{"id":107052,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/applus\/integracios-utmutato\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/","title":{"rendered":"APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ APplus<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja az APplus-partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze az APplus a SkyPlanner APS-sel. A SkyPlanner \u00e9s az APplus k\u00f6z\u00f6tti k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3 az Asseco saj\u00e1t interf\u00e9szeit haszn\u00e1lja:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlannerbe beker\u00fclnek a gy\u00e1rt\u00e1si rendel\u00e9sek (Fertigungsauftr\u00e4ge) a m\u0171veleteikkel (Arbeitsg\u00e4nge) egy\u00fctt, valamint a m\u0171velettervek (Arbeitspl\u00e4ne), a darabjegyz\u00e9kek (St\u00fccklisten), a kapacit\u00e1segys\u00e9gek (Kapazit\u00e4tsstellen \u00e9s Kapazit\u00e4tseinheiten), a szersz\u00e1mok (Betriebsmittel), a k\u00e9szletadatok \u00e9s a beszerz\u00e9si rendel\u00e9sek.<\/li>\n\n\n<li>A tervezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151, valamint a kapacit\u00e1segys\u00e9g m\u0171veletenk\u00e9nt visszaker\u00fcl a gy\u00e1rt\u00e1si rendel\u00e9sbe.<\/li>\n\n\n<li>Ig\u00e9ny szerint a g\u00e9pkezel\u0151k id\u0151r\u00e1ford\u00edt\u00e1sai BDE-\u00fczenetk\u00e9nt vissza\u00edrhat\u00f3k a rendel\u00e9sre.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1j\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n APplus-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Ez az \u00fatmutat\u00f3 azoknak a partnereknek \u00e9s fejleszt\u0151knek sz\u00f3l, akik r\u00e9szt k\u00edv\u00e1nnak venni a munk\u00e1ban, vagy \u00f6n\u00e1ll\u00f3an szeretn\u00e9nek fejleszteni a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra \u00e9p\u00edtve (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"applus-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az APplus integr\u00e1ci\u00f3s interf\u00e9szei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az APplus a k\u00f6vetkez\u0151 csatlakoz\u00e1si lehet\u0151s\u00e9geket k\u00edn\u00e1lja egy k\u00fcls\u0151 \u00fctemez\u0151 sz\u00e1m\u00e1ra:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>APplus-webszolg\u00e1ltat\u00e1sok.<\/strong> Az APplus webszolg\u00e1ltat\u00e1s-alap\u00fa architekt\u00far\u00e1ra \u00e9p\u00fcl. Az Asseco szerint az \u00fctemez\u00e9shez sz\u00fcks\u00e9ges \u00f6sszes funkci\u00f3 k\u00f6zvetlen\u00fcl el\u00e9rhet\u0151 az interneten kereszt\u00fcl, \u00e9s az \u00fcgyfelek, illetve a besz\u00e1ll\u00edt\u00f3k informatikai rendszerei is haszn\u00e1lhatj\u00e1k \u0151ket (<a href=\"https:\/\/www.applus-erp.de\/en\/solutions\/erp-features\/e-business\/\">Asseco<\/a>). Els\u0151sorban ezen a kapcsolaton kereszt\u00fcl t\u00f6rt\u00e9nik a gy\u00e1rt\u00e1si adatok olvas\u00e1sa \u00e9s a tervezett id\u0151pontok \u00edr\u00e1sa.<\/li>\n\n\n<li><strong>Business Integration Framework.<\/strong> Az APplus 6.3 verzi\u00f3j\u00e1t\u00f3l a keretrendszer adapt\u00edv adatstrukt\u00far\u00e1kkal, programoz\u00e1s n\u00e9lk\u00fcl kapcsol \u00f6ssze k\u00fcls\u0151 rendszereket (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/it-business-2016-asseco-stellt-neue-produktversion-applus-63-vor\/\">Asseco<\/a>). Seg\u00edts\u00e9g\u00e9vel az APplus objektumai megfeleltethet\u0151k a SkyPlanner REST API-j\u00e1nak.<\/li>\n\n\n<li><strong>Universal Cloud Connector.<\/strong> Az APplus 7.1 verzi\u00f3j\u00e1ban jelent meg. Partnermegold\u00e1sok \u00e9s SaaS-szolg\u00e1ltat\u00e1sok APplushoz val\u00f3 csatlakoztat\u00e1s\u00e1ra szolg\u00e1l, \u00e9s magas szint\u0171 v\u00e9delmet biztos\u00edt az \u00e1tvitt adatoknak (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/asseco-veroeffentlicht-applus-71\/\">Asseco<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Az APplus 10 verzi\u00f3j\u00e1ban a Flow Mode meghat\u00e1rozott id\u0151pontokban vagy bizonyos esem\u00e9nyek bek\u00f6vetkez\u00e9sekor, k\u00e9zi l\u00e9p\u00e9sek n\u00e9lk\u00fcl ind\u00edtja el a folyamatokat (<a href=\"https:\/\/www.applus-erp.de\/en\/new-version\/\">Asseco<\/a>). A bevezet\u00e9si felm\u00e9r\u00e9s sor\u00e1n d\u0151l el, hogy melyik objektum melyik kapcsolaton kereszt\u00fcl jut \u00e1t.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s \u00e9s hozz\u00e1f\u00e9r\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Az APplus oldal\u00e1n.<\/strong> Az integr\u00e1ci\u00f3 k\u00fcl\u00f6n technikai felhaszn\u00e1l\u00f3val fut az APplusban, \u00e9s csak az olvasott \u00e9s \u00edrt objektumokhoz kap jogosults\u00e1got. A felhaszn\u00e1l\u00f3t \u00e9s a webszolg\u00e1ltat\u00e1sokhoz val\u00f3 hozz\u00e1f\u00e9r\u00e9st az \u00d6n APplus-partnere \u00e1ll\u00edtja be.<\/li>\n\n\n<li><strong>H\u00e1l\u00f3zat.<\/strong> Az APplus helyben telep\u00edtve vagy hosztolt v\u00e1ltozatban fut (<a href=\"https:\/\/www.applus-erp.de\/en\/facts\/\">Tudnival\u00f3k az APplusr\u00f3l<\/a>). Az integr\u00e1ci\u00f3 az informatikai csapat vagy a t\u00e1rhelyszolg\u00e1ltat\u00f3 \u00e1ltal enged\u00e9lyezett kapcsolaton kereszt\u00fcl \u00e9ri el.<\/li>\n\n\n<li><strong>A SkyPlanner oldal\u00e1n.<\/strong> A REST API hiteles\u00edt\u00e9s\u00e9hez a Settings &gt; API men\u00fcpontban l\u00e9trehozott API-tokent kell elk\u00fcldeni az <code>Authorization-Token<\/code> fejl\u00e9cben. Az API dokument\u00e1ci\u00f3ja Swagger\/OpenAPI form\u00e1tum\u00fa, az <a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s oktat\u00f3anyag<\/a> pedig v\u00e9gigvezeti az els\u0151 h\u00edv\u00e1sokon.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Esem\u00e9nyek \u00e9s id\u0151szakos lek\u00e9rdez\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az APplus oldal\u00e1n az integr\u00e1ci\u00f3 id\u0151szakosan lek\u00e9rdezi a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s a legut\u00f3bbi v\u00e1ltoz\u00e1sokat a webszolg\u00e1ltat\u00e1sokon kereszt\u00fcl, vagy a Business Integration Framework k\u00fcldi el a v\u00e1ltoz\u00e1sokat a SkyPlannernek. A gyakoris\u00e1got \u00fczemenk\u00e9nt hat\u00e1rozz\u00e1k meg: a rendel\u00e9sek friss\u00edt\u00e9se n\u00e9h\u00e1ny percenk\u00e9nt, a k\u00e9szletadatok\u00e9 \u00f3r\u00e1nk\u00e9nt t\u00f6rt\u00e9nhet.<\/p>\n\n\n<p>A SkyPlanner webhookot k\u00fcld, ha az \u00e1llapot vagy az \u00fctemterv megv\u00e1ltozik, \u00edgy a vissza\u00edr\u00e1s esem\u00e9nyvez\u00e9relt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>APplus-objektum<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Cikkek (Artikel), m\u00e9rt\u00e9kegys\u00e9gek<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd id\u0151szakos lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>Darabjegyz\u00e9kek (St\u00fccklisten, Strukturst\u00fccklisten)<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek, term\u00e9kenk\u00e9nti anyagok<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>M\u0171velettervek (Arbeitspl\u00e4ne) m\u0171veletekkel, be\u00e1ll\u00edt\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151kkel<\/td><td>Folyamatl\u00e9p\u00e9sek id\u0151tartammal, be\u00e1ll\u00edt\u00e1si \u00e9s bont\u00e1si id\u0151kkel<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Kapacit\u00e1shelyek \u00e9s -egys\u00e9gek (Kapazit\u00e4tsstellen, Kapazit\u00e4tseinheiten)<\/td><td>Munka\u00e1llom\u00e1s-csoportok \u00e9s munka\u00e1llom\u00e1sok, hat\u00e9konys\u00e1gi \u00e9rt\u00e9kek<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, ut\u00e1na ritk\u00e1n<\/td><\/tr><tr><td>Szem\u00e9lyzeti kapacit\u00e1s<\/td><td>Dolgoz\u00f3k m\u0171szakbeoszt\u00e1ssal<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Naponta, vagy saj\u00e1t m\u0171szakbeoszt\u00e1s a SkyPlannerben<\/td><\/tr><tr><td>Szersz\u00e1mok \u00e9s k\u00e9sz\u00fcl\u00e9kek (Betriebsmittel)<\/td><td>Szersz\u00e1mok mint korl\u00e1tozott kapacit\u00e1s\u00fa, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek (Fertigungsauftr\u00e4ge) m\u0171veletekkel \u00e9s anyagokkal<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok hat\u00e1rid\u0151kkel \u00e9s anyagig\u00e9nnyel<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s n\u00e9h\u00e1ny percenk\u00e9nt<\/td><\/tr><tr><td>Rakt\u00e1ron l\u00e9v\u0151 k\u00e9szlet<\/td><td>K\u00e9szletegyenlegek<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>Beszerz\u00e9si rendel\u00e9sek (Bestellungen) sz\u00e1ll\u00edt\u00e1si d\u00e1tumokkal<\/td><td>Beszerz\u00e9si rendel\u00e9sek, be\u00e9rkez\u0151 anyagok sz\u00e1ll\u00edt\u00e1si d\u00e1tum szerint<\/td><td>APplus \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si rendel\u00e9s egyes m\u0171veleteinek tervezett kezd\u00e9si \u00e9s befejez\u00e9si ideje, valamint kapacit\u00e1segys\u00e9ge<\/td><td>\u00dctemezett kezd\u00e9s \u00e9s befejez\u00e9s gy\u00e1rt\u00e1si feladatonk\u00e9nt<\/td><td>SkyPlanner \u2192 APplus<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, SkyPlanner-webhookon kereszt\u00fcl<\/td><\/tr><tr><td>BDE-\u00fczenetek: id\u0151 \u00e9s mennyis\u00e9g m\u0171veletenk\u00e9nt, dolgoz\u00f3<\/td><td>Id\u0151r\u00e1ford\u00edt\u00e1sok \u00e9s g\u00e9pkezel\u0151i visszajelent\u00e9sek<\/td><td>SkyPlanner \u2192 APplus<\/td><td>Visszajelent\u00e9senk\u00e9nt vagy m\u0171szakonk\u00e9nt, ha ezt v\u00e1lasztj\u00e1k<\/td><\/tr><tr><td>Nem az APplusban<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, g\u00e9pkezel\u0151i l\u00e9tsz\u00e1m gy\u00e1rt\u00e1si feladatonk\u00e9nt, alternat\u00edv g\u00e9pek \u00e9s dolgoz\u00f3k<\/td><td>A SkyPlannerben kezelve<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be a cikkeket, darabjegyz\u00e9keket, m\u0171veletterveket, kapacit\u00e1shelyeket \u00e9s -egys\u00e9geket, a Betriebsmittel objektumokat \u00e9s a szem\u00e9lyzeti kapacit\u00e1st az APplus webszolg\u00e1ltat\u00e1sain kereszt\u00fcl. Gondosan hat\u00e1rozza meg a megfeleltet\u00e9st: egy n\u00e9gy Kapazit\u00e4tseinheiten egys\u00e9get tartalmaz\u00f3 Kapazit\u00e4tsstelle egyetlen, n\u00e9gy munka\u00e1llom\u00e1sb\u00f3l \u00e1ll\u00f3 munka\u00e1llom\u00e1s-csoportnak felel meg.<\/p>\n\n\n<p><strong>2. A rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Olvassa be a gy\u00e1rt\u00e1si rendel\u00e9seket a m\u0171veleteikkel \u00e9s anyagaikkal egy\u00fctt, valamint a nyitott beszerz\u00e9si rendel\u00e9seket. A SkyPlanner a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1n tekinti el\u00e9rhet\u0151nek, \u00e9s akkor friss\u00edti a k\u00e9szletet, amikor a rendel\u00e9s Delivered \u00e1llapotot kap. A beszerz\u00e9si javaslatok az APplus Disposition modulj\u00e1ban maradnak, am\u00edg rendel\u00e9ss\u00e9 nem v\u00e1lnak.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Amikor az \u00fctemez\u0151motor elhelyez vagy \u00e1thelyez egy m\u0171veletet, egy SkyPlanner-webhook elind\u00edtja az APplus friss\u00edt\u00e9s\u00e9t a felm\u00e9r\u00e9s sor\u00e1n egyeztetett kapcsolaton kereszt\u00fcl: webszolg\u00e1ltat\u00e1sokkal vagy a Business Integration Framework seg\u00edts\u00e9g\u00e9vel. A friss\u00edt\u00e9s be\u00e1ll\u00edtja a m\u0171velet tervezett kezd\u00e9si \u00e9s befejez\u00e9si idej\u00e9t, valamint kapacit\u00e1segys\u00e9g\u00e9t a gy\u00e1rt\u00e1si rendel\u00e9sen, \u00edgy az APplus tervez\u0151t\u00e1bl\u00e1ja a SkyPlanner \u00e1ltal meghat\u00e1rozott sorrendet mutatja.<\/p>\n\n\n<p><strong>4. A m\u0171helyrendel\u00e9sek kiad\u00e1sa.<\/strong> A tervez\u0151 tov\u00e1bbra is az APplusban adja ki a m\u0171helyrendel\u00e9seket (Werkstattauftr\u00e4ge), imm\u00e1r a SkyPlanner \u00e1ltal meghat\u00e1rozott id\u0151pontokkal. A kiadott rendel\u00e9sek \u00e9s \u00e1llapotuk a k\u00f6vetkez\u0151 szinkroniz\u00e1l\u00e1skor visszaker\u00fclnek a SkyPlannerbe.<\/p>\n\n\n<p><strong>5. \u00dczemi visszajelent\u00e9sek.<\/strong> A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations vagy a Production Timer seg\u00edts\u00e9g\u00e9vel r\u00f6gz\u00edtik a munk\u00e1t, az id\u0151r\u00e1ford\u00edt\u00e1sok pedig naprak\u00e9szen tartj\u00e1k az \u00fctemtervet. \u00d6n d\u00f6nti el, hogy a t\u00e9nyleges id\u0151k vissza\u00edr\u00f3djanak-e. Ha igen, az id\u0151- \u00e9s mennyis\u00e9gi adatok m\u0171veletenk\u00e9nt, BDE-\u00fczenetk\u00e9nt ker\u00fclnek a rendel\u00e9sre. Ha tov\u00e1bbra is a vonalk\u00f3dos BDE marad haszn\u00e1latban, a SkyPlanner ehelyett az APplusb\u00f3l olvassa be az \u00fczeneteket.<\/p>\n\n\n<p><strong>6. Az adatgazd\u00e1k \u00e9s az \u00fctk\u00f6z\u00e9skezel\u00e9s szab\u00e1lyai.<\/strong> R\u00f6gz\u00edtse ezeket az \u00e9les indul\u00e1s el\u0151tt:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Cikkek, darabjegyz\u00e9kek, m\u0171velettervek, mennyis\u00e9gek, rendel\u00e9s\u00e1llapot, m\u0171helyrendel\u00e9sek kiad\u00e1sa<\/td><td>APplus<\/td><\/tr><tr><td>M\u0171veleti sorrend, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151k, kapacit\u00e1segys\u00e9gek hozz\u00e1rendel\u00e9se<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, g\u00e9pkezel\u0151i l\u00e9tsz\u00e1m, alternat\u00edv er\u0151forr\u00e1sok<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Betriebsmittel-t\u00f6rzsadatok<\/td><td>APplus; az id\u0151beli rendelkez\u00e9sre \u00e1ll\u00e1s tervez\u00e9se a SkyPlannerben<\/td><\/tr><tr><td>M\u0171szakok \u00e9s munkamentes napok<\/td><td>Egyetlen rendszer, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><tr><td>BDE-\u00fczenetek, anyagkiad\u00e1sok \u00e9s bev\u00e9telez\u00e9sek<\/td><td>APplus; az adatok r\u00f6gz\u00edt\u00e9se az APplusban vagy \u00e1tad\u00e1sa a SkyPlanner id\u0151r\u00e1ford\u00edt\u00e1si nyilv\u00e1ntart\u00e1s\u00e1b\u00f3l<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A m\u0171veletek id\u0151pontjait csak egyetlen rendszer \u00edrja. Ha fut a PPS \u00fctemez\u00e9se, vagy a Feinplanung, illetve az APplus APS \u00edrja az id\u0151pontokat, kapcsolja ki ezt a SkyPlanner \u00e1ltal \u00fctemezett rendel\u00e9sekn\u00e9l.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s \u00e1ltal\u00e1ban a bevezet\u00e9s kezdet\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. El\u0151tte ellen\u0151rizze az \u00fctemtervet a 30 napos ingyenes pr\u00f3baid\u0151szakban, az APplusb\u00f3l CSV- vagy Excel-form\u00e1tumban export\u00e1lt kapacit\u00e1segys\u00e9gekkel, m\u0171velettervekkel \u00e9s nyitott gy\u00e1rt\u00e1si rendel\u00e9sekkel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Adatmegfeleltet\u00e9s.<\/strong> V\u00e9gleges\u00edtse a megfeleltet\u00e9si t\u00e1bl\u00e1t, az adatgazd\u00e1kra vonatkoz\u00f3 szab\u00e1lyokat, a szinkroniz\u00e1l\u00e1s gyakoris\u00e1g\u00e1t \u00e9s azt, hogy a BDE-\u00fczenetek vissza\u00edr\u00f3djanak-e.<\/li>\n\n\n<li><strong>APplus-hozz\u00e1f\u00e9r\u00e9s.<\/strong> Hozza l\u00e9tre a technikai felhaszn\u00e1l\u00f3t, APplus-partner\u00e9vel enged\u00e9lyezze a webszolg\u00e1ltat\u00e1sokat, \u00e9s el\u0151sz\u00f6r tesztrendszerben pr\u00f3b\u00e1lja ki a kapcsolatot.<\/li>\n\n\n<li><strong>Kezdeti bet\u00f6lt\u00e9s.<\/strong> Cikkek, darabjegyz\u00e9kek, m\u0171velettervek, kapacit\u00e1shelyek \u00e9s -egys\u00e9gek, Betriebsmittel, dolgoz\u00f3k.<\/li>\n\n\n<li><strong>A gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Id\u0151szakos lek\u00e9rdez\u00e9s sz\u0171r\u00e9ssel, lapoz\u00e1ssal \u00e9s \u00fajrapr\u00f3b\u00e1lkoz\u00e1ssal, vagy k\u00f6zvetlen adatk\u00fcld\u00e9s a Business Integration Framework seg\u00edts\u00e9g\u00e9vel.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlannerben.<\/strong> \u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, gy\u00e1rt\u00e1si feladatonk\u00e9nti kezel\u0151i l\u00e9tsz\u00e1m, valamint alternat\u00edv g\u00e9pek vagy munkat\u00e1rsak.<\/li>\n\n\n<li><strong>Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> A m\u0171veletek id\u0151pontjainak \u00e1tv\u00e9tele a SkyPlanner webhookjaib\u00f3l, ig\u00e9ny eset\u00e9n BDE-\u00fczenetekkel kieg\u00e9sz\u00edtve.<\/li>\n\n\n<li><strong>P\u00e1rhuzamos tesztel\u00e9s.<\/strong> Futtassa a SkyPlannert a jelenlegi tervez\u0151t\u00e1bla mellett, hasonl\u00edtsa \u00f6ssze az id\u0151pontokat, \u00e9s jav\u00edtsa a t\u00f6rzsadatokat.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s.<\/strong> Kapcsolja be a vissza\u00edr\u00e1st, amint az adatok egyeznek.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-applus-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire kell felk\u00e9sz\u00fclni az APplus integr\u00e1ci\u00f3j\u00e1n\u00e1l?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Korl\u00e1tos \u00e9s korl\u00e1tlan kapacit\u00e1segys\u00e9gek.<\/strong> Az APplus egyes kapacit\u00e1segys\u00e9gekn\u00e9l korl\u00e1tlan kapacit\u00e1ssal tervezhet. A SkyPlannerben minden munka\u00e1llom\u00e1s kapacit\u00e1sa korl\u00e1tos, ez\u00e9rt import\u00e1l\u00e1skor mindegyikn\u00e9l ellen\u0151rizze a m\u0171szakokat \u00e9s a hat\u00e9konys\u00e1gi \u00e9rt\u00e9keket.<\/li>\n\n\n<li><strong>Haszn\u00e1latban l\u00e9v\u0151 tervez\u00e9si szintek.<\/strong> Ellen\u0151rizze, hogy rendelkeznek-e Feinplanung- vagy APplus APS-licenccel, \u00e9s haszn\u00e1lj\u00e1k-e \u00e9lesben ezeket. Jel\u00f6lj\u00f6n ki egyetlen rendszert az id\u0151pontok \u00edr\u00e1s\u00e1ra.<\/li>\n\n\n<li><strong>Gy\u00e1rt\u00e1si k\u00eds\u00e9r\u0151lapok \u00e9s vonalk\u00f3dok.<\/strong> A BDE-\u00fczeneteket azokhoz a rendel\u00e9sekhez r\u00f6gz\u00edtik, amelyekhez kinyomtatt\u00e1k a gy\u00e1rt\u00e1si k\u00eds\u00e9r\u0151lapokat. Egyeztess\u00e9k, hogy a felszabad\u00edt\u00e1s \u00e9s a nyomtat\u00e1s az eddigi m\u00f3don az APplusban marad-e.<\/li>\n\n\n<li><strong>Az \u00e1t\u00e1ll\u00e1si \u00e9s fut\u00e1si id\u0151k m\u00e9rt\u00e9kegys\u00e9gei.<\/strong> Import\u00e1l\u00e1skor a megfelel\u0151 m\u00e9rt\u00e9kegys\u00e9ggel \u00e9s vet\u00edt\u00e9si alappal sz\u00e1m\u00edtsa \u00e1t az \u00e1t\u00e1ll\u00e1si \u00e9s fut\u00e1si id\u0151ket, k\u00fcl\u00f6nben minden id\u0151tartam hib\u00e1s lesz.<\/li>\n\n\n<li><strong>K\u00fcls\u0151 m\u0171veletek.<\/strong> Az alv\u00e1llalkoz\u00f3nak kiadott m\u0171veletek \u00e1tfut\u00e1si id\u0151t jelentenek, nem a saj\u00e1t kapacit\u00e1st terhelik. Csak id\u0151tartammal rendelkez\u0151 l\u00e9p\u00e9sekk\u00e9nt modellezze \u0151ket.<\/li>\n\n\n<li><strong>Hosztolt telep\u00edt\u00e9sek.<\/strong> Hosztolt verzi\u00f3 eset\u00e9n m\u00e1r kor\u00e1n egyeztessen a t\u00e1rhelyszolg\u00e1ltat\u00f3val a webszolg\u00e1ltat\u00e1sok h\u00e1l\u00f3zati el\u00e9r\u00e9s\u00e9r\u0151l.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-applus-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be \u00e9s t\u00e1mogatja az APplus integr\u00e1ci\u00f3j\u00e1t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata v\u00e9gzi a be\u00e1ll\u00edt\u00e1st a bevezet\u00e9s sor\u00e1n, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt,<\/strong> az egyeztetett webszolg\u00e1ltat\u00e1sokra \u00e9s adatmegfeleltet\u00e9sekre kiterjed\u0151en. Minden \u00fczem m\u00e1sk\u00e9pp haszn\u00e1lja az APplust; ezeket a saj\u00e1toss\u00e1gokat itt vessz\u00fck figyelembe.<\/li>\n\n\n<li><strong>Az \u00d6n APplus-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az egyedi testreszab\u00e1sokat, a felhaszn\u00e1l\u00f3i jogosults\u00e1gokat \u00e9s a Business Integration Framework be\u00e1ll\u00edt\u00e1sait, \u00edgy a SkyPlanner csapat\u00e1val egy\u00fctt biztos\u00edthatja a hozz\u00e1f\u00e9r\u00e9st.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is tov\u00e1bbfejleszthetik az integr\u00e1ci\u00f3t<\/strong> a SkyPlanner REST API haszn\u00e1lat\u00e1val, API-tokennel. A kezd\u00e9shez elegend\u0151 egy API-token, a SkyPlanner csapata pedig sz\u00fcks\u00e9g eset\u00e9n seg\u00edt. A r\u00e9szletes le\u00edr\u00e1st a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner integr\u00e1ci\u00f3s dokument\u00e1ci\u00f3j\u00e1ban<\/a> tal\u00e1lja.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra a csomaggal egy\u00fctt el\u0151zetes \u00e1raj\u00e1nlatot adunk, az \u00d6n folyamataihoz \u00e9s ig\u00e9nyeihez igaz\u00edtva. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, az <a href=\"\/hu\/integraciok\/erp\/applus\/termelesutemezes\/\">APplus termel\u00e9s\u00fctemez\u00e9s\u00e9t<\/a>, az <a href=\"\/hu\/integraciok\/erp\/applus\/\">APplus oldal\u00e1t<\/a> \u00e9s az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u00e9s\u00e9t<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1bla-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u00f3ra<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatos gy\u00e1rt\u00e1stervez\u00e9sr\u0151l val\u00f3s idej\u0171 termel\u00e9soptimaliz\u00e1l\u00e1sra v\u00e1ltottunk.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Villamos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra sz\u00f3l\u00f3 optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations termel\u00e9si vezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra el\u0151re<\/b><span>l\u00e1that\u00f3 szabad kapacit\u00e1s az \u00e9rt\u00e9kes\u00edt\u00e9s sz\u00e1m\u00e1ra<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner biztos\u00edtja a teljes gy\u00e1rt\u00e1stervez\u00e9s alapj\u00e1t \u00e9s megb\u00edzhat\u00f3s\u00e1g\u00e1t.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, termel\u00e9si vezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerrel val\u00f3 \u00e9rintkez\u00e9sre alkalmas csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st, az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1ra vonatkoz\u00f3 k\u00e9r\u00e9sekre pedig m\u00e1sodpercek alatt v\u00e1laszt kapnak a kor\u00e1bbi egy \u00f3ra vagy m\u00e9g hosszabb id\u0151 helyett.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/fredman-operations\/\">Olvassa el a Fredman Operations v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Kevesebb<\/b><span>anyaghi\u00e1ny miatti le\u00e1ll\u00e1s<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e9rt\u00e9ke sz\u00e1munkra az, hogy a mindennapi munk\u00e1ban bev\u00e1lt eszk\u00f6z, k\u00fcl\u00f6n\u00f6sen a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k meghat\u00e1roz\u00e1s\u00e1ban.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, gy\u00e1rt\u00e1stervez\u00e9si vezet\u0151<\/b><br>Eskomatic \u00b7 B\u00e9rforg\u00e1csol\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A terhel\u00e9s automatikus \u00fctemez\u00e9s\u00e9vel pontosabb sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k adhat\u00f3k meg, az anyaghi\u00e1ny okozta termel\u00e9si le\u00e1ll\u00e1sok pedig jelent\u0151sen cs\u00f6kkentek.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/eskomatic\/\">Olvassa el az Eskomatic v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van az APplusnak API-ja a gy\u00e1rt\u00e1si rendel\u00e9sekhez?<\/summary>\n<p class=\"sp-faq__a\">Igen. Az APplus webszolg\u00e1ltat\u00e1sokra \u00e9p\u00fcl, \u00e9s az Asseco t\u00e1j\u00e9koztat\u00e1sa szerint az \u00fctemez\u00e9si funkci\u00f3it az \u00fcgyfelek \u00e9s besz\u00e1ll\u00edt\u00f3k informatikai rendszerei k\u00f6zvetlen\u00fcl is haszn\u00e1lhatj\u00e1k. A Business Integration Framework adapt\u00edv adatstrukt\u00far\u00e1kon kereszt\u00fcl kapcsolja \u00f6ssze a k\u00fcls\u0151 rendszereket, a Universal Cloud Connector pedig SaaS-szolg\u00e1ltat\u00e1sokat csatlakoztat az APplushoz.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan ker\u00fclnek vissza a tervezett id\u0151pontok az APplusba?<\/summary>\n<p class=\"sp-faq__a\">Az \u00fctemterv minden v\u00e1ltoz\u00e1sakor egy SkyPlanner-webhook elind\u00edtja a tervezett kezd\u00e9s, a tervezett befejez\u00e9s \u00e9s a kapacit\u00e1segys\u00e9g friss\u00edt\u00e9s\u00e9t a gy\u00e1rt\u00e1si rendel\u00e9s minden m\u0171velet\u00e9n\u00e9l. A friss\u00edt\u00e9s az APplus webszolg\u00e1ltat\u00e1sain vagy a Business Integration Framework\u00f6n kereszt\u00fcl t\u00f6rt\u00e9nik. Az \u00fatvonalat a bevezet\u00e9shez kapcsol\u00f3d\u00f3 felm\u00e9r\u00e9s sor\u00e1n hat\u00e1rozzuk meg.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Tud a SkyPlanner BDE-\u00fczeneteket k\u00fcldeni az APplusba?<\/summary>\n<p class=\"sp-faq__a\">Igen, ha ezt v\u00e1lasztja. A SkyPlannerben r\u00f6gz\u00edtett kezel\u0151i id\u0151adatok BDE-\u00fczenetk\u00e9nt ker\u00fclnek a rendel\u00e9sre, m\u0171veletenk\u00e9nti id\u0151- \u00e9s mennyis\u00e9gadatokkal. A vonalk\u00f3dos BDE-t megtart\u00f3 \u00fczemekben ehelyett a SkyPlanner olvassa be az \u00fczeneteket.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Az APplus-partner az APplus APS-t vagy a SkyPlannert aj\u00e1nlja?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlannert, ha az \u00fcgyf\u00e9l heteken bel\u00fcl m\u0171k\u00f6d\u0151, a val\u00f3s kapacit\u00e1sokkal sz\u00e1mol\u00f3 \u00fctemtervet szeretne. Az APplus APS az APplusba integr\u00e1lt partnerterm\u00e9k, amely t\u00f6bb szersz\u00e1mra kiterjed\u0151 \u00e1t\u00e1ll\u00e1si m\u00e1trixokat \u00e9s t\u00f6bb er\u0151forr\u00e1s egy\u00fcttes tervez\u00e9s\u00e9t kezeli (<a href=\"https:\/\/www.applus-erp.de\/asseco-solutions\/news\/multiressourcenplanung-asseco-solutions-schliesst-partnerschaft-mit-dualis\/\">Asseco<\/a>). A SkyPlanner ezeket az eseteket is lefedi, az APplus webszolg\u00e1ltat\u00e1sain kereszt\u00fcl kapcsol\u00f3dik, automatikusan \u00fajra\u00fctemez, \u00e9s korl\u00e1tlan sz\u00e1m\u00fa felhaszn\u00e1l\u00f3t biztos\u00edt, havi 199 \u20ac-t\u00f3l.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u0171k\u00f6dik az integr\u00e1ci\u00f3 a hosztolt APplusszal is?<\/summary>\n<p class=\"sp-faq__a\">Igen. Az APplus helyben telep\u00edtett \u00e9s hosztolt verzi\u00f3ban is haszn\u00e1lhat\u00f3, a SkyPlanner pedig mindkett\u0151h\u00f6z webszolg\u00e1ltat\u00e1sokon kereszt\u00fcl kapcsol\u00f3dik. A h\u00e1l\u00f3zati el\u00e9r\u00e9st a felm\u00e9r\u00e9s sor\u00e1n egyeztetj\u00fck az \u00d6n informatikai csapat\u00e1val vagy t\u00e1rhelyszolg\u00e1ltat\u00f3j\u00e1val.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert az integr\u00e1ci\u00f3 ki\u00e9p\u00edt\u00e9se el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3ba legfeljebb 20 munka\u00e1llom\u00e1st, az APplusb\u00f3l sz\u00e1rmaz\u00f3 CSV- vagy Excel-adatok import\u00e1l\u00e1s\u00e1t \u00e9s a Basic csomag \u00f6sszes funkci\u00f3j\u00e1t biztos\u00edtja, bankk\u00e1rtya n\u00e9lk\u00fcl. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">egyeztessen \u00e9rt\u00e9kes\u00edt\u00e9si csapatunkkal<\/a> az integr\u00e1ci\u00f3 felm\u00e9r\u00e9s\u00e9hez.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ APplus APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja az APplus-partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze az APplus a SkyPlanner APS-sel. A SkyPlanner \u00e9s az APplus k\u00f6z\u00f6tti k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3 az Asseco saj\u00e1t interf\u00e9szeit haszn\u00e1lja: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n &#8230; <a title=\"APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/\" aria-label=\"Read more about APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106240,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107052","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>APplus\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"APplus\u2013SkyPlanner APS: webszolg\u00e1ltat\u00e1sok, Business Integration Framework, BDE-\u00fczenetek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\" \/>\n<meta property=\"og:description\" content=\"APplus\u2013SkyPlanner APS: webszolg\u00e1ltat\u00e1sok, Business Integration Framework, BDE-\u00fczenetek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/applus\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/applus\\\/integracios-utmutato\\\/\",\"name\":\"APplus\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"APplus\u2013SkyPlanner APS: webszolg\u00e1ltat\u00e1sok, Business Integration Framework, BDE-\u00fczenetek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/applus\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/applus\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/applus\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS az APplus mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/applus\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"APplus\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"APplus\u2013SkyPlanner APS: webszolg\u00e1ltat\u00e1sok, Business Integration Framework, BDE-\u00fczenetek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","og_description":"APplus\u2013SkyPlanner APS: webszolg\u00e1ltat\u00e1sok, Business Integration Framework, BDE-\u00fczenetek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/","name":"APplus\u2013APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"APplus\u2013SkyPlanner APS: webszolg\u00e1ltat\u00e1sok, Business Integration Framework, BDE-\u00fczenetek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS az APplus mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/applus\/"},{"@type":"ListItem","position":5,"name":"APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ APplus APplus-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja az APplus-partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze az APplus a SkyPlanner APS-sel. A SkyPlanner \u00e9s az APplus k\u00f6z\u00f6tti k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3 az Asseco saj\u00e1t interf\u00e9szeit haszn\u00e1lja: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107052","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=107052"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/107052\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106240"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=107052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}