{"id":100067,"date":"2026-10-16T15:12:10","date_gmt":"2026-10-16T15:12:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100067"},"modified":"2026-10-16T15:13:14","modified_gmt":"2026-10-16T15:13:14","slug":"alvallalkozoi-gyartas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/","title":{"rendered":"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1sr\u00f3l akkor besz\u00e9l\u00fcnk, ha egy v\u00e1llalat egy m\u00e1sik c\u00e9get b\u00edz meg gy\u00e1rt\u00e1si munk\u00e1val<\/strong>, legyen sz\u00f3 egy teljes term\u00e9k el\u0151\u00e1ll\u00edt\u00e1s\u00e1r\u00f3l vagy egy adott m\u0171velet elv\u00e9gz\u00e9s\u00e9r\u0151l. A gy\u00e1rt\u00f3 p\u00e9ld\u00e1ul h\u00e1zon bel\u00fcl v\u00e9gezheti a forg\u00e1csol\u00e1st \u00e9s az \u00f6sszeszerel\u00e9st, m\u00edg a h\u0151kezel\u00e9st vagy a fel\u00fcletkezel\u00e9st erre szakosodott partnerre b\u00edzza.<\/p>\n\n\n<p>A munka kiker\u00fcl az \u00fczemb\u0151l, de a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151\u00e9rt tov\u00e1bbra is \u00d6n felel. A vissza\u00e9rkez\u0151 alkatr\u00e9szeken m\u00e9g sz\u00fcks\u00e9g lehet tov\u00e1bbi g\u00e9pi megmunk\u00e1l\u00e1sra, \u00f6sszeszerel\u00e9sre \u00e9s v\u00e9gellen\u0151rz\u00e9sre, miel\u0151tt a vev\u0151 \u00e1tveheti a megrendel\u00e9s\u00e9t.<\/p>\n\n\n<p>Ez\u00e9rt a gy\u00e1rt\u00e1s megtervez\u00e9s\u00e9hez nem el\u00e9g tudni, mikorra v\u00e1rhat\u00f3 vissza az alkatr\u00e9sz az alv\u00e1llalkoz\u00f3t\u00f3l. A k\u00fcls\u0151 m\u0171veletet \u00f6ssze kell kapcsolni az el\u0151tte \u00e9s ut\u00e1na k\u00f6vetkez\u0151 munk\u00e1kkal. A SkyPlanner APS az alv\u00e1llalkoz\u00f3i munka\u00e1llom\u00e1sokat is beilleszti a gy\u00e1rt\u00e1si l\u00e1ncba. \u00cdgy egyetlen \u00fctemtervben tervezheti meg az \u00e1tad\u00e1st, l\u00e1thatja a h\u00e1tral\u00e9v\u0151 munk\u00e1t, \u00e9s reag\u00e1lhat az id\u0151pontok v\u00e1ltoz\u00e1s\u00e1ra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit szervez ki: egy term\u00e9k gy\u00e1rt\u00e1s\u00e1t vagy egy m\u0171veletet?<\/h2>\n\n\n<p>A kiszervez\u00e9s jelentheti egy teljes term\u00e9k gy\u00e1rt\u00e1s\u00e1nak \u00e1tad\u00e1s\u00e1t is. A v\u00e1llalat megadja a k\u00f6vetelm\u00e9nyeket a gy\u00e1rt\u00f3partnernek, \u00e9s k\u00e9szterm\u00e9ket kap vissza. Ezt gyakran b\u00e9rgy\u00e1rt\u00e1snak nevezik, b\u00e1r ezt a kifejez\u00e9st alkatr\u00e9szek el\u0151\u00e1ll\u00edt\u00e1s\u00e1ra vagy egyes gy\u00e1rt\u00e1si szolg\u00e1ltat\u00e1sokra is haszn\u00e1lj\u00e1k.<\/p>\n\n\n<p>Egy saj\u00e1t gy\u00e1rt\u00e1si er\u0151forr\u00e1sokkal rendelkez\u0151 \u00fczemn\u00e9l a kiszervez\u00e9s gyakran enn\u00e9l sz\u0171kebb feladatot jelent: <strong>a gy\u00e1rt\u00e1si \u00fatvonal egyik m\u0171velet\u00e9t k\u00fcls\u0151 partner v\u00e9gzi, a t\u00f6bbit h\u00e1zon bel\u00fcl v\u00e9gzik<\/strong>. \u00d6n elk\u00e9sz\u00edti az alkatr\u00e9szt, a partner elv\u00e9gzi rajta a kezel\u00e9st vagy a befejez\u0151 megmunk\u00e1l\u00e1st, majd az \u00d6n csapata fejezi be a rendel\u00e9st.<\/p>\n\n\n<p>Ez m\u00e1s \u00fctemez\u00e9si feladat, mint egyszer\u0171en megv\u00e1s\u00e1rolni egy k\u00e9szterm\u00e9ket. A saj\u00e1t munk\u00e1nak el kell k\u00e9sz\u00fclnie a partnerrel egyeztetett kezd\u00e9sre, a vissza\u00e9rkez\u0151 t\u00e9telt pedig be kell illeszteni a h\u00e1tral\u00e9v\u0151 bels\u0151 munk\u00e1k k\u00f6z\u00e9. Ha a k\u00fcls\u0151 l\u00e9p\u00e9st k\u00fcl\u00f6n\u00e1ll\u00f3 beszerz\u00e9sk\u00e9nt kezeli, mindk\u00e9t f\u00fcgg\u0151s\u00e9g rejtve maradhat.<\/p>\n\n\n<p>A kiszervez\u00e9s nem felt\u00e9tlen\u00fcl jelent k\u00fclf\u00f6ldi munkav\u00e9gz\u00e9st sem. A k\u00fcls\u0151 m\u0171veletet egy k\u00f6zeli szakosodott c\u00e9g is elv\u00e9gezheti. A t\u00e1vols\u00e1g sz\u00e1m\u00edt a sz\u00e1ll\u00edt\u00e1s \u00e9s az egyeztet\u00e9s szempontj\u00e1b\u00f3l, de a tervez\u00e9s alapk\u00e9rd\u00e9se ugyanaz: mikor \u00e1llnak k\u00e9szen az alkatr\u00e9szek a k\u00f6vetkez\u0151 l\u00e9p\u00e9sre?<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mikor \u00e9ri meg az alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s?<\/h2>\n\n\n<p>Egy felk\u00e9sz\u00fclt gy\u00e1rt\u00f3partner olyan elj\u00e1r\u00e1st tehet el\u00e9rhet\u0151v\u00e9, amellyel \u00d6n nem rendelkezik, t\u00f6bbletkapacit\u00e1st adhat, ha a saj\u00e1t er\u0151forr\u00e1sai m\u00e1r lek\u00f6t\u00f6ttek, vagy olyan szaktud\u00e1st ny\u00fajthat, amelyet k\u00f6lts\u00e9ges lenne h\u00e1zon bel\u00fcl ki\u00e9p\u00edteni. \u00cdgy tov\u00e1bbra is azokra a m\u0171veletekre ford\u00edthatja beruh\u00e1z\u00e1sait, amelyek megk\u00fcl\u00f6nb\u00f6ztetik v\u00e1llalkoz\u00e1s\u00e1t, ahelyett, hogy minden alkalmi ig\u00e9nyhez berendez\u00e9st v\u00e1s\u00e1rolna.<\/p>\n\n\n<p>Nem mindig a legalacsonyabb darab\u00e1r a kiszervez\u00e9s leger\u0151sebb indoka. Azt is m\u00e9rlegelje, hogyan hat a d\u00f6nt\u00e9s a teljes rendel\u00e9s elk\u00e9sz\u00fcl\u00e9s\u00e9re:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>A kiszervez\u00e9s indoka<\/th><th>Mit ellen\u0151rizzen a d\u00f6nt\u00e9s el\u0151tt?<\/th><\/tr><\/thead><tbody><tr><td>Hozz\u00e1f\u00e9r\u00e9s speci\u00e1lis berendez\u00e9sekhez vagy szaktud\u00e1shoz<\/td><td>A partner k\u00e9pes teljes\u00edteni az el\u0151\u00edrt k\u00f6vetelm\u00e9nyeket? Milyen igazol\u00e1sokra vagy \u00e1tv\u00e9teli ellen\u0151rz\u00e9sekre van sz\u00fcks\u00e9g?<\/td><\/tr><tr><td>Egy t\u00falterhelt bels\u0151 er\u0151forr\u00e1s tehermentes\u00edt\u00e9se<\/td><td>A sz\u00e1ll\u00edt\u00e1st \u00e9s a h\u00e1tral\u00e9v\u0151 m\u0171veleteket is belesz\u00e1m\u00edtva val\u00f3ban hamarabb elk\u00e9sz\u00fcl a rendel\u00e9s a k\u00fcls\u0151 m\u0171veletet tartalmaz\u00f3 \u00fatvonalon?<\/td><\/tr><tr><td>Alkalmi munk\u00e1khoz sz\u00fcks\u00e9ges beruh\u00e1z\u00e1s elker\u00fcl\u00e9se<\/td><td>A szolg\u00e1ltat\u00e1s k\u00f6lts\u00e9g\u00e9t, az egyeztet\u00e9si r\u00e1ford\u00edt\u00e1st \u00e9s a befejezetlen termel\u00e9st tekintve meg\u00e9ri a kiszervez\u00e9s ahhoz k\u00e9pest, mintha h\u00e1zon bel\u00fcl tartan\u00e1 fenn ezt a k\u00e9pess\u00e9get?<\/td><\/tr><tr><td>\u00c1tmeneti keresletn\u00f6veked\u00e9s kezel\u00e9se<\/td><td>Milyen kapacit\u00e1st \u00e9s \u00e1tfut\u00e1si id\u0151t v\u00e1llalt t\u00e9nylegesen a partner?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az alacsonyabb megmunk\u00e1l\u00e1si \u00e1r el\u0151ny\u00e9t felem\u00e9sztheti a t\u00f6bbletmozgat\u00e1s, a fuvar, az ut\u00f3munka vagy az, hogy a t\u00e9tel a k\u00f6vetkez\u0151 szabad bels\u0151 id\u0151ablakra v\u00e1r. Ezzel szemben egy dr\u00e1g\u00e1bb aj\u00e1nlatot ad\u00f3 szakosodott partner seg\u00edthet hamarabb befejezni a rendel\u00e9st, mik\u00f6zben az \u00d6n sz\u0171k\u00f6s saj\u00e1t kapacit\u00e1sa m\u00e1s munk\u00e1kra marad szabad.<\/p>\n\n\n<p>A teljes gy\u00e1rt\u00e1si \u00fatvonal alapj\u00e1n d\u00f6nts\u00f6n, ne a k\u00fcls\u0151 m\u0171veletet \u00f6nmag\u00e1ban vizsg\u00e1lja. Az \u00f6sszef\u00fcgg\u0151 \u00fctemterv jobb alapot ad ehhez az \u00f6sszehasonl\u00edt\u00e1shoz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi\u00e9rt nem azonos a vissza\u00e9rkez\u00e9s \u00e9s a kisz\u00e1ll\u00edt\u00e1s id\u0151pontja?<\/h2>\n\n\n<p>Tegy\u00fck fel, hogy m\u0171szerh\u00e1zakat gy\u00e1rt. A csapata forg\u00e1csol\u00e1ssal elk\u00e9sz\u00edti a h\u00e1zakat, majd elk\u00fcldi \u0151ket elox\u00e1l\u00e1sra. A vissza\u00e9rkez\u00e9s ut\u00e1n be\u00e9p\u00edti a bels\u0151 alkatr\u00e9szeket, \u00e9s kisz\u00e1ll\u00edt\u00e1s el\u0151tt elv\u00e9gzi a v\u00e9gellen\u0151rz\u00e9st.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1si \u00fatvonal egyszer\u0171:<\/p>\n\n\n<p><strong>Forg\u00e1csol\u00e1s \u2192 k\u00fcls\u0151 elox\u00e1l\u00e1s \u2192 vissza\u00e9rkez\u00e9s az \u00fczembe \u2192 \u00f6sszeszerel\u00e9s \u2192 ellen\u0151rz\u00e9s \u2192 kisz\u00e1ll\u00edt\u00e1s.<\/strong><\/p>\n\n\n<p>Az elox\u00e1l\u00e1st v\u00e9gz\u0151 partner v\u00e1rhat\u00f3an cs\u00fct\u00f6rt\u00f6k\u00f6n v\u00e9gez. Ez els\u0151re \u00f6sszeegyeztethet\u0151nek t\u0171nik a vev\u0151nek v\u00e1llalt hat\u00e1rid\u0151vel \u2013 am\u00edg nem tiszt\u00e1zza, mit jelent a cs\u00fct\u00f6rt\u00f6k. Akkor lehet elhozni a h\u00e1zakat? Addigra vissza\u00e9rnek az \u00fczembe? Vagy a be\u00e9rkez\u00e9si ellen\u0151rz\u00e9seken is \u00e1tesnek, \u00e9s kezd\u0151dhet az \u00f6sszeszerel\u00e9s?<\/p>\n\n\n<p>M\u00e9g ha a h\u00e1zak m\u00e1r vissza is \u00e9rtek, az \u00f6sszeszerel\u00e9s kapacit\u00e1s\u00e1t addigra egy m\u00e1sik rendel\u00e9s k\u00f6theti le. Annak \u00e1t\u00fctemez\u00e9se megmentheti ezt a sz\u00e1ll\u00edt\u00e1st, de vesz\u00e9lybe sodorhatja egy m\u00e1sik vev\u0151 rendel\u00e9s\u00e9t. Ha viszont v\u00e1ltozatlanul hagyja a sorrendet, az elk\u00e9sz\u00fcl\u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s \u00e1ltal v\u00e1llalt hat\u00e1rid\u0151n t\u00falra cs\u00faszhat.<\/p>\n\n\n<p>Egy k\u00fcl\u00f6n feljegyz\u00e9s arr\u00f3l, hogy \u201ecs\u00fct\u00f6rt\u00f6k\u00f6n vissza\u00e9r\u201d, egyik k\u00e9rd\u00e9sre sem ad v\u00e1laszt. A haszn\u00e1lhat\u00f3 v\u00e1laszhoz a k\u00fcls\u0151 m\u0171velet id\u0151z\u00edt\u00e9s\u00e9t \u00f6ssze kell kapcsolni a m\u00e9g sz\u00fcks\u00e9ges bels\u0151 kapacit\u00e1ssal. Ez a k\u00fcl\u00f6nbs\u00e9g ak\u00f6z\u00f6tt, hogy nyomon k\u00f6veti, hol tart egy t\u00e9tel, \u00e9s ak\u00f6z\u00f6tt, hogy megtervezi, mikor k\u00e9sz\u00fclhet el a rendel\u00e9s.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A k\u00fcls\u0151 m\u0171velet is maradjon a SkyPlanner gy\u00e1rt\u00e1si l\u00e1nc\u00e1ban<\/h2>\n\n\n<p>A SkyPlannerben a k\u00fcls\u0151 megmunk\u00e1l\u00e1st v\u00e9gz\u0151 partnert olyan munka\u00e1llom\u00e1sk\u00e9nt veheti fel, amelyn\u00e9l enged\u00e9lyezve van az <strong>alv\u00e1llalkoz\u00f3i m\u00f3d<\/strong>. \u00cdgy a k\u00fcls\u0151 m\u0171velet ugyanahhoz a gy\u00e1rt\u00e1si l\u00e1nchoz tartozik, mint a bels\u0151 munka, \u00e9s nem csup\u00e1n egy k\u00fcl\u00f6n besz\u00e1ll\u00edt\u00f3i list\u00e1n szerepel.<\/p>\n\n\n<p>\u00d6n meghat\u00e1rozza a rendel\u00e9s <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-utvonal\/\">m\u0171veleteit \u00e9s azok sorrendj\u00e9t<\/a>, karbantartja a gy\u00e1rt\u00e1si feladatok id\u0151tartam\u00e1t, \u00e9s az alv\u00e1llalkoz\u00f3i munka\u00e1llom\u00e1shoz rendeli a k\u00fcls\u0151 munk\u00e1t. A SkyPlanner \u00fctemez\u0151motorja, az Arcturus az \u00d6n szab\u00e1lyai \u00e9s priorit\u00e1sai alapj\u00e1n sz\u00e1m\u00edtja ki az \u00fctemtervet. A Gantt-diagramon l\u00e1that\u00f3v\u00e1 v\u00e1lik az \u00e9rintett er\u0151forr\u00e1sokra tervezett munka.<\/p>\n\n\n<p>A m\u0171szerh\u00e1zakn\u00e1l ez azt jelenti, hogy az elox\u00e1l\u00e1s a forg\u00e1csol\u00e1s \u00e9s az \u00f6sszeszerel\u00e9s k\u00f6z\u00e9 ker\u00fcl. A k\u00fcls\u0151 munk\u00e1ra tervezett id\u0151szakot az el\u0151tte befejezend\u0151 \u00e9s az ut\u00e1na k\u00f6vetkez\u0151 munk\u00e1kkal egy\u00fctt tekintheti \u00e1t. <strong>Kevesebb id\u0151t kell k\u00fcl\u00f6n\u00e1ll\u00f3 id\u0151pontok egyeztet\u00e9s\u00e9re \u00e9s a bels\u0151 munkasorrend k\u00e9zi \u00e1trendez\u00e9s\u00e9re ford\u00edtania.<\/strong><\/p>\n\n\n<h3 class=\"wp-block-heading\">Az \u00e1tad\u00e1st is tervezze meg, ne csak a vissza\u00e9rkez\u00e9st<\/h3>\n\n\n<p>A k\u00fcls\u0151 m\u0171velet egyeztetett kezd\u00e9si id\u0151pontja csak akkor hasznos, ha az azt megel\u0151z\u0151 m\u0171veletek id\u0151ben elk\u00e9sz\u00fclhetnek. A SkyPlanner <strong>Alv\u00e1llalkoz\u00f3i kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontok k\u00f6vet\u00e9se<\/strong> glob\u00e1lis szab\u00e1lya ellen\u0151rzi, hogy a gy\u00e1rt\u00e1si feladat megkezdhet\u0151-e. Emellett \u00fagy \u00fctemezi vagy \u00fctemezi \u00e1t az adott rendel\u00e9si t\u00e9tel kor\u00e1bbi gy\u00e1rt\u00e1si feladatait, hogy azok az alv\u00e1llalkoz\u00f3i m\u0171velet kezdet\u00e9re elk\u00e9sz\u00fcljenek.<\/p>\n\n\n<p>\u00cdgy a partnernek v\u00e1llalt \u00e1tad\u00e1si id\u0151pont is beker\u00fcl a tervez\u00e9si sz\u00e1m\u00edt\u00e1sba. Nem csup\u00e1n arra \u00f6sszpontos\u00edthat, mikorra v\u00e1rhat\u00f3 vissza a t\u00e9tel: azt is l\u00e1thatja, hogy az el\u0151k\u00e9sz\u00edt\u0151 munka belef\u00e9r-e a partnerrel egyeztetett kezd\u00e9sig.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hagyjon id\u0151t a befejez\u00e9s \u00e9s a k\u00f6vetkez\u0151 m\u0171velet k\u00f6z\u00f6tt<\/h3>\n\n\n<p>A megmunk\u00e1l\u00e1si id\u0151 nem azonos a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1ssal. Egy m\u0171velet befejez\u00e9se ut\u00e1n m\u00e9g sz\u00fcks\u00e9g lehet anyagmozgat\u00e1sra, sz\u00e1ll\u00edt\u00e1sra vagy sz\u00e1rad\u00e1sra, miel\u0151tt elkezd\u0151dhet a k\u00f6vetkez\u0151 l\u00e9p\u00e9s.<\/p>\n\n\n<p>A SkyPlanner <strong>M\u0171velet ut\u00e1ni v\u00e1rakoz\u00e1si id\u0151<\/strong> be\u00e1ll\u00edt\u00e1sa a megadott id\u0151tartammal k\u00e9sleltetheti a k\u00f6vetkez\u0151 m\u0171veletet. A gy\u00e1rt\u00e1si feladatot befejez\u0151 munka\u00e1llom\u00e1s ezalatt m\u00e1s rendel\u00e9seken tov\u00e1bb dolgozhat. \u00cdgy a sz\u00fcks\u00e9ges v\u00e1rakoz\u00e1st an\u00e9lk\u00fcl jelen\u00edtheti meg, hogy azt t\u00e9nyleges megmunk\u00e1l\u00e1si id\u0151nek sz\u00e1m\u00edtan\u00e1, vagy feleslegesen lek\u00f6tn\u00e9 az er\u0151forr\u00e1st.<\/p>\n\n\n<p>Tiszt\u00e1zza, hogy a k\u00fcls\u0151 m\u0171velethez megadott id\u0151 m\u00e1r mely id\u0151szakokat tartalmazza, nehogy ugyanazt az id\u0151ig\u00e9nyt k\u00e9tszer sz\u00e1molja el. A tervezett sz\u00e1ll\u00edt\u00e1si id\u0151 seg\u00edt abban, hogy az \u00fctemterv a gy\u00e1rt\u00e1si \u00fatvonalat t\u00fckr\u00f6zze, de nem helyettes\u00edti az alkatr\u00e9szek t\u00e9nyleges be\u00e9rkez\u00e9s\u00e9nek visszaigazol\u00e1s\u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00fcl\u00f6n\u00edtse el a t\u00e9nyleges el\u0151rehalad\u00e1st a tervt\u0151l<\/h3>\n\n\n<p>Az alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1si feladatokat is el kell ind\u00edtani \u00e9s le kell \u00e1ll\u00edtani az id\u0151m\u00e9r\u0151ben. A glob\u00e1lis szab\u00e1ly az \u00fctemez\u00e9st szab\u00e1lyozza; nem helyettes\u00edti a t\u00e9nyleges kezd\u00e9s \u00e9s befejez\u00e9s r\u00f6gz\u00edt\u00e9s\u00e9t.<\/p>\n\n\n<p>Ezeket az esem\u00e9nyeket a kik\u00fcld\u00e9sre \u00e9s vissza\u00e9rkez\u00e9sre egyeztetett munkafolyamattal \u00f6sszhangban r\u00f6gz\u00edtse. \u00cdgy a tervez\u0151 vil\u00e1gosan megk\u00fcl\u00f6nb\u00f6ztetheti a k\u00fcls\u0151 munk\u00e1ra tervezett id\u0151pontokat a t\u00e9nylegesen megt\u00f6rt\u00e9nt esem\u00e9nyekt\u0151l, \u00e9s a v\u00e1rhat\u00f3 vissza\u00e9rkez\u00e9s nem l\u00e9p az igazolt el\u0151rehalad\u00e1s hely\u00e9be.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ha v\u00e1ltozik a partner hat\u00e1rideje, ellen\u0151rizze a teljes rendel\u00e9st<\/h2>\n\n\n<p>A vissza\u00e9rkez\u00e9s m\u00f3dosult id\u0151pontja gy\u00e1rt\u00e1si d\u00f6nt\u00e9st ig\u00e9nyel, nem puszt\u00e1n egy besz\u00e1ll\u00edt\u00f3i megjegyz\u00e9s \u00e1t\u00edr\u00e1s\u00e1t. Friss\u00edtse az \u00e9rintett id\u0151adatokat a SkyPlannerben, \u00e9s hagyja, hogy az Arcturus a megv\u00e1ltozott helyzethez igaz\u00edtva \u00fajrasz\u00e1m\u00edtsa az \u00fctemezhet\u0151 munk\u00e1kat. Ezut\u00e1n tekintse \u00e1t a k\u00f6vetkez\u0151 m\u0171veleteket \u00e9s az \u00edgy ad\u00f3d\u00f3 befejez\u00e9si id\u0151pontot a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gantt-diagram-a-termeles-tervezesehez\/\">Gantt-diagramon<\/a>.<\/p>\n\n\n<p>A k\u00f6vetkez\u0151 l\u00e9p\u00e9s att\u00f3l f\u00fcgg, mit mutat az \u00fctemterv:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A h\u00e1tral\u00e9v\u0151 munka tov\u00e1bbra is belef\u00e9r.<\/strong> Tartsa a v\u00e1llalt hat\u00e1rid\u0151t, \u00e9s dolgozzon a friss\u00edtett sorrend szerint, an\u00e9lk\u00fcl, hogy sz\u00fcks\u00e9gtelen\u00fcl \u00e1trendezn\u00e9 a nem \u00e9rintett feladatokat.<\/li><li><strong>A k\u00f6vetkez\u0151 bels\u0151 er\u0151forr\u00e1s v\u00e1lt sz\u0171k keresztmetszett\u00e9.<\/strong> Vizsg\u00e1lja meg a priorit\u00e1sokat \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st, miel\u0151tt fel\u00e1rat fizetne a partnernek egy olyan munka gyors\u00edt\u00e1s\u00e1\u00e9rt, amely ut\u00e1na csak v\u00e1rakozna az \u00fczemben.<\/li><li><strong>A rendel\u00e9s m\u00e1r nem k\u00e9sz\u00fcl el a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ig.<\/strong> D\u00f6ntse el, hogy a kor\u00e1bbi vissza\u00e9rkez\u00e9s, a bels\u0151 priorit\u00e1sok indokolt m\u00f3dos\u00edt\u00e1sa vagy a vev\u0151vel egyeztetett \u00faj hat\u00e1rid\u0151 jelenti-e a legjobb megold\u00e1st.<\/li><\/ul>\n\n\n<p>Az \u00fczleti d\u00f6nt\u00e9s tov\u00e1bbra is az \u00d6n kez\u00e9ben marad. A SkyPlanner elv\u00e9gzi az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">\u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat<\/a>, amelyek alapj\u00e1n k\u00f6nnyebb felm\u00e9rni a k\u00f6vetkezm\u00e9nyeket. \u00cdgy kevesebb k\u00e9zi egyeztet\u00e9sre van sz\u00fcks\u00e9g, \u00e9s tiszt\u00e1bban l\u00e1thatja a helyzetet, amikor m\u00e9g van id\u0151 cselekedni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vegyen fel a tervbe egy k\u00fcls\u0151 m\u0171veletet is tartalmaz\u00f3 gy\u00e1rt\u00e1si \u00fatvonalat<\/h2>\n\n\n<p>Kezdjen egy visszat\u00e9r\u0151 rendel\u00e9ssel, amelynek gy\u00e1rt\u00e1sa sor\u00e1n k\u00fcls\u0151 partner is v\u00e9gez megmunk\u00e1l\u00e1st. Egyeztesse, pontosan mit jelent az \u201eelk\u00fcldve\u201d, az \u201eelk\u00e9sz\u00fclt\u201d \u00e9s a \u201evissza\u00e9rkezett\u201d \u00e1llapot, jel\u00f6lje ki az egyes esem\u00e9nyek r\u00f6gz\u00edt\u00e9s\u00e9\u00e9rt felel\u0151s szem\u00e9lyt, \u00e9s tiszt\u00e1zza, mennyi id\u0151 sz\u00fcks\u00e9ges a k\u00f6vetkez\u0151 bels\u0151 m\u0171velet megkezd\u00e9s\u00e9ig. Ezut\u00e1n a h\u00e1tral\u00e9v\u0151 \u00f6sszeszerel\u00e9st, tesztel\u00e9st vagy ellen\u0151rz\u00e9st is vegye bele a tervbe, ne \u00e1lljon meg a partnert\u0151l val\u00f3 vissza\u00e9rkez\u00e9sn\u00e9l.<\/p>\n\n\n<p>Nem kell lecser\u00e9lnie az ERP rendszer\u00e9t ahhoz, hogy ezt a gy\u00e1rt\u00e1si \u00fatvonalat egys\u00e9ges tervbe foglalja. <strong><a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">A SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3<\/a><\/strong>, \u00edgy megl\u00e9v\u0151 rendel\u00e9si \u00e9s gy\u00e1rt\u00e1si adatait felhaszn\u00e1lhatja az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokhoz. A beszerz\u00e9si \u00e9s kereskedelmi nyilv\u00e1ntart\u00e1sok megmaradhatnak a jelenlegi munkafolyamatban, mik\u00f6zben a gy\u00e1rt\u00e1s \u00f6sszef\u00fcgg\u0151 tervet kap.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">SkyPlanner bemutat\u00f3j\u00e1ra<\/a> hozzon egy k\u00fcls\u0151 m\u0171veletet is tartalmaz\u00f3 rendel\u00e9st, valamint egy k\u00f6zelm\u00faltbeli p\u00e9ld\u00e1t arra, amikor megv\u00e1ltozott a vissza\u00e9rkez\u00e9s id\u0151pontja. K\u00e9rje, hogy a k\u00fcls\u0151 m\u0171veletet a saj\u00e1t munk\u00e1ival k\u00f6z\u00f6s gy\u00e1rt\u00e1si \u00fatvonalon mutass\u00e1k meg, majd vizsg\u00e1lja meg, hogyan hat a v\u00e1ltoz\u00e1s a k\u00f6vetkez\u0151 bels\u0151 id\u0151ablakra \u00e9s a v\u00e9gs\u0151 elk\u00e9sz\u00fcl\u00e9s id\u0151pontj\u00e1ra. \u00cdgy a gyakorlatban l\u00e1thatja, mennyi napi egyeztet\u00e9st takar\u00edthat meg. Ha el\u0151bb saj\u00e1t maga ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlannert dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1sr\u00f3l akkor besz\u00e9l\u00fcnk, ha egy v\u00e1llalat egy m\u00e1sik c\u00e9get b\u00edz meg gy\u00e1rt\u00e1si munk\u00e1val, legyen sz\u00f3 egy teljes term\u00e9k el\u0151\u00e1ll\u00edt\u00e1s\u00e1r\u00f3l vagy egy adott m\u0171velet elv\u00e9gz\u00e9s\u00e9r\u0151l. A gy\u00e1rt\u00f3 p\u00e9ld\u00e1ul h\u00e1zon bel\u00fcl v\u00e9gezheti a forg\u00e1csol\u00e1st \u00e9s az \u00f6sszeszerel\u00e9st, m\u00edg &#8230; <a title=\"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/\" aria-label=\"Read more about Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":100085,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-100067","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is<\/title>\n<meta name=\"description\" content=\"Tervezzen alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1st a SkyPlannerben: partneri d\u00e1tumok \u00e9s bels\u0151 munkasor egy\u00fctt, a vissza\u00e9rkez\u00e9s hat\u00e1sa a v\u00e1llalt sz\u00e1ll\u00edt\u00e1sra is l\u00e1that\u00f3.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is\" \/>\n<meta property=\"og:description\" content=\"Tervezzen alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1st a SkyPlannerben: partneri d\u00e1tumok \u00e9s bels\u0151 munkasor egy\u00fctt, a vissza\u00e9rkez\u00e9s hat\u00e1sa a v\u00e1llalt sz\u00e1ll\u00edt\u00e1sra is l\u00e1that\u00f3.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T15:12:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T15:13:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is\",\"datePublished\":\"2026-10-16T15:12:10+00:00\",\"dateModified\":\"2026-10-16T15:13:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/\"},\"wordCount\":2599,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/outsourced-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/\",\"name\":\"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/outsourced-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T15:12:10+00:00\",\"dateModified\":\"2026-10-16T15:13:14+00:00\",\"description\":\"Tervezzen alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1st a SkyPlannerben: partneri d\u00e1tumok \u00e9s bels\u0151 munkasor egy\u00fctt, a vissza\u00e9rkez\u00e9s hat\u00e1sa a v\u00e1llalt sz\u00e1ll\u00edt\u00e1sra is l\u00e1that\u00f3.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/outsourced-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/outsourced-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A production route links in-house machining, an outside finishing workshop, and assembly before dispatch.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/alvallalkozoi-gyartas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is","description":"Tervezzen alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1st a SkyPlannerben: partneri d\u00e1tumok \u00e9s bels\u0151 munkasor egy\u00fctt, a vissza\u00e9rkez\u00e9s hat\u00e1sa a v\u00e1llalt sz\u00e1ll\u00edt\u00e1sra is l\u00e1that\u00f3.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/","og_locale":"hu_HU","og_type":"article","og_title":"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is","og_description":"Tervezzen alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1st a SkyPlannerben: partneri d\u00e1tumok \u00e9s bels\u0151 munkasor egy\u00fctt, a vissza\u00e9rkez\u00e9s hat\u00e1sa a v\u00e1llalt sz\u00e1ll\u00edt\u00e1sra is l\u00e1that\u00f3.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T15:12:10+00:00","article_modified_time":"2026-10-16T15:13:14+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is","datePublished":"2026-10-16T15:12:10+00:00","dateModified":"2026-10-16T15:13:14+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/"},"wordCount":2599,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/","name":"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png","datePublished":"2026-10-16T15:12:10+00:00","dateModified":"2026-10-16T15:13:14+00:00","description":"Tervezzen alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1st a SkyPlannerben: partneri d\u00e1tumok \u00e9s bels\u0151 munkasor egy\u00fctt, a vissza\u00e9rkez\u00e9s hat\u00e1sa a v\u00e1llalt sz\u00e1ll\u00edt\u00e1sra is l\u00e1that\u00f3.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png","width":1672,"height":941,"caption":"A production route links in-house machining, an outside finishing workshop, and assembly before dispatch."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/alvallalkozoi-gyartas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/outsourced-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s: tervezzen a vissza\u00e9rkez\u00e9s ut\u00e1nra is Alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1sr\u00f3l akkor besz\u00e9l\u00fcnk, ha egy v\u00e1llalat egy m\u00e1sik c\u00e9get b\u00edz meg gy\u00e1rt\u00e1si munk\u00e1val, legyen sz\u00f3 egy teljes term\u00e9k el\u0151\u00e1ll\u00edt\u00e1s\u00e1r\u00f3l vagy egy adott m\u0171velet elv\u00e9gz\u00e9s\u00e9r\u0151l. A gy\u00e1rt\u00f3 p\u00e9ld\u00e1ul h\u00e1zon bel\u00fcl v\u00e9gezheti a forg\u00e1csol\u00e1st \u00e9s az \u00f6sszeszerel\u00e9st, m\u00edg&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=100067"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100067\/revisions"}],"predecessor-version":[{"id":100130,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/100067\/revisions\/100130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/100085"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=100067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=100067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=100067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}