{"id":102409,"date":"2026-10-20T11:42:15","date_gmt":"2026-10-20T11:42:15","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102409"},"modified":"2026-10-20T11:43:06","modified_gmt":"2026-10-20T11:43:06","slug":"utemido","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/","title":{"rendered":"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; \u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Az \u00fctemid\u0151 a vev\u0151i ig\u00e9ny teljes\u00edt\u00e9s\u00e9hez sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si temp\u00f3t fejezi ki: megmutatja, hogy a rendelkez\u00e9sre \u00e1ll\u00f3 gy\u00e1rt\u00e1si id\u0151b\u0151l mennyi jut egy ig\u00e9nyelt, megfelel\u0151 min\u0151s\u00e9g\u0171 darabra. A k\u00e9tperces \u00fctemid\u0151 azt jelenti, hogy ebben az id\u0151szakban a folyamatnak \u00e1tlagosan k\u00e9tpercenk\u00e9nt kell egy j\u00f3 darabot kibocs\u00e1tania.<\/p>\n\n\n<p>A sz\u00e1m\u00edt\u00e1s egyszer\u0171. Az igaz\u00e1n fontos k\u00e9rd\u00e9s ezut\u00e1n k\u00f6vetkezik: a g\u00e9pek, a dolgoz\u00f3k \u00e9s a gy\u00e1rt\u00e1si \u00fatvonal lehet\u0151v\u00e9 teszik ezt a temp\u00f3t?<\/p>\n\n\n<p>Az ig\u00e9nyelt mennyis\u00e9g meghat\u00e1roz\u00e1sa \u00f6nmag\u00e1ban nem foglal le g\u00e9pet, \u00e9s az \u00e1t\u00e1ll\u00e1st sem teszi feleslegess\u00e9. A SkyPlanner APS r\u00e9szletes gy\u00e1rt\u00e1si \u00fctemtervbe illeszti a sz\u00fcks\u00e9ges mennyis\u00e9geket. \u00cdgy l\u00e1thatja, hogyan terheli a munka az er\u0151forr\u00e1sokat, \u00e9s reag\u00e1lhat, ha v\u00e1ltozik az ig\u00e9ny vagy az er\u0151forr\u00e1sok rendelkez\u00e9sre \u00e1ll\u00e1sa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az \u00fctemid\u0151 k\u00e9plete<\/h2>\n\n\n<p><strong>\u00dctemid\u0151 = rendelkez\u00e9sre \u00e1ll\u00f3 gy\u00e1rt\u00e1si id\u0151 \u00f7 vev\u0151i ig\u00e9ny<\/strong><\/p>\n\n\n<p>Mindk\u00e9t adat ugyanarra az id\u0151szakra vonatkozzon. A m\u0171szakonk\u00e9nt rendelkez\u00e9sre \u00e1ll\u00f3 perceket a m\u0171szakonk\u00e9nt ig\u00e9nyelt darabsz\u00e1mmal ossza el, a heti \u00f3rasz\u00e1mot pedig a heti darabsz\u00e1mmal. Az eredm\u00e9ny az egy darabra jut\u00f3 id\u0151, nem pedig az \u00f3r\u00e1nk\u00e9nti darabsz\u00e1m.<\/p>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3cell\u00e1t, amely nyolc\u00f3r\u00e1s m\u0171szakban dolgozik. A sz\u00fcnetek \u00e9s az egy\u00e9b, el\u0151re meghat\u00e1rozott munkamentes id\u0151szakok \u00f6sszesen 60 percet tesznek ki, \u00edgy 420 perc \u00e1ll rendelkez\u00e9sre. A vev\u0151k m\u0171szakonk\u00e9nt 210 j\u00f3 darabot ig\u00e9nyelnek ett\u0151l a cell\u00e1t\u00f3l.<\/p>\n\n\n<p><strong>420 perc \u00f7 210 darab = 2 perc\/darab<\/strong><\/p>\n\n\n<p>Ez darabonk\u00e9nt 120 m\u00e1sodperc, vagyis a rendelkez\u00e9sre \u00e1ll\u00f3 gy\u00e1rt\u00e1si id\u0151 minden \u00f3r\u00e1j\u00e1ban \u00e1tlagosan 30 darabot kell kibocs\u00e1tani. Ez nem a teljes nyolc\u00f3r\u00e1s m\u0171szakra sz\u00e1m\u00edtott \u00e1tlag, hiszen abban a munkamentes id\u0151szakok is benne vannak.<\/p>\n\n\n<p>A k\u00e9tperces \u00e9rt\u00e9k azt mutatja meg, milyen temp\u00f3t k\u00edv\u00e1n meg az ig\u00e9ny. Arr\u00f3l nem ad inform\u00e1ci\u00f3t, hogy a cella jelenleg milyen gyorsan dolgozik, vagy hogy egy term\u00e9k mennyi id\u0151 alatt jut v\u00e9gig az \u00f6sszes m\u0171veleten.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A teljes\u00edtend\u0151 feladathoz ill\u0151 adatokkal sz\u00e1moljon<\/h2>\n\n\n<p>Miel\u0151tt \u00fctemid\u0151c\u00e9llal dolgozna, egyeztesse az \u00e9rintettekkel, mire vonatkozik a mennyis\u00e9g \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151. A rosszul feltett k\u00e9rd\u00e9sre adott pontos v\u00e1laszb\u00f3l is rossz gy\u00e1rt\u00e1si terv sz\u00fcletik.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hat\u00e1rozza meg a term\u00e9kcsal\u00e1dot \u00e9s a kibocs\u00e1t\u00e1s m\u00e9r\u00e9si pontj\u00e1t<\/h3>\n\n\n<p>Induljon ki egy term\u00e9kb\u0151l vagy rendszeresen gy\u00e1rtott term\u00e9kcsal\u00e1db\u00f3l, amelynek k\u00f6z\u00f6s gy\u00e1rt\u00e1si folyamata \u00e9rdemben vizsg\u00e1lhat\u00f3. R\u00f6gz\u00edtse, hol sz\u00e1molj\u00e1k a kibocs\u00e1t\u00e1st: p\u00e9ld\u00e1ul a cell\u00e1t elhagy\u00f3 k\u00e9sz szerelv\u00e9nyeket vegy\u00e9k alapul, ne a k\u00fcl\u00f6nb\u00f6z\u0151 m\u0171veletekn\u00e9l elk\u00e9sz\u00fclt alkatr\u00e9szek \u00f6sszeg\u00e9t.<\/p>\n\n\n<p>Ugyanazt a darabot ne sz\u00e1molj\u00e1k \u00fajra minden alkalommal, amikor \u00e1thalad egy k\u00f6vetkez\u0151 \u00e1llom\u00e1son. Egy egyszer\u0171 alkatr\u00e9szt \u00e9s egy \u00f6sszetett szerelv\u00e9nyt se kezeljenek egyen\u00e9rt\u00e9k\u0171 darabk\u00e9nt puszt\u00e1n az\u00e9rt, mert mindkett\u0151 szerepel a rendel\u00e9s\u00e1llom\u00e1nyban.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Az ig\u00e9nyt a tervez\u00e9si id\u0151szakhoz igaz\u00edtsa<\/h3>\n\n\n<p>Azzal a mennyis\u00e9ggel sz\u00e1moljon, amelyre a vev\u0151knek a tervezett id\u0151szakban sz\u00fcks\u00e9g\u00fck van. K\u00e9szletfelt\u00f6lt\u00e9s eset\u00e9n az ig\u00e9nyt a k\u00e9szlet-ut\u00e1np\u00f3tl\u00e1si szab\u00e1lyokhoz igaz\u00edtsa, ahelyett, hogy bizonytalan k\u00e9s\u0151bbi keresletre nagy mennyis\u00e9get gy\u00e1rtana csak az\u00e9rt, hogy a g\u00e9pek ne \u00e1lljanak.<\/p>\n\n\n<p>A heti \u00e1tlag hasznos lehet a rendszeres gy\u00e1rt\u00e1si ritmus kialak\u00edt\u00e1s\u00e1hoz, de a h\u00e9ten bel\u00fcli sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is ellen\u0151rizni kell. Att\u00f3l, hogy p\u00e9ntekre elk\u00e9sz\u00fcl a megfelel\u0151 \u00f6sszmennyis\u00e9g, egy kedden esed\u00e9kes rendel\u00e9s m\u00e9g nem teljes\u00fcl id\u0151ben.<\/p>\n\n\n<p>Ha n\u0151 az ig\u00e9ny, de a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151 nem v\u00e1ltozik, az \u00fctemid\u0151 r\u00f6vid\u00fcl: minden ig\u00e9nyelt darabra kevesebb id\u0151 jut. Cs\u00f6kken\u0151 ig\u00e9ny mellett az \u00fctemid\u0151 hosszabb lesz. Ha az adott id\u0151szakban nincs ig\u00e9ny, nem sz\u00e1m\u00edthat\u00f3 \u00e9rtelmezhet\u0151 \u00fctemid\u0151; a null\u00e1val val\u00f3 oszt\u00e1sb\u00f3l nem lesz gy\u00e1rt\u00e1si c\u00e9l.<\/p>\n\n\n<h3 class=\"wp-block-heading\">R\u00f6gz\u00edtse pontosan a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151keretet<\/h3>\n\n\n<p>Az adott gy\u00e1rt\u00e1si folyamathoz t\u00e9nylegesen hozz\u00e1rendelt id\u0151vel sz\u00e1moljon, levonva a tervezett munkamentes id\u0151szakokat, p\u00e9ld\u00e1ul azokat a sz\u00fcneteket, amikor le\u00e1ll a termel\u00e9s. Ne vegyen alapul teljes m\u0171szakot egy olyan term\u00e9kcsal\u00e1dn\u00e1l, amely a k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1st csak a m\u0171szak egy r\u00e9sz\u00e9ben veheti ig\u00e9nybe.<\/p>\n\n\n<p>Az \u00e1t\u00e1ll\u00e1sokat \u00e9s a vesztes\u00e9geket k\u00f6vetkezetesen sz\u00e1molja el. Ebben az \u00fatmutat\u00f3ban az \u00e1t\u00e1ll\u00e1s olyan munka, amelynek bele kell f\u00e9rnie a rendelkez\u00e9sre \u00e1ll\u00f3 gy\u00e1rt\u00e1si id\u0151be; ez\u00e9rt az id\u0151keretb\u0151l k\u00fcl\u00f6n nem vonjuk le. M\u00e1s sz\u00e1m\u00edt\u00e1si m\u00f3dszerek el\u0151sz\u00f6r levonj\u00e1k a tervezett \u00e1t\u00e1ll\u00e1sok idej\u00e9t. B\u00e1rmelyik megold\u00e1st v\u00e1lasztja, ugyanazt az id\u0151t csak egyszer sz\u00e1molja el, ne k\u00e9tszer.<\/p>\n\n\n<p>A v\u00e1ratlan meghib\u00e1sod\u00e1sok, a lassabb m\u0171k\u00f6d\u00e9s \u00e9s a selejt nem cs\u00f6kkentik a vev\u0151i ig\u00e9nyt, csak annak teljes\u00edt\u00e9s\u00e9t nehez\u00edtik meg. A kapacit\u00e1s ellen\u0151rz\u00e9sekor ezek a vesztes\u00e9gek is maradjanak l\u00e1that\u00f3k; ne fedje el \u0151ket egy t\u00fal optimist\u00e1n meghat\u00e1rozott id\u0151keret.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dctemid\u0151 \u00e9s ciklusid\u0151: elv\u00e1rt temp\u00f3 \u00e9s t\u00e9nyleges teljes\u00edtm\u00e9ny<\/h2>\n\n\n<p>Az \u00fctemid\u0151t az ig\u00e9ny hat\u00e1rozza meg. A ciklusid\u0151t a folyamat m\u00e9r\u00e9s\u00e9vel kapjuk meg: azt mutatja, mennyi ideig tart t\u00e9nylegesen egy ism\u00e9tl\u0151d\u0151 m\u0171velet vagy gy\u00e1rt\u00e1si ciklus. A gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 ett\u0151l is elt\u00e9r: a meghat\u00e1rozott gy\u00e1rt\u00e1si \u00fatvonal bej\u00e1r\u00e1sa sor\u00e1n eltelt teljes id\u0151t jelenti, a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1ssal egy\u00fctt.<\/p>\n\n\n<p>Egy term\u00e9k \u00f3r\u00e1kat t\u00f6lthet egy olyan gy\u00e1rt\u00f3soron, amely k\u00e9tpercenk\u00e9nt bocs\u00e1t ki egy k\u00e9sz darabot. Egyszerre t\u00f6bb darab halad a folyamat k\u00fcl\u00f6nb\u00f6z\u0151 szakaszaiban. Az \u00fctemid\u0151 teh\u00e1t nem azt jelenti, hogy a teljes gy\u00e1rt\u00e1si \u00fatvonalat k\u00e9t perc alatt kell v\u00e9gigj\u00e1rni.<\/p>\n\n\n<p>A ciklusid\u0151 \u00e9s az \u00fctemid\u0151 \u00f6sszehasonl\u00edt\u00e1sakor ellen\u0151rizze, pontosan mire terjed ki a m\u00e9r\u00e9s. Egy g\u00e9p automatikus v\u00e1g\u00e1si ciklusa p\u00e9ld\u00e1ul nem felt\u00e9tlen\u00fcl tartalmazza a be- \u00e9s kirakod\u00e1st. A m\u0171k\u00f6d\u00e9s k\u00f6zben m\u00e9rt ciklusid\u0151b\u0151l pedig kimaradhatnak a le\u00e1ll\u00e1sok. \u00d6nmag\u00e1ban egyik adat sem bizony\u00edtja, hogy milyen \u00fctemben tarthat\u00f3 fenn a megfelel\u0151 min\u0151s\u00e9g\u0171 k\u00e9szterm\u00e9kek kibocs\u00e1t\u00e1sa.<\/p>\n\n\n<p>Ha egy \u00e1llom\u00e1s egyszerre egy darabot gy\u00e1rt, \u00e9s a ciklusideje hosszabb az \u00fctemid\u0151n\u00e9l, az m\u00e1r az \u00e1t\u00e1ll\u00e1sok \u00e9s vesztes\u00e9gek k\u00fcl\u00f6n besz\u00e1m\u00edt\u00e1sa el\u0151tt kapacit\u00e1shi\u00e1nyt jelez. Az \u00fctemid\u0151n\u00e9l r\u00f6videbb ciklusid\u0151 ad n\u00e9mi mozg\u00e1steret, de nem bizony\u00edtja, hogy a teljes folyamat k\u00e9pes kiel\u00e9g\u00edteni az ig\u00e9nyt. A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-ciklusido\/\">gy\u00e1rt\u00e1si ciklusid\u0151 m\u00e9r\u00e9s\u00e9r\u0151l<\/a> sz\u00f3l\u00f3 \u00fatmutat\u00f3nk bemutatja, hogyan gy\u0171jthet a tervez\u00e9shez j\u00f3l haszn\u00e1lhat\u00f3 m\u0171veleti id\u0151adatokat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ellen\u0151rizze, hogy a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1s elb\u00edrja-e az elv\u00e1rt temp\u00f3t<\/h2>\n\n\n<p>T\u00e9rj\u00fcnk vissza ahhoz a cell\u00e1hoz, amelynek 420 perc alatt 210 j\u00f3 darabot kell el\u0151\u00e1ll\u00edtania. Tegy\u00fck fel, hogy a kapacit\u00e1st korl\u00e1toz\u00f3 m\u0171velet darabonk\u00e9nt 1,8 percig tart, \u00e9s a m\u0171szak sor\u00e1n 30 perc \u00e1t\u00e1ll\u00e1si id\u0151re van sz\u00fcks\u00e9g. A megmunk\u00e1l\u00e1s \u00e9s az \u00e1t\u00e1ll\u00e1s ugyanazt az er\u0151forr\u00e1st veszi ig\u00e9nybe, id\u0151beli \u00e1tfed\u00e9s n\u00e9lk\u00fcl. Ebben az egyszer\u0171s\u00edtett p\u00e9ld\u00e1ban nincs selejt \u00e9s nem tervezett le\u00e1ll\u00e1s.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kapacit\u00e1sellen\u0151rz\u00e9s<\/th><th>Sz\u00e1m\u00edt\u00e1s<\/th><th>Id\u0151ig\u00e9ny<\/th><\/tr><\/thead><tbody><tr><td>Darabok gy\u00e1rt\u00e1sa<\/td><td>210 darab \u00d7 1,8 perc<\/td><td>378 perc<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1sok<\/td><td>K\u00fcl\u00f6n r\u00f6gz\u00edtve<\/td><td>30 perc<\/td><\/tr><tr><td>\u00d6sszes munka<\/td><td>378 + 30<\/td><td>408 perc<\/td><\/tr><tr><td>Fennmarad\u00f3 id\u0151<\/td><td>420 \u2212 408<\/td><td>12 perc<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A munka belef\u00e9r az er\u0151forr\u00e1s id\u0151keret\u00e9be, de csak 12 perc tartal\u00e9k marad. Az 1,8 perces ciklusid\u0151 b\u0151ven elegend\u0151nek t\u0171nik a k\u00e9tperces \u00fctemid\u0151h\u00f6z k\u00e9pest, am\u00edg az \u00e1t\u00e1ll\u00e1st is figyelembe nem vessz\u00fck. Egy megszak\u00edt\u00e1s vagy tov\u00e1bbi ut\u00f3munka gyorsan felem\u00e9sztheti a fennmarad\u00f3 id\u0151t.<\/p>\n\n\n<p>Most tegy\u00fck fel, hogy az ig\u00e9ny 240 darabra n\u0151, mik\u00f6zben a m\u0171szak nem v\u00e1ltozik. Az \u00faj \u00fctemid\u0151 <strong>420 \u00f7 240 = 1,75 perc\/darab<\/strong>. A m\u0171velet azonban tov\u00e1bbra is darabonk\u00e9nt 1,8 percig tart, az \u00e1t\u00e1ll\u00e1s pedig 30 percet vesz ig\u00e9nybe.<\/p>\n\n\n<p>A sz\u00fcks\u00e9ges munka id\u0151ig\u00e9nye \u00edgy <strong>240 \u00d7 1,8 + 30 = 462 perc<\/strong>. Ez 42 perccel t\u00f6bb a rendelkez\u00e9sre \u00e1ll\u00f3 420 percn\u00e9l. Ezt a hi\u00e1nyt nem sz\u00fcnteti meg, ha r\u00f6videbb c\u00e9lid\u0151t \u00edrunk a termel\u00e9si t\u00e1bl\u00e1ra.<\/p>\n\n\n<p>Gyakorlati megold\u00e1sra van sz\u00fcks\u00e9g: cs\u00f6kkenteni kell a m\u0171veleti vagy az \u00e1t\u00e1ll\u00e1si id\u0151t, megfelel\u0151 t\u00f6bbletkapacit\u00e1st kell biztos\u00edtani, az arra alkalmas munk\u00e1t m\u00e1sik er\u0151forr\u00e1sra kell \u00e1thelyezni, vagy m\u00f3dos\u00edtott ig\u00e9nyben, illetve sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ben kell meg\u00e1llapodni. Miel\u0151tt b\u00e1rmilyen javasolt gyors\u00edt\u00e1st felhaszn\u00e1lhat\u00f3 kapacit\u00e1sk\u00e9nt venne figyelembe, ellen\u0151rizze a min\u0151s\u00e9gi \u00e9s l\u00e9tsz\u00e1mfelt\u00e9teleket, valamint a biztons\u00e1gos munkav\u00e9gz\u00e9st.<\/p>\n\n\n<p>Itt v\u00e1lik fontoss\u00e1 a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/a> is. A fenti sz\u00e1m\u00edt\u00e1s egyetlen er\u0151forr\u00e1s \u00f6sszterhel\u00e9s\u00e9t ellen\u0151rzi. Az \u00fctemtervb\u0151l der\u00fcl ki, hogy mikor v\u00e9gezhet\u0151 el a munka, id\u0151ben befejez\u0151dnek-e az el\u0151z\u0151 m\u0171veletek, \u00e9s mely m\u00e1s rendel\u00e9seknek van sz\u00fcks\u00e9g\u00fck ugyanarra az er\u0151forr\u00e1sra. Az id\u0151keretbe \u00f6sszess\u00e9g\u00e9ben belef\u00e9r\u0151 munka is elk\u00e9shet, ha a sz\u00fcks\u00e9ges kapacit\u00e1s csak a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151 ut\u00e1n \u00e1ll rendelkez\u00e9sre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Haszn\u00e1lhat\u00f3 az \u00fctemid\u0151 sokf\u00e9le term\u00e9k gy\u00e1rt\u00e1s\u00e1n\u00e1l?<\/h2>\n\n\n<p>Az \u00fctemid\u0151 ott \u00e9rtelmezhet\u0151 a legk\u00f6nnyebben, ahol a term\u00e9kek ism\u00e9tl\u0151d\u0151 folyamatot k\u00f6vetnek, \u00e9s a gy\u00e1rt\u00e1sukhoz sz\u00fcks\u00e9ges munka mennyis\u00e9ge nagyj\u00e1b\u00f3l \u00f6sszevethet\u0151. Sokf\u00e9le term\u00e9k gy\u00e1rt\u00e1s\u00e1n\u00e1l is seg\u00edthet \u00e1tl\u00e1tni egy megfelel\u0151en kiv\u00e1lasztott term\u00e9kcsal\u00e1d visszat\u00e9r\u0151 ig\u00e9ny\u00e9t. Egyetlen, az eg\u00e9sz gy\u00e1rra meghat\u00e1rozott \u00fctemid\u0151 azonban \u00e9ppen azt a korl\u00e1tot fedheti el, amelyet fel kellene ismerni.<\/p>\n\n\n<p>Egy term\u00e9kb\u0151l t\u00edz darab t\u00f6bb g\u00e9pid\u0151t ig\u00e9nyelhet, mint egy m\u00e1sikb\u00f3l \u00f6tven. Az elt\u00e9r\u0151 term\u00e9kekhez m\u00e1s gy\u00e1rt\u00e1si \u00fatvonalra, k\u00e9sz\u00fcl\u00e9kekre vagy szaktud\u00e1sra is sz\u00fcks\u00e9g lehet. Att\u00f3l, hogy egyetlen \u00e1tlagos darabsz\u00e1mba vonjuk \u00f6ssze \u0151ket, a kapacit\u00e1sig\u00e9ny\u00fck nem lesz azonos.<\/p>\n\n\n<p>Tartsa meg az ig\u00e9nyelt mennyis\u00e9geket c\u00e9lk\u00e9nt, majd term\u00e9kenk\u00e9nt sz\u00e1m\u00edtsa ki a t\u00e9nyleges m\u0171veleti \u00e9s \u00e1t\u00e1ll\u00e1si id\u0151ig\u00e9nyt. Vizsg\u00e1lja meg az egy\u00fcttes terhel\u00e9st a k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sokon. Ha egyedi munk\u00e1kn\u00e1l jelent\u0151sen elt\u00e9rnek az \u00fatvonalak \u00e9s az id\u0151tartamok, a rendel\u00e9sek r\u00e9szletes \u00fctemez\u00e9se hasznosabb, mint minden gy\u00e1rt\u00e1si feladatot azonos ritmusba k\u00e9nyszer\u00edteni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u00e9sz\u00edtsen megval\u00f3s\u00edthat\u00f3 \u00fctemtervet az ig\u00e9nyb\u0151l a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A SkyPlanner nem egy egyszer\u0171 oszt\u00e1s kiv\u00e1lt\u00e1s\u00e1ra szolg\u00e1l, hanem arra, hogy az \u00edgy meghat\u00e1rozott gy\u00e1rt\u00e1si ig\u00e9nyt a teljes\u00edt\u00e9s\u00e9hez sz\u00fcks\u00e9ges munka \u00fctemez\u00e9s\u00e9vel kapcsolja \u00f6ssze.<\/p>\n\n\n<p>A SkyPlanner rendszer\u00e9ben egyszer kell meghat\u00e1roznia egy term\u00e9k m\u0171veleteit, azok id\u0151tartam\u00e1t \u00e9s az elv\u00e9gz\u00e9s\u00fckre alkalmas munka\u00e1llom\u00e1sokat. Az \u00faj rendel\u00e9si t\u00e9telek \u00e1tveszik ezt a gy\u00e1rt\u00e1si \u00fatvonalat; a mennyis\u00e9gek \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k adj\u00e1k meg az \u00fctemez\u0151rendszernek, hogy mit kell teljes\u00edteni. Megadhat\u00f3 darabonk\u00e9nti megmunk\u00e1l\u00e1si id\u0151, termel\u00e9si r\u00e1ta vagy r\u00f6gz\u00edtett id\u0151tartam\u00fa m\u0171velet is, az \u00e1t\u00e1ll\u00e1si id\u0151 k\u00fcl\u00f6n r\u00f6gz\u00edt\u00e9s\u00e9vel.<\/p>\n\n\n<p>Az Arcturus, a SkyPlanner mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151motorja a be\u00e1ll\u00edtott kapacit\u00e1s, a m\u0171szakok, a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek \u00e9s az \u00d6n \u00e1ltal megadott priorit\u00e1sok alapj\u00e1n, egy\u00fcttesen \u00fctemezi a gy\u00e1rt\u00e1si feladatokat. A Gantt-n\u00e9zet er\u0151forr\u00e1sonk\u00e9nt mutatja az \u00edgy kialakult feladatsorrendet \u00e9s az id\u0151z\u00edt\u00e9st. \u00cdgy l\u00e1that\u00f3, hogy a terv szerint mikorra k\u00e9sz\u00fcl el a sz\u00fcks\u00e9ges munka, \u00e9s nem kell abb\u00f3l kiindulni, hogy a megfelel\u0151 \u00e1tlagos gy\u00e1rt\u00e1si \u00fctem \u00f6nmag\u00e1ban garant\u00e1lja a rendel\u00e9s hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 teljes\u00edt\u00e9s\u00e9t.<\/p>\n\n\n<p>Ha n\u0151 a mennyis\u00e9g, vagy cs\u00f6kken egy m\u0171szak rendelkez\u00e9sre \u00e1ll\u00f3 ideje, friss\u00edtse az adatokat, \u00e9s hagyja, hogy az Arcturus \u00fajrasz\u00e1m\u00edtsa az \u00fctemtervet. N\u00e9zze \u00e1t, hogyan \u00e9rinti a v\u00e1ltoz\u00e1s az egyes rendel\u00e9seket, majd d\u00f6ntse el, hogy a priorit\u00e1sok m\u00f3dos\u00edt\u00e1s\u00e1ra, j\u00f3v\u00e1hagyott kapacit\u00e1sm\u00f3dos\u00edt\u00e1sra vagy a v\u00e1llal\u00e1s fel\u00fclvizsg\u00e1lat\u00e1ra van-e sz\u00fcks\u00e9g. \u00cdgy kevesebb id\u0151t kell az egyes g\u00e9pek feladatsorrendj\u00e9nek k\u00e9zi jav\u00edt\u00e1s\u00e1ra ford\u00edtania, \u00e9s vil\u00e1gosabb alapot kap a termel\u00e9si d\u00f6nt\u00e9shez.<\/p>\n\n\n<p>A SkyPlanner az \u00d6n \u00e1ltal meghat\u00e1rozott termel\u00e9si er\u0151forr\u00e1sokat \u00fctemezi; a gy\u00e1rt\u00f3sorok fizikai kiegyens\u00falyoz\u00e1sa \u00e9s a munkam\u00f3dszerek megv\u00e1ltoztat\u00e1sa tov\u00e1bbra is gy\u00e1rt\u00e1stechnol\u00f3giai d\u00f6nt\u00e9s. A jobb \u00fctemez\u00e9s seg\u00edt \u00e1tl\u00e1tni, hol van sz\u00fcks\u00e9g beavatkoz\u00e1sra, \u00e9s hogyan hat a m\u00f3dos\u00edtott terv a sz\u00e1ll\u00edt\u00e1sra.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit v\u00e1ltoztatott a Fredman Operations m\u0171k\u00f6d\u00e9s\u00e9ben a m\u0171szakonk\u00e9nti kapacit\u00e1s \u00e1tl\u00e1that\u00f3s\u00e1ga?<\/h3>\n\n\n<p>Az \u00e9lelmiszerrel val\u00f3 \u00e9rintkez\u00e9sre alkalmas konyhai \u00e9s csomagol\u00e1si megold\u00e1sokat gy\u00e1rt\u00f3 finn Fredman Operations kor\u00e1bban k\u00e9zzel vitte \u00e1t a munkalapokat az L7 ERP \u00e9s az LTR termel\u00e9sir\u00e1ny\u00edt\u00e1si szoftver k\u00f6z\u00f6tt. A gy\u00e1rt\u00e1si feladatok priorit\u00e1s\u00e1t is k\u00e9zzel hat\u00e1rozt\u00e1k meg, mik\u00f6zben csak korl\u00e1tozottan l\u00e1tt\u00e1k, mikor szabadulnak fel a g\u00e9pek, \u00e9s mekkora kapacit\u00e1s \u00e1ll rendelkez\u00e9sre az egyes m\u0171szakokban.<\/p>\n\n\n<p>A SkyPlanner k\u00f6z\u00f6s Gantt-n\u00e9zet\u00e9nek \u00e9s m\u0171szak\u00fctemez\u00e9s\u00e9nek k\u00f6sz\u00f6nhet\u0151en ez a kapacit\u00e1s is megjelent a gy\u00e1rt\u00e1si tervben. A munkat\u00e1rsak l\u00e1thatt\u00e1k a gy\u00e1rt\u00e1si feladatok tervezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontj\u00e1t. A v\u00e1llalat besz\u00e1mol\u00f3ja szerint gyorsabban tudtak reag\u00e1lni az \u00fctemterv v\u00e1ltoz\u00e1saira, \u00e9s kevesebb t\u00fal\u00f3r\u00e1ra volt sz\u00fcks\u00e9g.<\/p>\n\n\n<p>A Fredman tapasztalata j\u00f3l mutatja, mi\u00e9rt van sz\u00fcks\u00e9g haszn\u00e1lhat\u00f3 kapacit\u00e1stervre az el\u0151\u00edrt gy\u00e1rt\u00e1si mennyis\u00e9g teljes\u00edt\u00e9s\u00e9hez: a csapat a rendelkez\u00e9sre \u00e1ll\u00f3 gy\u00e1rt\u00e1si id\u0151 alapj\u00e1n \u00edt\u00e9lheti meg a v\u00e1llal\u00e1sokat, ahelyett, hogy ezt \u00fajra \u00e9s \u00fajra k\u00e9zzel kellene kisz\u00e1molnia. A teljes t\u00f6rt\u00e9net\u00e9rt olvassa el <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/fredman-operations\/\">a Fredman Operations besz\u00e1mol\u00f3j\u00e1t a SkyPlanner haszn\u00e1lat\u00e1r\u00f3l<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e9zze meg, mit jelent a sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si \u00fctem a gyakorlatban<\/h2>\n\n\n<p>Sz\u00e1m\u00edtsa ki az \u00fctemid\u0151t, hogy egy\u00e9rtelm\u0171 legyen, milyen gy\u00e1rt\u00e1si \u00fctemet k\u00f6vetel meg a vev\u0151i ig\u00e9ny. Ezut\u00e1n \u00fctemezze a t\u00e9nyleges munk\u00e1t a SkyPlanner seg\u00edts\u00e9g\u00e9vel: l\u00e1thatja, hol f\u00e9r bele a terhel\u00e9s az er\u0151forr\u00e1sok kapacit\u00e1s\u00e1ba, \u00e9s mi v\u00e1ltozik, ha m\u00f3dosul az ig\u00e9ny.<\/p>\n\n\n<p>A SkyPlanner a ny\u00edlt REST API r\u00e9v\u00e9n b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3, \u00edgy megl\u00e9v\u0151 rendel\u00e9si \u00e9s termel\u00e9si adatait felhaszn\u00e1lhatja a gy\u00e1rt\u00e1s \u00fctemez\u00e9s\u00e9hez.<\/p>\n\n\n<p>Ha saj\u00e1t gy\u00e1rt\u00e1s\u00e1nak p\u00e9ld\u00e1j\u00e1n szeretn\u00e9 megismerni a lehet\u0151s\u00e9geket, <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">foglaljon SkyPlanner-bemutat\u00f3t<\/a>. K\u00e9sz\u00fclj\u00f6n egy rendszeresen gy\u00e1rtott term\u00e9kcsal\u00e1d adataival: a hozz\u00e1 tartoz\u00f3 ig\u00e9nnyel, m\u0171veleti id\u0151kkel \u00e9s m\u0171szaknapt\u00e1rral. Ezek alapj\u00e1n konkr\u00e9tan \u00e1tbesz\u00e9lhet\u0151, mit kell legy\u00e1rtani, hol van sz\u00fcks\u00e9g kapacit\u00e1sra, \u00e9s hogyan reag\u00e1l az \u00fctemterv a v\u00e1ltoz\u00e1sokra. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; \u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t Az \u00fctemid\u0151 a vev\u0151i ig\u00e9ny teljes\u00edt\u00e9s\u00e9hez sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si temp\u00f3t fejezi ki: megmutatja, hogy a rendelkez\u00e9sre \u00e1ll\u00f3 gy\u00e1rt\u00e1si id\u0151b\u0151l mennyi jut egy ig\u00e9nyelt, megfelel\u0151 min\u0151s\u00e9g\u0171 darabra. A k\u00e9tperces \u00fctemid\u0151 azt jelenti, hogy ebben az id\u0151szakban a folyamatnak \u00e1tlagosan &#8230; <a title=\"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/\" aria-label=\"Read more about \u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":102432,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-102409","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t<\/title>\n<meta name=\"description\" content=\"Sz\u00e1m\u00edtson \u00fctemid\u0151t az ig\u00e9nyb\u0151l \u00e9s az el\u00e9rhet\u0151 id\u0151b\u0151l. M\u00e9rje fel a kapacit\u00e1sig\u00e9nyt, \u00e9s k\u00e9sz\u00edtsen a mennyis\u00e9gekb\u0151l megval\u00f3s\u00edthat\u00f3 \u00fctemtervet a SkyPlannerrel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t\" \/>\n<meta property=\"og:description\" content=\"Sz\u00e1m\u00edtson \u00fctemid\u0151t az ig\u00e9nyb\u0151l \u00e9s az el\u00e9rhet\u0151 id\u0151b\u0151l. M\u00e9rje fel a kapacit\u00e1sig\u00e9nyt, \u00e9s k\u00e9sz\u00edtsen a mennyis\u00e9gekb\u0151l megval\u00f3s\u00edthat\u00f3 \u00fctemtervet a SkyPlannerrel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T11:42:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T11:43:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1368\" \/>\n\t<meta property=\"og:image:height\" content=\"770\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t\",\"datePublished\":\"2026-10-20T11:42:15+00:00\",\"dateModified\":\"2026-10-20T11:43:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/\"},\"wordCount\":2955,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/\",\"name\":\"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"datePublished\":\"2026-10-20T11:42:15+00:00\",\"dateModified\":\"2026-10-20T11:43:06+00:00\",\"description\":\"Sz\u00e1m\u00edtson \u00fctemid\u0151t az ig\u00e9nyb\u0151l \u00e9s az el\u00e9rhet\u0151 id\u0151b\u0151l. M\u00e9rje fel a kapacit\u00e1sig\u00e9nyt, \u00e9s k\u00e9sz\u00edtsen a mennyis\u00e9gekb\u0151l megval\u00f3s\u00edthat\u00f3 \u00fctemtervet a SkyPlannerrel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"width\":1368,\"height\":770,\"caption\":\"Evenly spaced finished components leaving an assembly cell illustrate the demand-led production pace of takt time.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/utemido\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t","description":"Sz\u00e1m\u00edtson \u00fctemid\u0151t az ig\u00e9nyb\u0151l \u00e9s az el\u00e9rhet\u0151 id\u0151b\u0151l. M\u00e9rje fel a kapacit\u00e1sig\u00e9nyt, \u00e9s k\u00e9sz\u00edtsen a mennyis\u00e9gekb\u0151l megval\u00f3s\u00edthat\u00f3 \u00fctemtervet a SkyPlannerrel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/","og_locale":"hu_HU","og_type":"article","og_title":"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t","og_description":"Sz\u00e1m\u00edtson \u00fctemid\u0151t az ig\u00e9nyb\u0151l \u00e9s az el\u00e9rhet\u0151 id\u0151b\u0151l. M\u00e9rje fel a kapacit\u00e1sig\u00e9nyt, \u00e9s k\u00e9sz\u00edtsen a mennyis\u00e9gekb\u0151l megval\u00f3s\u00edthat\u00f3 \u00fctemtervet a SkyPlannerrel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T11:42:15+00:00","article_modified_time":"2026-10-20T11:43:06+00:00","og_image":[{"width":1368,"height":770,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t","datePublished":"2026-10-20T11:42:15+00:00","dateModified":"2026-10-20T11:43:06+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/"},"wordCount":2955,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/","name":"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","datePublished":"2026-10-20T11:42:15+00:00","dateModified":"2026-10-20T11:43:06+00:00","description":"Sz\u00e1m\u00edtson \u00fctemid\u0151t az ig\u00e9nyb\u0151l \u00e9s az el\u00e9rhet\u0151 id\u0151b\u0151l. M\u00e9rje fel a kapacit\u00e1sig\u00e9nyt, \u00e9s k\u00e9sz\u00edtsen a mennyis\u00e9gekb\u0151l megval\u00f3s\u00edthat\u00f3 \u00fctemtervet a SkyPlannerrel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","width":1368,"height":770,"caption":"Evenly spaced finished components leaving an assembly cell illustrate the demand-led production pace of takt time."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/utemido\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png",1368,770,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png",1368,770,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png",1368,770,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; \u00dctemid\u0151: sz\u00e1m\u00edtsa ki a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges temp\u00f3t Az \u00fctemid\u0151 a vev\u0151i ig\u00e9ny teljes\u00edt\u00e9s\u00e9hez sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si temp\u00f3t fejezi ki: megmutatja, hogy a rendelkez\u00e9sre \u00e1ll\u00f3 gy\u00e1rt\u00e1si id\u0151b\u0151l mennyi jut egy ig\u00e9nyelt, megfelel\u0151 min\u0151s\u00e9g\u0171 darabra. A k\u00e9tperces \u00fctemid\u0151 azt jelenti, hogy ebben az id\u0151szakban a folyamatnak \u00e1tlagosan&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/102409","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=102409"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/102409\/revisions"}],"predecessor-version":[{"id":102499,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/102409\/revisions\/102499"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/102432"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=102409"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=102409"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=102409"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}