{"id":107342,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/cegid\/integracios-utmutato\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/","title":{"rendered":"Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez a Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a Cegid gy\u00e1rt\u00e1si ERP-rendszereit a SkyPlanner APS rendszerrel. El\u0151sz\u00f6r a Cegid PMI, majd a Cegid Primavera \u00e9s a Cegid Ekon integr\u00e1ci\u00f3j\u00e1t ismertetj\u00fck. A SkyPlanner a Cegid saj\u00e1t interf\u00e9szein kereszt\u00fcl, mindk\u00e9t ir\u00e1nyban cser\u00e9l adatokat:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlanner \u00e1tveszi a gy\u00e1rt\u00e1si rendel\u00e9seket (OF: ordres de fabrication, ordens de fabrico, \u00f3rdenes de fabricaci\u00f3n) \u00e9s m\u0171veleteiket, a m\u0171veletterveket, darabjegyz\u00e9keket, munkak\u00f6zpontokat \u00e9s g\u00e9peket, cikkt\u00f6rzseket, k\u00e9szletadatokat \u00e9s sz\u00e1ll\u00edt\u00f3i rendel\u00e9seket.<\/li>\n\n\n<li>Minden OF-m\u0171velethez vissza\u00edrja a tervezett kezd\u00e9si \u00e9s befejez\u00e9si d\u00e1tumot.<\/li>\n\n\n<li>Ig\u00e9ny szerint a dolgoz\u00f3k munkaideje is vissza\u00edrhat\u00f3 pointages (PMI), Di\u00e1rios de Trabalho (Primavera) vagy imputaciones (Ekon) form\u00e1j\u00e1ban.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1j\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A Cegid integr\u00e1ci\u00f3s interf\u00e9szei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> A Cegid Web API-t biztos\u00edt a PMI rendszerhez: &#8220;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8221; (A Cegid gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1si rendszerben el\u00e9rhet\u0151 Web API-k megk\u00f6nny\u00edtik a biztons\u00e1gos adatcser\u00e9t a k\u00fcls\u0151 alkalmaz\u00e1sokkal.) A Web API a k\u00fcls\u0151 alkalmaz\u00e1sokban is \u00e9rv\u00e9nyes\u00edti a Manufacturing PMI \u00fczleti szab\u00e1lyait (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). A PMI emellett EDI-t, a CAD-rendszerekb\u0151l sz\u00e1rmaz\u00f3 m\u0171szaki adatokhoz szabv\u00e1nyos XML-f\u00e1jlokat, valamint Excel-exportot k\u00edn\u00e1l\u00f3 jelent\u00e9sk\u00e9sz\u00edt\u0151t is biztos\u00edt. A kipr\u00f3b\u00e1l\u00e1shoz sz\u00fcks\u00e9ges adatok \u00e1tvitel\u00e9nek leggyorsabb m\u00f3dja az Excel-export.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> A PRIMAVERA ERP V10 API &#8220;allows third party applications to perform both data query and writing operations&#8221; (lehet\u0151v\u00e9 teszi k\u00fcls\u0151 alkalmaz\u00e1sok sz\u00e1m\u00e1ra az adatok lek\u00e9rdez\u00e9s\u00e9t \u00e9s \u00edr\u00e1s\u00e1t is), \u00e9s a term\u00e9k \u00f6sszes modulj\u00e1t lefedi (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API-dokument\u00e1ci\u00f3<\/a>). A Web API dokument\u00e1ci\u00f3ja modulonk\u00e9nt \u00e9rhet\u0151 el a Swagger fel\u00fclet\u00e9n, ahonnan a h\u00edv\u00e1sok is v\u00e9grehajthat\u00f3k (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). A Produ\u00e7\u00e3o (GPR) modul a m\u0171szaki adatlapokat, a nett\u00f3 sz\u00fcks\u00e9gleteket, az OF ind\u00edt\u00e1s\u00e1t, a Planeamento funkci\u00f3t, a termel\u00e9si nyilv\u00e1ntart\u00e1sokat \u00e9s a Di\u00e1rios de Trabalho funkci\u00f3t fedi le (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">Produ\u00e7\u00e3o-referencia<\/a>). Az \u00fctemez\u00e9s f\u0151bb szolg\u00e1ltat\u00e1sai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Az <strong>IGprBSOrdensFabrico<\/strong> a gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s m\u0171veleteiket (GprBEOFOperacao) olvassa be.<\/li>\n\n\n<li>Az <strong>IGprBSPlaneamento<\/strong> bet\u00f6lti az OF-adatokat a tervez\u00e9shez, \u00e9s az <strong>ActualizaPlaneamentoOperacao<\/strong> seg\u00edts\u00e9g\u00e9vel friss\u00edti a tervezett m\u0171veleteket.<\/li>\n\n\n<li>Az <strong>IGprBSCentrosTrabalho<\/strong>, az <strong>IGprBSPostosTrabalho<\/strong>, az <strong>IGprBSOperadores<\/strong> \u00e9s az <strong>IGprBSRoteiros<\/strong> a munkak\u00f6zpontok, munkahelyek, dolgoz\u00f3k \u00e9s m\u0171velettervek adatait olvassa be.<\/li>\n\n\n<li>Az <strong>IGprBSDiariosTrabalho<\/strong> az <strong>IniciaPicagem<\/strong> \u00e9s a <strong>TerminaPicagem<\/strong> seg\u00edts\u00e9g\u00e9vel r\u00f6gz\u00edti a munkav\u00e9gz\u00e9st.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> A Cegid t\u00e1j\u00e9koztat\u00e1sa szerint az Ekon \u00f6sszekapcsolhat\u00f3 a v\u00e1llalat m\u00e1s ir\u00e1ny\u00edt\u00e1si rendszereivel (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). A SkyPlanner csapata a felm\u00e9r\u00e9s sor\u00e1n hat\u00e1rozza meg az adott Ekon-telep\u00edt\u00e9shez haszn\u00e1land\u00f3 interf\u00e9szt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s \u00e9s licencek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> A felm\u00e9r\u00e9s sor\u00e1n a Cegid-partnerrel egy\u00fctt enged\u00e9lyezz\u00fck az integr\u00e1ci\u00f3hoz sz\u00fcks\u00e9ges Web API-hozz\u00e1f\u00e9r\u00e9st az adott PMI-telep\u00edt\u00e9shez.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> Minden Web API-entit\u00e1s biztos\u00edt egy Login met\u00f3dust, amely munkamenetkulcsot tartalmaz\u00f3 Bearer tokent ad vissza. A token a tokenv\u00e9gponton kereszt\u00fcl \u00faj\u00edthat\u00f3 meg (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). Az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3nak rendelkeznie kell a megh\u00edvott ter\u00fcletekhez tartoz\u00f3 Produ\u00e7\u00e3o-licencekkel.<\/li>\n\n\n<li><strong>A SkyPlanner oldal\u00e1n.<\/strong> A REST API az Authorization-Token fejl\u00e9cben megadott API-tokennel hiteles\u00edt (SkyPlanner Settings &gt; API), dokument\u00e1ci\u00f3ja Swagger\/OpenAPI form\u00e1tumban \u00e9rhet\u0151 el. Az <a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s \u00fatmutat\u00f3<\/a> v\u00e9gigvezeti az els\u0151 h\u00edv\u00e1sokon.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Esem\u00e9nyek \u00e9s id\u0151szakos lek\u00e9rdez\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Cegid oldal\u00e1r\u00f3l id\u0151szakos lek\u00e9rdez\u00e9sekkel olvassuk be az adatokat. A nyitott OF-ekre \u00e9s a legut\u00f3bbi v\u00e1ltoz\u00e1sokra sz\u0171rt lek\u00e9rdez\u00e9sekkel azonos\u00edtjuk az \u00faj gy\u00e1rt\u00e1si feladatokat. A gyakoris\u00e1got \u00fczemenk\u00e9nt \u00e1ll\u00edtjuk be: az OF-eket n\u00e9h\u00e1ny percenk\u00e9nt, a k\u00e9szletadatokat \u00f3r\u00e1nk\u00e9nt k\u00e9rdezz\u00fck le.<\/p>\n\n\n<p>A SkyPlanner webhookot k\u00fcld, ha az \u00e1llapot vagy az \u00fctemterv megv\u00e1ltozik, \u00edgy a vissza\u00edr\u00e1s esem\u00e9nyvez\u00e9relt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Cegid-objektum (PMI \/ Primavera)<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Articles \/ artigos<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd id\u0151szakos lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>Nomenclatures \/ fichas t\u00e9cnicas, componentes<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek, term\u00e9kenk\u00e9nti anyagok<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Gammes \u00e9s m\u0171veletek \/ roteiros, opera\u00e7\u00f5es<\/td><td>M\u0171veleti l\u00e9p\u00e9sek az id\u0151tartamokkal, el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s lez\u00e1r\u00e1si id\u0151kkel<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Postes de charge \u00e9s g\u00e9pek \/ centros de trabalho, postos de trabalho<\/td><td>Munka\u00e1llom\u00e1sok, munka\u00e1llom\u00e1s-csoportok, hat\u00e9konys\u00e1gi \u00e9rt\u00e9kek<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, ut\u00e1na ritk\u00e1n<\/td><\/tr><tr><td>Salari\u00e9s \/ operadores<\/td><td>Dolgoz\u00f3k<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Napt\u00e1rak \/ exce\u00e7\u00f5es de capacidade<\/td><td>M\u0171szakok \u00e9s munkav\u00e9gz\u00e9s n\u00e9lk\u00fcli napok<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Naponta, vagy saj\u00e1t m\u0171szakok kezel\u00e9se a SkyPlannerben<\/td><\/tr><tr><td>Ferramentas e moldes (Primavera)<\/td><td>Szersz\u00e1mok mint korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sok<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>V\u00e9gleges \u00e9s tervezett OF-ek \/ ordens de fabrico a m\u0171veletekkel<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok hat\u00e1rid\u0151kkel \u00e9s anyagsz\u00fcks\u00e9gletekkel<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s n\u00e9h\u00e1ny percenk\u00e9nt<\/td><\/tr><tr><td>K\u00e9szlet cikkenk\u00e9nt \u00e9s rakt\u00e1rank\u00e9nt<\/td><td>K\u00e9szletegyenlegek<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>Sz\u00e1ll\u00edt\u00f3i rendel\u00e9sek sz\u00e1ll\u00edt\u00e1si d\u00e1tumokkal<\/td><td>Beszerz\u00e9si rendel\u00e9sek, be\u00e9rkez\u0151 anyagok sz\u00e1ll\u00edt\u00e1si d\u00e1tum szerint<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>Az OF-m\u0171velet tervezett kezdete \u00e9s v\u00e9ge \/ GprBEOFOperacao DataIniPrevista, DataFimPrevista az ActualizaPlaneamentoOperacao h\u00edv\u00e1s\u00e1val<\/td><td>L\u00e9p\u00e9senk\u00e9nti tervezett kezdet \u00e9s befejez\u00e9s, hozz\u00e1rendelt munka\u00e1llom\u00e1s<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, SkyPlanner-webhookon kereszt\u00fcl<\/td><\/tr><tr><td>Pointages \/ Di\u00e1rios de Trabalho (IniciaPicagem, TerminaPicagem)<\/td><td>Id\u0151napl\u00f3k \u00e9s dolgoz\u00f3i visszajelent\u00e9sek<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Visszajelent\u00e9senk\u00e9nt vagy m\u0171szakonk\u00e9nt, ha ezt v\u00e1lasztj\u00e1k<\/td><\/tr><tr><td>A Cegidben nem szerepel<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok mint korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sok (PMI), alternat\u00edv g\u00e9pek \u00e9s dolgoz\u00f3k<\/td><td>A SkyPlannerben kezelve<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be a cikkeket, darabjegyz\u00e9keket, m\u0171veletterveket, munkak\u00f6zpontokat, g\u00e9peket, dolgoz\u00f3kat \u00e9s napt\u00e1rakat. Gondosan alak\u00edtsa ki a munkak\u00f6zpontok megfeleltet\u00e9s\u00e9t: egy n\u00e9gy g\u00e9pet tartalmaz\u00f3 poste de charge egy munka\u00e1llom\u00e1s-csoportnak felel meg, benne n\u00e9gy munka\u00e1llom\u00e1ssal.<\/p>\n\n\n<p><strong>2. Az OF-ek szinkroniz\u00e1l\u00e1sa.<\/strong> Olvassa be a v\u00e9gleges OF-eket a m\u0171veleteikkel \u00e9s \u00f6sszetev\u0151ikkel, valamint a nyitott sz\u00e1ll\u00edt\u00f3i rendel\u00e9seket. A SkyPlanner a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l tekinti el\u00e9rhet\u0151nek, a k\u00e9szletet pedig akkor friss\u00edti, amikor a rendel\u00e9s Delivered \u00e1llapotot kap. A felm\u00e9r\u00e9s sor\u00e1n d\u00f6nts\u00e9k el, hogy a tervezett OF-eket (OF pr\u00e9visionnels) is \u00fctemezik-e, vagy csak a v\u00e9glegeseket.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Amikor az \u00fctemez\u0151motor elhelyez vagy \u00e1thelyez egy gy\u00e1rt\u00e1si feladatot, egy SkyPlanner-webhook ind\u00edtja el az adatok Cegidbe \u00edr\u00e1s\u00e1t. A PMI-ben a tervezett kezd\u00e9si \u00e9s befejez\u00e9si d\u00e1tumok a Web API-n kereszt\u00fcl, a PMI \u00fczleti szab\u00e1lyainak megfelel\u0151en ker\u00fclnek az OF-m\u0171veletekhez. A Primavera eset\u00e9ben az integr\u00e1ci\u00f3 megh\u00edvja az IGprBSPlaneamento.ActualizaPlaneamentoOperacao met\u00f3dust a m\u0171velet, a munkak\u00f6zpont \u00e9s a tervezett kezdet \u00e9s befejez\u00e9s megad\u00e1s\u00e1val. Ez friss\u00edti a gy\u00e1rt\u00e1si rendel\u00e9s m\u0171velet\u00e9nek DataIniPrevista \u00e9s DataFimPrevista mez\u0151it.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A dolgoz\u00f3k a SkyPlanner Mobile Confirmations vagy a Production Timer seg\u00edts\u00e9g\u00e9vel r\u00f6gz\u00edtik a munkav\u00e9gz\u00e9st, az id\u0151napl\u00f3k pedig naprak\u00e9szen tartj\u00e1k az \u00fctemtervet. \u00d6n d\u00f6nti el, hogy az id\u0151adatokat vissza\u00edrj\u00e1k-e a Cegidbe. Ha igen, akkor a PMI-ben pointages form\u00e1j\u00e1ban, a Primavera Di\u00e1rios de Trabalho funkci\u00f3j\u00e1ban pedig az IniciaPicagem \u00e9s TerminaPicagem h\u00edv\u00e1sokon kereszt\u00fcl ker\u00fclnek r\u00f6gz\u00edt\u00e9sre. Ha nem, az id\u0151adatokat tov\u00e1bbra is vonalk\u00f3ddal r\u00f6gz\u00edtik a Cegidben.<\/p>\n\n\n<p><strong>5. Adatgazd\u00e1k \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong> Az \u00e9les indul\u00e1s el\u0151tt r\u00f6gz\u00edts\u00e9k ezeket \u00edr\u00e1sban:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Cikkek, darabjegyz\u00e9kek, m\u0171velettervek, OF-mennyis\u00e9gek \u00e9s -\u00e1llapotok<\/td><td>Cegid<\/td><\/tr><tr><td>M\u0171veleti sorrend, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontok, g\u00e9phozz\u00e1rendel\u00e9s<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1m- \u00e9s dolgoz\u00f3i ig\u00e9nyek, alternat\u00edv er\u0151forr\u00e1sok<\/td><td>SkyPlanner<\/td><\/tr><tr><td>M\u0171szakok \u00e9s munkav\u00e9gz\u00e9s n\u00e9lk\u00fcli napok<\/td><td>Egyetlen rendszer, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><tr><td>Munkaid\u0151, anyagfelhaszn\u00e1l\u00e1s \u00e9s k\u00e9szrejelent\u00e9sek<\/td><td>Cegid, helyben r\u00f6gz\u00edtve vagy a SkyPlanner id\u0151napl\u00f3ib\u00f3l \u00e1tv\u00e9ve<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az OF-d\u00e1tumokat csak egy rendszer \u00edrja. A tervezett d\u00e1tumok meghat\u00e1roz\u00e1s\u00e1ban a SkyPlanner veszi \u00e1t a PMI tervez\u00e9si futtat\u00e1sainak \u00e9s a Primavera tervez\u00e9si algoritmus\u00e1nak szerep\u00e9t. A SkyPlanner \u00e1ltal \u00fctemezett OF-ekre ne futtass\u00e1k ezeket a tervez\u00e9seket, hogy a k\u00e9t rendszer ne \u00edrja fel\u00fcl egym\u00e1s adatait.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s \u00e1ltal\u00e1ban a bevezet\u00e9s kezdet\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. El\u0151tte ellen\u0151rizze az \u00fctemtervet a 30 napos ingyenes pr\u00f3baid\u0151szakban, a Cegid rendszerb\u0151l CSV- vagy Excel-form\u00e1tumban export\u00e1lt postes- \u00e9s gammes-adatokkal, valamint a nyitott OF-ek adataival.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Adatmegfeleltet\u00e9s.<\/strong> V\u00e9gleges\u00edtse a megfeleltet\u00e9si t\u00e1bl\u00e1t, az adatgazdai szab\u00e1lyokat \u00e9s a szinkroniz\u00e1l\u00e1s gyakoris\u00e1g\u00e1t, valamint d\u00f6ntse el, hogy az id\u0151adatokat is vissza\u00edrj\u00e1k-e.<\/li>\n\n\n<li><strong>Cegid-hozz\u00e1f\u00e9r\u00e9s.<\/strong> Hozza l\u00e9tre az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t, \u00e9s ellen\u0151rizze a gy\u00e1rt\u00e1si objektumokhoz sz\u00fcks\u00e9ges jogosults\u00e1gokat \u00e9s licenceket. El\u0151sz\u00f6r tesztv\u00e1llalatban v\u00e9gezze el a teszteket.<\/li>\n\n\n<li><strong>Kezdeti adatbet\u00f6lt\u00e9s.<\/strong> Articles, nomenclatures, gammes, postes de charge, g\u00e9pek, g\u00e9pkezel\u0151k \u00e9s napt\u00e1rak.<\/li>\n\n\n<li><strong>OF \u00e9s besz\u00e1ll\u00edt\u00f3i rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Rendszeres lek\u00e9rdez\u00e9s sz\u0171r\u00e9ssel, lapoz\u00e1ssal \u00e9s \u00fajrapr\u00f3b\u00e1lkoz\u00e1sokkal.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlanner rendszerben.<\/strong> \u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, gy\u00e1rt\u00e1si feladatonk\u00e9nt sz\u00fcks\u00e9ges kezel\u0151i l\u00e9tsz\u00e1m, valamint alternat\u00edv g\u00e9pek vagy munkat\u00e1rsak.<\/li>\n\n\n<li><strong>Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> A m\u0171veletek tervezett id\u0151pontjainak \u00e1tv\u00e9tele a SkyPlanner webhookjaib\u00f3l, valamint az id\u0151adatok vissza\u00edr\u00e1sa, ha ezt v\u00e1lasztott\u00e1k.<\/li>\n\n\n<li><strong>P\u00e1rhuzamos tesztel\u00e9s.<\/strong> Futtassa a SkyPlanner rendszert a jelenlegi terv mellett, hasonl\u00edtsa \u00f6ssze az id\u0151pontokat, \u00e9s jav\u00edtsa a t\u00f6rzsadatokat.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s.<\/strong> Akkor kapcsolja be a vissza\u00edr\u00e1st, ha az adatok m\u00e1r egyeznek.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire kell felk\u00e9sz\u00fclni a Cegid-integr\u00e1ci\u00f3n\u00e1l?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00e9gleges\u00edtett \u00e9s tervezett OF.<\/strong> A PMI mindkett\u0151t a CBN alapj\u00e1n hozza l\u00e9tre. A tervezett OF \u00fctemez\u00e9se megmutatja a j\u00f6v\u0151beli terhel\u00e9st, de az id\u0151pontokat csak a v\u00e9gleges\u00edtett OF eset\u00e9n \u00edrja vissza.<\/li>\n\n\n<li><strong>A tervez\u00e9sb\u0151l kiz\u00e1rt m\u0171veletek.<\/strong> A Primavera rendszerben egy m\u0171velet megjel\u00f6lhet\u0151 \u00fagy, hogy ne vegyen r\u00e9szt a tervez\u00e9sben (NaoSujeitaPlaneamento). Ezeket hagyja ki a vissza\u00edr\u00e1sb\u00f3l.<\/li>\n\n\n<li><strong>G\u00e9pid\u0151 \u00e9s kezel\u0151i id\u0151.<\/strong> A Primavera minden m\u0171veletn\u00e9l k\u00fcl\u00f6n t\u00e1rolja a g\u00e9pid\u0151t \u00e9s a kezel\u0151i id\u0151t. Mindkett\u0151h\u00f6z \u00e1ll\u00edtson be adatmegfeleltet\u00e9st, hogy a t\u00f6bb kezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatokhoz a megfelel\u0151 l\u00e9tsz\u00e1m \u00e1lljon rendelkez\u00e9sre.<\/li>\n\n\n<li><strong>\u00c1tfed\u0151 m\u0171veletek.<\/strong> A Primavera m\u0171veleteihez \u00e1tfed\u00e9si egy\u00fctthat\u00f3 tartozik. Feleltesse meg ezt a SkyPlanner m\u0171veleti id\u0151z\u00edt\u00e9s\u00e9nek, k\u00fcl\u00f6nben az \u00fctemterv hosszabb v\u00e1rakoz\u00e1ssal sz\u00e1mol, mint amennyi az \u00fczemben t\u00e9nylegesen sz\u00fcks\u00e9ges.<\/li>\n\n\n<li><strong>Melyik Cegid ERP?<\/strong> A PMI, a Primavera \u00e9s az Ekon elt\u00e9r\u0151 interf\u00e9szeket haszn\u00e1l. El\u0151sz\u00f6r tiszt\u00e1zza a term\u00e9ket \u00e9s a verzi\u00f3t; a Cegid XRP Flex eset\u00e9n az <a href=\"\/hu\/integraciok\/erp\/acumatica\/integracios-utmutato\/\">Acumatica integr\u00e1ci\u00f3s \u00fatmutat\u00f3j\u00e1t<\/a> haszn\u00e1lja.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be \u00e9s t\u00e1mogatja a Cegid-integr\u00e1ci\u00f3t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata v\u00e9gzi a be\u00e1ll\u00edt\u00e1st a bevezet\u00e9s sor\u00e1n, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt,<\/strong> a meg\u00e1llapod\u00e1s szerinti Cegid API-h\u00edv\u00e1sokra kiterjed\u0151en. Minden \u00fczem m\u00e1sk\u00e9pp haszn\u00e1lja a Cegid rendszert; ezeket a helyi saj\u00e1toss\u00e1gokat itt kell figyelembe venni.<\/li>\n\n\n<li><strong>Az \u00d6n Cegid-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az \u00d6n be\u00e1ll\u00edt\u00e1sait, testreszab\u00e1sait \u00e9s licenceit, \u00e9s a SkyPlanner csapat\u00e1val egy\u00fctt be\u00e1ll\u00edthatja az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t \u00e9s az API-hozz\u00e1f\u00e9r\u00e9st.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is tov\u00e1bbfejleszthetik az integr\u00e1ci\u00f3t<\/strong> a SkyPlanner REST API haszn\u00e1lat\u00e1val, API-tokennel. Az indul\u00e1shoz el\u00e9g egy API-token, a SkyPlanner csapata pedig sz\u00fcks\u00e9g eset\u00e9n seg\u00edt. A r\u00e9szleteket a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner integr\u00e1ci\u00f3s dokument\u00e1ci\u00f3j\u00e1ban<\/a> tal\u00e1lja.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151zetes \u00e1raj\u00e1nlatot adunk a csomaggal egy\u00fctt. Tov\u00e1bbi inform\u00e1ci\u00f3k: <a href=\"\/hu\/arkepzes\/\">\u00e1rak<\/a>, <a href=\"\/hu\/integraciok\/erp\/cegid\/termelesutemezes\/\">termel\u00e9s\u00fctemez\u00e9s Cegid mellett<\/a>, <a href=\"\/hu\/integraciok\/erp\/cegid\/\">Cegid-oldal<\/a> \u00e9s <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u00e9se<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3szekr\u00e9nygy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner seg\u00edts\u00e9g\u00e9vel az Excel-t\u00e1bl\u00e1zatokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a termel\u00e9s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos eloszt\u00f3szekr\u00e9nyek \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Az UTU v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1zatot visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">A Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations gy\u00e1rt\u00e1svezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra<\/b><span>el\u0151re l\u00e1tja a szabad kapacit\u00e1st az \u00e9rt\u00e9kes\u00edt\u00e9s<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner megb\u00edzhat\u00f3 alapot teremt a teljes gy\u00e1rt\u00e1stervez\u00e9shez.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gy\u00e1rt\u00e1svezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerrel \u00e9rintkez\u00e9sre alkalmas csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st. Az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1ra vonatkoz\u00f3 k\u00e9r\u00e9sekre m\u00e1sodpercek alatt \u00e9rkezik v\u00e1lasz a kor\u00e1bbi egy \u00f3ra vagy ann\u00e1l is hosszabb id\u0151 helyett.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/fredman-operations\/\">A Fredman Operations v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa 2021 \u00f3ta<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e1tl\u00e1that\u00f3v\u00e1 teszi a kapacit\u00e1sunkat, \u00e9s kisz\u00e1m\u00edthat\u00f3v\u00e1 a tervez\u00e9st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Vegyipari \u00e9s \u00e9lelmiszeripari gy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A SkyPlanner haszn\u00e1lat\u00e1nak teljes id\u0151tartama alatt, 2021 \u00f3ta a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa 100%-os.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/opes-corporation\/\">Az Opes Corporation v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van API a Cegid PMI rendszerhez?<\/summary>\n<p class=\"sp-faq__a\">Igen. A Cegid Web API-t biztos\u00edt a PMI sz\u00e1m\u00e1ra a k\u00fcls\u0151 alkalmaz\u00e1sokkal folytatott biztons\u00e1gos adatcser\u00e9hez, a Manufacturing PMI \u00fczleti szab\u00e1lyainak meg\u0151rz\u00e9s\u00e9vel. A SkyPlanner ezen kereszt\u00fcl olvassa be az OF adatait, \u00e9s \u00edrja vissza a tervezett id\u0151pontokat \u00e9s a pointages adatokat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van a Cegid Primavera rendszernek API-ja a gy\u00e1rt\u00e1si rendel\u00e9sekhez?<\/summary>\n<p class=\"sp-faq__a\">Igen. A PRIMAVERA V10 API minden modulban t\u00e1mogatja az olvas\u00e1st \u00e9s az \u00edr\u00e1st. A Produ\u00e7\u00e3o modul el\u00e9rhet\u0151v\u00e9 teszi az ordens de fabrico objektumokat, a Planeamento funkci\u00f3t az ActualizaPlaneamentoOperacao met\u00f3dussal, valamint a Di\u00e1rios de Trabalho objektumokat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan ker\u00fclnek vissza a tervezett id\u0151pontok a Cegid rendszerbe?<\/summary>\n<p class=\"sp-faq__a\">A PMI eset\u00e9ben a Web API-n kereszt\u00fcl, minden OF-m\u0171velethez. A Primavera eset\u00e9ben az IGprBSPlaneamento.ActualizaPlaneamentoOperacao met\u00f3dussal, amely be\u00e1ll\u00edtja az ordem de fabrico m\u0171velet tervezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontj\u00e1t.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>T\u00e1mogatja a Cegid a webhookokat?<\/summary>\n<p class=\"sp-faq__a\">Az integr\u00e1ci\u00f3 \u00fczemenk\u00e9nt be\u00e1ll\u00edtott gyakoris\u00e1ggal k\u00e9rdezi le a Cegid rendszert. A SkyPlanner saj\u00e1t webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait, \u00edgy az id\u0151pontok minden \u00fajra\u00fctemez\u00e9s ut\u00e1n r\u00f6gt\u00f6n eljutnak a Cegid rendszerbe.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A Cegid-partner a Cegid be\u00e9p\u00edtett tervez\u00e9s\u00e9t vagy a SkyPlannert aj\u00e1nlja?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlannert, ha az \u00fcgyf\u00e9lnek a g\u00e9peken \u00e9s a k\u00e9szleten t\u00fal m\u00e1s korl\u00e1tokat is figyelembe kell vennie. Maga a Cegid is fejlett tervez\u00e9si eszk\u00f6z\u00f6k csatlakoztat\u00e1s\u00e1t javasolja a tov\u00e1bbi korl\u00e1tok kezel\u00e9s\u00e9re (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). A SkyPlanner a tervez\u00e9s sor\u00e1n figyelembe veszi a g\u00e9pkezel\u0151ket, a szersz\u00e1mokat, az \u00e1t\u00e1ll\u00e1sokat \u00e9s az anyagokat, automatikusan \u00fajra\u00fctemez, \u00e9s korl\u00e1tlan sz\u00e1m\u00fa felhaszn\u00e1l\u00f3t biztos\u00edt, havi 199 \u20ac-t\u00f3l.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert az integr\u00e1ci\u00f3 ki\u00e9p\u00edt\u00e9se el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3baid\u0151szakban legfeljebb 20 munka\u00e1llom\u00e1ssal dolgozhat, a Cegid rendszerb\u0151l import\u00e1lt CSV- vagy Excel-adatokkal. Bankk\u00e1rtya nem sz\u00fcks\u00e9ges. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">egyeztessen \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a> az integr\u00e1ci\u00f3 felm\u00e9r\u00e9s\u00e9r\u0151l.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Cegid Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez a Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a Cegid gy\u00e1rt\u00e1si ERP-rendszereit a SkyPlanner APS rendszerrel. El\u0151sz\u00f6r a Cegid PMI, majd a Cegid Primavera \u00e9s a Cegid Ekon integr\u00e1ci\u00f3j\u00e1t ismertetj\u00fck. A SkyPlanner a Cegid saj\u00e1t interf\u00e9szein kereszt\u00fcl, mindk\u00e9t &#8230; <a title=\"Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/\" aria-label=\"Read more about Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106385,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107342","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cegid APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"Cegid PMI \u00e9s Cegid Primavera\u2013SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s, lek\u00e9rdez\u00e9sek, projekttippek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" \/>\n<meta property=\"og:description\" content=\"Cegid PMI \u00e9s Cegid Primavera\u2013SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s, lek\u00e9rdez\u00e9sek, projekttippek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/cegid\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/cegid\\\/integracios-utmutato\\\/\",\"name\":\"Cegid APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Cegid PMI \u00e9s Cegid Primavera\u2013SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s, lek\u00e9rdez\u00e9sek, projekttippek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/cegid\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/cegid\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/cegid\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Cegidhez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cegid APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"Cegid PMI \u00e9s Cegid Primavera\u2013SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s, lek\u00e9rdez\u00e9sek, projekttippek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez","og_description":"Cegid PMI \u00e9s Cegid Primavera\u2013SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s, lek\u00e9rdez\u00e9sek, projekttippek.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/","name":"Cegid APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Cegid PMI \u00e9s Cegid Primavera\u2013SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s, lek\u00e9rdez\u00e9sek, projekttippek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Cegidhez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Cegid Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez a Cegid-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a Cegid gy\u00e1rt\u00e1si ERP-rendszereit a SkyPlanner APS rendszerrel. El\u0151sz\u00f6r a Cegid PMI, majd a Cegid Primavera \u00e9s a Cegid Ekon integr\u00e1ci\u00f3j\u00e1t ismertetj\u00fck. A SkyPlanner a Cegid saj\u00e1t interf\u00e9szein kereszt\u00fcl, mindk\u00e9t&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=107342"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107342\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106385"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=107342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}