{"id":102676,"date":"2026-10-20T15:26:38","date_gmt":"2026-10-20T15:26:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102676"},"modified":"2026-10-20T15:27:49","modified_gmt":"2026-10-20T15:27:49","slug":"nyomo-es-huzo-termeles","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/","title":{"rendered":"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A nyom\u00f3 \u00e9s a h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00f6tti k\u00fcl\u00f6nbs\u00e9g abban \u00e1ll, hogy mi ad enged\u00e9lyt a gy\u00e1rt\u00e1sra. <strong>A nyom\u00f3 rendszerben a gy\u00e1rt\u00e1si terv alapj\u00e1n adj\u00e1k ki a feladatokat. A h\u00faz\u00f3 rendszerben a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9s ig\u00e9nye enged\u00e9lyezi a munk\u00e1t<\/strong>, p\u00e9ld\u00e1ul amikor az \u00f6sszeszerel\u00e9s alkatr\u00e9szeket v\u00e9telez ki. A hibrid megold\u00e1s az anyag\u00e1raml\u00e1s k\u00fcl\u00f6nb\u00f6z\u0151 pontjain elt\u00e9r\u0151 ind\u00edt\u00f3jeleket haszn\u00e1l.<\/p>\n\n\n<p>Ez a k\u00fcl\u00f6nbs\u00e9g fontosabb ann\u00e1l, hogy az \u00fczem k\u00e9szletre vagy rendel\u00e9sre gy\u00e1rt\u00f3k\u00e9nt hat\u00e1rozza-e meg mag\u00e1t. Egy k\u00e9szleten tartott cikk ut\u00e1np\u00f3tl\u00e1sa m\u0171k\u00f6dhet h\u00faz\u00f3 elven, mik\u00f6zben egy vev\u0151specifikus rendel\u00e9st k\u00f6zpontilag tervezett id\u0151pontok szerint is v\u00e9gig lehet tolni az egyes r\u00e9szlegeken.<\/p>\n\n\n<p>A gyakorlati k\u00e9rd\u00e9s az, hogy milyen jel ind\u00edtsa el az adott m\u0171veletet, \u00e9s a termel\u00e9s t\u00f6bbi r\u00e9sze k\u00e9pes-e ezt kiszolg\u00e1lni. A SkyPlanner APS a k\u00e9rd\u00e9s m\u00e1sodik r\u00e9sz\u00e9ben seg\u00edt: az \u00edgy keletkez\u0151 rendel\u00e9seket az anyagok, a kapacit\u00e1s \u00e9s a priorit\u00e1sok alapj\u00e1n k\u00f6z\u00f6s \u00fctemtervbe rendezi. Kevesebb id\u0151t kell t\u00f6lteni az egyes g\u00e9pek feladatsorainak \u00f6sszehangol\u00e1s\u00e1val, \u00e9s v\u00e1ltoz\u00e1s eset\u00e9n vil\u00e1gosabban l\u00e1tszik, hogyan alakulnak a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s r\u00f6viden<\/h2>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>D\u00f6nt\u00e9si szempont<\/th><th>Nyom\u00f3 termel\u00e9s<\/th><th>H\u00faz\u00f3 termel\u00e9s<\/th><\/tr><\/thead><tbody><tr><td>Mi enged\u00e9lyezi a munk\u00e1t?<\/td><td>Tervezett gy\u00e1rt\u00e1sba ad\u00e1s, amely gyakran el\u0151rejelz\u00e9sen vagy visszaigazolt ig\u00e9nyen alapul<\/td><td>A k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9s k\u00e9r\u00e9se vagy egy ut\u00e1np\u00f3tl\u00e1si jel<\/td><\/tr><tr><td>Mi hat\u00e1rozza meg a mennyis\u00e9get?<\/td><td>A tervezett sz\u00fcks\u00e9glet \u00e9s a gy\u00e1rt\u00e1si t\u00e9tel m\u00e9ret\u00e9r\u0151l hozott d\u00f6nt\u00e9s<\/td><td>A jelzett sz\u00fcks\u00e9glet \u00e9s a meghat\u00e1rozott ut\u00e1np\u00f3tl\u00e1si szab\u00e1ly<\/td><\/tr><tr><td>Hogyan kezelik a k\u00e9szleteket?<\/td><td>A k\u00e9szleteket \u00e9s a gy\u00e1rt\u00e1sba ad\u00e1st el\u0151re megtervezik; t\u00f6bblet halmoz\u00f3dhat fel, ha a terv szerinti termel\u00e9s meghaladja a felhaszn\u00e1l\u00e1st<\/td><td>Lehet k\u00e9szlet, de az ut\u00e1np\u00f3tl\u00e1s meghat\u00e1rozott szab\u00e1lyok szerint k\u00f6veti az ig\u00e9nyt<\/td><\/tr><tr><td>Hol lehet megfelel\u0151?<\/td><td>El\u0151zetes el\u0151k\u00e9sz\u00edt\u00e9st vagy tervezett gy\u00e1rt\u00e1si kamp\u00e1nyokat ig\u00e9nyl\u0151, illetve hossz\u00fa \u00e1tfut\u00e1si idej\u0171 munk\u00e1kn\u00e1l<\/td><td>Olyan folyamatokn\u00e1l, ahol egy\u00e9rtelm\u0171ek az ig\u00e9nyjelz\u00e9sek, \u00e9s az ut\u00e1np\u00f3tl\u00e1s l\u00e9p\u00e9st tud tartani vel\u00fck<\/td><\/tr><tr><td>Mi a f\u0151 kock\u00e1zat?<\/td><td>T\u00fal kor\u00e1n gy\u00e1rtanak, vagy t\u00f6bb munk\u00e1t adnak tov\u00e1bb, mint amennyit a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9s fel tud dolgozni<\/td><td>Egy elmaradt jelz\u00e9s vagy lass\u00fa ut\u00e1np\u00f3tl\u00e1s miatt hi\u00e1ny l\u00e9p fel a k\u00f6vetkez\u0151 m\u0171veletn\u00e9l<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Egyik megk\u00f6zel\u00edt\u00e9s sem teremt kapacit\u00e1st. A h\u00faz\u00f3 rendszer jelz\u00e9se azt mutatja, hogy munk\u00e1ra van sz\u00fcks\u00e9g, de nem biztos\u00edt \u00fajabb m\u0171szakot egy k\u00f6z\u00f6sen haszn\u00e1lt g\u00e9phez. A nyom\u00f3 rendszer terve id\u0151pontokat ad, de nem teszi el\u00e9rhet\u0151v\u00e9 a hi\u00e1nyz\u00f3 anyagot.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hogyan m\u0171k\u00f6dik a nyom\u00f3 termel\u00e9s?<\/h2>\n\n\n<p>A nyom\u00f3 termel\u00e9sben a terv hat\u00e1rozza meg, mikor adj\u00e1k gy\u00e1rt\u00e1sba a munk\u00e1t. A terv alapja lehet \u00e9rt\u00e9kes\u00edt\u00e9si el\u0151rejelz\u00e9s, visszaigazolt rendel\u00e9s, f\u0151 gy\u00e1rt\u00e1si \u00fctemterv vagy MRP-vel kisz\u00e1m\u00edtott anyagsz\u00fcks\u00e9glet. A r\u00e9szlegek megkapj\u00e1k a tervezett mennyis\u00e9geket \u00e9s id\u0151pontokat, majd tov\u00e1bbadj\u00e1k a munk\u00e1t a k\u00f6vetkez\u0151 m\u0171veletnek.<\/p>\n\n\n<p>Az el\u0151zetes tervez\u00e9s \u00e9rt\u00e9kes, ha a beszerz\u00e9s vagy a gy\u00e1rt\u00e1s tov\u00e1bb tart, mint amennyit a vev\u0151k hajland\u00f3k v\u00e1rni. A k\u00f6lts\u00e9ges \u00e1t\u00e1ll\u00e1sokhoz igazod\u00f3 gy\u00e1rt\u00e1si kamp\u00e1nyok megszervez\u00e9s\u00e9t is seg\u00edti. Az \u00e1ltal\u00e1nosan haszn\u00e1lt t\u00e9telek m\u00e1r azel\u0151tt elk\u00e9sz\u00edthet\u0151k, hogy a v\u00e9gs\u0151 ig\u00e9ny pontosan ismert lenne, \u00edgy nem kell minden tev\u00e9kenys\u00e9get a vev\u0151 \u00e1ltal megengedett sz\u00e1ll\u00edt\u00e1si id\u0151be beszor\u00edtani.<\/p>\n\n\n<p>Vesz\u00e9lyes, ha a tervezett gy\u00e1rt\u00e1sba ad\u00e1s \u00f6nmag\u00e1ban elegend\u0151 indok a termel\u00e9sre, f\u00fcggetlen\u00fcl att\u00f3l, mi t\u00f6rt\u00e9nik a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9sekben. Ha a megmunk\u00e1l\u00e1s tov\u00e1bbra is ell\u00e1t egy le\u00e1llt \u00f6sszeszerel\u0151 ter\u00fcletet, a t\u00f6bblettermel\u00e9s nem teljes\u00edtett sz\u00e1ll\u00edt\u00e1st, hanem v\u00e1rakoz\u00f3 k\u00e9szletet eredm\u00e9nyez. Az el\u0151rejelz\u00e9si hib\u00e1k miatt a k\u00e9szlet \u00f6sszet\u00e9tele is elt\u00e9rhet a sz\u00fcks\u00e9gest\u0151l.<\/p>\n\n\n<p>A nyom\u00f3 termel\u00e9shez ez\u00e9rt nem el\u00e9g egy ind\u00edt\u00e1si napt\u00e1r. Re\u00e1lis mennyis\u00e9gekre, a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9sek kapacit\u00e1s\u00e1nak ismeret\u00e9re \u00e9s a sorrend m\u00f3dos\u00edt\u00e1s\u00e1nak lehet\u0151s\u00e9g\u00e9re is sz\u00fcks\u00e9g van, ha v\u00e1ltoznak a k\u00f6r\u00fclm\u00e9nyek. Az, hogy minden g\u00e9p dolgozik, nem ugyanaz, mint hogy elk\u00e9sz\u00fcl az, amire a vev\u0151knek sz\u00fcks\u00e9g\u00fck van.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hogyan m\u0171k\u00f6dik a h\u00faz\u00f3 termel\u00e9s?<\/h2>\n\n\n<p>A h\u00faz\u00f3 termel\u00e9sben a k\u00f6vetkez\u0151 folyamat jelzi az el\u0151z\u0151nek, hogy mire van sz\u00fcks\u00e9ge. Ism\u00e9tl\u0151d\u0151en gy\u00e1rtott alkatr\u00e9szekn\u00e9l ez gyakran egy szab\u00e1lyozott k\u00e9szletpont, m\u00e1s n\u00e9ven szupermarket ut\u00e1np\u00f3tl\u00e1s\u00e1t jelenti. Az \u00f6sszeszerel\u00e9s alkatr\u00e9szeket v\u00e9telez ki, majd egy k\u00e1rtya, \u00fcres t\u00e1rol\u00f3 vagy elektronikus jelz\u00e9s ad enged\u00e9lyt a p\u00f3tl\u00e1sukra.<\/p>\n\n\n<p>A l\u00e9nyegi v\u00e1ltoz\u00e1s az enged\u00e9lyez\u00e9si szab\u00e1lyban van. Egy kor\u00e1bbi m\u0171velet nem gy\u00e1rt tov\u00e1bb t\u00f6bbletk\u00e9szletet puszt\u00e1n az\u00e9rt, mert van szabad kapacit\u00e1sa. A termel\u00e9s a meghat\u00e1rozott ig\u00e9nyjelz\u00e9st k\u00f6veti.<\/p>\n\n\n<p>Ez cs\u00f6kkentheti a t\u00faltermel\u00e9st, a felesleges anyagmozgat\u00e1st \u00e9s a k\u00e9szletekben lek\u00f6t\u00f6tt t\u0151k\u00e9t. A lass\u00fa vagy megb\u00edzhatatlan folyamatokat is nehezebb nagy k\u00e9szlethalmazok m\u00f6g\u00e9 rejteni. A pufferk\u00e9szletet \u00e9s az ut\u00e1np\u00f3tl\u00e1s m\u0171k\u00f6d\u00e9s\u00e9t azonban egy\u00fctt kell megtervezni. Ha az alkatr\u00e9szek p\u00f3tl\u00e1sa tov\u00e1bb tart, mint ameddig a rendelkez\u00e9sre \u00e1ll\u00f3 k\u00e9szlet elegend\u0151, a k\u00f6vetkez\u0151 m\u0171veletn\u00e9l hi\u00e1ny l\u00e9p fel.<\/p>\n\n\n<p>A h\u00faz\u00f3 termel\u00e9s nem jelenti a tervez\u00e9s elhagy\u00e1s\u00e1t. Tov\u00e1bbra is meg kell tervezni a kapacit\u00e1st, a besz\u00e1ll\u00edt\u00f3i ell\u00e1t\u00e1st, a mennyis\u00e9geket \u00e9s az ig\u00e9nycs\u00facsok kezel\u00e9s\u00e9t. A hossz\u00fa \u00e1t\u00e1ll\u00e1sok, a megb\u00edzhatatlan folyamatok vagy a sok ritk\u00e1n haszn\u00e1lt v\u00e1ltozat megnehez\u00edtheti egy egyszer\u0171 k\u00e9szlet-ut\u00e1np\u00f3tl\u00e1si k\u00f6r m\u0171k\u00f6dtet\u00e9s\u00e9t. Ilyen k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt a megfelel\u0151 ir\u00e1ny\u00edt\u00e1si m\u00f3dot kell kiv\u00e1lasztani, nem pedig minden alkatr\u00e9szre ugyanazt a szab\u00e1lyt alkalmazni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">H\u00e1rom k\u00fcl\u00f6nbs\u00e9g, amely seg\u00edt elker\u00fclni a rossz d\u00f6nt\u00e9st<\/h2>\n\n\n<h3 class=\"wp-block-heading\">A nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s nem azonos a k\u00e9szletre gy\u00e1rt\u00e1ssal (MTS) \u00e9s a rendel\u00e9sre gy\u00e1rt\u00e1ssal (MTO)<\/h3>\n\n\n<p>A k\u00e9szletre gy\u00e1rt\u00e1s (MTS) \u00e9s a rendel\u00e9sre gy\u00e1rt\u00e1s (MTO) azt \u00edrja le, hogyan kapcsol\u00f3dik a termel\u00e9s a vev\u0151i megrendel\u00e9sekhez. A nyom\u00f3 \u00e9s h\u00faz\u00f3 elv azt hat\u00e1rozza meg, hogyan enged\u00e9lyezik a munk\u00e1t a gy\u00e1rt\u00e1si folyamat ment\u00e9n.<\/p>\n\n\n<p>Egy k\u00e9szletre gy\u00e1rtott alkatr\u00e9sz ut\u00e1np\u00f3tl\u00e1sa m\u0171k\u00f6dhet h\u00faz\u00f3 elven: a k\u00e9szterm\u00e9kk\u00e9szletb\u0151l t\u00f6rt\u00e9n\u0151 kiv\u00e9telez\u00e9s ind\u00edtja el a p\u00f3tl\u00e1st. Ezzel szemben egy rendel\u00e9sre gy\u00e1rt\u00f3 \u00fczem minden m\u0171veletet k\u00f6zponti \u00fctemterv alapj\u00e1n adhat ki, tov\u00e1bbtolva a munk\u00e1t a k\u00f6vetkez\u0151 r\u00e9szleghez akkor is, ha az m\u00e1r teljesen leterhelt.<\/p>\n\n\n<p>A vev\u0151i megrendel\u00e9s be\u00e9rkez\u00e9se r\u00f6gz\u00edti az ig\u00e9nyt. Az \u00fczemen bel\u00fcli ir\u00e1ny\u00edt\u00e1s meg\u00e9rt\u00e9s\u00e9hez azt is meg kell vizsg\u00e1lni, hogy mi enged\u00e9lyezi az egyes tov\u00e1bbi \u00e1tad\u00e1sokat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A h\u00faz\u00f3 termel\u00e9s nem jelent nulla k\u00e9szletet<\/h3>\n\n\n<p>A szupermarket-elv\u0171 h\u00faz\u00f3 rendszer tudatosan tart k\u00e9szletet. A c\u00e9l az, hogy a k\u00e9szlet meghat\u00e1rozott c\u00e9lt szolg\u00e1ljon, \u00e9s a felhaszn\u00e1lt mennyis\u00e9get p\u00f3tolj\u00e1k, ne pedig \u00fagy gy\u00e1rtsanak k\u00e9szletre, hogy arra a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9snek nincs sz\u00fcks\u00e9ge.<\/p>\n\n\n<p>Az alapanyagok, az ut\u00e1np\u00f3tl\u00e1si k\u00e9szletek \u00e9s a befejezetlen termel\u00e9s tov\u00e1bbra is \u00e9szszer\u0171 szab\u00e1lyoz\u00e1st ig\u00e9nyelnek. Ha a pufferk\u00e9szletet azel\u0151tt sz\u00fcntetik meg, hogy az ut\u00e1np\u00f3tl\u00e1s megb\u00edzhat\u00f3v\u00e1 v\u00e1lna, a k\u00e9szletprobl\u00e9ma hely\u00e9t sz\u00e1ll\u00edt\u00e1si probl\u00e9ma veheti \u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A visszafel\u00e9 \u00fctemez\u00e9s nem azonos a h\u00faz\u00f3 termel\u00e9ssel<\/h3>\n\n\n<p>A visszafel\u00e9 \u00fctemez\u00e9s az elv\u00e1rt befejez\u00e9si id\u0151pontb\u00f3l visszasz\u00e1molva hat\u00e1rozza meg, mikor kell elv\u00e9gezni a m\u0171veleteket. A h\u00faz\u00f3 elv azt hat\u00e1rozza meg, mi enged\u00e9lyezi a gy\u00e1rt\u00e1st. A kett\u0151 m\u00e1s-m\u00e1s k\u00e9rd\u00e9sre ad v\u00e1laszt.<\/p>\n\n\n<p>Egy gy\u00e1rt\u00e1si feladatot a sz\u00e1ll\u00edt\u00e1s id\u0151pontj\u00e1hoz k\u00f6zelre is lehet \u00fctemezni \u00fagy, hogy tov\u00e1bbra is k\u00f6zponti terv alapj\u00e1n adj\u00e1k ki. Ugyan\u00edgy a h\u00faz\u00f3 elven ind\u00edtott ut\u00e1np\u00f3tl\u00e1si feladatnak is helyet kell tal\u00e1lni az \u00fctemtervben, miut\u00e1n be\u00e9rkezett a jelz\u00e9s. Az ind\u00edt\u00f3jel \u00e9s az id\u0151z\u00edt\u00e9s kiv\u00e1laszt\u00e1sa \u00f6sszef\u00fcgg\u0151, de nem felcser\u00e9lhet\u0151 d\u00f6nt\u00e9s.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hibrid p\u00e9lda: k\u00f6z\u00f6s alkatr\u00e9szek, egyedi vev\u0151i ig\u00e9nyek<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3t, amely ipari szivatty\u00fak term\u00e9kcsal\u00e1dj\u00e1t \u00e1ll\u00edtja el\u0151. T\u00f6bb modellhez ugyanazt a megmunk\u00e1lt h\u00e1zat haszn\u00e1lj\u00e1k, de a t\u00f6m\u00edt\u00e9sek \u00e9s a v\u00e9gs\u0151 kialak\u00edt\u00e1s elt\u00e9rnek.<\/p>\n\n\n<p>A v\u00e1llalat el\u0151re megtervezi a h\u00e1zak gy\u00e1rt\u00e1s\u00e1t, mert a megmunk\u00e1l\u00e1s \u00e9s az ehhez k\u00f6z\u00f6sen haszn\u00e1lt berendez\u00e9sek el\u0151k\u00e9sz\u00edt\u00e9st ig\u00e9nyelnek. A h\u00e1zakat az elfogadott gy\u00e1rt\u00e1si terv szerint, nyom\u00f3 elven adj\u00e1k gy\u00e1rt\u00e1sba. Az \u00f6sszeszerel\u00e9sn\u00e9l a gyakran haszn\u00e1lt t\u00f6m\u00edt\u00e9sk\u00e9szleteket szab\u00e1lyozott ut\u00e1np\u00f3tl\u00e1si ter\u00fcleten t\u00e1rolj\u00e1k. Egy t\u00e1rol\u00f3 kiv\u00e9telez\u00e9se jelz\u00e9st ad az adott mennyis\u00e9g p\u00f3tl\u00e1s\u00e1ra: ez a k\u00f6r h\u00faz\u00f3 elven m\u0171k\u00f6dik, annak ellen\u00e9re, hogy k\u00e9szletet tart.<\/p>\n\n\n<p>A szivatty\u00fa v\u00e9gs\u0151 kialak\u00edt\u00e1s\u00e1t a vev\u0151i megrendel\u00e9sek hat\u00e1rozz\u00e1k meg. A csapat el\u0151re elk\u00e9sz\u00edtheti a k\u00f6z\u00f6s h\u00e1zakat an\u00e9lk\u00fcl, hogy minden k\u00e9szterm\u00e9kv\u00e1ltozat ig\u00e9ny\u00e9t meg kellene j\u00f3solnia, mik\u00f6zben a v\u00e9gterm\u00e9ket t\u00e9nyleges ig\u00e9nyre konfigur\u00e1lja. Ett\u0151l m\u00e9g meg kell hat\u00e1rozni az \u00f6sszeszerel\u00e9si munka enged\u00e9lyez\u00e9s\u00e9nek \u00e9s sorrendj\u00e9nek szab\u00e1lyait, nem pedig abb\u00f3l kiindulni, hogy a rendel\u00e9s \u00f6nmag\u00e1ban minden \u00e1tad\u00e1st szab\u00e1lyoz.<\/p>\n\n\n<p>Egy\u00e9rtelm\u0171en el kell hat\u00e1rolni a k\u00e9tf\u00e9le ir\u00e1ny\u00edt\u00e1st: h\u00e1ny h\u00e1z gy\u00e1rt\u00e1s\u00e1t \u00edrja el\u0151 a terv, h\u00e1ny t\u00f6m\u00edt\u00e9sk\u00e9szlet p\u00f3tl\u00e1s\u00e1t ind\u00edtj\u00e1k el a kiv\u00e9telez\u00e9si jelz\u00e9sek, \u00e9s ki kezeli a kiv\u00e9teleket? A hibrid megold\u00e1s akkor hasznos, ha minden jelz\u00e9snek meghat\u00e1rozott szerepe van. Zavart okoz viszont, ha ugyanannak az ig\u00e9nynek a kiel\u00e9g\u00edt\u00e9s\u00e9re a tervez\u0151 is kiad egy p\u00f3tl\u00e1si feladatot, \u00e9s az ut\u00e1np\u00f3tl\u00e1si jelz\u00e9s is l\u00e9trehoz egyet.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy egy h\u00e1zakb\u00f3l \u00e1ll\u00f3 gy\u00e1rt\u00e1si t\u00e9telnek \u00e9s egy s\u00fcrg\u0151s ut\u00e1np\u00f3tl\u00e1si feladatnak ugyanarra az er\u0151forr\u00e1sra van sz\u00fcks\u00e9ge. Mindkett\u0151 enged\u00e9lyezett lehet, de egyszerre nem foglalhatj\u00e1k le ugyanazt az er\u0151forr\u00e1st. Ezen a ponton v\u00e1lik az ir\u00e1ny\u00edt\u00e1si m\u00f3d megv\u00e1laszt\u00e1sa \u00fctemez\u00e9si k\u00e9rd\u00e9ss\u00e9.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hogyan v\u00e1lasszuk ki a megfelel\u0151 gy\u00e1rt\u00e1si ind\u00edt\u00f3jelet?<\/h2>\n\n\n<p>Induljon ki egy term\u00e9kcsal\u00e1db\u00f3l, \u00e9s k\u00f6vesse v\u00e9gig annak gy\u00e1rt\u00e1si \u00fatvonal\u00e1t. Az eg\u00e9sz \u00fczemre alkalmazott c\u00edmk\u00e9n\u00e9l t\u00f6bbet \u00e9r, ha minden fontos \u00e1tad\u00e1sn\u00e1l egy\u00e9rtelm\u0171 szab\u00e1ly \u00e9rv\u00e9nyes\u00fcl.<\/p>\n\n\n<p>1. <strong>Azonos\u00edtsa, milyen ig\u00e9nyt szolg\u00e1l ki a m\u0171velet.<\/strong> \u00c1ltal\u00e1nosan haszn\u00e1lt t\u00e9teleket k\u00e9sz\u00edt el\u0151 a v\u00e1rhat\u00f3 ig\u00e9nyre, felhaszn\u00e1lt k\u00e9szletet p\u00f3tol, vagy egy konkr\u00e9t rendel\u00e9st teljes\u00edt? R\u00f6gz\u00edtse azt az esem\u00e9nyt, amely t\u00e9nylegesen enged\u00e9lyezi a munk\u00e1t.<\/p>\n\n\n<p>2. <strong>Vesse \u00f6ssze az ut\u00e1np\u00f3tl\u00e1si id\u0151t a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151vel.<\/strong> Sz\u00e1moljon a v\u00e1rakoz\u00e1ssal, az \u00e1t\u00e1ll\u00e1sokkal, a feldolgoz\u00e1ssal \u00e9s az ell\u00e1t\u00e1si k\u00e9sedelmekkel is. Ha a vev\u0151k nem tudj\u00e1k kiv\u00e1rni a teljes gy\u00e1rt\u00e1si folyamat befejez\u00e9s\u00e9t, d\u00f6ntse el, mely k\u00f6z\u00f6sen haszn\u00e1lt anyagoknak vagy alkatr\u00e9szeknek kell kor\u00e1bban rendelkez\u00e9sre \u00e1llniuk.<\/p>\n\n\n<p>3. <strong>Ellen\u0151rizze a jelz\u00e9s megb\u00edzhat\u00f3s\u00e1g\u00e1t.<\/strong> A h\u00faz\u00f3 rendszer ut\u00e1np\u00f3tl\u00e1si k\u00f6r\u00e9hez l\u00e1that\u00f3 ig\u00e9nyjelz\u00e9s, meghat\u00e1rozott mennyis\u00e9g \u00e9s kijel\u00f6lt felel\u0151s sz\u00fcks\u00e9ges. A tervvez\u00e9relt munk\u00e1hoz naprak\u00e9sz sz\u00fcks\u00e9gletek \u00e9s gy\u00e1rt\u00e1sba ad\u00e1si id\u0151pontok kellenek. El\u0151zze meg a kett\u0151s enged\u00e9lyez\u00e9st.<\/p>\n\n\n<p>4. <strong>Vizsg\u00e1lja meg, hogy a munka belef\u00e9r-e a k\u00f6z\u00f6sen haszn\u00e1lt kapacit\u00e1sba.<\/strong> Vegye figyelembe az ugyanazokat a g\u00e9peket \u00e9s dolgoz\u00f3kat ig\u00e9nybe vev\u0151 t\u00f6bbi term\u00e9kcsal\u00e1dot is. A helyi ut\u00e1np\u00f3tl\u00e1si szab\u00e1lynak \u00f6sszhangban kell lennie az \u00fczem sz\u00e1ll\u00edt\u00e1si priorit\u00e1saival.<\/p>\n\n\n<p>5. <strong>Tekintse \u00e1t, mi t\u00f6rt\u00e9nik, ha v\u00e1ltoznak a k\u00f6r\u00fclm\u00e9nyek.<\/strong> Egy k\u00e9s\u0151 anyagsz\u00e1ll\u00edt\u00e1s, g\u00e9phiba vagy ig\u00e9nycs\u00facs egy\u00e9rtelm\u0171 d\u00f6nt\u00e9shez vezessen, ne egy nem hivatalos m\u00e1sodik feladatsor kialakul\u00e1s\u00e1hoz.<\/p>\n\n\n<p>V\u00e1lasszon nyom\u00f3 termel\u00e9st ott, ahol indokolt az el\u0151zetes el\u0151k\u00e9sz\u00edt\u00e9s, h\u00faz\u00f3 termel\u00e9st ott, ahol a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9s ig\u00e9nye megb\u00edzhat\u00f3an vez\u00e9relheti az ut\u00e1np\u00f3tl\u00e1st, \u00e9s hibrid megold\u00e1st ott, ahol az egyes szakaszok elt\u00e9r\u0151 k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt m\u0171k\u00f6dnek. Ezut\u00e1n tartsa \u00f6sszhangban az enged\u00e9lyezett munk\u00e1t a v\u00e9grehajthat\u00f3 \u00fctemtervvel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tegye m\u0171k\u00f6d\u0151k\u00e9pess\u00e9 a v\u00e1lasztott megk\u00f6zel\u00edt\u00e9st a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A SkyPlanner <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">egyetlen \u00fctemez\u00e9si k\u00f6rnyezetben<\/a> fogja \u00f6ssze az \u00edgy l\u00e9trej\u00f6v\u0151 gy\u00e1rt\u00e1si rendel\u00e9seket, m\u0171veleti \u00fatvonalakat, munka\u00e1llom\u00e1sokat, m\u0171szakokat \u00e9s priorit\u00e1sokat. Az Arcturus, a rendszer \u00fctemez\u00e9s\u00e9rt felel\u0151s mesters\u00e9ges intelligenci\u00e1ja a megadott er\u0151forr\u00e1s-kapacit\u00e1sok \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek alapj\u00e1n sz\u00e1m\u00edtja ki a sorrendet. Az anyagell\u00e1t\u00e1st is figyelembe vev\u0151 \u00fctemez\u00e9s az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1val is sz\u00e1mol, \u00edgy egy hi\u00e1nyz\u00f3 alkatr\u00e9sz m\u00e1r a tervre hat\u00e1ssal van, nem pedig a g\u00e9pn\u00e9l okoz meglepet\u00e9st.<\/p>\n\n\n<p>A Gantt-\u00fctemterv megmutatja, hogy melyik er\u0151forr\u00e1sra milyen feladat ker\u00fclt, \u00e9s hogyan kapcsol\u00f3dnak egym\u00e1shoz a munk\u00e1k. A r\u00e9szlegenk\u00e9nti list\u00e1k ism\u00e9telt jav\u00edtgat\u00e1sa helyett arra \u00f6sszpontos\u00edthat, hogy melyik v\u00e1llal\u00e1s \u00e9lvezzen els\u0151bbs\u00e9get, \u00e9s a teljes gy\u00e1rt\u00e1si \u00fatvonalon l\u00e1thatja az ennek megfelel\u0151 \u00fctemez\u00e9st.<\/p>\n\n\n<p>Az id\u0151z\u00edt\u00e9s rendel\u00e9senk\u00e9nt is elt\u00e9rhet. <strong>A SkyPlanner t\u00e1mogatja a lehet\u0151 legkor\u00e1bbi v\u00e9grehajt\u00e1sra t\u00f6rekv\u0151 ASAP-\u00fctemez\u00e9st \u00e9s a rendel\u00e9s sz\u00e1ll\u00edt\u00e1si hat\u00e1ridej\u00e9hez k\u00f6zeli JIT-\u00fctemez\u00e9st is<\/strong>, valamint a kett\u0151 kombin\u00e1ci\u00f3j\u00e1t. M\u00e1sk\u00e9nt id\u0151z\u00edtheti a korai kezd\u00e9st ig\u00e9nyl\u0151 munk\u00e1t, mint azt a rendel\u00e9st, amelynek a kisz\u00e1ll\u00edt\u00e1shoz k\u00f6zelebb kell elk\u00e9sz\u00fclnie. Ez seg\u00edt elker\u00fclni a sz\u00fcks\u00e9gtelen\u00fcl korai gy\u00e1rt\u00e1st, mik\u00f6zben ott tov\u00e1bbra is lehet\u0151v\u00e9 teszi az el\u0151zetes felk\u00e9sz\u00fcl\u00e9st, ahol az hasznos.<\/p>\n\n\n<p>A gyakorlatban tov\u00e1bbra is fontos a k\u00fcl\u00f6nbs\u00e9g: a gy\u00e1rt\u00e1sba ad\u00e1si vagy ut\u00e1np\u00f3tl\u00e1si szab\u00e1ly hat\u00e1rozza meg, hogy milyen munk\u00e1ra van sz\u00fcks\u00e9g; a SkyPlanner az \u00edgy l\u00e9trej\u00f6v\u0151 rendel\u00e9seket \u00fctemezi. A JIT szerinti id\u0151z\u00edt\u00e9s nem helyettes\u00edti annak meghat\u00e1roz\u00e1s\u00e1t, hogy a folyamat k\u00e9s\u0151bbi szakasz\u00e1b\u00f3l milyen ig\u00e9nyjelz\u00e9s ind\u00edtsa el a munk\u00e1t.<\/p>\n\n\n<p>Ha v\u00e1ltoznak a priorit\u00e1sok, a kapacit\u00e1sok vagy az anyagell\u00e1t\u00e1si felt\u00e9telek, az Arcturus a megadott szab\u00e1lyok \u00e9s r\u00f6gz\u00edt\u00e9sek betart\u00e1s\u00e1val \u00fajrasz\u00e1m\u00edthatja az \u00fctemtervet. \u00cdgy naprak\u00e9szen tarthat\u00f3 tervet kap, ahelyett, hogy \u00fajra k\u00e9zzel kellene \u00e1thelyeznie a munk\u00e1kat a v\u00e1rakoz\u00e1si sorok k\u00f6z\u00f6tt. A SkyPlanner a ny\u00edlt REST API r\u00e9v\u00e9n b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3, \u00edgy a megl\u00e9v\u0151 rendel\u00e9si \u00e9s termel\u00e9si adatok beker\u00fclhetnek az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sba.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Jobb v\u00e9grehajt\u00e1s a teljes termel\u00e9si szeml\u00e9let megv\u00e1ltoztat\u00e1sa n\u00e9lk\u00fcl<\/h3>\n\n\n<p>A finn b\u00e9rforg\u00e1csol\u00f3 v\u00e1llalat, az Eskomatic p\u00e9ld\u00e1ja j\u00f3l mutatja, milyen \u00e9rt\u00e9ket jelenthet \u00f6nmag\u00e1ban az \u00fctemez\u00e9s fejleszt\u00e9se. Kor\u00e1bbi rendszer\u00fckben a munkasorokat nagyr\u00e9szt k\u00e9zzel kellett kezelni, \u00e9s az anyagell\u00e1t\u00e1s korl\u00e1tozott \u00e1tl\u00e1that\u00f3s\u00e1ga miatt nehezebb volt el\u0151re l\u00e1tni a hi\u00e1nyokat.<\/p>\n\n\n<p>A SkyPlanner bevezet\u00e9s\u00e9vel a csapat Gantt-diagramon tekintheti \u00e1t a munkasort, automatikusan \u00fctemezheti a kapacit\u00e1sterhel\u00e9st, \u00e9s tiszt\u00e1bban l\u00e1thatja az anyaghi\u00e1nyokat. <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/eskomatic\/\">Az Eskomatic besz\u00e1mol\u00f3ja szerint<\/a> pontosabban tudj\u00e1k meghat\u00e1rozni a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s ritk\u00e1bban \u00e1ll le a termel\u00e9s anyaghi\u00e1ny miatt. A tervez\u00e9s alapjai nem v\u00e1ltoztak; a napi v\u00e9grehajt\u00e1s lett \u00e1tl\u00e1that\u00f3bb \u00e9s jobban k\u00e9zben tarthat\u00f3.<\/p>\n\n\n<p>Ez j\u00f3 \u00e9rv a SkyPlanner mellett, ak\u00e1r megtartja a terv alapj\u00e1n t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1sba ad\u00e1st, ak\u00e1r kijel\u00f6lt pontokon h\u00faz\u00f3 elvet vezet be: az enged\u00e9lyezett munk\u00e1nak mindk\u00e9t esetben megb\u00edzhat\u00f3 helyet kell kapnia a gy\u00e1rt\u00e1si \u00fctemtervben.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tesztelje egy\u00fctt az ind\u00edt\u00f3jelz\u00e9st \u00e9s az \u00fctemtervet<\/h2>\n\n\n<p>V\u00e1lasszon ki egy term\u00e9kcsal\u00e1dot, hat\u00e1rozza meg, minek kell enged\u00e9lyeznie a gy\u00e1rt\u00e1s\u00e1t, \u00e9s hozzon egy k\u00f6zelm\u00faltbeli rendk\u00edv\u00fcli esetet is a megbesz\u00e9l\u00e9sre. Egy j\u00f3l fel\u00e9p\u00edtett SkyPlanner-bemutat\u00f3n v\u00e9gigk\u00f6vethet\u0151k az \u00edgy l\u00e9trej\u00f6v\u0151 rendel\u00e9sek az anyagsz\u00fcks\u00e9glet\u00fck, a k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1saik \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1ridej\u00fck alapj\u00e1n. Az is megvizsg\u00e1lhat\u00f3, hogyan hat az \u00fctemtervre egy priorit\u00e1s vagy egy er\u0151forr\u00e1s megv\u00e1ltoz\u00e1sa.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s n\u00e9zze meg, hogyan m\u0171k\u00f6dne ez az \u00d6n \u00fczem\u00e9ben. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t mintaadatokkal<\/a>. Nem az a c\u00e9l, hogy a termel\u00e9s min\u00e9l tiszt\u00e1bban megfeleljen a nyom\u00f3 vagy a h\u00faz\u00f3 elv c\u00edmk\u00e9j\u00e9nek. Hanem az, hogy kevesebb legyen a sz\u00fcks\u00e9gtelen\u00fcl kor\u00e1n elv\u00e9gzett munka \u00e9s a munkasorok k\u00e9zi karbantart\u00e1sa, valamint \u00e1tl\u00e1that\u00f3bb\u00e1 v\u00e1ljon, hogyan teljes\u00edthet\u0151k a v\u00e1llalt sz\u00e1ll\u00edt\u00e1sok.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st? Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st? A nyom\u00f3 \u00e9s a h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00f6tti k\u00fcl\u00f6nbs\u00e9g abban \u00e1ll, hogy mi ad enged\u00e9lyt a gy\u00e1rt\u00e1sra. A nyom\u00f3 rendszerben a gy\u00e1rt\u00e1si terv alapj\u00e1n adj\u00e1k ki a feladatokat. A h\u00faz\u00f3 rendszerben a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9s &#8230; <a title=\"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/\" aria-label=\"Read more about Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":102723,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-102676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?<\/title>\n<meta name=\"description\" content=\"Mikor v\u00e1lasszon nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00fcl, vagy \u00f6tv\u00f6zze \u0151ket? Hangolja \u00f6ssze az ind\u00edt\u00f3jelet az anyagokkal, kapacit\u00e1ssal, hat\u00e1rid\u0151kkel a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?\" \/>\n<meta property=\"og:description\" content=\"Mikor v\u00e1lasszon nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00fcl, vagy \u00f6tv\u00f6zze \u0151ket? Hangolja \u00f6ssze az ind\u00edt\u00f3jelet az anyagokkal, kapacit\u00e1ssal, hat\u00e1rid\u0151kkel a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T15:26:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T15:27:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?\",\"datePublished\":\"2026-10-20T15:26:38+00:00\",\"dateModified\":\"2026-10-20T15:27:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/\"},\"wordCount\":3468,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/\",\"name\":\"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"datePublished\":\"2026-10-20T15:26:38+00:00\",\"dateModified\":\"2026-10-20T15:27:49+00:00\",\"description\":\"Mikor v\u00e1lasszon nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00fcl, vagy \u00f6tv\u00f6zze \u0151ket? Hangolja \u00f6ssze az ind\u00edt\u00f3jelet az anyagokkal, kapacit\u00e1ssal, hat\u00e1rid\u0151kkel a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/push-vs-pull-manufacturing-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Planned batches and a downstream replenishment request illustrate push and pull manufacturing signals.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/nyomo-es-huzo-termeles\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?","description":"Mikor v\u00e1lasszon nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00fcl, vagy \u00f6tv\u00f6zze \u0151ket? Hangolja \u00f6ssze az ind\u00edt\u00f3jelet az anyagokkal, kapacit\u00e1ssal, hat\u00e1rid\u0151kkel a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/","og_locale":"hu_HU","og_type":"article","og_title":"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?","og_description":"Mikor v\u00e1lasszon nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00fcl, vagy \u00f6tv\u00f6zze \u0151ket? Hangolja \u00f6ssze az ind\u00edt\u00f3jelet az anyagokkal, kapacit\u00e1ssal, hat\u00e1rid\u0151kkel a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T15:26:38+00:00","article_modified_time":"2026-10-20T15:27:49+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?","datePublished":"2026-10-20T15:26:38+00:00","dateModified":"2026-10-20T15:27:49+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/"},"wordCount":3468,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/","name":"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","datePublished":"2026-10-20T15:26:38+00:00","dateModified":"2026-10-20T15:27:49+00:00","description":"Mikor v\u00e1lasszon nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00fcl, vagy \u00f6tv\u00f6zze \u0151ket? Hangolja \u00f6ssze az ind\u00edt\u00f3jelet az anyagokkal, kapacit\u00e1ssal, hat\u00e1rid\u0151kkel a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png","width":1672,"height":941,"caption":"Planned batches and a downstream replenishment request illustrate push and pull manufacturing signals."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/nyomo-es-huzo-termeles\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/push-vs-pull-manufacturing-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st? Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Nyom\u00f3 \u00e9s h\u00faz\u00f3 termel\u00e9s: mi ind\u00edtsa el a gy\u00e1rt\u00e1st? A nyom\u00f3 \u00e9s a h\u00faz\u00f3 termel\u00e9s k\u00f6z\u00f6tti k\u00fcl\u00f6nbs\u00e9g abban \u00e1ll, hogy mi ad enged\u00e9lyt a gy\u00e1rt\u00e1sra. A nyom\u00f3 rendszerben a gy\u00e1rt\u00e1si terv alapj\u00e1n adj\u00e1k ki a feladatokat. A h\u00faz\u00f3 rendszerben a k\u00f6vetkez\u0151 folyamatl\u00e9p\u00e9s&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/102676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=102676"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/102676\/revisions"}],"predecessor-version":[{"id":103419,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/102676\/revisions\/103419"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/102723"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=102676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=102676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=102676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}