{"id":107110,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/visma-l7\/integracios-utmutato\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/","title":{"rendered":"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Visma L7<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a Visma L7 a SkyPlanner APS rendszerrel. A SkyPlanner a Visma L7 REST API seg\u00edts\u00e9g\u00e9vel k\u00e9tir\u00e1ny\u00fa adatkapcsolatot tart fenn a Visma L7 rendszerrel:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlanner \u00e1tveszi a munkasz\u00e1mokat (ty\u00f6numero), a munkaf\u00e1zisokat (ty\u00f6nvaihe), az er\u0151forr\u00e1sokat, a term\u00e9kstrukt\u00far\u00e1kat, az alkatr\u00e9szeket, az anyagokat, a k\u00e9szletegyenlegeket, valamint a vev\u0151i \u00e9s beszerz\u00e9si rendel\u00e9sek sorait.<\/li>\n\n\n<li>A <code>PUT \/manufphases\/<\/code> h\u00edv\u00e1ssal minden munkalaphoz vissza\u00edrja az er\u0151forr\u00e1st, a kezd\u00e9si d\u00e1tumot, a priorit\u00e1st, a szem\u00e9lyt \u00e9s a napi bont\u00e1s\u00fa \u00f3rasz\u00e1mokat.<\/li>\n\n\n<li>Az er\u0151forr\u00e1snapt\u00e1r kapacit\u00e1s\u00e1t a <code>POST \/resourceupdates\/<\/code> h\u00edv\u00e1s tartja szinkronban.<\/li>\n\n\n<li>Az L7 munkasoraiban r\u00f6gz\u00edtett termel\u00e9si esem\u00e9nyeket a <code>GET \/manufevents\/<\/code> h\u00edv\u00e1ssal olvassa vissza.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta rendel\u00e9slist\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n L7-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1. A partnerek \u00e9s fejleszt\u0151k a SkyPlanner dokument\u00e1lt REST API fel\u00fclet\u00e9re \u00e9p\u00edtve is fejleszthetnek (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-s-rest-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A Visma L7 REST API fel\u00fclete<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az API neve <strong>Visma L7 &#8211; REST API<\/strong>. Dokument\u00e1ci\u00f3ja az OpenAPI 3.0.3 szabv\u00e1nyt k\u00f6veti, \u00e9s v\u00e1ltoz\u00e1snapl\u00f3t is tartalmaz (<a href=\"https:\/\/demoltr1.visma.fi\/ltrws\/L7RESTapi\/\">dokument\u00e1ci\u00f3<\/a>). Az API a Visma LTR-en fut.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Az <strong>alap\u00fatvonal<\/strong> az \u00d6n saj\u00e1t LTR-kiszolg\u00e1l\u00f3j\u00e1n: <code>\/ltrws\/REST\/L7<\/code>. A kiszolg\u00e1l\u00f3 helyben vagy a Visma hosztolt alkalmaz\u00e1sszolg\u00e1ltat\u00e1s\u00e1ban m\u0171k\u00f6dhet.<\/li>\n\n\n<li><strong>Licencel\u00e9s.<\/strong> Minden v\u00e9gponthoz k\u00fcl\u00f6n licenc sz\u00fcks\u00e9ges. Az \u00fctemez\u00e9s vissza\u00edr\u00e1s\u00e1hoz, a <code>PUT \/manufphases\/<\/code> haszn\u00e1lat\u00e1hoz L7RMFPP licenc kell, a kapacit\u00e1s friss\u00edt\u00e9s\u00e9hez pedig L7RMCAP. Az olvas\u00e1si v\u00e9gpontokhoz szint\u00e9n k\u00fcl\u00f6n licencek tartoznak.<\/li>\n\n\n<li><strong>Lapoz\u00e1s.<\/strong> A list\u00e1k a <code>pageSize<\/code> \u00e9s a <code>recAfter<\/code> param\u00e9terrel lapozhat\u00f3k, sz\u0171r\u00e9s\u00fckh\u00f6z pedig a <code>queryKey1<\/code>, a <code>queryKey2<\/code> \u00e9s a <code>queryString<\/code> haszn\u00e1lhat\u00f3.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Minden L7-h\u00edv\u00e1shoz k\u00e9t tokent kell k\u00fcldeni:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>A <strong>hash<\/strong> v\u00e1lasztja ki az adatb\u00e1zist \u00e9s a v\u00e1llalatot.<\/li>\n\n\n<li>A <strong>token<\/strong> azonos\u00edtja az API-felhaszn\u00e1l\u00f3t.<\/li>\n\n<\/ol>\n\n\n<p>Az LTR-rendszergazda l\u00e9trehozza az API-felhaszn\u00e1l\u00f3t a Visma LTR-ben, hozz\u00e1rendeli az L7-v\u00e1llalathoz, profilokat rendel hozz\u00e1, \u00e9s l\u00e9trehozza a felhaszn\u00e1l\u00f3i tokent (<a href=\"https:\/\/demoltr1.visma.fi\/ltrws\/L7RESTapi\/\">els\u0151 l\u00e9p\u00e9sek<\/a>). Haszn\u00e1ljon k\u00fcl\u00f6n integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t, kiz\u00e1r\u00f3lag az integr\u00e1ci\u00f3hoz sz\u00fcks\u00e9ges jogosults\u00e1gokkal.<\/p>\n\n\n<p>A SkyPlanner oldal\u00e1n a REST API hiteles\u00edt\u00e9se az <code>Authorization-Token<\/code> fejl\u00e9cben k\u00fcld\u00f6tt API-tokennel t\u00f6rt\u00e9nik. Ezt a Settings &gt; API men\u00fcpontban hozhatja l\u00e9tre. Az <a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s oktat\u00f3anyag<\/a> v\u00e9gigvezeti az els\u0151 h\u00edv\u00e1sokon.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-modifiedafter\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">V\u00e1ltoz\u00e1sok \u00e9szlel\u00e9se: modifiedAfter<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az L7 REST API nem t\u00e1mogat webhookokat. A v\u00e1ltoz\u00e1sok rendszeres lek\u00e9rdez\u00e9ssel olvashat\u00f3k be:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Az L7 f\u00e1jlkarbantart\u00e1si modulj\u00e1ban (Tiedostohuolto) kapcsolja be a v\u00e1ltoz\u00e1snapl\u00f3z\u00e1st (DBLOG) az integr\u00e1ci\u00f3 \u00e1ltal olvasott t\u00e1bl\u00e1khoz, p\u00e9ld\u00e1ul a munkalapokhoz \u00e9s az alkatr\u00e9szekhez.<\/li>\n\n\n<li>H\u00edvja meg az olvas\u00e1si v\u00e9gpontokat \u00fagy, hogy a <code>modifiedAfter<\/code> \u00e9rt\u00e9ke az utols\u00f3 fut\u00e1s id\u0151pontja legyen. A t\u00f6r\u00f6lt rekordok t\u00f6r\u00f6ltk\u00e9nt megjel\u00f6lve \u00e9rkeznek vissza, \u00edgy a visszavont gy\u00e1rt\u00e1si feladatok kiker\u00fclnek az \u00fctemez\u00e9sb\u0151l.<\/li>\n\n\n<li>N\u00e9h\u00e1ny percenk\u00e9nt v\u00e9gezzen lek\u00e9rdez\u00e9st. A SkyPlanner webhookot k\u00fcld, ha az \u00e1llapot vagy az \u00fctemez\u00e9s megv\u00e1ltozik, \u00edgy a vissza\u00edr\u00e1s esem\u00e9nyvez\u00e9relt.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma L7-objektum (v\u00e9gpont)<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Tuote (<code>GET \/products\/<\/code>)<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>A munkasz\u00e1mhoz tartoz\u00f3 alkatr\u00e9szek (<code>GET \/manufcomponents\/<\/code>)<\/td><td>R\u00e9szterm\u00e9kek<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Rendszeres lek\u00e9rdez\u00e9s a modifiedAfter param\u00e9terrel<\/td><\/tr><tr><td>Anyagig\u00e9nyek (<code>GET \/manufmaterials\/<\/code>)<\/td><td>Anyagsz\u00fcks\u00e9glet gy\u00e1rt\u00e1si feladatonk\u00e9nt<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Rendszeres lek\u00e9rdez\u00e9s a modifiedAfter param\u00e9terrel<\/td><\/tr><tr><td>Er\u0151forr\u00e1sfa (KRYH) g\u00e9psz\u00e1mmal (<code>GET \/manufresources\/<\/code>)<\/td><td>Munka\u00e1llom\u00e1sok \u00e9s munka\u00e1llom\u00e1s-csoportok<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, ut\u00e1na ritk\u00e1n<\/td><\/tr><tr><td>Munkalap (TSUUNR) munkaf\u00e1zisonk\u00e9nt (<code>GET \/manufphases\/<\/code>)<\/td><td>Gy\u00e1rt\u00e1si feladatok (m\u0171veleti l\u00e9p\u00e9sek) munka\u00e1llom\u00e1sonk\u00e9nt<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s n\u00e9h\u00e1ny percenk\u00e9nt<\/td><\/tr><tr><td>K\u00e9szletegyenlegek (<code>GET \/stockbalances\/<\/code>)<\/td><td>K\u00e9szlet<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Rendszeres lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>Beszerz\u00e9si rendel\u00e9sek sorai (<code>GET \/purchaserows\/<\/code>)<\/td><td>Beszerz\u00e9si rendel\u00e9sek sz\u00e1ll\u00edt\u00e1si d\u00e1tumokkal<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Rendszeres lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>Vev\u0151i rendel\u00e9sek \u00e9s soraik (<code>GET \/salesorders\/<\/code>, <code>GET \/salesrows\/<\/code>)<\/td><td>Hat\u00e1rid\u0151k, vev\u0151i priorit\u00e1s<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Rendszeres lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>Termel\u00e9si esem\u00e9nyek (<code>GET \/manufevents\/<\/code>)<\/td><td>El\u0151rehalad\u00e1s gy\u00e1rt\u00e1si feladatonk\u00e9nt<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Rendszeres lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>A munkalap resource, startDate, priority, person, schedulingDays mez\u0151i (<code>PUT \/manufphases\/<\/code>)<\/td><td>Tervezett munka\u00e1llom\u00e1s, kezd\u00e9s, sorrend \u00e9s napi \u00f3rasz\u00e1mok<\/td><td>SkyPlanner \u2192 L7<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, SkyPlanner-webhookon kereszt\u00fcl<\/td><\/tr><tr><td>Az er\u0151forr\u00e1snapt\u00e1r kapacit\u00e1sa (<code>POST \/resourceupdates\/<\/code>)<\/td><td>M\u0171szakkapacit\u00e1s<\/td><td>SkyPlanner \u2192 L7<\/td><td>A m\u0171szakok v\u00e1ltoz\u00e1sakor<\/td><\/tr><tr><td>A SkyPlannerben be\u00e1ll\u00edtott \u00fctemez\u00e9si szab\u00e1lyok<\/td><td>Enged\u00e9lyezett munka\u00e1llom\u00e1sok, \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, dolgoz\u00f3k<\/td><td>A SkyPlannerben karbantartva<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be az er\u0151forr\u00e1sf\u00e1t, \u00e9s minden g\u00e9phez rendeljen k\u00fcl\u00f6n SkyPlanner-munka\u00e1llom\u00e1st. Ha egy L7-er\u0151forr\u00e1shoz t\u00f6bb g\u00e9p tartozik, hozzon l\u00e9tre g\u00e9penk\u00e9nt egy munka\u00e1llom\u00e1st, az er\u0151forr\u00e1shoz pedig egy munka\u00e1llom\u00e1s-csoportot. Olvassa be a term\u00e9keket \u00e9s a term\u00e9kstrukt\u00far\u00e1kat a hozz\u00e1juk tartoz\u00f3 munkaf\u00e1zisokkal egy\u00fctt.<\/p>\n\n\n<p><strong>2. Munkasz\u00e1mok szinkroniz\u00e1l\u00e1sa.<\/strong> Olvassa be a nyitott munkalapokat a <code>GET \/manufphases\/<\/code> h\u00edv\u00e1ssal, majd tartsa \u0151ket naprak\u00e9szen a <code>modifiedAfter<\/code> param\u00e9terrel. Olvassa be az egyes munkasz\u00e1mokhoz tartoz\u00f3 alkatr\u00e9szeket \u00e9s anyagig\u00e9nyeket, valamint a k\u00e9szletegyenlegeket \u00e9s a beszerz\u00e9si rendel\u00e9sek sorait, hogy a munkaf\u00e1zis megv\u00e1rja a hozz\u00e1 tartoz\u00f3 beszerz\u00e9si sor sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t.<\/p>\n\n\n<p><strong>3. Az \u00fctemez\u00e9s vissza\u00edr\u00e1sa.<\/strong> A SkyPlanner minden olyan munkaf\u00e1zisn\u00e1l megh\u00edvja a <code>PUT \/manufphases\/<\/code> v\u00e9gpontot, amelyet az \u00fctemez\u0151motor elhelyezett vagy \u00e1thelyezett. A k\u00e9r\u00e9s t\u00f6rzse munkalaponk\u00e9nt egy <code>workSheet<\/code> bejegyz\u00e9st tartalmaz a k\u00f6vetkez\u0151kkel:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>number<\/code>: a munkalap; <code>resource<\/code>: a kiv\u00e1lasztott er\u0151forr\u00e1s<\/li>\n\n\n<li><code>startDate<\/code> \u00e9s <code>priority<\/code>, hogy az L7 munkasorai a SkyPlanner sorrendj\u00e9t mutass\u00e1k<\/li>\n\n\n<li><code>person<\/code>, ha a terv n\u00e9v szerint kijel\u00f6lt g\u00e9pkezel\u0151t tartalmaz<\/li>\n\n\n<li><code>schedulingDays<\/code>: a tervezett \u00f3rasz\u00e1mok d\u00e1tumonk\u00e9nt<\/li>\n\n<\/ul>\n\n\n<p>Az L7 v\u00e1ltozatlanul megtartja a k\u00fcls\u0151 rendszer \u00e1ltal be\u00e1ll\u00edtott priorit\u00e1st (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Jarjesta-paivan-tyot-toimi\">forr\u00e1s<\/a>), \u00edgy a sorrend a munkasorokban is megmarad.<\/p>\n\n\n<p><strong>4. Kapacit\u00e1s szinkroniz\u00e1l\u00e1sa.<\/strong> Ha a SkyPlannerben m\u00f3dosulnak a m\u0171szakok, a szabadnapok vagy a t\u00fal\u00f3r\u00e1k, a <code>POST \/resourceupdates\/<\/code> h\u00edv\u00e1s be\u00edrja az \u00faj kapacit\u00e1st az L7 er\u0151forr\u00e1snapt\u00e1r\u00e1ba. Az L7 terhel\u00e9si n\u00e9zetei \u00edgy \u00f6sszhangba ker\u00fclnek a tervvel.<\/p>\n\n\n<p><strong>5. \u00dczemi el\u0151rehalad\u00e1s.<\/strong> A g\u00e9pkezel\u0151k tov\u00e1bbra is az L7 munkasoraiban \u00e9s a Visma LTR-ben r\u00f6gz\u00edtik az adatokat, a SkyPlanner pedig a <code>GET \/manufevents\/<\/code> h\u00edv\u00e1ssal olvassa be az esem\u00e9nyeket. A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations fel\u00fclet\u00e9n is visszaigazolhatj\u00e1k a munk\u00e1t. Az Autopilot mindk\u00e9t forr\u00e1s adatai alapj\u00e1n \u00fajra\u00fctemez, \u00e9s a k\u00f6vetkez\u0151 vissza\u00edr\u00e1s m\u00e1r az \u00faj id\u0151pontokat tov\u00e1bb\u00edtja.<\/p>\n\n\n<p><strong>6. Adatgazdai \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong> R\u00f6gz\u00edtse \u0151ket az \u00e9les indul\u00e1s el\u0151tt:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Term\u00e9kek, term\u00e9kstrukt\u00far\u00e1k, munkaf\u00e1zisok, mennyis\u00e9gek, a munkasz\u00e1m \u00e1llapota<\/td><td>Visma L7<\/td><\/tr><tr><td>A munkaf\u00e1zisok sorrendje, kezd\u00e9si d\u00e1tumok, napi \u00f3rasz\u00e1mok, er\u0151forr\u00e1s kiv\u00e1laszt\u00e1sa<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Enged\u00e9lyezett munka\u00e1llom\u00e1sok, \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, dolgoz\u00f3k<\/td><td>SkyPlanner<\/td><\/tr><tr><td>M\u0171szakok \u00e9s t\u00e1voll\u00e9tek<\/td><td>SkyPlanner, az L7 er\u0151forr\u00e1snapt\u00e1r\u00e1ba vissza\u00edrva<\/td><\/tr><tr><td>Termel\u00e9si esem\u00e9nyek \u00e9s k\u00e9szletk\u00f6nyvel\u00e9sek<\/td><td>A Visma L7 munkasorai \u00e9s az LTR<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az \u00fctk\u00f6z\u00e9sek f\u0151 forr\u00e1sa az L7 saj\u00e1t tervez\u00e9se. A sz\u00fcks\u00e9gletsz\u00e1m\u00edt\u00e1s \u00e9s a finomtervez\u00e9s \u00fajra elhelyezheti a nem z\u00e1rolt munkaf\u00e1zisokat. Ezeket csak az anyagok \u00e9s a foglal\u00e1sok kezel\u00e9s\u00e9re futtassa, \u00e9s ne \u00fctemezze \u00fajra a SkyPlanner \u00e1ltal kezelt munkaf\u00e1zisokat.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt szok\u00e1sos l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s \u00e1ltal\u00e1ban a bevezet\u00e9s megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl befejez\u0151dik. Ezt megel\u0151z\u0151en a 30 napos ingyenes pr\u00f3ba sor\u00e1n saj\u00e1t adatait haszn\u00e1lhatja, a munkasz\u00e1mok, munkaf\u00e1zisok \u00e9s er\u0151forr\u00e1sok Excel-exportja alapj\u00e1n.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Felm\u00e9r\u00e9s.<\/strong> V\u00e9gleges\u00edtse az adatmegfeleltet\u00e9si t\u00e1bl\u00e1t, az adatgazdai szab\u00e1lyokat \u00e9s a lek\u00e9rdez\u00e9sek gyakoris\u00e1g\u00e1t.<\/li>\n\n\n<li><strong>Hozz\u00e1f\u00e9r\u00e9s \u00e9s licencek.<\/strong> Szerezze be az \u00e9rintett REST-v\u00e9gpontok licenceit. Az LTR-rendszergazda l\u00e9trehozza az API-felhaszn\u00e1l\u00f3t, valamint a hash \u00e9s token \u00e9rt\u00e9keket, lehet\u0151leg el\u0151sz\u00f6r egy tesztv\u00e1llalatban.<\/li>\n\n\n<li><strong>V\u00e1ltoz\u00e1snapl\u00f3z\u00e1s.<\/strong> Kapcsolja be a DBLOG funkci\u00f3t az olvasott t\u00e1bl\u00e1khoz.<\/li>\n\n\n<li><strong>Kezdeti bet\u00f6lt\u00e9s.<\/strong> Er\u0151forr\u00e1sok, term\u00e9kek, term\u00e9kstrukt\u00far\u00e1k \u00e9s munkaf\u00e1zisok.<\/li>\n\n\n<li><strong>Munkasz\u00e1mok szinkroniz\u00e1l\u00e1sa.<\/strong> Rendszeres lek\u00e9rdez\u00e9s a modifiedAfter param\u00e9terrel, a t\u00f6rl\u00e9sek \u00e9s a lapoz\u00e1s kezel\u00e9se.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlannerben.<\/strong> Enged\u00e9lyezett munka\u00e1llom\u00e1sok, \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok \u00e9s dolgoz\u00f3k.<\/li>\n\n\n<li><strong>Vissza\u00edr\u00e1s.<\/strong> A <code>PUT \/manufphases\/<\/code> \u00e9s a <code>POST \/resourceupdates\/<\/code> tesztel\u00e9se a tesztv\u00e1llalatban.<\/li>\n\n\n<li><strong>P\u00e1rhuzamos m\u0171k\u00f6d\u00e9s \u00e9s \u00e9les indul\u00e1s.<\/strong> Hasonl\u00edtsa \u00f6ssze az eredm\u00e9nyt a jelenlegi tervvel, jav\u00edtsa a t\u00f6rzsadatokat, majd kapcsolja be a vissza\u00edr\u00e1st az \u00e9les k\u00f6rnyezetben.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-visma-l7-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire \u00e9rdemes felk\u00e9sz\u00fclni a Visma L7 integr\u00e1ci\u00f3j\u00e1n\u00e1l?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00e9gpontonk\u00e9nti licencek.<\/strong> M\u00e1r a projekt elej\u00e9n vegye sz\u00e1mba az \u00f6sszes v\u00e9gpontot, \u00e9s a tesztel\u00e9s el\u0151tt szerezze be a hozz\u00e1juk sz\u00fcks\u00e9ges licenceket.<\/li>\n\n\n<li><strong>G\u00e9pek sz\u00e1ma.<\/strong> Az L7 a t\u00f6bb g\u00e9pet tartalmaz\u00f3 er\u0151forr\u00e1sn\u00e1l megosztja a munk\u00e1t a g\u00e9pek k\u00f6z\u00f6tt (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">forr\u00e1s<\/a>). A SkyPlannerben bontsa ezt k\u00fcl\u00f6n munka\u00e1llom\u00e1sokra, vissza\u00edr\u00e1skor pedig az L7 \u00e1ltal v\u00e1rt er\u0151forr\u00e1st adja meg.<\/li>\n\n\n<li><strong>Napi \u00f3rasz\u00e1mok.<\/strong> Az L7 d\u00e1tumonk\u00e9nt, \u00f3r\u00e1kban t\u00e1rolja az \u00fctemtervet. A SkyPlanner \u00e1ltal k\u00fcld\u00f6tt <code>schedulingDays<\/code> adatok \u00f6sszege megegyezik a m\u0171velet id\u0151tartam\u00e1val.<\/li>\n\n\n<li><strong>\u00dczemi napt\u00e1r.<\/strong> Gondoskodjon a hi\u00e1nytalan kit\u00f6lt\u00e9s\u00e9r\u0151l, mert a hi\u00e1nyz\u00f3 adatok miatt a m\u0171veletek a m\u00faltba ker\u00fclnek (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Tehdaskalenteri\">forr\u00e1s<\/a>).<\/li>\n\n\n<li><strong>K\u00e9szletre gy\u00e1rt\u00e1si rendel\u00e9sek.<\/strong> A <code>mainNumber<\/code>, <code>subNumber<\/code>, <code>rowNumber<\/code> \u00e9s <code>newQuantity<\/code> mez\u0151k kiz\u00e1r\u00f3lag a k\u00e9szletre gy\u00e1rt\u00e1si rendel\u00e9s mennyis\u00e9g\u00e9nek m\u00f3dos\u00edt\u00e1s\u00e1ra szolg\u00e1lnak. Vev\u0151i megrendel\u00e9sre v\u00e9gzett munk\u00e1kn\u00e1l hagyja ki \u0151ket.<\/li>\n\n\n<li><strong>A k\u00f6vetkez\u0151 ERP.<\/strong> A Visma le\u00e1ll\u00edtotta az L7 tov\u00e1bbfejleszt\u00e9s\u00e9t, a term\u00e9k haszn\u00e1lata pedig 2028 v\u00e9g\u00e9n megsz\u0171nik (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/\">a Visma k\u00f6zlem\u00e9nye<\/a>). Az \u00fctemez\u00e9si szab\u00e1lyokat a SkyPlannerben tartsa, ne az L7 mez\u0151iben, \u00edgy ERP-v\u00e1lt\u00e1skor is megmaradnak.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-visma-l7-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be \u00e9s t\u00e1mogatja a Visma L7 integr\u00e1ci\u00f3j\u00e1t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A munka sor\u00e1n az adatok megfeleltet\u00e9s\u00e9t az \u00d6n er\u0151forr\u00e1saihoz, munkaf\u00e1zisaihoz \u00e9s L7-be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtjuk. A munka a SkyPlannerben t\u00e1rolt \u00fctemez\u00e9si szab\u00e1lyokra is kiterjed: az enged\u00e9lyezett munka\u00e1llom\u00e1sokra, az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixra, a szersz\u00e1mokra \u00e9s a dolgoz\u00f3kra.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n be\u00e1ll\u00edtja az integr\u00e1ci\u00f3t, az \u00e9les indul\u00e1s ut\u00e1n pedig t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1.<\/strong> Minden \u00fczemben m\u00e1sk\u00e9pp haszn\u00e1lj\u00e1k az L7-et; a be\u00e1ll\u00edt\u00e1sokn\u00e1l ezt a helyi tud\u00e1st vessz\u00fck alapul.<\/li>\n\n\n<li><strong>Visma-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az \u00d6n L7- \u00e9s LTR-be\u00e1ll\u00edt\u00e1sait, \u00e9s gondoskodhat az API-felhaszn\u00e1l\u00f3r\u00f3l, a licencekr\u0151l \u00e9s a tesztc\u00e9gr\u0151l. A SkyPlanner biztos\u00edtja a REST API-t, a Swagger\/OpenAPI dokument\u00e1ci\u00f3t \u00e9s a webhookokat.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek r\u00e1<\/strong> ugyanazon a dokument\u00e1lt REST API-n kereszt\u00fcl, API-token haszn\u00e1lat\u00e1val. Az indul\u00e1shoz el\u00e9g egy API-token, a SkyPlanner csapata pedig sz\u00fcks\u00e9g eset\u00e9n seg\u00edt.<\/li>\n\n<\/ol>\n\n\n<p>Ha lecser\u00e9li az L7-et, a SkyPlanner a megl\u00e9v\u0151 be\u00e1ll\u00edt\u00e1sokkal csatlakozik az \u00faj ERP-hez. Tekintse meg a <a href=\"\/hu\/integraciok\/erp\/business-central\/\">Business Central<\/a>, a <a href=\"\/hu\/integraciok\/erp\/visma-net\/\">Visma Net<\/a>, a <a href=\"\/hu\/integraciok\/erp\/lemonsoft\/\">Lemonsoft<\/a>, a <a href=\"\/hu\/integraciok\/erp\/monitor-erp\/\">Monitor ERP<\/a> \u00e9s az <a href=\"\/hu\/integraciok\/erp\/odoo\/\">Odoo<\/a> oldal\u00e1t.<\/p>\n\n\n<p>A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra az \u00d6n folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n, az el\u0151fizet\u00e9si csomaggal egy\u00fctt el\u0151zetes \u00e1raj\u00e1nlatot adunk, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n\n\n<p>Az L7 saj\u00e1t tervez\u00e9si lehet\u0151s\u00e9geit a <a href=\"\/hu\/integraciok\/erp\/visma-l7\/termelesutemezes\/\">T\u00e1mogatja a Visma L7 a termel\u00e9s\u00fctemez\u00e9st?<\/a> c\u00edm\u0171 cikkben hasonl\u00edtjuk \u00f6ssze. \u00c1ttekint\u00e9st a <a href=\"\/hu\/integraciok\/erp\/visma-l7\/\">Visma L7 oldal\u00e1n<\/a> tal\u00e1l, a t\u00f6bbi rendszerr\u0151l pedig az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k gy\u0171jt\u0151oldal\u00e1n<\/a> olvashat.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, a Mamec vez\u00e9rigazgat\u00f3ja a v\u00e1llalat lohjai gy\u00e1rt\u00f3csarnok\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-es nagys\u00e1grendben<\/b><span>automatikusan \u00fctemezett gy\u00e1rt\u00e1si rendel\u00e9sek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEg\u00e9szen m\u00e1sk\u00e9pp tartjuk k\u00e9zben a gy\u00e1rt\u00e1st, \u00e9s teljesen m\u00e1s szinten l\u00e1tjuk \u00e1t a kapacit\u00e1sainkat.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, vez\u00e9rigazgat\u00f3<\/b><br>Mamec \u00b7 Ipari kever\u0151k, szivatty\u00fak \u00e9s cs\u00facstechnol\u00f3gi\u00e1s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">Gy\u00e1rt\u00e1si rendel\u00e9sek ezreit \u00fctemezik automatikusan, mik\u00f6zben a teljes szervezet val\u00f3s id\u0151ben k\u00f6vetheti a gy\u00e1rt\u00e1st.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/mamec\/\">Olvassa el a Mamec v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner meghat\u00e1roz\u00f3 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, \u00e9s az \u00fctemez\u00e9shez ma m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/kjh-comp\/\">Olvassa el a KJH-Comp v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1blagy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Villamos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, az \u00faj munkasorrend pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1zatot visel\u0151 g\u00e9pkezel\u0151k egy palackt\u00f6lt\u0151 sor mellett a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van a Visma L7-nek API-ja a gy\u00e1rt\u00e1si adatok el\u00e9r\u00e9s\u00e9hez?<\/summary>\n<p class=\"sp-faq__a\">Igen. A Visma LTR-en el\u00e9rhet\u0151 Visma L7 REST API hozz\u00e1f\u00e9r\u00e9st biztos\u00edt a munkam\u0171veletekhez, er\u0151forr\u00e1sokhoz, alkatr\u00e9szekhez, anyagokhoz, gy\u00e1rt\u00e1si esem\u00e9nyekhez, term\u00e9kekhez, k\u00e9szletegyenlegekhez, valamint az \u00e9rt\u00e9kes\u00edt\u00e9si \u00e9s beszerz\u00e9si sorokhoz. Minden v\u00e9gponthoz k\u00fcl\u00f6n licenc sz\u00fcks\u00e9ges, az API-felhaszn\u00e1l\u00f3t \u00e9s a tokeneket pedig az LTR rendszergazd\u00e1ja hozza l\u00e9tre.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan ker\u00fcl vissza az \u00fctemterv a Visma L7-be?<\/summary>\n<p class=\"sp-faq__a\">A <code>PUT \/manufphases\/<\/code> h\u00edv\u00e1ssal, amely minden munkalapn\u00e1l friss\u00edti az er\u0151forr\u00e1st, a kezd\u00e9si d\u00e1tumot, a priorit\u00e1st, a szem\u00e9lyt \u00e9s a d\u00e1tumonk\u00e9nt tervezett \u00f3rasz\u00e1mot. A <code>POST \/resourceupdates\/<\/code> az er\u0151forr\u00e1snapt\u00e1r kapacit\u00e1s\u00e1t \u00edrja vissza. Az L7 meg\u0151rzi a k\u00fcls\u0151 priorit\u00e1st, \u00edgy a munkasorok a SkyPlannerben meghat\u00e1rozott sorrendet k\u00f6vetik.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>T\u00e1mogatja a Visma L7 a webhookokat?<\/summary>\n<p class=\"sp-faq__a\">A dokument\u00e1ci\u00f3 nem eml\u00edt webhookokat. Kapcsolja be a v\u00e1ltoz\u00e1snapl\u00f3z\u00e1st az \u00e9rintett t\u00e1bl\u00e1khoz, \u00e9s a <code>modifiedAfter<\/code> haszn\u00e1lat\u00e1val k\u00e9rdezze le rendszeresen a v\u00e1ltoz\u00e1sokat. A SkyPlanner saj\u00e1t webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Milyen \u00fctemez\u0151szoftver integr\u00e1lhat\u00f3 a Visma L7-tel?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner APS az L7 REST API-n kereszt\u00fcl k\u00e9tir\u00e1ny\u00fa kapcsolatot biztos\u00edt a Visma L7-tel, a Visma pedig felt\u00fcnteti a Skycode-ot \u00e9s a SkyPlannert az <a href=\"https:\/\/vismal7.fi\/integraatiot\/\">L7-integr\u00e1ci\u00f3kat bemutat\u00f3 oldal\u00e1n<\/a>. Az integr\u00e1ci\u00f3t a SkyPlanner csapata \u00e1ll\u00edtja be a bevezet\u00e9s sor\u00e1n.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ki k\u00e9sz\u00edti el a Visma L7 integr\u00e1ci\u00f3j\u00e1t?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n L7-be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja a k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t, az \u00e9les indul\u00e1s ut\u00e1n pedig t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1. Visma-partnere vagy saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra; az indul\u00e1shoz el\u00e9g egy API-token.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert az integr\u00e1ci\u00f3 elk\u00e9sz\u00edt\u00e9se el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3ba sor\u00e1n ak\u00e1r 20 munka\u00e1llom\u00e1st is haszn\u00e1lhat az L7-b\u0151l Excel- vagy CSV-f\u00e1jllal import\u00e1lt adatokkal, bankk\u00e1rtya n\u00e9lk\u00fcl. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">vegye fel a kapcsolatot \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a> az integr\u00e1ci\u00f3 felm\u00e9r\u00e9s\u00e9hez.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Visma L7 Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a Visma L7 a SkyPlanner APS rendszerrel. A SkyPlanner a Visma L7 REST API seg\u00edts\u00e9g\u00e9vel k\u00e9tir\u00e1ny\u00fa adatkapcsolatot tart fenn a Visma L7 rendszerrel: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A SkyPlanner csapata &#8230; <a title=\"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/\" aria-label=\"Read more about Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106269,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107110","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"Visma L7\u2013SkyPlanner APS: L7 REST API Visma LTR-en, fejl\u00e9c-tokenek, modifiedAfter szinkron, munkalap-vissza\u00edr\u00e1s \u00e9s adatmegfeleltet\u00e9s.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\" \/>\n<meta property=\"og:description\" content=\"Visma L7\u2013SkyPlanner APS: L7 REST API Visma LTR-en, fejl\u00e9c-tokenek, modifiedAfter szinkron, munkalap-vissza\u00edr\u00e1s \u00e9s adatmegfeleltet\u00e9s.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/integracios-utmutato\\\/\",\"name\":\"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Visma L7\u2013SkyPlanner APS: L7 REST API Visma LTR-en, fejl\u00e9c-tokenek, modifiedAfter szinkron, munkalap-vissza\u00edr\u00e1s \u00e9s adatmegfeleltet\u00e9s.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"Visma L7\u2013SkyPlanner APS: L7 REST API Visma LTR-en, fejl\u00e9c-tokenek, modifiedAfter szinkron, munkalap-vissza\u00edr\u00e1s \u00e9s adatmegfeleltet\u00e9s.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","og_description":"Visma L7\u2013SkyPlanner APS: L7 REST API Visma LTR-en, fejl\u00e9c-tokenek, modifiedAfter szinkron, munkalap-vissza\u00edr\u00e1s \u00e9s adatmegfeleltet\u00e9s.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/","name":"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Visma L7\u2013SkyPlanner APS: L7 REST API Visma LTR-en, fejl\u00e9c-tokenek, modifiedAfter szinkron, munkalap-vissza\u00edr\u00e1s \u00e9s adatmegfeleltet\u00e9s.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/"},{"@type":"ListItem","position":5,"name":"Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Visma L7 Visma L7\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a Visma L7 a SkyPlanner APS rendszerrel. A SkyPlanner a Visma L7 REST API seg\u00edts\u00e9g\u00e9vel k\u00e9tir\u00e1ny\u00fa adatkapcsolatot tart fenn a Visma L7 rendszerrel: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A SkyPlanner csapata&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=107110"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107110\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106269"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=107110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}