{"id":100436,"date":"2026-10-16T22:47:32","date_gmt":"2026-10-16T22:47:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100436"},"modified":"2026-10-16T22:48:28","modified_gmt":"2026-10-16T22:48:28","slug":"hataridore-torteno-szallitas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/","title":{"rendered":"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>A hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s (OTD) mutat\u00f3ja azt m\u00e9ri, milyen ar\u00e1nyban teljes\u00edti a vev\u0151kkel egyeztetett sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.<\/strong> A gy\u00e1rt\u00e1sban ennek jav\u00edt\u00e1s\u00e1hoz biztos\u00edtani kell, hogy a megfelel\u0151 rendel\u00e9sek id\u0151ben v\u00e9gighaladjanak a gy\u00e1rt\u00e1son, elk\u00e9sz\u00fcljenek, \u00e9s eljussanak a meg\u00e1llapod\u00e1s szerinti \u00e1tad\u00e1si pontra.<\/p>\n\n\n<p>Ez nem ugyanaz, mint minden g\u00e9pet folyamatosan munk\u00e1val ell\u00e1tni. A v\u00e1g\u00e1s j\u00e1rhat az \u00fctemterv el\u0151tt, mik\u00f6zben a holnap feladand\u00f3 rendel\u00e9shez m\u00e9g hi\u00e1nyzik egy hegesztett alkatr\u00e9sz. Az \u00fczem termel\u00e9kenynek l\u00e1tszik, a vev\u0151 m\u00e9gis k\u00e9sve kapja meg az \u00e1rut.<\/p>\n\n\n<p>A gyakorlati k\u00e9rd\u00e9s teh\u00e1t ez: <strong>a jelenlegi gy\u00e1rt\u00e1si \u00fctemtervvel m\u00e9g tarthat\u00f3k a meg\u00edg\u00e9rt hat\u00e1rid\u0151k?<\/strong> A SkyPlanner APS seg\u00edt ezt megv\u00e1laszolni: az \u00f6sszef\u00fcgg\u0151 feladatokat a kapacit\u00e1s, az anyagok \u00e9s a priorit\u00e1sok figyelembev\u00e9tel\u00e9vel \u00fctemezi, majd a gy\u00e1rt\u00e1s v\u00e1ltoz\u00e1sakor \u00fajrasz\u00e1m\u00edtja a tervet. \u00cdgy kevesebb id\u0151t kell a g\u00e9penk\u00e9nti feladatsorok \u00e1trendez\u00e9s\u00e9re ford\u00edtania, \u00e9s t\u00f6bb ideje marad arra, hogy biztos\u00edtsa a figyelmet ig\u00e9nyl\u0151 rendel\u00e9sek hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 teljes\u00edt\u00e9s\u00e9t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s kisz\u00e1m\u00edt\u00e1sa<\/h2>\n\n\n<p>Ahhoz, hogy az OTD val\u00f3ban hasznos mutat\u00f3 legyen, el\u0151sz\u00f6r meg kell \u00e1llapodni abban, mi sz\u00e1m\u00edt hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1snak. Az \u00e1ru felad\u00e1s\u00e1t, a vev\u0151 telephely\u00e9re t\u00f6rt\u00e9n\u0151 kisz\u00e1ll\u00edt\u00e1s\u00e1t vagy az \u00e1tv\u00e9telre val\u00f3 rendelkez\u00e9sre bocs\u00e1t\u00e1s\u00e1t v\u00e1llalt\u00e1k? Egy befejezett gy\u00e1rt\u00e1si rendel\u00e9s m\u00e9g nem jelent automatikusan hat\u00e1rid\u0151re teljes\u00edtett vev\u0151i sz\u00e1ll\u00edt\u00e1st.<\/p>\n\n\n<p>Rendel\u00e9salap\u00fa m\u00e9r\u00e9shez haszn\u00e1lja az al\u00e1bbi k\u00e9pletet:<\/p>\n\n\n<p><strong>Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s (%) = Az id\u0151szakban esed\u00e9kes, az egyeztetett sz\u00e1ll\u00edt\u00e1si id\u0151ablakon bel\u00fcl teljes\u00edtett rendel\u00e9sek sz\u00e1ma \u00f7 Az id\u0151szakban esed\u00e9kes \u00f6sszes rendel\u00e9s sz\u00e1ma \u00d7 100<\/strong><\/p>\n\n\n<p>Tegy\u00fck fel, hogy ebben a h\u00f3napban 50 rendel\u00e9s volt esed\u00e9kes. Ezek k\u00f6z\u00fcl 44 \u00e9rkezett meg az egyeztetett \u00e1tad\u00e1si pontra az elfogadott id\u0151ablakon bel\u00fcl. Az OTD \u00edgy 88%. Az esed\u00e9kes, de m\u00e9g le nem sz\u00e1ll\u00edtott rendel\u00e9seknek is a nevez\u0151ben kell maradniuk, k\u00fcl\u00f6nben \u00e9ppen a legs\u00falyosabb k\u00e9s\u00e9sek t\u0171nhetnek el a mutat\u00f3b\u00f3l.<\/p>\n\n\n<p>A mutat\u00f3t haszn\u00e1l\u00f3 koll\u00e9g\u00e1kkal egyeztess\u00e9k az al\u00e1bbi szab\u00e1lyokat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A sz\u00e1ml\u00e1l\u00e1s egys\u00e9ge:<\/strong> teljes rendel\u00e9sek, rendel\u00e9si t\u00e9telek vagy \u00fctemezett sz\u00e1ll\u00edt\u00e1sok. Ezt k\u00f6vetkezetesen alkalmazz\u00e1k.<\/li><li><strong>A hat\u00e1rid\u0151 \u00e9s az id\u0151ablak:<\/strong> az egyeztetett sz\u00e1ll\u00edt\u00e1si d\u00e1tum, valamint a megengedett kor\u00e1bbi vagy k\u00e9s\u0151bbi teljes\u00edt\u00e9s. A korai sz\u00e1ll\u00edt\u00e1s sem mindig elfogadhat\u00f3, ha a vev\u0151 nem tudja \u00e1tvenni vagy t\u00e1rolni az \u00e1rut.<\/li><li><strong>R\u00e9szsz\u00e1ll\u00edt\u00e1sok:<\/strong> hat\u00e1rozz\u00e1k meg, mikor sz\u00e1m\u00edt egy rendel\u00e9s lesz\u00e1ll\u00edtottnak, ahelyett, hogy m\u00e1r az els\u0151 sz\u00e1ll\u00edtm\u00e1nnyal teljes\u00edtettnek tekinten\u00e9k.<\/li><li><strong>M\u00f3dos\u00edtott v\u00e1llal\u00e1sok:<\/strong> a m\u00f3dos\u00edt\u00e1sok mellett \u0151rizz\u00e9k meg az eredetileg egyeztetett d\u00e1tumot is, hogy a hat\u00e1rid\u0151 \u00e1t\u00edr\u00e1sa ne fedje el a k\u00e9s\u00e9st.<\/li><\/ul>\n\n\n<p>Az OTD az id\u0151beli teljes\u00edt\u00e9sre \u00f6sszpontos\u00edt. A <strong>hat\u00e1rid\u0151re, teljes mennyis\u00e9gben t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s (OTIF)<\/strong> az id\u0151z\u00edt\u00e9s mellett a teljes v\u00e1llalt mennyis\u00e9g lesz\u00e1ll\u00edt\u00e1s\u00e1t is figyelembe veszi. <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesi-terv-teljesitese\/\">A gy\u00e1rt\u00e1si \u00fctemterv betart\u00e1sa<\/a> m\u00e1s k\u00e9rd\u00e9sre ad v\u00e1laszt: a bels\u0151 m\u0171veleteket a tervezett id\u0151ben v\u00e9gezt\u00e9k-e el? Egy \u00fczem behozhatja egy m\u0171velet cs\u00fasz\u00e1s\u00e1t, \u00e9s m\u00e9g sz\u00e1ll\u00edthat hat\u00e1rid\u0151re. Ugyanakkor egy irre\u00e1lis gy\u00e1rt\u00e1si tervet pontosan k\u00f6vetve is elmulaszthatja a vev\u0151nek tett v\u00e1llal\u00e1st.<\/p>\n\n\n<p>Az OTD-vel a vev\u0151 szempontj\u00e1b\u00f3l el\u00e9rt eredm\u00e9nyt \u00e9rt\u00e9kelje, a bels\u0151 mutat\u00f3kkal pedig annak okait t\u00e1rja fel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi\u00e9rt k\u00e9sik a sz\u00e1ll\u00edt\u00e1s akkor is, ha az \u00fczem tele van munk\u00e1val?<\/h2>\n\n\n<p>A sz\u00e1ll\u00edt\u00e1si probl\u00e9m\u00e1k gyakran a m\u0171veletek k\u00f6z\u00f6tt alakulnak ki, nem csup\u00e1n ann\u00e1l a g\u00e9pn\u00e9l, amely v\u00e9g\u00fcl k\u00e9sve fejezi be a munk\u00e1t. Egy alkatr\u00e9sz anyagra v\u00e1r, emiatt lemarad a hajl\u00edt\u00e1sra kijel\u00f6lt id\u0151s\u00e1vj\u00e1r\u00f3l, majd csak a hozz\u00e1 tartoz\u00f3 t\u00f6bbi alkatr\u00e9sz ut\u00e1n \u00e9rkezik meg az \u00f6sszeszerel\u00e9sre.<\/p>\n\n\n<p>Az egyes r\u00e9szlegek feladatsora \u00f6nmag\u00e1ban \u00e9szszer\u0171nek t\u0171nhet. A neh\u00e9zs\u00e9get az jelenti, hogy ezek a sorok k\u00f6z\u00f6s kapacit\u00e1s\u00e9rt versengenek, \u00e9s egym\u00e1st\u00f3l is f\u00fcggenek. Ha az egyik g\u00e9pen el\u0151revesznek egy s\u00fcrg\u0151s gy\u00e1rt\u00e1si feladatot, azzal kiszor\u00edthatnak egy m\u00e1sik rendel\u00e9st, amelynek a h\u00e1tral\u00e9v\u0151 m\u0171veleteire m\u00e1r kevesebb id\u0151 jut.<\/p>\n\n\n<p>A hasonl\u00f3 munk\u00e1k \u00f6sszevon\u00e1sa \u00fajabb m\u00e9rlegel\u00e9st k\u00edv\u00e1n. Az ilyen munk\u00e1k egym\u00e1s ut\u00e1ni elv\u00e9gz\u00e9s\u00e9vel \u00e1t\u00e1ll\u00e1si id\u0151 takar\u00edthat\u00f3 meg, de egy hossz\u00fa, hat\u00e9kony sorozat sem j\u00f3 v\u00e1laszt\u00e1s, ha emiatt k\u00e9sik egy ma feladand\u00f3 rendel\u00e9s. A c\u00e9l a kapacit\u00e1s hat\u00e9kony kihaszn\u00e1l\u00e1sa mellett a megfelel\u0151 rendel\u00e9sek befejez\u00e9se, nem pedig az, hogy minden munka\u00e1llom\u00e1s a lehet\u0151 legt\u00f6bbet dolgozzon.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151kre \u00e9p\u00fcl\u0151 \u00fctemez\u00e9s<\/a> l\u00e1that\u00f3v\u00e1 teszi ezeket az \u00f6sszef\u00fcgg\u00e9seket. \u00cdgy nemcsak az a k\u00e9rd\u00e9s, hogy az adott helyen melyik gy\u00e1rt\u00e1si feladat a legs\u00fcrg\u0151sebb, hanem az is, hogy milyen sorrenddel lehet re\u00e1lisan teljes\u00edteni a teljes rendel\u00e9s\u00e1llom\u00e1nyt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151b\u0151l legyen konkr\u00e9t gy\u00e1rt\u00e1si c\u00e9l<\/h2>\n\n\n<p>Induljon ki a vev\u0151 \u00e1ltal elv\u00e1rt \u00e1tad\u00e1s hely\u00e9b\u0151l \u00e9s id\u0151pontj\u00e1b\u00f3l, majd visszafel\u00e9 sz\u00e1molva hat\u00e1rozza meg, mikorra kell befejezni a gy\u00e1rt\u00e1st. Hagyjon id\u0151t a k\u00e9t esem\u00e9ny k\u00f6z\u00f6tti teend\u0151kre is: a rendel\u00e9st\u0151l f\u00fcgg\u0151en a v\u00e9gellen\u0151rz\u00e9sre, a csomagol\u00e1sra \u00e9s a fuvaroz\u00e1sra, figyelembe v\u00e9ve a felad\u00e1s hat\u00e1ridej\u00e9t is.<\/p>\n\n\n<p>Ha a vev\u0151nek p\u00e9nteken van sz\u00fcks\u00e9ge az \u00e1rura, \u00e9s annak cs\u00fct\u00f6rt\u00f6k\u00f6n el kell hagynia a telephelyet, akkor a gy\u00e1rt\u00e1s befejez\u00e9s\u00e9nek c\u00e9lid\u0151pontja nem lehet szint\u00e9n p\u00e9ntek. A gy\u00e1rt\u00e1st el\u00e9g kor\u00e1n kell befejezni ahhoz, hogy a cs\u00fct\u00f6rt\u00f6ki felad\u00e1st is el\u0151 lehessen k\u00e9sz\u00edteni.<\/p>\n\n\n<p>A SkyPlanner rendszer\u00e9ben a rendel\u00e9s <strong>sz\u00e1ll\u00edt\u00e1si napja<\/strong> az a d\u00e1tum, amelyre a rendel\u00e9snek el kell k\u00e9sz\u00fclnie, felad\u00e1sra k\u00e9sz \u00e1llapotban. Ezt a gy\u00e1rt\u00e1si c\u00e9ld\u00e1tumot haszn\u00e1lja, amikor a vev\u0151nek tett v\u00e1llal\u00e1st \u00e1t\u00fclteti az \u00fctemtervbe. \u00cdgy az \u00fczemi hat\u00e1rid\u0151 \u00f6sszhangban marad a sz\u00e1ll\u00edt\u00e1si meg\u00e1llapod\u00e1ssal, an\u00e9lk\u00fcl hogy a gy\u00e1rt\u00e1s befejez\u00e9s\u00e9t \u00f6sszekevern\u00e9 a vev\u0151i \u00e1tv\u00e9tellel.<\/p>\n\n\n<p>\u00daj hat\u00e1rid\u0151 v\u00e1llal\u00e1sa el\u0151tt ellen\u0151rizze, hogy az belef\u00e9r-e a megl\u00e9v\u0151 terhel\u00e9sbe. A rendel\u00e9s elfogad\u00e1sa ut\u00e1n is folyamatosan vesse \u00f6ssze a v\u00e1llal\u00e1st a v\u00e1ltoz\u00f3 \u00fctemtervvel. Egy m\u00falt h\u00e9ten m\u00e9g tarthat\u00f3 d\u00e1tum g\u00e9phiba vagy besz\u00e1ll\u00edt\u00f3i k\u00e9s\u00e9s ut\u00e1n m\u00e1r nem felt\u00e9tlen\u00fcl teljes\u00edthet\u0151.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A napi gy\u00e1rt\u00e1s\u00fctemez\u00e9ssel biztos\u00edtsa a v\u00e1llalt hat\u00e1rid\u0151k betart\u00e1s\u00e1t<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Minden rendel\u00e9s gy\u00e1rt\u00e1si \u00fatvonal\u00e1t a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1shoz igaz\u00edtsa<\/h3>\n\n\n<p>A h\u00e1tral\u00e9v\u0151 m\u0171veleteket egy\u00fctt \u00fctemezze, figyelembe v\u00e9ve a sz\u00fcks\u00e9ges g\u00e9peket, m\u0171szakokat, dolgoz\u00f3kat \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9geket. Egy szabad v\u00e1g\u00e1si id\u0151s\u00e1v csak akkor hasznos, ha az azt k\u00f6vet\u0151 m\u0171veletek is befejezhet\u0151k m\u00e9g id\u0151ben.<\/p>\n\n\n<p>A SkyPlanner mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151motorja, az Arcturus a gy\u00e1rt\u00e1si er\u0151forr\u00e1sok \u00e9s a megadott szab\u00e1lyok alapj\u00e1n sz\u00e1m\u00edtja ki az \u00fctemtervet. A Gantt-id\u0151vonalon l\u00e1that\u00f3, hogy az egyes feladatok mikorra ker\u00fcltek. A k\u00fcl\u00f6n\u00e1ll\u00f3 feladatsorok sz\u00e1molgat\u00e1sa helyett \u00edgy \u00f6sszef\u00fcgg\u0151 k\u00e9pet kap arr\u00f3l, hogyan versengenek a rendel\u00e9sek a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151\u00e9rt.<\/p>\n\n\n<p>Ha a terhel\u00e9s nem f\u00e9r bele a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1sba, az \u00fctemterv alapot ad a beavatkoz\u00e1shoz: m\u00e9rlegelheti tov\u00e1bbi, megfelel\u0151 szem\u00e9lyzettel ell\u00e1tott kapacit\u00e1s bevon\u00e1s\u00e1t, egy m\u00e1sik alkalmas munka\u00e1llom\u00e1s haszn\u00e1lat\u00e1t vagy a sorrend m\u00f3dos\u00edt\u00e1s\u00e1t. Ha egyik megold\u00e1ssal sem tarthat\u00f3 a v\u00e1llal\u00e1s, m\u00e9g akkor kezelje a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151vel kapcsolatos probl\u00e9m\u00e1t, amikor a vev\u0151nek van ideje reag\u00e1lni.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t is \u00e9p\u00edtse be a tervbe<\/h3>\n\n\n<p>Att\u00f3l, hogy egy g\u00e9p szabad, a rendel\u00e9s gy\u00e1rt\u00e1sa m\u00e9g nem felt\u00e9tlen\u00fcl ind\u00edthat\u00f3. A hi\u00e1nyz\u00f3 alapanyag vagy v\u00e1s\u00e1rolt alkatr\u00e9sz akkor is megakaszthatja a gy\u00e1rt\u00e1st, ha van hozz\u00e1 kapacit\u00e1s.<\/p>\n\n\n<p>A SkyPlanner anyagell\u00e1t\u00e1st is figyelembe vev\u0151 \u00fctemez\u00e9se sz\u00e1mol a k\u00e9szlettel \u00e9s a be\u00e9rkez\u0151 anyagokkal, ha az erre vonatkoz\u00f3 szab\u00e1ly be van kapcsolva. Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa \u00edgy k\u00f6zvetlen\u00fcl befoly\u00e1solja a feladatok \u00fctemez\u00e9s\u00e9t, nem marad k\u00fcl\u00f6n megjegyz\u00e9s, amelyet a tervez\u0151nek fejben kell tartania a feladatsorok \u00e1trendez\u00e9sekor.<\/p>\n\n\n<p>Gondoskodjon r\u00f3la, hogy a beszerz\u00e9s friss inform\u00e1ci\u00f3i eljussanak a tervez\u00e9shez. Ha v\u00e1ltozik egy be\u00e9rkez\u00e9si d\u00e1tum, nemcsak az a k\u00e9rd\u00e9s, hogy mikor \u00e9rkezik meg az anyag, hanem az is, hogy mely m\u00e1r v\u00e1llalt sz\u00e1ll\u00edt\u00e1sokhoz kell emiatt m\u00f3dos\u00edtani a gy\u00e1rt\u00e1si tervet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tudatosan \u00e1ll\u00edtsa fel a priorit\u00e1sokat, ne a legut\u00f3bbi telefonh\u00edv\u00e1s alapj\u00e1n<\/h3>\n\n\n<p>Egy s\u00fcrg\u0151s ig\u00e9nyr\u0151l a k\u00f6vetkezm\u00e9nyek m\u00e9rlegel\u00e9s\u00e9vel kell d\u00f6nteni. Ha el\u0151reveszi, azzal elhaszn\u00e1lhatja azt a kapacit\u00e1st, amelyre egy m\u00e1sik, m\u00e1r v\u00e1llalt rendel\u00e9shez lenne sz\u00fcks\u00e9g.<\/p>\n\n\n<p>A SkyPlanner dinamikus priorit\u00e1sainak k\u00f6sz\u00f6nhet\u0151en a befejez\u00e9si hat\u00e1rid\u0151k \u00e9s m\u00e1s \u00fczleti szempontok is befoly\u00e1solhatj\u00e1k az \u00fctemez\u00e9si sorrendet. A priorit\u00e1sokat \u00e9s a szab\u00e1lyokat a tervez\u0151k adj\u00e1k meg, az Arcturus pedig ezek alapj\u00e1n sz\u00e1mol. \u00cdgy biztos\u00edthatja a fontos v\u00e1llal\u00e1sok teljes\u00edt\u00e9s\u00e9t an\u00e9lk\u00fcl, hogy \u00fajra \u00e9s \u00fajra k\u00e9zzel kellene \u00e1thelyeznie minden \u00e9rintett m\u0171veletet.<\/p>\n\n\n<p>Ne adjon minden rendel\u00e9snek legmagasabb priorit\u00e1st. A t\u00e9nyleges kapacit\u00e1s\u00fctk\u00f6z\u00e9st a c\u00edmk\u00e9k \u00e1t\u00edr\u00e1sa nem oldja meg. A priorit\u00e1sokkal d\u00f6ntse el, mely munk\u00e1k kapj\u00e1k meg a sz\u0171k\u00f6sen rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151t, majd vizsg\u00e1lja meg, ez hogyan hat a t\u00f6bbi v\u00e1llal\u00e1sra.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A terv k\u00f6vesse az \u00fczemi v\u00e1ltoz\u00e1sokat<\/h3>\n\n\n<p>Halad\u00e9ktalanul r\u00f6gz\u00edtse az elk\u00e9sz\u00fclt munk\u00e1kat, a m\u00f3dosult id\u0151tartamokat, az \u00e1ll\u00e1sid\u0151ket \u00e9s a kapacit\u00e1sv\u00e1ltoz\u00e1sokat. A tegnapi k\u00e9sz\u00fclts\u00e9gi \u00e1llapotra \u00e9p\u00fcl\u0151 \u00fctemterv t\u00e9ves alapot adhat a sz\u00e1ll\u00edt\u00e1sokr\u00f3l sz\u00f3l\u00f3 mai egyeztet\u00e9shez.<\/p>\n\n\n<p>Bekapcsolt Autopilot mellett a SkyPlanner a be\u00e1ll\u00edtott esem\u00e9nyek hat\u00e1s\u00e1ra vagy id\u0151z\u00edtve \u00fajrasz\u00e1m\u00edthatja az \u00fctemtervet, megtartva a megadott szab\u00e1lyokat \u00e9s r\u00f6gz\u00edt\u00e9seket. A Gantt-diagramon a k\u00e9s\u00e9sben l\u00e9v\u0151 gy\u00e1rt\u00e1si feladatok kiemel\u00e9se seg\u00edt \u00e9szrevenni, hol van sz\u00fcks\u00e9g fel\u00fclvizsg\u00e1latra. \u00cdgy egy naprak\u00e9szen tartott, d\u00f6nt\u00e9sekhez haszn\u00e1lhat\u00f3 terv \u00e1ll rendelkez\u00e9sre, ahelyett, hogy minden v\u00e1ltoz\u00e1s ut\u00e1n ism\u00e9t k\u00e9zzel kellene fel\u00e9p\u00edteni a feladatsorokat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00f6nts\u00f6n a sz\u00e1ll\u00edt\u00e1si kock\u00e1zat kezel\u00e9s\u00e9r\u0151l m\u00e9g a felad\u00e1s napja el\u0151tt<\/h2>\n\n\n<p>K\u00e9pzeljen el egy m\u00e1r elfogadott rendel\u00e9st, amelynek cs\u00fct\u00f6rt\u00f6kre felad\u00e1sra k\u00e9sz \u00e1llapotban kell lennie. A v\u00e1g\u00e1s elk\u00e9sz\u00fclt, de az \u00f6sszeszerel\u00e9shez sz\u00fcks\u00e9ges egyik v\u00e1s\u00e1rolt alkatr\u00e9sz a tervezettn\u00e9l k\u00e9s\u0151bb \u00e9rkezik. Az \u00f6sszeszerel\u00e9st r\u00e1ad\u00e1sul ugyanaz a csapat v\u00e9gzi, amely egy k\u00f6vetkez\u0151 h\u00e9tre esed\u00e9kes rendel\u00e9sen is dolgozik.<\/p>\n\n\n<p>Att\u00f3l, hogy az els\u0151 rendel\u00e9st s\u00fcrg\u0151snek jel\u00f6li, a hi\u00e1nyz\u00f3 alkatr\u00e9sz m\u00e9g nem lesz meg. M\u00e1s, ett\u0151l f\u00fcggetlen munk\u00e1k kor\u00e1bbi ind\u00edt\u00e1s\u00e1val ugyan lek\u00f6theti a dolgoz\u00f3kat, de lehet, hogy t\u00fal kev\u00e9s \u00f6sszeszerel\u00e9si kapacit\u00e1s marad arra az id\u0151re, amikor az alkatr\u00e9sz meg\u00e9rkezik.<\/p>\n\n\n<p>Vizsg\u00e1lja fel\u00fcl az \u00f6sszef\u00fcgg\u0151 \u00fctemtervet az anyag \u00faj be\u00e9rkez\u00e9si d\u00e1tum\u00e1val. Belef\u00e9r m\u00e9g a h\u00e1tral\u00e9v\u0151 \u00f6sszeszerel\u00e9s \u00e9s ellen\u0151rz\u00e9s a felad\u00e1s el\u0151tti id\u0151be? \u00c1t lehet \u00fctemezni a k\u00e9s\u0151bbi rendel\u00e9s munk\u00e1it \u00fagy, hogy annak v\u00e1llalt hat\u00e1rideje se s\u00e9r\u00fclj\u00f6n? Megoldan\u00e1 az \u00fctk\u00f6z\u00e9st, ha megfelel\u0151 szem\u00e9lyzettel t\u00f6bb munka\u00f3r\u00e1t tudn\u00e1nak biztos\u00edtani, vagy az anyag m\u00e1r eleve t\u00fal k\u00e9s\u0151n \u00e9rkezik?<\/p>\n\n\n<p>A SkyPlanner az anyagokra, a kapacit\u00e1sra \u00e9s a priorit\u00e1sokra vonatkoz\u00f3 adatokat egyar\u00e1nt felhaszn\u00e1lja az \u00fctemterv kisz\u00e1m\u00edt\u00e1s\u00e1hoz. \u00cdgy a tervez\u0151 megalapozottabban v\u00e1laszthat int\u00e9zked\u00e9st a cs\u00fasz\u00e1s behoz\u00e1s\u00e1ra. Ha m\u00e1r nincs megval\u00f3s\u00edthat\u00f3 megold\u00e1s, jelezze a probl\u00e9m\u00e1t, \u00e9s egyeztess\u00e9k a k\u00f6vetkez\u0151 l\u00e9p\u00e9st, ahelyett, hogy cs\u00fct\u00f6rt\u00f6kig v\u00e1rna annak meger\u0151s\u00edt\u00e9s\u00e9re, amit a terv m\u00e1r most mutat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit v\u00e1ltoztatott ez a KJH-Comp m\u0171k\u00f6d\u00e9s\u00e9ben?<\/h2>\n\n\n<p>A finn lemezmegmunk\u00e1l\u00f3 b\u00e9rgy\u00e1rt\u00f3, a KJH-Comp azzal szembes\u00fclt, hogy a heti gy\u00e1rt\u00e1si \u00e1ttekint\u00e9s nem el\u00e9g a konkr\u00e9t napokra tett v\u00e1llal\u00e1sokhoz. A C9000 ERP \u00e9s a t\u00e1bl\u00e1zatok csak a heti \u00f6sszes\u00edtett terhel\u00e9st mutatt\u00e1k, mik\u00f6zben a m\u0171vezet\u0151k k\u00e9zzel osztott\u00e1k ki a munk\u00e1kat a g\u00e9pekre.<\/p>\n\n\n<p>A SkyPlanner bevezet\u00e9s\u00e9vel a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9s<\/a> \u00e9s a feladatok g\u00e9pekhez rendel\u00e9se automatikuss\u00e1 v\u00e1lt. A v\u00e1llalat hegeszt\u00e9s el\u0151tti el\u0151k\u00e9sz\u00edtetts\u00e9gi ellen\u0151rz\u00e9se azt is biztos\u00edtja, hogy minden sz\u00fcks\u00e9ges alkatr\u00e9sz, k\u00f6zt\u00fck a v\u00e1s\u00e1rolt elemek is rendelkez\u00e9sre \u00e1lljanak, miel\u0151tt a munka beker\u00fcl a feladatsorba. A v\u00e1ltoztat\u00e1s \u00f6sszhangba hozza az ind\u00edthat\u00f3 munk\u00e1kat a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1ssal \u00e9s a betartand\u00f3 hat\u00e1rid\u0151kkel.<\/p>\n\n\n<p>A KJH-Comp besz\u00e1mol\u00f3ja szerint a hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya a kor\u00e1bbi mintegy 50%-r\u00f3l 2026-ban ak\u00e1r 98%-ra emelkedett. M\u00e1s gy\u00e1rt\u00f3k sz\u00e1m\u00e1ra az eredm\u00e9ny m\u00f6g\u00f6tti tervez\u00e9si v\u00e1ltoz\u00e1s a tanuls\u00e1g: a heti \u00f6sszes\u00edtett terhel\u00e9s \u00f6nmag\u00e1ban nem el\u00e9g, ha a vev\u0151k egy meghat\u00e1rozott napra v\u00e1rj\u00e1k a rendel\u00e9s\u00fcket.<\/p>\n\n\n<p>A bevezet\u00e9sr\u0151l \u00e9s az eredm\u00e9nyekr\u0151l b\u0151vebben a <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/kjh-comp\/\">KJH-Comp SkyPlanner-tapasztalatait bemutat\u00f3 esettanulm\u00e1nyban<\/a> olvashat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vizsg\u00e1lja meg a sz\u00e1ll\u00edt\u00e1si kock\u00e1zatot, miel\u0151tt k\u00e9s\u00e9s lesz bel\u0151le<\/h2>\n\n\n<p>A napi tervez\u00e9si egyeztet\u00e9sen azokra a visszaigazolt megrendel\u00e9sekre \u00f6sszpontos\u00edtsanak, amelyekn\u00e9l vesz\u00e9lyben van a tervezett elk\u00e9sz\u00fcl\u00e9si hat\u00e1rid\u0151. Mindegyikn\u00e9l azonos\u00edts\u00e1k, melyik anyag, m\u0171velet vagy er\u0151forr\u00e1s jelenti a korl\u00e1tot, v\u00e1lasszanak int\u00e9zked\u00e9st, \u00e9s ellen\u0151rizz\u00e9k, hogy az mely tov\u00e1bbi v\u00e1llal\u00e1sokat \u00e9rinti. Az \u00edgy kialak\u00edtott sorrendet tegy\u00e9k l\u00e1that\u00f3v\u00e1 a munk\u00e1t v\u00e9gz\u0151k sz\u00e1m\u00e1ra.<\/p>\n\n\n<p>Az OTD mellett vizsg\u00e1lj\u00e1k meg a k\u00e9sedelmes sz\u00e1ll\u00edt\u00e1sok k\u00e9s\u00e9s\u00e9nek m\u00e9rt\u00e9k\u00e9t \u00e9s a visszat\u00e9r\u0151 okokat is. M\u00e1s beavatkoz\u00e1st ig\u00e9nyel, ha nem \u00e1ll id\u0151ben rendelkez\u00e9sre az anyag, mint ha ugyanaz a munka\u00e1llom\u00e1s rendre t\u00falterheltt\u00e9 v\u00e1lik. A teljes\u00edtm\u00e9nyt az eredeti \u00e9s a m\u00f3dos\u00edtott v\u00e1llal\u00e1sokhoz k\u00e9pest is k\u00f6vess\u00e9k, hogy val\u00f3ban a sz\u00e1ll\u00edt\u00e1s javuljon, ne csak a hat\u00e1rid\u0151k v\u00e1ltozzanak.<\/p>\n\n\n<p>Ha az \u00e1ttekint\u00e9s ut\u00e1n tov\u00e1bbra is t\u00f6bb g\u00e9p feladatsor\u00e1t kell valakinek k\u00e9zzel helyreigaz\u00edtania, a SkyPlanner gyakorlatias k\u00f6vetkez\u0151 l\u00e9p\u00e9s. Ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3<\/a>, a gy\u00e1rt\u00e1si bemen\u0151 adatokb\u00f3l pedig olyan \u00fctemtervet k\u00e9sz\u00edt, amely a munka v\u00e1ltoz\u00e1saihoz is hozz\u00e1igaz\u00edthat\u00f3.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon bemutat\u00f3t<\/a>, amelynek k\u00f6z\u00e9ppontj\u00e1ban egy visszaigazolt megrendel\u00e9s \u00e9s az \u00d6n \u00fczem\u00e9ben felmer\u00fcl\u0151 val\u00f3s fennakad\u00e1s \u00e1ll. N\u00e9zze meg, hogyan hangolhat\u00f3k \u00f6ssze a h\u00e1tral\u00e9v\u0151 gy\u00e1rt\u00e1si m\u0171veletek, az ugyanaz\u00e9rt a kapacit\u00e1s\u00e9rt verseng\u0151 feladatok \u00e9s a sz\u00e1ll\u00edt\u00e1si c\u00e9lhat\u00e1rid\u0151. Vagy <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">ind\u00edtson pr\u00f3baverzi\u00f3t dem\u00f3adatokkal<\/a>, \u00e9s fedezze fel, hogyan seg\u00edthet a SkyPlanner csapat\u00e1nak a k\u00f6vetkez\u0151 v\u00e1llal\u00e1s betart\u00e1s\u00e1ban.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit A hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s (OTD) mutat\u00f3ja azt m\u00e9ri, milyen ar\u00e1nyban teljes\u00edti a vev\u0151kkel egyeztetett sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket. A gy\u00e1rt\u00e1sban ennek jav\u00edt\u00e1s\u00e1hoz biztos\u00edtani kell, hogy a megfelel\u0151 rendel\u00e9sek id\u0151ben v\u00e9gighaladjanak a gy\u00e1rt\u00e1son, elk\u00e9sz\u00fcljenek, \u00e9s eljussanak a meg\u00e1llapod\u00e1s szerinti \u00e1tad\u00e1si &#8230; <a title=\"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/\" aria-label=\"Read more about Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":100454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-100436","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit<\/title>\n<meta name=\"description\" content=\"Sok a munka, m\u00e9gis k\u00e9snek a rendel\u00e9sek? Ismerje meg a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s m\u00e9r\u00e9s\u00e9t, \u00e9s igaz\u00edtsa a gy\u00e1rt\u00e1st az \u00edg\u00e9rt d\u00e1tumokhoz a SkyPlannerrel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit\" \/>\n<meta property=\"og:description\" content=\"Sok a munka, m\u00e9gis k\u00e9snek a rendel\u00e9sek? Ismerje meg a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s m\u00e9r\u00e9s\u00e9t, \u00e9s igaz\u00edtsa a gy\u00e1rt\u00e1st az \u00edg\u00e9rt d\u00e1tumokhoz a SkyPlannerrel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T22:47:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T22:48:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:48:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/\"},\"wordCount\":3124,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/\",\"name\":\"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:48:28+00:00\",\"description\":\"Sok a munka, m\u00e9gis k\u00e9snek a rendel\u00e9sek? Ismerje meg a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s m\u00e9r\u00e9s\u00e9t, \u00e9s igaz\u00edtsa a gy\u00e1rt\u00e1st az \u00edg\u00e9rt d\u00e1tumokhoz a SkyPlannerrel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manufactured components converge into a complete shipping carton beside a waiting delivery truck.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hataridore-torteno-szallitas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit","description":"Sok a munka, m\u00e9gis k\u00e9snek a rendel\u00e9sek? Ismerje meg a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s m\u00e9r\u00e9s\u00e9t, \u00e9s igaz\u00edtsa a gy\u00e1rt\u00e1st az \u00edg\u00e9rt d\u00e1tumokhoz a SkyPlannerrel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/","og_locale":"hu_HU","og_type":"article","og_title":"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit","og_description":"Sok a munka, m\u00e9gis k\u00e9snek a rendel\u00e9sek? Ismerje meg a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s m\u00e9r\u00e9s\u00e9t, \u00e9s igaz\u00edtsa a gy\u00e1rt\u00e1st az \u00edg\u00e9rt d\u00e1tumokhoz a SkyPlannerrel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T22:47:32+00:00","article_modified_time":"2026-10-16T22:48:28+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:48:28+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/"},"wordCount":3124,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/","name":"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:48:28+00:00","description":"Sok a munka, m\u00e9gis k\u00e9snek a rendel\u00e9sek? Ismerje meg a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s m\u00e9r\u00e9s\u00e9t, \u00e9s igaz\u00edtsa a gy\u00e1rt\u00e1st az \u00edg\u00e9rt d\u00e1tumokhoz a SkyPlannerrel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","width":1672,"height":941,"caption":"Manufactured components converge into a complete shipping carton beside a waiting delivery truck."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hataridore-torteno-szallitas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s a gy\u00e1rt\u00e1sban: tartsa \u00edg\u00e9reteit A hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s (OTD) mutat\u00f3ja azt m\u00e9ri, milyen ar\u00e1nyban teljes\u00edti a vev\u0151kkel egyeztetett sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket. A gy\u00e1rt\u00e1sban ennek jav\u00edt\u00e1s\u00e1hoz biztos\u00edtani kell, hogy a megfelel\u0151 rendel\u00e9sek id\u0151ben v\u00e9gighaladjanak a gy\u00e1rt\u00e1son, elk\u00e9sz\u00fcljenek, \u00e9s eljussanak a meg\u00e1llapod\u00e1s szerinti \u00e1tad\u00e1si&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=100436"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100436\/revisions"}],"predecessor-version":[{"id":100495,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100436\/revisions\/100495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/100454"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=100436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=100436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=100436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}