{"id":101800,"date":"2026-10-20T00:44:37","date_gmt":"2026-10-20T00:44:37","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101800"},"modified":"2026-10-20T00:45:35","modified_gmt":"2026-10-20T00:45:35","slug":"termelesutemezes-karbantartas-alatt","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/","title":{"rendered":"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A megmunk\u00e1l\u00f3k\u00f6zpont cs\u00fct\u00f6rt\u00f6k\u00f6n \u00fajra \u00fczembe \u00e1ll. A vev\u0151 rendel\u00e9s\u00e9t p\u00e9nteken kell kisz\u00e1ll\u00edtani. Ez teljes\u00edthet\u0151nek t\u0171nik, am\u00edg ki nem der\u00fcl, hogy az ellen\u0151rz\u00e9shez m\u00e1r cs\u00fct\u00f6rt\u00f6k reggel sz\u00fcks\u00e9g van a megmunk\u00e1lt alkatr\u00e9szekre \u2014 m\u00e9g miel\u0151tt az \u00fajraind\u00edtott g\u00e9p el tudn\u00e1 k\u00e9sz\u00edteni \u0151ket.<\/p>\n\n\n<p>A karbantart\u00e1shoz igazod\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9s sor\u00e1n a rendel\u00e9sek m\u0171veleteit a g\u00e9p vagy szersz\u00e1m el\u0151re egyeztetett kies\u00e9se el\u0151tti \u00e9s ut\u00e1ni id\u0151szakra \u00fctemezz\u00fck, mik\u00f6zben a termel\u00e9s t\u00f6bbi r\u00e9sze folytat\u00f3dik. A l\u00e9nyeg, hogy a kisz\u00e1ll\u00edt\u00e1shoz sz\u00fcks\u00e9ges m\u0171veletekb\u0151l visszafel\u00e9 tervezz\u00fcnk, ne egyszer\u0171en a kies\u0151 er\u0151forr\u00e1s \u00fajb\u00f3li rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1nak id\u0151pontj\u00e1ra toljuk az ott v\u00e1rakoz\u00f3 feladatokat.<\/p>\n\n\n<p>A SkyPlanner APS ezt a d\u00f6nt\u00e9st a teljes gy\u00e1rt\u00e1si \u00fctemtervbe illeszti. \u00d6n megadja a karbantart\u00e1s id\u0151szak\u00e1t \u00e9s a priorit\u00e1sokat; az Arcturus, a rendszer \u00fctemez\u0151 mesters\u00e9ges intelligenci\u00e1ja pedig a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1s \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek alapj\u00e1n kisz\u00e1m\u00edtja az \u00fctemez\u00e9st. Az eredm\u00e9ny a Gantt-diagramon l\u00e1that\u00f3, \u00edgy \u00e1ttekintheti a sz\u00e1ll\u00edt\u00e1sokat an\u00e9lk\u00fcl, hogy minden \u00e9rintett g\u00e9p feladatsor\u00e1t k\u00e9zzel kellene \u00fajra \u00f6ssze\u00e1ll\u00edtania.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A karbantart\u00e1si terv m\u00e9g nem gy\u00e1rt\u00e1si terv<\/h2>\n\n\n<p>A karbantart\u00f3 csapat m\u00e1r tudhatja, milyen feladatokra, emberekre \u00e9s alkatr\u00e9szekre lesz sz\u00fcks\u00e9g a beavatkoz\u00e1shoz. A termel\u00e9snek azonban egy m\u00e1sik k\u00e9rd\u00e9sre is v\u00e1laszt kell kapnia: mit gy\u00e1rtson az \u00fczem, am\u00edg az adott er\u0151forr\u00e1s nem \u00e1ll rendelkez\u00e9sre?<\/p>\n\n\n<p>Erre nem ad v\u00e1laszt egy bejegyz\u00e9s a karbantart\u00e1si napt\u00e1rban. Az sem el\u00e9g, ha a kies\u0151 \u00f3r\u00e1kat levonjuk a heti \u00f6sszkapacit\u00e1sb\u00f3l. Ugyanaz a kapacit\u00e1scs\u00f6kken\u00e9s egy j\u00f6v\u0151 h\u00e9tre esed\u00e9kes rendel\u00e9sn\u00e9l m\u00e9g kezelhet\u0151 lehet, egy m\u00e1sikn\u00e1l viszont kritikus, ha annak k\u00f6vetkez\u0151 m\u0171velet\u00e9t a g\u00e9p visszat\u00e9r\u00e9se el\u0151tt el kell kezdeni.<\/p>\n\n\n<p>Els\u0151k\u00e9nt egyeztesse a karbantart\u00f3kkal a kies\u00e9s pontos id\u0151szak\u00e1t, bele\u00e9rtve azt is, mikor lesz az er\u0151forr\u00e1s ism\u00e9t gy\u00e1rt\u00e1sra k\u00e9sz. Az esetleg sz\u00fcks\u00e9ges ellen\u0151rz\u00e9seket \u00e9s az \u00fajraind\u00edt\u00e1s el\u0151k\u00e9sz\u00edt\u00e9s\u00e9t is vegy\u00e9k figyelembe. Ezut\u00e1n tiszt\u00e1zza, mi esik ki t\u00e9nylegesen: egy g\u00e9p, egy t\u00f6bb g\u00e9pen haszn\u00e1lt fizikai szersz\u00e1m, vagy azonos id\u0151ben le\u00e1ll\u00f3 er\u0151forr\u00e1sok csoportja.<\/p>\n\n\n<p>A SkyPlanner rendszerben a g\u00e9p karbantart\u00e1si id\u0151szaka munka\u00e1llom\u00e1s-kiv\u00e9telk\u00e9nt r\u00f6gz\u00edthet\u0151. A szersz\u00e1mhoz k\u00fcl\u00f6n karbantart\u00e1si id\u0151pontok tartoznak. Mindkett\u0151 hat\u00e1ssal van a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">gy\u00e1rt\u00e1s\u00fctemez\u00e9sre<\/a>. \u00cdgy az egyeztetett kies\u00e9s ugyanabban a tervben szerepel, mint a fennmarad\u00f3 kapacit\u00e1s\u00e9rt verseng\u0151 feladatok, \u00e9s nem \u00d6nnek kell k\u00e9t k\u00fcl\u00f6n napt\u00e1rt \u00f6sszehangolnia.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00f6ntse el, minek kell elk\u00e9sz\u00fclnie a le\u00e1ll\u00e1s el\u0151tt<\/h2>\n\n\n<p>Kezdje azokkal a rendel\u00e9sekkel, amelyek gy\u00e1rt\u00e1si \u00fatvonala \u00e9rinti a kies\u0151 er\u0151forr\u00e1st. K\u00f6vesse v\u00e9gig a m\u00e9g h\u00e1tral\u00e9v\u0151 m\u0171veleteket eg\u00e9szen a kisz\u00e1ll\u00edt\u00e1sig. A m\u00e9rvad\u00f3 hat\u00e1rid\u0151 az a legk\u00e9s\u0151bbi id\u0151pont, amikor az \u00e9rintett m\u0171velet m\u00e9g befejezhet\u0151 \u00fagy, hogy a kisz\u00e1ll\u00edt\u00e1sig h\u00e1tral\u00e9v\u0151 m\u0171veletsor is teljes\u00edthet\u0151 maradjon.<\/p>\n\n\n<p>Ez a hat\u00e1rid\u0151 akkor is a karbantart\u00e1s el\u00e9 eshet, ha maga a kisz\u00e1ll\u00edt\u00e1s csak ut\u00e1na esed\u00e9kes. El\u0151sz\u00f6r ezeket a m\u0171veleteket azonos\u00edtsa. Ezeket \u00e9rdemes kor\u00e1bbra \u00fctemezni, felt\u00e9ve, hogy az el\u0151z\u0151 m\u0171veletek id\u0151ben elk\u00e9sz\u00fclnek, \u00e9s az anyagok, valamint az er\u0151forr\u00e1sok is rendelkez\u00e9sre \u00e1llnak.<\/p>\n\n\n<p>Ne hozzon el\u0151re minden \u00e9rintett rendel\u00e9st. A j\u00f6v\u0151 havi alkatr\u00e9szek korai legy\u00e1rt\u00e1sa \u00e9ppen az e heti v\u00e1llal\u00e1sokhoz sz\u00fcks\u00e9ges kapacit\u00e1st k\u00f6theti le, mik\u00f6zben olyan f\u00e9lk\u00e9sz k\u00e9szletet halmoz fel, amelyet egyel\u0151re nem lehet tov\u00e1bb feldolgozni. A c\u00e9l az, hogy elegend\u0151 munka k\u00e9sz\u00fclj\u00f6n el ahhoz, hogy a sz\u00fcks\u00e9ges tov\u00e1bbi m\u0171veletek a le\u00e1ll\u00e1s alatt is folytat\u00f3dhassanak.<\/p>\n\n\n<h3 class=\"wp-block-heading\">P\u00e9lda: p\u00e9nteki kisz\u00e1ll\u00edt\u00e1shoz h\u00e9tf\u0151i megmunk\u00e1l\u00e1s<\/h3>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy b\u00e9rgy\u00e1rt\u00f3 v\u00e1llalatot, amelynek egyik megmunk\u00e1l\u00f3k\u00f6zpontj\u00e1n kedd reggelt\u0151l cs\u00fct\u00f6rt\u00f6k reggelig karbantart\u00e1st v\u00e9geznek. Egy p\u00e9nteken kisz\u00e1ll\u00edtand\u00f3 rendel\u00e9shez megmunk\u00e1l\u00e1sra, ellen\u0151rz\u00e9sre \u00e9s v\u00e9gszerel\u00e9sre van sz\u00fcks\u00e9g. Az ellen\u0151rz\u00e9sre cs\u00fct\u00f6rt\u00f6k reggel van szabad id\u0151ablak, az \u00f6sszeszerel\u00e9sre pedig aznap d\u00e9lut\u00e1n ker\u00fclhet sor.<\/p>\n\n\n<p>Ha megv\u00e1rn\u00e1k a megmunk\u00e1l\u00f3k\u00f6zpont visszat\u00e9r\u00e9s\u00e9t, lemaradn\u00e1nak az ellen\u0151rz\u00e9si id\u0151ablakr\u00f3l. A tervez\u0151nek ez\u00e9rt \u00fagy kell \u00fctemeznie, hogy a megmunk\u00e1l\u00e1s a keddi le\u00e1ll\u00e1s el\u0151tt befejez\u0151dj\u00f6n, \u00e9s az ehhez sz\u00fcks\u00e9ges el\u0151k\u00e9sz\u00edt\u00e9s is id\u0151ben elk\u00e9sz\u00fclj\u00f6n.<\/p>\n\n\n<p>Egy m\u00e1sik rendel\u00e9s a k\u00f6vetkez\u0151 h\u00e9ten esed\u00e9kes, \u00edgy annak megmunk\u00e1l\u00e1sa a cs\u00fct\u00f6rt\u00f6ki visszat\u00e9r\u00e9s ut\u00e1n is belef\u00e9r. Ek\u00f6zben egy m\u00e1sik megmunk\u00e1l\u00f3k\u00f6zpont folytathatja azokat a munk\u00e1kat, amelyekre alkalmas, \u00e9s amelyekhez nincs sz\u00fcks\u00e9g a kies\u0151 er\u0151forr\u00e1sra.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u00c9rintett munka<\/th><th>Gy\u00e1rt\u00e1si d\u00f6nt\u00e9s<\/th><th>Mit kell ellen\u0151rizni?<\/th><\/tr><\/thead><tbody><tr><td>P\u00e9nteken kisz\u00e1ll\u00edtand\u00f3 rendel\u00e9s<\/td><td>A megmunk\u00e1l\u00e1s fejez\u0151dj\u00f6n be a le\u00e1ll\u00e1s el\u0151tt<\/td><td>Az el\u0151k\u00e9sz\u00edt\u00e9s id\u0151beni befejez\u00e9se \u00e9s az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa, majd az ellen\u0151rz\u00e9si \u00e9s szerel\u00e9si kapacit\u00e1s<\/td><\/tr><tr><td>A k\u00f6vetkez\u0151 h\u00e9tre esed\u00e9kes rendel\u00e9s<\/td><td>A megmunk\u00e1l\u00e1s maradjon a visszat\u00e9r\u00e9s ut\u00e1nra, ha a teljes m\u0171veletsor m\u00e9g belef\u00e9r<\/td><td>Az \u00fajraind\u00edt\u00e1s ut\u00e1ni feladatsor \u00e9s a kisz\u00e1ll\u00edt\u00e1sig h\u00e1tral\u00e9v\u0151 id\u0151<\/td><\/tr><tr><td>F\u00fcggetlen munka<\/td><td>Folytat\u00f3djon a karbantart\u00e1s alatt<\/td><td>A hozz\u00e1 sz\u00fcks\u00e9ges g\u00e9p, g\u00e9pkezel\u0151 \u00e9s szersz\u00e1mok rendelkez\u00e9sre \u00e1ll\u00e1sa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A k\u00fcl\u00f6nbs\u00e9g egyszer\u0171: <strong>\u00f6nmag\u00e1ban a kisz\u00e1ll\u00edt\u00e1si priorit\u00e1s nem mondja meg, melyik m\u0171veletnek kell a karbantart\u00e1s el\u0151tt befejez\u0151dnie. Ezt a h\u00e1tral\u00e9v\u0151 m\u0171veletsor hat\u00e1rozza meg.<\/strong><\/p>\n\n\n<h2 class=\"wp-block-heading\">A t\u00f6bbi munka folytat\u00f3djon, de csak val\u00f3s helyettes\u00edt\u0151 kapacit\u00e1ssal sz\u00e1moljon<\/h2>\n\n\n<p>A tervezett kies\u00e9s nem jelenti azt, hogy az eg\u00e9sz r\u00e9szlegnek le kell \u00e1llnia. A nem \u00e9rintett g\u00e9peket tartsa el\u00e9rhet\u0151k\u00e9nt az \u00fctemtervben, \u00e9s azonos\u00edtsa azokat a munk\u00e1kat, amelyeket t\u00e9nylegesen el tudnak v\u00e9gezni. Ha csak egy szersz\u00e1mot tartanak karban, ugyanazon a g\u00e9pen m\u00e1s szersz\u00e1mokkal tov\u00e1bbra is v\u00e9gezhet\u0151k gy\u00e1rt\u00e1si feladatok.<\/p>\n\n\n<p>Egy m\u00e1sik g\u00e9p is seg\u00edthet, de csak akkor, ha a sz\u00fcks\u00e9ges szersz\u00e1mokkal, szem\u00e9lyzettel \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151ben el tudja v\u00e9gezni a m\u0171veletet. Ellen\u0151rizze az oda m\u00e1r be\u00fctemezett rendel\u00e9seket is. Egy t\u00e9tel \u00e1thelyez\u00e9se megmentheti az egyik sz\u00e1ll\u00edt\u00e1s hat\u00e1ridej\u00e9t, mik\u00f6zben k\u00e9sleltet egy m\u00e1sikat.<\/p>\n\n\n<p>A szersz\u00e1mkarbantart\u00e1s k\u00fcl\u00f6n\u00f6s figyelmet ig\u00e9nyel. Ha k\u00e9t g\u00e9pnek ugyanarra a fizikai befog\u00f3k\u00e9sz\u00fcl\u00e9kre van sz\u00fcks\u00e9ge, a feladat \u00e1thelyez\u00e9se a m\u00e1sodik g\u00e9pre sem seg\u00edt, am\u00edg a k\u00e9sz\u00fcl\u00e9k karbantart\u00e1son van. A korl\u00e1t a szersz\u00e1mhoz k\u00f6t\u0151dik. Egy m\u00e1sik alkalmas szersz\u00e1m csak akkor jelent alternat\u00edv\u00e1t, ha val\u00f3ban l\u00e9tezik \u00e9s rendelkez\u00e9sre is \u00e1ll.<\/p>\n\n\n<p>A SkyPlanner <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-utvonal\/\">m\u0171veletei<\/a> hat\u00e1rozz\u00e1k meg az alkalmas munka\u00e1llom\u00e1sokat, az id\u0151tartamokat \u00e9s a f\u00fcgg\u0151s\u00e9geket, az \u00fctemez\u00e9s pedig a szersz\u00e1mok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t is figyelembe veszi. E kapcsolatok r\u00f6gz\u00edt\u00e9s\u00e9vel az Arcturus a t\u00e9nylegesen haszn\u00e1lhat\u00f3 alternat\u00edv\u00e1kkal sz\u00e1molhat ahelyett, hogy minden szabad g\u00e9pi id\u0151ablakot egym\u00e1ssal felcser\u00e9lhet\u0151 kapacit\u00e1sk\u00e9nt kezelne.<\/p>\n\n\n<h2 class=\"wp-block-heading\">B\u00edzza a SkyPlanner rendszerre az \u00f6sszef\u00fcgg\u0151 m\u0171veletsor \u00fctemez\u00e9s\u00e9t<\/h2>\n\n\n<p>Ha a karbantart\u00e1si id\u0151szak \u00e9s a kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1si adatok naprak\u00e9szek, sz\u00e1m\u00edttassa \u00fajra az \u00fctemtervet. A SkyPlanner King Button gombja a be\u00e1ll\u00edtott er\u0151forr\u00e1sok, f\u00fcgg\u0151s\u00e9gek, priorit\u00e1sok \u00e9s szab\u00e1lyok alapj\u00e1n ind\u00edtja el az Arcturus \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1s\u00e1t, figyelembe v\u00e9ve a r\u00f6gz\u00edtett kies\u00e9si id\u0151szakokat. Az \u00edgy kapott er\u0151forr\u00e1s-hozz\u00e1rendel\u00e9sek \u00e9s id\u0151pontok a Gantt-diagramon l\u00e1that\u00f3k.<\/p>\n\n\n<p>A megmunk\u00e1l\u00e1si p\u00e9ld\u00e1ban az el\u0151ny nem puszt\u00e1n az, hogy a megmunk\u00e1l\u00f3k\u00f6zpont keddi \u00e9s szerdai napt\u00e1r\u00e1ban megjelenik a kies\u00e9s. Ellen\u0151rizheti, hogy a p\u00e9nteki rendel\u00e9s megmunk\u00e1l\u00e1sa befejez\u0151dik-e a le\u00e1ll\u00e1s el\u0151tt, az ellen\u0151rz\u00e9s \u00e9s az \u00f6sszeszerel\u00e9s tov\u00e1bbra is belef\u00e9r-e, illetve milyen feladatsor v\u00e1rja a k\u00f6vetkez\u0151 heti munk\u00e1t a cs\u00fct\u00f6rt\u00f6ki visszat\u00e9r\u00e9s ut\u00e1n. Ha egy alkalmas m\u00e1sik g\u00e9p \u00e1tvesz bizonyos feladatokat, az arra \u00fctemezett t\u00f6bbi rendel\u00e9st is figyelembe veheti az \u00e1ttekint\u00e9s sor\u00e1n.<\/p>\n\n\n<p>Ez\u00e9rt \u00e9rdemes a SkyPlanner rendszert haszn\u00e1lni k\u00fcl\u00f6n\u00e1ll\u00f3 g\u00e9pi feladatsorok vezet\u00e9se helyett. Az egyik er\u0151forr\u00e1st \u00e9rint\u0151 v\u00e1ltoz\u00e1s a t\u00f6bbire is hat\u00e1ssal van; az Arcturus elv\u00e9gzi az \u00f6sszef\u00fcgg\u0151 \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat, \u00d6n pedig eld\u00f6nti, mely v\u00e1llal\u00e1sok \u00e9lvezzenek els\u0151bbs\u00e9get.<\/p>\n\n\n<p>H\u00e1rom szempontb\u00f3l ellen\u0151rizze az eredm\u00e9nyt:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A le\u00e1ll\u00e1s el\u0151tt:<\/strong> id\u0151ben elk\u00e9sz\u00fcl-e a sz\u00fcks\u00e9ges munka, \u00e9s ehhez az el\u0151z\u0151 m\u0171veletek is id\u0151ben befejez\u0151dnek-e, valamint rendelkez\u00e9sre \u00e1llnak-e az anyagok?<\/li><li><strong>A le\u00e1ll\u00e1s alatt:<\/strong> a k\u00f6vetkez\u0151 m\u0171veletekhez rendelkez\u00e9sre \u00e1llnak-e a sz\u00fcks\u00e9ges munkadarabok, \u00e9s folytat\u00f3dhat-e a f\u00fcggetlen termel\u00e9s?<\/li><li><strong>A visszat\u00e9r\u00e9s ut\u00e1n:<\/strong> megval\u00f3s\u00edthat\u00f3-e az \u00fajraind\u00edt\u00e1sra tervezett sorrend, \u00e9s a h\u00e1tral\u00e9v\u0151 m\u0171veletekkel tarthat\u00f3k-e a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k?<\/li><\/ul>\n\n\n<p>Ha egy fontos rendel\u00e9s \u00edgy sem k\u00e9sz\u00fcl el hat\u00e1rid\u0151re, \u00e9rdemi termel\u00e9si d\u00f6nt\u00e9sre van sz\u00fcks\u00e9g. Seg\u00edthet egy alkalmas alternat\u00edv er\u0151forr\u00e1s, egy j\u00f3v\u00e1hagyott, szem\u00e9lyzettel is biztos\u00edtott t\u00f6bbletmunkaid\u0151 vagy a priorit\u00e1sok tudatos m\u00f3dos\u00edt\u00e1sa. Vizsg\u00e1lja meg az egyes v\u00e1ltoztat\u00e1sok hat\u00e1s\u00e1t a t\u00f6bbi rendel\u00e9sre. Ha tov\u00e1bbra sem teljes\u00edthet\u0151 a m\u0171veletsor, id\u0151ben egyeztessen \u00faj v\u00e1llal\u00e1st, ne csak kisz\u00e1ll\u00edt\u00e1skor der\u00fclj\u00f6n ki a hi\u00e1ny.<\/p>\n\n\n<p>Tartsa mag\u00e1t a felel\u0151s csapattal egyeztetett karbantart\u00e1si id\u0151ablakhoz. A feltorl\u00f3dott gy\u00e1rt\u00e1si feladatok nem adnak alapot annak felt\u00e9telez\u00e9s\u00e9re, hogy a g\u00e9p vagy a szersz\u00e1m biztons\u00e1gosan tov\u00e1bb haszn\u00e1lhat\u00f3.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kevesebb feladatsor-kezel\u00e9s, t\u00f6bb figyelem a termel\u00e9s ir\u00e1ny\u00edt\u00e1s\u00e1ra<\/h2>\n\n\n<p>A finn Mamec, amely ipari kever\u0151ket \u00e9s b\u00e9rgy\u00e1rt\u00e1sban cs\u00facstechnol\u00f3gi\u00e1s term\u00e9keket k\u00e9sz\u00edt, j\u00f3l ismeri, mennyi munk\u00e1val j\u00e1r az \u00f6sszef\u00fcgg\u0151 gy\u00e1rt\u00e1si feladatok sorrendj\u00e9nek kezel\u00e9se. A SkyPlanner bevezet\u00e9se el\u0151tt a m\u0171vezet\u0151k a pap\u00edralap\u00fa munkalapokon szerepl\u0151 sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k alapj\u00e1n rangsorolt\u00e1k a munk\u00e1kat. T\u00f6bb ezer gy\u00e1rt\u00e1si feladat k\u00f6lcs\u00f6n\u00f6s f\u00fcgg\u0151s\u00e9geit neh\u00e9z volt k\u00e9zzel kezelni, az \u00f6sszterhel\u00e9sr\u0151l pedig nem volt egy\u00e9rtelm\u0171 k\u00e9p.<\/p>\n\n\n<p>A Mamec \u00f6sszekapcsolta a SkyPlanner rendszert az Oscar ERP rendszer\u00e9vel, \u00e9s a gy\u00e1rt\u00e1stervez\u00e9s els\u0151dleges platformj\u00e1v\u00e1 tette. Az alapot a mesters\u00e9ges intelligenci\u00e1ra \u00e9p\u00fcl\u0151, v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9s adja, a k\u00f6z\u00f6sen el\u00e9rhet\u0151 \u00e1ttekint\u00e9sb\u0151l pedig a munkat\u00e1rsak l\u00e1thatj\u00e1k, hol tart egy rendel\u00e9s. <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">A Mamec besz\u00e1mol\u00f3ja szerint<\/a> a tervez\u00e9si munkateher \u00e9rezhet\u0151en cs\u00f6kkent, \u00e9s javult a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa.<\/p>\n\n\n<p>Ez a tapasztalat j\u00f3l mutatja az \u00f6sszef\u00fcgg\u00e9seket kezel\u0151 \u00fctemez\u00e9s \u00e9rt\u00e9k\u00e9t: a tervez\u0151 \u00e1tl\u00e1thatja egy v\u00e1ltoztat\u00e1s k\u00f6vetkezm\u00e9nyeit an\u00e9lk\u00fcl, hogy k\u00fcl\u00f6n\u00e1ll\u00f3 feladatlist\u00e1kb\u00f3l kellene \u00fajra \u00f6ssze\u00e1ll\u00edtania a gy\u00e1rt\u00e1s sorrendj\u00e9t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00e1r a le\u00e1ll\u00e1s el\u0151tt k\u00e9sz\u00edtse el\u0151 az \u00fajraind\u00edt\u00e1st<\/h2>\n\n\n<p>A karbantart\u00e1s kezdete el\u0151tt adjon a m\u0171vezet\u0151nek egy\u00e9rtelm\u0171 sorrendet a m\u00e9g befejezend\u0151 munk\u00e1kr\u00f3l, a m\u00e1sutt folytat\u00f3d\u00f3 feladatokr\u00f3l \u00e9s a visszat\u00e9r\u00e9s ut\u00e1nra tervezett els\u0151 gy\u00e1rt\u00e1si feladatokr\u00f3l. Ellen\u0151rizze, hogy az \u00fajraind\u00edt\u00e1shoz rendelkez\u00e9sre \u00e1llnak-e majd a szersz\u00e1mok, az anyagok \u00e9s a g\u00e9pkezel\u0151k. Ker\u00fclje az olyan feladatsort, amelyben pap\u00edron minden munka a g\u00e9p el\u00e9rhet\u0151v\u00e9 v\u00e1l\u00e1s\u00e1nak pillanat\u00e1ban indulna.<\/p>\n\n\n<p>Az \u00e9rt\u00e9kes\u00edt\u00e9snek is biztos\u00edtson egys\u00e9ges k\u00e9pet az \u00e9rintett v\u00e1llal\u00e1sokr\u00f3l. Ugyanabb\u00f3l a gy\u00e1rt\u00e1si tervb\u0151l der\u00fclj\u00f6n ki, mely rendel\u00e9sek f\u00e9rnek m\u00e9g bele, melyekr\u0151l kell d\u00f6nteni, \u00e9s milyen hat\u00e1rid\u0151k m\u00f3dosultak.<\/p>\n\n\n<p>Ha a karbantart\u00e1s miatt v\u00e1ltozik a v\u00e1rhat\u00f3 visszat\u00e9r\u00e9s id\u0151pontja, friss\u00edtse a r\u00f6gz\u00edtett rendelkez\u00e9sre \u00e1ll\u00e1st, \u00e9s sz\u00e1m\u00edttassa \u00fajra az \u00fctemtervet. Miel\u0151tt \u00faj v\u00e1llal\u00e1sokat k\u00f6z\u00f6lne, ism\u00e9t tekintse \u00e1t a tov\u00e1bbi m\u0171veleteket \u00e9s az \u00fajraind\u00edt\u00e1s ut\u00e1ni feladatsort. A SkyPlanner cs\u00f6kkenti az ehhez sz\u00fcks\u00e9ges k\u00e9zi munk\u00e1t, mert az er\u0151forr\u00e1sok k\u00f6z\u00f6tti kapcsolatok m\u00e1r az \u00fctemterv r\u00e9sz\u00e9t k\u00e9pezik.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tervezze meg a k\u00f6vetkez\u0151 karbantart\u00e1si le\u00e1ll\u00e1st a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>Az el\u0151re egyeztetett karbantart\u00e1si id\u0151szak lehet\u0151s\u00e9get ad arra, hogy m\u00e9g a s\u00fcrget\u0151 helyzet kialakul\u00e1sa el\u0151tt d\u00f6nts\u00f6n a gy\u00e1rt\u00e1sr\u00f3l. A SkyPlanner ezt az id\u0151szakot \u00fctemez\u00e9si korl\u00e1tk\u00e9nt veszi figyelembe, \u00f6sszekapcsolja a rendel\u00e9sek m\u0171veleti sorrendj\u00e9vel, \u00e9s megjelen\u00edti az \u00edgy \u00fctemezett feladatokat a Gantt-diagramon. \u00cdgy kevesebb id\u0151t kell a feladatsorok jav\u00edt\u00e1s\u00e1ra ford\u00edtania, \u00e9s t\u00f6bb ideje marad a fontos v\u00e1llal\u00e1sok betart\u00e1s\u00e1ra.<\/p>\n\n\n<p>Megl\u00e9v\u0151 v\u00e1llalatir\u00e1ny\u00edt\u00e1si vagy gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1si rendszer\u00e9t tov\u00e1bbra is haszn\u00e1lhatja: a SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3<\/a>.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, amelynek k\u00f6z\u00e9ppontj\u00e1ban a k\u00f6vetkez\u0151 tervezett karbantart\u00e1si id\u0151szaka \u00e1ll. K\u00e9sz\u00fclj\u00f6n az \u00e9rintett g\u00e9p vagy szersz\u00e1m adataival, egy rendel\u00e9s m\u0171veleti sorrendj\u00e9vel \u00e9s az \u00fajb\u00f3li rendelkez\u00e9sre \u00e1ll\u00e1s k\u00f6r\u00fcli id\u0151szakban esed\u00e9kes sz\u00e1ll\u00edt\u00e1sok adataival. K\u00e9rje meg, hogy mutass\u00e1k meg, mely m\u0171veleteknek kell befejez\u0151dni\u00fck a le\u00e1ll\u00e1s el\u0151tt, melyek folytat\u00f3dhatnak k\u00f6zben, \u00e9s hogyan m\u00f3dos\u00edtja az \u00fajraind\u00edt\u00e1s a t\u00f6bbi rendel\u00e9s \u00fctemez\u00e9s\u00e9t.<\/p>\n\n\n<p>Ha el\u0151sz\u00f6r az \u00fctemez\u00e9si megk\u00f6zel\u00edt\u00e9st szeretn\u00e9 megismerni, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner m\u0171k\u00f6d\u00e9s\u00e9t bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket A megmunk\u00e1l\u00f3k\u00f6zpont cs\u00fct\u00f6rt\u00f6k\u00f6n \u00fajra \u00fczembe \u00e1ll. A vev\u0151 rendel\u00e9s\u00e9t p\u00e9nteken kell kisz\u00e1ll\u00edtani. Ez teljes\u00edthet\u0151nek t\u0171nik, am\u00edg ki nem der\u00fcl, hogy az ellen\u0151rz\u00e9shez m\u00e1r cs\u00fct\u00f6rt\u00f6k reggel sz\u00fcks\u00e9g van a megmunk\u00e1lt alkatr\u00e9szekre \u2014 m\u00e9g miel\u0151tt az \u00fajraind\u00edtott g\u00e9p el &#8230; <a title=\"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/\" aria-label=\"Read more about Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":101818,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-101800","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Termel\u00e9s\u00fctemez\u00e9s karbantart\u00e1s alatt: pontos sz\u00e1ll\u00edt\u00e1s<\/title>\n<meta name=\"description\" content=\"A karbantart\u00e1s id\u0151pontja adott. Mi k\u00e9sz\u00fclj\u00f6n el el\u0151tte, mi v\u00e1rhat? A SkyPlanner az \u00f6sszef\u00fcgg\u0151 rendel\u00e9seket \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is szem el\u0151tt tartja.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket\" \/>\n<meta property=\"og:description\" content=\"A karbantart\u00e1s id\u0151pontja adott. Mi k\u00e9sz\u00fclj\u00f6n el el\u0151tte, mi v\u00e1rhat? A SkyPlanner az \u00f6sszef\u00fcgg\u0151 rendel\u00e9seket \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is szem el\u0151tt tartja.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T00:44:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T00:45:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket\",\"datePublished\":\"2026-10-20T00:44:37+00:00\",\"dateModified\":\"2026-10-20T00:45:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/\"},\"wordCount\":2781,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/\",\"name\":\"Termel\u00e9s\u00fctemez\u00e9s karbantart\u00e1s alatt: pontos sz\u00e1ll\u00edt\u00e1s\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"datePublished\":\"2026-10-20T00:44:37+00:00\",\"dateModified\":\"2026-10-20T00:45:35+00:00\",\"description\":\"A karbantart\u00e1s id\u0151pontja adott. Mi k\u00e9sz\u00fclj\u00f6n el el\u0151tte, mi v\u00e1rhat? A SkyPlanner az \u00f6sszef\u00fcgg\u0151 rendel\u00e9seket \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is szem el\u0151tt tartja.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-around-maintenance-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Machined components on a rack beside a machining centre, a wrench and an inspection bench.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/termelesutemezes-karbantartas-alatt\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Termel\u00e9s\u00fctemez\u00e9s karbantart\u00e1s alatt: pontos sz\u00e1ll\u00edt\u00e1s","description":"A karbantart\u00e1s id\u0151pontja adott. Mi k\u00e9sz\u00fclj\u00f6n el el\u0151tte, mi v\u00e1rhat? A SkyPlanner az \u00f6sszef\u00fcgg\u0151 rendel\u00e9seket \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is szem el\u0151tt tartja.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/","og_locale":"hu_HU","og_type":"article","og_title":"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket","og_description":"A karbantart\u00e1s id\u0151pontja adott. Mi k\u00e9sz\u00fclj\u00f6n el el\u0151tte, mi v\u00e1rhat? A SkyPlanner az \u00f6sszef\u00fcgg\u0151 rendel\u00e9seket \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is szem el\u0151tt tartja.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T00:44:37+00:00","article_modified_time":"2026-10-20T00:45:35+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket","datePublished":"2026-10-20T00:44:37+00:00","dateModified":"2026-10-20T00:45:35+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/"},"wordCount":2781,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/","name":"Termel\u00e9s\u00fctemez\u00e9s karbantart\u00e1s alatt: pontos sz\u00e1ll\u00edt\u00e1s","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","datePublished":"2026-10-20T00:44:37+00:00","dateModified":"2026-10-20T00:45:35+00:00","description":"A karbantart\u00e1s id\u0151pontja adott. Mi k\u00e9sz\u00fclj\u00f6n el el\u0151tte, mi v\u00e1rhat? A SkyPlanner az \u00f6sszef\u00fcgg\u0151 rendel\u00e9seket \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is szem el\u0151tt tartja.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png","width":1776,"height":999,"caption":"Machined components on a rack beside a machining centre, a wrench and an inspection bench."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesutemezes-karbantartas-alatt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-around-maintenance-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Gy\u00e1rt\u00e1s\u00fctemez\u00e9s karbantart\u00e1s idej\u00e9n: tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket A megmunk\u00e1l\u00f3k\u00f6zpont cs\u00fct\u00f6rt\u00f6k\u00f6n \u00fajra \u00fczembe \u00e1ll. A vev\u0151 rendel\u00e9s\u00e9t p\u00e9nteken kell kisz\u00e1ll\u00edtani. Ez teljes\u00edthet\u0151nek t\u0171nik, am\u00edg ki nem der\u00fcl, hogy az ellen\u0151rz\u00e9shez m\u00e1r cs\u00fct\u00f6rt\u00f6k reggel sz\u00fcks\u00e9g van a megmunk\u00e1lt alkatr\u00e9szekre \u2014 m\u00e9g miel\u0151tt az \u00fajraind\u00edtott g\u00e9p el&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/101800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=101800"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/101800\/revisions"}],"predecessor-version":[{"id":101865,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/101800\/revisions\/101865"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/101818"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=101800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=101800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=101800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}