{"id":106936,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/","title":{"rendered":"QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a QAD Adaptive ERP rendszert a SkyPlanner APS rendszerrel, bele\u00e9rtve a kor\u00e1bbi QAD Enterprise Edition \u00e9s MFG\/PRO telep\u00edt\u00e9seket is. A SkyPlanner k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t biztos\u00edt a QAD Adaptive ERP rendszerrel a QAD saj\u00e1t interf\u00e9szein kereszt\u00fcl:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlanner \u00e1tveszi a gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s m\u0171veleteiket, a cikkt\u00f6rzset, a term\u00e9kstrukt\u00far\u00e1kat, a technol\u00f3giai \u00fatvonalakat, a munka\u00e1llom\u00e1sokat, az \u00fczemi napt\u00e1rakat, a k\u00e9szletadatokat \u00e9s a beszerz\u00e9si rendel\u00e9seket.<\/li>\n\n\n<li>Az \u00fctemezett ind\u00edt\u00e1si d\u00e1tumok \u00e9s hat\u00e1rid\u0151k visszaker\u00fclnek a Work Order Maintenance (16.1) programba.<\/li>\n\n\n<li>A g\u00e9pkezel\u0151k munkaid\u0151-bejegyz\u00e9sei a Labor Feedback by Work Order (16.20.1), az elk\u00e9sz\u00fclt mennyis\u00e9gek pedig a Work Order Receipt (16.11) programon kereszt\u00fcl ker\u00fclnek vissza a QAD rendszerbe.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1j\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n QAD-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Ez az \u00fatmutat\u00f3 azoknak a partnereknek \u00e9s fejleszt\u0151knek sz\u00f3l, akik r\u00e9szt szeretn\u00e9nek venni a munk\u00e1ban, vagy saj\u00e1t maguk fejleszten\u00e9nek a SkyPlanner dokument\u00e1lt REST API fel\u00fclet\u00e9re \u00e9p\u00edtve (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A QAD integr\u00e1ci\u00f3s interf\u00e9szei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A QAD h\u00e1rom csatlakoz\u00e1si lehet\u0151s\u00e9get k\u00edn\u00e1l a k\u00fcls\u0151 \u00fctemez\u0151rendszerek sz\u00e1m\u00e1ra:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> A QAD le\u00edr\u00e1sa szerint: &#8220;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8221; (Webszolg\u00e1ltat\u00e1sokra \u00e9p\u00fcl\u0151, SOAP-kompatibilis XML-keretrendszer, amely teljes, platformf\u00fcggetlen hozz\u00e1f\u00e9r\u00e9st biztos\u00edt a QAD Enterprise Applications \u00fczleti funkci\u00f3ihoz.) Minden k\u00e9r\u00e9s egy <strong>QDoc<\/strong>, amely egy QAD-programot futtat, a k\u00e9perny\u0151s fel\u00fclettel azonos ellen\u0151rz\u00e9sekkel. Minden k\u00e9r\u00e9sre egy v\u00e1lasz-QDoc \u00e9rkezik. A kiadott QDoc-dokumentumok k\u00f6z\u00e9 tartozik a <code>maintainItemMaster<\/code>, a <code>maintainRouting<\/code> \u00e9s a <code>maintainPurchaseOrder<\/code>. Azokhoz a programokhoz, amelyekhez nincs kiadott QDoc, a QAD <strong>QGen<\/strong> eszk\u00f6ze k\u00e9pezi le a men\u00fcb\u0151l el\u00e9rhet\u0151 programot: &#8220;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8221; (A QGen olyan egyedi vagy QAD Enterprise Applications programok lek\u00e9pez\u00e9s\u00e9re szolg\u00e1l, amelyekhez nincs kiadott QDoc-s\u00e9ma \u00e9s esem\u00e9nyf\u00e1jl.) Maga a QAD is ezt a megold\u00e1st haszn\u00e1lja: &#8220;QAD Production Scheduler uses QAD QXtend to update work orders.&#8221; (A QAD Production Scheduler a QAD QXtend seg\u00edts\u00e9g\u00e9vel friss\u00edti a gy\u00e1rt\u00e1si rendel\u00e9seket.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">QXtend \u00fatmutat\u00f3<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> A QXO le\u00edr\u00e1sa szerint: &#8220;exports user-configurable business objects as XML QDocs out of QAD products.&#8221; (A felhaszn\u00e1l\u00f3 \u00e1ltal konfigur\u00e1lhat\u00f3 \u00fczleti objektumokat XML QDoc form\u00e1tumban export\u00e1lja a QAD term\u00e9keib\u0151l.) A szabv\u00e1nyos \u00fczleti objektumok k\u00f6z\u00e9 tartozik az Item, a Product Structure, a Routing, a Work Center, a Department, az Inventory Transaction \u00e9s az Inventory Status.<\/li>\n\n\n<li><strong>REST API fel\u00fcletek \u00fczleti dokumentumokhoz.<\/strong> Az Adaptive ERP 2022.1 verzi\u00f3t\u00f3l: &#8220;Query REST APIs are now available for business documents,&#8221; (Az \u00fczleti dokumentumokhoz m\u00e1r lek\u00e9rdez\u0151 REST API fel\u00fcletek is el\u00e9rhet\u0151k.) Ezek sz\u0171r\u00e9st, rendez\u00e9st, lapoz\u00e1st \u00e9s r\u00e9szleges adatlek\u00e9r\u00e9st is t\u00e1mogatnak. Dokument\u00e1ci\u00f3juk az \u00d6n rendszerp\u00e9ld\u00e1ny\u00e1nak Swagger fel\u00fclet\u00e9n tal\u00e1lhat\u00f3 (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">kiad\u00e1si megjegyz\u00e9sek<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Az \u00edr\u00e1si m\u0171veleteket a QXtend v\u00e9gzi. Az olvas\u00e1s a QXO \u00e9s a lek\u00e9rdez\u0151 REST API fel\u00fcletek feladata.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s \u00e9s licencel\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> Ha a fogad\u00f3 oldalon be van kapcsolva a Require Authentication be\u00e1ll\u00edt\u00e1s, minden QDoc tartalmaz egy Session ID azonos\u00edt\u00f3t vagy egy QAD-felhaszn\u00e1l\u00f3nevet \u00e9s -jelsz\u00f3t. A QXI a program futtat\u00e1sa el\u0151tt ellen\u0151rzi a felhaszn\u00e1l\u00f3 men\u00fchozz\u00e1f\u00e9r\u00e9si jogosults\u00e1gait.<\/li>\n\n\n<li><strong>Integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3.<\/strong> Hozzon l\u00e9tre k\u00fcl\u00f6n QAD-felhaszn\u00e1l\u00f3t, amely kiz\u00e1r\u00f3lag az integr\u00e1ci\u00f3 \u00e1ltal h\u00edvott men\u00fcprogramokhoz f\u00e9r hozz\u00e1: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt \u00e9s a t\u00f6rzsadatkezel\u0151 programok.<\/li>\n\n\n<li><strong>QXtend-licenc.<\/strong> A QXtend licencel\u00e9se az \u00fcgyn\u00f6k\u00f6k \u00e9s a fogad\u00f3k alapj\u00e1n t\u00f6rt\u00e9nik. A QAD \u00fatmutat\u00f3ja szerint a k\u00fcls\u0151 alkalmaz\u00e1ssal folytatott, mindk\u00e9t ir\u00e1ny\u00fa webszolg\u00e1ltat\u00e1s-forgalom d\u00edjk\u00f6teles, ez\u00e9rt a projekt megkezd\u00e9se el\u0151tt tiszt\u00e1zza a QXtend licencfelt\u00e9teleit.<\/li>\n\n<\/ul>\n\n\n<p>A SkyPlanner oldal\u00e1n a REST API hiteles\u00edt\u00e9se az <code>Authorization-Token<\/code> fejl\u00e9cben megadott API-tokennel t\u00f6rt\u00e9nik (SkyPlanner Settings &gt; API). Az API dokument\u00e1ci\u00f3ja Swagger\/OpenAPI form\u00e1tumban \u00e9rhet\u0151 el. Az <a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s oktat\u00f3anyag<\/a> v\u00e9gigvezeti \u00d6nt az els\u0151 h\u00edv\u00e1sokon.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Esem\u00e9nyek \u00e9s adatv\u00e1ltoz\u00e1sok<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A QAD az adatv\u00e1ltoz\u00e1sokat a QXtend Outbound seg\u00edts\u00e9g\u00e9vel kezeli. &#8220;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8221; (A QAD Enterprise Applications figyelt adataiban v\u00e1ltoz\u00e1s t\u00f6rt\u00e9nik. A v\u00e1ltoz\u00e1s\u00e9rtes\u00edt\u00e9sek a qxevents adatb\u00e1zisba ker\u00fclnek.) A QXO ezut\u00e1n el\u0151\u00e1ll\u00edtja a QDoc-dokumentumokat, \u00e9s tov\u00e1bb\u00edtja \u0151ket: &#8220;to a directory location where the subscriber polls for and picks up new QDocs,&#8221; (egy k\u00f6nyvt\u00e1rba, amelyet a feliratkoz\u00f3 rendszeresen lek\u00e9rdez, \u00e9s ahonnan \u00e1tveszi az \u00faj QDoc-dokumentumokat), vagy egy URL-en figyel\u0151 webszolg\u00e1ltat\u00e1snak.<\/p>\n\n\n<p>A SkyPlanner webszolg\u00e1ltat\u00e1sk\u00e9nt iratkozik fel a QXO \u00e1ltal k\u00f6zz\u00e9tett adatokra, a QXO \u00e1ltal nem kezelt adatokat pedig a lek\u00e9rdez\u0151 REST API fel\u00fcleteken kereszt\u00fcl k\u00e9rdezi le rendszeresen. A Work Order nem tartozik a szabv\u00e1nyos QXO \u00fczleti objektumok k\u00f6z\u00e9. Ez\u00e9rt az integr\u00e1ci\u00f3 vagy egy QXO \u00fczleti objektumot hoz l\u00e9tre a gy\u00e1rt\u00e1si rendel\u00e9sek t\u00e1bl\u00e1ihoz (<code>wo_mstr<\/code>, <code>wr_route<\/code>), vagy n\u00e9h\u00e1ny percenk\u00e9nt lek\u00e9rdezi a gy\u00e1rt\u00e1si rendel\u00e9seket a lek\u00e9rdez\u0151 REST API fel\u00fcleteken kereszt\u00fcl.<\/p>\n\n\n<p>A SkyPlanner az \u00e1llapot vagy az \u00fctemterv v\u00e1ltoz\u00e1sakor webhookokat k\u00fcld, \u00edgy a vissza\u00edr\u00e1s esem\u00e9nyvez\u00e9relt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QAD-objektum (program, interf\u00e9sz)<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Cikkek (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor QXO-n kereszt\u00fcl<\/td><\/tr><tr><td>Term\u00e9kstrukt\u00far\u00e1k (13.5; QXO Product Structure)<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek, term\u00e9kenk\u00e9nti anyagok<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor QXO-n kereszt\u00fcl<\/td><\/tr><tr><td>Technol\u00f3giai \u00fatvonalak (14.13.1; QXO Routing): sorban \u00e1ll\u00e1si, el\u0151k\u00e9sz\u00edt\u00e9si, megmunk\u00e1l\u00e1si, v\u00e1rakoz\u00e1si \u00e9s mozgat\u00e1si id\u0151<\/td><td>M\u0171veletek az id\u0151tartamokkal, be\u00e1ll\u00edt\u00e1si \u00e9s leszerel\u00e9si id\u0151kkel<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor QXO-n kereszt\u00fcl<\/td><\/tr><tr><td>Munka\u00e1llom\u00e1sok (14.5) \u00e9s r\u00e9szlegek (14.1; QXO Work Center, Department)<\/td><td>Munka\u00e1llom\u00e1sok, munka\u00e1llom\u00e1s-csoportok, hat\u00e9konys\u00e1gi \u00e9rt\u00e9kek<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, ut\u00e1na ritk\u00e1n<\/td><\/tr><tr><td>\u00dczemi \u00e9s munka\u00e1llom\u00e1s-napt\u00e1rak<\/td><td>M\u0171szakok \u00e9s munkamentes napok<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Naponta, vagy saj\u00e1t m\u0171szakok kezel\u00e9se a SkyPlannerben<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek (16.1) a hozz\u00e1juk tartoz\u00f3 technol\u00f3giai \u00fatvonalakkal (16.13.13) \u00e9s komponensekkel<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok hat\u00e1rid\u0151kkel \u00e9s anyagig\u00e9nyekkel<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Egyedi QXO-objektum vagy n\u00e9h\u00e1ny percenk\u00e9nti REST-lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>K\u00e9szlet (QXO Inventory Status, Inventory Transaction)<\/td><td>K\u00e9szletegyenlegek<\/td><td>QAD \u2192 SkyPlanner<\/td><td>V\u00e1ltoz\u00e1skor vagy \u00f3r\u00e1nk\u00e9nt<\/td><\/tr><tr><td>Beszerz\u00e9si rendel\u00e9sek hat\u00e1rid\u0151kkel<\/td><td>Beszerz\u00e9si rendel\u00e9sek, be\u00e9rkez\u0151 anyagok sz\u00e1ll\u00edt\u00e1si d\u00e1tum szerint<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Lek\u00e9rdez\u00e9s \u00f3r\u00e1nk\u00e9nt vagy az \u00fctemez\u00e9s futtat\u00e1sakor<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek ind\u00edt\u00e1si d\u00e1tumai \u00e9s hat\u00e1rid\u0151i (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Tervezett kezd\u00e9s \u00e9s befejez\u00e9s rendel\u00e9senk\u00e9nt<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, SkyPlanner-webhookon kereszt\u00fcl<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s megmunk\u00e1l\u00e1si id\u0151 m\u0171veletenk\u00e9nt<\/td><td>Id\u0151napl\u00f3k \u00e9s g\u00e9pkezel\u0151i visszajelent\u00e9sek<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Visszajelent\u00e9senk\u00e9nt vagy m\u0171szakonk\u00e9nt, ha ezt v\u00e1lasztj\u00e1k<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>Elk\u00e9sz\u00fclt mennyis\u00e9gek<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Visszajelent\u00e9senk\u00e9nt, ha ezt v\u00e1lasztj\u00e1k<\/td><\/tr><tr><td>Nem szerepel a QAD rendszerben<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok mint korl\u00e1tozott er\u0151forr\u00e1sok, alternat\u00edv g\u00e9pek \u00e9s dolgoz\u00f3k<\/td><td>A SkyPlannerben karbantartva<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. T\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be a cikkeket, term\u00e9kstrukt\u00far\u00e1kat, technol\u00f3giai \u00fatvonalakat, munka\u00e1llom\u00e1sokat \u00e9s napt\u00e1rakat a QXO vagy a lek\u00e9rdez\u0151 REST API fel\u00fcletek seg\u00edts\u00e9g\u00e9vel. Tudatosan alak\u00edtsa ki a munka\u00e1llom\u00e1sok megfeleltet\u00e9s\u00e9t: egy n\u00e9gy g\u00e9pb\u0151l \u00e1ll\u00f3 QAD-munka\u00e1llom\u00e1sb\u00f3l egy munka\u00e1llom\u00e1scsoport vagy n\u00e9gy k\u00fcl\u00f6n munka\u00e1llom\u00e1s lesz. A Production Line Maintenance sorozatgy\u00e1rt\u00f3 sorai is lek\u00e9pezhet\u0151k munka\u00e1llom\u00e1sk\u00e9nt.<\/p>\n\n\n<p><strong>2. Gy\u00e1rt\u00e1si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Olvassa be a r\u00f6gz\u00edtett tervezett \u00e9s a kiadott gy\u00e1rt\u00e1si rendel\u00e9seket a technol\u00f3giai \u00fatvonalaikkal \u00e9s komponenseikkel egy\u00fctt, valamint a nyitott beszerz\u00e9si rendel\u00e9seket. A SkyPlanner a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l tekinti el\u00e9rhet\u0151nek, a k\u00e9szletet pedig akkor friss\u00edti, amikor a rendel\u00e9s Delivered \u00e1llapotba ker\u00fcl.<\/p>\n\n\n<p>Gy\u00e1rt\u00e1si rendel\u00e9seket \u00fctemezzen, ne az MRP tervezett rendel\u00e9seit. A tervezett rendel\u00e9seket el\u0151sz\u00f6r a QAD rendszerben kell r\u00f6gz\u00edtett tervezett vagy kiadott gy\u00e1rt\u00e1si rendel\u00e9ss\u00e9 alak\u00edtani.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Amikor az \u00fctemez\u0151motor elhelyez vagy \u00e1thelyez egy rendel\u00e9st, egy SkyPlanner-webhook QXtend Inbound QDoc-k\u00e9r\u00e9st ind\u00edt a Work Order Maintenance (16.1) programhoz. Ez az ind\u00edt\u00e1si d\u00e1tumot az els\u0151 \u00fctemezett m\u0171velethez, a hat\u00e1rid\u0151t pedig az utols\u00f3hoz igaz\u00edtja. A QXtend a QAD saj\u00e1t ellen\u0151rz\u00e9seivel futtatja a programot, majd v\u00e1lasz-QDoc-dokumentumot ad vissza, amelyet az integr\u00e1ci\u00f3 ellen\u0151riz.<\/p>\n\n\n<p>Az egyes g\u00e9pek m\u0171veleti sorrendje a SkyPlanner rendszerben marad, \u00e9s a Mobile Confirmations fel\u00fclet\u00e9n jut el a g\u00e9pkezel\u0151kh\u00f6z. \u00cdgy az integr\u00e1ci\u00f3t nem akad\u00e1lyozza, hogy a QAD a kiadott rendel\u00e9sekn\u00e9l z\u00e1rolja a technol\u00f3giai \u00fatvonalat.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations vagy a Production Timer seg\u00edts\u00e9g\u00e9vel r\u00f6gz\u00edtik munk\u00e1jukat, a munkaid\u0151-bejegyz\u00e9sek pedig naprak\u00e9szen tartj\u00e1k az \u00fctemtervet. \u00d6n d\u00f6nti el, hogy a t\u00e9nyleges id\u0151k visszaker\u00fcljenek-e a QAD rendszerbe. Ha igen, az el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s megmunk\u00e1l\u00e1si id\u0151k m\u0171veletenk\u00e9nt a Labor Feedback by Work Order, az elk\u00e9sz\u00fclt mennyis\u00e9gek pedig a Work Order Receipt programba ker\u00fclnek. Ha nem, a munkaid\u0151t tov\u00e1bbra is a QAD rendszerben r\u00f6gz\u00edtik.<\/p>\n\n\n<p><strong>5. Adatgazd\u00e1k \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong> Az \u00e9les indul\u00e1s el\u0151tt r\u00f6gz\u00edtse \u0151ket \u00edr\u00e1sban:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Cikkek, term\u00e9kstrukt\u00far\u00e1k, technol\u00f3giai \u00fatvonalak, mennyis\u00e9gek, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1llapota<\/td><td>QAD<\/td><\/tr><tr><td>M\u0171veleti sorrend, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontok, g\u00e9pek hozz\u00e1rendel\u00e9se<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek ind\u00edt\u00e1si d\u00e1tumai \u00e9s hat\u00e1rid\u0151i<\/td><td>A SkyPlanner \u00edrja, a QAD t\u00e1rolja<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1m- \u00e9s g\u00e9pkezel\u0151ig\u00e9ny, alternat\u00edv er\u0151forr\u00e1sok<\/td><td>SkyPlanner<\/td><\/tr><tr><td>M\u0171szakok \u00e9s munkamentes napok<\/td><td>Egyetlen rendszer, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><tr><td>Munkaid\u0151, komponensek kiad\u00e1sa \u00e9s bev\u00e9telez\u00e9se<\/td><td>QAD: k\u00f6zvetlen r\u00f6gz\u00edt\u00e9ssel vagy a SkyPlanner munkaid\u0151-bejegyz\u00e9seib\u0151l \u00e1tv\u00e9ve<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Jel\u00f6lj\u00f6n ki egyetlen rendszert a gy\u00e1rt\u00e1si rendel\u00e9sek d\u00e1tumainak \u00edr\u00e1s\u00e1ra. A SkyPlanner nem ig\u00e9nyel QAD-\u00fctemez\u0151modult, \u00edgy az \u00e1ltala \u00fctemezett rendel\u00e9sekn\u00e9l \u00e1tveszi a d\u00e1tumok \u00edr\u00e1s\u00e1t az \u00fctemez\u00e9si munkafel\u00fcletekt\u0151l vagy m\u00e1s \u00fctemez\u0151rendszerekt\u0151l.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s \u00e1ltal\u00e1ban a bevezet\u00e9s megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. El\u0151tte ellen\u0151rizze az \u00fctemtervet a 30 napos ingyenes pr\u00f3baid\u0151szakban, a QAD rendszerb\u0151l CSV- vagy Excel-form\u00e1tumban export\u00e1lt munka\u00e1llom\u00e1sokkal, technol\u00f3giai \u00fatvonalakkal \u00e9s nyitott gy\u00e1rt\u00e1si rendel\u00e9sekkel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Adatmegfeleltet\u00e9s.<\/strong> V\u00e9gleges\u00edtse a megfeleltet\u00e9si t\u00e1bl\u00e1zatot, az adatgazd\u00e1kra vonatkoz\u00f3 szab\u00e1lyokat, az \u00e9rintett telephelyek \u00e9s tartom\u00e1nyok k\u00f6r\u00e9t, a szinkroniz\u00e1l\u00e1si gyakoris\u00e1gokat, valamint azt, hogy vissza\u00edrj\u00e1k-e a munkaid\u0151adatokat.<\/li>\n\n\n<li><strong>QAD-hozz\u00e1f\u00e9r\u00e9s.<\/strong> Hozza l\u00e9tre az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t, tiszt\u00e1zza a QXtend licencfelt\u00e9teleit, \u00e1ll\u00edtsa be a QXtend fogad\u00f3j\u00e1t \u00e9s a QXO feliratkoz\u00f3j\u00e1t. El\u0151sz\u00f6r egy teszttartom\u00e1nyban v\u00e9gezzen tesztel\u00e9st.<\/li>\n\n\n<li><strong>QDoc-be\u00e1ll\u00edt\u00e1sok.<\/strong> Ahol rendelkez\u00e9sre \u00e1llnak, haszn\u00e1lja a kiadott QDoc-dokumentumokat. Sz\u00fcks\u00e9g eset\u00e9n a QGen seg\u00edts\u00e9g\u00e9vel gener\u00e1ljon QDoc-dokumentumokat a Work Order Maintenance, a Labor Feedback by Work Order \u00e9s a Work Order Receipt programhoz.<\/li>\n\n\n<li><strong>Kezdeti bet\u00f6lt\u00e9s.<\/strong> Cikkek, term\u00e9kstrukt\u00far\u00e1k, technol\u00f3giai \u00fatvonalak, munka\u00e1llom\u00e1sok, napt\u00e1rak.<\/li>\n\n\n<li><strong>Gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> QXO-esem\u00e9nyek vagy rendszeres REST-lek\u00e9rdez\u00e9sek sz\u0171r\u00e9ssel, lapoz\u00e1ssal \u00e9s \u00fajrapr\u00f3b\u00e1lkoz\u00e1sokkal.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlanner rendszerben.<\/strong> \u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, gy\u00e1rt\u00e1si feladatonk\u00e9nti g\u00e9pkezel\u0151l\u00e9tsz\u00e1m, valamint alternat\u00edv g\u00e9pek vagy munkat\u00e1rsak.<\/li>\n\n\n<li><strong>Az \u00fctemterv vissza\u00edr\u00e1sa \u00e9s p\u00e1rhuzamos tesztel\u00e9s.<\/strong> \u00cdrja vissza a d\u00e1tumokat a SkyPlanner-webhookok alapj\u00e1n, futtassa az \u00fctemez\u00e9st a jelenlegi tervvel p\u00e1rhuzamosan, hasonl\u00edtsa \u00f6ssze a d\u00e1tumokat, \u00e9s jav\u00edtsa a t\u00f6rzsadatokat.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s.<\/strong> Ha az adatok egyeznek, kapcsolja be a vissza\u00edr\u00e1st.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire \u00e9rdemes felk\u00e9sz\u00fclni a QAD Adaptive ERP integr\u00e1ci\u00f3j\u00e1n\u00e1l?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A CRP \u00fajb\u00f3li futtat\u00e1sa.<\/strong> A CRP \u00fajra\u00fctemezi a kiv\u00e1lasztott gy\u00e1rt\u00e1si rendel\u00e9sek \u00f6sszes nyitott m\u0171velet\u00e9t. A QAD csak akkor tartja meg a k\u00e9zzel megadott d\u00e1tumokat, ha &#8220;you also adjusted the work order release and due date to match,&#8221; (a gy\u00e1rt\u00e1si rendel\u00e9s kiad\u00e1si d\u00e1tum\u00e1t \u00e9s hat\u00e1ridej\u00e9t is ezekhez igaz\u00edtotta). A SkyPlanner pontosan ezeket az adatokat \u00edrja vissza. A CRP-t a vissza\u00edr\u00e1s ut\u00e1n futtassa, vagy z\u00e1rja ki bel\u0151le a SkyPlanner \u00e1ltal \u00fctemezett rendel\u00e9seket.<\/li>\n\n\n<li><strong>A kiadott technol\u00f3giai \u00fatvonalak m\u00e1r nem m\u00f3dos\u00edthat\u00f3k.<\/strong> &#8220;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (Ha a gy\u00e1rt\u00e1si rendel\u00e9s \u00e1llapota Exploded, Allocated vagy Released, a technol\u00f3giai \u00fatvonal m\u00e1r nem m\u00f3dos\u00edthat\u00f3.) A technol\u00f3giai \u00fatvonalat a kiad\u00e1skor olvassa be, \u00e9s csak a tervezett vagy r\u00f6gz\u00edtett tervezett \u00e1llapot\u00fa rendel\u00e9sekn\u00e9l m\u00f3dos\u00edtsa.<\/li>\n\n\n<li><strong>A technol\u00f3giai \u00fatvonal id\u0151egys\u00e9gei.<\/strong> Az \u00e1t\u00e1ll\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151 terhel\u00e9snek sz\u00e1m\u00edt, m\u00edg &#8220;queue, wait, and move times are excluded from load calculations.&#8221; (a sorban \u00e1ll\u00e1si, v\u00e1rakoz\u00e1si \u00e9s mozgat\u00e1si id\u0151k nem szerepelnek a terhel\u00e9ssz\u00e1m\u00edt\u00e1sban). Ezeket a SkyPlannerben csak id\u0151t ig\u00e9nyl\u0151 l\u00e9p\u00e9sekk\u00e9nt modellezze, \u00e9s ellen\u0151rizze, hogy a megmunk\u00e1l\u00e1si id\u0151 darabonk\u00e9nt vagy rendel\u00e9senk\u00e9nt \u00e9rtend\u0151-e.<\/li>\n\n\n<li><strong>A QXtend \u00e1tereszt\u0151k\u00e9pess\u00e9ge.<\/strong> A QAD figyelmeztet: &#8220;UI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.&#8221; (A UI API adapter teljes\u00edtm\u00e9nye nagy adatmennyis\u00e9gek vagy val\u00f3s idej\u0171 tranzakci\u00f3k feldolgoz\u00e1sakor el\u00e9gtelen lehet.) Csak a m\u00f3dosult rendel\u00e9seket k\u00fcldje el, k\u00f6tegekben, \u00e9s ahol el\u00e9rhet\u0151k, haszn\u00e1ljon nat\u00edv QDocs dokumentumokat.<\/li>\n\n\n<li><strong>Domainek \u00e9s telephelyek.<\/strong> A t\u00f6bb domaint haszn\u00e1l\u00f3 QAD-rendszerek domainenk\u00e9nt \u00e9s telephelyenk\u00e9nt tartj\u00e1k nyilv\u00e1n a munka\u00e1llom\u00e1sokat \u00e9s a gy\u00e1rt\u00e1si rendel\u00e9seket. Az integr\u00e1ci\u00f3ba bevont minden telephelyhez k\u00fcl\u00f6n munka\u00e1llom\u00e1scsoportot rendeljen.<\/li>\n\n\n<li><strong>Ism\u00e9tl\u0151d\u0151 \u00e9s diszkr\u00e9t gy\u00e1rt\u00e1s egy\u00fctt.<\/strong> Az Advanced Repetitive gy\u00e1rt\u00f3sorai ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si \u00fctemterveket haszn\u00e1lnak, nem gy\u00e1rt\u00e1si rendel\u00e9seket. A felm\u00e9r\u00e9s sor\u00e1n hat\u00e1rozz\u00e1k meg, mely gy\u00e1rt\u00f3sorokat \u00fctemezze a SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be \u00e9s t\u00e1mogatja a QAD-integr\u00e1ci\u00f3t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n be\u00e1ll\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja.<\/strong> Ez a meg\u00e1llapod\u00e1sban r\u00f6gz\u00edtett QDocs dokumentumokra, QXO-feliratkoz\u00e1sokra \u00e9s REST-lek\u00e9rdez\u00e9sekre terjed ki. Minden \u00fczem m\u00e1sk\u00e9pp haszn\u00e1lja a QAD-t; ezt a helyi tud\u00e1st itt \u00e9p\u00edtj\u00fck be a megold\u00e1sba.<\/li>\n\n\n<li><strong>Az \u00d6n QAD-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az \u00d6n domainjeit, egyedi m\u00f3dos\u00edt\u00e1sait \u00e9s licencel\u00e9s\u00e9t, \u00edgy a SkyPlanner csapat\u00e1val egy\u00fctt be\u00e1ll\u00edthatja a QXtend rendszert, a QGen QDocs dokumentumokat \u00e9s az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is tov\u00e1bbfejleszthetik az integr\u00e1ci\u00f3t<\/strong> a SkyPlanner REST API haszn\u00e1lat\u00e1val, API-tokennel. A kezd\u00e9shez elegend\u0151 egy API-token, \u00e9s sz\u00fcks\u00e9g eset\u00e9n a SkyPlanner csapata is seg\u00edt. A dokument\u00e1ci\u00f3 a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner integr\u00e1ci\u00f3s dokument\u00e1ci\u00f3j\u00e1ban<\/a> \u00e9rhet\u0151 el.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, havi sz\u00e1ml\u00e1z\u00e1ssal, 5 munka\u00e1llom\u00e1ssal. Az integr\u00e1ci\u00f3ra a folyamatok \u00e9s az ig\u00e9nyek alapj\u00e1n el\u0151re adunk \u00e1raj\u00e1nlatot, a v\u00e1lasztott csomaggal egy\u00fctt. Tov\u00e1bbi inform\u00e1ci\u00f3k: <a href=\"\/hu\/arkepzes\/\">\u00e1rak<\/a>, <a href=\"\/hu\/integraciok\/erp\/qad-adaptive-erp\/termelesutemezes\/\">termel\u00e9s\u00fctemez\u00e9s QAD Adaptive ERP mellett<\/a>, <a href=\"\/hu\/integraciok\/erp\/qad-adaptive-erp\/\">QAD Adaptive ERP<\/a> \u00e9s <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1bla-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokon alapul\u00f3 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Villamos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Az UTU v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">A Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, a Mamec vez\u00e9rigazgat\u00f3ja a v\u00e1llalat lohjai gy\u00e1rt\u00f3csarnok\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-es nagys\u00e1grendben<\/b><span>automatikusan \u00fctemezett gy\u00e1rt\u00e1si rendel\u00e9sek<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEg\u00e9szen m\u00e1sk\u00e9pp tartjuk k\u00e9zben a termel\u00e9st, \u00e9s teljesen m\u00e1s szinten l\u00e1tjuk \u00e1t a kapacit\u00e1sunkat.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, vez\u00e9rigazgat\u00f3<\/b><br>Mamec \u00b7 Ipari kever\u0151k, szivatty\u00fak \u00e9s cs\u00facstechnol\u00f3gi\u00e1s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">T\u00f6bb ezer gy\u00e1rt\u00e1si rendel\u00e9s \u00fctemez\u00e9se t\u00f6rt\u00e9nik automatikusan, mik\u00f6zben az eg\u00e9sz szervezet val\u00f3s id\u0151ben k\u00f6vetheti a termel\u00e9st.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/mamec\/\">A Mamec v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"L\u00e9gifelv\u00e9tel a Piristeel tet\u0151biztons\u00e1gi term\u00e9keket gy\u00e1rt\u00f3 kauhavai \u00fczem\u00e9r\u0151l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner l\u00e1that\u00f3v\u00e1 tette a sz\u0171k keresztmetszeteket, \u00e9s egy\u00e9rtelm\u0171bb\u00e9 tette a termel\u00e9sir\u00e1ny\u00edt\u00e1st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, termel\u00e9svezet\u0151<\/b><br>Piristeel \u00b7 Tet\u0151biztons\u00e1gi \u00e9s csapad\u00e9kv\u00edz-elvezet\u0151 rendszerek<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya id\u00e9n el\u00e9rte a 99,2%-ot, az \u00fctemez\u00e9ssel pedig naponta ak\u00e1r n\u00e9gy \u00f3ra munkaid\u0151t takar\u00edtanak meg.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/piristeel\/\">A Piristeel v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van a QAD Adaptive ERP-nek API-ja a gy\u00e1rt\u00e1si rendel\u00e9sek kezel\u00e9s\u00e9hez?<\/summary>\n<p class=\"sp-faq__a\">Igen. A QXtend Inbound SOAP-on kereszt\u00fcl, XML QDocs dokumentumokkal futtatja a Work Order Maintenance \u00e9s az \u00fczemi programokat. Ahol nincs kiadott QDoc, ott QGen seg\u00edts\u00e9g\u00e9vel gener\u00e1lj\u00e1k a sz\u00fcks\u00e9ges dokumentumot. Az \u00fczleti dokumentumokhoz tartoz\u00f3 REST API-k sz\u0171r\u00e9ssel \u00e9s lapoz\u00e1ssal kieg\u00e9sz\u00edtett lek\u00e9rdez\u00e9st is lehet\u0151v\u00e9 tesznek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>T\u00e1mogatja a QAD a webhookokat?<\/summary>\n<p class=\"sp-faq__a\">A QAD a QXtend Outbound seg\u00edts\u00e9g\u00e9vel tov\u00e1bb\u00edtja az adatv\u00e1ltoz\u00e1sokat: az adatb\u00e1zist\u00e1bl\u00e1k triggerei r\u00f6gz\u00edtik a v\u00e1ltoz\u00e1sokat, a QXO pedig egy webszolg\u00e1ltat\u00e1s URL-c\u00edm\u00e9re vagy egy rendszeresen lek\u00e9rdezett k\u00f6nyvt\u00e1rba k\u00fcldi a QDocs dokumentumokat. A SkyPlanner saj\u00e1t webhookjai az \u00fctemterv v\u00e1ltoz\u00e1sait azonnal tov\u00e1bb\u00edtj\u00e1k.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan ker\u00fclnek vissza az \u00fctemezett d\u00e1tumok a QAD-ba?<\/summary>\n<p class=\"sp-faq__a\">A Work Order Maintenance (16.1) funkci\u00f3hoz k\u00fcld\u00f6tt QXtend Inbound QDoc seg\u00edts\u00e9g\u00e9vel, amely a SkyPlanner \u00fctemterve alapj\u00e1n be\u00e1ll\u00edtja a gy\u00e1rt\u00e1si rendel\u00e9s kiad\u00e1si d\u00e1tum\u00e1t \u00e9s hat\u00e1ridej\u00e9t. A QAD ugyanazokkal a szab\u00e1lyokkal ellen\u0151rzi a QDoc dokumentumot, mint a k\u00e9perny\u0151n bevitt adatokat, majd egy v\u00e1lasz QDoc dokumentumot k\u00fcld vissza.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan jutnak el a g\u00e9pkezel\u0151i visszajelent\u00e9sek a QAD-ba?<\/summary>\n<p class=\"sp-faq__a\">Az \u00e1t\u00e1ll\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151 a Labor Feedback by Work Order (16.20.1), az elk\u00e9sz\u00fclt mennyis\u00e9gek pedig a Work Order Receipt (16.11) funkci\u00f3n kereszt\u00fcl ker\u00fclnek r\u00f6gz\u00edt\u00e9sre, mindk\u00e9t esetben QXtend Inbound QDocs dokumentumokkal. A vissza\u00edr\u00e1sr\u00f3l a felm\u00e9r\u00e9s sor\u00e1n d\u00f6ntenek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A QAD-partner melyiket aj\u00e1nlja: a QAD Advanced Scheduling vagy a SkyPlanner megold\u00e1st?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlannert, ha az \u00fcgyf\u00e9l diszkr\u00e9t gy\u00e1rt\u00e1si rendel\u00e9sekkel dolgozik, \u00e9s heteken bel\u00fcl m\u0171k\u00f6d\u0151, a t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 \u00fctemtervet szeretne. A QAD az Advanced Scheduling megold\u00e1st \u00fczemenk\u00e9nt \u00e9s gy\u00e1rt\u00f3soronk\u00e9nt k\u00e9sz\u00fcl\u0151 \u00fctemtervk\u00e9nt mutatja be, a DSCP Production Planning \u00e9s a Redzone mellett (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). A SkyPlanner a QXtend rendszeren kereszt\u00fcl kapcsol\u00f3dik, minden g\u00e9pet, g\u00e9pkezel\u0151t, szersz\u00e1mot \u00e9s anyagot \u00fctemez, automatikusan \u00fajratervez, \u00e9s korl\u00e1tlan sz\u00e1m\u00fa felhaszn\u00e1l\u00f3t biztos\u00edt, havi 199 \u20ac-t\u00f3l.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert az integr\u00e1ci\u00f3 ki\u00e9p\u00edt\u00e9se el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3ba legfeljebb 20 munka\u00e1llom\u00e1st t\u00e1mogat, a QAD-b\u00f3l sz\u00e1rmaz\u00f3 adatok CSV- vagy Excel-importj\u00e1val, bankk\u00e1rtya megad\u00e1sa n\u00e9lk\u00fcl. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">keresse \u00e9rt\u00e9kes\u00edt\u0151inket<\/a> az integr\u00e1ci\u00f3 felm\u00e9r\u00e9s\u00e9hez.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ QAD Adaptive ERP QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a QAD Adaptive ERP rendszert a SkyPlanner APS rendszerrel, bele\u00e9rtve a kor\u00e1bbi QAD Enterprise Edition \u00e9s MFG\/PRO telep\u00edt\u00e9seket is. A SkyPlanner k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t biztos\u00edt &#8230; <a title=\"QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/\" aria-label=\"Read more about QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106182,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106936","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound esem\u00e9nyek, munkaid\u0151adatok, megfeleltet\u00e9s, projekttippek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\" \/>\n<meta property=\"og:description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound esem\u00e9nyek, munkaid\u0151adatok, megfeleltet\u00e9s, projekttippek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/qad-adaptive-erp\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/qad-adaptive-erp\\\/integracios-utmutato\\\/\",\"name\":\"QAD APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound esem\u00e9nyek, munkaid\u0151adatok, megfeleltet\u00e9s, projekttippek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/qad-adaptive-erp\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/qad-adaptive-erp\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/qad-adaptive-erp\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a QAD Adaptive ERP mell\u00e9: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound esem\u00e9nyek, munkaid\u0151adatok, megfeleltet\u00e9s, projekttippek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel","og_description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound esem\u00e9nyek, munkaid\u0151adatok, megfeleltet\u00e9s, projekttippek.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/","name":"QAD APS integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound esem\u00e9nyek, munkaid\u0151adatok, megfeleltet\u00e9s, projekttippek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a QAD Adaptive ERP mell\u00e9: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ QAD Adaptive ERP QAD Adaptive ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel Ez az integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a QAD Adaptive ERP rendszert a SkyPlanner APS rendszerrel, bele\u00e9rtve a kor\u00e1bbi QAD Enterprise Edition \u00e9s MFG\/PRO telep\u00edt\u00e9seket is. A SkyPlanner k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t biztos\u00edt&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=106936"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106936\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106182"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=106936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}