{"id":104877,"date":"2026-10-21T10:20:06","date_gmt":"2026-10-21T10:20:06","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104877"},"modified":"2026-10-21T10:20:57","modified_gmt":"2026-10-21T10:20:57","slug":"oee","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/","title":{"rendered":"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A teljes eszk\u00f6zhat\u00e9konys\u00e1g (OEE) azt m\u00e9ri, hogy a tervezett termel\u00e9si id\u0151 mekkora r\u00e9sz\u00e9ben k\u00e9sz\u00fcl megfelel\u0151 term\u00e9k a folyamat ide\u00e1lis sebess\u00e9g\u00e9vel. H\u00e1rom t\u00e9nyez\u0151t egyes\u00edt: a rendelkez\u00e9sre \u00e1ll\u00e1st, a teljes\u00edtm\u00e9nyt \u00e9s a min\u0151s\u00e9get. Egy g\u00e9p a m\u0171szak nagy r\u00e9sz\u00e9ben m\u0171k\u00f6dhet, az OEE-je m\u00e9gis alacsony lehet, ha lassan termel, vagy jav\u00edt\u00e1sra szorul\u00f3 darabokat gy\u00e1rt.<\/p>\n\n\n<p>Ez\u00e9rt hasznos az OEE, amikor az \u00fczemben l\u00e1tsz\u00f3lag mindenki elfoglalt, a sz\u00e1ll\u00edt\u00e1sok m\u00e9gis rendre cs\u00fasznak. Elk\u00fcl\u00f6n\u00edti az \u00e1ll\u00e1sokb\u00f3l, a lassabb m\u0171k\u00f6d\u00e9sb\u0151l \u00e9s az els\u0151re nem megfelel\u0151 darabokb\u00f3l ered\u0151 vesztes\u00e9get. \u00cdgy jobb kiindul\u00f3pontot ad, mint ha egyszer\u0171en nagyobb termel\u00e9st k\u00e9rn\u00e9nk a csapatt\u00f3l.<\/p>\n\n\n<p>A k\u00f6vetkez\u0151 l\u00e9p\u00e9s a felt\u00e1rt vesztes\u00e9g kezel\u00e9se. A SkyPlanner a kapacit\u00e1s \u00e9s a terhel\u00e9s mellett az OEE mutat\u00f3t is megjelen\u00edti a termel\u00e9si \u00e1ttekint\u0151ben, \u00e9s ugyanebben a k\u00f6rnyezetben mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u00e9st is k\u00edn\u00e1l. Megvizsg\u00e1lhatja az eredm\u00e9nyt, figyelembe veheti az igazolt kapacit\u00e1sv\u00e1ltoz\u00e1st, \u00e9s m\u00f3dos\u00edthatja az \u00f6sszef\u00fcgg\u0151 gy\u00e1rt\u00e1si tervet an\u00e9lk\u00fcl, hogy minden g\u00e9p feladatsor\u00e1t k\u00e9zzel kellene \u00fajra \u00f6ssze\u00e1ll\u00edtania.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az OEE kisz\u00e1m\u00edt\u00e1sa<\/h2>\n\n\n<p>A k\u00e9plet:<\/p>\n\n\n<p><strong>OEE = Rendelkez\u00e9sre \u00e1ll\u00e1s \u00d7 Teljes\u00edtm\u00e9ny \u00d7 Min\u0151s\u00e9g<\/strong><\/p>\n\n\n<p>A szorz\u00e1shoz tizedes t\u00f6rtk\u00e9nt haszn\u00e1lja a t\u00e9nyez\u0151ket, majd az eredm\u00e9nyt adja meg sz\u00e1zal\u00e9kban. Ne adja \u00f6ssze \u00e9s ne \u00e1tlagolja a h\u00e1rom \u00e9rt\u00e9ket: minden t\u00e9nyez\u0151 az el\u0151z\u0151 vesztes\u00e9g ut\u00e1n megmarad\u00f3 r\u00e9szt cs\u00f6kkenti tov\u00e1bb.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>T\u00e9nyez\u0151<\/th><th>Sz\u00e1m\u00edt\u00e1s<\/th><th>Milyen k\u00e9rd\u00e9sre ad v\u00e1laszt?<\/th><\/tr><\/thead><tbody><tr><td>Rendelkez\u00e9sre \u00e1ll\u00e1s<\/td><td>M\u0171k\u00f6d\u00e9si id\u0151 \u00f7 Tervezett termel\u00e9si id\u0151<\/td><td>M\u0171k\u00f6d\u00f6tt a folyamat akkor, amikor termel\u00e9st tervezt\u00fcnk?<\/td><\/tr><tr><td>Teljes\u00edtm\u00e9ny<\/td><td>Ide\u00e1lis ciklusid\u0151 \u00d7 \u00d6sszes gy\u00e1rtott darab \u00f7 M\u0171k\u00f6d\u00e9si id\u0151<\/td><td>M\u0171k\u00f6d\u00e9s k\u00f6zben az ide\u00e1lis sebess\u00e9ggel termelt?<\/td><\/tr><tr><td>Min\u0151s\u00e9g<\/td><td>Els\u0151re megfelel\u0151 darabok sz\u00e1ma \u00f7 \u00d6sszes gy\u00e1rtott darab<\/td><td>A legy\u00e1rtott mennyis\u00e9g mekkora r\u00e9sze felelt meg ut\u00f3munka n\u00e9lk\u00fcl a k\u00f6vetelm\u00e9nyeknek?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az id\u0151- \u00e9s mennyis\u00e9gi adatoknak ugyanarra a berendez\u00e9sre, termel\u00e9si id\u0151szakra \u00e9s azonos folyamathat\u00e1rok k\u00f6z\u00f6tt m\u00e9rt kibocs\u00e1t\u00e1sra kell vonatkozniuk. A forg\u00e1csol\u00e1s eredm\u00e9nye nem tekinthet\u0151 automatikusan a fel\u00fcletkezel\u00e9st \u00e9s az \u00f6sszeszerel\u00e9st is mag\u00e1ban foglal\u00f3 teljes gy\u00e1rt\u00e1si \u00fatvonal eredm\u00e9ny\u00e9nek.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Rendelkez\u00e9sre \u00e1ll\u00e1s: az \u00e1ll\u00e1sok miatt kies\u0151 id\u0151<\/h3>\n\n\n<p>El\u0151sz\u00f6r hat\u00e1rozza meg a tervezett termel\u00e9si id\u0151t: azt az id\u0151szakot, amelyben a berendez\u00e9ssel termelni k\u00edv\u00e1ntak. Hagyja ki azokat az id\u0151szakokat, amelyekre nem terveztek termel\u00e9st, p\u00e9ld\u00e1ul a szem\u00e9lyzet n\u00e9lk\u00fcli m\u0171szakot vagy azt a sz\u00fcnetet, amikor a folyamatot a terv szerint le\u00e1ll\u00edtj\u00e1k.<\/p>\n\n\n<p>Ezut\u00e1n vonja le az ezen id\u0151szakon bel\u00fcli \u00e1ll\u00e1sokat, \u00edgy kapja meg a m\u0171k\u00f6d\u00e9si id\u0151t. A meghib\u00e1sod\u00e1sok cs\u00f6kkentik a rendelkez\u00e9sre \u00e1ll\u00e1st, de ugyan\u00edgy az id\u0151szakon bel\u00fcl v\u00e9gzett tervezett \u00e1t\u00e1ll\u00e1sok is. Att\u00f3l, hogy egy \u00e1t\u00e1ll\u00e1s el\u0151re ismert, a r\u00e1ford\u00edtott id\u0151 m\u00e9g nem t\u0171nik el a tervezett termel\u00e9si id\u0151b\u0151l.<\/p>\n\n\n<p>\u00c1llapodjanak meg egys\u00e9ges szab\u00e1lyban arr\u00f3l, mely megszak\u00edt\u00e1sokat r\u00f6gz\u00edtik \u00e1ll\u00e1sid\u0151k\u00e9nt. A hosszabb le\u00e1ll\u00e1sok \u00e1ltal\u00e1ban a rendelkez\u00e9sre \u00e1ll\u00e1st cs\u00f6kkentik; a k\u00fcl\u00f6n nem napl\u00f3zott r\u00f6vid meg\u00e1ll\u00e1sok a teljes\u00edtm\u00e9nyvesztes\u00e9gben maradnak. Minden megszak\u00edt\u00e1st csak egyszer sz\u00e1moljon el, ne mindk\u00e9t t\u00e9nyez\u0151ben.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Teljes\u00edtm\u00e9ny: a m\u0171k\u00f6d\u00e9s k\u00f6zben kies\u0151 termel\u00e9s<\/h3>\n\n\n<p>Az ide\u00e1lis ciklusid\u0151 az adott term\u00e9k egy darabj\u00e1ra jut\u00f3, optim\u00e1lis k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt el\u00e9rhet\u0151 legr\u00f6videbb id\u0151. Nem azonos a vev\u0151nek megadott \u00e1tfut\u00e1si id\u0151vel, sem az \u00e1ll\u00e1sokra \u00e9s \u00e1t\u00e1ll\u00e1sokra sz\u00e1nt r\u00e1hagy\u00e1ssal megn\u00f6velt \u00fctemez\u00e9si id\u0151vel.<\/p>\n\n\n<p>Szorozza meg az ide\u00e1lis ciklusid\u0151t az \u00f6sszes legy\u00e1rtott darab sz\u00e1m\u00e1val \u2013 a hib\u00e1s darabokat is bele\u00e9rtve \u2013, majd ossza el a m\u0171k\u00f6d\u00e9si id\u0151vel. V\u00e9gig azonos id\u0151egys\u00e9geket haszn\u00e1ljon. A lassabb ciklusok \u00e9s a r\u00f6vid meg\u00e1ll\u00e1sok akkor is cs\u00f6kkentik az eredm\u00e9nyt, ha a berendez\u00e9s l\u00e1tsz\u00f3lag rendben m\u0171k\u00f6dik.<\/p>\n\n\n<p>Ha a teljes\u00edtm\u00e9ny 100% f\u00f6l\u00f6tti, ellen\u0151rizni kell az ide\u00e1lis ciklusid\u0151t, a mennyis\u00e9geket \u00e9s a r\u00f6gz\u00edtett id\u0151adatokat. Az ide\u00e1lis ciklusid\u0151 n\u00f6vel\u00e9s\u00e9vel a mutat\u00f3 szebb lesz, de a folyamat nem v\u00e1lik gyorsabb\u00e1.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Min\u0151s\u00e9g: az els\u0151re megfelel\u0151 darabok<\/h3>\n\n\n<p>A megfelel\u0151 darabok sz\u00e1ma azokat a term\u00e9keket jelenti, amelyek ut\u00f3munka n\u00e9lk\u00fcl teljes\u00edtett\u00e9k az egyeztetett k\u00f6vetelm\u00e9nyeket. A visszautas\u00edtott, majd jav\u00edt\u00e1s ut\u00e1n elfogadott darab megmentett term\u00e9k, de az eredeti gy\u00e1rt\u00e1si eredm\u00e9nyben nem sz\u00e1m\u00edt els\u0151re megfelel\u0151 darabnak.<\/p>\n\n\n<p>K\u00fcl\u00f6n\u00edtse el az \u00f6sszes legy\u00e1rtott, az els\u0151re elfogadott, a selejtezett \u00e9s az ut\u00f3munk\u00e1t ig\u00e9nyl\u0151 darabok mennyis\u00e9g\u00e9t. M\u00e1sk\u00fcl\u00f6nben a v\u00e9g\u00fcl elfogadott darabok kedvez\u0151 \u00f6sszmennyis\u00e9ge elfedheti az ehhez sz\u00fcks\u00e9ges t\u00f6bblet-g\u00e9pid\u0151t. Az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/\">els\u0151re megfelelt darabok ar\u00e1nya<\/a> r\u00e9szletesebben vizsg\u00e1lja ezt a min\u0151s\u00e9gi k\u00e9rd\u00e9st; az OEE az id\u0151- \u00e9s sebess\u00e9gvesztes\u00e9gekkel egy\u00fctt veszi figyelembe.<\/p>\n\n\n<h2 class=\"wp-block-heading\">OEE-sz\u00e1m\u00edt\u00e1si p\u00e9lda: mire ment el a m\u0171szak?<\/h2>\n\n\n<p>Vegy\u00fcnk egy g\u00e9pet, amely egy nyolc\u00f3r\u00e1s m\u0171szak sor\u00e1n v\u00e9gig ugyanazt az alkatr\u00e9szt gy\u00e1rtja. A 30 perces sz\u00fcnetben nem terveznek termel\u00e9st. A tov\u00e1bbi r\u00f6gz\u00edtett adatok:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>M\u0171szakadat<\/th><th>\u00c9rt\u00e9k<\/th><\/tr><\/thead><tbody><tr><td>M\u0171szak hossza<\/td><td>480 perc<\/td><\/tr><tr><td>Tervezett sz\u00fcnet termel\u00e9s n\u00e9lk\u00fcl<\/td><td>30 perc<\/td><\/tr><tr><td>Tervezett termel\u00e9si id\u0151<\/td><td>450 perc<\/td><\/tr><tr><td>R\u00f6gz\u00edtett \u00e1ll\u00e1sok, az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt<\/td><td>90 perc<\/td><\/tr><tr><td>M\u0171k\u00f6d\u00e9si id\u0151<\/td><td>360 perc<\/td><\/tr><tr><td>Ide\u00e1lis ciklusid\u0151<\/td><td>0,5 perc\/darab<\/td><\/tr><tr><td>\u00d6sszes legy\u00e1rtott darab<\/td><td>600<\/td><\/tr><tr><td>Ut\u00f3munka n\u00e9lk\u00fcl elfogadott darabok<\/td><td>570<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A rendelkez\u00e9sre \u00e1ll\u00e1s: <strong>360 \u00f7 450 = 80%<\/strong>.<\/p>\n\n\n<p>A teljes\u00edtm\u00e9ny: <strong>(0,5 \u00d7 600) \u00f7 360 = 83,33%<\/strong>.<\/p>\n\n\n<p>A min\u0151s\u00e9g: <strong>570 \u00f7 600 = 95%<\/strong>.<\/p>\n\n\n<p>A kerek\u00edtetlen t\u00e9nyez\u0151k szorzata <strong>63,33%-os OEE-t<\/strong> ad. Az eredm\u00e9nyt az al\u00e1bbi r\u00f6videbb, egyen\u00e9rt\u00e9k\u0171 k\u00e9plettel ellen\u0151rizheti:<\/p>\n\n\n<p><strong>OEE = Els\u0151re megfelel\u0151 darabok sz\u00e1ma \u00d7 Ide\u00e1lis ciklusid\u0151 \u00f7 Tervezett termel\u00e9si id\u0151<\/strong><\/p>\n\n\n<p>Ebben a m\u0171szakban ez <strong>570 \u00d7 0,5 \u00f7 450 = 63,33%<\/strong>.<\/p>\n\n\n<p>Az 570 megfelel\u0151 darab ide\u00e1lis ciklusid\u0151vel sz\u00e1molva 285 percnyi termel\u00e9st jelent. A tervezett termel\u00e9si id\u0151 fennmarad\u00f3 165 perce \u00e1ll\u00e1sok, lassabb m\u0171k\u00f6d\u00e9s \u00e9s hib\u00e1s darabok miatt veszett el. Nem mind \u00e1ll\u00e1sid\u0151.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A vesztes\u00e9geket percben is hasonl\u00edtsa \u00f6ssze, ne csak sz\u00e1zal\u00e9kban<\/h3>\n\n\n<p>A h\u00e1rom t\u00e9nyez\u0151 sz\u00e1zal\u00e9kos \u00e9rt\u00e9k\u00e9nek elt\u00e9r\u0151 a nevez\u0151je. Ha mindegyiket kivonjuk 100%-b\u00f3l, a kapott \u00e9rt\u00e9kek nem a m\u0171szak idej\u00e9nek k\u00f6zvetlen\u00fcl \u00f6sszehasonl\u00edthat\u00f3 h\u00e1nyadait adj\u00e1k meg. Fejezze ki a vesztes\u00e9geket k\u00f6z\u00f6s alapon, ide\u00e1lis termel\u00e9si id\u0151ben:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vesztes\u00e9g<\/th><th>Sz\u00e1m\u00edt\u00e1s<\/th><th>Elveszett percek<\/th><\/tr><\/thead><tbody><tr><td>Rendelkez\u00e9sre\u00e1ll\u00e1si vesztes\u00e9g<\/td><td>450 perc tervezett termel\u00e9si id\u0151 \u2212 360 perc m\u0171k\u00f6d\u00e9si id\u0151<\/td><td>90<\/td><\/tr><tr><td>Teljes\u00edtm\u00e9nyvesztes\u00e9g<\/td><td>360 perc m\u0171k\u00f6d\u00e9si id\u0151 \u2212 (600 darab \u00d7 0,5 perc)<\/td><td>60<\/td><\/tr><tr><td>Min\u0151s\u00e9gi vesztes\u00e9g<\/td><td>30 els\u0151re el nem fogadott darab \u00d7 0,5 perc<\/td><td>15<\/td><\/tr><tr><td>\u00d6sszes vesztes\u00e9g<\/td><td>90 + 60 + 15<\/td><td>165<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A 15 percnyi min\u0151s\u00e9gi vesztes\u00e9g ide\u00e1lis id\u0151re \u00e1tsz\u00e1m\u00edtott \u00e9rt\u00e9k, nem a sz\u00fcks\u00e9ges ut\u00f3munka m\u00e9rt ideje. Ezeknek a daraboknak a jav\u00edt\u00e1sa j\u00f3val tov\u00e1bb tarthat, vagy m\u00e1sik er\u0151forr\u00e1st vehet ig\u00e9nybe.<\/p>\n\n\n<p>Ebben a p\u00e9ld\u00e1ban a r\u00f6gz\u00edtett \u00e1ll\u00e1sok okozz\u00e1k a legnagyobb id\u0151vesztes\u00e9get. El\u0151sz\u00f6r az okukat \u00e9s az id\u0151tartamukat vizsg\u00e1lja meg. Ha a 90 perc nagy r\u00e9sz\u00e9t visszat\u00e9r\u0151 \u00e1t\u00e1ll\u00e1si probl\u00e9ma okozta, \u00e9rdemes az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/smed\/\">\u00e1t\u00e1ll\u00e1sok fejleszt\u00e9s\u00e9re<\/a> \u00f6sszpontos\u00edtani. Ha viszont egyetlen meghib\u00e1sod\u00e1s okozta a vesztes\u00e9get, \u00e9s a g\u00e9p tov\u00e1bbra sem haszn\u00e1lhat\u00f3, m\u00e1s az azonnali tervez\u00e9si feladat: biztos\u00edtani kell az \u00e9rintett sz\u00e1ll\u00edt\u00e1sok teljes\u00edt\u00e9s\u00e9t, am\u00edg a karbantart\u00f3k helyre\u00e1ll\u00edtj\u00e1k a g\u00e9pet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az OEE t\u00e9nyez\u0151i alapj\u00e1n d\u00f6nts\u00f6n a fejleszt\u00e9sr\u0151l<\/h2>\n\n\n<p>A rendelkez\u00e9sre \u00e1ll\u00e1s, a teljes\u00edtm\u00e9ny \u00e9s a min\u0151s\u00e9g megmutatja, milyen t\u00edpus\u00fa vesztes\u00e9g keletkezett. A kiv\u00e1lt\u00f3 okot azonban nem t\u00e1rja fel.<\/p>\n\n\n<p>Az \u00e9rdemi vizsg\u00e1lat a t\u00e9nyez\u0151t egy megfigyelt esem\u00e9nyhez kapcsolja. A berendez\u00e9sek meghib\u00e1sod\u00e1sai, valamint az \u00e1t\u00e1ll\u00e1si \u00e9s be\u00e1ll\u00edt\u00e1si vesztes\u00e9gek a rendelkez\u00e9sre \u00e1ll\u00e1st \u00e9rintik. A r\u00f6vid meg\u00e1ll\u00e1sok \u00e9s a cs\u00f6kkent sebess\u00e9g a teljes\u00edtm\u00e9nyt rontj\u00e1k. Az indul\u00e1skor keletkez\u0151 selejt \u00e9s a termel\u00e9s k\u00f6zben gy\u00e1rtott hib\u00e1s darabok a min\u0151s\u00e9get befoly\u00e1solj\u00e1k. Ezeket \u00e1ltal\u00e1ban a hat nagy vesztes\u00e9gk\u00e9nt tartj\u00e1k sz\u00e1mon.<\/p>\n\n\n<p>A lehets\u00e9ges okok k\u00f6r\u00e9t a berendez\u00e9s nyilv\u00e1ntart\u00e1sai \u00e9s a g\u00e9pen dolgoz\u00f3k tapasztalatai alapj\u00e1n sz\u0171k\u00edtse. Az ism\u00e9tl\u0151d\u0151 r\u00f6vid megszak\u00edt\u00e1sokat adagol\u00e1si probl\u00e9m\u00e1k okozhatj\u00e1k, a lassabb ciklus pedig kopott szersz\u00e1mra vagy nehezebben gy\u00e1rthat\u00f3 term\u00e9kv\u00e1ltozatra utalhat. Ugyanaz a sz\u00e1zal\u00e9kos \u00e9rt\u00e9k eg\u00e9szen elt\u00e9r\u0151 probl\u00e9m\u00e1kat takarhat.<\/p>\n\n\n<p>Az int\u00e9zked\u00e9s kiv\u00e1laszt\u00e1sakor a vesztes\u00e9g nagys\u00e1ga mellett annak termel\u00e9si k\u00f6vetkezm\u00e9nyeit is vegye figyelembe. Egy hat\u00e1rid\u0151s rendel\u00e9s teljes\u00edt\u00e9s\u00e9t korl\u00e1toz\u00f3 er\u0151forr\u00e1s visszat\u00e9r\u0151 vesztes\u00e9ge s\u00fcrget\u0151bb lehet, mint egy b\u0151s\u00e9ges szabad kapacit\u00e1ssal rendelkez\u0151 g\u00e9p nagyobb vesztes\u00e9ge. A nagyobb kibocs\u00e1t\u00e1s akkor hasznos, ha azt a k\u00f6vetkez\u0151 m\u0171veletek \u00e9s a vev\u0151i kereslet is indokolj\u00e1k. Ha puszt\u00e1n egy helyi mutat\u00f3 jav\u00edt\u00e1sa \u00e9rdek\u00e9ben sz\u00fcks\u00e9gtelen darabokat gy\u00e1rtanak, azzal k\u00e9szlet keletkezik, nem a sz\u00e1ll\u00edt\u00e1si teljes\u00edtm\u00e9ny javul.<\/p>\n\n\n<p>Jel\u00f6lj\u00f6n ki felel\u0151st a kiv\u00e1lasztott int\u00e9zked\u00e9shez, \u00e9s ellen\u0151rizze az eredm\u00e9ny\u00e9t \u00f6sszehasonl\u00edthat\u00f3 termel\u00e9si k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt. A karbantart\u00e1s, egy jobb \u00e1t\u00e1ll\u00e1si m\u00f3dszer vagy a folyamat korrekci\u00f3ja mag\u00e1t a vesztes\u00e9get kezeli. Az \u00fctemez\u00e9s pedig a fejleszt\u00e9s ideje alatt rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st \u00e9s az elv\u00e9gzend\u0151 munk\u00e1t hangolja \u00f6ssze. Mindkett\u0151re sz\u00fcks\u00e9g van, ha egy berendez\u00e9sprobl\u00e9ma egy m\u00e1r visszaigazolt rendel\u00e9s teljes\u00edt\u00e9s\u00e9t vesz\u00e9lyezteti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">OEE \u00e9s kihaszn\u00e1lts\u00e1g: a foglalts\u00e1g nem jelent hat\u00e9konys\u00e1got<\/h2>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/optimalis-eroforras-kihasznalas-novelje-hatekonysagat\/\">kihaszn\u00e1lts\u00e1g<\/a> azt mutatja meg, hogy egy er\u0151forr\u00e1s meghat\u00e1rozott kapacit\u00e1s\u00e1nak mekkora r\u00e9sz\u00e9t haszn\u00e1lj\u00e1k fel. A nevez\u0151je lehet a rendelkez\u00e9sre \u00e1ll\u00f3 m\u0171szak\u00f3r\u00e1k sz\u00e1ma vagy m\u00e1s, egy\u00e9rtelm\u0171en megadott id\u0151alap. Az OEE ezzel szemben azt mutatja, hogy a termel\u00e9sre sz\u00e1nt id\u0151 mekkora r\u00e9sze hasznosult ide\u00e1lis sebess\u00e9ggel el\u0151\u00e1ll\u00edtott, megfelel\u0151 min\u0151s\u00e9g\u0171 term\u00e9kk\u00e9nt.<\/p>\n\n\n<p>Egy er\u0151sen leterhelt g\u00e9p OEE-\u00e9rt\u00e9ke teh\u00e1t lehet alacsony. El\u0151fordulhat, hogy m\u0171k\u00f6d\u00e9si idej\u00e9nek nagy r\u00e9sz\u00e9ben lassan termel vagy hib\u00e1s darabokat gy\u00e1rt. Ugyanakkor egy g\u00e9p a tervezett termel\u00e9si id\u0151szakban magas OEE-\u00e9rt\u00e9ket \u00e9rhet el, mik\u00f6zben ezen az id\u0151szakon k\u00edv\u00fcl kereslet hi\u00e1ny\u00e1ban kihaszn\u00e1latlanul \u00e1ll.<\/p>\n\n\n<p>Az OEE \u00f6nmag\u00e1ban nem m\u00e9ri a teljes napt\u00e1ri id\u0151 kihaszn\u00e1l\u00e1s\u00e1t. A teljes eszk\u00f6zkihaszn\u00e1l\u00e1si hat\u00e9konys\u00e1g (TEEP) a termel\u00e9sre \u00fctemezett id\u0151 ar\u00e1ny\u00e1t is figyelembe veszi, \u00edgy a teljes napt\u00e1ri id\u0151re kiterjeszti a k\u00e9pet. A napi d\u00f6nt\u00e9sekn\u00e9l k\u00e9t k\u00e9rd\u00e9st \u00e9rdemes vil\u00e1gosan k\u00fcl\u00f6nv\u00e1lasztani: van-e elegend\u0151 kereslet \u00e9s \u00fctemezett munka, illetve mennyi hasznos kibocs\u00e1t\u00e1st \u00e9r\u00fcnk el a m\u0171k\u00f6d\u00e9sre sz\u00e1nt id\u0151 alatt?<\/p>\n\n\n<h3 class=\"wp-block-heading\">J\u00f3 c\u00e9l\u00e9rt\u00e9k a 85%-os OEE?<\/h3>\n\n\n<p>A gyakran id\u00e9zett 85% a diszkr\u00e9t gy\u00e1rt\u00e1sban ismert viszony\u00edt\u00e1si \u00e9rt\u00e9k, nem pedig \u00e1ltal\u00e1nos megfelel\u00e9si k\u00fcsz\u00f6b. Egy sokf\u00e9le term\u00e9ket gy\u00e1rt\u00f3, sz\u00fcks\u00e9gszer\u0171en gyakori \u00e1t\u00e1ll\u00e1sokkal m\u0171k\u00f6d\u0151 g\u00e9p nem hasonl\u00edthat\u00f3 k\u00f6zvetlen\u00fcl egyetlen term\u00e9kre kialak\u00edtott gy\u00e1rt\u00f3sorhoz.<\/p>\n\n\n<p>El\u0151sz\u00f6r hat\u00e1rozzon meg megb\u00edzhat\u00f3 kiindul\u00e1si \u00e9rt\u00e9ket a saj\u00e1t folyamat\u00e1ra. K\u00f6vetkezetesen alkalmazza ugyanazokat a szab\u00e1lyokat a termel\u00e9si id\u0151 lehat\u00e1rol\u00e1s\u00e1ra, az ide\u00e1lis ciklusid\u0151kre \u00e9s a min\u0151s\u00e9gi elfogad\u00e1sra, majd v\u00e1lasszon ki egy igazolt, cs\u00f6kkenthet\u0151 vesztes\u00e9get. Nem jelent val\u00f3di m\u0171k\u00f6d\u00e9sbeli javul\u00e1st, ha a mutat\u00f3 csak az\u00e9rt lesz jobb, mert a probl\u00e9m\u00e1s id\u0151szakokat kiz\u00e1rj\u00e1k a sz\u00e1m\u00edt\u00e1sb\u00f3l, vagy az ut\u00f3munk\u00e1zott darabokat els\u0151re megfelel\u0151k\u00e9nt sz\u00e1molj\u00e1k el.<\/p>\n\n\n<p>Ha a term\u00e9kek ide\u00e1lis ciklusideje elt\u00e9r, az egyes term\u00e9kekre jut\u00f3 hasznos termel\u00e9si id\u0151t az adott term\u00e9k ide\u00e1lis gy\u00e1rt\u00e1si sebess\u00e9ge alapj\u00e1n sz\u00e1m\u00edtsa ki. Az alapul szolg\u00e1l\u00f3 id\u0151- \u00e9s mennyis\u00e9gi adatokat \u00f6sszes\u00edtse, ne az egym\u00e1st\u00f3l f\u00fcggetlen m\u0171szakok vagy g\u00e9pek OEE-sz\u00e1zal\u00e9kainak egyszer\u0171 \u00e1tlag\u00e1t vegye.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kapcsolja \u00f6ssze az OEE-t a k\u00f6vetkez\u0151 termel\u00e9si tervvel a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A m\u0171szak \u00e9rt\u00e9kel\u00e9se hasznosabb, ha a berendez\u00e9sek eredm\u00e9nyeit \u00e9s a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket egy\u00fctt vizsg\u00e1lj\u00e1k. A SkyPlanner <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesi-iranyitopult\/\">kezd\u0151oldali ir\u00e1ny\u00edt\u00f3pultj\u00e1n<\/a> az OEE a kapacit\u00e1sra, a terhel\u00e9sre \u00e9s a termel\u00e9s \u00e1llapot\u00e1ra vonatkoz\u00f3 f\u0151 teljes\u00edtm\u00e9nymutat\u00f3k mellett jelenik meg. A gy\u00e1rt\u00e1si feladatokr\u00f3l k\u00e9sz\u00fclt jelent\u00e9sek \u00e9s a terv\u2013t\u00e9ny kimutat\u00e1sok seg\u00edtenek megvizsg\u00e1lni az \u00f6sszes\u00edtett adatok m\u00f6g\u00f6tti munk\u00e1t, a Timer pedig r\u00f6gz\u00edti a munkaid\u0151t, valamint a gy\u00e1rtott \u00e9s a hib\u00e1s mennyis\u00e9geket.<\/p>\n\n\n<p>Miut\u00e1n meg\u00e9rtette a vesztes\u00e9get, hat\u00e1rozza meg pontosan, mit kell miatta m\u00f3dos\u00edtani a tervben. Ha egy g\u00e9p nem haszn\u00e1lhat\u00f3, ezt a tervezett rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1ban is r\u00f6gz\u00edteni kell. A rendszeresen lassabban v\u00e9gbemen\u0151 folyamathoz re\u00e1lis m\u0171veleti id\u0151tartamot kell megadni. A j\u00f3v\u00e1hagyott ut\u00f3munk\u00e1hoz k\u00fcl\u00f6n id\u0151t kell biztos\u00edtani a sz\u00fcks\u00e9ges er\u0151forr\u00e1son. Egyetlen \u00f6sszes\u00edtett sz\u00e1zal\u00e9kos \u00e9rt\u00e9kb\u0151l nem der\u00fcl ki, hogy ezek k\u00f6z\u00fcl melyik v\u00e1ltoztat\u00e1sra van sz\u00fcks\u00e9g.<\/p>\n\n\n<p>A p\u00e9ld\u00e1ban szerepl\u0151 m\u0171szakn\u00e1l maradva tegy\u00fck fel, hogy a karbantart\u00e1s meger\u0151s\u00edti: a g\u00e9pen holnap egy k\u00e9t\u00f3r\u00e1s jav\u00edt\u00e1sra is sz\u00fcks\u00e9g lesz. R\u00f6gz\u00edtse ezt a kies\u0151 id\u0151szakot munka\u00e1llom\u00e1s-kiv\u00e9telk\u00e9nt a SkyPlanner rendszer\u00e9ben. A kiv\u00e9tel megakad\u00e1lyozza, hogy erre az id\u0151szakra munka ker\u00fclj\u00f6n az \u00fctemtervbe. Az Arcturus, a SkyPlanner mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151je ezut\u00e1n a be\u00e1ll\u00edtott kapacit\u00e1s, a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek \u00e9s a priorit\u00e1sok alapj\u00e1n \u00fajrasz\u00e1m\u00edthatja az \u00e9rintett munk\u00e1k \u00fctemez\u00e9s\u00e9t. Az \u00edgy kialakul\u00f3 sorrendet \u00e9s befejez\u00e9si d\u00e1tumokat a Gantt-diagram mutatja.<\/p>\n\n\n<p>\u00cdgy l\u00e1that\u00f3v\u00e1 v\u00e1lik, hogyan \u00e9rinti a kies\u0151 id\u0151szak a k\u00f6vetkez\u0151 m\u0171veleteket \u00e9s a g\u00e9pet haszn\u00e1l\u00f3 t\u00f6bbi rendel\u00e9st, ahelyett, hogy csup\u00e1n \u00e1thelyezn\u00e9 a holnapi els\u0151 gy\u00e1rt\u00e1si feladatot, \u00e9s csak k\u00e9s\u0151bb szembes\u00fclne a tovagy\u0171r\u0171z\u0151 hat\u00e1sokkal. Ha egy m\u00e1sik be\u00e1ll\u00edtott munka\u00e1llom\u00e1s is alkalmas a feladatra, az \u00fctemez\u00e9s annak kapacit\u00e1s\u00e1t is figyelembe veheti. A priorit\u00e1sok \u00e9s a m\u00f3dos\u00edt\u00e1s ellen v\u00e9dett d\u00f6nt\u00e9sek tov\u00e1bbra is az \u00d6n kez\u00e9ben maradnak; az Arcturus elv\u00e9gzi az \u00f6sszef\u00fcgg\u0151 feladatok \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sait.<\/p>\n\n\n<p>Az OEE sz\u00e1m\u00edt\u00e1s\u00e1hoz haszn\u00e1lt ide\u00e1lis sebess\u00e9get kezelje k\u00fcl\u00f6n a munka tervez\u00e9s\u00e9hez haszn\u00e1lt re\u00e1lis id\u0151tartamokt\u00f3l. Ha az \u00fctemterv m\u00e1r tartalmazza a t\u00e9nyleges megmunk\u00e1l\u00e1si sebess\u00e9geket, az \u00e1t\u00e1ll\u00e1si id\u0151t \u00e9s az ismert \u00e1ll\u00e1sid\u0151t, a teljes OEE-sz\u00e1zal\u00e9k \u00fajb\u00f3li alkalmaz\u00e1s\u00e1val ugyanazokat a vesztes\u00e9geket k\u00e9tszer is figyelembe veheti. Ehelyett azt a bemeneti adatot friss\u00edtse, amely az igazolt probl\u00e9m\u00e1t t\u00fckr\u00f6zi.<\/p>\n\n\n<p>A SkyPlanner a ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3. \u00cdgy <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">\u00f6sszekapcsolhatja a megl\u00e9v\u0151 rendel\u00e9si \u00e9s termel\u00e9si adatokat a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9ssel<\/a>, cs\u00f6kkentheti a teljes\u00edtm\u00e9nymutat\u00f3k k\u00fcl\u00f6n adminisztr\u00e1ci\u00f3j\u00e1t, \u00e9s kapacit\u00e1sv\u00e1ltoz\u00e1skor kevesebb id\u0151t kell a g\u00e9pekre v\u00e1r\u00f3 feladatok sorrendj\u00e9nek helyre\u00e1ll\u00edt\u00e1s\u00e1ra ford\u00edtania.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott a jobb munkasorrend a Mamec m\u0171k\u00f6d\u00e9s\u00e9n?<\/h3>\n\n\n<p>A kever\u00e9stechnol\u00f3gi\u00e1val \u00e9s b\u00e9rgy\u00e1rt\u00e1ssal foglalkoz\u00f3 Mamec kor\u00e1bban pap\u00edralap\u00fa munkalapok \u00e9s ERP-rendszer\u00e9nek merev tervez\u00e9si funkci\u00f3i seg\u00edts\u00e9g\u00e9vel \u00e1ll\u00edtotta fontoss\u00e1gi sorrendbe a t\u00f6bb ezer, egym\u00e1st\u00f3l f\u00fcgg\u0151 gy\u00e1rt\u00e1si feladatot. A teljes terhel\u00e9st neh\u00e9z volt \u00e1tl\u00e1tni, a sorrend \u00f6sszehangol\u00e1s\u00e1nak terhe pedig a termel\u00e9sir\u00e1ny\u00edt\u00e1sra h\u00e1rult.<\/p>\n\n\n<p>Az Oscar ERP rendszerrel integr\u00e1lt SkyPlanner bevezet\u00e9s\u00e9vel a Mamec \u00e1tt\u00e9rt a mesters\u00e9ges intelligenci\u00e1val t\u00e1mogatott, v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9sre, a rendel\u00e9sek \u00e9s a terhel\u00e9s pedig minden \u00e9rintett sz\u00e1m\u00e1ra \u00e1tl\u00e1that\u00f3v\u00e1 v\u00e1ltak. A v\u00e1llalat besz\u00e1mol\u00f3ja szerint az optimaliz\u00e1lt munkasorrendnek k\u00f6sz\u00f6nhet\u0151en cs\u00f6kkent a munka\u00e1llom\u00e1sok \u00e1ll\u00e1sideje, \u00e9s <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">\u00e9rezhet\u0151en kevesebb munka h\u00e1rul a tervez\u0151kre<\/a>.<\/p>\n\n\n<p>Ez k\u00e9zzelfoghat\u00f3 \u00e9rv a berendez\u00e9sek teljes\u00edtm\u00e9ny\u00e9nek \u00e9s az \u00fctemez\u00e9snek az \u00f6sszekapcsol\u00e1sa mellett: a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si feladat \u00e9s annak f\u00fcgg\u0151s\u00e9gei egy naprak\u00e9szen tartott terv r\u00e9sz\u00e9v\u00e9 v\u00e1lnak, nem pedig \u00fajabb, k\u00fcl\u00f6n-k\u00fcl\u00f6n meghozott d\u00f6nt\u00e9sekk\u00e9, amelyeket ut\u00f3lag kell \u00f6sszehangolni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e9zze meg, hogyan hatnak a berendez\u00e9sek vesztes\u00e9gei a sz\u00e1ll\u00edt\u00e1sokra<\/h2>\n\n\n<p>V\u00e1lasszon ki egy g\u00e9pet, amelynek id\u0151kies\u00e9se rendszeresen megzavarja a v\u00e1llalt munk\u00e1k teljes\u00edt\u00e9s\u00e9t. A SkyPlanner-bemutat\u00f3ra hozza mag\u00e1val a g\u00e9p termel\u00e9sre sz\u00e1nt id\u0151szak\u00e1nak, ide\u00e1lis ciklusidej\u00e9nek, a gy\u00e1rtott mennyis\u00e9geknek \u00e9s a le\u00e1ll\u00e1sok f\u0151 okainak adatait, valamint egy \u00e9rintett rendel\u00e9s \u00e9s az ahhoz tartoz\u00f3, m\u00e9g h\u00e1tral\u00e9v\u0151 m\u0171veletek adatait.<\/p>\n\n\n<p>Ezen a helyzeten kereszt\u00fcl v\u00e9gigveheti a teljes folyamatot: \u00e9rtelmezheti az OEE eredm\u00e9ny\u00e9t, r\u00f6gz\u00edthet egy igazolt kapacit\u00e1sv\u00e1ltoz\u00e1st, \u00e9s megn\u00e9zheti, hogyan hat a m\u00f3dos\u00edtott \u00fctemterv a sz\u00e1ll\u00edt\u00e1sokra. <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, hogy \u00e1tbesz\u00e9lhess\u00fck az \u00d6n termel\u00e9s\u00e9t, vagy el\u0151sz\u00f6r <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa A teljes eszk\u00f6zhat\u00e9konys\u00e1g (OEE) azt m\u00e9ri, hogy a tervezett termel\u00e9si id\u0151 mekkora r\u00e9sz\u00e9ben k\u00e9sz\u00fcl megfelel\u0151 term\u00e9k a folyamat ide\u00e1lis sebess\u00e9g\u00e9vel. H\u00e1rom t\u00e9nyez\u0151t egyes\u00edt: a rendelkez\u00e9sre \u00e1ll\u00e1st, a teljes\u00edtm\u00e9nyt \u00e9s a min\u0151s\u00e9get. Egy g\u00e9p a m\u0171szak nagy r\u00e9sz\u00e9ben &#8230; <a title=\"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/\" aria-label=\"Read more about Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":104895,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2692,312],"tags":[],"class_list":["post-104877","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-hu","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa<\/title>\n<meta name=\"description\" content=\"A g\u00e9p dolgozik, m\u00e9gis kev\u00e9s a j\u00f3 darab? Sz\u00e1m\u00edtsa ki az OEE-t, t\u00e1rja fel a mutat\u00f3 m\u00f6g\u00f6tti vesztes\u00e9get, \u00e9s k\u00e9sz\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa\" \/>\n<meta property=\"og:description\" content=\"A g\u00e9p dolgozik, m\u00e9gis kev\u00e9s a j\u00f3 darab? Sz\u00e1m\u00edtsa ki az OEE-t, t\u00e1rja fel a mutat\u00f3 m\u00f6g\u00f6tti vesztes\u00e9get, \u00e9s k\u00e9sz\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T10:20:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T10:20:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa\",\"datePublished\":\"2026-10-21T10:20:06+00:00\",\"dateModified\":\"2026-10-21T10:20:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/\"},\"wordCount\":3438,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"articleSection\":[\"ERP\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/\",\"name\":\"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"datePublished\":\"2026-10-21T10:20:06+00:00\",\"dateModified\":\"2026-10-21T10:20:57+00:00\",\"description\":\"A g\u00e9p dolgozik, m\u00e9gis kev\u00e9s a j\u00f3 darab? Sz\u00e1m\u00edtsa ki az OEE-t, t\u00e1rja fel a mutat\u00f3 m\u00f6g\u00f6tti vesztes\u00e9get, \u00e9s k\u00e9sz\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A machining station with finished parts and a rejected component illustrates equipment effectiveness losses.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/oee\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa","description":"A g\u00e9p dolgozik, m\u00e9gis kev\u00e9s a j\u00f3 darab? Sz\u00e1m\u00edtsa ki az OEE-t, t\u00e1rja fel a mutat\u00f3 m\u00f6g\u00f6tti vesztes\u00e9get, \u00e9s k\u00e9sz\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/","og_locale":"hu_HU","og_type":"article","og_title":"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa","og_description":"A g\u00e9p dolgozik, m\u00e9gis kev\u00e9s a j\u00f3 darab? Sz\u00e1m\u00edtsa ki az OEE-t, t\u00e1rja fel a mutat\u00f3 m\u00f6g\u00f6tti vesztes\u00e9get, \u00e9s k\u00e9sz\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T10:20:06+00:00","article_modified_time":"2026-10-21T10:20:57+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa","datePublished":"2026-10-21T10:20:06+00:00","dateModified":"2026-10-21T10:20:57+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/"},"wordCount":3438,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","articleSection":["ERP","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/","name":"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","datePublished":"2026-10-21T10:20:06+00:00","dateModified":"2026-10-21T10:20:57+00:00","description":"A g\u00e9p dolgozik, m\u00e9gis kev\u00e9s a j\u00f3 darab? Sz\u00e1m\u00edtsa ki az OEE-t, t\u00e1rja fel a mutat\u00f3 m\u00f6g\u00f6tti vesztes\u00e9get, \u00e9s k\u00e9sz\u00edtsen re\u00e1lis gy\u00e1rt\u00e1si tervet.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","width":1672,"height":941,"caption":"A machining station with finished parts and a rejected component illustrates equipment effectiveness losses."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/oee\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Teljes eszk\u00f6zhat\u00e9konys\u00e1g: az OEE sz\u00e1m\u00edt\u00e1sa \u00e9s alkalmaz\u00e1sa A teljes eszk\u00f6zhat\u00e9konys\u00e1g (OEE) azt m\u00e9ri, hogy a tervezett termel\u00e9si id\u0151 mekkora r\u00e9sz\u00e9ben k\u00e9sz\u00fcl megfelel\u0151 term\u00e9k a folyamat ide\u00e1lis sebess\u00e9g\u00e9vel. H\u00e1rom t\u00e9nyez\u0151t egyes\u00edt: a rendelkez\u00e9sre \u00e1ll\u00e1st, a teljes\u00edtm\u00e9nyt \u00e9s a min\u0151s\u00e9get. Egy g\u00e9p a m\u0171szak nagy r\u00e9sz\u00e9ben&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/104877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=104877"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/104877\/revisions"}],"predecessor-version":[{"id":104970,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/104877\/revisions\/104970"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/104895"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=104877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=104877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=104877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}