{"id":105429,"date":"2026-10-21T23:26:46","date_gmt":"2026-10-21T23:26:46","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105429"},"modified":"2026-10-21T23:28:06","modified_gmt":"2026-10-21T23:28:06","slug":"kanban-a-gyartasban","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/","title":{"rendered":"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A kanban a gy\u00e1rt\u00e1sban olyan <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/\">h\u00faz\u00f3 elv\u0171 ir\u00e1ny\u00edt\u00e1si m\u00f3dszer<\/a>, amelyben egy jelz\u00e9s meghat\u00e1rozott mennyis\u00e9g\u0171 alkatr\u00e9sz gy\u00e1rt\u00e1s\u00e1t vagy mozgat\u00e1s\u00e1t enged\u00e9lyezi. Az ig\u00e9nyt a k\u00f6vetkez\u0151 folyamat felhaszn\u00e1l\u00e1sa teremti meg; a jelz\u00e9s pedig megadja az ell\u00e1t\u00f3 folyamatnak, hogy mit kell p\u00f3tolnia. Ezt az utas\u00edt\u00e1st k\u00e1rtya, \u00fcres t\u00e1rol\u00f3 vagy elektronikus \u00fczenet is k\u00f6zvet\u00edtheti.<\/p>\n\n\n<p>El\u0151nye, hogy egy\u00e9rtelm\u0171 korl\u00e1tot szab az ut\u00e1np\u00f3tl\u00e1snak. Nem az\u00e9rt k\u00e9sz\u00fcl \u00fajabb sorozat, mert \u00e9ppen szabad egy g\u00e9p, hanem azt p\u00f3toljuk, amit a k\u00f6vetkez\u0151 folyamat t\u00e9nylegesen elvitt. \u00cdgy cs\u00f6kken a felesleges k\u00e9szlet, \u00e9s k\u00f6nnyebb \u00e9szrevenni az elmaradt ut\u00e1np\u00f3tl\u00e1st.<\/p>\n\n\n<p>A jelz\u00e9s azonban nem teremt g\u00e9pid\u0151t. Ha a rendszeresen gy\u00e1rtott alkatr\u00e9szek ugyanazon a pr\u00e9sen, megmunk\u00e1l\u00f3k\u00f6zponton vagy hajl\u00edt\u00f3g\u00e9pen k\u00e9sz\u00fclnek, mint a vev\u0151i megrendel\u00e9sek, az ut\u00e1np\u00f3tl\u00e1snak is helyet kell tal\u00e1lni az \u00fctemtervben. A kanbannal enged\u00e9lyezze a meghat\u00e1rozott mennyis\u00e9g gy\u00e1rt\u00e1s\u00e1t, a SkyPlanner APS seg\u00edts\u00e9g\u00e9vel pedig \u00fctemezze az elfogadott munk\u00e1kat az \u00fczem rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1s\u00e1hoz \u00e9s anyagaihoz igazodva. \u00cdgy kevesebb id\u0151t kell a k\u00fcl\u00f6n\u00e1ll\u00f3 v\u00e1r\u00f3list\u00e1k \u00f6sszehangol\u00e1s\u00e1ra ford\u00edtania, \u00e9s m\u00e9g azel\u0151tt l\u00e1thatja az \u00fctk\u00f6z\u00e9seket, hogy azok alkatr\u00e9szhi\u00e1nyt okozn\u00e1nak az \u00f6sszeszerel\u00e9sn\u00e9l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A gy\u00e1rt\u00e1si \u00e9s az anyagmozgat\u00e1si kanban elt\u00e9r\u0151 m\u0171veleteket enged\u00e9lyez<\/h2>\n\n\n<p>A gy\u00e1rt\u00e1sban haszn\u00e1lt kanban t\u00f6bb ann\u00e1l, mint hogy egy k\u00e1rty\u00e1t \u00e1tmozgatunk az Elv\u00e9gzend\u0151, Folyamatban \u00e9s K\u00e9sz oszlopok k\u00f6z\u00f6tt. Egy konkr\u00e9t ut\u00e1np\u00f3tl\u00e1si m\u0171veletre ad enged\u00e9lyt. \u00c1ltal\u00e1ban k\u00e9t jelz\u00e9s m\u0171k\u00f6dik egy\u00fctt:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Jelz\u00e9s<\/th><th>Mit enged\u00e9lyez?<\/th><th>Mit nem enged\u00e9lyez?<\/th><\/tr><\/thead><tbody><tr><td>Gy\u00e1rt\u00e1si kanban<\/td><td>Az ell\u00e1t\u00f3 folyamat a kivett k\u00e9szlet p\u00f3tl\u00e1s\u00e1ra legy\u00e1rtja a megadott alkatr\u00e9szt az el\u0151\u00edrt mennyis\u00e9gben.<\/td><td>Tov\u00e1bbi t\u00e1rol\u00f3nyi alkatr\u00e9sz gy\u00e1rt\u00e1s\u00e1t puszt\u00e1n az\u00e9rt, hogy a g\u00e9p ne \u00e1lljon.<\/td><\/tr><tr><td>Anyagmozgat\u00e1si kanban, m\u00e1s n\u00e9ven v\u00e9telez\u00e9si vagy sz\u00e1ll\u00edt\u00e1si kanban<\/td><td>Az anyagmozgat\u00f3 a megadott mennyis\u00e9get az ell\u00e1t\u00e1si helyr\u0151l a felhaszn\u00e1l\u00e1si helyre viszi.<\/td><td>\u00dajabb sorozat gy\u00e1rt\u00e1s\u00e1t puszt\u00e1n az\u00e9rt, mert sz\u00e1ll\u00edt\u00e1si ig\u00e9ny \u00e9rkezett.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A <strong>szupermarket<\/strong> a folyamatok k\u00f6z\u00f6tti, szab\u00e1lyozott k\u00f6ztes k\u00e9szlet t\u00e1rol\u00f3helye. Minden alkatr\u00e9sznek kijel\u00f6lt helye \u00e9s meghat\u00e1rozott ut\u00e1np\u00f3tl\u00e1si mennyis\u00e9ge van. A k\u00f6vetkez\u0151 folyamat elveszi, amire sz\u00fcks\u00e9ge van, az el\u0151z\u0151 folyamat pedig p\u00f3tolja a kivett mennyis\u00e9get.<\/p>\n\n\n<p>A kanban teh\u00e1t nem k\u00f6vetel meg nulla k\u00e9szletet. A szupermarket k\u00e9szlete biztos\u00edtja az alkatr\u00e9szek rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t, am\u00edg az ut\u00e1np\u00f3tl\u00e1s zajlik. A l\u00e9nyeg az, hogy ezt a k\u00e9szletet szab\u00e1lyozzuk, ne pedig folyamatosan n\u00f6velj\u00fck.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u00f6vess\u00fck v\u00e9gig egy t\u00e1rol\u00f3 \u00fatj\u00e1t a k\u00e9tk\u00e1rty\u00e1s rendszerben<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy szerel\u0151sort, amely rendszeresen felhaszn\u00e1l egy tart\u00f3elemet. Ezt egy m\u00e1s munk\u00e1kra is haszn\u00e1lt hajl\u00edt\u00f3g\u00e9p gy\u00e1rtja. A tart\u00f3elemek 20 darabos t\u00e1rol\u00f3kban \u00e9rkeznek. A k\u00e9sz alkatr\u00e9szekkel teli t\u00e1rol\u00f3k a hajl\u00edt\u00e1s k\u00f6zel\u00e9ben kialak\u00edtott szupermarketben v\u00e1rakoznak, az \u00f6sszeszerel\u00e9snek pedig saj\u00e1t k\u00e9szlete van a felhaszn\u00e1l\u00e1s hely\u00e9n.<\/p>\n\n\n<p>Ebben a p\u00e9ld\u00e1ban az anyagmozgat\u00e1si jelz\u00e9st akkor adj\u00e1k ki, amikor az \u00f6sszeszerel\u00e9sn\u00e9l \u00faj t\u00e1rol\u00f3t bontanak meg, nem pedig akkor, amikor az utols\u00f3 tart\u00f3elem is elfogyott. \u00cdgy az anyagmozgat\u00f3nak van ideje odavinni a k\u00f6vetkez\u0151 t\u00e1rol\u00f3t, am\u00edg az \u00f6sszeszerel\u00e9s a m\u00e1r megkezdett t\u00e1rol\u00f3b\u00f3l dolgozik.<\/p>\n\n\n<p>1. <strong>Az \u00f6sszeszerel\u00e9sn\u00e9l megkezdik egy t\u00e1rol\u00f3 felhaszn\u00e1l\u00e1s\u00e1t.<\/strong> A dolgoz\u00f3 leveszi r\u00f3la az anyagmozgat\u00e1si k\u00e1rty\u00e1t, \u00e9s a gy\u0171jt\u0151helyre teszi. A k\u00e1rtya egy \u00fajabb, 20 tart\u00f3elemet tartalmaz\u00f3 t\u00e1rol\u00f3t ig\u00e9nyel a szupermarketb\u0151l.<\/p>\n\n\n<p>2. <strong>Az anyagmozgat\u00f3 \u00e1tveszi az ig\u00e9nyt.<\/strong> A szupermarketb\u0151l elvesz egy, a megfelel\u0151 tart\u00f3elemekkel teli t\u00e1rol\u00f3t. Leveszi r\u00f3la a gy\u00e1rt\u00e1si k\u00e1rty\u00e1t, \u00e9s a gy\u00e1rt\u00e1si k\u00e1rty\u00e1k gy\u0171jt\u0151hely\u00e9re teszi. Az anyagmozgat\u00e1si k\u00e1rty\u00e1t az \u00f6sszeszerel\u00e9shez sz\u00e1ll\u00edtand\u00f3 t\u00e1rol\u00f3ra helyezi.<\/p>\n\n\n<p>3. <strong>A hajl\u00edt\u00f3hoz meg\u00e9rkezik a gy\u00e1rt\u00e1si jelz\u00e9s.<\/strong> A vissza\u00e9rkezett gy\u00e1rt\u00e1si k\u00e1rtya egy t\u00e1rol\u00f3nyi, azaz 20 tart\u00f3elem p\u00f3tl\u00e1s\u00e1t enged\u00e9lyezi. Nem ad enged\u00e9lyt korl\u00e1tlan mennyis\u00e9g gy\u00e1rt\u00e1s\u00e1ra.<\/p>\n\n\n<p>4. <strong>Legy\u00e1rtj\u00e1k \u00e9s ellen\u0151rzik a p\u00f3tl\u00e1st.<\/strong> Amint elk\u00e9sz\u00fcl az el\u0151\u00edrt mennyis\u00e9g\u0171, felhaszn\u00e1lhat\u00f3 tart\u00f3elem, a t\u00e1rol\u00f3 a gy\u00e1rt\u00e1si k\u00e1rty\u00e1val egy\u00fctt visszaker\u00fcl a szupermarketben kijel\u00f6lt hely\u00e9re.<\/p>\n\n\n<p>5. <strong>A k\u00f6r az \u00f6sszeszerel\u00e9s alkatr\u00e9sz-felhaszn\u00e1l\u00e1s\u00e1val ism\u00e9tl\u0151dik.<\/strong> Ha nem \u00e9rkezik vissza tov\u00e1bbi gy\u00e1rt\u00e1si k\u00e1rtya, nincs enged\u00e9ly \u00fajabb mennyis\u00e9g gy\u00e1rt\u00e1s\u00e1ra ebben a k\u00f6rben.<\/p>\n\n\n<p>A k\u00e1rty\u00e1kon szerepel a cikksz\u00e1m, a mennyis\u00e9g, az ell\u00e1t\u00e1si \u00e9s a felhaszn\u00e1l\u00e1si hely, valamint egy azonos\u00edt\u00f3, amely megk\u00fcl\u00f6nb\u00f6zteti az egyes enged\u00e9lyeket. Az elektronikus jelz\u00e9snek is ugyanilyen egy\u00e9rtelm\u0171nek kell lennie: egy k\u00e9t\u00e9rtelm\u0171 utas\u00edt\u00e1s att\u00f3l m\u00e9g nem v\u00e1lik megb\u00edzhat\u00f3 ut\u00e1np\u00f3tl\u00e1si szab\u00e1lly\u00e1, hogy digitaliz\u00e1ljuk.<\/p>\n\n\n<p>M\u00e1s rendszerekben a t\u00e1rol\u00f3 ki\u00fcr\u00fcl\u00e9se ind\u00edtja el a jelz\u00e9st. Ez is m\u0171k\u00f6dhet, ha a megmarad\u00f3 k\u00e9szlet a teljes v\u00e1laszid\u0151re elegend\u0151. Hat\u00e1rozza meg, melyik esem\u00e9ny v\u00e1ltja ki a jelz\u00e9st, \u00e9s tan\u00edtson be mindenkit annak k\u00f6vetkezetes alkalmaz\u00e1s\u00e1ra. A \u201et\u00e1rol\u00f3 megbontva\u201d \u00e9s a \u201et\u00e1rol\u00f3 \u00fcres\u201d jelz\u00e9sek kever\u00e9se megv\u00e1ltoztatja, mennyi id\u0151 \u00e1ll a k\u00f6r rendelkez\u00e9s\u00e9re az ut\u00e1np\u00f3tl\u00e1shoz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e1lasszon megb\u00edzhat\u00f3an p\u00f3tolhat\u00f3 alkatr\u00e9szeket<\/h2>\n\n\n<p>J\u00f3 kiindul\u00f3pont egy rendszeresen felhaszn\u00e1lt, visszat\u00e9r\u0151en gy\u00e1rtott alkatr\u00e9sz, amelynek specifik\u00e1ci\u00f3ja \u00e1lland\u00f3, ut\u00e1np\u00f3tl\u00e1si \u00fatja pedig viszonylag j\u00f3l kisz\u00e1m\u00edthat\u00f3. Egy t\u00f6bbf\u00e9le \u00f6ssze\u00e1ll\u00edt\u00e1sban haszn\u00e1lt k\u00f6z\u00f6s tart\u00f3elem jobb v\u00e1laszt\u00e1s lehet, mint egy \u00e9vente egyszer rendelt, vev\u0151specifikus alkatr\u00e9sz.<\/p>\n\n\n<p>A k\u00e1rty\u00e1k bevezet\u00e9se el\u0151tt ellen\u0151rizze, hogy az ell\u00e1t\u00f3 folyamat k\u00e9pes-e l\u00e9p\u00e9st tartani az \u00e1tlagos ig\u00e9nnyel. Ha az \u00f6sszeszerel\u00e9s tart\u00f3san gyorsabban haszn\u00e1lja fel az alkatr\u00e9szeket, mint ahogy a hajl\u00edt\u00f3 gy\u00e1rtani tudja \u0151ket, a t\u00f6bb k\u00e1rtya csak k\u00e9slelteti a hi\u00e1nyt. Ilyenkor a kapacit\u00e1sr\u00f3l vagy az ig\u00e9nyr\u0151l kell d\u00f6nteni, nem az enged\u00e9lyek sz\u00e1m\u00e1t n\u00f6velni.<\/p>\n\n\n<p>Az \u00e1t\u00e1ll\u00e1si id\u0151 is sz\u00e1m\u00edt. Egy k\u00e1rtya jelenthet egy t\u00e1rol\u00f3t an\u00e9lk\u00fcl, hogy minden t\u00e1rol\u00f3hoz k\u00fcl\u00f6n g\u00e9p\u00e1t\u00e1ll\u00e1sra lenne sz\u00fcks\u00e9g. Ha t\u00f6bb vissza\u00e9rkezett k\u00e1rty\u00e1t egy gy\u00e1rt\u00e1si sorozatba vonnak \u00f6ssze, hat\u00e1rozza meg a sorozat ind\u00edt\u00e1s\u00e1nak felt\u00e9tel\u00e9t, \u00e9s sz\u00e1m\u00edtsa bele a v\u00e1rakoz\u00e1st az ut\u00e1np\u00f3tl\u00e1s \u00e1tfut\u00e1si idej\u00e9be. Ne eg\u00e9sz\u00edtse ki \u00e9szrev\u00e9tlen\u00fcl a sorozatot olyan k\u00e9szlettel, amelyre nem \u00e9rkezett ig\u00e9ny.<\/p>\n\n\n<p>A pr\u00f3ba\u00fczem megkezd\u00e9se el\u0151tt \u00e1llapodjanak meg a m\u0171k\u00f6d\u00e9si szab\u00e1lyokban:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Csak a megfelel\u0151, \u00e9rv\u00e9nyes jelz\u00e9s alapj\u00e1n gy\u00e1rtsanak vagy mozgassanak alkatr\u00e9szt, az azon megadott mennyis\u00e9gben.<\/li><li>Az enged\u00e9ly maradjon nyomon k\u00f6vethet\u0151 v\u00e1rakoz\u00e1s \u00e9s feldolgoz\u00e1s k\u00f6zben, valamint akkor is, amikor a k\u00e9sz alkatr\u00e9szeket k\u00eds\u00e9ri.<\/li><li>Ne adjanak tov\u00e1bb hib\u00e1s alkatr\u00e9szt a k\u00f6vetkez\u0151 folyamatnak, \u00e9s a z\u00e1rolt k\u00e9szletet ne sz\u00e1m\u00edts\u00e1k felhaszn\u00e1lhat\u00f3 ut\u00e1np\u00f3tl\u00e1snak.<\/li><li>Jel\u00f6ljenek ki felel\u0151st a hi\u00e1nyok, az elveszett k\u00e1rty\u00e1k \u00e9s a s\u00fcrg\u0151s kiv\u00e9telek kezel\u00e9s\u00e9re. P\u00f3tl\u00e1s kiad\u00e1sa el\u0151tt tiszt\u00e1zz\u00e1k az eredeti enged\u00e9ly st\u00e1tusz\u00e1t, hogy egyetlen ig\u00e9nyb\u0151l ne legyen k\u00e9t rendel\u00e9s.<\/li><li>A k\u00e1rty\u00e1k sz\u00e1m\u00e1t tudatos d\u00f6nt\u00e9ssel m\u00f3dos\u00edts\u00e1k, ne adjanak hozz\u00e1 nem hivatalos k\u00e1rty\u00e1kat minden alkalommal, amikor a k\u00f6r m\u0171k\u00f6d\u00e9se akadozik.<\/li><\/ul>\n\n\n<p>Ezek a szab\u00e1lyok teszik val\u00f3di korl\u00e1tt\u00e1 a k\u00e1rty\u00e1k sz\u00e1m\u00e1t. N\u00e9lk\u00fcl\u00fck a kanban csup\u00e1n \u00fajabb helyi lista lesz a megl\u00e9v\u0151 termel\u00e9si terv mellett.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00e9retezze a k\u00f6rt az ut\u00e1np\u00f3tl\u00e1si id\u0151 alatt jelentkez\u0151 ig\u00e9ny alapj\u00e1n<\/h2>\n\n\n<p>R\u00f6gz\u00edtett t\u00e1rol\u00f3m\u00e9rettel m\u0171k\u00f6d\u0151 gy\u00e1rt\u00e1si k\u00f6rn\u00e9l a k\u00f6vetkez\u0151 sz\u00e1m\u00edt\u00e1s haszn\u00e1lhat\u00f3 kiindul\u00f3pontk\u00e9nt:<\/p>\n\n\n<p><strong>Gy\u00e1rt\u00e1si k\u00e1rty\u00e1k sz\u00e1ma = [(D \u00d7 L + S) \u00f7 C] felfel\u00e9 kerek\u00edtve<\/strong><\/p>\n\n\n<p>Ahol:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>D<\/strong> a k\u00f6r v\u00e9telez\u00e9si pontj\u00e1n jelentkez\u0151 \u00e1tlagos ig\u00e9ny, id\u0151egys\u00e9genk\u00e9nti darabsz\u00e1mban.<\/li><li><strong>L<\/strong> az ut\u00e1np\u00f3tl\u00e1s \u00e1tfut\u00e1si ideje, ugyanabban az id\u0151egys\u00e9gben megadva: a gy\u00e1rt\u00e1si jelz\u00e9st kiv\u00e1lt\u00f3 v\u00e9telez\u00e9st\u0151l addig, am\u00edg a felhaszn\u00e1lhat\u00f3 p\u00f3tl\u00e1s rendelkez\u00e9sre \u00e1ll az adott szupermarketben.<\/li><li><strong>S<\/strong> a kiv\u00e9deni k\u00edv\u00e1nt ingadoz\u00e1sokra k\u00e9pzett kieg\u00e9sz\u00edt\u0151 biztons\u00e1gi tartal\u00e9k, darabsz\u00e1mban.<\/li><li><strong>C<\/strong> az egy k\u00e1rty\u00e1hoz vagy t\u00e1rol\u00f3hoz tartoz\u00f3, felhaszn\u00e1lhat\u00f3 alkatr\u00e9szek sz\u00e1ma.<\/li><\/ul>\n\n\n<p>Az elv egyszer\u0171: fedezz\u00fck az ut\u00e1np\u00f3tl\u00e1s ideje alatt v\u00e1rhat\u00f3 felhaszn\u00e1l\u00e1st, hozz\u00e1adjuk a v\u00e1lasztott biztons\u00e1gi tartal\u00e9kot, majd a mennyis\u00e9get eg\u00e9sz t\u00e1rol\u00f3kra sz\u00e1m\u00edtjuk \u00e1t. Felfel\u00e9 kerek\u00edt\u00fcnk, mert egy t\u00f6rt k\u00e1rtya nem enged\u00e9lyez egy teljes t\u00e1rol\u00f3t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sz\u00e1m\u00edt\u00e1si p\u00e9lda a gy\u00e1rt\u00e1si k\u00e1rty\u00e1k sz\u00e1m\u00e1ra<\/h3>\n\n\n<p>A tart\u00f3elem gy\u00e1rt\u00e1si k\u00f6r\u00e9n\u00e9l sz\u00e1moljunk a k\u00f6vetkez\u0151 tervez\u00e9si adatokkal:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Bemeneti adat<\/th><th>A p\u00e9ld\u00e1ban haszn\u00e1lt \u00e9rt\u00e9k<\/th><\/tr><\/thead><tbody><tr><td>\u00c1tlagos v\u00e9telez\u00e9si \u00fctem a hajl\u00edt\u00f3 szupermarketj\u00e9b\u0151l<\/td><td>40 tart\u00f3elem \u00fczem\u00f3r\u00e1nk\u00e9nt<\/td><\/tr><tr><td>\u00c1tfut\u00e1si id\u0151 a v\u00e9telez\u00e9st\u0151l a felhaszn\u00e1lhat\u00f3 p\u00f3tl\u00e1sig<\/td><td>3 \u00fczem\u00f3ra<\/td><\/tr><tr><td>Kieg\u00e9sz\u00edt\u0151 biztons\u00e1gi tartal\u00e9k<\/td><td>30 tart\u00f3elem<\/td><\/tr><tr><td>T\u00e1rol\u00f3nk\u00e9nti mennyis\u00e9g<\/td><td>20 tart\u00f3elem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az ut\u00e1np\u00f3tl\u00e1s ideje alatt v\u00e1rhat\u00f3 ig\u00e9ny <strong>40 \u00d7 3 = 120 tart\u00f3elem<\/strong>. A 30 darabos tartal\u00e9kkal egy\u00fctt ez 150. Ezt 20-szal osztva 7,5-et kapunk, amit felfel\u00e9 kerek\u00edt\u00fcnk: <strong>8 gy\u00e1rt\u00e1si k\u00e1rty\u00e1ra van sz\u00fcks\u00e9g<\/strong>.<\/p>\n\n\n<p>Ez a nyolc k\u00e1rtya <strong>\u00f6sszesen 160 tart\u00f3elemet enged\u00e9lyez a gy\u00e1rt\u00e1si k\u00f6rben<\/strong>. Ez a mennyis\u00e9g a szupermarket k\u00e9szterm\u00e9kk\u00e9szlete, valamint a v\u00e1rakoz\u00f3 vagy folyamatban l\u00e9v\u0151 ut\u00e1np\u00f3tl\u00e1s k\u00f6z\u00f6tt oszlik meg. Nem azt jelenti, hogy 160 tart\u00f3elem van a polcon, \u00e9s tov\u00e1bbi 160 gy\u00e1rt\u00e1s alatt. Amikor egy teli t\u00e1rol\u00f3t elvisznek, a gy\u00e1rt\u00e1si k\u00e1rty\u00e1ja visszat\u00e9r, \u00e9s enged\u00e9lyezi a p\u00f3tl\u00e1st; nem hozunk l\u00e9tre \u00fajabb \u00e1lland\u00f3 k\u00e1rty\u00e1t.<\/p>\n\n\n<p>Ez a sz\u00e1m\u00edt\u00e1s kiz\u00e1r\u00f3lag a hajl\u00edt\u00f3 gy\u00e1rt\u00e1si k\u00f6r\u00e9re vonatkozik. Az \u00f6sszeszerel\u00e9st kiszolg\u00e1l\u00f3 anyagmozgat\u00e1si k\u00f6rnek saj\u00e1t sz\u00e1ll\u00edt\u00e1si ideje \u00e9s a felhaszn\u00e1l\u00e1s hely\u00e9n tartand\u00f3 k\u00e9szletig\u00e9nye van. Ne felt\u00e9telezze, hogy ugyanez a nyolc k\u00e1rtya a folyamat tov\u00e1bbi k\u00e9szletpontjait vagy az eg\u00e9sz \u00fczem befejezetlen termel\u00e9s\u00e9t is m\u00e9retezi.<\/p>\n\n\n<p>A 30 tart\u00f3elemes tartal\u00e9k a p\u00e9lda kedv\u00e9\u00e9rt v\u00e1lasztott \u00e9rt\u00e9k, nem \u00e1ltal\u00e1nosan alkalmazand\u00f3 sz\u00e1zal\u00e9k vagy garant\u00e1lt kiszolg\u00e1l\u00e1si szint. A biztons\u00e1gi tartal\u00e9kot a t\u00e9nyleges ig\u00e9ny- \u00e9s ut\u00e1np\u00f3tl\u00e1si ingadoz\u00e1sok, a hi\u00e1ny k\u00f6vetkezm\u00e9nyei \u00e9s az elv\u00e1rt kiszolg\u00e1l\u00e1s alapj\u00e1n hat\u00e1rozza meg. Ahogy a folyamat megb\u00edzhat\u00f3bb\u00e1 v\u00e1lik, vizsg\u00e1lja fel\u00fcl az \u00e9rt\u00e9k\u00e9t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A teljes v\u00e1laszid\u0151t m\u00e9rje, ne csak a v\u00e1g\u00e1s vagy a hajl\u00edt\u00e1s idej\u00e9t<\/h3>\n\n\n<p>A felt\u00e9telezett h\u00e1rom\u00f3r\u00e1s ut\u00e1np\u00f3tl\u00e1si \u00e1tfut\u00e1si id\u0151nek nem csup\u00e1n a g\u00e9pen t\u00f6lt\u00f6tt perceket kell lefednie. Sz\u00e1m\u00edtsa bele a jelz\u00e9sek begy\u0171jt\u00e9s\u00e9t, a rendel\u00e9sek kezel\u00e9s\u00e9t, a gy\u00e1rt\u00e1si t\u00e9telre vagy er\u0151forr\u00e1sra v\u00e1rakoz\u00e1st, az \u00e1t\u00e1ll\u00e1st, a megmunk\u00e1l\u00e1st, az ellen\u0151rz\u00e9st \u00e9s a visszasz\u00e1ll\u00edt\u00e1st a szupermarketk\u00e9nt m\u0171k\u00f6d\u0151 k\u00f6ztes t\u00e1rol\u00f3ba. A vizsg\u00e1lt folyamathat\u00e1ron bel\u00fcli \u00f6sszes sz\u00e1ll\u00edt\u00e1si \u00e9s \u00e1tv\u00e9teli tev\u00e9kenys\u00e9get is vegye figyelembe.<\/p>\n\n\n<p>K\u00f6vetkezetesen ugyanazzal az id\u0151alappal sz\u00e1moljon. Ha az ig\u00e9nyt \u00fczem\u00f3r\u00e1nk\u00e9nt adja meg, az \u00e1tfut\u00e1si id\u0151ben figyelembe kell venni az ut\u00e1np\u00f3tl\u00e1st befoly\u00e1sol\u00f3 \u00fczemid\u0151ket \u00e9s a m\u0171szakok k\u00f6z\u00f6tti sz\u00fcneteket. A besz\u00e1ll\u00edt\u00f3 k\u00e9t napt\u00e1ri napos \u00e1tfut\u00e1si idej\u00e9vel \u00e9s az \u00f6sszeszerel\u00e9s \u00f3r\u00e1nk\u00e9nti felhaszn\u00e1l\u00e1s\u00e1val csak az id\u0151egys\u00e9gek megfelel\u0151 \u00e1tsz\u00e1m\u00edt\u00e1sa ut\u00e1n lehet egy\u00fctt sz\u00e1molni.<\/p>\n\n\n<p>A k\u00e9plet kiindul\u00f3 korl\u00e1tot ad. M\u00e9rje a t\u00e9nyleges v\u00e9telez\u00e9seket, az ut\u00e1np\u00f3tl\u00e1si id\u0151ket \u00e9s a k\u00e9szlethi\u00e1nyokat, hogy kider\u00fclj\u00f6n, m\u0171k\u00f6dik-e ez a korl\u00e1t. A pontos sz\u00e1m\u00edt\u00e1s sem ellens\u00falyozza, ha a begy\u0171jt\u00e9si k\u00f6rj\u00e1rat egyes jelz\u00e9seket kihagy, vagy a g\u00e9p el\u0151tti v\u00e1rakoz\u00e1s rendszeresen a felt\u00e9telezett v\u00e1laszid\u0151 k\u00e9tszeres\u00e9re ny\u00fajtja a folyamatot.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Re\u00e1lis ut\u00e1np\u00f3tl\u00e1si \u00e1tfut\u00e1si id\u0151 a t\u00f6bbf\u00e9le munk\u00e1t v\u00e9gz\u0151 g\u00e9peken<\/h2>\n\n\n<p>T\u00e9rj\u00fcnk vissza a konzol p\u00e9ld\u00e1j\u00e1hoz. A kanbank\u00f6rt h\u00e1rom\u00f3r\u00e1s ut\u00e1np\u00f3tl\u00e1si id\u0151re m\u00e9retezt\u00fck, de a hajl\u00edt\u00f3g\u00e9pen vev\u0151i rendel\u00e9sekhez tartoz\u00f3 munk\u00e1k is futnak. Ha ezek miatt az ut\u00e1np\u00f3tl\u00e1s \u00f6t \u00f3r\u00e1ra ny\u00falik, az eredeti sz\u00e1m\u00edt\u00e1s m\u00e1r nem \u00edrja le a folyamatot.<\/p>\n\n\n<p>V\u00e1ltozatlan ig\u00e9ny \u00e9s biztons\u00e1gi k\u00e9szlet mellett az \u00f6t\u00f3r\u00e1s \u00e1tfut\u00e1s kiindul\u00e1sk\u00e9nt <strong>12 k\u00e1rty\u00e1t<\/strong> ig\u00e9nyelne, nem nyolcat. A k\u00e1rtyasz\u00e1m n\u00f6vel\u00e9se v\u00e9dheti az ell\u00e1t\u00e1st, de t\u00f6bb k\u00e9szletet is lek\u00f6t egy olyan probl\u00e9ma kezel\u00e9s\u00e9re, amelyet ak\u00e1r a t\u00falzott v\u00e1rakoz\u00e1s okozhat. El\u0151sz\u00f6r tiszt\u00e1zza, hogy a t\u00f6bbletid\u0151 elker\u00fclhetetlen kapacit\u00e1skorl\u00e1tb\u00f3l, elker\u00fclhet\u0151 sorban \u00e1ll\u00e1sb\u00f3l vagy megb\u00edzhatatlan v\u00e9grehajt\u00e1sb\u00f3l ered-e.<\/p>\n\n\n<p>Ebben ny\u00fajt seg\u00edts\u00e9get a SkyPlanner. Az elfogadott ut\u00e1np\u00f3tl\u00e1si rendel\u00e9seket illessze <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">ugyanabba a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemtervbe<\/a>, mint az adott g\u00e9p\u00e9rt verseng\u0151 t\u00f6bbi munk\u00e1t. Adja meg az elv\u00e1rt befejez\u00e9si id\u0151ket, a gy\u00e1rt\u00e1si \u00fatvonalakat, a mennyis\u00e9geket \u00e9s a priorit\u00e1sokat. A SkyPlanner mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151je, az Arcturus a be\u00e1ll\u00edtott kapacit\u00e1s, a m\u0171szakok \u00e9s a f\u00fcgg\u0151s\u00e9gek alapj\u00e1n sz\u00e1m\u00edtja ki, melyik munka melyik g\u00e9pre ker\u00fclj\u00f6n, \u00e9s mikorra legyenek \u00fctemezve a m\u0171veletek. A Gantt n\u00e9zetben ez a sorrend \u00e1ttekinthet\u0151v\u00e9 v\u00e1lik.<\/p>\n\n\n<p>Az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s bekapcsol\u00e1sakor az Arcturus az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1val \u00e9s a v\u00e1rhat\u00f3 be\u00e9rkez\u00e9sekkel is sz\u00e1mol. A konzolok ut\u00e1np\u00f3tl\u00e1si munk\u00e1ja nem jelenhet meg ind\u00edthat\u00f3k\u00e9nt, ha a sz\u00fcks\u00e9ges lemezanyag nem \u00e1ll rendelkez\u00e9sre. A SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3. \u00cdgy a megl\u00e9v\u0151 rendel\u00e9si \u00e9s termel\u00e9si adatok kapcsol\u00f3dnak az \u00fctemtervhez, nem kell k\u00fcl\u00f6n\u00e1ll\u00f3 tervez\u00e9si rendszert fenntartania.<\/p>\n\n\n<p>\u00d6n hat\u00e1rozza meg a priorit\u00e1sokat, az Arcturus pedig elv\u00e9gzi az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat. Ha v\u00e1ltoznak a k\u00f6r\u00fclm\u00e9nyek, az \u00fajrasz\u00e1m\u00edt\u00e1s seg\u00edt \u00e1tl\u00e1tni, hogyan illeszthet\u0151k \u00f6ssze az ut\u00e1np\u00f3tl\u00e1si \u00e9s az egy\u00e9b rendel\u00e9sek. Ez cs\u00f6kkenti a k\u00e9zi sorrendtervez\u00e9st, \u00e9s lehet\u0151v\u00e9 teszi az \u00fctk\u00f6z\u00e9sek kezel\u00e9s\u00e9t an\u00e9lk\u00fcl, hogy \u00e9szrev\u00e9tlen\u00fcl egy m\u00e1sik sz\u00e1ll\u00edt\u00e1s rov\u00e1s\u00e1ra menn\u00e9nek.<\/p>\n\n\n<p>A SkyPlanner ASAP \u00e9s JIT \u00fctemez\u00e9si m\u00f3dja ezt az id\u0151z\u00edt\u00e9si d\u00f6nt\u00e9st t\u00e1mogatja. Az ASAP korai szabad id\u0151pontot keres, a JIT pedig a hat\u00e1rid\u0151h\u00f6z k\u00f6zelebb \u00fctemezi a munk\u00e1t. Egyik be\u00e1ll\u00edt\u00e1s sem a felhaszn\u00e1l\u00e1st jelz\u0151 ut\u00e1np\u00f3tl\u00e1si jelz\u00e9s. A kanbanszab\u00e1lyok hat\u00e1rozz\u00e1k meg, mi kap enged\u00e9lyt, az \u00fctemez\u00e9s pedig azt, hogy az elfogadott munka mikor v\u00e9gezhet\u0151 el.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott a napi \u00fctemez\u00e9s a KJH-Comp m\u0171k\u00f6d\u00e9s\u00e9n?<\/h3>\n\n\n<p>A lemezalkatr\u00e9szek b\u00e9rgy\u00e1rt\u00e1s\u00e1val foglalkoz\u00f3 <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/kjh-comp\/\">KJH-Comp<\/a> kor\u00e1bban a C9000 rendszert \u00e9s t\u00e1bl\u00e1zatokat haszn\u00e1lta a heti terhel\u00e9s hozz\u00e1vet\u0151leges tervez\u00e9s\u00e9re. A munk\u00e1k napi szint\u0171 g\u00e9phez rendel\u00e9se tov\u00e1bbra is k\u00e9zzel t\u00f6rt\u00e9nt: k\u00e9t m\u0171vezet\u0151 k\u00fcl\u00f6n-k\u00fcl\u00f6n legal\u00e1bb a munkaideje fel\u00e9t \u00fctemez\u00e9ssel t\u00f6lt\u00f6tte.<\/p>\n\n\n<p>A v\u00e1llalat megtartotta ERP rendszer\u00e9t, a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9shez \u00e9s a munk\u00e1k automatikus g\u00e9phez rendel\u00e9s\u00e9hez pedig bevezette a SkyPlanner rendszert. Besz\u00e1mol\u00f3juk szerint \u00edgy jobban l\u00e1that\u00f3, amikor feltorl\u00f3dik a terhel\u00e9s a n\u00e9gym\u00e9teres hajl\u00edt\u00f3g\u00e9pen, \u00e9s ritk\u00e1bban szor\u00edtj\u00e1k h\u00e1tt\u00e9rbe a k\u00e9s\u0151bbre esed\u00e9kes munk\u00e1k a hamarabb sz\u00e1ll\u00edtand\u00f3kat. Az \u00fctemez\u00e9s a kor\u00e1bbi k\u00e9t m\u0171vezet\u0151 helyett egyetlen m\u0171vezet\u0151 feladata lett, a m\u00e1sik pedig m\u00e1s feladatk\u00f6rbe ker\u00fclt.<\/p>\n\n\n<p>Ez a tapasztalat j\u00f3l mutatja az ut\u00e1np\u00f3tl\u00e1sra v\u00e1llalt hat\u00e1rid\u0151 m\u00f6g\u00f6tti \u00fctemez\u00e9si probl\u00e9m\u00e1t: a heti \u00f6sszterhel\u00e9s \u00f6nmag\u00e1ban nem el\u00e9g annak eld\u00f6nt\u00e9s\u00e9hez, hogy mi k\u00f6vetkezzen egy t\u00f6bbf\u00e9le munk\u00e1t v\u00e9gz\u0151 g\u00e9pen. A SkyPlanner a munk\u00e1k k\u00f6r\u00e9nek b\u0151v\u00fcl\u00e9se mellett is kezelhet\u0151v\u00e9 teszi a napi sorrendet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kezdje egy kanbank\u00f6rrel, \u00e9s igazolja m\u00e9r\u00e9ssel az ut\u00e1np\u00f3tl\u00e1si id\u0151t<\/h2>\n\n\n<p>V\u00e1lasszon ki pr\u00f3bak\u00e9nt egy rendszeresen gy\u00e1rtott alkatr\u00e9szt, \u00e9s vonja be azokat, akik felhaszn\u00e1lj\u00e1k, sz\u00e1ll\u00edtj\u00e1k \u00e9s gy\u00e1rtj\u00e1k. Jel\u00f6lje ki a szupermarketk\u00e9nt szolg\u00e1l\u00f3 k\u00f6ztes t\u00e1rol\u00f3 hely\u00e9t, egys\u00e9ges\u00edtse a t\u00e1rol\u00f3nk\u00e9nti mennyis\u00e9get, adja ki a meg\u00e1llapod\u00e1s szerinti k\u00e1rty\u00e1kat, \u00e9s tegye egy\u00e9rtelm\u0171v\u00e9, mely esem\u00e9ny v\u00e1ltja ki a jelz\u00e9s kiad\u00e1s\u00e1t. Egyeztesse az indul\u00f3 k\u00e9szletet \u00e9s a nyitott ut\u00e1np\u00f3tl\u00e1si munk\u00e1kat, hogy a k\u00f6r ellen\u0151rz\u00f6tt mennyis\u00e9gekkel induljon.<\/p>\n\n\n<p>K\u00f6vesse a jelz\u00e9st\u0151l a vissza\u00e9rkez\u00e9sig t\u00e9nylegesen eltelt id\u0151t, a hi\u00e1nyokat, a felhaszn\u00e1lhat\u00f3 k\u00e9szletet, az enged\u00e9lyezett, de hat\u00e1rid\u0151re el nem v\u00e9gzett ut\u00e1np\u00f3tl\u00e1sokat \u00e9s a rendk\u00edv\u00fcli beavatkoz\u00e1sokat. Ha valami nem m\u0171k\u00f6dik, j\u00e1rja v\u00e9gig a k\u00f6rt: begy\u0171jt\u00f6tt\u00e9k a jelz\u00e9st, be\u00fctemezt\u00e9k az ut\u00e1np\u00f3tl\u00e1st, rendelkez\u00e9sre \u00e1lltak az anyagok, \u00e9s a megfelel\u0151 min\u0151s\u00e9g\u0171 alkatr\u00e9szek a megfelel\u0151 helyre ker\u00fcltek?<\/p>\n\n\n<p>Ha a k\u00e9szlet tart\u00f3san meghaladja a sz\u00fcks\u00e9ges szintet, pr\u00f3b\u00e1lja meg ellen\u0151rz\u00f6tt m\u00f3don cs\u00f6kkenteni a k\u00e1rty\u00e1k sz\u00e1m\u00e1t, \u00e9s figyelje az eredm\u00e9nyt. Ha ism\u00e9tl\u0151dnek a hi\u00e1nyok, a k\u00e9szlet n\u00f6vel\u00e9se el\u0151tt vizsg\u00e1lja fel\u00fcl az id\u0151z\u00edt\u00e9sre \u00e9s a kapacit\u00e1sra vonatkoz\u00f3 felt\u00e9telez\u00e9seket. Tekintse \u00e1t \u00fajra a kanbank\u00f6rt, ha v\u00e1ltozik az ig\u00e9ny, a t\u00e1rol\u00f3m\u00e9ret, az \u00e1t\u00e1ll\u00e1si szab\u00e1ly vagy a m\u0171szakrend.<\/p>\n\n\n<p>Ha az \u00fczemben t\u00f6bbf\u00e9le munka osztozik ugyanazokon az er\u0151forr\u00e1sokon, v\u00e1lassza a SkyPlanner rendszert, hogy az enged\u00e9lyezett ut\u00e1np\u00f3tl\u00e1st \u00e9s a vev\u0151i rendel\u00e9seket egyetlen gy\u00e1rt\u00e1si \u00fctemtervben kezelhesse. A bemutat\u00f3ra hozzon p\u00e9ldak\u00e9nt egy rendszeresen gy\u00e1rtott alkatr\u00e9szt, annak felhaszn\u00e1l\u00e1si \u00fctem\u00e9t, t\u00e1rol\u00f3nk\u00e9nti mennyis\u00e9g\u00e9t, gy\u00e1rt\u00e1si \u00fatvonal\u00e1t \u00e9s az ugyanazokat a g\u00e9peket ig\u00e9nyl\u0151 t\u00f6bbi munk\u00e1t. \u00cdgy megvizsg\u00e1lhatja a kanbank\u00f6r m\u0171k\u00f6d\u0151k\u00e9pess\u00e9g\u00e9t eld\u00f6nt\u0151 k\u00e9rd\u00e9st: <strong>elk\u00e9sz\u00fclhet-e az ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt elfogy a felhaszn\u00e1l\u00e1st fedez\u0151 k\u00e9szlet?<\/strong><\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, hogy saj\u00e1t gy\u00e1rt\u00e1si k\u00f6rnyezet\u00e9ben vizsg\u00e1lhassa meg a kiv\u00e1lasztott alkatr\u00e9sz ut\u00e1np\u00f3tl\u00e1s\u00e1t, vagy <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert mintaadatokkal<\/a>, \u00e9s ismerje meg az \u00fctemez\u00e9s m\u0171k\u00f6d\u00e9s\u00e9t.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s A kanban a gy\u00e1rt\u00e1sban olyan h\u00faz\u00f3 elv\u0171 ir\u00e1ny\u00edt\u00e1si m\u00f3dszer, amelyben egy jelz\u00e9s meghat\u00e1rozott mennyis\u00e9g\u0171 alkatr\u00e9sz gy\u00e1rt\u00e1s\u00e1t vagy mozgat\u00e1s\u00e1t enged\u00e9lyezi. Az ig\u00e9nyt a k\u00f6vetkez\u0151 folyamat felhaszn\u00e1l\u00e1sa teremti meg; a jelz\u00e9s pedig megadja az ell\u00e1t\u00f3 folyamatnak, hogy mit kell &#8230; <a title=\"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/\" aria-label=\"Read more about Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":105447,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-105429","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s<\/title>\n<meta name=\"description\" content=\"Hat\u00e9kony \u00fczemi ut\u00e1np\u00f3tl\u00e1s: ismerje meg, mi enged\u00e9lyezi a gy\u00e1rt\u00e1st \u00e9s az anyagmozgat\u00e1st, hogyan m\u00e9retezze a kanbank\u00f6rt \u00e9s tervezze meg a sz\u00fcks\u00e9ges g\u00e9pid\u0151t.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s\" \/>\n<meta property=\"og:description\" content=\"Hat\u00e9kony \u00fczemi ut\u00e1np\u00f3tl\u00e1s: ismerje meg, mi enged\u00e9lyezi a gy\u00e1rt\u00e1st \u00e9s az anyagmozgat\u00e1st, hogyan m\u00e9retezze a kanbank\u00f6rt \u00e9s tervezze meg a sz\u00fcks\u00e9ges g\u00e9pid\u0151t.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T23:26:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T23:28:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:28:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/\"},\"wordCount\":3761,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/\",\"name\":\"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:28:06+00:00\",\"description\":\"Hat\u00e9kony \u00fczemi ut\u00e1np\u00f3tl\u00e1s: ismerje meg, mi enged\u00e9lyezi a gy\u00e1rt\u00e1st \u00e9s az anyagmozgat\u00e1st, hogyan m\u00e9retezze a kanbank\u00f6rt \u00e9s tervezze meg a sz\u00fcks\u00e9ges g\u00e9pid\u0151t.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"width\":1536,\"height\":1024,\"caption\":\"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/kanban-a-gyartasban\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s","description":"Hat\u00e9kony \u00fczemi ut\u00e1np\u00f3tl\u00e1s: ismerje meg, mi enged\u00e9lyezi a gy\u00e1rt\u00e1st \u00e9s az anyagmozgat\u00e1st, hogyan m\u00e9retezze a kanbank\u00f6rt \u00e9s tervezze meg a sz\u00fcks\u00e9ges g\u00e9pid\u0151t.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/","og_locale":"hu_HU","og_type":"article","og_title":"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s","og_description":"Hat\u00e9kony \u00fczemi ut\u00e1np\u00f3tl\u00e1s: ismerje meg, mi enged\u00e9lyezi a gy\u00e1rt\u00e1st \u00e9s az anyagmozgat\u00e1st, hogyan m\u00e9retezze a kanbank\u00f6rt \u00e9s tervezze meg a sz\u00fcks\u00e9ges g\u00e9pid\u0151t.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T23:26:46+00:00","article_modified_time":"2026-10-21T23:28:06+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:28:06+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/"},"wordCount":3761,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/","name":"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:28:06+00:00","description":"Hat\u00e9kony \u00fczemi ut\u00e1np\u00f3tl\u00e1s: ismerje meg, mi enged\u00e9lyezi a gy\u00e1rt\u00e1st \u00e9s az anyagmozgat\u00e1st, hogyan m\u00e9retezze a kanbank\u00f6rt \u00e9s tervezze meg a sz\u00fcks\u00e9ges g\u00e9pid\u0151t.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","width":1536,"height":1024,"caption":"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-360x240.png",360,240,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Kanban a gy\u00e1rt\u00e1sban: jelz\u00e9sek, k\u00f6r\u00f6k \u00e9s m\u00e9retez\u00e9s A kanban a gy\u00e1rt\u00e1sban olyan h\u00faz\u00f3 elv\u0171 ir\u00e1ny\u00edt\u00e1si m\u00f3dszer, amelyben egy jelz\u00e9s meghat\u00e1rozott mennyis\u00e9g\u0171 alkatr\u00e9sz gy\u00e1rt\u00e1s\u00e1t vagy mozgat\u00e1s\u00e1t enged\u00e9lyezi. Az ig\u00e9nyt a k\u00f6vetkez\u0151 folyamat felhaszn\u00e1l\u00e1sa teremti meg; a jelz\u00e9s pedig megadja az ell\u00e1t\u00f3 folyamatnak, hogy mit kell&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=105429"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105429\/revisions"}],"predecessor-version":[{"id":105491,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/105429\/revisions\/105491"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/105447"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=105429"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=105429"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=105429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}