{"id":101433,"date":"2026-10-17T17:00:34","date_gmt":"2026-10-17T17:00:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101433"},"modified":"2026-10-17T17:01:30","modified_gmt":"2026-10-17T17:01:30","slug":"munkaido-normazas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/","title":{"rendered":"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A gy\u00e1rt\u00e1si munkaid\u0151-norm\u00e1z\u00e1s sor\u00e1n egy pontosan meghat\u00e1rozott munka id\u0151ig\u00e9ny\u00e9t m\u00e9rj\u00fck, hogy meg\u00e1llap\u00edthassuk, adott felt\u00e9telek mellett mennyi ideig kell tartania. K\u00f6zvetlen, stopper\u00f3r\u00e1s id\u0151felv\u00e9teln\u00e9l a munk\u00e1t elemekre bontjuk, megm\u00e9rj\u00fck az id\u0151tartamukat, ahol indokolt, figyelembe vessz\u00fck a norm\u00e1l munkatemp\u00f3t, majd a megalapozott p\u00f3tid\u0151k hozz\u00e1ad\u00e1s\u00e1val meghat\u00e1rozzuk a normaid\u0151t.<\/p>\n\n\n<p>A kulcssz\u00f3 a <strong>pontosan meghat\u00e1rozott<\/strong>. A m\u00falt h\u00f3napban a gy\u00e1rt\u00e1si feladatokra k\u00f6nyvelt id\u0151k \u00e1tlaga k\u00fcl\u00f6nb\u00f6z\u0151 munkam\u00f3dszereket, anyaghi\u00e1ny miatti v\u00e1rakoz\u00e1st \u00e9s betanul\u00e1si id\u0151t is \u00f6sszemoshat. A leggyorsabb dolgoz\u00f3 idej\u00e9t m\u00e9rve m\u00e1s sz\u00e1mot kapunk, de ett\u0151l a norma m\u00e9g nem felt\u00e9tlen\u00fcl lesz jobb.<\/p>\n\n\n<p>A hasznos vizsg\u00e1lat olyan id\u0151\u00e9rt\u00e9ket ad, amelynek az alapj\u00e1t meg tudjuk indokolni, amelyet ellen\u0151rizni tudunk, \u00e9s amelyet a munka v\u00e1ltoz\u00e1sakor friss\u00edthet\u00fcnk. A SkyPlanner ezut\u00e1n seg\u00edt a re\u00e1lis m\u0171veleti id\u0151ket a teljes rendel\u00e9s\u00e1llom\u00e1ny tervez\u00e9s\u00e9ben \u00e9rv\u00e9nyes\u00edteni. \u00cdgy nem kell az ERP-ben \u00e1t\u00edrt sz\u00e1m ut\u00e1n minden \u00e9rintett g\u00e9p feladatsor\u00e1t k\u00e9zzel \u00fajratervezni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00e9rt id\u0151, norm\u00e1lid\u0151 \u00e9s normaid\u0151<\/h2>\n\n\n<p>Ez a h\u00e1rom id\u0151\u00e9rt\u00e9k m\u00e1s-m\u00e1s k\u00e9rd\u00e9sre ad v\u00e1laszt:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Id\u0151<\/th><th>Jelent\u00e9se<\/th><th>Mit kell hozz\u00e1 ismerni?<\/th><\/tr><\/thead><tbody><tr><td>M\u00e9rt id\u0151<\/td><td>Mennyi ideig tartott t\u00e9nylegesen a megfigyelt munka<\/td><td>A munkam\u00f3dszert, a m\u00e9r\u00e9s kezd\u0151- \u00e9s v\u00e9gpontj\u00e1t, valamint a megfigyel\u00e9s k\u00f6r\u00fclm\u00e9nyeit<\/td><\/tr><tr><td>Norm\u00e1lid\u0151<\/td><td>A meghat\u00e1rozott munka id\u0151ig\u00e9nye a viszony\u00edt\u00e1si alapk\u00e9nt haszn\u00e1lt munkatemp\u00f3 mellett<\/td><td>A temp\u00f3f\u00fcgg\u0151 k\u00e9zi munka munkatemp\u00f3j\u00e1nak megalapozott \u00e9rt\u00e9kel\u00e9s\u00e9t<\/td><\/tr><tr><td>Normaid\u0151<\/td><td>Norm\u00e1lid\u0151 a vonatkoz\u00f3 p\u00f3tid\u0151kkel egy\u00fctt<\/td><td>Az alkalmazand\u00f3 p\u00f3tid\u0151ket \u00e9s sz\u00e1m\u00edt\u00e1si m\u00f3djukat<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A normaid\u0151 nem gyorsas\u00e1gi rekord. Egy meghat\u00e1rozott munkam\u00f3dszer id\u0151ig\u00e9ny\u00e9t fejezi ki, ha azt betan\u00edtott, gyakorlott dolgoz\u00f3 v\u00e9gzi a viszony\u00edt\u00e1si alapk\u00e9nt haszn\u00e1lt temp\u00f3ban, a sz\u00fcks\u00e9ges p\u00f3tid\u0151ket is figyelembe v\u00e9ve.<\/p>\n\n\n<p>A k\u00e9zi munka normaid\u0151je sem jelenti automatikusan azt az id\u0151t, amelyre egy g\u00e9pet le kell foglalni. A g\u00e9p p\u00e9ld\u00e1ul m\u0171k\u00f6dhet, mik\u00f6zben a kezel\u0151je az el\u0151z\u0151 darabot ellen\u0151rzi. Ezt a k\u00fcl\u00f6nbs\u00e9get a teljes vizsg\u00e1lat sor\u00e1n tartsa szem el\u0151tt: el\u0151sz\u00f6r a munkatartalmat hat\u00e1rozza meg, \u00e9s csak ut\u00e1na d\u00f6nti el, hogyan terheli az egyes er\u0151forr\u00e1sokat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A munk\u00e1hoz ill\u0151 m\u00e9r\u00e9si m\u00f3dszert v\u00e1lasszon<\/h2>\n\n\n<p>A k\u00f6zvetlen, stopper\u00f3r\u00e1s id\u0151felv\u00e9tel olyan stabil, ism\u00e9tl\u0151d\u0151 munk\u00e1hoz alkalmas, amelynek az elemei megfigyelhet\u0151k. J\u00f3 v\u00e1laszt\u00e1s, ha meg kell \u00e9rtenie, mi\u00e9rt hib\u00e1s a megl\u00e9v\u0151 norma, \u00e9s nem csup\u00e1n egy m\u00e1sik becsl\u00e9ssel szeretn\u00e9 felv\u00e1ltani.<\/p>\n\n\n<p>M\u00e1s helyzetekben m\u00e1s megk\u00f6zel\u00edt\u00e9sre van sz\u00fcks\u00e9g:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A hasonl\u00f3 munk\u00e1kban ismert elemek ism\u00e9tl\u0151dnek.<\/strong> Valid\u00e1lt normaid\u0151-adatb\u00e1zis alapj\u00e1n a m\u00e1r meghat\u00e1rozott elemi id\u0151k \u00f6sszevonhat\u00f3k, ha a munkam\u00f3dszer \u00e9s a befoly\u00e1sol\u00f3 t\u00e9nyez\u0151k megegyeznek. Elt\u00e9r\u0151 term\u00e9kek adataib\u00f3l ne k\u00e9pezzen k\u00f6z\u00f6s \u00e1tlagot.<\/li><li><strong>A k\u00e9zi munka m\u00f3dszer\u00e9t m\u00e9g a gy\u00e1rt\u00e1s megkezd\u00e9se el\u0151tt tervezik.<\/strong> El\u0151re meghat\u00e1rozott mozdulatid\u0151kre \u00e9p\u00fcl\u0151 rendszerrel az id\u0151ig\u00e9ny a defini\u00e1lt mozdulatokb\u00f3l \u00e1ll\u00edthat\u00f3 \u00f6ssze. Ehhez a v\u00e1lasztott rendszer szakszer\u0171, k\u00e9pzetts\u00e9gre \u00e9p\u00fcl\u0151 alkalmaz\u00e1sa sz\u00fcks\u00e9ges, nem pedig a stopper\u00f3r\u00e1s m\u00e9r\u00e9shez tartoz\u00f3 munkatemp\u00f3 tal\u00e1lomra t\u00f6rt\u00e9n\u0151 \u00e9rt\u00e9kel\u00e9se.<\/li><li><strong>Azt kell meg\u00e9rtenie, mire megy el a m\u0171szak ideje.<\/strong> A munkanap-f\u00e9nyk\u00e9pez\u00e9s mintav\u00e9teles v\u00e1ltozata, a multimoment felv\u00e9tel megbecs\u00fcli a tev\u00e9kenys\u00e9gekre vagy v\u00e1rakoz\u00e1sra ford\u00edtott id\u0151 ar\u00e1ny\u00e1t. Seg\u00edtheti a p\u00f3tid\u0151k meghat\u00e1roz\u00e1s\u00e1t, de \u00f6nmag\u00e1ban nem adja meg az egyes r\u00f6vid munkaelemek r\u00e9szletes id\u0151ig\u00e9ny\u00e9t.<\/li><li><strong>Az id\u0151tartamot a technol\u00f3giai folyamat hat\u00e1rozza meg.<\/strong> A g\u00e9pid\u0151t a program vagy a folyamat param\u00e9terei alapj\u00e1n sz\u00e1m\u00edtsa ki, illetve ellen\u0151rizze, a g\u00e9pkezel\u0151 munk\u00e1j\u00e1t pedig k\u00fcl\u00f6n vizsg\u00e1lja.<\/li><\/ul>\n\n\n<p>A kor\u00e1bbi gy\u00e1rt\u00e1si feladatok nyilv\u00e1ntart\u00e1sai tov\u00e1bbra is hasznos t\u00e1mpontok. Miel\u0151tt normak\u00e9nt kezeln\u00e9 \u0151ket, ellen\u0151rizze, mit tartalmaznak: az anyaghi\u00e1ny miatti v\u00e1rakoz\u00e1st is mag\u00e1ban foglal\u00f3 k\u00f6nyvelt id\u0151 \u00f6nmag\u00e1ban nem mutatja meg a k\u00e9zi munka norm\u00e1l id\u0151ig\u00e9ny\u00e9t.<\/p>\n\n\n<p>Az al\u00e1bbi m\u00f3dszer az ism\u00e9tl\u0151d\u0151 munka k\u00f6zvetlen id\u0151felv\u00e9tel\u00e9re \u00f6sszpontos\u00edt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. A stopper ind\u00edt\u00e1sa el\u0151tt hat\u00e1rozza meg a munkam\u00f3dszert<\/h2>\n\n\n<p>Olyan m\u0171veletet v\u00e1lasszon, amelyn\u00e9l egy megb\u00edzhat\u00f3bb norma t\u00e9nylegesen befoly\u00e1sol egy d\u00f6nt\u00e9st. Ilyen lehet p\u00e9ld\u00e1ul egy er\u0151sen terhelt szerel\u0151\u00e1llom\u00e1s, vagy egy visszat\u00e9r\u0151 gy\u00e1rt\u00e1si feladat, amelynek az id\u0151ig\u00e9nye rendszeresen meglepi a tervez\u0151ket.<\/p>\n\n\n<p>R\u00f6gz\u00edtse a term\u00e9ket \u00e9s annak m\u00f3dos\u00edt\u00e1si \u00e1llapot\u00e1t, a berendez\u00e9seket, a szersz\u00e1mokat, az anyagok elrendez\u00e9s\u00e9t \u00e9s rendelkez\u00e9sre bocs\u00e1t\u00e1s\u00e1nak m\u00f3dj\u00e1t, a munkasorrendet \u00e9s a sz\u00fcks\u00e9ges min\u0151s\u00e9gellen\u0151rz\u00e9seket. Hat\u00e1rozza meg a kezd\u0151 \u00e9s a befejez\u0151 esem\u00e9nyt. Tegye egy\u00e9rtelm\u0171v\u00e9, hogy az eredm\u00e9ny darabra, ciklusra vagy gy\u00e1rt\u00e1si t\u00e9telre vonatkozik, az egyszeri \u00e1t\u00e1ll\u00e1st pedig k\u00fcl\u00f6n t\u00e9telk\u00e9nt r\u00f6gz\u00edtse.<\/p>\n\n\n<p>A le\u00edr\u00e1st besz\u00e9lje \u00e1t a m\u0171veletet v\u00e9gz\u0151 dolgoz\u00f3kkal. Mondja el, mi\u00e9rt k\u00e9sz\u00fcl a vizsg\u00e1lat, \u00e9s mire haszn\u00e1lj\u00e1k majd az eredm\u00e9nyeket. A tapasztalatuk gyakran r\u00e1vil\u00e1g\u00edt olyan sz\u00fcks\u00e9ges munk\u00e1kra, amelyeket a megl\u00e9v\u0151 becsl\u00e9s kihagy, p\u00e9ld\u00e1ul egy k\u00e9sz\u00fcl\u00e9k \u00fajrat\u00f6lt\u00e9s\u00e9re vagy egy id\u0151szakos ellen\u0151rz\u00e9sre.<\/p>\n\n\n<p>Olyan betan\u00edtott dolgoz\u00f3t figyeljen meg, aki a kialak\u00edtott, biztons\u00e1gos munkam\u00f3dszert k\u00f6veti. Ha a k\u00e9sz\u00fcl\u00e9ket m\u00e9g \u00e1ttervezik, vagy a dolgoz\u00f3 m\u00e9g tanulja a munkasorrendet, el\u0151bb tegye stabill\u00e1 a m\u00f3dszert. Egy kiforratlan folyamatra t\u00f6bb stopper\u00f3r\u00e1s m\u00e9r\u00e9ssel sem lehet megb\u00edzhat\u00f3 normaid\u0151t meg\u00e1llap\u00edtani.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. R\u00f6gz\u00edtse az elemeket, a gyakoris\u00e1gokat \u00e9s a rendk\u00edv\u00fcli esem\u00e9nyeket<\/h2>\n\n\n<p>A m\u0171veletet egy\u00e9rtelm\u0171en megfigyelhet\u0151 esem\u00e9nyekn\u00e9l bontsa elemekre: a h\u00e1z a k\u00e9sz\u00fcl\u00e9kbe ker\u00fclt, a k\u00f6t\u0151elemeket megh\u00fazt\u00e1k, az ellen\u0151rz\u00e9s befejez\u0151d\u00f6tt. V\u00e1lassza k\u00fcl\u00f6n a munkatemp\u00f3t\u00f3l f\u00fcgg\u0151 k\u00e9zi munk\u00e1t a g\u00e9p \u00e1ltal meghat\u00e1rozott id\u0151t\u0151l. A csak id\u0151nk\u00e9nt el\u0151fordul\u00f3 munk\u00e1t, p\u00e9ld\u00e1ul a t\u00e1rol\u00f3ed\u00e9ny cser\u00e9j\u00e9t a gyakoris\u00e1g\u00e1val egy\u00fctt r\u00f6gz\u00edtse, ne \u00fagy sz\u00e1moljon vele, mintha minden darabn\u00e1l elv\u00e9gezn\u00e9k.<\/p>\n\n\n<p>Minden megfigyel\u00e9sn\u00e9l \u0151rizze meg az elem idej\u00e9t, a l\u00e9nyeges k\u00f6r\u00fclm\u00e9nyeket \u00e9s az alkalmazott munkatemp\u00f3-\u00e9rt\u00e9kel\u00e9st. A megszak\u00edt\u00e1sokat akkor jegyezze fel, amikor bek\u00f6vetkeznek. Ha hi\u00e1nyzik egy alkatr\u00e9sz vagy elt\u00f6rik egy szersz\u00e1m, az esem\u00e9nyt \u00e9s az id\u0151tartam\u00e1t k\u00fcl\u00f6n r\u00f6gz\u00edtse; ne t\u00f6r\u00f6lje indokl\u00e1s n\u00e9lk\u00fcl a hossz\u00fa m\u00e9r\u00e9si eredm\u00e9nyt, \u00e9s ne rejtse el a szok\u00e1sos munkaid\u0151k \u00e1tlag\u00e1ban.<\/p>\n\n\n<p>A megfigyel\u00e9seket a jellemz\u0151 gy\u00e1rt\u00e1si k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt gy\u0171jtse, ne csup\u00e1n egy k\u00e9nyelmesen m\u00e9rhet\u0151, megszak\u00edt\u00e1s n\u00e9lk\u00fcli sorozatb\u00f3l. Ellen\u0151rizze, hogy azonos munkam\u00f3dszer \u00e9s k\u00f6r\u00fclm\u00e9nyek mellett az elemi id\u0151k kell\u0151en egyenletesek-e. Ha nem, vizsg\u00e1lja meg az ok\u00e1t: az anyagok elt\u00e9r\u0151 elrendez\u00e9se vagy rendelkez\u00e9sre bocs\u00e1t\u00e1sa k\u00fcl\u00f6n munkam\u00f3dszert ig\u00e9nyelhet, m\u00edg egy alkalmi m\u00e9r\u00e9si hib\u00e1t dokument\u00e1ltan jav\u00edtani kell.<\/p>\n\n\n<p><strong>Nincs olyan \u00e1ltal\u00e1nosan \u00e9rv\u00e9nyes ciklussz\u00e1m, amely \u00f6nmag\u00e1ban elegend\u0151v\u00e9 tenne egy vizsg\u00e1latot.<\/strong> A megfigyel\u00e9sek sz\u00fcks\u00e9ges sz\u00e1ma az ingadoz\u00e1st\u00f3l, az elv\u00e1rt pontoss\u00e1gt\u00f3l \u00e9s att\u00f3l a d\u00f6nt\u00e9st\u0151l f\u00fcgg, amelyet a norma t\u00e1mogatni fog. Egy kezdeti mint\u00e1val m\u00e9rje fel a sz\u00f3r\u00f3d\u00e1st, majd a v\u00e1lasztott megb\u00edzhat\u00f3s\u00e1gi \u00e9s pontoss\u00e1gi k\u00f6vetelm\u00e9nyek alapj\u00e1n hat\u00e1rozza meg a sz\u00fcks\u00e9ges mintanagys\u00e1got. Ezt k\u00e9pzett munkam\u00e9r\u00e9si szakember tudja meg\u00edt\u00e9lni. Egyetlen szokatlan gy\u00e1rt\u00e1si sorozat t\u00edz k\u00f6zel azonos m\u00e9r\u00e9si eredm\u00e9nye nem helyettes\u00edti a reprezentat\u00edv adatokat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. Sz\u00e1m\u00edtsa \u00e1t a k\u00e9zi munka m\u00e9rt idej\u00e9t norm\u00e1lid\u0151re<\/h2>\n\n\n<p>Minden elemhez sz\u00e1m\u00edtson reprezentat\u00edv m\u00e9rt id\u0151t az \u00f6sszehasonl\u00edthat\u00f3 m\u00e9r\u00e9si eredm\u00e9nyekb\u0151l; ez rendszerint a sz\u00e1mtani \u00e1tlaguk. Minden kiz\u00e1rt m\u00e9r\u00e9s indok\u00e1t \u0151rizze meg. Ha a munkatemp\u00f3 elt\u00e9r az egyes megfigyel\u00e9sek sor\u00e1n, az \u00f6sszes\u00edt\u00e9s el\u0151tt a hozz\u00e1juk tartoz\u00f3 \u00e9rt\u00e9kel\u00e9ssel sz\u00e1m\u00edtsa \u00e1t az id\u0151ket norm\u00e1lid\u0151re, ne egy t\u0151l\u00fck f\u00fcggetlen \u00e1tlagos temp\u00f3t\u00e9nyez\u0151t alkalmazzon.<\/p>\n\n\n<p>A munkatemp\u00f3 \u00e9rt\u00e9kel\u00e9se a megfigyelt k\u00e9zi munka temp\u00f3j\u00e1t egy meghat\u00e1rozott viszony\u00edt\u00e1si temp\u00f3hoz hasonl\u00edtja. Ha a sk\u00e1l\u00e1n a norm\u00e1l temp\u00f3 100%, a sz\u00e1m\u00edt\u00e1s a k\u00f6vetkez\u0151:<\/p>\n\n\n<p><strong>A k\u00e9zi munka norm\u00e1lideje = a k\u00e9zi munka m\u00e9rt ideje \u00d7 munkatemp\u00f3-t\u00e9nyez\u0151<\/strong><\/p>\n\n\n<p>A 110%-os munkatemp\u00f3hoz 1,10-es t\u00e9nyez\u0151 tartozik. Ez azt jelenti, hogy a megfigyelt munkav\u00e9gz\u00e9s gyorsabb volt a viszony\u00edt\u00e1si temp\u00f3n\u00e1l, ez\u00e9rt a norm\u00e1lideje hosszabb a m\u00e9rt id\u0151n\u00e9l. A 100% alatti \u00e9rt\u00e9kel\u00e9s ellenkez\u0151 ir\u00e1ny\u00fa korrekci\u00f3t eredm\u00e9nyez.<\/p>\n\n\n<p>A munkatemp\u00f3 \u00e9rt\u00e9kel\u00e9se nem olyan sz\u00e1zal\u00e9k megv\u00e1laszt\u00e1sa, amellyel az eredm\u00e9nyt a r\u00e9gi ERP-norm\u00e1hoz lehet igaz\u00edtani. K\u00e9pzett \u00e9rt\u00e9kel\u0151re, k\u00f6vetkezetesen alkalmazott viszony\u00edt\u00e1si alapra \u00e9s a munka megfigyel\u00e9se k\u00f6zben v\u00e9gzett \u00e9rt\u00e9kel\u00e9sre van sz\u00fcks\u00e9g. Ha az \u00e9rt\u00e9kel\u00e9s nem indokolhat\u00f3 meg, az eredm\u00e9nyt megfigyel\u00e9si adatk\u00e9nt \u0151rizze meg, ne norm\u00e1l temp\u00f3ra vonatkoz\u00f3 normak\u00e9nt t\u00fcntesse fel.<\/p>\n\n\n<p>A munkatemp\u00f3-t\u00e9nyez\u0151t az \u00e9rintett k\u00e9zi munkaelemekre alkalmazza, ne v\u00e1logat\u00e1s n\u00e9lk\u00fcl a m\u0171velet teljes eltelt idej\u00e9re. Egy automatikus, h\u00e1romperces f\u0171t\u00e9si ciklus nem lesz hosszabb att\u00f3l, hogy a berakod\u00e1st v\u00e9gz\u0151 dolgoz\u00f3 110%-os temp\u00f3ban dolgozott. Ha a temp\u00f3 megfigyel\u00e9senk\u00e9nt v\u00e1ltozik, az \u00f6sszetartoz\u00f3 id\u0151t \u00e9s \u00e9rt\u00e9kel\u00e9st egy\u00fctt \u0151rizze meg, hogy a sz\u00e1m\u00edt\u00e1s a t\u00e9nylegesen megfigyelt munk\u00e1t t\u00fckr\u00f6zze.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. Egy\u00e9rtelm\u0171 sz\u00e1m\u00edt\u00e1si alap szerint adja hozz\u00e1 a p\u00f3tid\u0151ket<\/h2>\n\n\n<p>A norm\u00e1lid\u0151 \u00f6nmag\u00e1ban nem fedezi a munkanap minden indokolt id\u0151ig\u00e9ny\u00e9t. A szem\u00e9lyes sz\u00fcks\u00e9gleteket, a munkav\u00e9gz\u00e9s okozta f\u00e1radts\u00e1g miatti pihen\u0151id\u0151t \u00e9s az adott munk\u00e1n\u00e1l elker\u00fclhetetlen v\u00e1rakoz\u00e1sokat megfelel\u0151en figyelembe kell venni.<\/p>\n\n\n<p>A p\u00f3tid\u0151ket a munka k\u00f6r\u00fclm\u00e9nyei, az alkalmazott munkam\u00e9r\u00e9si m\u00f3dszer, valamint az \u00e9rintett tev\u00e9kenys\u00e9gekr\u0151l vagy megszak\u00edt\u00e1sokr\u00f3l gy\u0171jt\u00f6tt adatok alapj\u00e1n hat\u00e1rozza meg. \u00c1tfog\u00f3bb megfigyel\u00e9ssel vagy multimoment felv\u00e9tellel meg\u00e1llap\u00edthat\u00f3 a rendszeresen visszat\u00e9r\u0151 kiszolg\u00e1l\u00f3 tev\u00e9kenys\u00e9gek \u00e9s v\u00e1rakoz\u00e1sok id\u0151ig\u00e9nye; a regener\u00e1l\u00f3d\u00e1si sz\u00fcks\u00e9gletekhez viszont a munk\u00e1t \u00e9s annak k\u00f6r\u00fclm\u00e9nyeit kell \u00e9rt\u00e9kelni. Egy m\u00e1sik gy\u00e1rb\u00f3l \u00e1tvett sz\u00e1zal\u00e9k nem helyettes\u00edti ezt az \u00e9rt\u00e9kel\u00e9st.<\/p>\n\n\n<p>A sz\u00fcks\u00e9ges, id\u0151szakosan v\u00e9gzett munk\u00e1kr\u00f3l se feledkezzen meg. Ha a rendszeres t\u00e1rol\u00f3ed\u00e9nycser\u00e9t m\u00e1r munkaelemk\u00e9nt besz\u00e1m\u00edtotta, ne sz\u00e1molja el \u00fajra az \u00e1ltal\u00e1nos v\u00e1rakoz\u00e1si p\u00f3tid\u0151ben. Ugyan\u00edgy ne \u00e9p\u00edtsen be minden elker\u00fclhet\u0151 meghib\u00e1sod\u00e1st vagy anyaghi\u00e1ny miatti v\u00e1rakoz\u00e1st \u00e1lland\u00f3 munkatartalomk\u00e9nt. R\u00f6gz\u00edtse ezeket a vesztes\u00e9geket, hogy kezelni lehessen \u0151ket, \u00e9s tegye egy\u00e9rtelm\u0171v\u00e9, hogyan veszik \u0151ket figyelembe a tervez\u00e9sben.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sz\u00e1m\u00edt\u00e1si p\u00e9lda: a megfigyel\u00e9sekt\u0151l a normaid\u0151ig<\/h3>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy stabil k\u00e9zi \u00f6sszeszerel\u00e9si m\u0171veletet. Az al\u00e1bbi sz\u00e1mok a sz\u00e1m\u00edt\u00e1st szeml\u00e9ltetik; a munkatemp\u00f3 \u00e9rt\u00e9kel\u00e9se \u00e9s a p\u00f3tid\u0151 m\u00e9rt\u00e9ke nem aj\u00e1nl\u00e1s az \u00d6n gy\u00e1ra sz\u00e1m\u00e1ra. Tegy\u00fck fel, hogy a felsorolt elemek egym\u00e1s ut\u00e1n, \u00f6sszeszerelt darabonk\u00e9nt egyszer fordulnak el\u0151, \u00e9s az elemz\u0151 megalapozottan 110%-osnak \u00e9rt\u00e9kelte a megfigyelt k\u00e9zi munka temp\u00f3j\u00e1t.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>K\u00e9zi munkaelem<\/th><th>Kiv\u00e1lasztott m\u00e9rt id\u0151<\/th><th>Munkatemp\u00f3-t\u00e9nyez\u0151<\/th><th>Norm\u00e1lid\u0151<\/th><\/tr><\/thead><tbody><tr><td>A h\u00e1z beilleszt\u00e9se<\/td><td>30 m\u00e1sodperc<\/td><td>1,10<\/td><td>33 m\u00e1sodperc<\/td><\/tr><tr><td>A szerelv\u00e9ny r\u00f6gz\u00edt\u00e9se<\/td><td>40 m\u00e1sodperc<\/td><td>1,10<\/td><td>44 m\u00e1sodperc<\/td><\/tr><tr><td>Ellen\u0151rz\u00e9s \u00e9s t\u00e1lc\u00e1ra helyez\u00e9s<\/td><td>20 m\u00e1sodperc<\/td><td>1,10<\/td><td>22 m\u00e1sodperc<\/td><\/tr><tr><td>A minden darabn\u00e1l ism\u00e9tl\u0151d\u0151 munka \u00f6sszesen<\/td><td>90 m\u00e1sodperc<\/td><td><\/td><td>99 m\u00e1sodperc<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Emellett minden 20 \u00f6ssze\u00e1ll\u00edtott darab ut\u00e1n t\u00e1rol\u00f3ed\u00e9nyt kell cser\u00e9lni. Ennek k\u00fcl\u00f6n meghat\u00e1rozott norm\u00e1lideje 60 m\u00e1sodperc, \u00edgy darabonk\u00e9nt 60 \u00f7 20 = 3 m\u00e1sodperccel kell sz\u00e1molni. A teljes norm\u00e1lid\u0151 teh\u00e1t <strong>102 m\u00e1sodperc darabonk\u00e9nt<\/strong>.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy a vizsg\u00e1lat a norm\u00e1lid\u0151 15%-\u00e1nak megfelel\u0151 p\u00f3tid\u0151t \u00e1llap\u00edt meg:<\/p>\n\n\n<p><strong>Normaid\u0151 = norm\u00e1lid\u0151 \u00d7 (1 + p\u00f3tid\u0151 ar\u00e1nya)<\/strong><\/p>\n\n\n<p>102 \u00d7 1,15 = <strong>117,3 m\u00e1sodperc darabonk\u00e9nt<\/strong>.<\/p>\n\n\n<p>Nem mindegy, mi a viszony\u00edt\u00e1si alap. Ha a p\u00f3tid\u0151 a teljes normaid\u0151 15%-a, akkor a k\u00f6vetkez\u0151 k\u00e9pletet kell haszn\u00e1lni:<\/p>\n\n\n<p><strong>Normaid\u0151 = norm\u00e1lid\u0151 \u00f7 (1 \u2212 p\u00f3tid\u0151 ar\u00e1nya)<\/strong><\/p>\n\n\n<p>102 \u00f7 0,85 = <strong>120 m\u00e1sodperc darabonk\u00e9nt<\/strong>.<\/p>\n\n\n<p>A k\u00e9t eredm\u00e9ny az\u00e9rt t\u00e9r el, mert a \u201e15%\u201d k\u00e9t k\u00fcl\u00f6nb\u00f6z\u0151 ar\u00e1nyt jel\u00f6l. R\u00f6gz\u00edtse, hogy a normaid\u0151 melyik viszony\u00edt\u00e1si alapra \u00e9p\u00fcl. A k\u00e9s\u0151bb ezzel dolgoz\u00f3 tervez\u0151nek ne a v\u00e9geredm\u00e9nyb\u0151l kelljen visszafejtenie a sz\u00e1m\u00edt\u00e1s m\u00f3dj\u00e1t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. Ellen\u0151rizze, majd vezesse be a k\u00e9s\u0151bb is karbantarthat\u00f3 normaid\u0151t<\/h2>\n\n\n<p>Miel\u0151tt lecser\u00e9li a jelenlegi normaid\u0151t, ellen\u0151rizze az eredm\u00e9nyt tov\u00e1bbi, azonos m\u00f3dszerrel \u00e9s k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt v\u00e9gzett gy\u00e1rt\u00e1sok adataival. Azonos mennyis\u00e9geket \u00e9s azonos kezd\u0151- \u00e9s v\u00e9gpontok k\u00f6z\u00f6tt m\u00e9rt id\u0151ket hasonl\u00edtson \u00f6ssze, bele\u00e9rtve a normaid\u0151ben szerepl\u0151 id\u0151szakos munk\u00e1t \u00e9s p\u00f3tid\u0151ket is. Ha egy ciklus a p\u00f3tid\u0151t is tartalmaz\u00f3 normaid\u0151n\u00e9l r\u00f6videbb, az \u00f6nmag\u00e1ban nem indokolja a p\u00f3tid\u0151 elhagy\u00e1s\u00e1t.<\/p>\n\n\n<p>A megmagyar\u00e1zatlan elt\u00e9r\u00e9seket tekintse \u00e1t a m\u0171veletet v\u00e9gz\u0151 dolgoz\u00f3val \u00e9s a munkam\u00f3dszer\u00e9rt felel\u0151s szem\u00e9llyel. Ha egy l\u00e9nyeges m\u0171veletelem hi\u00e1nya miatt hib\u00e1s az eredm\u00e9ny, jav\u00edtsa a vizsg\u00e1latot. Ha a munkam\u00f3dszer v\u00e1ltoz\u00f3, hat\u00e1rozza meg a v\u00e1ltozatokat. Ne emelje egyszer\u0171en addig a normaid\u0151t, am\u00edg minden kor\u00e1bbi id\u0151r\u00f6gz\u00edt\u00e9s bele nem f\u00e9r.<\/p>\n\n\n<p>Vezessen visszak\u00f6vethet\u0151 nyilv\u00e1ntart\u00e1st az al\u00e1bbiakr\u00f3l:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Az \u00e9rintett term\u00e9k, m\u0171velet, a munkam\u00f3dszer verzi\u00f3ja \u00e9s az er\u0151forr\u00e1sokra vonatkoz\u00f3 felt\u00e9telek.<\/li><li>Az eredeti m\u00e9r\u00e9si adatok, a m\u0171veletelemek el\u0151fordul\u00e1si gyakoris\u00e1ga \u00e9s a kiv\u00e9telek kezel\u00e9se.<\/li><li>A munkatemp\u00f3 \u00e9rt\u00e9kel\u00e9s\u00e9nek szab\u00e1lyai \u00e9s eredm\u00e9nye, valamint a norm\u00e1lid\u0151 sz\u00e1m\u00edt\u00e1sa.<\/li><li>A p\u00f3tid\u0151k kateg\u00f3ri\u00e1i, al\u00e1t\u00e1maszt\u00e1suk, a sz\u00e1m\u00edt\u00e1s viszony\u00edt\u00e1si alapja \u00e9s az \u00edgy kapott normaid\u0151.<\/li><li>Az ellen\u0151rz\u00e9s eredm\u00e9nye, a fel\u00fclvizsg\u00e1lat\u00e9rt felel\u0151s szem\u00e9ly, a hat\u00e1lybal\u00e9p\u00e9s d\u00e1tuma \u00e9s a fel\u00fclvizsg\u00e1latot sz\u00fcks\u00e9gess\u00e9 tev\u0151 k\u00f6r\u00fclm\u00e9nyek.<\/li><\/ul>\n\n\n<p>A normaid\u0151t a gy\u00e1rt\u00e1stechnol\u00f3giai j\u00f3v\u00e1hagy\u00e1si folyamaton kereszt\u00fcl vezesse be. A j\u00f3v\u00e1hagy\u00e1s azt igazolja, hogy a normaid\u0151 megfelel\u0151en al\u00e1t\u00e1masztott, \u00e9s a meghat\u00e1rozott k\u00f6rben haszn\u00e1lhat\u00f3; nem arra szolg\u00e1l, hogy a m\u00e9r\u00e9st egy alkuval kialak\u00edtott sz\u00e1mmal helyettes\u00edtse.<\/p>\n\n\n<p>Vizsg\u00e1lja fel\u00fcl a normaid\u0151t, ha v\u00e1ltozik a szersz\u00e1moz\u00e1s, az anyag, a konstrukci\u00f3, az ellen\u0151rz\u00e9si k\u00f6vetelm\u00e9ny vagy a munkam\u00f3dszer, illetve ha az \u00f6sszehasonl\u00edthat\u00f3 t\u00e9nyadatok tart\u00f3s, megmagyar\u00e1zatlan elt\u00e9r\u00e9st mutatnak. \u0150rizze meg az el\u0151z\u0151 verzi\u00f3t, hogy megk\u00fcl\u00f6nb\u00f6ztethesse a munkam\u00f3dszer t\u00e9nyleges javul\u00e1s\u00e1t az id\u0151r\u00f6gz\u00edt\u00e9s m\u00f3dj\u00e1nak v\u00e1ltoz\u00e1s\u00e1t\u00f3l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A normaid\u0151b\u0151l sz\u00e1m\u00edtson megfelel\u0151 er\u0151forr\u00e1s-terhel\u00e9st<\/h2>\n\n\n<p>Miel\u0151tt az eredm\u00e9nyt beviszi az \u00fctemez\u00e9si modellbe, tegye fel a k\u00e9rd\u00e9st: <strong>mit foglal le ez az id\u0151?<\/strong><\/p>\n\n\n<p>A teljesen k\u00e9zi munk\u00e1ra \u00e9p\u00fcl\u0151 p\u00e9ld\u00e1ban a normaid\u0151 egy munka\u00e1llom\u00e1son v\u00e9gzett \u00f6sszeszerel\u00e9st \u00edr le. Egy megmunk\u00e1l\u00e1si m\u0171veletn\u00e9l viszont a g\u00e9pkezel\u0151 munk\u00e1ja, az automatikus g\u00e9pi fut\u00e1s \u00e9s az ellen\u0151rz\u00e9s \u00e1tfedheti egym\u00e1st. Ha ezeket egyszer\u0171en \u00f6sszeadn\u00e1, t\u00falbecs\u00fcln\u00e9 a g\u00e9p foglalts\u00e1gi idej\u00e9t; ha viszont csak a forg\u00e1csol\u00e1si id\u0151vel sz\u00e1molna, kimaradhatna a munkadarab behelyez\u00e9se, amelynek befejez\u00e9s\u00e9ig a k\u00f6vetkez\u0151 ciklus nem indulhat el.<\/p>\n\n\n<p>Ha az \u00e1tfed\u00e9s sz\u00e1m\u00edt, \u00e1br\u00e1zolja p\u00e1rhuzamos id\u0151vonalakon a g\u00e9pkezel\u0151 \u00e9s a g\u00e9p tev\u00e9kenys\u00e9geit. Hat\u00e1rozza meg, hogy az egyes er\u0151forr\u00e1sok mikor foglaltak, \u00e9s hogy a g\u00e9pkezel\u0151 az automatikus fut\u00e1s alatt val\u00f3ban el tud-e l\u00e1tni m\u00e1s gy\u00e1rt\u00e1si feladatot. Ne felt\u00e9telezze, hogy a fel\u00fcgyelet n\u00e9lk\u00fcli g\u00e9pi fut\u00e1s korl\u00e1tlan g\u00e9pkezel\u0151i rendelkez\u00e9sre \u00e1ll\u00e1st jelent.<\/p>\n\n\n<p>A p\u00f3tid\u0151ket az er\u0151forr\u00e1snapt\u00e1rral is hangolja \u00f6ssze. Ha egy sz\u00fcnetet m\u00e1r levont a rendelkez\u00e9sre \u00e1ll\u00f3 munkaid\u0151b\u0151l, ugyanaz a sz\u00fcnet p\u00f3tid\u0151k\u00e9nt nem cs\u00f6kkentheti m\u00e9g egyszer a kapacit\u00e1st. \u0150rizze meg a vizsg\u00e1latban meg\u00e1llap\u00edtott normaid\u0151t, de dokument\u00e1lja, hogyan k\u00e9pez annak \u00f6sszetev\u0151ib\u0151l tervez\u00e9si id\u0151tartamot \u00e9s rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st.<\/p>\n\n\n<p>A darabid\u0151 kisz\u00e1m\u00edt\u00e1s\u00e1hoz \u00e9s az \u00e1t\u00e1ll\u00e1si id\u0151 k\u00fcl\u00f6n \u00e1tsz\u00e1m\u00edt\u00e1s\u00e1hoz elt\u00e9r\u0151 rendel\u00e9si mennyis\u00e9gek eset\u00e9n haszn\u00e1lja a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-ciklusido\/\">gy\u00e1rt\u00e1si ciklusid\u0151r\u0151l sz\u00f3l\u00f3 \u00fatmutat\u00f3nkat<\/a>. Itt azonban egy ezt megel\u0151z\u0151 k\u00e9rd\u00e9sr\u0151l van sz\u00f3: az alapul szolg\u00e1l\u00f3 normaid\u0151 egy\u00e1ltal\u00e1n a meghat\u00e1rozott munk\u00e1t \u00edrja-e le.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hasznos\u00edtsa a pontosabb id\u0151adatokat a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>Egy id\u0151tartam helyesb\u00edt\u00e9se nem csak a vizsg\u00e1lt m\u0171veletre hat. Megv\u00e1ltoztatja, hogy a feladat mekkora id\u0151s\u00e1vot ig\u00e9nyel a g\u00e9pre v\u00e1rakoz\u00f3 munk\u00e1k sor\u00e1ban, mikor indulhatnak a k\u00f6vetkez\u0151 m\u0171veletek, \u00e9s hogyan versenyeznek m\u00e1s rendel\u00e9sek ugyanaz\u00e9rt a kapacit\u00e1s\u00e9rt. Egyetlen t\u00f6rzsadat m\u00f3dos\u00edt\u00e1sa ennek a tervez\u00e9si munk\u00e1nak csak a kezdete.<\/p>\n\n\n<p>A SkyPlanner rendszerben meghat\u00e1rozhatja a m\u0171veletek id\u0151tartam\u00e1t, az el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s befejez\u00e9si id\u0151ket, az alkalmas munka\u00e1llom\u00e1sokat \u00e9s a f\u00fcgg\u0151s\u00e9geket. Az Arcturus, a rendszer \u00fctemez\u00e9sre szolg\u00e1l\u00f3 mesters\u00e9ges intelligenci\u00e1ja, a be\u00e1ll\u00edtott er\u0151forr\u00e1sok \u00e9s priorit\u00e1sok alapj\u00e1n <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">kisz\u00e1m\u00edtja a gy\u00e1rt\u00e1si \u00fctemtervet<\/a>, az eredm\u00e9nyt pedig a Gantt-n\u00e9zet jelen\u00edti meg. A re\u00e1lisabb id\u0151tartamok hat\u00e1s\u00e1t a teljes rendel\u00e9s\u00e1llom\u00e1nyon \u00e1ttekintheti, ahelyett, hogy minden \u00e9rintett g\u00e9p feladatsor\u00e1t k\u00e9zzel \u00e9p\u00edten\u00e9 \u00fajra. A priorit\u00e1sokat \u00d6n hat\u00e1rozza meg, d\u00f6nt\u00e9seit pedig szab\u00e1lyokkal \u00e9s z\u00e1rol\u00e1sokkal v\u00e9dheti.<\/p>\n\n\n<p>A SkyPlanner Timer \u00e9s ShopFloor eszk\u00f6zei t\u00e1mogatj\u00e1k az id\u0151k \u00e9s mennyis\u00e9gek r\u00f6gz\u00edt\u00e9s\u00e9t, \u00edgy a k\u00e9s\u0151bbi fel\u00fclvizsg\u00e1latokhoz t\u00e9nyleges gy\u00e1rt\u00e1si adatok \u00e1llnak rendelkez\u00e9sre. A rendszer kor\u00e1bbi id\u0151napl\u00f3k alapj\u00e1n a m\u0171veletek id\u0151tartam\u00e1t is k\u00e9pes el\u0151re jelezni. Ez seg\u00edt abban, hogy a tervez\u00e9si becsl\u00e9sek a tapasztalatokra \u00e9p\u00fcljenek. A munkaid\u0151-norm\u00e1z\u00e1s arra ad v\u00e1laszt, hogy a meghat\u00e1rozott munka norm\u00e1l munkatemp\u00f3 mellett mennyi id\u0151t ig\u00e9nyel; a m\u00faltbeli adatokra \u00e9p\u00fcl\u0151 el\u0151rejelz\u00e9s pedig a r\u00f6gz\u00edtett gy\u00e1rt\u00e1si adatokb\u00f3l seg\u00edt megbecs\u00fclni az id\u0151tartamot. Amikor eld\u00f6nti, melyik bemeneti adatot haszn\u00e1lja, tartsa szem el\u0151tt ezt a k\u00e9t elt\u00e9r\u0151 c\u00e9lt.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">A Mamec tapasztalatai<\/a> megmutatj\u00e1k, mi\u00e9rt fontos az \u00f6sszehangolt \u00fctemez\u00e9s. A finn gy\u00e1rt\u00f3n\u00e1l t\u00f6bb ezer, egym\u00e1st\u00f3l f\u00fcgg\u0151 gy\u00e1rt\u00e1si munkalapot kezeltek, a priorit\u00e1sokat pedig a pap\u00edralap\u00fa munkalapokon szerepl\u0151 sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k alapj\u00e1n hat\u00e1rozt\u00e1k meg. A SkyPlanner rendszert integr\u00e1lt\u00e1k a v\u00e1llalat Oscar ERP rendszer\u00e9vel, \u00e9s ez lett a gy\u00e1rt\u00e1stervez\u00e9s f\u0151 platformja. A Mamec besz\u00e1mol\u00f3ja szerint k\u00f6z\u00f6s, val\u00f3s idej\u0171 k\u00e9pet kaptak a termel\u00e9sr\u0151l, a tervez\u00e9si munkateher pedig \u00e9rezhet\u0151en cs\u00f6kkent. T\u00f6rt\u00e9net\u00fck j\u00f3l mutatja, mi\u00e9rt \u00e9rdemes a teljes tervet egys\u00e9gesen kezelni ahelyett, hogy minden feladatsorr\u00f3l k\u00fcl\u00f6n, k\u00e9zzel d\u00f6nten\u00e9nek.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner rendszert, ha a pontosabb m\u0171veleti id\u0151kb\u0151l jobb gy\u00e1rt\u00e1si \u00fctemtervet szeretne k\u00e9sz\u00edteni.<\/strong> Ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3, \u00edgy megl\u00e9v\u0151 rendszereit megtartva haszn\u00e1lhat re\u00e1lis id\u0151tartamokat a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9sben.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozza mag\u00e1val egy m\u0171velet jelenlegi normaid\u0151j\u00e9t, a hozz\u00e1 tartoz\u00f3 vizsg\u00e1lat dokument\u00e1ci\u00f3j\u00e1t, a k\u00f6zelm\u00falt t\u00e9nyadatait \u00e9s egy jellemz\u0151 rendel\u00e9s gy\u00e1rt\u00e1si \u00fatvonal\u00e1t. \u00cdgy konkr\u00e9t adatokb\u00f3l kiindulva n\u00e9zheti meg, hogyan jav\u00edthatja egy megalapozott id\u0151adat az \u00fczemben k\u00f6vetett tervet. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151 Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151 A gy\u00e1rt\u00e1si munkaid\u0151-norm\u00e1z\u00e1s sor\u00e1n egy pontosan meghat\u00e1rozott munka id\u0151ig\u00e9ny\u00e9t m\u00e9rj\u00fck, hogy meg\u00e1llap\u00edthassuk, adott felt\u00e9telek mellett mennyi ideig kell tartania. K\u00f6zvetlen, stopper\u00f3r\u00e1s id\u0151felv\u00e9teln\u00e9l a munk\u00e1t elemekre bontjuk, megm\u00e9rj\u00fck az id\u0151tartamukat, ahol indokolt, figyelembe vessz\u00fck a norm\u00e1l munkatemp\u00f3t, majd a megalapozott p\u00f3tid\u0151k hozz\u00e1ad\u00e1s\u00e1val &#8230; <a title=\"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/\" aria-label=\"Read more about Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":101453,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-101433","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151<\/title>\n<meta name=\"description\" content=\"Becsl\u00e9s helyett megalapozott normaid\u0151: munkavizsg\u00e1lat, munkatemp\u00f3-\u00e9rt\u00e9kel\u00e9s \u00e9s p\u00f3tid\u0151k. Ismerje meg a m\u00f3dszert, \u00e9s tervezzen a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151\" \/>\n<meta property=\"og:description\" content=\"Becsl\u00e9s helyett megalapozott normaid\u0151: munkavizsg\u00e1lat, munkatemp\u00f3-\u00e9rt\u00e9kel\u00e9s \u00e9s p\u00f3tid\u0151k. Ismerje meg a m\u00f3dszert, \u00e9s tervezzen a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T17:00:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-17T17:01:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:01:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/\"},\"wordCount\":3942,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/\",\"name\":\"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:01:30+00:00\",\"description\":\"Becsl\u00e9s helyett megalapozott normaid\u0151: munkavizsg\u00e1lat, munkatemp\u00f3-\u00e9rt\u00e9kel\u00e9s \u00e9s p\u00f3tid\u0151k. Ismerje meg a m\u00f3dszert, \u00e9s tervezzen a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/munkaido-normazas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151","description":"Becsl\u00e9s helyett megalapozott normaid\u0151: munkavizsg\u00e1lat, munkatemp\u00f3-\u00e9rt\u00e9kel\u00e9s \u00e9s p\u00f3tid\u0151k. Ismerje meg a m\u00f3dszert, \u00e9s tervezzen a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/","og_locale":"hu_HU","og_type":"article","og_title":"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151","og_description":"Becsl\u00e9s helyett megalapozott normaid\u0151: munkavizsg\u00e1lat, munkatemp\u00f3-\u00e9rt\u00e9kel\u00e9s \u00e9s p\u00f3tid\u0151k. Ismerje meg a m\u00f3dszert, \u00e9s tervezzen a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-17T17:00:34+00:00","article_modified_time":"2026-10-17T17:01:30+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:01:30+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/"},"wordCount":3942,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/","name":"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:01:30+00:00","description":"Becsl\u00e9s helyett megalapozott normaid\u0151: munkavizsg\u00e1lat, munkatemp\u00f3-\u00e9rt\u00e9kel\u00e9s \u00e9s p\u00f3tid\u0151k. Ismerje meg a m\u00f3dszert, \u00e9s tervezzen a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","width":1672,"height":941,"caption":"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151 Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Munkaid\u0151-norm\u00e1z\u00e1s a gy\u00e1rt\u00e1sban: haszn\u00e1lhat\u00f3 normaid\u0151 A gy\u00e1rt\u00e1si munkaid\u0151-norm\u00e1z\u00e1s sor\u00e1n egy pontosan meghat\u00e1rozott munka id\u0151ig\u00e9ny\u00e9t m\u00e9rj\u00fck, hogy meg\u00e1llap\u00edthassuk, adott felt\u00e9telek mellett mennyi ideig kell tartania. K\u00f6zvetlen, stopper\u00f3r\u00e1s id\u0151felv\u00e9teln\u00e9l a munk\u00e1t elemekre bontjuk, megm\u00e9rj\u00fck az id\u0151tartamukat, ahol indokolt, figyelembe vessz\u00fck a norm\u00e1l munkatemp\u00f3t, majd a megalapozott p\u00f3tid\u0151k hozz\u00e1ad\u00e1s\u00e1val&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/101433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=101433"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/101433\/revisions"}],"predecessor-version":[{"id":101496,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/101433\/revisions\/101496"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/101453"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=101433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=101433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=101433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}