{"id":100159,"date":"2026-10-16T17:01:26","date_gmt":"2026-10-16T17:01:26","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100159"},"modified":"2026-10-16T17:02:17","modified_gmt":"2026-10-16T17:02:17","slug":"rendelesallomany","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/","title":{"rendered":"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>A rendel\u00e9s\u00e1llom\u00e1ny a m\u00e1r elfogadott, de m\u00e9g nem teljes\u00edtett vev\u0151i megrendel\u00e9seket foglalja mag\u00e1ban.<\/strong> A gy\u00e1rt\u00e1sban \u00e1ltal\u00e1ban a m\u00e9g kisz\u00e1ll\u00edtand\u00f3 rendel\u00e9seket, mennyis\u00e9geket vagy azok \u00e9rt\u00e9k\u00e9t jelenti. Egy r\u00e9sz\u00fck gy\u00e1rt\u00e1sa m\u00e9g el sem kezd\u0151d\u00f6tt, m\u00e1s r\u00e9sz\u00fck m\u00e1r gy\u00e1rt\u00e1sban van, vagy kisz\u00e1ll\u00edt\u00e1sra v\u00e1r.<\/p>\n\n\n<p>A rendel\u00e9s\u00e1llom\u00e1ny \u00f6nmag\u00e1ban nem jelent probl\u00e9m\u00e1t: eg\u00e9szs\u00e9ges keresletet is jelezhet a k\u00f6vetkez\u0151 id\u0151szakra. A gy\u00e1rt\u00e1s szempontj\u00e1b\u00f3l az a k\u00e9rd\u00e9s, hogy a h\u00e1tral\u00e9v\u0151 munka elv\u00e9gezhet\u0151-e \u00fagy, hogy a m\u00e1r v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k tarthat\u00f3k legyenek.<\/p>\n\n\n<p>Erre az \u00f6sszes\u00edtett mennyis\u00e9g vagy \u00e9rt\u00e9k \u00f6nmag\u00e1ban nem ad v\u00e1laszt. A SkyPlanner APS a rendel\u00e9s\u00e1llom\u00e1ny m\u00f6g\u00f6tt \u00e1ll\u00f3 gy\u00e1rt\u00e1si munk\u00e1t a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1shoz rendeli. \u00cdgy k\u00f6z\u00f6s \u00fctemtervvel dolgozhatnak egy \u00fajabb lista helyett, amelyet minden el\u0151rehozott sz\u00e1ll\u00edt\u00e1si ig\u00e9nyn\u00e9l \u00fajra \u00f6ssze kell \u00e1ll\u00edtani.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi tartozik a rendel\u00e9s\u00e1llom\u00e1nyba?<\/h2>\n\n\n<p>Azokat az elfogadott rendel\u00e9seket vegye sz\u00e1m\u00edt\u00e1sba, amelyekn\u00e9l m\u00e9g fenn\u00e1ll sz\u00e1ll\u00edt\u00e1si k\u00f6telezetts\u00e9g, bele\u00e9rtve a r\u00e9szben kisz\u00e1ll\u00edtott rendel\u00e9sek h\u00e1tral\u00e9v\u0151 mennyis\u00e9g\u00e9t is. Az \u00e1raj\u00e1nlatokat, \u00e9rdekl\u0151d\u00e9seket \u00e9s m\u00e9g nem visszaigazolt \u00e9rt\u00e9kes\u00edt\u00e9si lehet\u0151s\u00e9geket kezelje k\u00fcl\u00f6n: ezek fontosak lehetnek a k\u00e9s\u0151bbi tervez\u00e9shez, de nem azonosak a m\u00e1r v\u00e1llalt vev\u0151i megrendel\u00e9sekkel.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy egy vev\u0151 100 k\u00e9sz\u00fcl\u00e9kh\u00e1zat rendel, \u00e9s \u00d6n ebb\u0151l 40 darabot kisz\u00e1ll\u00edt. Enn\u00e9l a rendel\u00e9sn\u00e9l a fennmarad\u00f3 rendel\u00e9s\u00e1llom\u00e1ny 60 k\u00e9sz\u00fcl\u00e9kh\u00e1z, nem az eredeti 100. A tov\u00e1bbi 60 darab legy\u00e1rt\u00e1sa \u00f6nmag\u00e1ban m\u00e9g nem jelenti a sz\u00e1ll\u00edt\u00e1si k\u00f6telezetts\u00e9g teljes\u00edt\u00e9s\u00e9t: ellen\u0151rz\u00e9s, csomagol\u00e1s vagy kisz\u00e1ll\u00edt\u00e1s m\u00e9g h\u00e1tra lehet.<\/p>\n\n\n<p>Azonos mennyis\u00e9gi egys\u00e9get haszn\u00e1lva az \u00e1llom\u00e1ny a k\u00f6vetkez\u0151k\u00e9ppen vezethet\u0151 le:<\/p>\n\n\n<p><strong>Z\u00e1r\u00f3 rendel\u00e9s\u00e1llom\u00e1ny = nyit\u00f3 rendel\u00e9s\u00e1llom\u00e1ny + \u00fajonnan elfogadott mennyis\u00e9gek \u2212 kisz\u00e1ll\u00edtott mennyis\u00e9gek \u2212 lemondott mennyis\u00e9gek<\/strong>, az egy\u00e9b, meg\u00e1llapod\u00e1s szerinti rendel\u00e9sm\u00f3dos\u00edt\u00e1sokat pedig korrekci\u00f3k\u00e9nt kell figyelembe venni.<\/p>\n\n\n<p>Ezt a sz\u00e1m\u00edt\u00e1st egy adott term\u00e9kre vagy m\u00e1s, \u00e9rdemi \u00f6sszehasonl\u00edt\u00e1st lehet\u0151v\u00e9 tev\u0151 k\u00f6z\u00f6s egys\u00e9gre alkalmazza. K\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9kek darabsz\u00e1m\u00e1nak \u00f6sszead\u00e1sa t\u00f6bbet fedhet el, mint amennyit megmutat. A rendel\u00e9s\u00e1llom\u00e1ny \u00e9rt\u00e9ke \u00fczleti \u00e1ttekint\u00e9st ad a vezet\u00e9snek, de a m\u00e9g sz\u00fcks\u00e9ges g\u00e9p\u00f3r\u00e1kat nem mutatja meg.<\/p>\n\n\n<p>Hat\u00e1rozza meg egy\u00e9rtelm\u0171en, hogy a kimutat\u00e1s melyik esem\u00e9nyn\u00e9l tekinti teljes\u00edtettnek a rendel\u00e9st \u2013 p\u00e9ld\u00e1ul felad\u00e1skor vagy a vev\u0151h\u00f6z t\u00f6rt\u00e9n\u0151 meg\u00e9rkez\u00e9skor \u2013, \u00e9s ezt k\u00f6vetkezetesen alkalmazza. M\u00e1sk\u00fcl\u00f6nben \u00fagy t\u0171nhet, hogy az \u00e9rt\u00e9kes\u00edt\u00e9s \u00e9s a termel\u00e9s adatai elt\u00e9rnek, pedig csak m\u00e1st vesznek sz\u00e1m\u00edt\u00e1sba.<\/p>\n\n\n<p>A rendel\u00e9s\u00e1llom\u00e1ny \u00e9rtelmez\u00e9s\u00e9hez h\u00e1rom k\u00fcl\u00f6nbs\u00e9get \u00e9rdemes tiszt\u00e1zni:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Rendel\u00e9s\u00e1llom\u00e1ny \u00e9s k\u00e9sedelmes rendel\u00e9sek:<\/strong> egy j\u00f6v\u0151 h\u00f3napban esed\u00e9kes rendel\u00e9s is r\u00e9sze lehet a rendel\u00e9s\u00e1llom\u00e1nynak an\u00e9lk\u00fcl, hogy k\u00e9s\u00e9sben lenne. A k\u00e9sedelmes rendel\u00e9sek azok, amelyek meg\u00e1llapod\u00e1s szerinti teljes\u00edt\u00e9si hat\u00e1rideje m\u00e1r lej\u00e1rt.<\/li><li><strong>Rendel\u00e9s\u00e1llom\u00e1ny \u00e9s befejezetlen termel\u00e9s:<\/strong> a befejezetlen termel\u00e9s (WIP) a m\u00e1r megkezdett, de m\u00e9g be nem fejezett munk\u00e1t jelenti. A rendel\u00e9s\u00e1llom\u00e1nyban viszont m\u00e9g el nem kezdett rendel\u00e9sek \u00e9s sz\u00e1ll\u00edt\u00e1sra v\u00e1r\u00f3 k\u00e9szterm\u00e9kek is lehetnek. A k\u00e9szletre gy\u00e1rt\u00e1s is lehet befejezetlen termel\u00e9s an\u00e9lk\u00fcl, hogy visszaigazolt vev\u0151i rendel\u00e9shez tartozna.<\/li><li><strong>Rendel\u00e9s\u00e1llom\u00e1ny \u00e9s k\u00e9szlethi\u00e1ny miatt f\u00fcgg\u0151 rendel\u00e9sek:<\/strong> az ut\u00f3bbiak alatt \u00e1ltal\u00e1ban olyan rendel\u00e9seket \u00e9rt\u00fcnk, amelyek az el\u00e9rhet\u0151 k\u00e9szletb\u0151l jelenleg nem szolg\u00e1lhat\u00f3k ki. A rendel\u00e9s\u00e1llom\u00e1ny enn\u00e9l t\u00e1gabb fogalom: a szok\u00e1sos, k\u00e9s\u0151bbi teljes\u00edt\u00e9sre elfogadott rendel\u00e9seket is mag\u00e1ban foglalja.<\/li><\/ul>\n\n\n<p>A rendel\u00e9s\u00e1llom\u00e1ny cs\u00f6kkent\u00e9s\u00e9hez ez\u00e9rt nem el\u00e9g t\u00f6bb gy\u00e1rt\u00e1si feladatot elind\u00edtani. A megfelel\u0151 munk\u00e1kat kell befejezni \u00e9s a term\u00e9keket kisz\u00e1ll\u00edtani.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi\u00e9rt jelenthet azonos rendel\u00e9s\u00e1llom\u00e1ny eg\u00e9szen elt\u00e9r\u0151 terhel\u00e9st?<\/h2>\n\n\n<p>Tegy\u00fck fel, hogy az \u00fczemnek h\u00e1rom, m\u00e9g nem teljes\u00edtett k\u00e9sz\u00fcl\u00e9kh\u00e1z-rendel\u00e9se van. Az \u00e1llapotukt\u00f3l f\u00fcgg, hogy milyen munka v\u00e1r m\u00e9g az \u00fczemre.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>A rendel\u00e9s \u00e1llapota<\/th><th>H\u00e1tral\u00e9v\u0151 feladatok<\/th><th>Tervez\u00e9si k\u00e9rd\u00e9s<\/th><\/tr><\/thead><tbody><tr><td>Elfogadva, gy\u00e1rt\u00e1sa m\u00e9g nem kezd\u0151d\u00f6tt el<\/td><td>V\u00e1g\u00e1s, hajl\u00edt\u00e1s, bevonatol\u00e1s \u00e9s \u00f6sszeszerel\u00e9s<\/td><td>Hogyan illeszthet\u0151 be a teljes gy\u00e1rt\u00e1si \u00fatvonal a m\u00e1r v\u00e1llalt munk\u00e1k mell\u00e9?<\/td><\/tr><tr><td>R\u00e9szben legy\u00e1rtva<\/td><td>Bevonatol\u00e1s \u00e9s \u00f6sszeszerel\u00e9s<\/td><td>Mikor lesz szabad kapacit\u00e1s a bevonatol\u00e1shoz, \u00e9s ut\u00e1na id\u0151ben elv\u00e9gezhet\u0151-e az \u00f6sszeszerel\u00e9s?<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1s befejezve<\/td><td>Csomagol\u00e1s \u00e9s kisz\u00e1ll\u00edt\u00e1s<\/td><td>Mi akad\u00e1lyozza a k\u00e9sz rendel\u00e9s kisz\u00e1ll\u00edt\u00e1s\u00e1t?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Mindh\u00e1rom rendel\u00e9s a m\u00e9g ki nem sz\u00e1ll\u00edtott rendel\u00e9s\u00e1llom\u00e1ny r\u00e9sze, de nem mindegyikn\u00e9l kell \u00fajra v\u00e9gigj\u00e1rni a teljes gy\u00e1rt\u00e1si \u00fatvonalat. Az eredeti munka \u00fajb\u00f3li \u00fctemez\u00e9se a val\u00f3sn\u00e1l nagyobb termel\u00e9si kapacit\u00e1sig\u00e9nyt mutatna, a m\u00e9g el nem kezdett rendel\u00e9s figyelmen k\u00edv\u00fcl hagy\u00e1sa pedig kisebbet.<\/p>\n\n\n<p>Most a r\u00e9szben legy\u00e1rtott rendel\u00e9s vev\u0151je kor\u00e1bbi sz\u00e1ll\u00edt\u00e1st k\u00e9r. J\u00f3 megold\u00e1snak t\u0171nik el\u0151revenni a rendel\u00e9st a bevonatol\u00e1sra v\u00e1r\u00f3k sor\u00e1ban. Csakhogy a m\u00e9g el nem kezdett rendel\u00e9snek k\u00e9s\u0151bb ugyanarra a bevonatol\u00f3 er\u0151forr\u00e1sra lesz sz\u00fcks\u00e9ge, majd az \u00f6sszeszerel\u00e9snek is el kell k\u00e9sz\u00fclnie a saj\u00e1t v\u00e1llalt hat\u00e1ridej\u00e9re.<\/p>\n\n\n<p>Mindk\u00e9t rendel\u00e9sre n\u00e9zve l\u00e1tnia kell a k\u00f6vetkezm\u00e9nyeket, nem csup\u00e1n azt, hogy bef\u00e9r-e m\u00e9g egy t\u00e9tel a bevonatol\u00e1sba. K\u00f6zben a gy\u00e1rt\u00e1s felgyors\u00edt\u00e1sa semmit sem seg\u00edt azon a k\u00e9sz rendel\u00e9sen, amely kisz\u00e1ll\u00edt\u00e1sra v\u00e1r.<\/p>\n\n\n<p><strong>A v\u00e1llalt k\u00f6telezetts\u00e9geket \u00e9s a h\u00e1tral\u00e9v\u0151 munk\u00e1t egy\u00fctt kezelje.<\/strong> \u00cdgy kider\u00fcl, hogy az \u00fctemez\u00e9s m\u00f3dos\u00edt\u00e1sa, egy kapacit\u00e1ssal kapcsolatos d\u00f6nt\u00e9s vagy egyszer\u0171en a k\u00e9sz rendel\u00e9s kisz\u00e1ll\u00edt\u00e1sa visz-e el\u0151re.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u00e9sz\u00edtsen gy\u00e1rt\u00e1si tervet a rendel\u00e9s\u00e1llom\u00e1nyb\u00f3l a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A vev\u0151i rendel\u00e9seket \u00e9s a kisz\u00e1ll\u00edt\u00e1sokat tov\u00e1bbra is az ERP-rendszer\u00e9ben kezelheti. A SkyPlanner ny\u00edlt REST API seg\u00edts\u00e9g\u00e9vel b\u00e1rmely ERP vagy MES rendszerhez kapcsol\u00f3dik, \u00e9s a megl\u00e9v\u0151 rendel\u00e9si \u00e9s termel\u00e9si adatokat \u00f6sszek\u00f6ti a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">r\u00e9szletes gy\u00e1rt\u00e1s\u00fctemez\u00e9ssel<\/a>. \u00cdgy megtervezheti a munk\u00e1t an\u00e9lk\u00fcl, hogy le kellene cser\u00e9lnie a v\u00e1llalt vev\u0151i k\u00f6telezetts\u00e9geket nyilv\u00e1ntart\u00f3 rendszert.<\/p>\n\n\n<p>Az \u00fctemez\u00e9s bemen\u0151 adatai a h\u00e1tral\u00e9v\u0151 munk\u00e1t \u00edrj\u00e1k le: a m\u0171veleteket, azok sorrendj\u00e9t \u00e9s id\u0151tartam\u00e1t, az alkalmas munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151ket \u00e9s a priorit\u00e1sokat. Az Arcturus, a SkyPlanner mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151je a be\u00e1ll\u00edtott kapacit\u00e1sok \u00e9s f\u00fcgg\u0151s\u00e9gek alapj\u00e1n helyezi el ezt a munk\u00e1t az \u00fctemtervben. Az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s bekapcsol\u00e1s\u00e1val az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa is beker\u00fcl a sz\u00e1m\u00edt\u00e1sba.<\/p>\n\n\n<p>A k\u00e9sz\u00fcl\u00e9kh\u00e1zakat gy\u00e1rt\u00f3 \u00fczemn\u00e9l ez az elfogadott rendel\u00e9sekhez m\u00e9g sz\u00fcks\u00e9ges v\u00e1g\u00e1s, hajl\u00edt\u00e1s, bevonatol\u00e1s \u00e9s \u00f6sszeszerel\u00e9s megtervez\u00e9s\u00e9t jelenti. Nem kell a rendel\u00e9s\u00e1llom\u00e1ny m\u00e9ret\u00e9b\u0151l megbecs\u00fclnie a sz\u00e1ll\u00edt\u00e1s idej\u00e9t: az \u00fctemezett munk\u00e1t eg\u00e9szen a v\u00e1rhat\u00f3 befejez\u00e9sig k\u00f6vetheti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tal\u00e1ljon helyet a m\u00e9g nem \u00fctemezett munk\u00e1nak<\/h3>\n\n\n<p>Att\u00f3l, hogy egy rendel\u00e9st elfogadtak, m\u00e9g nem felt\u00e9tlen\u00fcl \u00fctemezt\u00e9k be. Tartsa szem el\u0151tt a tervbe m\u00e9g be nem illesztett munk\u00e1kat is, nehogy az \u00e1ttekinthet\u0151nek t\u0171n\u0151 Gantt-diagram elfedje az azon k\u00edv\u00fcl v\u00e1rakoz\u00f3 v\u00e1llal\u00e1sokat.<\/p>\n\n\n<p>A SkyPlanner lehet\u0151v\u00e9 teszi a kiv\u00e1lasztott, m\u00e9g nem \u00fctemezett gy\u00e1rt\u00e1si feladatok be\u00fctemez\u00e9s\u00e9t, \u00e9s az Asszisztensben is k\u00fcl\u00f6n m\u0171velet szolg\u00e1l erre. Az \u00edgy elhelyezett munka a gy\u00e1rt\u00e1si \u00fctemterv r\u00e9sz\u00e9v\u00e9 v\u00e1lik, ahol a megl\u00e9v\u0151 gy\u00e1rt\u00e1si feladatokkal egy\u00fctt tekinthet\u0151 \u00e1t.<\/p>\n\n\n<p>Ez nem ugyanaz, mint a <strong>Mind \u00fajra\u00fctemez\u00e9se<\/strong> funkci\u00f3, amely az id\u0151vonalon m\u00e1r szerepl\u0151 gy\u00e1rt\u00e1si feladatokat sz\u00e1m\u00edtja \u00fajra. Az els\u0151 be\u00fctemez\u00e9ssel a munk\u00e1t a tervbe emeli, az \u00fajra\u00fctemez\u00e9ssel pedig a m\u00e1r \u00fctemezett munk\u00e1t igaz\u00edtja a megv\u00e1ltozott k\u00f6r\u00fclm\u00e9nyekhez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ne csak a k\u00f6vetkez\u0151 szabad helyet n\u00e9zze, hanem a sz\u00e1ll\u00edt\u00e1sra gyakorolt hat\u00e1st is<\/h3>\n\n\n<p>A Gantt-id\u0151vonal megmutatja, hogy a gy\u00e1rt\u00e1si feladatokat hov\u00e1 \u00e9s mikorra \u00fctemezt\u00e9k. <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/termelesi-kapacitastervezes\/\">A kapacit\u00e1s \u00e9s a terhel\u00e9s \u00e1ttekint\u00e9se<\/a> seg\u00edt l\u00e1tni, mely er\u0151forr\u00e1sok foglaltak, \u00e9s hol versengenek a h\u00e1tral\u00e9v\u0151 munk\u00e1k ugyanaz\u00e9rt az id\u0151\u00e9rt.<\/p>\n\n\n<p>A k\u00e9sz\u00fcl\u00e9kh\u00e1zak p\u00e9ld\u00e1j\u00e1ban k\u00f6vesse v\u00e9gig a munk\u00e1t a bevonatol\u00e1st\u00f3l az \u00f6sszeszerel\u00e9sig. A kor\u00e1bbi bevonatol\u00e1si id\u0151pont csak akkor hasznos, ha az \u00fatvonal t\u00f6bbi m\u0171velete is lehet\u0151v\u00e9 teszi a k\u00e9rt id\u0151re t\u00f6rt\u00e9n\u0151 befejez\u00e9st. Miel\u0151tt visszaigazolja a vev\u0151nek a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t, sz\u00e1moljon a csomagol\u00e1ssal, a fuvaroz\u00e1ssal \u00e9s a gy\u00e1rt\u00e1son t\u00fali egy\u00e9b k\u00f6telezetts\u00e9gekkel is.<\/p>\n\n\n<p>Az \u00e9rt\u00e9kes\u00edt\u00e9s \u00e9s a termel\u00e9s \u00edgy sz\u00e1m\u00edt\u00e1sokon alapul\u00f3 tervet egyeztethet ahelyett, hogy k\u00fcl\u00f6n-k\u00fcl\u00f6n tal\u00e1lgatn\u00e1k, mennyire lehet leterhelt az \u00fczem.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00e9zi \u00fajratervez\u00e9s helyett sz\u00e1m\u00edttassa \u00fajra az \u00fctemtervet<\/h3>\n\n\n<p>Ha a vev\u0151 kor\u00e1bbi hat\u00e1rid\u0151t k\u00e9r, m\u00f3dos\u00edtsa az \u00e9rintett priorit\u00e1st, \u00e9s b\u00edzza az Arcturus rendszerre az \u00fctemezett munka \u00fajrasz\u00e1m\u00edt\u00e1s\u00e1t. Az \u00faj hat\u00e1rid\u0151 v\u00e1llal\u00e1sa el\u0151tt ellen\u0151rizze az \u00e9rintett rendel\u00e9sek befejez\u00e9si id\u0151pontjait. A sz\u00e1m\u00edt\u00e1st az \u00d6n priorit\u00e1sai \u00e9s z\u00e1rol\u00e1sai ir\u00e1ny\u00edtj\u00e1k, az \u00f6sszef\u00fcgg\u0151 \u00fctemez\u00e9si feladatokat pedig a szoftver v\u00e9gzi el.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1s el\u0151rehalad\u00e1s\u00e1r\u00f3l is tartson naprak\u00e9sz adatokat. A befejezett m\u0171veletek \u00e9s az el\u00e9rhet\u0151 kapacit\u00e1s v\u00e1ltoz\u00e1sai befoly\u00e1solj\u00e1k, mi val\u00f3s\u00edthat\u00f3 m\u00e9g meg. Bekapcsolt Autopilot mellett a be\u00e1ll\u00edtott esem\u00e9nyek vagy id\u0151z\u00edtett futtat\u00e1sok folyamatos k\u00e9zi fel\u00fcgyelet n\u00e9lk\u00fcl is elind\u00edthatj\u00e1k az \u00fajra\u00fctemez\u00e9st.<\/p>\n\n\n<p>\u00cdgy kevesebb id\u0151 megy el a m\u0171veletek \u00e1trendez\u00e9s\u00e9re a v\u00e1rakoz\u00e1si sorok k\u00f6z\u00f6tt, \u00e9s t\u00f6bb marad az eredm\u00e9ny alapj\u00e1n sz\u00fcks\u00e9ges d\u00f6nt\u00e9sekre. A sz\u00e1ll\u00edt\u00e1si k\u00e9r\u00e9sre k\u00f6zvetlen\u00fcl v\u00e1laszolhat a vev\u0151nek, nem kell egy \u00fajabb k\u00f6r k\u00e9zi sz\u00e1m\u00edt\u00e1ssal megv\u00e1ratnia.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fredman: v\u00e1laszok a sz\u00e1ll\u00edt\u00e1si k\u00e9rd\u00e9sekre az \u00e1tl\u00e1that\u00f3 kapacit\u00e1s alapj\u00e1n<\/h2>\n\n\n<p>A n\u00f6vekv\u0151 rendel\u00e9smennyis\u00e9g ezt a probl\u00e9m\u00e1t okozta a Fredman Operations v\u00e1llalatn\u00e1l is, amely \u00e9lelmiszerrel biztons\u00e1gosan \u00e9rintkez\u0151 konyhai \u00e9s csomagol\u00e1si megold\u00e1sokat gy\u00e1rt Finnorsz\u00e1gban. A munkalapokat k\u00e9zzel vitt\u00e9k \u00e1t az L7 ERP \u00e9s az LTR termel\u00e9sir\u00e1ny\u00edt\u00e1si szoftver k\u00f6z\u00f6tt. A tervez\u0151 nem l\u00e1tta pontosan, mikor szabadulnak fel a g\u00e9pek, \u00e9s mennyi kapacit\u00e1s \u00e1ll rendelkez\u00e9sre m\u0171szakonk\u00e9nt; egy s\u00fcrg\u0151s \u00e1t\u00fctemez\u00e9s ak\u00e1r egy \u00f3r\u00e1t vagy m\u00e9g t\u00f6bbet is ig\u00e9nybe vehetett.<\/p>\n\n\n<p>A SkyPlanner seg\u00edts\u00e9g\u00e9vel a Fredman Gantt-n\u00e9zete egy helyen mutatja a g\u00e9peket, a szabad \u00e9s lek\u00f6t\u00f6tt kapacit\u00e1st, valamint a gy\u00e1rt\u00e1si feladatok el\u0151rehalad\u00e1s\u00e1t. A m\u0171szakonk\u00e9nti kapacit\u00e1s a napi tervez\u00e9s r\u00e9sz\u00e9v\u00e9 v\u00e1lik, \u00e9s a termel\u00e9si csapat minden gy\u00e1rt\u00e1si feladat tervezett kezd\u00e9s\u00e9t \u00e9s befejez\u00e9s\u00e9t l\u00e1tja.<\/p>\n\n\n<p>A Fredman besz\u00e1mol\u00f3ja szerint az \u00e9rt\u00e9kes\u00edt\u00e9s a kapacit\u00e1sadatok alapj\u00e1n ak\u00e1r hat h\u00f3napra el\u0151re is v\u00e1llalhat sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1val kapcsolatos k\u00e9r\u00e9sekre pedig \u00f3r\u00e1k helyett m\u00e1sodpercek alatt kapnak v\u00e1laszt. A v\u00e1llalat arr\u00f3l is besz\u00e1molt, hogy kevesebb t\u00fal\u00f3r\u00e1ra van sz\u00fcks\u00e9g.<\/p>\n\n\n<p>Tapasztalatuk megmutatja, milyen gyakorlati el\u0151nyt jelent a rendel\u00e9s\u00e1llom\u00e1ny \u00f6sszekapcsol\u00e1sa a termel\u00e9ssel: gyorsabban, k\u00f6z\u00f6s adatok alapj\u00e1n adhatnak v\u00e1laszt arra, mit \u00e9s mikorra tud elv\u00e1llalni az \u00fczem. A csapat tapasztalatair\u00f3l a <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/fredman-operations\/\">Fredman Operations r\u00e9szletes SkyPlanner-\u00e9rt\u00e9kel\u00e9s\u00e9ben<\/a> olvashat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a teend\u0151, ha a rendel\u00e9s\u00e1llom\u00e1ny meghaladja a kapacit\u00e1st?<\/h2>\n\n\n<p>A jobb \u00fctemez\u00e9s hat\u00e9konyabban haszn\u00e1lhatja ki a megl\u00e9v\u0151 kapacit\u00e1st. Egy t\u00falterhelt bevonatol\u00f3 sor sz\u00e1m\u00e1ra azonban nem teremt korl\u00e1tlan sz\u00e1m\u00fa munka\u00f3r\u00e1t.<\/p>\n\n\n<p>A terv alapj\u00e1n azonos\u00edtsa, mely v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k ker\u00fcltek vesz\u00e9lybe, \u00e9s mi akad\u00e1lyozza a sz\u00fcks\u00e9ges munka id\u0151beni be\u00fctemez\u00e9s\u00e9t. Ezut\u00e1n hozzon c\u00e9lzott d\u00f6nt\u00e9st:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>M\u00f3dos\u00edtsa a priorit\u00e1sokat, ahol ezt az \u00fczleti m\u00e9rlegel\u00e9s indokolja, \u00e9s ellen\u0151rizze a t\u00f6bbi rendel\u00e9sre gyakorolt hat\u00e1st.<\/li><li>N\u00f6velje az \u00fczemid\u0151t, vagy haszn\u00e1ljon j\u00f3v\u00e1hagyott alternat\u00edv er\u0151forr\u00e1st ott, ahol ez val\u00f3ban enyh\u00edtheti a kapacit\u00e1skorl\u00e1tot.<\/li><li>Oldja meg az anyaghi\u00e1nyt vagy a munkakezd\u00e9s egy\u00e9b akad\u00e1lyait ahelyett, hogy \u00fajra \u00e9s \u00fajra \u00e1thelyezn\u00e9 az elakadt munk\u00e1t.<\/li><li>Ha az eredeti v\u00e1llal\u00e1s m\u00e1r nem tarthat\u00f3, \u00e1llapodjon meg a vev\u0151vel \u00faj sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ben vagy sz\u00e1m\u00e1ra hasznos r\u00e9szsz\u00e1ll\u00edt\u00e1sban.<\/li><\/ul>\n\n\n<p>A k\u00e9sedelmes rendel\u00e9seket a j\u00f6v\u0151beli v\u00e1llal\u00e1sokt\u00f3l elk\u00fcl\u00f6n\u00edtve vizsg\u00e1lja. A cs\u00f6kken\u0151 \u00f6sszes\u00edtett rendel\u00e9s\u00e1llom\u00e1ny m\u00f6g\u00f6tt is rejt\u0151zhet egy vev\u0151 egyre nagyobb sz\u00e1ll\u00edt\u00e1si k\u00e9sedelme, m\u00edg a n\u00f6vekv\u0151 \u00e1llom\u00e1ny kezelhet\u0151 maradhat, ha a munka belef\u00e9r a j\u00f6v\u0151beli kapacit\u00e1sba.<\/p>\n\n\n<p>Nem az a c\u00e9l, hogy a rendel\u00e9s\u00e1llom\u00e1ny a lehet\u0151 legkisebb legyen, hanem az, hogy pontosan \u00e1tl\u00e1ssa a v\u00e1llal\u00e1sait, \u00e9s nyeres\u00e9gesen tudja teljes\u00edteni \u0151ket.<\/p>\n\n\n<h2 class=\"wp-block-heading\">L\u00e1ssa, milyen sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket v\u00e1llalhat a rendel\u00e9s\u00e1llom\u00e1ny alapj\u00e1n<\/h2>\n\n\n<p>Ha egy kor\u00e1bbi sz\u00e1ll\u00edt\u00e1sra vonatkoz\u00f3 k\u00e9r\u00e9s miatt a gy\u00e1rt\u00e1stervez\u0151nek m\u00e9g mindig t\u00e1bl\u00e1zatokhoz kell visszany\u00falnia, \u00e9rdemes tov\u00e1bbl\u00e9pnie a SkyPlanner haszn\u00e1lat\u00e1ra. A h\u00e1tral\u00e9v\u0151 gy\u00e1rt\u00e1si munk\u00e1t, a kapacit\u00e1st \u00e9s a priorit\u00e1sokat olyan \u00fctemtervben kapcsolja \u00f6ssze, amelyre a csapat a k\u00f6vetkez\u0151 sz\u00e1ll\u00edt\u00e1si d\u00f6nt\u00e9sn\u00e9l t\u00e1maszkodhat.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon p\u00e9ldak\u00e9nt egy jellemz\u0151 rendel\u00e9st, egy olyan er\u0151forr\u00e1st, amelyre m\u00e1s rendel\u00e9seknek is sz\u00fcks\u00e9g\u00fck van, valamint egy nemr\u00e9g \u00e9rkezett k\u00e9r\u00e9st a sz\u00e1ll\u00edt\u00e1s el\u0151rehoz\u00e1s\u00e1ra. Ezek j\u00f3 kiindul\u00f3pontot adnak annak megismer\u00e9s\u00e9hez, hogyan v\u00e1ltozik a terv, \u00e9s mely tov\u00e1bbi v\u00e1llal\u00e1sokat \u00e9rinti a m\u00f3dos\u00edt\u00e1s. Ha el\u0151bb az \u00fctemez\u00e9si k\u00f6rnyezettel ismerkedne meg, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra? Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra? A rendel\u00e9s\u00e1llom\u00e1ny a m\u00e1r elfogadott, de m\u00e9g nem teljes\u00edtett vev\u0151i megrendel\u00e9seket foglalja mag\u00e1ban. A gy\u00e1rt\u00e1sban \u00e1ltal\u00e1ban a m\u00e9g kisz\u00e1ll\u00edtand\u00f3 rendel\u00e9seket, mennyis\u00e9geket vagy azok \u00e9rt\u00e9k\u00e9t jelenti. Egy r\u00e9sz\u00fck gy\u00e1rt\u00e1sa m\u00e9g el sem kezd\u0151d\u00f6tt, m\u00e1s r\u00e9sz\u00fck m\u00e1r gy\u00e1rt\u00e1sban van, vagy kisz\u00e1ll\u00edt\u00e1sra &#8230; <a title=\"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/\" aria-label=\"Read more about Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":100177,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-100159","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?<\/title>\n<meta name=\"description\" content=\"A n\u00f6vekv\u0151 rendel\u00e9s\u00e1llom\u00e1ny m\u00e9g nem sz\u00e1ll\u00edt\u00e1si terv. A SkyPlanner a h\u00e1tral\u00e9v\u0151 munk\u00e1t kapacit\u00e1shoz rendeli, \u00edgy a v\u00e1llalt rendel\u00e9sekhez re\u00e1lis hat\u00e1rid\u0151t adhat.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?\" \/>\n<meta property=\"og:description\" content=\"A n\u00f6vekv\u0151 rendel\u00e9s\u00e1llom\u00e1ny m\u00e9g nem sz\u00e1ll\u00edt\u00e1si terv. A SkyPlanner a h\u00e1tral\u00e9v\u0151 munk\u00e1t kapacit\u00e1shoz rendeli, \u00edgy a v\u00e1llalt rendel\u00e9sekhez re\u00e1lis hat\u00e1rid\u0151t adhat.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T17:01:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T17:02:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:02:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/\"},\"wordCount\":2889,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/\",\"name\":\"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:02:17+00:00\",\"description\":\"A n\u00f6vekv\u0151 rendel\u00e9s\u00e1llom\u00e1ny m\u00e9g nem sz\u00e1ll\u00edt\u00e1si terv. A SkyPlanner a h\u00e1tral\u00e9v\u0151 munk\u00e1t kapacit\u00e1shoz rendeli, \u00edgy a v\u00e1llalt rendel\u00e9sekhez re\u00e1lis hat\u00e1rid\u0151t adhat.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesallomany\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?","description":"A n\u00f6vekv\u0151 rendel\u00e9s\u00e1llom\u00e1ny m\u00e9g nem sz\u00e1ll\u00edt\u00e1si terv. A SkyPlanner a h\u00e1tral\u00e9v\u0151 munk\u00e1t kapacit\u00e1shoz rendeli, \u00edgy a v\u00e1llalt rendel\u00e9sekhez re\u00e1lis hat\u00e1rid\u0151t adhat.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/","og_locale":"hu_HU","og_type":"article","og_title":"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?","og_description":"A n\u00f6vekv\u0151 rendel\u00e9s\u00e1llom\u00e1ny m\u00e9g nem sz\u00e1ll\u00edt\u00e1si terv. A SkyPlanner a h\u00e1tral\u00e9v\u0151 munk\u00e1t kapacit\u00e1shoz rendeli, \u00edgy a v\u00e1llalt rendel\u00e9sekhez re\u00e1lis hat\u00e1rid\u0151t adhat.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T17:01:26+00:00","article_modified_time":"2026-10-16T17:02:17+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:02:17+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/"},"wordCount":2889,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/","name":"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:02:17+00:00","description":"A n\u00f6vekv\u0151 rendel\u00e9s\u00e1llom\u00e1ny m\u00e9g nem sz\u00e1ll\u00edt\u00e1si terv. A SkyPlanner a h\u00e1tral\u00e9v\u0151 munk\u00e1t kapacit\u00e1shoz rendeli, \u00edgy a v\u00e1llalt rendel\u00e9sekhez re\u00e1lis hat\u00e1rid\u0151t adhat.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","width":1672,"height":941,"caption":"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesallomany\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra? Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Rendel\u00e9s\u00e1llom\u00e1ny: mit jelent az \u00fczem sz\u00e1m\u00e1ra? A rendel\u00e9s\u00e1llom\u00e1ny a m\u00e1r elfogadott, de m\u00e9g nem teljes\u00edtett vev\u0151i megrendel\u00e9seket foglalja mag\u00e1ban. A gy\u00e1rt\u00e1sban \u00e1ltal\u00e1ban a m\u00e9g kisz\u00e1ll\u00edtand\u00f3 rendel\u00e9seket, mennyis\u00e9geket vagy azok \u00e9rt\u00e9k\u00e9t jelenti. Egy r\u00e9sz\u00fck gy\u00e1rt\u00e1sa m\u00e9g el sem kezd\u0151d\u00f6tt, m\u00e1s r\u00e9sz\u00fck m\u00e1r gy\u00e1rt\u00e1sban van, vagy kisz\u00e1ll\u00edt\u00e1sra&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=100159"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100159\/revisions"}],"predecessor-version":[{"id":100221,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100159\/revisions\/100221"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/100177"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=100159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=100159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=100159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}