00e9s\u00e9re szolg\u00e1ljanak.<\/p>\n\n\n<h3 class=\"wp-block-heading\">R\u00f6vid gy\u00e1rt\u00e1si p\u00e9lda<\/h3>\n\n\n<p>Vegy\u00fcnk egy ism\u00e9tl\u0151d\u0151en gy\u00e1rtott burkolatokb\u00f3l \u00e1ll\u00f3 term\u00e9kcsal\u00e1dot, amelyn\u00e9l az \u00e1tlagos vev\u0151i ig\u00e9ny <strong>gy\u00e1rt\u00e1si naponk\u00e9nt 100 megfelel\u0151 burkolat<\/strong>. A jelen\u00e1llapot anyag\u00e1raml\u00e1sa a k\u00f6vetkez\u0151:<\/p>\n\n\n<p><strong>Be\u00e9rkez\u0151 el\u0151gy\u00e1rtm\u00e1nyok \u2192 V\u00e1g\u00e1s \u2192 Alak\u00edt\u00e1s \u2192 \u00d6sszeszerel\u00e9s \u2192 Kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz k\u00e9szterm\u00e9kek<\/strong><\/p>\n\n\n<p>A t\u00e9rk\u00e9pen a v\u00e1rakoz\u00f3 k\u00e9szletek \u00e9s a m\u00e9rt feldolgoz\u00e1si id\u0151k is szerepelnek:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Hely a t\u00e9rk\u00e9pen<\/th><th>V\u00e1rakoz\u00f3 k\u00e9szlet<\/th><th>Feldolgoz\u00e1si id\u0151 burkolatonk\u00e9nt<\/th><\/tr><\/thead><tbody><tr><td>V\u00e1g\u00e1s el\u0151tt<\/td><td>100 darab<\/td><td>V\u00e1g\u00e1s: 20 m\u00e1sodperc<\/td><\/tr><tr><td>V\u00e1g\u00e1s \u00e9s alak\u00edt\u00e1s k\u00f6z\u00f6tt<\/td><td>300 darab<\/td><td>Alak\u00edt\u00e1s: 40 m\u00e1sodperc<\/td><\/tr><tr><td>Alak\u00edt\u00e1s \u00e9s \u00f6sszeszerel\u00e9s k\u00f6z\u00f6tt<\/td><td>100 darab<\/td><td>\u00d6sszeszerel\u00e9s: 60 m\u00e1sodperc<\/td><\/tr><tr><td>Kisz\u00e1ll\u00edt\u00e1sra v\u00e1r\u00f3 k\u00e9szterm\u00e9kek<\/td><td>100 darab<\/td><td>Nem r\u00e9sze a p\u00e9ld\u00e1ban \u00f6sszes\u00edtett feldolgoz\u00e1si id\u0151nek<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az anyag\u00e1raml\u00e1s f\u00f6l\u00e9 rajzoljuk fel a t\u00e9nyleges inform\u00e1ci\u00f3\u00e1raml\u00e1st: a vev\u0151i ig\u00e9nyek naponta jutnak el a tervez\u00e9shez, a tervez\u00e9s k\u00fcl\u00f6n list\u00e1kat k\u00fcld a v\u00e1g\u00e1snak \u00e9s az alak\u00edt\u00e1snak, az \u00f6sszeszerel\u00e9s pedig telefonon k\u00e9ri a s\u00fcrg\u0151s alkatr\u00e9szeket. A v\u00e1g\u00e1s nagy t\u00e9teleket ind\u00edt, amikor szabad kapacit\u00e1sa van. Az alak\u00edt\u00e1shoz haszn\u00e1lt g\u00e9pen m\u00e1s term\u00e9kcsal\u00e1dokat is gy\u00e1rtanak.<\/p>\n\n\n<p>A t\u00e9rk\u00e9p \u00edgy m\u00e1r magyar\u00e1zatra v\u00e1r\u00f3 \u00f6sszef\u00fcgg\u00e9st mutat. A leghosszabb v\u00e1rakoz\u00f3 sor nem felt\u00e9tlen\u00fcl a m\u00e9r\u00e9s szerint leglassabb m\u0171veletn\u00e9l alakul ki. Lehet, hogy ott keletkezik, ahol az id\u0151 el\u0151tt elind\u00edtott t\u00e9teleknek m\u00e1s munk\u00e1kkal kell versenyezni\u00fck a k\u00f6z\u00f6sen haszn\u00e1lt kapacit\u00e1s\u00e9rt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. \u00c9rtelmezz\u00fck a v\u00e1rakoz\u00e1st az id\u0151mutat\u00f3k \u00f6sszekever\u00e9se n\u00e9lk\u00fcl<\/h2>\n\n\n<p>Stabil, \u00f6sszehasonl\u00edthat\u00f3 term\u00e9k\u00e1raml\u00e1s eset\u00e9n a k\u00e9szletfedezet els\u0151 becsl\u00e9s\u00e9hez j\u00f3l haszn\u00e1lhat\u00f3 az al\u00e1bbi k\u00e9plet:<\/p>\n\n\n<p><strong>K\u00e9szletfedezet termel\u00e9si napokban = k\u00e9szletmennyis\u00e9g \u00f7 \u00e1tlagos napi ig\u00e9ny<\/strong><\/p>\n\n\n<p>A p\u00e9ld\u00e1ban az alak\u00edt\u00e1s el\u0151tt v\u00e1rakoz\u00f3 k\u00e9szlet <strong>300 \u00f7 100 = 3 termel\u00e9si nap<\/strong> ig\u00e9ny\u00e9t fedezi. A n\u00e9gy v\u00e1rakoz\u00e1si helyen \u00f6sszesen 600 darab tal\u00e1lhat\u00f3, ami enn\u00e9l az ig\u00e9nyn\u00e9l <strong>6 termel\u00e9si napra<\/strong> elegend\u0151.<\/p>\n\n\n<p>A h\u00e1rom feldolgoz\u00e1si id\u0151 \u00f6sszege <strong>20 + 40 + 60 = 120 m\u00e1sodperc<\/strong>, azaz <strong>burkolatonk\u00e9nt 2 perc<\/strong>. Ez a k\u00fcl\u00f6nbs\u00e9g arra h\u00edvja fel a csapat figyelm\u00e9t, hogy el\u0151bb a v\u00e1rakoz\u00e1s okait vizsg\u00e1lja meg, \u00e9s ne csak a g\u00e9pi ciklusok gyors\u00edt\u00e1s\u00e1ra \u00f6sszpontos\u00edtson.<\/p>\n\n\n<p>A hatnapos k\u00e9szletfedezet azonban nem az egyes rendel\u00e9sek stopperrel m\u00e9rt <a href=\"\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/\">\u00e1tfut\u00e1si ideje<\/a>. A term\u00e9k\u00f6sszet\u00e9tel, a v\u00e1ltoz\u00f3 ig\u00e9ny, a t\u00e9telek mozgat\u00e1sa, a munkarendek \u00e9s a magasabb priorit\u00e1s\u00fa munk\u00e1k el\u0151resorol\u00e1sa mind befoly\u00e1solhatj\u00e1k a t\u00e9nylegesen eltelt id\u0151t. Ellen\u0151rizze a kapott k\u00e9pet reprezentat\u00edv rendel\u00e9sek id\u0151b\u00e9lyegei alapj\u00e1n, azonos kezd\u0151- \u00e9s v\u00e9gpontokat haszn\u00e1lva. A termel\u00e9si napokat ne cser\u00e9lje fel \u00e9szrev\u00e9tlen\u00fcl napt\u00e1ri napokra.<\/p>\n\n\n<p>A k\u00e9t perc feldolgoz\u00e1si id\u0151 sem jelent automatikusan k\u00e9t perc \u00e9rt\u00e9kteremt\u0151 munk\u00e1t. A lean szeml\u00e9let szerint az \u00e9rt\u00e9kteremt\u0151 munka \u00fagy v\u00e1ltoztatja meg a term\u00e9ket, hogy az a vev\u0151 sz\u00e1m\u00e1ra \u00e9rt\u00e9ket k\u00e9pviseljen. Az ellen\u0151rz\u00e9s vagy az ut\u00f3munka id\u0151t vehet ig\u00e9nybe an\u00e9lk\u00fcl, hogy megfelelne ennek a meghat\u00e1roz\u00e1snak. Ha az \u00e9rt\u00e9kteremt\u0151 id\u0151 ar\u00e1ny\u00e1t sz\u00e1m\u00edtja ki, el\u0151bb sorolja be a tev\u00e9kenys\u00e9geket, \u00e9s a sz\u00e1ml\u00e1l\u00f3ban, illetve a nevez\u0151ben azonos id\u0151alapot haszn\u00e1ljon.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A folyamatot az ig\u00e9nyhez is m\u00e9rje, ne csak a szomsz\u00e9dos m\u0171velethez<\/h3>\n\n\n<p>Ha a term\u00e9kcsal\u00e1d gy\u00e1rt\u00e1s\u00e1ra naponta 420 perc \u00e1ll rendelkez\u00e9sre, az ig\u00e9nyb\u0151l sz\u00e1m\u00edtott <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/\">\u00fctemid\u0151<\/a> <strong>420 \u00f7 100 = 4,2 perc burkolatonk\u00e9nt<\/strong>. Az \u00fctemid\u0151 a vev\u0151i ig\u00e9ny \u00e1ltal megk\u00f6vetelt temp\u00f3t fejezi ki, nem egy g\u00e9p m\u00e9rt sebess\u00e9g\u00e9t.<\/p>\n\n\n<p>A p\u00e9ld\u00e1ban az egyes feldolgoz\u00e1si id\u0151k r\u00f6videbbek enn\u00e9l az \u00fctemid\u0151n\u00e9l, a t\u00e9rk\u00e9p m\u00e9gis jelent\u0151s v\u00e1rakoz\u00f3 k\u00e9szletet mutat. Ez nem bizony\u00edtja, hogy az er\u0151forr\u00e1soknak van szabad kapacit\u00e1suk: az alak\u00edt\u00f3g\u00e9p m\u00e1s term\u00e9kcsal\u00e1dokat is kiszolg\u00e1l, \u00e9s az \u00e1t\u00e1ll\u00e1sok, a rendelkez\u00e9sre \u00e1ll\u00e1s korl\u00e1tai, valamint a l\u00e9tsz\u00e1mhelyzet is cs\u00f6kkentik a felhaszn\u00e1lhat\u00f3 id\u0151t. Vizsg\u00e1lja meg a teljes terhel\u00e9st, miel\u0151tt sz\u0171k keresztmetszetet \u00e1llap\u00edt meg vagy \u00fajabb g\u00e9pet v\u00e1s\u00e1rol.<\/p>\n\n\n<p>A v\u00e1g\u00e1s n\u00e9gy m\u00e1sodperces gyors\u00edt\u00e1sa \u00f6nmag\u00e1ban nem magyar\u00e1zza meg \u00e9s nem sz\u00fcnteti meg az alak\u00edt\u00e1s el\u0151tt felhalmoz\u00f3dott, h\u00e1rom napra elegend\u0151 k\u00e9szletet. Hasznosabb azt megk\u00e9rdezni, mi\u00e9rt adt\u00e1k gy\u00e1rt\u00e1sba ezt a 300 darabot, \u00e9s mi akad\u00e1lyozza a tov\u00e1bbhalad\u00e1sukat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. A j\u00f6v\u0151\u00e1llapot tervez\u00e9sekor a k\u00e9sedelem ok\u00e1b\u00f3l induljon ki<\/h2>\n\n\n<p>A jelen\u00e1llapot t\u00e9rk\u00e9pe alapj\u00e1n \u00e1llapodjanak meg az anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1s k\u00edv\u00e1nt m\u0171k\u00f6d\u00e9s\u00e9ben; ne csup\u00e1n kisebb k\u00e9szletmennyis\u00e9geket \u00edrjanak a t\u00e9rk\u00e9pre.<\/p>\n\n\n<p>A burkolatok term\u00e9kcsal\u00e1dj\u00e1n\u00e1l a gy\u00e1rt\u00e1stervez\u0151vel \u00e9s a g\u00e9pkezel\u0151kkel k\u00f6z\u00f6sen vizsg\u00e1lja meg az alak\u00edt\u00e1s el\u0151tt kialakult sort. Felhaszn\u00e1lhat\u00f3 alkatr\u00e9szek v\u00e1rnak szabad kapacit\u00e1sra? Anyaghi\u00e1ny vagy a min\u0151s\u00e9g\u00fcgyi felszabad\u00edt\u00e1s hi\u00e1nya akad\u00e1lyozza a munk\u00e1kat? Folyton v\u00e1ltozik a napi feladatlista? Az\u00e9rt gy\u00e1rt el\u0151re a v\u00e1g\u00e1s, mert a teljes\u00edtm\u00e9ny\u00e9t az adott g\u00e9p kihaszn\u00e1lts\u00e1ga alapj\u00e1n \u00e9rt\u00e9kelik?<\/p>\n\n\n<p>Az elt\u00e9r\u0151 okok elt\u00e9r\u0151 v\u00e1ltoztat\u00e1sokat ig\u00e9nyelnek. Az \u00e1t\u00e1ll\u00e1si id\u0151 cs\u00f6kkent\u00e9se lehet\u0151v\u00e9 teheti a kisebb t\u00e9telek gazdas\u00e1gos gy\u00e1rt\u00e1s\u00e1t. Az arra alkalmas folyamatok folyamatos \u00e1raml\u00e1sba kapcsol\u00e1s\u00e1val megsz\u00fcntethet\u0151 egy k\u00f6ztes v\u00e1rakoz\u00e1si sor. Ahol ez nem megoldhat\u00f3, szab\u00e1lyozott FIFO-kapcsolat vagy szupermarket-k\u00e9szletb\u0151l t\u00f6rt\u00e9n\u0151 ut\u00e1np\u00f3tl\u00e1s szab\u00e1lyozhatja, mi haladjon tov\u00e1bb. A sz\u00fcks\u00e9ges kikem\u00e9nyed\u00e9si, h\u0171l\u00e9si vagy min\u0151s\u00e9g\u00fcgyi v\u00e1rakoz\u00e1snak mindaddig l\u00e1that\u00f3nak kell maradnia, am\u00edg egy j\u00f3v\u00e1hagyott folyamatm\u00f3dos\u00edt\u00e1s meg nem sz\u00fcnteti a sz\u00fcks\u00e9gess\u00e9g\u00e9t.<\/p>\n\n\n<p>Ism\u00e9tl\u0151d\u0151 term\u00e9k\u00e1raml\u00e1s tervez\u00e9sekor hat\u00e1rozza meg, hol l\u00e9p be a vev\u0151i \u00fctemez\u00e9s az \u00e9rt\u00e9k\u00e1ramba. Ez gyakran az <strong>\u00fctemad\u00f3 folyamat<\/strong>: az a pont, amelynek termel\u00e9si ritmusa az eg\u00e9sz \u00e9rt\u00e9k\u00e1ramot vez\u00e9rli. Hat\u00e1rozza meg, mi enged\u00e9lyezi az ezt megel\u0151z\u0151 munk\u00e1k elind\u00edt\u00e1s\u00e1t, \u00e9s hogyan igazodnak hozz\u00e1 az ezt k\u00f6vet\u0151 munk\u00e1k. Ha minden folyamat k\u00fcl\u00f6n\u00e1ll\u00f3, egym\u00e1snak ellentmond\u00f3 \u00fctemtervet kap, \u00fajra kialakulhatnak azok a v\u00e1rakoz\u00e1si sorok, amelyeket a j\u00f6v\u0151\u00e1llapot t\u00e9rk\u00e9p\u00e9vel meg akartak sz\u00fcntetni.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy a csapat a pr\u00f3ba\u00fczem c\u00e9lj\u00e1ul az alak\u00edt\u00e1s el\u0151tt v\u00e1rakoz\u00f3 k\u00e9szlet 300 darabr\u00f3l 100 darabra cs\u00f6kkent\u00e9s\u00e9t t\u0171zi ki. Ez v\u00e1ltozatlan ig\u00e9ny mellett k\u00e9t termel\u00e9si nappal cs\u00f6kkenten\u00e9 a k\u00e9szletfedezetet. Ez egy kipr\u00f3b\u00e1land\u00f3 c\u00e9l, nem pedig a sz\u00e1ll\u00edt\u00e1si id\u0151 automatikus, k\u00e9tnapos javul\u00e1sa.<\/p>\n\n\n<p>Tegye egy\u00e9rtelm\u0171v\u00e9 a m\u0171k\u00f6d\u00e9s v\u00e1ltoz\u00e1sait: mi enged\u00e9lyezi a v\u00e1g\u00e1s ind\u00edt\u00e1s\u00e1t, mennyi k\u00e9szlet v\u00e1rakozhat az alak\u00edt\u00e1s el\u0151tt, ki kezeli a s\u00fcrg\u0151s kiv\u00e9teleket, \u00e9s hogyan hangolj\u00e1k \u00f6ssze az alak\u00edt\u00e1s kapacit\u00e1s\u00e1t a t\u00f6bbi term\u00e9k gy\u00e1rt\u00e1s\u00e1val. A pap\u00edrra rajzolt kisebb h\u00e1romsz\u00f6gek \u00f6nmagukban nem \u00e9rv\u00e9nyes\u00edtik ezeket a d\u00f6nt\u00e9seket.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcltesse \u00e1t a gyakorlatba az \u00fctemez\u00e9si fejleszt\u00e9seket a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A j\u00f6v\u0151\u00e1llapot t\u00e9rk\u00e9pe meghat\u00e1rozza a k\u00edv\u00e1nt \u00e1raml\u00e1st. A SkyPlanner seg\u00edt abban, hogy az ehhez sz\u00fcks\u00e9ges \u00fctemez\u00e9s a teljes t\u00e9nyleges rendel\u00e9s\u00e1llom\u00e1nyra kiterjedjen, ne csak a felt\u00e9rk\u00e9pezett term\u00e9kcsal\u00e1dra.<\/p>\n\n\n<p>R\u00f6gz\u00edtse az egyeztetett m\u0171veleteket a term\u00e9k gy\u00e1rt\u00e1si l\u00e9p\u00e9seik\u00e9nt, a megfelel\u0151 munka\u00e1llom\u00e1sokkal, megmunk\u00e1l\u00e1si id\u0151kkel \u00e9s \u00e1t\u00e1ll\u00e1si id\u0151kkel egy\u00fctt. Adja meg a m\u0171szakokat \u00e9s az er\u0151forr\u00e1sok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t, majd \u00e1ll\u00edtsa be a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151knek megfelel\u0151 priorit\u00e1sokat. Az Arcturus, a SkyPlanner \u00fctemez\u00e9sre szolg\u00e1l\u00f3 mesters\u00e9ges intelligenci\u00e1ja a kapacit\u00e1s, a m\u0171veleti f\u00fcgg\u0151s\u00e9gek \u00e9s e priorit\u00e1sok alapj\u00e1n sz\u00e1m\u00edtja ki az \u00fctemtervet. Ha bekapcsolja az anyagell\u00e1totts\u00e1got figyelembe vev\u0151 \u00fctemez\u00e9st, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa is befoly\u00e1solja, mikor v\u00e9gezhet\u0151k el a munk\u00e1k.<\/p>\n\n\n<p>A burkolatok term\u00e9kcsal\u00e1dj\u00e1n\u00e1l ez azt jelenti, hogy az alak\u00edt\u00e1si munk\u00e1k \u00fctemez\u00e9se az ugyanaz\u00e9rt a g\u00e9pkapacit\u00e1s\u00e9rt verseng\u0151 t\u00f6bbi rendel\u00e9ssel egy\u00fctt t\u00f6rt\u00e9nik. Az \u00edgy kialakult sorrendet a Gantt-n\u00e9zetben ellen\u0151rizheti, ahelyett, hogy k\u00fcl\u00f6n tervet tartana fenn a term\u00e9kcsal\u00e1dhoz, folyamatosan rendelkez\u00e9sre \u00e1ll\u00f3 g\u00e9pet felt\u00e9telezve. \u00cdgy kevesebb k\u00e9zi egyeztet\u00e9st ig\u00e9nyelnek a munkasorok, \u00e9s kor\u00e1bban l\u00e1that\u00f3v\u00e1 v\u00e1lnak azok az \u00fctk\u00f6z\u00e9sek, amelyek egy\u00e9bk\u00e9nt v\u00e1rakoz\u00e1sra k\u00e9nyszer\u00edten\u00e9k az alkatr\u00e9szeket.<\/p>\n\n\n<p>Tartsa meg az \u00e1raml\u00e1s szab\u00e1lyoz\u00e1s\u00e1r\u00f3l hozott d\u00f6nt\u00e9st. Ha a j\u00f6v\u0151\u00e1llapot h\u00faz\u00f3 rendszer\u0171 ut\u00e1np\u00f3tl\u00e1st alkalmaz, a jelz\u00e9s enged\u00e9lyezi a munk\u00e1t; az \u00fctemez\u00e9s az enged\u00e9lyezett munk\u00e1kat illeszti a rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sokhoz. A kapacit\u00e1ssz\u00e1m\u00edt\u00e1s ne v\u00e1ljon felhatalmaz\u00e1ss\u00e1 felesleges k\u00e9szlet gy\u00e1rt\u00e1s\u00e1ra.<\/p>\n\n\n<p>Ha egy s\u00fcrg\u0151s rendel\u00e9s vagy a m\u0171szakbeoszt\u00e1s v\u00e1ltoz\u00e1sa m\u00f3dos\u00edtja a helyzetet, az Arcturus \u00fajrasz\u00e1m\u00edthatja az \u00fctemtervet. A be\u00e1ll\u00edtott szab\u00e1lyok \u00e9s r\u00f6gz\u00edt\u00e9sek v\u00e9dik azokat a d\u00f6nt\u00e9seket, amelyeknek v\u00e1ltozatlanul kell maradniuk. <strong>A SkyPlanner a ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3<\/strong>, \u00edgy az \u00fctemez\u00e9st a rendel\u00e9seket \u00e9s termel\u00e9si adatokat m\u00e1r t\u00e1rol\u00f3 rendszerek megtart\u00e1s\u00e1val fejlesztheti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott meg az \u00f6sszehangolt \u00fctemez\u00e9s a Mamecn\u00e9l?<\/h3>\n\n\n<p>A kever\u00e9stechnikai berendez\u00e9seket gy\u00e1rt\u00f3 \u00e9s cs\u00facstechnol\u00f3gi\u00e1s b\u00e9rgy\u00e1rt\u00e1st v\u00e9gz\u0151 <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">finn Mamec<\/a> t\u00f6bb ezer, egym\u00e1st\u00f3l f\u00fcgg\u0151 munkalappal dolgozott. A m\u0171vezet\u0151k a pap\u00edralap\u00fa munkalapokon szerepl\u0151 sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k alapj\u00e1n rangsorolt\u00e1k a munk\u00e1kat, mik\u00f6zben a vezet\u0151s\u00e9gnek nem volt megb\u00edzhat\u00f3 \u00f6sszk\u00e9pe a terhel\u00e9sr\u0151l.<\/p>\n\n\n<p>A v\u00e1llalat integr\u00e1lta a SkyPlanner rendszer\u00e9t az Oscar ERP rendszerrel. Az alapvet\u0151 \u00fctemez\u00e9si feladatokat ma m\u00e1r mesters\u00e9ges intelligenci\u00e1val t\u00e1mogatott, v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9ssel v\u00e9gzik. Az egyszerre egy h\u00e9tre r\u00f6gz\u00edtett munkasorok seg\u00edtenek a g\u00e9pkezel\u0151knek abban, hogy el\u0151re ismerj\u00e9k \u00e9s el\u0151k\u00e9sz\u00edthess\u00e9k a k\u00f6vetkez\u0151 feladatokat.<\/p>\n\n\n<p>A Mamec a SkyPlanner haszn\u00e1lat\u00e1r\u00f3l sz\u00f3l\u00f3 besz\u00e1mol\u00f3j\u00e1ban arr\u00f3l sz\u00e1mol be, hogy a jobb munkasorrendnek k\u00f6sz\u00f6nhet\u0151en cs\u00f6kkent a munka\u00e1llom\u00e1sok \u00e1ll\u00e1sideje, kevesebb munk\u00e1t ig\u00e9nyel a tervez\u00e9s, \u00e9s kevesebb forg\u00f3t\u0151ke van feleslegesen lek\u00f6tve a befejezetlen termel\u00e9sben. Tapasztalata j\u00f3l mutatja az egym\u00e1st\u00f3l f\u00fcgg\u0151 munk\u00e1k \u00f6sszehangol\u00e1s\u00e1nak gyakorlati \u00e9rt\u00e9k\u00e9t: a jobb \u00e1raml\u00e1shoz olyan k\u00f6z\u00f6s terv kell, amelyet a munkat\u00e1rsak a termel\u00e9s v\u00e1ltoz\u00e1sai k\u00f6zepette is haszn\u00e1lni tudnak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kezdje egy olyan v\u00e1ltoztat\u00e1ssal, amelynek eredm\u00e9nye ellen\u0151rizhet\u0151<\/h2>\n\n\n<p>A j\u00f6v\u0151\u00e1llapot fel\u00e9 vezet\u0151 els\u0151 int\u00e9zked\u00e9shez rendeljen felel\u0151st, hat\u00e1rid\u0151t \u00e9s m\u00e9rhet\u0151 eredm\u00e9nyt. Az alak\u00edt\u00e1s el\u0151tti sorn\u00e1l k\u00f6vesse a v\u00e1rakoz\u00f3 k\u00e9szletet \u00e9s a be\u00e9rkez\u00e9st\u0151l a m\u0171velet kezdet\u00e9ig t\u00e9nylegesen eltelt id\u0151t, a kibocs\u00e1t\u00e1s, a sz\u00e1ll\u00edt\u00e1si teljes\u00edtm\u00e9ny \u00e9s a s\u00fcrg\u0151s kiv\u00e9telek mellett. Ellen\u0151rizze, hogy a kisebb v\u00e1rakoz\u00e1si sor nem csup\u00e1n a v\u00e1g\u00e1sra, az \u00f6sszeszerel\u00e9sre vagy a vev\u0151re h\u00e1r\u00edtotta-e \u00e1t a k\u00e9sedelmet.<\/p>\n\n\n<p>\u00c9rt\u00e9kelje az eredm\u00e9nyt az \u00e9rt\u00e9k\u00e1ramban dolgoz\u00f3 munkat\u00e1rsakkal k\u00f6z\u00f6sen. Tartsa meg azt, ami jav\u00edtja az \u00e1raml\u00e1st, vizsg\u00e1lja meg, mi nem m\u0171k\u00f6d\u00f6tt, \u00e9s a k\u00f6vetkez\u0151 v\u00e1ltoztat\u00e1s kiv\u00e1laszt\u00e1sa el\u0151tt friss\u00edtse a jelen\u00e1llapot t\u00e9rk\u00e9p\u00e9t.<\/p>\n\n\n<p>Ha szeretn\u00e9 l\u00e1tni, hogyan m\u0171k\u00f6dne az \u00fctemez\u00e9s az \u00d6n \u00fczem\u00e9ben, <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">foglaljon SkyPlanner-bemutat\u00f3t<\/a>. Hozza mag\u00e1val a felt\u00e9rk\u00e9pezett term\u00e9kcsal\u00e1d, a legnagyobb v\u00e1rakoz\u00e1si sor \u00e9s az ugyanazt az er\u0151forr\u00e1st haszn\u00e1l\u00f3 t\u00f6bbi munka adatait. Ez k\u00e9zzelfoghat\u00f3 kiindul\u00f3pont ahhoz, hogy a t\u00e9rk\u00e9p alapj\u00e1n cs\u00f6kkentse a v\u00e1rakoz\u00e1st, \u00e9s a csapat sz\u00e1m\u00e1ra k\u00f6vethet\u0151 termel\u00e9si tervet alak\u00edtson ki. Ha el\u0151bb ink\u00e1bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t mintaadatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; \u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig Egy alkatr\u00e9sz megmunk\u00e1l\u00e1sa mind\u00f6ssze perceket vehet ig\u00e9nybe, mik\u00f6zben napokat v\u00e1r arra, hogy tov\u00e1bbjusson. A m\u0171veletek sorrendj\u00e9nek felrajzol\u00e1s\u00e1b\u00f3l kider\u00fcl, merre halad. Az \u00e9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s pedig abban seg\u00edt, hogy meg\u00e9rts\u00fck, mi\u00e9rt tart ilyen sok\u00e1ig az \u00fatja. Az \u00e9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s (VSM) olyan &#8230; <a title=\"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/\" aria-label=\"Read more about \u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":105538,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-105520","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: t\u00e9rk\u00e9pt\u0151l a jobb \u00fczemi \u00e1raml\u00e1sig<\/title>\n<meta name=\"description\" content=\"Mi\u00e9rt v\u00e1r a term\u00e9k? T\u00e9rk\u00e9pezze fel egy term\u00e9kcsal\u00e1d anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1s\u00e1t, \u00e9rt\u00e9kelje a v\u00e1rakoz\u00e1st, \u00e9s v\u00e1lasszon az \u00fczemben megval\u00f3s\u00edthat\u00f3 v\u00e1ltoztat\u00e1st.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig\" \/>\n<meta property=\"og:description\" content=\"Mi\u00e9rt v\u00e1r a term\u00e9k? T\u00e9rk\u00e9pezze fel egy term\u00e9kcsal\u00e1d anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1s\u00e1t, \u00e9rt\u00e9kelje a v\u00e1rakoz\u00e1st, \u00e9s v\u00e1lasszon az \u00fczemben megval\u00f3s\u00edthat\u00f3 v\u00e1ltoztat\u00e1st.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T01:38:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T01:39:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig\",\"datePublished\":\"2026-10-22T01:38:15+00:00\",\"dateModified\":\"2026-10-22T01:39:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/\"},\"wordCount\":4152,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/\",\"name\":\"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: t\u00e9rk\u00e9pt\u0151l a jobb \u00fczemi \u00e1raml\u00e1sig\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"datePublished\":\"2026-10-22T01:38:15+00:00\",\"dateModified\":\"2026-10-22T01:39:27+00:00\",\"description\":\"Mi\u00e9rt v\u00e1r a term\u00e9k? T\u00e9rk\u00e9pezze fel egy term\u00e9kcsal\u00e1d anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1s\u00e1t, \u00e9rt\u00e9kelje a v\u00e1rakoz\u00e1st, \u00e9s v\u00e1lasszon az \u00fczemben megval\u00f3s\u00edthat\u00f3 v\u00e1ltoztat\u00e1st.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Material and information paths connect three manufacturing stations, with parts waiting before the middle machine.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/ertekaram-terkepezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: t\u00e9rk\u00e9pt\u0151l a jobb \u00fczemi \u00e1raml\u00e1sig","description":"Mi\u00e9rt v\u00e1r a term\u00e9k? T\u00e9rk\u00e9pezze fel egy term\u00e9kcsal\u00e1d anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1s\u00e1t, \u00e9rt\u00e9kelje a v\u00e1rakoz\u00e1st, \u00e9s v\u00e1lasszon az \u00fczemben megval\u00f3s\u00edthat\u00f3 v\u00e1ltoztat\u00e1st.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/","og_locale":"hu_HU","og_type":"article","og_title":"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig","og_description":"Mi\u00e9rt v\u00e1r a term\u00e9k? T\u00e9rk\u00e9pezze fel egy term\u00e9kcsal\u00e1d anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1s\u00e1t, \u00e9rt\u00e9kelje a v\u00e1rakoz\u00e1st, \u00e9s v\u00e1lasszon az \u00fczemben megval\u00f3s\u00edthat\u00f3 v\u00e1ltoztat\u00e1st.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T01:38:15+00:00","article_modified_time":"2026-10-22T01:39:27+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig","datePublished":"2026-10-22T01:38:15+00:00","dateModified":"2026-10-22T01:39:27+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/"},"wordCount":4152,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/","name":"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: t\u00e9rk\u00e9pt\u0151l a jobb \u00fczemi \u00e1raml\u00e1sig","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","datePublished":"2026-10-22T01:38:15+00:00","dateModified":"2026-10-22T01:39:27+00:00","description":"Mi\u00e9rt v\u00e1r a term\u00e9k? T\u00e9rk\u00e9pezze fel egy term\u00e9kcsal\u00e1d anyag- \u00e9s inform\u00e1ci\u00f3\u00e1raml\u00e1s\u00e1t, \u00e9rt\u00e9kelje a v\u00e1rakoz\u00e1st, \u00e9s v\u00e1lasszon az \u00fczemben megval\u00f3s\u00edthat\u00f3 v\u00e1ltoztat\u00e1st.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","width":1672,"height":941,"caption":"Material and information paths connect three manufacturing stations, with parts waiting before the middle machine."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/ertekaram-terkepezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; \u00c9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s: az \u00fczem felt\u00e9rk\u00e9pez\u00e9s\u00e9t\u0151l a jobb \u00e1raml\u00e1sig Egy alkatr\u00e9sz megmunk\u00e1l\u00e1sa mind\u00f6ssze perceket vehet ig\u00e9nybe, mik\u00f6zben napokat v\u00e1r arra, hogy tov\u00e1bbjusson. A m\u0171veletek sorrendj\u00e9nek felrajzol\u00e1s\u00e1b\u00f3l kider\u00fcl, merre halad. Az \u00e9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s pedig abban seg\u00edt, hogy meg\u00e9rts\u00fck, mi\u00e9rt tart ilyen sok\u00e1ig az \u00fatja. Az \u00e9rt\u00e9k\u00e1ram-t\u00e9rk\u00e9pez\u00e9s (VSM) olyan&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=105520"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105520\/revisions"}],"predecessor-version":[{"id":105584,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105520\/revisions\/105584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/105538"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=105520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=105520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=105520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}