{"id":107692,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/","title":{"rendered":"DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 partnereknek \u00e9s informatikai csapatoknak mutatja be, hogyan kapcsolhat\u00f3 \u00f6ssze a DELMIAWorks, kor\u00e1bbi nev\u00e9n IQMS, a SkyPlanner APS rendszerrel. A SkyPlanner a DELMIAWorks WebAPI haszn\u00e1lat\u00e1val mindk\u00e9t ir\u00e1nyban adatot cser\u00e9l a DELMIAWorks rendszerrel:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlanner gy\u00e1rt\u00e1si rendel\u00e9seket, az alkatr\u00e9szek m\u0171veleteit is tartalmaz\u00f3 Bills of Manufacturing adatokat, munka\u00e1llom\u00e1sokat, szersz\u00e1mokat \u00e9s formaszersz\u00e1mokat, k\u00e9szletcikkeket, k\u00e9szletadatokat \u00e9s beszerz\u00e9si rendel\u00e9seket fogad.<\/li>\n\n\n<li>A tervezett kezd\u00e9si \u00e9s befejez\u00e9si d\u00e1tumok, valamint a hozz\u00e1rendelt munka\u00e1llom\u00e1s visszaker\u00fclnek a gy\u00e1rt\u00e1si rendel\u00e9sekbe.<\/li>\n\n\n<li>A megfelel\u0151 min\u0151s\u00e9g\u0171 darabok gy\u00e1rt\u00e1si bizonylatk\u00e9nt, a be\u00e1ll\u00edt\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151k pedig a Time &amp; Attendance feladatokhoz tartoz\u00f3 munkaid\u0151k\u00e9nt k\u00f6nyvelhet\u0151k.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1j\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata a REST API seg\u00edts\u00e9g\u00e9vel az \u00d6n DELMIAWorks-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Ez az \u00fatmutat\u00f3 azoknak a partnereknek \u00e9s fejleszt\u0151knek sz\u00f3l, akik r\u00e9szt szeretn\u00e9nek venni ebben, vagy maguk szeretn\u00e9nek fejleszteni a SkyPlanner dokument\u00e1lt REST API fel\u00fclet\u00e9re \u00e9p\u00edtve (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A DELMIAWorks integr\u00e1ci\u00f3s interf\u00e9szei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A DELMIAWorks dokument\u00e1ci\u00f3ja szerint: &#8220;WebAPI includes both the API SDK for GRAPHQL APIs and WebAPI SDK for REST APIs&#8221; (A WebAPI a GRAPHQL API-khoz tartoz\u00f3 API SDK-t \u00e9s a REST API-khoz tartoz\u00f3 WebAPI SDK-t is tartalmazza.) (<a href=\"https:\/\/www.3ds.com\/assets\/invest\/2022-03\/delmiaworks-webapi-graphql-rest-api-datasheet.pdf\">WebAPI-adatlap<\/a>). A REST-oldal modulokb\u00f3l \u00e9s kontrollerekb\u0151l \u00e1ll. Az \u00fctemez\u00e9si integr\u00e1ci\u00f3 az al\u00e1bbiakat haszn\u00e1lja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Manufacturing WorkOrders:<\/strong> WorkOrder, WorkOrders, ScheduledWorkOrders, UnscheduledWorkOrders, CreateWorkOrder, UpdateWorkOrder, UpdateWorkOrderEx, WorkOrderReleases, InventoryItemsForWorkOrder, SalesOrdersForWorkOrder.<\/li>\n\n\n<li><strong>Manufacturing Schedule:<\/strong> RunAutoLoad, RemoveFromSchedule, NextSetup, GetSetupTemplateChecklists.<\/li>\n\n\n<li><strong>Manufacturing WorkCenters:<\/strong> WorkCenter, WorkCenters, WorkCenterDetails, RunningWorkOrder, PMEquipment.<\/li>\n\n\n<li><strong>Manufacturing BOM:<\/strong> BillOfMaterials, BomLabor, PartOperations, StandardOperations, BOMComponents.<\/li>\n\n\n<li><strong>Manufacturing Inventory:<\/strong> InventoryItems, AddProductionRecords, InventoryProductionReportsByWorkOrder.<\/li>\n\n\n<li><strong>Manufacturing Realtime:<\/strong> GetWorkCenterSchedule, ActualCavity, GetSetupTime, RealTimeData.<\/li>\n\n\n<li><strong>Manufacturing Downtime:<\/strong> AddDownTime, CloseDownTime.<\/li>\n\n\n<li><strong>PO Receiving:<\/strong> POs, POLineItems, POReleaseItems, POReceipts.<\/li>\n\n\n<li><strong>Time &amp; Attendance:<\/strong> TimeClock (LogInOut, TaskClockLogin), Tasks (ClockInTATask, ClockOutTATask, UpdateGoodParts), EmployeeCalendar.<\/li>\n\n<\/ul>\n\n\n<p>A GraphQL SDK t\u00f6meges adatlek\u00e9r\u00e9sre alkalmas, p\u00e9ld\u00e1ul a cikkek \u00e9s darabjegyz\u00e9kek kezdeti bet\u00f6lt\u00e9s\u00e9hez. Minden \u00edr\u00e1si m\u0171velet a REST-kontrollereken kereszt\u00fcl t\u00f6rt\u00e9nik.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s \u00e9s licencel\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A DELMIAWorks rendszerben hozzon l\u00e9tre k\u00fcl\u00f6n felhaszn\u00e1l\u00f3t az integr\u00e1ci\u00f3hoz, \u00e9s ellen\u0151rizze, hogy a WebAPI rendelkezik-e licenccel, \u00e9s telep\u00edtve van-e az \u00d6n k\u00f6rnyezet\u00e9ben. A Realtime modul egy AuthToken kontrollert biztos\u00edt; a WebAPI-munkamenet az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3 hiteles\u00edt\u0151 adataival ny\u00edlik meg. Az adott verzi\u00f3hoz sz\u00fcks\u00e9ges pontos be\u00e1ll\u00edt\u00e1sokat a DELMIAWorks-partner er\u0151s\u00edti meg.<\/p>\n\n\n<p>A SkyPlanner fel\u00e9 ind\u00edtott minden h\u00edv\u00e1s az <code>Authorization-Token<\/code> fejl\u00e9cben k\u00fcldi az API-tokent. A tokent a SkyPlanner Settings &gt; API men\u00fcpontj\u00e1ban hozhatja l\u00e9tre. A fejleszt\u00e9s megkezd\u00e9s\u00e9hez elegend\u0151 egy API-token.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Esem\u00e9nyek \u00e9s rendszeres lek\u00e9rdez\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner az \u00fctemterv minden v\u00e1ltoz\u00e1sakor webhookot k\u00fcld, \u00edgy a v\u00e1ltoz\u00e1sokkal egy\u00fctt megt\u00f6rt\u00e9nik a DELMIAWorks rendszerbe val\u00f3 vissza\u00edr\u00e1s is.<\/p>\n\n\n<p>A DELMIAWorks v\u00e1ltoz\u00e1sait a WebAPI rendszeres lek\u00e9rdez\u00e9s\u00e9vel k\u00f6vesse. A ScheduledWorkOrders \u00e9s UnscheduledWorkOrders adatait n\u00e9h\u00e1ny percenk\u00e9nt k\u00e9rdezze le, a beszerz\u00e9si rendel\u00e9seket \u00e9s k\u00e9szletcikkeket pedig ritk\u00e1bban. A DELMIAWorks be\u00e9p\u00edtett riaszt\u00e1si \u00e9s m\u0171veletv\u00e9grehajt\u00f3 motorja, az IQAlert egy partnerprojektben esem\u00e9nyek hat\u00e1s\u00e1ra m\u0171veleteket ind\u00edthat.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>DELMIAWorks-objektum (interf\u00e9sz)<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>K\u00e9szletcikkek (InventoryItems)<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd rendszeres lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>Bill of Manufacturing, darabjegyz\u00e9k-komponensek (BillOfMaterials, BOMComponents)<\/td><td>Term\u00e9kstrukt\u00fara, term\u00e9kenk\u00e9nti anyagok<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Alkatr\u00e9szm\u0171veletek, standard m\u0171veletek, darabjegyz\u00e9khez tartoz\u00f3 munkaid\u0151adatok (PartOperations, BomLabor)<\/td><td>M\u0171veleti l\u00e9p\u00e9sek id\u0151tartammal, be\u00e1ll\u00edt\u00e1si id\u0151vel \u00e9s kezel\u0151i l\u00e9tsz\u00e1mmal<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Munka\u00e1llom\u00e1sok: pr\u00e9sek, extruderek, gy\u00e1rt\u00f3cell\u00e1k (WorkCenters, WorkCenterDetails)<\/td><td>Munka\u00e1llom\u00e1sok, munka\u00e1llom\u00e1s-csoportok, hat\u00e9konys\u00e1gi \u00e9rt\u00e9kek<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, ut\u00e1na ritk\u00e1n<\/td><\/tr><tr><td>Szersz\u00e1mok \u00e9s formaszersz\u00e1mok, csal\u00e1dszersz\u00e1mok, forma\u00fcregek (BOM, ActualCavity)<\/td><td>Szersz\u00e1mok mint korl\u00e1tozott kapacit\u00e1s\u00fa er\u0151forr\u00e1sok, ciklusonk\u00e9nti mennyis\u00e9g<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Shop Calendar, dolgoz\u00f3i napt\u00e1r (EmployeeCalendar)<\/td><td>M\u0171szakok, dolgoz\u00f3k, t\u00e1voll\u00e9tek<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Naponta, vagy saj\u00e1t m\u0171szakkezel\u00e9s a SkyPlanner rendszerben<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s leh\u00edv\u00e1sok (WorkOrders, ScheduledWorkOrders, UnscheduledWorkOrders)<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok hat\u00e1rid\u0151kkel \u00e9s anyagsz\u00fcks\u00e9glettel<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s n\u00e9h\u00e1ny percenk\u00e9nt<\/td><\/tr><tr><td>Cikkenk\u00e9nti rakt\u00e1rk\u00e9szlet (InventoryItems)<\/td><td>K\u00e9szletegyenlegek<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>Beszerz\u00e9si rendel\u00e9sek \u00e9s leh\u00edv\u00e1sok (POs, POReleaseItems)<\/td><td>Beszerz\u00e9si rendel\u00e9sek, be\u00e9rkez\u0151 anyagok sz\u00e1ll\u00edt\u00e1si d\u00e1tum szerint<\/td><td>DELMIAWorks \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9s kezd\u00e9si \u00e9s befejez\u00e9si d\u00e1tuma, munka\u00e1llom\u00e1sa (Manufacturing WorkOrders kontroller)<\/td><td>Tervezett kezd\u00e9s \u00e9s befejez\u00e9s, hozz\u00e1rendelt munka\u00e1llom\u00e1s<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, SkyPlanner-webhookon kereszt\u00fcl<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si bizonylatok: megfelel\u0151 min\u0151s\u00e9g\u0171 darabok gy\u00e1rt\u00e1si rendel\u00e9senk\u00e9nt (AddProductionRecords)<\/td><td>Visszajelent\u00e9sekb\u0151l sz\u00e1rmaz\u00f3 elk\u00e9sz\u00fclt mennyis\u00e9gek<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>Visszajelent\u00e9senk\u00e9nt, ha ezt v\u00e1lasztj\u00e1k<\/td><\/tr><tr><td>Feladatra ford\u00edtott munkaid\u0151 (ClockInTATask, ClockOutTATask)<\/td><td>Id\u0151napl\u00f3k \u00e9s kezel\u0151i visszajelent\u00e9sek<\/td><td>SkyPlanner \u2192 DELMIAWorks<\/td><td>Visszajelent\u00e9senk\u00e9nt vagy m\u0171szakonk\u00e9nt, ha ezt v\u00e1lasztj\u00e1k<\/td><\/tr><tr><td>Nincs a DELMIAWorks rendszerben<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, alternat\u00edv pr\u00e9sek \u00e9s dolgoz\u00f3k<\/td><td>A SkyPlanner rendszerben karbantartva<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be a k\u00e9szletcikkeket, darabjegyz\u00e9keket, alkatr\u00e9szm\u0171veleteket, munka\u00e1llom\u00e1sokat \u00e9s formaszersz\u00e1mokat. Gondosan alak\u00edtsa ki a munka\u00e1llom\u00e1sok megfeleltet\u00e9s\u00e9t: minden pr\u00e9s egy munka\u00e1llom\u00e1s, az azonos formaszersz\u00e1mm\u00e9rettel dolgoz\u00f3 pr\u00e9sek pedig egym\u00e1st helyettes\u00edt\u0151 munka\u00e1llom\u00e1sok csoportj\u00e1t alkotj\u00e1k.<\/p>\n\n\n<p><strong>2. A gy\u00e1rt\u00e1si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Olvassa be a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket a m\u0171veleteikkel \u00e9s anyagaikkal egy\u00fctt, valamint a nyitott beszerz\u00e9si rendel\u00e9seket. A SkyPlanner a megrendelt m\u0171anyag alapanyagot \u00e9s bet\u00e9teket a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1n tekinti el\u00e9rhet\u0151nek, a k\u00e9szletet pedig akkor friss\u00edti, amikor a beszerz\u00e9si rendel\u00e9s Delivered \u00e1llapotba ker\u00fcl.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Amikor az \u00fctemez\u0151motor elhelyez vagy \u00e1thelyez egy gy\u00e1rt\u00e1si rendel\u00e9st, egy SkyPlanner-webhook elind\u00edtja a rendel\u00e9s friss\u00edt\u00e9s\u00e9t a Manufacturing WorkOrders kontrolleren kereszt\u00fcl. A friss\u00edt\u00e9s tartalmazza a tervezett kezd\u00e9si \u00e9s befejez\u00e9si d\u00e1tumokat, valamint a SkyPlanner \u00e1ltal kiv\u00e1lasztott munka\u00e1llom\u00e1st. A pontos mez\u0151ket \u00e9s azt, hogy a Finite Schedule t\u00e1bla hogyan k\u00f6veti ezeket, a bevezet\u00e9si felm\u00e9r\u00e9s sor\u00e1n r\u00f6gz\u00edtik.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations vagy a Production Timer haszn\u00e1lat\u00e1val r\u00f6gz\u00edtik a munk\u00e1t, az id\u0151napl\u00f3k pedig naprak\u00e9szen tartj\u00e1k az \u00fctemtervet. \u00d6n d\u00f6nti el, hogy a t\u00e9nyadatok vissza\u00edr\u00f3djanak-e. Ha igen, a megfelel\u0151 min\u0151s\u00e9g\u0171 darabok adatai az AddProductionRecords h\u00edv\u00e1ssal, a munkaid\u0151adatok pedig a Time &amp; Attendance feladatokhoz tartoz\u00f3 h\u00edv\u00e1sokkal ker\u00fclnek vissza a DELMIAWorks rendszerbe. Ha nem, a RealTime \u00e9s a Shopworks a kor\u00e1bbi m\u00f3don jelenti az adatokat, a SkyPlanner pedig a DELMIAWorks rendszerb\u0151l olvassa be az el\u0151rehalad\u00e1st.<\/p>\n\n\n<p><strong>5. Adatgazdai \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong> R\u00f6gz\u00edtse \u0151ket az \u00e9les indul\u00e1s el\u0151tt:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Cikkek, darabjegyz\u00e9kek, ciklusid\u0151k, forma\u00fcregek, a gy\u00e1rt\u00e1si rendel\u00e9sek mennyis\u00e9ge \u00e9s \u00e1llapota<\/td><td>DELMIAWorks<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si rendel\u00e9sek sorrendje, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontja, pr\u00e9shez rendel\u00e9se<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, formaszersz\u00e1m- \u00e9s kezel\u0151i k\u00f6vetelm\u00e9nyek, alternat\u00edv pr\u00e9sek<\/td><td>SkyPlanner<\/td><\/tr><tr><td>M\u0171szakok \u00e9s munkav\u00e9gz\u00e9s n\u00e9lk\u00fcli napok<\/td><td>Egy rendszer, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1s, selejt, munkaid\u0151 \u00e9s anyagkiad\u00e1s<\/td><td>DELMIAWorks: ott r\u00f6gz\u00edtve vagy a SkyPlanner id\u0151napl\u00f3ib\u00f3l k\u00f6nyvelve<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Jel\u00f6lj\u00f6n ki egyetlen rendszert a gy\u00e1rt\u00e1si rendel\u00e9sek d\u00e1tumainak \u00edr\u00e1s\u00e1ra. Kapcsolja ki az Auto Load funkci\u00f3t a SkyPlanner \u00e1ltal \u00fctemezett munka\u00e1llom\u00e1sokn\u00e1l, bele\u00e9rtve az Update Schedule \u00e9s az Auto Load funkci\u00f3kat futtat\u00f3 \u00f6sszes IQAlert-m\u0171veletet is. Ezeken a munka\u00e1llom\u00e1sokon a k\u00f6zelj\u00f6v\u0151 \u00fctemterv\u00e9nek r\u00f6gz\u00edt\u00e9s\u00e9re a DELMIAWorks \u00fctemez\u00e9sm\u00f3dos\u00edt\u00e1st korl\u00e1toz\u00f3 id\u0151szaka helyett a SkyPlanner Running Time Lock funkci\u00f3j\u00e1t haszn\u00e1lja.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s a bevezet\u00e9s megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtva \u00e1ltal\u00e1ban n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. El\u0151tte ellen\u0151rizze az \u00fctemtervet a 30 napos ingyenes pr\u00f3ba sor\u00e1n, a DELMIAWorks rendszerb\u0151l CSV- vagy Excel-form\u00e1tumban export\u00e1lt munka\u00e1llom\u00e1sokkal, darabjegyz\u00e9kekkel \u00e9s nyitott gy\u00e1rt\u00e1si rendel\u00e9sekkel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Adatmegfeleltet\u00e9s.<\/strong> R\u00f6gz\u00edtse a megfeleltet\u00e9si t\u00e1bl\u00e1t, az adatok\u00e9rt felel\u0151s rendszert kijel\u00f6l\u0151 szab\u00e1lyokat \u00e9s a szinkroniz\u00e1l\u00e1s gyakoris\u00e1g\u00e1t, valamint azt, hogy a termel\u00e9si \u00e9s munkaid\u0151adatok visszaker\u00fcljenek-e az ERP-be.<\/li>\n\n\n<li><strong>DELMIAWorks-hozz\u00e1f\u00e9r\u00e9s.<\/strong> Hozza l\u00e9tre az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t, \u00e9s ellen\u0151rizze a WebAPI licencel\u00e9s\u00e9t. El\u0151sz\u00f6r tesztadatb\u00e1zisban v\u00e9gezze el a teszteket.<\/li>\n\n\n<li><strong>Kezdeti adatbet\u00f6lt\u00e9s.<\/strong> Cikkek, BOM-ok, alkatr\u00e9szm\u0171veletek, munka\u00e1llom\u00e1sok, formaszersz\u00e1mok \u00e9s napt\u00e1rak.<\/li>\n\n\n<li><strong>Gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Id\u0151szakos lek\u00e9rdez\u00e9s sz\u0171r\u0151kkel \u00e9s \u00fajrapr\u00f3b\u00e1lkoz\u00e1sokkal.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlannerben.<\/strong> \u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mk\u00e9nt kezelt \u00f6nt\u0151form\u00e1k, gy\u00e1rt\u00e1si feladatonk\u00e9nti kezel\u0151i l\u00e9tsz\u00e1m, alternat\u00edv pr\u00e9sg\u00e9pek \u00e9s szem\u00e9lyzet.<\/li>\n\n\n<li><strong>\u00dctemez\u00e9s vissza\u00edr\u00e1sa.<\/strong> Gy\u00e1rt\u00e1si rendel\u00e9sek friss\u00edt\u00e9se a SkyPlanner webhookjai alapj\u00e1n, valamint ig\u00e9ny eset\u00e9n a termel\u00e9si \u00e9s munkaid\u0151adatok k\u00f6nyvel\u00e9se.<\/li>\n\n\n<li><strong>P\u00e1rhuzamos tesztel\u00e9s.<\/strong> Futtassa a SkyPlannert a jelenlegi Finite Schedule mellett, hasonl\u00edtsa \u00f6ssze a d\u00e1tumokat, \u00e9s jav\u00edtsa a t\u00f6rzsadatokat.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s.<\/strong> Kapcsolja ki az Auto Load funkci\u00f3t az \u00fctemezett munka\u00e1llom\u00e1sokon, \u00e9s kapcsolja be a vissza\u00edr\u00e1st.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-delmiaworks-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire k\u00e9sz\u00fclj\u00f6n a DELMIAWorks integr\u00e1ci\u00f3j\u00e1n\u00e1l?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Csal\u00e1dszersz\u00e1mok.<\/strong> Egy szersz\u00e1m egy ciklusban t\u00f6bbf\u00e9le cikket gy\u00e1rt. Ezt egyetlen gy\u00e1rt\u00e1si feladatk\u00e9nt modellezze, amely az \u00f6sszes \u00e9rintett cikket el\u0151\u00e1ll\u00edtja, \u00edgy a szersz\u00e1mot csak egyszer foglalja le a rendszer.<\/li>\n\n\n<li><strong>Formaf\u00e9szkek.<\/strong> A t\u00e9nyleges f\u00e9szeksz\u00e1m elt\u00e9rhet a n\u00e9vlegest\u0151l, ha egy f\u00e9szek le van z\u00e1rva. D\u00f6ntse el, hogy az id\u0151tartamok sz\u00e1m\u00edt\u00e1sa a n\u00e9vleges \u00e9rt\u00e9k vagy a RealTime ActualCavity \u00e9rt\u00e9ke alapj\u00e1n t\u00f6rt\u00e9njen.<\/li>\n\n\n<li><strong>Szersz\u00e1mok \u00e9s pr\u00e9sg\u00e9pek kompatibilit\u00e1sa.<\/strong> Nem minden szersz\u00e1m haszn\u00e1lhat\u00f3 minden pr\u00e9sg\u00e9pen. A SkyPlannerben szersz\u00e1monk\u00e9nt \u00e1ll\u00edtsa be alternat\u00edvak\u00e9nt az enged\u00e9lyezett pr\u00e9sg\u00e9peket, \u00edgy a munka csak megfelel\u0151 g\u00e9pre ker\u00fclhet \u00e1t.<\/li>\n\n\n<li><strong>Sz\u00edn- \u00e9s anyagv\u00e1lt\u00e1sok.<\/strong> Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixban mindk\u00e9t ir\u00e1nyra adja meg a t\u00e9nyleges \u00e1t\u00f6bl\u00edt\u00e9si \u00e9s szersz\u00e1mcsere-id\u0151ket. P\u00e9ld\u00e1ul a k\u00e9kr\u0151l pirosra v\u00e1lt\u00e1s 30 percet, a pirosr\u00f3l k\u00e9kre v\u00e1lt\u00e1s pedig 60 percet vehet ig\u00e9nybe.<\/li>\n\n\n<li><strong>Auto Load \u00e9s \u00fctemez\u00e9si id\u0151korl\u00e1tok.<\/strong> Ha k\u00e9t \u00fctemez\u0151 \u00edrja a d\u00e1tumokat, fel\u00fcl\u00edrj\u00e1k egym\u00e1s m\u00f3dos\u00edt\u00e1sait. Az \u00e9les indul\u00e1s el\u0151tt kapcsolja ki az Auto Load funkci\u00f3t \u00e9s az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1t korl\u00e1toz\u00f3 id\u0151szakokat a SkyPlanner \u00e1ltal \u00fctemezett munka\u00e1llom\u00e1sokon.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-delmiaworks-inte\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be \u00e9s t\u00e1mogatja a DELMIAWorks-integr\u00e1ci\u00f3t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata v\u00e9gzi a be\u00e1ll\u00edt\u00e1st a bevezet\u00e9s sor\u00e1n, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt,<\/strong> a meg\u00e1llapod\u00e1s szerinti WebAPI-vez\u00e9rl\u0151kre kiterjed\u0151en. Minden \u00fczem m\u00e1sk\u00e9pp haszn\u00e1lja a DELMIAWorks rendszer\u00e9t, \u00e9s a be\u00e1ll\u00edt\u00e1sokban ez a helyi tud\u00e1s is szerepet kap.<\/li>\n\n\n<li><strong>Az \u00d6n DELMIAWorks-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az \u00d6n \u00e1ltal haszn\u00e1lt verzi\u00f3t, az egyedi mez\u0151ket \u00e9s a licencel\u00e9st, \u00edgy a SkyPlanner csapat\u00e1val egy\u00fctt be\u00e1ll\u00edthatja az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t \u00e9s a WebAPI-t.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is tov\u00e1bbfejleszthetik az integr\u00e1ci\u00f3t<\/strong> a SkyPlanner REST API haszn\u00e1lat\u00e1val, a <code>Authorization-Token<\/code> fejl\u00e9cben megadott API-tokennel. A SkyPlanner csapata sz\u00fcks\u00e9g eset\u00e9n seg\u00edt. A r\u00e9szleteket a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner integr\u00e1ci\u00f3s dokument\u00e1ci\u00f3j\u00e1ban<\/a> tal\u00e1lja.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151zetes \u00e1raj\u00e1nlatot adunk, a v\u00e1lasztott csomaggal egy\u00fctt. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, a <a href=\"\/hu\/integraciok\/erp\/delmiaworks\/termelesutemezes\/\">DELMIAWorks termel\u00e9s\u00fctemez\u00e9s\u00e9t<\/a>, a <a href=\"\/hu\/integraciok\/erp\/delmiaworks\/\">DELMIAWorks oldal\u00e1t<\/a> \u00e9s az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u00e9s\u00e9t<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3szekr\u00e9ny-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokon alapul\u00f3 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3szekr\u00e9nyek \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri v\u00e9d\u0151ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napos optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa, a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner d\u00f6nt\u0151 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, \u00e9s az \u00fctemez\u00e9shez ma m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/kjh-comp\/\">Olvassa el a KJH-Comp v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations termel\u00e9si vezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra<\/b><span>el\u0151re l\u00e1tja az \u00e9rt\u00e9kes\u00edt\u00e9s a szabad kapacit\u00e1st<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner biztos \u00e9s megb\u00edzhat\u00f3 alapot ad a teljes gy\u00e1rt\u00e1stervez\u00e9shez.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, termel\u00e9si vezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerekkel biztons\u00e1gosan \u00e9rintkez\u0151 csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st, az \u00fctemez\u00e9s m\u00f3dos\u00edt\u00e1s\u00e1ra ir\u00e1nyul\u00f3 k\u00e9r\u00e9sekre pedig m\u00e1sodpercek alatt v\u00e1laszt kapnak a kor\u00e1bbi egy \u00f3ra vagy m\u00e9g hosszabb id\u0151 helyett.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/fredman-operations\/\">Olvassa el a Fredman Operations v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Melyik DELMIAWorks API-t haszn\u00e1lja a SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">A DELMIAWorks WebAPI-t. A SkyPlanner a REST-vez\u00e9rl\u0151k\u00f6n kereszt\u00fcl olvas adatokat, t\u00f6meges adatolvas\u00e1shoz pedig a GraphQL SDK-t is haszn\u00e1lhatja. A vissza\u00edr\u00e1s a REST-vez\u00e9rl\u0151k\u00f6n kereszt\u00fcl t\u00f6rt\u00e9nik: a gy\u00e1rt\u00e1si rendel\u00e9sek friss\u00edt\u00e9s\u00e9hez a WorkOrders vez\u00e9rl\u0151t, a tov\u00e1bbi m\u0171veletekhez az AddProductionRecords \u00e9s a Time &amp; Attendance feladath\u00edv\u00e1sait haszn\u00e1lja.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mit \u00edr vissza a SkyPlanner a DELMIAWorks rendszer\u00e9be?<\/summary>\n<p class=\"sp-faq__a\">Az egyes gy\u00e1rt\u00e1si rendel\u00e9sek tervezett kezd\u00e9si \u00e9s befejez\u00e9si d\u00e1tum\u00e1t, valamint a hozz\u00e1juk rendelt munka\u00e1llom\u00e1st. Ig\u00e9ny eset\u00e9n a selejtmentes darabok termel\u00e9si rekordk\u00e9nt, az \u00e1t\u00e1ll\u00e1si \u00e9s gy\u00e1rt\u00e1si id\u0151k pedig a feladathoz tartoz\u00f3 munkaid\u0151k\u00e9nt ker\u00fclnek k\u00f6nyvel\u00e9sre.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Az integr\u00e1ci\u00f3 az IQMS EnterpriseIQ rendszerrel is m\u0171k\u00f6dik?<\/summary>\n<p class=\"sp-faq__a\">A DELMIAWorks az IQMS EnterpriseIQ jelenlegi neve. Az integr\u00e1ci\u00f3 a WebAPI-t haszn\u00e1lja, \u00edgy az a d\u00f6nt\u0151, hogy az \u00d6n verzi\u00f3j\u00e1hoz telep\u00edtve van-e a WebAPI, \u00e9s rendelkezik-e hozz\u00e1 licenccel. Ezt a partnere a felm\u00e9r\u00e9s sor\u00e1n ellen\u0151rzi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan kezeli a rendszer a szersz\u00e1mokat \u00e9s a csal\u00e1dszersz\u00e1mokat?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner az \u00f6nt\u0151form\u00e1kat korl\u00e1tozott kapacit\u00e1s\u00fa szersz\u00e1mk\u00e9nt kezeli, \u00edgy egy szersz\u00e1m soha nem szerepelhet egyszerre k\u00e9t pr\u00e9sg\u00e9pen. A csal\u00e1dszersz\u00e1mmal v\u00e9gzett gy\u00e1rt\u00e1s egyetlen gy\u00e1rt\u00e1si feladat, amely az \u00f6sszes \u00e9rintett cikket el\u0151\u00e1ll\u00edtja. Az adott szersz\u00e1mhoz enged\u00e9lyezett pr\u00e9sg\u00e9pek alternat\u00edvak\u00e9nt szerepelnek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mi t\u00f6rt\u00e9nik az Auto Load funkci\u00f3val?<\/summary>\n<p class=\"sp-faq__a\">Kapcsolja ki a SkyPlanner \u00e1ltal \u00fctemezett munka\u00e1llom\u00e1sokon, az azt futtat\u00f3 IQAlert-m\u0171veletekkel egy\u00fctt. Ezeken a munka\u00e1llom\u00e1sokon kiz\u00e1r\u00f3lag a SkyPlanner \u00edrja majd a gy\u00e1rt\u00e1si rendel\u00e9sek d\u00e1tumait.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ki k\u00e9sz\u00edti el az integr\u00e1ci\u00f3t?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner csapata v\u00e9gzi a be\u00e1ll\u00edt\u00e1st a bevezet\u00e9s sor\u00e1n, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt. DELMIAWorks-partnere vagy saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek integr\u00e1ci\u00f3t a SkyPlanner REST API haszn\u00e1lat\u00e1val, API-tokenes hiteles\u00edt\u00e9ssel.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ DELMIAWorks DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 partnereknek \u00e9s informatikai csapatoknak mutatja be, hogyan kapcsolhat\u00f3 \u00f6ssze a DELMIAWorks, kor\u00e1bbi nev\u00e9n IQMS, a SkyPlanner APS rendszerrel. A SkyPlanner a DELMIAWorks WebAPI haszn\u00e1lat\u00e1val mindk\u00e9t ir\u00e1nyban adatot cser\u00e9l a DELMIAWorks rendszerrel: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A bevezet\u00e9s sor\u00e1n a SkyPlanner &#8230; <a title=\"DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/\" aria-label=\"Read more about DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106559,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107692","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>DELMIAWorks APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"DELMIAWorks (IQMS)\u2013SkyPlanner APS: WebAPI REST \u00e9s GraphQL, WorkOrders-vissza\u00edr\u00e1s, gy\u00e1rt\u00e1s \u00e9s munkaid\u0151 k\u00f6nyvel\u00e9se, adatmegfeleltet\u00e9s.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" \/>\n<meta property=\"og:description\" content=\"DELMIAWorks (IQMS)\u2013SkyPlanner APS: WebAPI REST \u00e9s GraphQL, WorkOrders-vissza\u00edr\u00e1s, gy\u00e1rt\u00e1s \u00e9s munkaid\u0151 k\u00f6nyvel\u00e9se, adatmegfeleltet\u00e9s.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/delmiaworks\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/delmiaworks\\\/integracios-utmutato\\\/\",\"name\":\"DELMIAWorks APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"DELMIAWorks (IQMS)\u2013SkyPlanner APS: WebAPI REST \u00e9s GraphQL, WorkOrders-vissza\u00edr\u00e1s, gy\u00e1rt\u00e1s \u00e9s munkaid\u0151 k\u00f6nyvel\u00e9se, adatmegfeleltet\u00e9s.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/delmiaworks\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/delmiaworks\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/delmiaworks\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a DELMIAWorks (IQMS) rendszerhez: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/delmiaworks\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"DELMIAWorks APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"DELMIAWorks (IQMS)\u2013SkyPlanner APS: WebAPI REST \u00e9s GraphQL, WorkOrders-vissza\u00edr\u00e1s, gy\u00e1rt\u00e1s \u00e9s munkaid\u0151 k\u00f6nyvel\u00e9se, adatmegfeleltet\u00e9s.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez","og_description":"DELMIAWorks (IQMS)\u2013SkyPlanner APS: WebAPI REST \u00e9s GraphQL, WorkOrders-vissza\u00edr\u00e1s, gy\u00e1rt\u00e1s \u00e9s munkaid\u0151 k\u00f6nyvel\u00e9se, adatmegfeleltet\u00e9s.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/","name":"DELMIAWorks APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"DELMIAWorks (IQMS)\u2013SkyPlanner APS: WebAPI REST \u00e9s GraphQL, WorkOrders-vissza\u00edr\u00e1s, gy\u00e1rt\u00e1s \u00e9s munkaid\u0151 k\u00f6nyvel\u00e9se, adatmegfeleltet\u00e9s.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a DELMIAWorks (IQMS) rendszerhez: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/delmiaworks\/"},{"@type":"ListItem","position":5,"name":"DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ DELMIAWorks DELMIAWorks integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 partnereknek \u00e9s informatikai csapatoknak mutatja be, hogyan kapcsolhat\u00f3 \u00f6ssze a DELMIAWorks, kor\u00e1bbi nev\u00e9n IQMS, a SkyPlanner APS rendszerrel. A SkyPlanner a DELMIAWorks WebAPI haszn\u00e1lat\u00e1val mindk\u00e9t ir\u00e1nyban adatot cser\u00e9l a DELMIAWorks rendszerrel: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A bevezet\u00e9s sor\u00e1n a SkyPlanner&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107692","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=107692"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107692\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106559"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=107692"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}