{"id":104571,"date":"2026-10-20T19:34:39","date_gmt":"2026-10-20T19:34:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104571"},"modified":"2026-10-20T19:35:43","modified_gmt":"2026-10-20T19:35:43","slug":"elsore-megfelelt-darabok-aranya","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/","title":{"rendered":"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Az els\u0151re megfelelt darabok ar\u00e1nya (FPY) azoknak a daraboknak a sz\u00e1zal\u00e9kos ar\u00e1ny\u00e1t mutatja, amelyek egy meghat\u00e1rozott folyamatban m\u00e1r els\u0151re teljes\u00edtik az el\u0151\u00edrt min\u0151s\u00e9gi k\u00f6vetelm\u00e9nyeket, jav\u00edt\u00e1s, ut\u00f3munka vagy sikertelen vizsg\u00e1lat ut\u00e1ni ism\u00e9telt tesztel\u00e9s n\u00e9lk\u00fcl. Azt jelzi, hogy a termel\u00e9s mekkora r\u00e9sze siker\u00fclt els\u0151re, nem pedig azt, hogy v\u00e9g\u00fcl mennyi lett elfogadhat\u00f3.<\/p>\n\n\n<p>Ez a k\u00fcl\u00f6nbs\u00e9g akkor v\u00e1lik fontoss\u00e1, amikor az elk\u00e9sz\u00fclt mennyis\u00e9g megfelel\u0151nek t\u0171nik, az \u00fczem m\u00e9gis nehezen tartja a temp\u00f3t. A jav\u00edtott alkatr\u00e9szek m\u00e9g kisz\u00e1ll\u00edthat\u00f3k lehetnek, de a helyre\u00e1ll\u00edt\u00e1suk olyan id\u0151t k\u00f6t\u00f6tt le, amelyre m\u00e1s rendel\u00e9seknek lett volna sz\u00fcks\u00e9g\u00fck. Az FPY \u00e9s a helyre\u00e1ll\u00edt\u00e1sra ford\u00edtott munka egy\u00fcttes k\u00f6vet\u00e9se megmutatja, mit fed el a megfelel\u0151 darabok \u00f6sszes\u00edtett mennyis\u00e9ge. Ha ezt a munk\u00e1t \u00f6sszekapcsolja a SkyPlanner gy\u00e1rt\u00e1si nyilv\u00e1ntart\u00e1saival \u00e9s \u00fctemez\u00e9s\u00e9vel, k\u00f6nnyebben \u00e1tl\u00e1thatja a kapacit\u00e1sra \u00e9s a sz\u00e1ll\u00edt\u00e1sokra gyakorolt hat\u00e1s\u00e1t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az els\u0151re megfelelt darabok ar\u00e1ny\u00e1nak kisz\u00e1m\u00edt\u00e1sa<\/h2>\n\n\n<p>Haszn\u00e1lja az al\u00e1bbi k\u00e9pletet:<\/p>\n\n\n<p><strong>Els\u0151re megfelelt darabok ar\u00e1nya (%) = Els\u0151re elfogadott darabok sz\u00e1ma \u00f7 A meghat\u00e1rozott folyamatba bel\u00e9p\u0151 darabok sz\u00e1ma \u00d7 100<\/strong><\/p>\n\n\n<p>Minden darabot csak egyszer sz\u00e1moljon, ne az ellen\u0151rz\u00e9si esem\u00e9nyeket vagy az egyes hib\u00e1kat sz\u00e1molja. Az a darab, amely el\u0151sz\u00f6r nem felel meg, majd jav\u00edt\u00e1s ut\u00e1n \u00e1tmegy az ellen\u0151rz\u00e9sen, belesz\u00e1m\u00edt a v\u00e9g\u00fcl elfogadott darabok sz\u00e1m\u00e1ba, de nem sz\u00e1m\u00edt els\u0151re megfelel\u0151nek. A t\u00f6bb hib\u00e1t tartalmaz\u00f3 alkatr\u00e9sz is csak egyetlen nem megfelel\u0151 darabnak sz\u00e1m\u00edt ebben a sz\u00e1m\u00edt\u00e1sban.<\/p>\n\n\n<p>Az adatok gy\u0171jt\u00e9se el\u0151tt hat\u00e1rozza meg a vizsg\u00e1lt folyamat hat\u00e1rait. M\u00e9rhet egy megmunk\u00e1l\u00e1si m\u0171veletet, egy vizsg\u00e1l\u00f3\u00e1llom\u00e1st vagy egy teljes gy\u00e1rt\u00e1si \u00fatvonalat. A sz\u00e1ml\u00e1l\u00f3nak \u00e9s a nevez\u0151nek ugyanarra a darabcsoportra kell vonatkoznia, ugyanazon folyamathat\u00e1rok mellett.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u00e9lda: 90%-os FPY, 96%-os v\u00e9gs\u0151 megfelel\u00e9si ar\u00e1ny<\/h3>\n\n\n<p>Tegy\u00fck fel, hogy egy 500 megmunk\u00e1lt alkatr\u00e9szb\u0151l \u00e1ll\u00f3 t\u00e9tel minden darabj\u00e1n\u00e1l ismert az els\u0151 ellen\u0151rz\u00e9s eredm\u00e9nye:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Az els\u0151 ellen\u0151rz\u00e9s eredm\u00e9nye<\/th><th>Darabsz\u00e1m<\/th><th>Tov\u00e1bbi sorsuk<\/th><\/tr><\/thead><tbody><tr><td>Jav\u00edt\u00e1s n\u00e9lk\u00fcl elfogadva<\/td><td>450<\/td><td>Mehetnek a k\u00f6vetkez\u0151 m\u0171veletre<\/td><\/tr><tr><td>Ut\u00f3munk\u00e1ra k\u00fcldve<\/td><td>40<\/td><td>30 k\u00e9s\u0151bb megfelel; 10 v\u00e9g\u00fcl selejt lesz<\/td><\/tr><tr><td>Azonnal selejtezve<\/td><td>10<\/td><td>Nem mehetnek tov\u00e1bb<\/td><\/tr><tr><td>A m\u0171veletbe bel\u00e9p\u0151 \u00f6sszes darab<\/td><td>500<\/td><td>Minden darabhoz egy els\u0151 ellen\u0151rz\u00e9si eredm\u00e9ny tartozik<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az els\u0151re megfelelt darabok ar\u00e1nya:<\/p>\n\n\n<p><strong>450 \u00f7 500 \u00d7 100 = 90%<\/strong><\/p>\n\n\n<p>Az ut\u00f3munka ut\u00e1n 480 elfogadott darab van: az eredeti 450 \u00e9s a sikeresen helyre\u00e1ll\u00edtott 30 darab. A t\u00e9tel v\u00e9gs\u0151 megfelel\u00e9si ar\u00e1nya teh\u00e1t:<\/p>\n\n\n<p><strong>480 \u00f7 500 \u00d7 100 = 96%<\/strong><\/p>\n\n\n<p>Mindk\u00e9t sz\u00e1zal\u00e9kos \u00e9rt\u00e9k hasznos. Az FPY az els\u0151re el\u00e9rt eredm\u00e9nyt mutatja. A v\u00e9gs\u0151 megfelel\u00e9si ar\u00e1ny azt jelzi, hogy v\u00e9g\u00fcl a darabok mekkora r\u00e9sz\u00e9t fogadt\u00e1k el, a sikeres ut\u00f3munk\u00e1t is bele\u00e9rtve. Ha csak a 96%-ot k\u00f6z\u00f6lj\u00fck, rejtve marad az a jav\u00edt\u00e1si munka, amely a 30 darab helyre\u00e1ll\u00edt\u00e1s\u00e1hoz kellett.<\/p>\n\n\n<p>Az FPY sz\u00e1m\u00edt\u00e1s\u00e1ban fennmarad\u00f3 10% sem azonos a selejtar\u00e1nnyal. Ebben a p\u00e9ld\u00e1ban v\u00e9g\u00fcl 20 darabot selejteznek, \u00edgy a v\u00e9gs\u0151 selejtar\u00e1ny 4%. Az eredeti t\u00e9tel tov\u00e1bbi 6%-\u00e1t t\u00f6bbletmunk\u00e1val siker\u00fclt megfelel\u0151v\u00e9 tenni. Ha csak a selejt ar\u00e1ny\u00e1t vonn\u00e1nk le, a v\u00e9gs\u0151 megfelel\u00e9si ar\u00e1nyt kapn\u00e1nk meg, nem az els\u0151re megfelelt darabok ar\u00e1ny\u00e1t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Csak helyes sz\u00e1ml\u00e1l\u00e1si szab\u00e1lyok mellett megb\u00edzhat\u00f3 a sz\u00e1zal\u00e9kos \u00e9rt\u00e9k<\/h2>\n\n\n<p>A sz\u00e1m\u00edt\u00e1s egyszer\u0171. Arra m\u00e1r jobban kell \u00fcgyelni, hogy az \u201eels\u0151re\u201d jelent\u00e9se ne v\u00e1ltozzon meg, k\u00fcl\u00f6n\u00f6sen akkor, ha a gy\u00e1rt\u00e1si \u00e9s az ellen\u0151rz\u00e9si adatok k\u00fcl\u00f6nb\u00f6z\u0151 rendszerekb\u0151l sz\u00e1rmaznak.<\/p>\n\n\n<p>1. <strong>V\u00e1lasszon egy folyamatot \u00e9s egy \u00f6sszehasonl\u00edthat\u00f3 term\u00e9kcsoportot.<\/strong> A megmunk\u00e1l\u00e1s sor\u00e1n els\u0151re el\u00e9rt megfelel\u00e9s nem jelenti a teljes szerelv\u00e9ny v\u00e9gs\u0151 elfogad\u00e1s\u00e1t. R\u00f6gz\u00edtse egy\u00e9rtelm\u0171en a gy\u00e1rt\u00e1si \u00fatvonalakat \u00e9s az elfogad\u00e1si k\u00f6vetelm\u00e9nyeket, hogy a term\u00e9k\u00f6sszet\u00e9tel v\u00e1ltoz\u00e1sa ne t\u0171nhessen min\u0151s\u00e9gjavul\u00e1snak.<\/p>\n\n\n<p>2. <strong>A bel\u00e9p\u0151 darabokhoz a saj\u00e1t eredm\u00e9nyeiket rendelje.<\/strong> Induljon ki egy t\u00e9telb\u0151l vagy m\u00e1s nyomon k\u00f6vethet\u0151 darabcsoportb\u00f3l, amelynek ismertek az els\u0151 ellen\u0151rz\u00e9si eredm\u00e9nyei. Ha a ma elk\u00e9sz\u00fclt \u00e9s elfogadott darabok sz\u00e1m\u00e1t a ma ind\u00edtott darabok sz\u00e1m\u00e1val osztja el, elt\u00e9r\u0151 darabcsoportokat keverhet \u00f6ssze, k\u00fcl\u00f6n\u00f6sen t\u00f6bb m\u0171szakon \u00e1t tart\u00f3 gy\u00e1rt\u00e1si feladatokn\u00e1l.<\/p>\n\n\n<p>3. <strong>\u0150rizze meg az eredeti eredm\u00e9nyt.<\/strong> Az els\u0151re t\u00f6rt\u00e9n\u0151 elfogad\u00e1st tartsa k\u00fcl\u00f6n a jav\u00edt\u00e1s vagy ism\u00e9telt tesztel\u00e9s ut\u00e1ni elfogad\u00e1st\u00f3l. Ha a jav\u00edtott darab megfelel\u00e9sekor fel\u00fcl\u00edrja az eredeti nem megfelel\u0151 eredm\u00e9nyt, az el\u0151zm\u00e9nyek kedvez\u0151bbnek l\u00e1tszanak, de a t\u00f6rt\u00e9nteken ez nem v\u00e1ltoztat.<\/p>\n\n\n<p>4. <strong>Az adott folyamathat\u00e1rn\u00e1l minden darabot csak egyszer sz\u00e1moljon.<\/strong> A t\u00f6bb hiba, az ism\u00e9telt tesztek \u00e9s az ism\u00e9telt id\u0151bejegyz\u00e9sek nem n\u00f6velik az eredeti darabsz\u00e1mot. Haszn\u00e1ljon darabazonos\u00edt\u00f3kat vagy olyan egyeztetett t\u00e9telnyilv\u00e1ntart\u00e1st, amely meg\u0151rzi a mennyis\u00e9geket \u00e9s az ut\u00f3munka el\u0151zm\u00e9nyeit.<\/p>\n\n\n<p>5. <strong>Tegye l\u00e1that\u00f3v\u00e1 a m\u00e9g nyitott eredm\u00e9nyeket.<\/strong> Az ellen\u0151rz\u00e9sre v\u00e1r\u00f3 darabok nem tekinthet\u0151k automatikusan sem elfogadottnak, sem elutas\u00edtottnak. T\u00fcntesse fel a m\u00e9g el nem b\u00edr\u00e1lt mennyis\u00e9get, \u00e9s csak akkor v\u00e9gleges\u00edtse az adott darabcsoport FPY-\u00e9rt\u00e9k\u00e9t, amikor minden els\u0151 ellen\u0151rz\u00e9si eredm\u00e9ny rendelkez\u00e9sre \u00e1ll. Ne hagyja ki csendben a probl\u00e9m\u00e1s darabokat a sz\u00e1m\u00edt\u00e1sb\u00f3l.<\/p>\n\n\n<p>Egy m\u0171velet szok\u00e1sos \u00fatvonal\u00e1n t\u00f6bb tervezett ellen\u0151rz\u00e9s is szerepelhet. Ennek az el\u0151\u00edrt ellen\u0151rz\u00e9ssorozatnak az els\u0151re hib\u00e1tlan teljes\u00edt\u00e9se nem ugyanaz, mint egy sikertelen teszt megism\u00e9tl\u00e9se vagy egy hiba kijav\u00edt\u00e1sa. Ezt a k\u00fcl\u00f6nbs\u00e9get r\u00f6gz\u00edtse a m\u00e9r\u00e9s defin\u00edci\u00f3j\u00e1ban, \u00e9s k\u00f6vetkezetesen alkalmazza.<\/p>\n\n\n<p>Ha a jelent\u00e9se csak az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesi-jelentes\/\">\u00f6sszes elk\u00e9sz\u00fclt \u00e9s hib\u00e1s darab mennyis\u00e9g\u00e9t<\/a> tartalmazza, ellen\u0151rizze e mez\u0151k jelent\u00e9s\u00e9t, miel\u0151tt FPY-sz\u00e1m\u00edt\u00e1shoz haszn\u00e1ln\u00e1 \u0151ket. Tudnia kell, hogy az elfogadott mennyis\u00e9g tartalmazza-e a jav\u00edtott darabokat, \u00e9s hogy az ism\u00e9telt megmunk\u00e1l\u00e1st nem sz\u00e1molt\u00e1k-e t\u00f6bbsz\u00f6r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az FPY \u00e9s a teljes folyamat els\u0151re megfelel\u00e9si ar\u00e1nya (RTY)<\/h2>\n\n\n<p>Egy m\u0171velet eredm\u00e9nyesnek t\u0171nhet akkor is, ha a teljes gy\u00e1rt\u00e1si \u00fatvonalon jelent\u0151s jav\u00edt\u00e1si munk\u00e1ra van sz\u00fcks\u00e9g. A teljes folyamat els\u0151re megfelel\u00e9si ar\u00e1nya (RTY) az egym\u00e1st k\u00f6vet\u0151 folyamatl\u00e9p\u00e9sek egy\u00fcttes, els\u0151re el\u00e9rt eredm\u00e9ny\u00e9t mutatja.<\/p>\n\n\n<p>Egys\u00e9ges m\u0171veletsor eset\u00e9n szorozza \u00f6ssze az egyes l\u00e9p\u00e9sek megfelel\u00e9si ar\u00e1ny\u00e1t tizedes t\u00f6rt alakban:<\/p>\n\n\n<p><strong>RTY (%) = Az 1. l\u00e9p\u00e9s els\u0151re megfelel\u00e9si ar\u00e1nya \u00d7 A 2. l\u00e9p\u00e9s els\u0151re megfelel\u00e9si ar\u00e1nya \u00d7 \u2026 \u00d7 100<\/strong><\/p>\n\n\n<p>Tegy\u00fck fel, hogy 1 000 alkatr\u00e9szt k\u00f6vet\u00fcnk v\u00e9gig h\u00e1rom m\u0171veleten. Ebben a p\u00e9ld\u00e1ban csak azok a darabok haladnak tov\u00e1bb a k\u00f6vetett csoportban, amelyek minden l\u00e9p\u00e9sn\u00e9l els\u0151re megfelelnek; a jav\u00edtott darabok nem ker\u00fclnek vissza a csoportba.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>M\u0171velet<\/th><th>A m\u0171veletbe bel\u00e9p\u0151 darabok a k\u00f6vetett csoportb\u00f3l<\/th><th>Els\u0151re megfelelt darabok<\/th><th>A l\u00e9p\u00e9s megfelel\u00e9si ar\u00e1nya<\/th><\/tr><\/thead><tbody><tr><td>Megmunk\u00e1l\u00e1s<\/td><td>1 000<\/td><td>900<\/td><td>90%<\/td><\/tr><tr><td>Befejez\u0151 megmunk\u00e1l\u00e1s<\/td><td>900<\/td><td>810<\/td><td>90%<\/td><\/tr><tr><td>Tesztel\u00e9s<\/td><td>810<\/td><td>729<\/td><td>90%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>0,90 \u00d7 0,90 \u00d7 0,90 \u00d7 100 = 72,9% RTY<\/strong><\/p>\n\n\n<p>Minden m\u0171velet megfelel\u00e9si ar\u00e1nya 90%, m\u00e9gis az eredeti 1 000 darabb\u00f3l csak 729 jut \u00e1t mindh\u00e1rom l\u00e9p\u00e9sen hiba n\u00e9lk\u00fcl. A h\u00e1rom sz\u00e1zal\u00e9kos \u00e9rt\u00e9k \u00e1tlaga 90% lenne, ami elfedn\u00e9 a halmoz\u00f3d\u00f3 hat\u00e1st.<\/p>\n\n\n<p>A t\u00e9nyleges gy\u00e1rt\u00e1sban a jav\u00edtott darabok visszaker\u00fclhetnek a folyamatba, \u00e9s a term\u00e9kek elt\u00e9r\u0151 \u00fatvonalakon haladhatnak. Olyan l\u00e9p\u00e9senk\u00e9nti megfelel\u00e9si ar\u00e1nyokat haszn\u00e1ljon, amelyek egym\u00e1ssal \u00f6sszeegyeztethet\u0151 gy\u00e1rt\u00e1si \u00fatvonalra \u00e9s azonos sz\u00e1ml\u00e1l\u00e1si alapra vonatkoznak. Ne szorozzon \u00f6ssze egym\u00e1st\u00f3l f\u00fcggetlen r\u00e9szleg\u00e1tlagokat \u00fagy, mintha az eredm\u00e9ny a teljes folyamatban megfigyelt sikeress\u00e9gi ar\u00e1ny lenne. Ha minden darabn\u00e1l meg\u0151rzi az els\u0151 pr\u00f3b\u00e1lkoz\u00e1sok eredm\u00e9nyeit, ellen\u0151rizheti, h\u00e1ny eredeti darab jutott v\u00e9gig t\u00e9nylegesen a teljes \u00fatvonalon jav\u00edt\u00e1s n\u00e9lk\u00fcl.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mekkora FPY sz\u00e1m\u00edt j\u00f3nak?<\/h2>\n\n\n<p>A hasznos c\u00e9l\u00e9rt\u00e9k figyelembe veszi a term\u00e9ket, a folyamatot, a min\u0151s\u00e9gi k\u00f6vetelm\u00e9nyeket \u00e9s a hib\u00e1k k\u00f6vetkezm\u00e9nyeit. Egy \u00e1ltal\u00e1nos referencia\u00e9rt\u00e9k \u00f6nmag\u00e1ban nem el\u00e9g annak meg\u00edt\u00e9l\u00e9s\u00e9hez, hogy az adott m\u0171velet j\u00f3l teljes\u00edt-e.<\/p>\n\n\n<p>Induljon ki az \u00f6sszehasonl\u00edthat\u00f3 munk\u00e1k trendj\u00e9b\u0151l. A sz\u00e1zal\u00e9kos \u00e9rt\u00e9ket a m\u00e9rt darabsz\u00e1mmal, a hib\u00e1k okaival \u00e9s a jav\u00edt\u00e1si munka mennyis\u00e9g\u00e9vel egy\u00fctt \u00e9rt\u00e9kelje. A magasabb FPY akkor jelent val\u00f3di el\u0151rel\u00e9p\u00e9st, ha ugyanazok az elfogad\u00e1si szab\u00e1lyok \u00e9rv\u00e9nyesek. Nem javul\u00e1s, ha a csapat csup\u00e1n enyh\u00edtett az ellen\u0151rz\u00e9si k\u00f6vetelm\u00e9nyeken, vagy kivette a probl\u00e9m\u00e1s darabokat a nevez\u0151b\u0151l.<\/p>\n\n\n<p>A jav\u00edt\u00e1shoz keressen olyan visszat\u00e9r\u0151 probl\u00e9m\u00e1t, amelyen v\u00e1ltoztatni tud. Csoportos\u00edtsa az els\u0151 ellen\u0151rz\u00e9skor tal\u00e1lt nemmegfelel\u0151s\u00e9geket m\u0171velet \u00e9s igazolt ok szerint. Egy term\u00e9k visszat\u00e9r\u0151 m\u00e9rethib\u00e1ja a szersz\u00e1mra, a befog\u00f3k\u00e9sz\u00fcl\u00e9kre, az anyagra vagy a m\u00f3dszerre ir\u00e1ny\u00edthatja a figyelmet; a sz\u00e1zal\u00e9kos \u00e9rt\u00e9k \u00f6nmag\u00e1ban nem mutatja meg, melyik a felel\u0151s. Vizsg\u00e1lja meg a bizony\u00edt\u00e9kokat a munk\u00e1t v\u00e9gz\u0151 koll\u00e9g\u00e1kkal, sz\u00fcntesse meg az okot, majd m\u00e9rje \u00fajra az \u00f6sszehasonl\u00edthat\u00f3 termel\u00e9s eredm\u00e9ny\u00e9t.<\/p>\n\n\n<p>Vegye figyelembe a helyre\u00e1ll\u00edt\u00e1s terh\u00e9t is. K\u00e9t azonos FPY-\u00e9rt\u00e9k\u0171 m\u0171velet k\u00f6vetkezm\u00e9nyei nagyon elt\u00e9rhetnek, ha az egyikn\u00e9l el\u00e9g egy gyors jav\u00edt\u00e1s, a m\u00e1sik viszont \u00f3r\u00e1kra lek\u00f6t egy k\u00f6z\u00f6sen haszn\u00e1lt g\u00e9pet. Ilyenkor a min\u0151s\u00e9gi eredm\u00e9ny alapj\u00e1n m\u00e1r a tervez\u00e9sben is d\u00f6nteni kell.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sz\u00e1moljon re\u00e1lis kapacit\u00e1sig\u00e9nnyel az FPY m\u00f6g\u00f6tt rejl\u0151 ut\u00f3munk\u00e1hoz<\/h2>\n\n\n<p>T\u00e9rj\u00fcnk vissza az 500 darabos t\u00e9telhez. Tegy\u00fck fel, hogy mind a 40 ut\u00f3munk\u00e1l\u00e1si k\u00eds\u00e9rlet tov\u00e1bbi 12 percet vesz ig\u00e9nybe ugyanazon a megmunk\u00e1l\u00f3k\u00f6zponton, f\u00fcggetlen\u00fcl att\u00f3l, hogy a darab v\u00e9g\u00fcl megfelel-e, vagy selejt lesz.<\/p>\n\n\n<p><strong>40 k\u00eds\u00e9rlet \u00d7 12 perc = 480 perc = 8 g\u00e9p\u00f3ra<\/strong><\/p>\n\n\n<p>A v\u00e9gs\u0151 megfelel\u00e9si ar\u00e1nyr\u00f3l sz\u00f3l\u00f3 jelent\u00e9sben 480 elfogadott darab szerepel. A gy\u00e1rt\u00e1si tervben azonban a nyolc t\u00f6bblet\u00f3r\u00e1val is sz\u00e1molni kell. A tov\u00e1bbi \u00e1t\u00e1ll\u00e1s, ellen\u0151rz\u00e9s vagy anyagmozgat\u00e1s m\u00e1shol is ig\u00e9nyelhet t\u00f6bbletid\u0151t.<\/p>\n\n\n<p>Ne felt\u00e9telezze, hogy ha a darabok 10%-a els\u0151re nem felel meg, az pontosan 10% kapacit\u00e1svesztes\u00e9get jelent. Az ut\u00f3munka m\u0171veleti \u00fatvonala \u00e9s id\u0151ig\u00e9nye elt\u00e9r\u0151 lehet. Sz\u00e1m\u00edtsa ki a t\u00e9nylegesen sz\u00fcks\u00e9ges munk\u00e1t azokra az er\u0151forr\u00e1sokra, amelyeknek azt el kell v\u00e9gezni\u00fck. A g\u00e9p\u00f3r\u00e1kat \u00e9s a kezel\u0151i munka\u00f3r\u00e1kat is k\u00fcl\u00f6n kell kezelni, ha elt\u00e9r\u0151 korl\u00e1tokat jelentenek.<\/p>\n\n\n<p>Ha a megmunk\u00e1l\u00f3k\u00f6zpont kapacit\u00e1sa egy fontos kisz\u00e1ll\u00edt\u00e1sig m\u00e1r le van k\u00f6tve, az ut\u00f3munka k\u00fcl\u00f6n v\u00e1r\u00f3list\u00e1ra helyez\u00e9se nem teremt \u00faj kapacit\u00e1st. Csak azt v\u00e1ltoztatja meg, hogy melyik rendel\u00e9s k\u00e9sz\u00fclhet el el\u0151bb. Ha id\u0151ben l\u00e1tja az \u00fctk\u00f6z\u00e9st, m\u00e9g d\u00f6nthet a priorit\u00e1sokr\u00f3l, bevonhat egy m\u00e1sik alkalmas er\u0151forr\u00e1st, vagy fel\u00fclvizsg\u00e1lhatja a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t, miel\u0151tt az utols\u00f3 pillanatban \u00e9rn\u00e9 meglepet\u00e9s.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00c9p\u00edtse be a r\u00f6gz\u00edtett ut\u00f3munk\u00e1t a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si tervbe a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A SkyPlanner egyes\u00edti a gy\u00e1rt\u00e1si id\u0151k r\u00f6gz\u00edt\u00e9s\u00e9t, a r\u00e9szletes jelent\u00e9seket \u00e9s a mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u00e9st. Ahol az ut\u00f3munka rendszeresen felbor\u00edtja a kisz\u00e1ll\u00edt\u00e1sokat, ott ez a hasznos k\u00f6vetkez\u0151 l\u00e9p\u00e9s: l\u00e1that\u00f3v\u00e1 tenni a hib\u00e1s darabok helyrehoz\u00e1s\u00e1hoz sz\u00fcks\u00e9ges r\u00e1ford\u00edt\u00e1st, \u00e9s a j\u00f3v\u00e1hagyott jav\u00edt\u00e1si munk\u00e1knak re\u00e1lis helyet tal\u00e1lni a vev\u0151i megrendel\u00e9sek mellett.<\/p>\n\n\n<p>A SkyPlanner Timer id\u0151r\u00f6gz\u00edt\u0151 funkci\u00f3ja r\u00f6gz\u00edti a munkaid\u0151t, valamint a legy\u00e1rtott vagy hib\u00e1s mennyis\u00e9geket. Az All Timelogs Report r\u00e9szletes id\u0151kimutat\u00e1s\u00e1ban a bejegyz\u00e9sekhez kapcsol\u00f3d\u00f3an megjelenik a gy\u00e1rt\u00e1si feladat, a m\u0171velet, a munka\u00e1llom\u00e1s, a munkat\u00e1rs, a kezd\u00e9si \u00e9s befejez\u00e9si id\u0151, az elk\u00e9sz\u00fclt \u00e9s hib\u00e1s darabok sz\u00e1ma, a r\u00f6gz\u00edtett id\u0151 \u00e9s a megjegyz\u00e9sek. A bejegyz\u00e9sek itt ellen\u0151rizhet\u0151k, szerkeszthet\u0151k \u00e9s j\u00f3v\u00e1hagyhat\u00f3k.<\/p>\n\n\n<p>Ha a jav\u00edt\u00e1si munka azonos\u00edthat\u00f3 a gy\u00e1rt\u00e1si feladatok \u00e9s az id\u0151r\u00f6gz\u00edt\u00e9sek adatai k\u00f6z\u00f6tt, megvizsg\u00e1lhatja, mire ford\u00edtott\u00e1k a r\u00f6gz\u00edtett id\u0151t, ahelyett hogy az elveszne egy r\u00e9szletez\u00e9s n\u00e9lk\u00fcli napi \u00f6sszes\u00edt\u00e9sben. Az FPY kisz\u00e1m\u00edt\u00e1s\u00e1hoz \u0151rizze meg a min\u0151s\u00e9g\u00fcgyi vagy MES-nyilv\u00e1ntart\u00e1sokb\u00f3l az els\u0151re t\u00f6rt\u00e9n\u0151 elfogad\u00e1s \u00e9s az ut\u00f3munka el\u0151zm\u00e9nyeit. Ezekb\u0151l der\u00fcl ki a min\u0151s\u00e9gi eredm\u00e9ny; a hozz\u00e1juk kapcsol\u00f3d\u00f3 id\u0151adatok pedig a helyrehoz\u00e1s r\u00e1ford\u00edt\u00e1s\u00e1t mutatj\u00e1k meg.<\/p>\n\n\n<p>Ezut\u00e1n vegye fel az \u00fctemtervbe a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-munkalap\/\">j\u00f3v\u00e1hagyott jav\u00edt\u00e1si m\u0171veleteket<\/a>, azok id\u0151tartam\u00e1t \u00e9s az elv\u00e9gz\u00e9s\u00fckre alkalmas er\u0151forr\u00e1sokat. A SkyPlanner \u00fctemez\u00e9st v\u00e9gz\u0151 mesters\u00e9ges intelligenci\u00e1ja, az Arcturus a be\u00e1ll\u00edtott kapacit\u00e1s, a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek \u00e9s a priorit\u00e1sok alapj\u00e1n sz\u00e1m\u00edtja ki az \u00fctemez\u00e9st. A Gantt-id\u0151vonalon l\u00e1that\u00f3 az \u00edgy kialakul\u00f3 sorrend \u00e9s a befejez\u00e9si id\u0151pontok. A priorit\u00e1sokat \u00e9s a fel\u00fcl\u00edr\u00e1st\u00f3l v\u00e9dett d\u00f6nt\u00e9seket \u00d6n hat\u00e1rozza meg; az \u00f6sszef\u00fcgg\u0151 \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat az Arcturus v\u00e9gzi el.<\/p>\n\n\n<p>A p\u00e9ldabeli t\u00e9teln\u00e9l m\u00e1r konkr\u00e9t a k\u00e9rd\u00e9s: hov\u00e1 f\u00e9r be tov\u00e1bbi nyolc g\u00e9p\u00f3r\u00e1nyi megmunk\u00e1l\u00e1s, \u00e9s mi t\u00f6rt\u00e9nik az adott er\u0151forr\u00e1sra m\u00e1r be\u00fctemezett rendel\u00e9sekkel? A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">k\u00f6z\u00f6s \u00fctemterv<\/a> \u00fajrasz\u00e1m\u00edt\u00e1sa l\u00e1that\u00f3v\u00e1 teszi a kompromisszumot an\u00e9lk\u00fcl, hogy minden \u00e9rintett munka\u00e1llom\u00e1s k\u00fcl\u00f6n v\u00e1r\u00f3list\u00e1j\u00e1t k\u00e9zzel kellene m\u00f3dos\u00edtani.<\/p>\n\n\n<p>A SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3. Megtarthatja a rendel\u00e9seket \u00e9s a min\u0151s\u00e9g\u00fcgyi el\u0151zm\u00e9nyeket t\u00e1rol\u00f3 rendszereit, mik\u00f6zben az azokb\u00f3l sz\u00e1rmaz\u00f3 munk\u00e1kat bekapcsolja a v\u00e9ges kapacit\u00e1s\u00fa gy\u00e1rt\u00e1s\u00fctemez\u00e9sbe.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e9zze meg, hogyan hatnak a kisz\u00e1ll\u00edt\u00e1sokra az els\u0151re nem megfelel\u0151 darabok<\/h2>\n\n\n<p>V\u00e1lasszon egy olyan m\u0171veletet, amelyn\u00e9l a v\u00e9g\u00fcl elfogadott darabsz\u00e1m rendszeresen elfedi a t\u00f6bbletmunk\u00e1t. Hozza el az els\u0151 pr\u00f3b\u00e1lkoz\u00e1s eredm\u00e9nyeit, egy jellemz\u0151, j\u00f3v\u00e1hagyott jav\u00edt\u00e1si m\u0171veleti \u00fatvonalat \u00e9s egy \u00e9rintett vev\u0151i megrendel\u00e9st a SkyPlanner bemutat\u00f3j\u00e1ra.<\/p>\n\n\n<p>\u00cdgy konkr\u00e9t p\u00e9ld\u00e1b\u00f3l kiindulva l\u00e1thatja, hogyan seg\u00edthetik csapat\u00e1t a r\u00f6gz\u00edtett gy\u00e1rt\u00e1si adatok \u00e9s a k\u00f6z\u00f6s \u00fctemterv a reag\u00e1l\u00e1sban: felm\u00e9rhetik a helyrehoz\u00e1shoz sz\u00fcks\u00e9ges r\u00e1ford\u00edt\u00e1st, \u00e1ttekinthetik a kapacit\u00e1s\u00fctk\u00f6z\u00e9st, \u00e9s olyan terv alapj\u00e1n d\u00f6nthetnek a k\u00f6vetkez\u0151 kisz\u00e1ll\u00edt\u00e1sr\u00f3l, amely a m\u00e9g h\u00e1tral\u00e9v\u0151 munk\u00e1t is tartalmazza. <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, hogy \u00e1ttekints\u00fck a folyamat\u00e1t, vagy el\u0151sz\u00f6r <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka Az els\u0151re megfelelt darabok ar\u00e1nya (FPY) azoknak a daraboknak a sz\u00e1zal\u00e9kos ar\u00e1ny\u00e1t mutatja, amelyek egy meghat\u00e1rozott folyamatban m\u00e1r els\u0151re teljes\u00edtik az el\u0151\u00edrt min\u0151s\u00e9gi k\u00f6vetelm\u00e9nyeket, jav\u00edt\u00e1s, ut\u00f3munka vagy sikertelen vizsg\u00e1lat ut\u00e1ni ism\u00e9telt &#8230; <a title=\"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/\" aria-label=\"Read more about Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":104594,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-104571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>FPY: k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka<\/title>\n<meta name=\"description\" content=\"Sz\u00e1m\u00edtson FPY-t: a jav\u00edtott darab nem els\u0151re megfelel\u0151. N\u00e9zze meg az ut\u00f3munka kapacit\u00e1sig\u00e9ny\u00e9t \u00e9s azt, hogyan seg\u00edt a SkyPlanner a tervez\u00e9sben.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka\" \/>\n<meta property=\"og:description\" content=\"Sz\u00e1m\u00edtson FPY-t: a jav\u00edtott darab nem els\u0151re megfelel\u0151. N\u00e9zze meg az ut\u00f3munka kapacit\u00e1sig\u00e9ny\u00e9t \u00e9s azt, hogyan seg\u00edt a SkyPlanner a tervez\u00e9sben.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T19:34:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T19:35:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:35:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/\"},\"wordCount\":2978,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/\",\"name\":\"FPY: k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:35:43+00:00\",\"description\":\"Sz\u00e1m\u00edtson FPY-t: a jav\u00edtott darab nem els\u0151re megfelel\u0151. N\u00e9zze meg az ut\u00f3munka kapacit\u00e1sig\u00e9ny\u00e9t \u00e9s azt, hogyan seg\u00edt a SkyPlanner a tervez\u00e9sben.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elsore-megfelelt-darabok-aranya\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"FPY: k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka","description":"Sz\u00e1m\u00edtson FPY-t: a jav\u00edtott darab nem els\u0151re megfelel\u0151. N\u00e9zze meg az ut\u00f3munka kapacit\u00e1sig\u00e9ny\u00e9t \u00e9s azt, hogyan seg\u00edt a SkyPlanner a tervez\u00e9sben.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/","og_locale":"hu_HU","og_type":"article","og_title":"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka","og_description":"Sz\u00e1m\u00edtson FPY-t: a jav\u00edtott darab nem els\u0151re megfelel\u0151. N\u00e9zze meg az ut\u00f3munka kapacit\u00e1sig\u00e9ny\u00e9t \u00e9s azt, hogyan seg\u00edt a SkyPlanner a tervez\u00e9sben.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T19:34:39+00:00","article_modified_time":"2026-10-20T19:35:43+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:35:43+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/"},"wordCount":2978,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/","name":"FPY: k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:35:43+00:00","description":"Sz\u00e1m\u00edtson FPY-t: a jav\u00edtott darab nem els\u0151re megfelel\u0151. N\u00e9zze meg az ut\u00f3munka kapacit\u00e1sig\u00e9ny\u00e9t \u00e9s azt, hogyan seg\u00edt a SkyPlanner a tervez\u00e9sben.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","width":1672,"height":941,"caption":"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elsore-megfelelt-darabok-aranya\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Els\u0151re megfelelt darabok ar\u00e1nya (FPY): k\u00e9plet, p\u00e9lda \u00e9s rejtett ut\u00f3munka Az els\u0151re megfelelt darabok ar\u00e1nya (FPY) azoknak a daraboknak a sz\u00e1zal\u00e9kos ar\u00e1ny\u00e1t mutatja, amelyek egy meghat\u00e1rozott folyamatban m\u00e1r els\u0151re teljes\u00edtik az el\u0151\u00edrt min\u0151s\u00e9gi k\u00f6vetelm\u00e9nyeket, jav\u00edt\u00e1s, ut\u00f3munka vagy sikertelen vizsg\u00e1lat ut\u00e1ni ism\u00e9telt&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/104571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=104571"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/104571\/revisions"}],"predecessor-version":[{"id":104633,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/104571\/revisions\/104633"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/104594"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=104571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=104571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=104571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}