{"id":106994,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/psipenta\/integracios-utmutato\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/","title":{"rendered":"PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ PSIpenta<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez a PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a PSI-partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a PSIpenta\/ERP a SkyPlanner APS-sel. A SkyPlanner k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t biztos\u00edt a PSIpenta rendszerrel, a PSI saj\u00e1t interf\u00e9szein kereszt\u00fcl:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlanner \u00e1tveszi a gy\u00e1rt\u00e1si rendel\u00e9seket (Fertigungsauftr\u00e4ge) a m\u0171veleteikkel (Arbeitsg\u00e4nge) egy\u00fctt, valamint a m\u0171veletterveket (Arbeitspl\u00e4ne), darabjegyz\u00e9keket (St\u00fccklisten), munka\u00e1llom\u00e1sokat, g\u00e9peket, szersz\u00e1mokat (Betriebsmittel), k\u00e9szletadatokat \u00e9s beszerz\u00e9si rendel\u00e9seket.<\/li>\n\n\n<li>A m\u0171veletenk\u00e9nt tervezett kezd\u00e9s, befejez\u00e9s \u00e9s munka\u00e1llom\u00e1s visszaker\u00fcl a gy\u00e1rt\u00e1si rendel\u00e9sbe.<\/li>\n\n\n<li>Ig\u00e9ny eset\u00e9n a g\u00e9pkezel\u0151k id\u0151r\u00e1ford\u00edt\u00e1sai BDE-visszajelent\u00e9sk\u00e9nt (R\u00fcckmeldungen) visszak\u00fcldhet\u0151k.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1j\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n PSIpenta-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Ez az \u00fatmutat\u00f3 azoknak a partnereknek \u00e9s fejleszt\u0151knek sz\u00f3l, akik r\u00e9szt k\u00edv\u00e1nnak venni a munk\u00e1ban, vagy maguk szeretn\u00e9nek fejleszteni a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra \u00e9p\u00edtve (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"psipenta-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A PSIpenta integr\u00e1ci\u00f3s interf\u00e9szei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A PSI h\u00e1rom kapcsol\u00f3d\u00e1si lehet\u0151s\u00e9get k\u00edn\u00e1l k\u00fcls\u0151 \u00fctemez\u0151rendszerek sz\u00e1m\u00e1ra (<a href=\"https:\/\/www.messe.de\/apollo\/hannover_messe_2020\/obs\/Binary\/A1002706\/1002706_02134036.pdf\">PSI-prospektus<\/a>):<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>PSIpenta\/ERP REST API.<\/strong> A PSI REST \u00e9s SOAP API-t nevez meg a PSIpenta\/ERP rendszerhez, \u00e9s k\u00f6zl\u00e9se szerint minden PSIpenta-komponens integr\u00e1lhat\u00f3 a megl\u00e9v\u0151 architekt\u00far\u00e1kba RESTful webszolg\u00e1ltat\u00e1sokon kereszt\u00fcl. Els\u0151sorban ezen kereszt\u00fcl t\u00f6rt\u00e9nik a gy\u00e1rt\u00e1si adatok olvas\u00e1sa \u00e9s a tervezett id\u0151pontok \u00edr\u00e1sa.<\/li>\n\n\n<li><strong>PSIpenta\/BDE REST \u00e9s SOAP API.<\/strong> Az \u00fczemi adatgy\u0171jt\u0151 modulnak saj\u00e1t API-ja van. Ezen kereszt\u00fcl k\u00fcldhet\u0151k be a g\u00e9pkezel\u0151i visszajelent\u00e9sek.<\/li>\n\n\n<li><strong>PSIintegration.<\/strong> A PSI szabv\u00e1nyos integr\u00e1ci\u00f3s r\u00e9tege a PSIpenta-modulok \u00f6sszekapcsol\u00e1s\u00e1hoz. K\u00f6zponti csom\u00f3pont k\u00f6r\u00e9 szervez\u0151dik, az adapterekben grafikus fel\u00fcleten felelteti meg az \u00fczeneteket, \u00e9s minden \u00fczenetet adatb\u00e1zisban archiv\u00e1l. Akkor haszn\u00e1lja, ha az \u00d6n k\u00f6rnyezet\u00e9ben m\u00e1r ezen kereszt\u00fcl kapcsol\u00f3dnak a k\u00fcls\u0151 rendszerek.<\/li>\n\n<\/ol>\n\n\n<p>A PSIpenta\/ERP 10 a k\u00fcls\u0151 rendszerek integr\u00e1l\u00e1s\u00e1hoz BPMN 2.0 munkafolyamatokat is k\u00edn\u00e1l, amelyek a webes Workflow Developer eszk\u00f6zben k\u00e9sz\u00edthet\u0151k el (<a href=\"https:\/\/www.psi.de\/en\/trends\/article\/psipenta-erp-10-from-software-upgrade-to-competitve-advantage\">PSI<\/a>). Egy munkafolyamat reag\u00e1lhat a PSIpenta rendszerben bek\u00f6vetkez\u0151 v\u00e1ltoz\u00e1sra, \u00e9s megh\u00edvhatja a SkyPlanner rendszer\u00e9t.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s \u00e9s hozz\u00e1f\u00e9r\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A PSIpenta oldal\u00e1n.<\/strong> Az integr\u00e1ci\u00f3 k\u00fcl\u00f6n technikai felhaszn\u00e1l\u00f3val fut, amelynek jogosults\u00e1gai kiz\u00e1r\u00f3lag az olvasott \u00e9s \u00edrt objektumokra terjednek ki. A felhaszn\u00e1l\u00f3t \u00e9s az API-hozz\u00e1f\u00e9r\u00e9st az \u00d6n PSI-partnere \u00e1ll\u00edtja be a rendszer\u00e9ben.<\/li>\n\n\n<li><strong>H\u00e1l\u00f3zat.<\/strong> A PSIpenta \u00e1ltal\u00e1ban helyi infrastrukt\u00far\u00e1n fut. Az integr\u00e1ci\u00f3 az informatikai csapat \u00e1ltal enged\u00e9lyezett \u00fatvonalon \u00e9ri el, p\u00e9ld\u00e1ul egy el\u00e9rhet\u0151v\u00e9 tett API-v\u00e9gponton vagy a bels\u0151 h\u00e1l\u00f3zatban fut\u00f3 kis csatlakoz\u00f3programon kereszt\u00fcl.<\/li>\n\n\n<li><strong>A SkyPlanner oldal\u00e1n.<\/strong> A REST API hiteles\u00edt\u00e9s\u00e9hez a Settings &gt; API men\u00fcpontban l\u00e9trehozott API-tokent kell elk\u00fcldeni az <code>Authorization-Token<\/code> fejl\u00e9cben. Az API dokument\u00e1ci\u00f3ja Swagger\/OpenAPI form\u00e1tum\u00fa, az <a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s oktat\u00f3anyag<\/a> pedig v\u00e9gigvezeti az els\u0151 h\u00edv\u00e1sokon.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Esem\u00e9nyek \u00e9s id\u0151szakos lek\u00e9rdez\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A PSIpenta oldal\u00e1n az integr\u00e1ci\u00f3 rendszeresen lek\u00e9rdezi a REST API-n kereszt\u00fcl a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s a legut\u00f3bbi v\u00e1ltoz\u00e1sokat, vagy egy BPMN-munkafolyamat, illetve PSIintegration-\u00fczenet tov\u00e1bb\u00edtja a v\u00e1ltoz\u00e1st a SkyPlanner fel\u00e9. A gyakoris\u00e1got \u00fczemenk\u00e9nt \u00e1ll\u00edtj\u00e1k be: a rendel\u00e9sek lek\u00e9rdez\u00e9se n\u00e9h\u00e1ny percenk\u00e9nt, a k\u00e9szlet\u00e9 ak\u00e1r \u00f3r\u00e1nk\u00e9nt t\u00f6rt\u00e9nhet.<\/p>\n\n\n<p>A SkyPlanner webhookot k\u00fcld, ha az \u00e1llapot vagy az \u00fctemterv megv\u00e1ltozik, \u00edgy a vissza\u00edr\u00e1s esem\u00e9nyvez\u00e9relt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>PSIpenta-objektum<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Cikkek (Artikel), m\u00e9rt\u00e9kegys\u00e9gek<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd id\u0151szakos lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>T\u00f6bbszint\u0171 darabjegyz\u00e9kek (St\u00fccklisten)<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek, term\u00e9kenk\u00e9nti anyagok<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>M\u0171velettervek (Arbeitspl\u00e4ne) m\u0171veletekkel, be\u00e1ll\u00edt\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151kkel<\/td><td>Folyamatl\u00e9p\u00e9sek id\u0151tartammal, be\u00e1ll\u00edt\u00e1si \u00e9s bont\u00e1si id\u0151kkel<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Munka\u00e1llom\u00e1sok (Arbeitspl\u00e4tze) \u00e9s g\u00e9pek<\/td><td>Munka\u00e1llom\u00e1sok, munka\u00e1llom\u00e1s-csoportok, hat\u00e9konys\u00e1gi \u00e9rt\u00e9kek<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, ut\u00e1na ritk\u00e1n<\/td><\/tr><tr><td>Szersz\u00e1mok \u00e9s k\u00e9sz\u00fcl\u00e9kek (Betriebsmittel)<\/td><td>Szersz\u00e1mok mint korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>M\u0171szaknapt\u00e1rak<\/td><td>M\u0171szakok \u00e9s munkav\u00e9gz\u00e9s n\u00e9lk\u00fcli napok<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Naponta, vagy saj\u00e1t m\u0171szakok kezel\u00e9se a SkyPlanner rendszerben<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek (Fertigungsauftr\u00e4ge) m\u0171veletekkel \u00e9s anyagokkal<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok hat\u00e1rid\u0151kkel \u00e9s anyagig\u00e9nnyel<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s n\u00e9h\u00e1ny percenk\u00e9nt<\/td><\/tr><tr><td>Rakt\u00e1ron l\u00e9v\u0151 k\u00e9szlet<\/td><td>K\u00e9szletegyenlegek<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>Beszerz\u00e9si rendel\u00e9sek (Bestellungen) sz\u00e1ll\u00edt\u00e1si d\u00e1tumokkal<\/td><td>Beszerz\u00e9si rendel\u00e9sek, be\u00e9rkez\u0151 anyagok sz\u00e1ll\u00edt\u00e1si d\u00e1tum szerint<\/td><td>PSIpenta \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si rendel\u00e9s m\u0171veletenk\u00e9nt tervezett kezd\u00e9se, befejez\u00e9se \u00e9s munka\u00e1llom\u00e1sa<\/td><td>\u00dctemezett kezd\u00e9s \u00e9s befejez\u00e9s gy\u00e1rt\u00e1si feladatonk\u00e9nt<\/td><td>SkyPlanner \u2192 PSIpenta<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, SkyPlanner-webhookon kereszt\u00fcl<\/td><\/tr><tr><td>BDE-visszajelent\u00e9sek (R\u00fcckmeldungen): id\u0151 \u00e9s mennyis\u00e9g m\u0171veletenk\u00e9nt, dolgoz\u00f3<\/td><td>Id\u0151r\u00e1ford\u00edt\u00e1sok \u00e9s g\u00e9pkezel\u0151i visszajelent\u00e9sek<\/td><td>SkyPlanner \u2192 PSIpenta<\/td><td>Visszajelent\u00e9senk\u00e9nt vagy m\u0171szakonk\u00e9nt, ha ezt v\u00e1lasztj\u00e1k<\/td><\/tr><tr><td>A SkyPlanner \u00fctemez\u00e9si szab\u00e1lyai<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, g\u00e9pkezel\u0151i l\u00e9tsz\u00e1m gy\u00e1rt\u00e1si feladatonk\u00e9nt, alternat\u00edv g\u00e9pek \u00e9s dolgoz\u00f3k<\/td><td>A SkyPlannerben kezelve<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be a cikkeket, darabjegyz\u00e9keket, m\u0171veletterveket, munka\u00e1llom\u00e1sokat, g\u00e9peket, Betriebsmittel-adatokat \u00e9s napt\u00e1rakat a PSIpenta\/ERP REST API-n kereszt\u00fcl. A munka\u00e1llom\u00e1sok megfeleltet\u00e9s\u00e9t tudatosan alak\u00edtsa ki: egy n\u00e9gy g\u00e9pb\u0151l \u00e1ll\u00f3 munka\u00e1llom\u00e1sb\u00f3l egy munka\u00e1llom\u00e1s-csoport vagy n\u00e9gy k\u00fcl\u00f6n munka\u00e1llom\u00e1s lesz.<\/p>\n\n\n<p><strong>2. Rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Olvassa be a kiadott gy\u00e1rt\u00e1si rendel\u00e9seket a m\u0171veleteikkel \u00e9s anyagaikkal egy\u00fctt, valamint a nyitott beszerz\u00e9si rendel\u00e9seket. A SkyPlanner a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si napj\u00e1n tekinti rendelkez\u00e9sre \u00e1ll\u00f3nak, a k\u00e9szletet pedig akkor friss\u00edti, amikor a beszerz\u00e9si rendel\u00e9s Delivered \u00e1llapotot kap. A beszerz\u00e9si javaslatok a PSIpenta rendszerben maradnak, am\u00edg rendel\u00e9ss\u00e9 nem v\u00e1lnak.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Amikor az \u00fctemez\u0151motor elhelyez vagy \u00e1thelyez egy m\u0171veletet, egy SkyPlanner-webhook h\u00edv\u00e1st ind\u00edt a PSIpenta\/ERP REST API fel\u00e9. Ez friss\u00edti az adott m\u0171velet tervezett kezd\u00e9s\u00e9t, befejez\u00e9s\u00e9t \u00e9s munka\u00e1llom\u00e1s\u00e1t a gy\u00e1rt\u00e1si rendel\u00e9sen. A rendel\u00e9s id\u0151pontjai a m\u0171veletek id\u0151pontjaib\u00f3l ad\u00f3dnak. Az \u00d6n rendszer\u00e9ben haszn\u00e1lt er\u0151forr\u00e1sokat \u00e9s mez\u0151ket a bevezet\u00e9shez kapcsol\u00f3d\u00f3 felm\u00e9r\u00e9s sor\u00e1n hat\u00e1rozz\u00e1k meg.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations vagy a Production Timer seg\u00edts\u00e9g\u00e9vel r\u00f6gz\u00edtik a munk\u00e1t, az id\u0151r\u00e1ford\u00edt\u00e1sok pedig naprak\u00e9szen tartj\u00e1k az \u00fctemtervet. \u00d6n d\u00f6nti el, hogy a t\u00e9nyleges id\u0151adatok visszaker\u00fcljenek-e a PSIpenta rendszerbe. Ha igen, az id\u0151 \u00e9s a mennyis\u00e9g m\u0171veletenk\u00e9nt, BDE-visszajelent\u00e9sk\u00e9nt ker\u00fcl \u00e1t a PSIpenta\/BDE API-n kereszt\u00fcl. Ha tov\u00e1bbra is a BDE-termin\u00e1lokat haszn\u00e1lj\u00e1k, a SkyPlanner ehelyett a PSIpenta rendszerb\u0151l olvassa be a visszajelent\u00e9seket.<\/p>\n\n\n<p><strong>5. Adatgazd\u00e1k \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong> Ezeket az \u00e9les indul\u00e1s el\u0151tt r\u00f6gz\u00edtse \u00edr\u00e1sban:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Cikkek, darabjegyz\u00e9kek, m\u0171velettervek, mennyis\u00e9gek, rendel\u00e9si \u00e1llapot<\/td><td>PSIpenta<\/td><\/tr><tr><td>M\u0171veleti sorrend, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontok, g\u00e9phozz\u00e1rendel\u00e9s<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, g\u00e9pkezel\u0151i l\u00e9tsz\u00e1mok, alternat\u00edv er\u0151forr\u00e1sok<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Betriebsmittel-t\u00f6rzsadatok<\/td><td>PSIpenta; az id\u0151beli rendelkez\u00e9sre \u00e1ll\u00e1s tervez\u00e9se a SkyPlanner rendszerben<\/td><\/tr><tr><td>M\u0171szakok \u00e9s munkav\u00e9gz\u00e9s n\u00e9lk\u00fcli napok<\/td><td>Egyetlen rendszer, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><tr><td>Visszajelent\u00e9sek, anyagkiad\u00e1sok \u00e9s bev\u00e9telez\u00e9sek<\/td><td>PSIpenta, helyben r\u00f6gz\u00edtve vagy a SkyPlanner id\u0151r\u00e1ford\u00edt\u00e1si adataib\u00f3l \u00e1tk\u00fcldve<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Csak egy rendszer \u00edrhassa a m\u0171veletek id\u0151pontjait. Ha a Leitstand, az Adaptive Planung vagy a MES Scheduling is be\u00e1ll\u00edt tervezett id\u0151pontokat, kapcsolja ki ezt a funkci\u00f3t a SkyPlanner \u00e1ltal \u00fctemezett rendel\u00e9sekn\u00e9l.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s \u00e1ltal\u00e1ban a bevezet\u00e9s kezdet\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. El\u0151tte ellen\u0151rizze az \u00fctemtervet a 30 napos ingyenes pr\u00f3baid\u0151szakban, a PSIpenta rendszerb\u0151l CSV- vagy Excel-form\u00e1tumban export\u00e1lt munka\u00e1llom\u00e1sokkal, m\u0171velettervekkel \u00e9s nyitott gy\u00e1rt\u00e1si rendel\u00e9sekkel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Adatmegfeleltet\u00e9s.<\/strong> V\u00e9gleges\u00edtse a megfeleltet\u00e9si t\u00e1bl\u00e1t, az adatgazd\u00e1kra vonatkoz\u00f3 szab\u00e1lyokat, a szinkroniz\u00e1l\u00e1s gyakoris\u00e1g\u00e1t \u00e9s azt, hogy a visszajelent\u00e9seket visszak\u00fcldik-e.<\/li>\n\n\n<li><strong>PSIpenta-hozz\u00e1f\u00e9r\u00e9s.<\/strong> Hozza l\u00e9tre a technikai felhaszn\u00e1l\u00f3t, enged\u00e9lyezze az API-kapcsolatokat a PSI-partner\u00e9vel k\u00f6z\u00f6sen, \u00e9s el\u0151sz\u00f6r tesztk\u00f6rnyezetben teszteljen.<\/li>\n\n\n<li><strong>Kezdeti bet\u00f6lt\u00e9s.<\/strong> Cikkek, darabjegyz\u00e9kek, m\u0171velettervek, munka\u00e1llom\u00e1sok, g\u00e9pek, Betriebsmittel-adatok, napt\u00e1rak.<\/li>\n\n\n<li><strong>Gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Rendszeres lek\u00e9rdez\u00e9s sz\u0171r\u00e9ssel, lapoz\u00e1ssal \u00e9s \u00fajrapr\u00f3b\u00e1lkoz\u00e1sokkal, vagy munkafolyamat \u00e1ltal ind\u00edtott \u00fczenetek.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlanner rendszerben.<\/strong> \u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, gy\u00e1rt\u00e1si feladatonk\u00e9nti g\u00e9pkezel\u0151i l\u00e9tsz\u00e1m, valamint alternat\u00edv g\u00e9pek vagy dolgoz\u00f3k.<\/li>\n\n\n<li><strong>Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> A m\u0171veleti id\u0151pontok \u00e1tvitele SkyPlanner-webhookok alapj\u00e1n, valamint ig\u00e9ny eset\u00e9n BDE-visszajelent\u00e9sek k\u00fcld\u00e9se.<\/li>\n\n\n<li><strong>P\u00e1rhuzamos tesztel\u00e9s.<\/strong> Futtassa a SkyPlanner rendszert a jelenlegi terv mellett, hasonl\u00edtsa \u00f6ssze az id\u0151pontokat, \u00e9s jav\u00edtsa a t\u00f6rzsadatokat.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s.<\/strong> Kapcsolja be a vissza\u00edr\u00e1st, amint az adatok egyeznek.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-psipenta-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire kell felk\u00e9sz\u00fclni a PSIpenta integr\u00e1ci\u00f3j\u00e1n\u00e1l?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Haszn\u00e1lt modulok.<\/strong> Ellen\u0151rizze, mely PSI-tervez\u0151modulokhoz van licenc, \u00e9s melyek m\u0171k\u00f6dnek \u00e9lesben. Minden olyan modulhoz egy\u00e9rtelm\u0171 szab\u00e1ly sz\u00fcks\u00e9ges, amely id\u0151pontokat \u00edr.<\/li>\n\n\n<li><strong>Munka\u00e1llom\u00e1s vagy g\u00e9p.<\/strong> D\u00f6ntse el, hogy a SkyPlanner munka\u00e1llom\u00e1s- vagy g\u00e9pszinten \u00fctemezzen, \u00e9s mindk\u00e9t ir\u00e1nyban ugyanazt a szintet haszn\u00e1lja.<\/li>\n\n\n<li><strong>Betriebsmittel.<\/strong> A Betriebsmittel-list\u00e1ban szerepl\u0151 k\u00e9sz\u00fcl\u00e9kek \u00e9s szersz\u00e1mok korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3 szersz\u00e1mk\u00e9nt ker\u00fclnek a SkyPlanner rendszerbe, \u00edgy a m\u0171velet a hozz\u00e1 sz\u00fcks\u00e9ges szersz\u00e1mot is lefoglalja.<\/li>\n\n\n<li><strong>Az \u00e1t\u00e1ll\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151k egys\u00e9gei.<\/strong> Import\u00e1l\u00e1skor a megfelel\u0151 m\u00e9rt\u00e9kegys\u00e9g \u00e9s vet\u00edt\u00e9si alap szerint sz\u00e1m\u00edtsa \u00e1t az \u00e1t\u00e1ll\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151ket, k\u00fcl\u00f6nben minden id\u0151tartam hib\u00e1s lesz.<\/li>\n\n\n<li><strong>K\u00fcls\u0151 m\u0171veletek.<\/strong> Az alv\u00e1llalkoz\u00f3knak kiadott m\u0171veletek \u00e1tfut\u00e1si id\u0151t jelentenek, nem a saj\u00e1t kapacit\u00e1st terhelik. Csak id\u0151ig\u00e9nnyel rendelkez\u0151 l\u00e9p\u00e9sk\u00e9nt modellezze \u0151ket.<\/li>\n\n\n<li><strong>Megkezdett m\u0171veletek.<\/strong> Minden \u00fctemez\u00e9si futtat\u00e1s el\u0151tt olvassa be az el\u0151rehalad\u00e1st a visszajelent\u00e9sekb\u0151l, hogy az \u00fctemterv a m\u00e1r elv\u00e9gzett munk\u00e1b\u00f3l induljon ki. A Running Time Lock ezut\u00e1n r\u00f6gz\u00edti a k\u00f6vetkez\u0151 \u00f3r\u00e1kra \u00fctemezett feladatokat.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-psipenta-integra\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be \u00e9s t\u00e1mogatja a PSIpenta-integr\u00e1ci\u00f3t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata \u00e1ll\u00edtja be az integr\u00e1ci\u00f3t a bevezet\u00e9s sor\u00e1n, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt,<\/strong> a meg\u00e1llapod\u00e1s szerinti API-h\u00edv\u00e1sokra \u00e9s \u00fczenetekre kiterjed\u0151en. Minden \u00fczem m\u00e1sk\u00e9pp haszn\u00e1lja a PSIpenta rendszert; ez a helyi tud\u00e1s itt \u00e9p\u00fcl be az integr\u00e1ci\u00f3ba.<\/li>\n\n\n<li><strong>Az \u00d6n PSI-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az \u00d6n moduljait, egyedi mez\u0151it \u00e9s PSIintegration-be\u00e1ll\u00edt\u00e1sait, \u00e9s a SkyPlanner csapat\u00e1val egy\u00fcttm\u0171k\u00f6dve megnyithatja az API-hozz\u00e1f\u00e9r\u00e9st.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek az integr\u00e1ci\u00f3ra<\/strong> a SkyPlanner REST API-j\u00e1n kereszt\u00fcl, API-token haszn\u00e1lat\u00e1val. Az indul\u00e1shoz elegend\u0151 egy API-token, \u00e9s a SkyPlanner csapata sz\u00fcks\u00e9g eset\u00e9n seg\u00edt. A r\u00e9szleteket a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner integr\u00e1ci\u00f3s dokument\u00e1ci\u00f3j\u00e1ban<\/a> tal\u00e1lja.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra az \u00d6n folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n, a v\u00e1lasztott csomaggal egy\u00fctt el\u0151zetes \u00e1raj\u00e1nlat k\u00e9sz\u00fcl. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, a <a href=\"\/hu\/integraciok\/erp\/psipenta\/termelesutemezes\/\">PSIpenta-termel\u00e9s\u00fctemez\u00e9st<\/a>, a <a href=\"\/hu\/integraciok\/erp\/psipenta\/\">PSIpenta oldal\u00e1t<\/a> \u00e9s az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u00e9s\u00e9t<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Foglaljon bemutat\u00f3t<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3szekr\u00e9ny-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3szekr\u00e9nyek \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa 2021 \u00f3ta<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel \u00e1tl\u00e1tjuk a kapacit\u00e1sainkat, \u00e9s kisz\u00e1m\u00edthat\u00f3v\u00e1 v\u00e1lik a tervez\u00e9s.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Vegyipari \u00e9s \u00e9lelmiszeripari gy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A SkyPlanner bevezet\u00e9se \u00f3ta, azaz 2021-t\u0151l kezdve folyamatosan 100%-os a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/opes-corporation\/\">Olvassa el az Opes Corporation v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Kevesebb<\/b><span>anyaghi\u00e1ny miatti le\u00e1ll\u00e1s<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e9rt\u00e9k\u00e9t sz\u00e1munkra az adja, hogy a mindennapokban j\u00f3l haszn\u00e1lhat\u00f3 eszk\u00f6z, k\u00fcl\u00f6n\u00f6sen a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k meghat\u00e1roz\u00e1s\u00e1hoz.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, gy\u00e1rt\u00e1stervez\u00e9si vezet\u0151<\/b><br>Eskomatic \u00b7 B\u00e9rforg\u00e1csol\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A terhel\u00e9s automatikus \u00fctemez\u00e9s\u00e9vel pontosabban meghat\u00e1rozhat\u00f3k a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k, az anyaghi\u00e1ny miatti gy\u00e1rt\u00e1sle\u00e1ll\u00e1sok pedig jelent\u0151sen cs\u00f6kkentek.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/eskomatic\/\">Olvassa el az Eskomatic v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van a PSIpent\u00e1nak API-ja a gy\u00e1rt\u00e1si rendel\u00e9sek kezel\u00e9s\u00e9hez?<\/summary>\n<p class=\"sp-faq__a\">Igen. A PSI REST \u00e9s SOAP API-t eml\u00edt a PSIpenta\/ERP \u00e9s a PSIpenta\/BDE eset\u00e9ben, \u00e9s k\u00f6zl\u00e9se szerint minden PSIpenta-komponens integr\u00e1lhat\u00f3 RESTful webszolg\u00e1ltat\u00e1sokon kereszt\u00fcl. A PSIintegration \u00fczenetalap\u00fa integr\u00e1ci\u00f3s r\u00e9teget biztos\u00edt a modulok k\u00f6z\u00f6tt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan ker\u00fclnek vissza a tervezett id\u0151pontok a PSIpent\u00e1ba?<\/summary>\n<p class=\"sp-faq__a\">A PSIpenta\/ERP REST API-n kereszt\u00fcl. Az \u00fctemterv minden m\u00f3dos\u00edt\u00e1sakor egy SkyPlanner-webhook ind\u00edtja el a gy\u00e1rt\u00e1si rendel\u00e9s egyes m\u0171veleteihez tartoz\u00f3 tervezett kezd\u00e9s, tervezett befejez\u00e9s \u00e9s munka\u00e1llom\u00e1s friss\u00edt\u00e9s\u00e9t.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u00fcldhet a SkyPlanner visszajelent\u00e9seket a PSIpenta BDE rendszer\u00e9be?<\/summary>\n<p class=\"sp-faq__a\">Igen, ha ezt a megold\u00e1st v\u00e1lasztja. A SkyPlannerben r\u00f6gz\u00edtett dolgoz\u00f3i id\u0151adatok a PSIpenta\/BDE API-n kereszt\u00fcl BDE-visszajelent\u00e9sk\u00e9nt ker\u00fclnek \u00e1tad\u00e1sra, m\u0171veletenk\u00e9nti id\u0151- \u00e9s mennyis\u00e9gi adatokkal. Azokban az \u00fczemekben, ahol megtartj\u00e1k a BDE-termin\u00e1lokat, a SkyPlanner ehelyett beolvassa a visszajelent\u00e9seket.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A PSIpenta Leitstandot vagy a SkyPlannert aj\u00e1nlja a PSI-partner?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlannert, ha az \u00fcgyf\u00e9l heteken bel\u00fcl m\u0171k\u00f6d\u0151, a t\u00e9nyleges kapacit\u00e1sokkal sz\u00e1mol\u00f3 termel\u00e9s\u00fctemez\u00e9st szeretne. A Leitstand, az Adaptive Planung \u00e9s a MES Scheduling a PSI modul\u00e1ris term\u00e9k\u00e9nek k\u00fcl\u00f6n\u00e1ll\u00f3 moduljai (<a href=\"https:\/\/www.psi.de\/loesungen\/produkte\/erp\">PSI<\/a>). A SkyPlanner a PSIpenta\/ERP \u00e9s a BDE API-jain kereszt\u00fcl kapcsol\u00f3dik, a gy\u00e1rt\u00e1s v\u00e1ltoz\u00e1sakor automatikusan \u00fajra\u00fctemez, \u00e9s megtervezi az \u00e1t\u00e1ll\u00e1sokat, a szersz\u00e1mhaszn\u00e1latot, a munkacsoportok beoszt\u00e1s\u00e1t \u00e9s az anyagfelhaszn\u00e1l\u00e1st. Korl\u00e1tlan sz\u00e1m\u00fa felhaszn\u00e1l\u00f3val haszn\u00e1lhat\u00f3, havi 199 \u20ac-t\u00f3l.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sz\u00fcks\u00e9ges a PSIpenta\/MES az integr\u00e1ci\u00f3hoz?<\/summary>\n<p class=\"sp-faq__a\">Nem. A SkyPlanner a PSIpenta\/ERP rendszerhez, a visszajelent\u00e9sekhez pedig a PSIpenta\/BDE rendszerhez kapcsol\u00f3dik. A dolgoz\u00f3k telefonon vagy t\u00e1blag\u00e9pen is r\u00f6gz\u00edthetik munk\u00e1jukat a SkyPlannerben.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert az integr\u00e1ci\u00f3 ki\u00e9p\u00edt\u00e9se el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3ba sor\u00e1n legfeljebb 20 munka\u00e1llom\u00e1st kezelhet, CSV- vagy Excel-f\u00e1jlokb\u00f3l import\u00e1lhat adatokat a PSIpent\u00e1b\u00f3l, \u00e9s a Basic csomag minden funkci\u00f3j\u00e1t haszn\u00e1lhatja. Bankk\u00e1rtya nem sz\u00fcks\u00e9ges. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el a pr\u00f3baid\u0151szakot<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">egyeztessen \u00e9rt\u00e9kes\u00edt\u00e9si csapatunkkal<\/a> az integr\u00e1ci\u00f3 felm\u00e9r\u00e9s\u00e9r\u0151l.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ PSIpenta PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez Ez a PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a PSI-partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a PSIpenta\/ERP a SkyPlanner APS-sel. A SkyPlanner k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t biztos\u00edt a PSIpenta rendszerrel, a PSI saj\u00e1t interf\u00e9szein kereszt\u00fcl: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n &#8230; <a title=\"PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/\" aria-label=\"Read more about PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106211,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106994","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>PSIpenta APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"PSIpenta\u2013SkyPlanner APS kapcsolat: PSIpenta\/ERP REST API, PSIintegration, BDE-visszajelent\u00e9sek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\" \/>\n<meta property=\"og:description\" content=\"PSIpenta\u2013SkyPlanner APS kapcsolat: PSIpenta\/ERP REST API, PSIintegration, BDE-visszajelent\u00e9sek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/psipenta\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/psipenta\\\/integracios-utmutato\\\/\",\"name\":\"PSIpenta APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"PSIpenta\u2013SkyPlanner APS kapcsolat: PSIpenta\\\/ERP REST API, PSIintegration, BDE-visszajelent\u00e9sek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/psipenta\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/psipenta\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/psipenta\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a PSIpenta mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/psipenta\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"PSIpenta APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"PSIpenta\u2013SkyPlanner APS kapcsolat: PSIpenta\/ERP REST API, PSIintegration, BDE-visszajelent\u00e9sek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","og_description":"PSIpenta\u2013SkyPlanner APS kapcsolat: PSIpenta\/ERP REST API, PSIintegration, BDE-visszajelent\u00e9sek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/","name":"PSIpenta APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"PSIpenta\u2013SkyPlanner APS kapcsolat: PSIpenta\/ERP REST API, PSIintegration, BDE-visszajelent\u00e9sek, adatmegfeleltet\u00e9s, m\u0171veletek vissza\u00edr\u00e1sa \u00e9s projekttippek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a PSIpenta mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/psipenta\/"},{"@type":"ListItem","position":5,"name":"PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ PSIpenta PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS-sel v\u00e9gzett gy\u00e1rt\u00e1s\u00fctemez\u00e9shez Ez a PSIpenta-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a PSI-partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a PSIpenta\/ERP a SkyPlanner APS-sel. A SkyPlanner k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t biztos\u00edt a PSIpenta rendszerrel, a PSI saj\u00e1t interf\u00e9szein kereszt\u00fcl: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=106994"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106994\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106211"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=106994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}