{"id":107605,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/sage-100\/termelesutemezes\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"termelesutemezes","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/","title":{"rendered":"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Sage 100<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? <span class=\"hl\">A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Nem \u00fagy, mint egy termel\u00e9s\u00fctemez\u0151, amely minden m\u0171veletet oda \u00fctemez, ahol van szabad kapacit\u00e1s. Ezt a nevet k\u00e9t k\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9k viseli. Az amerikai Sage 100 Production Management minden munkajegyet a Sage \u00e1ltal \u201einfinite\u201d (korl\u00e1tlan) terhel\u00e9snek nevezett m\u00f3dszerrel \u00fctemez, a t\u00falterhelt munka\u00e1llom\u00e1sok tehermentes\u00edt\u00e9se pedig a tervez\u0151 feladata. A n\u00e9met Sage 100 Produktion megmutatja a terhel\u00e9st \u00e9s a sz\u0171k keresztmetszeteket, a k\u00fcl\u00f6n v\u00e1laszthat\u00f3 Plantafel fel\u00fclet\u00e9n pedig a tervez\u0151 h\u00faz\u00e1ssal mozgathatja a feladatokat egy t\u00e1bl\u00e1n. Azok az \u00fczemek, ahol minden g\u00e9pet, dolgoz\u00f3t, szersz\u00e1mot \u00e9s anyagot <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">a t\u00e9nyleges kapacit\u00e1skorl\u00e1tok figyelembev\u00e9tel\u00e9vel kell \u00fctemezni<\/a>, a Sage 100 mellett SkyPlanner APS-t haszn\u00e1lnak.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"first-which-sage-100-do-you-run\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">El\u0151sz\u00f6r is: melyik Sage 100-at haszn\u00e1lja?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Az Egyes\u00fclt \u00c1llamokban \u00e9s Kanad\u00e1ban haszn\u00e1lt Sage 100<\/strong> a kor\u00e1bbi MAS 90 \u00e9s MAS 200. A gy\u00e1rt\u00e1st a Production Management kezeli, amely munkajegyekre, sablonokra, tev\u00e9kenys\u00e9gk\u00f3dokra \u00e9s munka\u00e1llom\u00e1sokra \u00e9p\u00fcl. A Production Management a kor\u00e1bbi Work Order modult v\u00e1ltotta fel.<\/p>\n\n\n<p><strong>A N\u00e9metorsz\u00e1gban \u00e9s Ausztri\u00e1ban haszn\u00e1lt Sage 100<\/strong> a Sage Office Line \u00e9s a Sage New Classic ut\u00f3dja. A gy\u00e1rt\u00e1st a Sage 100 Produktion kezeli, amelynek alapj\u00e1t a Ressourcenlisten, a Fertigungsauftr\u00e4ge \u00e9s az Arbeitspl\u00e4tze objektumok adj\u00e1k. A Sage Basic, Professional \u00e9s Enterprise csomagban k\u00edn\u00e1lja (<a href=\"https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/\">Sage 100 Produktion<\/a>).<\/p>\n\n\n<p>A k\u00e9t term\u00e9knek csak a neve \u00e9s a sz\u00e1ll\u00edt\u00f3ja k\u00f6z\u00f6s, a k\u00f3db\u00e1zisa nem. Az al\u00e1bbiakban mindkett\u0151t a saj\u00e1t fogalmaival mutatjuk be.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-us-sage-100-production-management-schedules\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy \u00fctemez az amerikai Sage 100 Production Management, l\u00e9p\u00e9sr\u0151l l\u00e9p\u00e9sre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Munka\u00e1llom\u00e1sok<\/h3>\n\n\n<p>A Work Center Maintenance fel\u00fclet\u00e9n \u00e1ll\u00edthat\u00f3 be a sorban \u00e1ll\u00e1si id\u0151, a hat\u00e9konys\u00e1g sz\u00e1zal\u00e9kos \u00e9rt\u00e9ke, a dolgoz\u00f3k vagy g\u00e9pek sz\u00e1ma, a h\u00e9t egyes napjain rendelkez\u00e9sre \u00e1ll\u00f3 \u00f3r\u00e1k \u00e9s a le\u00e1ll\u00e1si id\u0151szakok. A Sage meghat\u00e1roz\u00e1sa szerint a munka\u00e1llom\u00e1s \u201eone or more persons or machines\u201d (egy vagy t\u00f6bb szem\u00e9ly vagy g\u00e9p), \u00e9s \u201ethey are considered a single unit for capacity planning and detailed work assignments.\u201d (a kapacit\u00e1stervez\u00e9s \u00e9s a r\u00e9szletes feladatkioszt\u00e1s sor\u00e1n egyetlen egys\u00e9gk\u00e9nt kezelik \u0151ket). (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMSetup\/Work_Center_Maint.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<p>A kapacit\u00e1s az adott napon rendelkez\u00e9sre \u00e1ll\u00f3 \u00f3r\u00e1k sz\u00e1ma. \u201eEach work center has a capacity, expressed in hours, that it can perform on a given day.\u201d (Minden munka\u00e1llom\u00e1snak van egy \u00f3r\u00e1ban kifejezett kapacit\u00e1sa, amely az adott napon elv\u00e9gezhet\u0151 munka mennyis\u00e9g\u00e9t jelzi.) A Sage ezt a napi norm\u00e1l munkaid\u0151 \u00e9s a hat\u00e9konys\u00e1gi sz\u00e1zal\u00e9k szorzatak\u00e9nt sz\u00e1m\u00edtja ki. (<a href=\"https:\/\/help-sage100.na.sage.com\/2023\/Subsystems\/PM\/PMConcepts\/Determine_Work_Ctr_Cap.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Sablonok \u00e9s munkajegyek<\/h3>\n\n\n<p>A munkajegysablon tartalmazza a l\u00e9p\u00e9seket. Mindegyikhez tartozik egy tev\u00e9kenys\u00e9gk\u00f3d, amely egy munka\u00e1llom\u00e1sra hivatkozik. A munkajegy az ebb\u0151l l\u00e9trehozott termel\u00e9si rendel\u00e9s. A Sage Work Order-felhaszn\u00e1l\u00f3knak sz\u00f3l\u00f3 \u00fatmutat\u00f3ja megfelelteti egym\u00e1snak a r\u00e9gi \u00e9s az \u00faj fogalmakat: a gy\u00e1rt\u00e1si rendel\u00e9sb\u0151l munkajegy, a technol\u00f3giai \u00fatvonalb\u00f3l sablon, a m\u0171veletk\u00f3db\u00f3l tev\u00e9kenys\u00e9gk\u00f3d lesz. (<a href=\"https:\/\/docs.sage.com\/docs\/en\/customer\/100erp\/2022\/open\/SwitchingFromWOtoPM.pdf\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Enhanced Scheduling<\/h3>\n\n\n<p>Enhanced Scheduling n\u00e9lk\u00fcl a l\u00e9p\u00e9sek d\u00e1tumai a munkajegyen megadott d\u00e1tumokb\u00f3l sz\u00e1rmaznak. A kisz\u00e1m\u00edt\u00e1sukhoz nyissa meg a Production Management Options ablakot, majd a Schedule lapon k\u00f6vesse ezt az utas\u00edt\u00e1st: \u201eselect the Enable Enhanced Scheduling check box.\u201d (Jel\u00f6lje be az Enable Enhanced Scheduling jel\u00f6l\u0151n\u00e9gyzetet.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2024\/Subsystems\/PM\/PMSetupProcedures\/Set_Up_Enhanced_Scheduling.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<p>Az Enhanced Scheduling le\u00edr\u00e1sa szerint a funkci\u00f3 \u201euses the forward or backward scheduling method to determine when each step of a work ticket should be started and how long each step takes to complete.\u201d (El\u0151re- vagy visszafel\u00e9 \u00fctemez\u00e9ssel hat\u00e1rozza meg, mikor kell elkezdeni a munkajegy egyes l\u00e9p\u00e9seit, \u00e9s mennyi id\u0151 sz\u00fcks\u00e9ges az elv\u00e9gz\u00e9s\u00fckh\u00f6z.) Az el\u0151refel\u00e9 \u00fctemez\u00e9s a gy\u00e1rt\u00e1s kezd\u0151d\u00e1tum\u00e1b\u00f3l indul ki. A visszafel\u00e9 \u00fctemez\u00e9s a hat\u00e1rid\u0151b\u0151l indul ki.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Korl\u00e1tlan terhel\u00e9s<\/h3>\n\n\n<p>Ez a m\u0171k\u00f6d\u00e9s meghat\u00e1roz\u00f3 alapelve. A Sage s\u00fag\u00f3ja \u00edgy fogalmaz: \u201eThe &#8220;infinite&#8221; loading technique is used to allow each work ticket to be scheduled independently.\u201d (A \u201ekorl\u00e1tlan\u201d terhel\u00e9s m\u00f3dszer\u00e9vel a munkajegyek egym\u00e1st\u00f3l f\u00fcggetlen\u00fcl \u00fctemezhet\u0151k.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2025\/Subsystems\/PM\/PMConcepts\/Enhanced_Scheduling.htm\">forr\u00e1s<\/a>) A kor\u00e1bbi Work Order s\u00fag\u00f3 \u00edgy magyar\u00e1zza az \u00fctemez\u00e9s elv\u00e9t: \u201eeach work order as if it were the only work order in the shop,\u201d (minden gy\u00e1rt\u00e1si rendel\u00e9st \u00fagy \u00fctemez, mintha az lenne az egyetlen az \u00fczemben), \u00e9s hozz\u00e1teszi: \u201ecare must be taken not to overload the work centers.\u201d (\u00dcgyelni kell arra, hogy a munka\u00e1llom\u00e1sokat ne terhelj\u00e9k t\u00fal.) (<a href=\"https:\/\/help-sage100.na.sage.com\/2022\/Subsystems\/WO\/ConceptTopics\/Infinite_Loading.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. A terhel\u00e9s ellen\u0151rz\u00e9se \u00e9s a t\u00falterhel\u00e9sek megsz\u00fcntet\u00e9se<\/h3>\n\n\n<p>A Work Center Capacity Inquiry ezt mutatja meg: \u201ecommitments against work centers in three formats: daily, weekly, and detail.\u201d (A munka\u00e1llom\u00e1sokra lek\u00f6t\u00f6tt terhel\u00e9s h\u00e1rom n\u00e9zetben: napi, heti \u00e9s r\u00e9szletes bont\u00e1sban.) (<a href=\"https:\/\/docs.sage.com\/docs\/en\/customer\/100erp\/2023\/open\/WhatsNew_2023.pdf\">\u00dajdons\u00e1gok, 2023<\/a>) A t\u00falterhelt munka\u00e1llom\u00e1sokra a Sage k\u00e9zi megold\u00e1st javasol: \u201eIndividual work orders can be rescheduled or the queue time can be increased to relieve overcommitted work centers.\u201d (A t\u00falterhelt munka\u00e1llom\u00e1sok az egyes gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1t\u00fctemez\u00e9s\u00e9vel vagy a sorban \u00e1ll\u00e1si id\u0151 n\u00f6vel\u00e9s\u00e9vel tehermentes\u00edthet\u0151k.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-german-sage-100-produktion-plans-step-by-ste\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy tervez a n\u00e9met Sage 100 Produktion, l\u00e9p\u00e9sr\u0151l l\u00e9p\u00e9sre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Ressourcenliste<\/h3>\n\n\n<p>A k\u00f6zponti objektum a Ressourcenliste. A Sage megfogalmaz\u00e1sa szerint ez tartalmazza: \u201ealle f\u00fcr die Herstellung eines Artikels notwendigen Ressourcen und Arbeitsabl\u00e4ufe\u201d (a term\u00e9k gy\u00e1rt\u00e1s\u00e1hoz sz\u00fcks\u00e9ges \u00f6sszes er\u0151forr\u00e1st \u00e9s munkafolyamatot), vagyis a St\u00fcckliste \u00e9s az Arbeitsplan adatait, a szersz\u00e1mlist\u00e1t \u00e9s a b\u00e9rmunk\u00e1t. Az Arbeitsg\u00e4nge m\u0171veleteihez el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s darabid\u0151k, mennyis\u00e9gi szorz\u00f3k, puffer- \u00e9s v\u00e1rakoz\u00e1si id\u0151k tartoznak. (<a href=\"https:\/\/onlinehilfe.sage.de\/onlinehilfe\/ol\/80\/abf\/leistungsumfang_produktion_doku.htm\">Sage s\u00fag\u00f3<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Fertigungssteuerung<\/h3>\n\n\n<p>Az alapmodul el\u0151re- \u00e9s visszafel\u00e9 \u00fctemez\u00e9st, just-in-time \u00fctemez\u00e9st, \u00fctemez\u00e9si szimul\u00e1ci\u00f3t, gy\u00e1rt\u00e1si javaslatokat, rendel\u00e9sek \u00f6sszevon\u00e1s\u00e1t \u00e9s feloszt\u00e1s\u00e1t, valamint integr\u00e1lt anyagtervez\u00e9st k\u00edn\u00e1l. Emellett el\u00e9rhet\u0151 az \u201eAnzeige von Engpass-Positionen (Material und Kapazit\u00e4t)\u201d (az anyag- \u00e9s kapacit\u00e1soldali sz\u0171k keresztmetszetek megjelen\u00edt\u00e9se), valamint a megval\u00f3s\u00edthat\u00f3s\u00e1g ellen\u0151rz\u00e9se is.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Terhel\u00e9s Arbeitsplatz szerint<\/h3>\n\n\n<p>\u201eMit der integrierten Arbeitsplatzauslastung k\u00f6nnen Sie unter Einbeziehung flexibler Zeitr\u00e4ume die aktuelle Belastung Ihrer Arbeitspl\u00e4tze und Maschinen grafisch und tabellarisch einsehen.\u201d (A be\u00e9p\u00edtett munka\u00e1llom\u00e1s-kihaszn\u00e1lts\u00e1gi funkci\u00f3val rugalmasan megadott id\u0151szakokra, grafikonon \u00e9s t\u00e1bl\u00e1zatban tekintheti meg munka\u00e1llom\u00e1sai \u00e9s g\u00e9pei aktu\u00e1lis terhel\u00e9s\u00e9t.) A munka\u00e1llom\u00e1sok \u00e9s g\u00e9pek aktu\u00e1lis terhel\u00e9se teh\u00e1t grafikonon vagy t\u00e1bl\u00e1zatban l\u00e1that\u00f3.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. A Plantafel<\/h3>\n\n\n<p>A grafikus tervez\u0151t\u00e1bla a \u201eGrafische Ressourcenplanung (Zusatzpaket)\u201d (grafikus er\u0151forr\u00e1s-tervez\u00e9s, kieg\u00e9sz\u00edt\u0151 csomag) r\u00e9sze. Er\u0151forr\u00e1sonk\u00e9nt \u2013 dolgoz\u00f3nk\u00e9nt, g\u00e9penk\u00e9nt vagy alv\u00e1llalkoz\u00f3nk\u00e9nt \u2013 jelen\u00edt meg egy Gantt-diagramot. \u201eMittels Drag &amp; Drop k\u00f6nnen Sie die T\u00e4tigkeiten verschieben, und in Sekundenschnelle werden die Auftr\u00e4ge und der Materialbedarf neu terminiert.\u201d (H\u00faz\u00e1ssal \u00e1thelyezheti a tev\u00e9kenys\u00e9geket, a rendel\u00e9sek \u00e9s az anyagsz\u00fcks\u00e9glet pedig m\u00e1sodpercek alatt \u00faj id\u0151pontot kapnak.) A tervez\u0151 mozgatja a feladatokat, a Sage 100 pedig m\u00f3dos\u00edtja a rendel\u00e9sek \u00e9s az anyagsz\u00fcks\u00e9glet d\u00e1tumait. A Sage Produktion oldala minden csomagn\u00e1l k\u00fcl\u00f6n v\u00e1laszthat\u00f3 lehet\u0151s\u00e9gk\u00e9nt sorolja fel a Grafische Ressourcenplanung\/Leitstand funkci\u00f3t (<a href=\"https:\/\/www.sage.com\/de-de\/produkte\/sage-100\/produktion\/\">forr\u00e1s<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mi marad a tervez\u0151 feladata?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>USA: minden munkajegy k\u00fcl\u00f6n \u00fctemez\u0151dik.<\/strong> A korl\u00e1tlan terhel\u00e9s nem veszi figyelembe az ugyanarra a munka\u00e1llom\u00e1sra \u00fctemezett t\u00f6bbi munkajegyet.<\/li>\n\n\n<li><strong>USA: a t\u00falterhel\u00e9st k\u00e9zzel kell megsz\u00fcntetni.<\/strong> A Sage megold\u00e1sa a munkajegyek \u00e1t\u00fctemez\u00e9se vagy a sorban \u00e1ll\u00e1si id\u0151 n\u00f6vel\u00e9se.<\/li>\n\n\n<li><strong>USA: egy munka\u00e1llom\u00e1snak egy k\u00f6z\u00f6s \u00f3rakerete van.<\/strong> A munka\u00e1llom\u00e1shoz tartoz\u00f3 t\u00f6bb g\u00e9p \u00e9s dolgoz\u00f3 egyetlen napi \u00f3rakereten osztozik. A Sage s\u00fag\u00f3ja nem \u00edr le g\u00e9penk\u00e9nti id\u0151vonalat, \u00e1t\u00e1ll\u00e1si m\u00e1trixot vagy szersz\u00e1mkorl\u00e1tot.<\/li>\n\n\n<li><strong>N\u00e9metorsz\u00e1g: a t\u00e1bl\u00e1n h\u00faz\u00e1ssal mozgathat\u00f3k a feladatok.<\/strong> A Plantafel azut\u00e1n m\u00f3dos\u00edtja a rendel\u00e9sek d\u00e1tumait, hogy a tervez\u0151 \u00e1thelyezett egy feladatot. A Sage nem \u00edr le automatikus sorrendk\u00e9pz\u00e9st.<\/li>\n\n\n<li><strong>N\u00e9metorsz\u00e1g: a t\u00e1bla kieg\u00e9sz\u00edt\u0151 csomag r\u00e9sze.<\/strong> A Grafische Ressourcenplanung egy Zusatzpaket, azaz kieg\u00e9sz\u00edt\u0151 csomag, \u00edgy az alapmodul a t\u00e1bla n\u00e9lk\u00fcl mutatja a terhel\u00e9st \u00e9s a sz\u0171k keresztmetszeteket.<\/li>\n\n\n<li><strong>Mindkett\u0151: az \u00e1t\u00e1ll\u00e1si id\u0151k l\u00e9p\u00e9senk\u00e9nt vannak megadva.<\/strong> Az el\u0151k\u00e9sz\u00edt\u00e9si id\u0151k az egyes l\u00e9p\u00e9sekhez, illetve az Arbeitsgang m\u0171veletekhez tartoznak. A Sage dokument\u00e1ci\u00f3ja nem \u00edr le term\u00e9kek k\u00f6z\u00f6tti, sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1st.<\/li>\n\n\n<li><strong>Mindkett\u0151: minden v\u00e1ltoz\u00e1s ut\u00e1n \u00fajra ki kell egyenl\u00edteni a terhel\u00e9st.<\/strong> S\u00fcrg\u0151s rendel\u00e9s vagy meghib\u00e1sod\u00e1s ut\u00e1n a tervez\u0151 ism\u00e9t v\u00e9gign\u00e9zi \u00e9s rendezi a terhel\u00e9st.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-sage-100-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor el\u00e9g a Sage 100 saj\u00e1t tervez\u00e9se?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Sage 100 \u00fctemez\u00e9se megfelel\u0151, ha:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Egy vagy k\u00e9t sz\u0171k keresztmetszetet jelent\u0151 munka\u00e1llom\u00e1s hat\u00e1rozza meg a tervet, az \u00fczem t\u00f6bbi r\u00e9sz\u00e9n pedig van szabad kapacit\u00e1s.<\/li>\n\n\n<li>Hossz\u00faak az \u00e1tfut\u00e1si id\u0151k, \u00e9s elegend\u0151 a munka\u00e1llom\u00e1sok napi vagy heti terhel\u00e9s\u00e9r\u0151l d\u00f6nteni.<\/li>\n\n\n<li>A g\u00e9pn\u00e9l a m\u0171vezet\u0151 hat\u00e1rozza meg a sorrendet.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1sok nem f\u00fcggnek att\u00f3l, hogy el\u0151z\u0151leg melyik term\u00e9ket gy\u00e1rtott\u00e1k.<\/li>\n\n\n<li>A dolgoz\u00f3k \u00e9s szersz\u00e1mok rendelkez\u00e9sre \u00e1ll\u00e1sa, valamint az anyagok be\u00e9rkez\u00e9se nem v\u00e1ltoztatja meg a munk\u00e1k sorrendj\u00e9t.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor van sz\u00fcks\u00e9g termel\u00e9s\u00fctemez\u0151re?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kin\u0151tte a Sage 100 tervez\u00e9si lehet\u0151s\u00e9geit, ha az al\u00e1bbiak k\u00f6z\u00fcl t\u00f6bb is igaz:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A tervez\u0151 hetente \u00f3r\u00e1kat t\u00f6lt a munkajegyek \u00e1t\u00fctemez\u00e9s\u00e9vel vagy a feladatok mozgat\u00e1s\u00e1val a Plantafel fel\u00fclet\u00e9n.<\/li>\n\n\n<li>Cs\u00fasznak a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k, pedig a munka\u00e1llom\u00e1sok napi terhel\u00e9se megfelel\u0151nek l\u00e1tszik.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1si id\u0151 f\u00fcgg att\u00f3l, hogy el\u0151z\u0151leg melyik term\u00e9ket gy\u00e1rtott\u00e1k.<\/li>\n\n\n<li>A g\u00e9pkezel\u0151k rendelkez\u00e9sre \u00e1ll\u00e1sa, a m\u0171szakok \u00e9s a hi\u00e1nyz\u00e1sok ugyan\u00fagy korl\u00e1tozz\u00e1k a tervet, mint a g\u00e9pek.<\/li>\n\n\n<li>T\u00f6bb g\u00e9p haszn\u00e1lja ugyanazokat a pr\u00e9sszersz\u00e1mokat, \u00f6nt\u0151form\u00e1kat vagy befog\u00f3k\u00e9sz\u00fcl\u00e9keket.<\/li>\n\n\n<li>Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa d\u00f6nti el, melyik gy\u00e1rt\u00e1si feladat indulhat el.<\/li>\n\n\n<li>A s\u00fcrg\u0151s rendel\u00e9sek \u00e9s a meghib\u00e1sod\u00e1sok miatt hetente t\u00f6bbsz\u00f6r is \u00fajra kell tervezni.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mire figyeljen a v\u00e1laszt\u00e1sn\u00e1l?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>M\u0171veletszint\u0171 \u00fctemez\u00e9s<\/strong>, amely minden l\u00e9p\u00e9shez, illetve Arbeitsgang m\u0171velethez kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontot, valamint munka\u00e1llom\u00e1st rendel.<\/li>\n\n\n<li><strong>Minden er\u0151forr\u00e1s kapacit\u00e1skorl\u00e1tj\u00e1nak egyidej\u0171 figyelembev\u00e9tele<\/strong>: g\u00e9pek\u00e9, dolgoz\u00f3k\u00e9 \u00e9s szersz\u00e1mok\u00e9.<\/li>\n\n\n<li><strong>A t\u00falterhel\u00e9sek automatikus megsz\u00fcntet\u00e9se<\/strong>, nem csup\u00e1n kapacit\u00e1slek\u00e9rdez\u00e9s vagy k\u00e9zzel \u00e1trendezend\u0151 t\u00e1bla.<\/li>\n\n\n<li><strong>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix<\/strong> a sorrendf\u00fcgg\u0151, ir\u00e1nyonk\u00e9nt elt\u00e9r\u0151 idej\u0171 \u00e1t\u00e1ll\u00e1sokhoz.<\/li>\n\n\n<li><strong>A szersz\u00e1mok kezel\u00e9se korl\u00e1tozott kapacit\u00e1s\u00fa, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sk\u00e9nt<\/strong>, valamint az egyszerre t\u00f6bb g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatok kezel\u00e9se.<\/li>\n\n\n<li><strong>Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s<\/strong>, amely ellen\u0151rzi a k\u00e9szletet \u00e9s a beszerz\u00e9si rendel\u00e9sek alapj\u00e1n v\u00e1rhat\u00f3 be\u00e9rkez\u00e9seket.<\/li>\n\n\n<li><strong>\u00c1tl\u00e1that\u00f3 adatkapcsolat a Sage 100-zal.<\/strong> K\u00e9rdezze meg a sz\u00e1ll\u00edt\u00f3t, hogyan olvassa ki a munkajegyeket vagy a Fertigungsauftr\u00e4ge adatait, \u00e9s hogyan \u00edrja vissza a d\u00e1tumokat az \u00d6n Sage 100 rendszer\u00e9be.<\/li>\n\n<\/ul>\n\n\n<p>A lehet\u0151s\u00e9gek h\u00e1rom csoportba sorolhat\u00f3k:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tervez\u00e9s a Sage 100-on bel\u00fcl<\/strong>: az Egyes\u00fclt \u00c1llamokban az Enhanced Scheduling, N\u00e9metorsz\u00e1gban a Plantafel kieg\u00e9sz\u00edt\u0151. A t\u00falterhel\u00e9seket a tervez\u0151 sz\u00fcnteti meg.<\/li>\n\n\n<li><strong>Helyben telep\u00edtett Leitstand- \u00e9s APS-kieg\u00e9sz\u00edt\u0151k<\/strong>, amelyeket a Sage 100 mell\u00e9 telep\u00edtenek, \u00e9s a sz\u00e1ll\u00edt\u00f3 bevezet\u00e9si projektben \u00e1ll\u00edt be.<\/li>\n\n\n<li><strong>Felh\u0151alap\u00fa APS \u00fczemi v\u00e9grehajt\u00e1si funkci\u00f3kkal<\/strong>: ide tartozik a SkyPlanner. A Sage 100 mellett minden er\u0151forr\u00e1st automatikusan \u00fctemez, a gy\u00e1rt\u00e1s v\u00e1ltoz\u00e1saihoz igazodva \u00fajratervez, \u00e9s az \u00fctemtervet k\u00f6zvetlen\u00fcl a g\u00e9pkezel\u0151k rendelkez\u00e9s\u00e9re bocs\u00e1tja.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hol seg\u00edt a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner APS a fenti hi\u00e1nyoss\u00e1gok mindegyik\u00e9re megold\u00e1st ad. Minden munka\u00e1llom\u00e1s kapacit\u00e1sa korl\u00e1tozott, az Arcturus AI motor pedig m\u00e1sodpercek alatt \u00fctemez minden l\u00e9p\u00e9st. A g\u00e9peket, a dolgoz\u00f3kat, a szersz\u00e1mokat \u00e9s az anyagokat egyetlen motor \u00fctemezi \u00f6sszehangoltan. Egy n\u00e9gy g\u00e9pb\u0151l \u00e1ll\u00f3 munka\u00e1llom\u00e1s n\u00e9gy k\u00fcl\u00f6n munka\u00e1llom\u00e1sk\u00e9nt vagy egy munka\u00e1llom\u00e1s-csoportk\u00e9nt jelenik meg, \u00e9s minden g\u00e9p saj\u00e1t id\u0151vonalat kap.<\/p>\n\n\n<p>Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix minden term\u00e9kp\u00e1rn\u00e1l mindk\u00e9t ir\u00e1nyban t\u00e1rolja az \u00e1t\u00e1ll\u00e1s idej\u00e9t, a motor pedig azt a sorrendet v\u00e1lasztja, amelyhez a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151 sz\u00fcks\u00e9ges. A szersz\u00e1mok korl\u00e1tozott kapacit\u00e1s\u00fa, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok, \u00e9s egy gy\u00e1rt\u00e1si feladathoz egyszerre t\u00f6bb g\u00e9pkezel\u0151re is sz\u00fcks\u00e9g lehet. Ha egy g\u00e9p vagy dolgoz\u00f3 nem \u00e1ll rendelkez\u00e9sre, a motor az \u00d6n \u00e1ltal megadott alternat\u00edv\u00e1kat haszn\u00e1lja.<\/p>\n\n\n<p>Az anyagell\u00e1t\u00e1shoz igazod\u00f3 \u00fctemez\u00e9s a megl\u00e9v\u0151 k\u00e9szlet \u00e9s a be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9sek alapj\u00e1n szimul\u00e1lja a j\u00f6v\u0151beli k\u00e9szletet. A megrendelt anyag a sz\u00e1ll\u00edt\u00e1s napj\u00e1t\u00f3l sz\u00e1m\u00edt el\u00e9rhet\u0151nek, \u00edgy a rendszer csak olyan id\u0151pontra tervez munk\u00e1t, amikor az anyag m\u00e1r rendelkez\u00e9sre \u00e1ll.<\/p>\n\n\n<p>Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a termel\u00e9s, az \u00d6n \u00e1ltal be\u00e1ll\u00edtott z\u00e1rol\u00e1sok \u00e9s priorit\u00e1sok betart\u00e1s\u00e1val. A tervez\u0151k a Gantt-id\u0151vonalon m\u00f3dos\u00edtj\u00e1k a gy\u00e1rt\u00e1si feladatokat, a g\u00e9pkezel\u0151k pedig telefonon vagy t\u00e1blag\u00e9pen r\u00f6gz\u00edtik az elv\u00e9gzett munk\u00e1t a Mobile Confirmations seg\u00edts\u00e9g\u00e9vel.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> a munka\u00e1llom\u00e1sok terhel\u00e9s\u00e9nek kiegyenl\u00edt\u00e9se vagy a feladatok h\u00faz\u00e1ssal t\u00f6rt\u00e9n\u0151 \u00e1thelyez\u00e9se a Plantafel fel\u00fclet\u00e9n hetente \u00f3r\u00e1kat vesz ig\u00e9nybe.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> az \u00e1t\u00e1ll\u00e1sok, a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok vagy a t\u00f6bb g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatok hat\u00e1rozz\u00e1k meg, mi indulhat k\u00f6vetkez\u0151k\u00e9nt.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> heteken bel\u00fcl m\u0171k\u00f6d\u0151, a val\u00f3s kapacit\u00e1sokat betart\u00f3 \u00fctemtervet szeretne a m\u00e1r haszn\u00e1lt Sage 100 mell\u00e9.<\/p>\n\n\n<p>Kezdje a nyitott munkajegyek vagy Fertigungsauftr\u00e4ge Excel-exportj\u00e1val a <a href=\"\/hu\/proba\/\">30 napos ingyenes pr\u00f3baid\u0151szakban<\/a> (legfeljebb 20 munka\u00e1llom\u00e1s, bankk\u00e1rtya n\u00e9lk\u00fcl). Ezt k\u00f6vet\u0151en az el\u0151fizet\u00e9s havi 199 \u20ac-t\u00f3l indul, 5 munka\u00e1llom\u00e1st tartalmaz, havonta sz\u00e1ml\u00e1zzuk, \u00e9s b\u00e1rmikor lemondhat\u00f3. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151re adunk \u00e1raj\u00e1nlatot az el\u0151fizet\u00e9ssel egy\u00fctt, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get. A bevezet\u00e9s \u00e1ltal\u00e1ban az indul\u00e1si folyamat megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul.<\/p>\n\n\n<p>A SkyPlanner \u00e9s a Sage 100 k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa az integr\u00e1ci\u00f3. Az amerikai Sage 100 rendszerb\u0151l munkajegyek, munka\u00e1llom\u00e1sok, cikkek \u00e9s beszerz\u00e9si rendel\u00e9sek \u00e9rkeznek, a tervezett m\u0171veleti id\u0151pontok \u00e9s a munkaid\u0151-bejegyz\u00e9sek pedig a Business Object Interface fel\u00fclet\u00e9n kereszt\u00fcl ker\u00fclnek vissza. A n\u00e9met Sage 100 rendszerb\u0151l Fertigungsauftr\u00e4ge, Arbeitsg\u00e4nge \u00e9s Arbeitspl\u00e4tze adatok \u00e9rkeznek. Az Arbeitsgang id\u0151pontjai \u00e9s a R\u00fcckmeldungen adatai azon a kapcsolaton kereszt\u00fcl ker\u00fclnek vissza, amelyet a bevezet\u00e9s felm\u00e9r\u00e9si szakasz\u00e1ban az \u00d6n Sage-partner\u00e9vel egyeztet\u00fcnk. A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n be\u00e1ll\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Az \u00d6n Sage-partnere vagy bels\u0151 fejleszt\u0151i mind\u00f6ssze egy API-token birtok\u00e1ban haszn\u00e1lhatj\u00e1k a dokument\u00e1lt REST API-t (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-dokument\u00e1ci\u00f3<\/a>).<\/p>\n\n\n<p>A <a href=\"\/hu\/integraciok\/erp\/sage-100\/\">SkyPlanner a Sage 100 mell\u00e9<\/a> oldalon elolvashatja, hogyan kapcsol\u00f3dnak \u00f6ssze a rendszerek, vagy r\u00f6gt\u00f6n megnyithatja a <a href=\"\/hu\/integraciok\/erp\/sage-100\/integracios-utmutato\/\">Sage 100 integr\u00e1ci\u00f3s \u00fatmutat\u00f3j\u00e1t<\/a>. Sage 200-at vagy Sage X3-at haszn\u00e1l? Tekintse meg a <a href=\"\/hu\/integraciok\/erp\/sage-200\/\">Sage 200<\/a> \u00e9s a <a href=\"\/hu\/integraciok\/erp\/sage-x3\/\">Sage X3<\/a> oldal\u00e1t. A t\u00f6bbi ERP-rendszert az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u0151 oldal\u00e1n<\/a> tal\u00e1lja.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"L\u00e9gifelv\u00e9tel a Piristeel tet\u0151biztons\u00e1gi term\u00e9keket gy\u00e1rt\u00f3 \u00fczem\u00e9r\u0151l Kauhav\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner l\u00e1that\u00f3v\u00e1 tette a sz\u0171k keresztmetszeteket, \u00e9s \u00e1tl\u00e1that\u00f3bb\u00e1 tette a termel\u00e9sir\u00e1ny\u00edt\u00e1st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, termel\u00e9svezet\u0151<\/b><br>Piristeel \u00b7 Tet\u0151biztons\u00e1gi \u00e9s es\u0151v\u00edzelvezet\u0151 rendszerek<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya id\u00e9n el\u00e9rte a 99,2%-ot, az \u00fctemez\u00e9s pedig naponta ak\u00e1r n\u00e9gy \u00f3ra munkaid\u0151t takar\u00edt meg.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/piristeel\/\">Olvassa el a Piristeel v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, a Mamec vez\u00e9rigazgat\u00f3ja a v\u00e1llalat lohjai gy\u00e1rt\u00f3csarnok\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-es nagys\u00e1grendben<\/b><span>automatikusan \u00fctemezett gy\u00e1rt\u00e1si rendel\u00e9sek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEg\u00e9szen m\u00e1sk\u00e9pp tartjuk k\u00e9zben a termel\u00e9st, \u00e9s teljesen m\u00e1s szinten l\u00e1tjuk \u00e1t a kapacit\u00e1sainkat.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, vez\u00e9rigazgat\u00f3<\/b><br>Mamec \u00b7 Ipari kever\u0151k, szivatty\u00fak \u00e9s cs\u00facstechnol\u00f3gi\u00e1s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">T\u00f6bb ezer gy\u00e1rt\u00e1si rendel\u00e9s \u00fctemez\u00e9se t\u00f6rt\u00e9nik automatikusan, \u00e9s az eg\u00e9sz szervezet val\u00f3s id\u0151ben l\u00e1tja a termel\u00e9s \u00e1llapot\u00e1t.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/mamec\/\">Olvassa el a Mamec v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van a Sage 100-ban \u00fctemez\u0151eszk\u00f6z?<\/summary>\n<p class=\"sp-faq__a\">Igen, mindk\u00e9t term\u00e9kben. Az amerikai Sage 100 Production Management Enhanced Scheduling funkci\u00f3ja el\u0151re vagy visszafel\u00e9 sz\u00e1m\u00edtja ki a m\u0171veletek id\u0151pontj\u00e1t, korl\u00e1tlan kapacit\u00e1st felt\u00e9telezve. A n\u00e9met Sage 100 Produktion el\u0151re- \u00e9s visszafel\u00e9 \u00fctemez\u00e9st, a sz\u0171k keresztmetszetek megjelen\u00edt\u00e9s\u00e9t \u00e9s opcion\u00e1lis grafikus Plantafel fel\u00fcletet k\u00edn\u00e1l. A t\u00falterhel\u00e9seket mindk\u00e9t esetben a tervez\u0151 oldja fel.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>V\u00e9gez a Sage 100 Enhanced Scheduling val\u00f3s kapacit\u00e1sokra \u00e9p\u00fcl\u0151 termel\u00e9s\u00fctemez\u00e9st?<\/summary>\n<p class=\"sp-faq__a\">Nem. A Sage s\u00fag\u00f3ja \u201einfinite\u201d (korl\u00e1tlan) terhel\u00e9si m\u00f3dszerk\u00e9nt \u00edrja le, amely minden gy\u00e1rt\u00e1si rendel\u00e9st egym\u00e1st\u00f3l f\u00fcggetlen\u00fcl \u00fctemez. A Work Center Capacity Inquiry ezut\u00e1n megmutatja a lek\u00f6t\u00f6tt kapacit\u00e1sokat, a tervez\u0151 pedig \u00e1t\u00fctemezi a rendel\u00e9seket, vagy v\u00e1rakoz\u00e1si id\u0151t ad hozz\u00e1juk.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Val\u00f3s kapacit\u00e1sokkal \u00fctemez a Sage 100 Plantafel?<\/summary>\n<p class=\"sp-faq__a\">A Plantafel egy grafikus tervez\u0151t\u00e1bla, amelyen a tervez\u0151 h\u00faz\u00e1ssal helyezi \u00e1t a feladatokat, a Sage 100 pedig ennek megfelel\u0151en m\u00f3dos\u00edtja a rendel\u00e9sek \u00e9s az anyagig\u00e9nyek d\u00e1tum\u00e1t. A val\u00f3s kapacit\u00e1sokra \u00e9p\u00fcl\u0151 termel\u00e9s\u00fctemez\u0151 \u00f6n\u00e1ll\u00f3an helyez minden m\u0171veletet szabad kapacit\u00e1sra, \u00e9s \u00fajratervez, ha v\u00e1ltozik a termel\u00e9s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kezeli a Sage 100 a sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1si id\u0151ket?<\/summary>\n<p class=\"sp-faq__a\">A Sage 100 l\u00e9p\u00e9senk\u00e9nt vagy Arbeitsgang szerint t\u00e1rolja a be\u00e1ll\u00edt\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151ket. A SkyPlanner APS ezt egy \u00e1t\u00e1ll\u00e1si id\u0151m\u00e1trixszal eg\u00e9sz\u00edti ki. Ebben t\u00e1rolja a term\u00e9kp\u00e1rok k\u00f6z\u00f6tti \u00e1t\u00e1ll\u00e1si id\u0151ket (k\u00e9kr\u0151l pirosra 30 perc, pirosr\u00f3l k\u00e9kre 60), \u00e9s \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy ezek az id\u0151k a lehet\u0151 legr\u00f6videbbek legyenek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan kapcsol\u00f3dik a SkyPlanner APS a Sage 100-hoz?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner \u00e9s a Sage 100 k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa az integr\u00e1ci\u00f3, amelyet a SkyPlanner csapata \u00e1ll\u00edt be a bevezet\u00e9s sor\u00e1n. Az amerikai Sage 100 a Business Object Interface \u00e9s az ODBC seg\u00edts\u00e9g\u00e9vel kapcsol\u00f3dik. A n\u00e9met Sage 100 adatait az SQL Server adatb\u00e1zis\u00e1b\u00f3l olvassuk ki, a vissza\u00edr\u00e1s m\u00f3dj\u00e1t pedig az \u00d6n Sage-partner\u00e9vel egyeztetj\u00fck. A tervezett id\u0151pontok minden m\u0171velethez visszaker\u00fclnek, a SkyPlanner webhookjai pedig azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatom a SkyPlannert, miel\u0151tt integr\u00e1ln\u00e1m a Sage 100-zal?<\/summary>\n<p class=\"sp-faq__a\">Igen. Export\u00e1lja a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket vagy a nyitott Fertigungsauftr\u00e4ge t\u00e9teleit, valamint az er\u0151forr\u00e1sokat Excelbe, import\u00e1lja \u0151ket a SkyPlannerbe a 30 napos pr\u00f3baid\u0151szak alatt, majd hasonl\u00edtsa \u00f6ssze az \u00fctemtervet a jelenlegi terv\u00e9vel. Bankk\u00e1rty\u00e1ra nincs sz\u00fcks\u00e9g. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, <a href=\"\/hu\/proba\/\">ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">l\u00e9pjen kapcsolatba \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Sage 100 T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa Nem \u00fagy, mint egy termel\u00e9s\u00fctemez\u0151, amely minden m\u0171veletet oda \u00fctemez, ahol van szabad kapacit\u00e1s. Ezt a nevet k\u00e9t k\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9k viseli. Az amerikai Sage 100 Production Management minden munkajegyet a Sage \u00e1ltal \u201einfinite\u201d (korl\u00e1tlan) &#8230; <a title=\"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/\" aria-label=\"Read more about T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106530,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107605","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st?<\/title>\n<meta name=\"description\" content=\"Sage 100: az USA-ban korl\u00e1tlan terhel\u00e9s, N\u00e9metorsz\u00e1gban k\u00e9zi Plantafel. Hogyan m\u0171k\u00f6dnek, mi marad a tervez\u0151re, \u00e9s mikor kell APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa\" \/>\n<meta property=\"og:description\" content=\"Sage 100: az USA-ban korl\u00e1tlan terhel\u00e9s, N\u00e9metorsz\u00e1gban k\u00e9zi Plantafel. Hogyan m\u0171k\u00f6dnek, mi marad a tervez\u0151re, \u00e9s mikor kell APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-100\\\/termelesutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-100\\\/termelesutemezes\\\/\",\"name\":\"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Sage 100: az USA-ban korl\u00e1tlan terhel\u00e9s, N\u00e9metorsz\u00e1gban k\u00e9zi Plantafel. Hogyan m\u0171k\u00f6dnek, mi marad a tervez\u0151re, \u00e9s mikor kell APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-100\\\/termelesutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-100\\\/termelesutemezes\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-100\\\/termelesutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Sage 100 mell\u00e9: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-100\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st?","description":"Sage 100: az USA-ban korl\u00e1tlan terhel\u00e9s, N\u00e9metorsz\u00e1gban k\u00e9zi Plantafel. Hogyan m\u0171k\u00f6dnek, mi marad a tervez\u0151re, \u00e9s mikor kell APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa","og_description":"Sage 100: az USA-ban korl\u00e1tlan terhel\u00e9s, N\u00e9metorsz\u00e1gban k\u00e9zi Plantafel. Hogyan m\u0171k\u00f6dnek, mi marad a tervez\u0151re, \u00e9s mikor kell APS?","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/","name":"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Sage 100: az USA-ban korl\u00e1tlan terhel\u00e9s, N\u00e9metorsz\u00e1gban k\u00e9zi Plantafel. Hogyan m\u0171k\u00f6dnek, mi marad a tervez\u0151re, \u00e9s mikor kell APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/termelesutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Sage 100 mell\u00e9: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-100\/"},{"@type":"ListItem","position":5,"name":"T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Sage 100 T\u00e1mogatja a Sage 100 a termel\u00e9s\u00fctemez\u00e9st? A Production Management \u00e9s a Sage 100 Produktion bemutat\u00e1sa Nem \u00fagy, mint egy termel\u00e9s\u00fctemez\u0151, amely minden m\u0171veletet oda \u00fctemez, ahol van szabad kapacit\u00e1s. Ezt a nevet k\u00e9t k\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9k viseli. Az amerikai Sage 100 Production Management minden munkajegyet a Sage \u00e1ltal \u201einfinite\u201d (korl\u00e1tlan)&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=107605"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107605\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106530"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=107605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}