{"id":106269,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/visma-l7\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"visma-l7","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/","title":{"rendered":"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Visma L7<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS a Visma L7-hez: <span class=\"hl\">termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">A SkyPlanner APS termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 a Visma L7-hez, a finn ipari, kivitelez\u0151 \u00e9s energetikai nagy- \u00e9s k\u00f6z\u00e9pv\u00e1llalatok \u00e1ltal haszn\u00e1lt ERP-rendszerhez. Minden g\u00e9p, g\u00e9pkezel\u0151, szersz\u00e1m \u00e9s anyag \u00fctemez\u00e9se konkr\u00e9t id\u0151pontokra, a t\u00e9nyleges kapacit\u00e1sok figyelembev\u00e9tel\u00e9vel t\u00f6rt\u00e9nik. Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a termel\u00e9s.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner a Visma L7 REST API-n kereszt\u00fcl, k\u00e9tir\u00e1ny\u00faan kapcsol\u00f3dik a Visma L7-hez. \u00c1tveszi a munkasz\u00e1mokat (ty\u00f6numero), a m\u0171veleteket (ty\u00f6nvaihe), az er\u0151forr\u00e1sokat, a term\u00e9kstrukt\u00far\u00e1kat, az anyagokat, a k\u00e9szletegyenlegeket \u00e9s a beszerz\u00e9si sorokat. Az \u00fctemezett kezd\u00e9si d\u00e1tumokat, az er\u0151forr\u00e1sokat, a priorit\u00e1sokat, a dolgoz\u00f3kat \u00e9s a napi \u00f3rasz\u00e1mokat vissza\u00edrja az egyes munkalapokra. A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n L7-be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja az integr\u00e1ci\u00f3t.<\/p>\n\n\n<p>Az el\u0151fizet\u00e9s havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, ami 5 munka\u00e1llom\u00e1st tartalmaz. Minden tov\u00e1bbi munka\u00e1llom\u00e1s d\u00edja havi 20 \u20ac. Az ingyenes pr\u00f3ba 30 napig tart, legfeljebb 20 munka\u00e1llom\u00e1ssal, bankk\u00e1rtya megad\u00e1sa n\u00e9lk\u00fcl.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mi v\u00e1ltozik a gy\u00e1rt\u00e1sban?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Minden m\u0171velet konkr\u00e9t id\u0151pontban.<\/p>\n\n\n<p class=\"fx-pain__b\">Az L7 napokra lebontott \u00f3rasz\u00e1mokkal tervezi a m\u0171veleteket. A SkyPlanner minden m\u0171veletet egy szabad munka\u00e1llom\u00e1sra, konkr\u00e9t id\u0151pontra \u00fctemez, figyelembe v\u00e9ve a m\u0171szakokat, a munkasz\u00fcneti napokat, a t\u00e1voll\u00e9teket \u00e9s a t\u00fal\u00f3r\u00e1kat. Ugyanazon a g\u00e9pen soha nem fut k\u00e9t m\u0171velet egy id\u0151ben.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Minden g\u00e9pnek saj\u00e1t \u00fctemterv.<\/p>\n\n\n<p class=\"fx-pain__b\">Az L7 egy er\u0151forr\u00e1s\u00e1n bel\u00fcl a g\u00e9pek sz\u00e1ma alapj\u00e1n oszlik meg a munka. A SkyPlanner minden g\u00e9phez k\u00fcl\u00f6n feladatsort rendel, \u00e9s ha az els\u0151dlegesen v\u00e1lasztott munka\u00e1llom\u00e1s foglalt, egy alternat\u00edv munka\u00e1llom\u00e1sra helyezi \u00e1t a m\u0171veletet. A kiv\u00e1lasztott er\u0151forr\u00e1st vissza\u00edrja az L7 munkalapj\u00e1ra.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A dolgoz\u00f3k \u00e9s a szersz\u00e1mok kapacit\u00e1sa sem korl\u00e1tlan.<\/p>\n\n\n<p class=\"fx-pain__b\">Az egyik g\u00e9pen haszn\u00e1lt k\u00e9sz\u00fcl\u00e9ket soha nem foglalja le egy m\u00e1sikhoz, a h\u00e1rom g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladathoz pedig h\u00e1rom, az adott m\u0171szakban szabad dolgoz\u00f3t rendel.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kevesebb \u00e1t\u00e1ll\u00e1s.<\/p>\n\n\n<p class=\"fx-pain__b\">A SkyPlanner az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixban t\u00e1rolja a term\u00e9kek k\u00f6z\u00f6tti \u00e1t\u00e1ll\u00e1si id\u0151ket, mindk\u00e9t ir\u00e1nyban. A k\u00e9kr\u0151l pirosra v\u00e1lt\u00e1s p\u00e9ld\u00e1ul 30 percig tarthat, a pirosr\u00f3l k\u00e9kre v\u00e1lt\u00e1s pedig 60 percig. Az Arcturus egym\u00e1s ut\u00e1n \u00fctemezi a hasonl\u00f3 gy\u00e1rt\u00e1si feladatokat, \u00e9s a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja, a hat\u00e1rid\u0151ket is m\u00e9rlegelve.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A munka akkor indul, amikor van hozz\u00e1 anyag.<\/p>\n\n\n<p class=\"fx-pain__b\">A SkyPlanner az L7 k\u00e9szletegyenlegei \u00e9s beszerz\u00e9si sorai alapj\u00e1n el\u0151rejelzi a k\u00e9szletek alakul\u00e1s\u00e1t. A besz\u00e1ll\u00edt\u00f3i sz\u00e1ll\u00edt\u00e1sra v\u00e1r\u00f3 m\u0171veletet az anyag be\u00e9rkez\u00e9s\u00e9re \u00fctemezi. Ha k\u00e9sik a sz\u00e1ll\u00edt\u00e1s, a gy\u00e1rt\u00e1si feladat is vele egy\u00fctt tol\u00f3dik.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">ERP-v\u00e1lt\u00e1skor is megmarad a terve.<\/p>\n\n\n<p class=\"fx-pain__b\">A Visma befejezte az L7 \u00faj funkci\u00f3inak fejleszt\u00e9s\u00e9t. A munka\u00e1llom\u00e1sok, a m\u0171veletek, az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix \u00e9s a szab\u00e1lyok a SkyPlannerben maradnak, \u00edgy \u00faj ERP-re v\u00e1lt\u00e1skor csak a kapcsolat v\u00e1ltozik.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je egy hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span> a hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya, a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner d\u00f6nt\u0151 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya a kor\u00e1bbi k\u00f6r\u00fclbel\u00fcl 50%-r\u00f3l el\u00e9rte a 98%-ot, az \u00fctemez\u00e9shez pedig m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/kjh-comp\/\">Olvassa el a KJH-Comp v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, a Mamec vez\u00e9rigazgat\u00f3ja a v\u00e1llalat lohjai gy\u00e1rt\u00f3csarnok\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-es nagys\u00e1grend\u0171<\/b><span> automatikusan \u00fctemezett gy\u00e1rt\u00e1si rendel\u00e9s<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEg\u00e9szen m\u00e1sk\u00e9pp tartjuk k\u00e9zben a termel\u00e9st, \u00e9s teljesen m\u00e1s szinten l\u00e1tjuk \u00e1t a kapacit\u00e1sainkat.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, vez\u00e9rigazgat\u00f3<\/b><br>Mamec \u00b7 Ipari kever\u0151k, szivatty\u00fak \u00e9s cs\u00facstechnol\u00f3giai b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1si rendel\u00e9sek ezreit \u00fctemezi automatikusan a rendszer, \u00e9s a teljes szervezet val\u00f3s id\u0151ben l\u00e1thatja a termel\u00e9s \u00e1llapot\u00e1t.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/mamec\/\">Olvassa el a Mamec v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3szekr\u00e9ny-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u00f3ra<\/b><span> megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokon alapul\u00f3 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a termel\u00e9s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Villamos kapcsol\u00f3szekr\u00e9nyek \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span> termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-visma-l7-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hogyan m\u0171k\u00f6dik a Visma L7 integr\u00e1ci\u00f3ja?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Az L7 \u00e1tadja a gy\u00e1rt\u00e1si feladatokat.<\/strong> A SkyPlanner a m\u0171veleteket a <code>GET \/manufphases\/<\/code>, az er\u0151forr\u00e1sokat a <code>GET \/manufresources\/<\/code>, az alkatr\u00e9szeket \u00e9s anyagokat pedig a <code>GET \/manufcomponents\/<\/code> \u00e9s a <code>GET \/manufmaterials\/<\/code> h\u00edv\u00e1sokkal olvassa be. Emellett \u00e1tveszi a term\u00e9keket, a k\u00e9szletegyenlegeket, az \u00e9rt\u00e9kes\u00edt\u00e9si \u00e9s a beszerz\u00e9si sorokat is. Az els\u0151 bet\u00f6lt\u00e9s ut\u00e1n a lek\u00e9rdez\u00e9sek a <code>modifiedAfter<\/code> param\u00e9tert haszn\u00e1lj\u00e1k, \u00edgy csak az el\u0151z\u0151 fut\u00e1s \u00f3ta m\u00f3dos\u00edtott rekordok \u00e9rkeznek be.<\/li>\n\n\n<li><strong>A SkyPlanner elk\u00e9sz\u00edti \u00e9s naprak\u00e9szen tartja az \u00fctemtervet.<\/strong> Az Arcturus motor m\u00e1sodpercek alatt optimaliz\u00e1lja a teljes tervet, minden g\u00e9pet, dolgoz\u00f3t, szersz\u00e1mot \u00e9s anyagot figyelembe v\u00e9ve. Az Autopilot \u00fajratervez, ha v\u00e1ltozik a termel\u00e9s.<\/li>\n\n\n<li><strong>Az \u00fctemterv visszaker\u00fcl az L7-be.<\/strong> A <code>PUT \/manufphases\/<\/code> minden munkalapr\u00f3l vissza\u00edrja az er\u0151forr\u00e1st, a kezd\u00e9si d\u00e1tumot, a priorit\u00e1st, a dolgoz\u00f3t \u00e9s a napi \u00f3rasz\u00e1mokat az L7 m\u0171velet\u00e9hez. A <code>POST \/resourceupdates\/<\/code> szinkronban tartja az er\u0151forr\u00e1snapt\u00e1r kapacit\u00e1s\u00e1t. Az L7 feladatsorai ezut\u00e1n a SkyPlanner \u00e1ltal meghat\u00e1rozott sorrendben mutatj\u00e1k a gy\u00e1rt\u00e1si feladatokat.<\/li>\n\n\n<li><strong>A k\u00e9sz\u00fclts\u00e9gi adatok vissza\u00e9rkeznek.<\/strong> Az L7 feladatsoraiban r\u00f6gz\u00edtett termel\u00e9si esem\u00e9nyeket a <code>GET \/manufevents\/<\/code> h\u00edv\u00e1s olvassa be. A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations fel\u00fclet\u00e9n is visszajelenthetik a munk\u00e1t.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner a felh\u0151ben fut, \u00e9s a Visma LTR kiszolg\u00e1l\u00f3n el\u00e9rhet\u0151 L7 REST API-hoz csatlakozik, \u00edgy az L7-be semmit sem kell telep\u00edteni. A Visma az <a href=\"https:\/\/vismal7.fi\/integraatiot\/\">L7 integr\u00e1ci\u00f3s oldal\u00e1n<\/a> felsorolja a Skycode v\u00e1llalatot \u00e9s a SkyPlanner term\u00e9ket. A SkyPlanner csapata az \u00d6n L7-be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1.<\/p>\n\n\n<p>Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151zetes \u00e1raj\u00e1nlatot adunk, az el\u0151fizet\u00e9si csomaggal egy\u00fctt. Visma-partnere vagy saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek a SkyPlanner dokument\u00e1lt API-j\u00e1ra (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>). A v\u00e9gpontokat, a mez\u0151megfeleltet\u00e9seket \u00e9s az adatgazdai szab\u00e1lyokat a <a href=\"\/hu\/integraciok\/erp\/visma-l7\/integracios-utmutato\/\">Visma L7 gy\u00e1rt\u00e1s\u00fctemez\u00e9si integr\u00e1ci\u00f3s \u00fatmutat\u00f3ja<\/a> ismerteti.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-visma-l7-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mit \u00fctemez a Visma L7, \u00e9s mit ad hozz\u00e1 a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az L7 termel\u00e9sir\u00e1ny\u00edt\u00e1sa (Tuotannonohjaus) a sz\u00fcks\u00e9gletsz\u00e1m\u00edt\u00e1s (Tarvelaskenta), a finomtervez\u00e9s (Hienosuunnittelu) \u00e9s a gy\u00e1rt\u00e1stervez\u00e9si t\u00e1bl\u00e1zat seg\u00edts\u00e9g\u00e9vel tervez. A finomtervez\u00e9s napi bont\u00e1sban \u00fctemezi a m\u0171veleteket az er\u0151forr\u00e1sra, \u00e9s megmutatja az egyes napok terhel\u00e9s\u00e9t. A korl\u00e1tokat a Visma saj\u00e1t dokument\u00e1ci\u00f3ja r\u00f6gz\u00edti:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A munka a g\u00e9pek sz\u00e1ma alapj\u00e1n oszlik meg.<\/strong> T\u00f6bb g\u00e9pet tartalmaz\u00f3 er\u0151forr\u00e1sn\u00e1l a kapacit\u00e1sig\u00e9nyt elosztja a g\u00e9pek sz\u00e1m\u00e1val (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">forr\u00e1s<\/a>). A SkyPlanner minden g\u00e9pet k\u00fcl\u00f6n munka\u00e1llom\u00e1sk\u00e9nt \u00fctemez.<\/li>\n\n\n<li><strong>A t\u00falterhel\u00e9st jelzi, de nem oldja meg.<\/strong> Ha a terhel\u00e9s meghaladja a kapacit\u00e1st, az L7 pirosra sz\u00ednezi a terhel\u00e9si \u00e9rt\u00e9keket (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">forr\u00e1s<\/a>). A r\u00f6gz\u00edtett m\u0171veletek \u00fctemez\u00e9se megengedi a t\u00falterhel\u00e9st, \u00e9s csak egyszint\u0171 strukt\u00far\u00e1kat kezel (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">2024-es oktat\u00e1si anyag<\/a>). A SkyPlanner soha nem foglal le egy g\u00e9pet, dolgoz\u00f3t vagy szersz\u00e1mot egyszerre k\u00e9t feladathoz.<\/li>\n\n\n<li><strong>A tervez\u0151 \u00e1ll\u00edtja sorrendbe a napi munk\u00e1t.<\/strong> A napi feladatok rendez\u00e9s\u00e9t k\u00e9zzel kell elind\u00edtani, a k\u00fcls\u0151 rendszer \u00e1ltal be\u00e1ll\u00edtott priorit\u00e1s pedig v\u00e1ltozatlan marad (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Jarjesta-paivan-tyot-toimi\">forr\u00e1s<\/a>). A SkyPlanner be\u00e1ll\u00edtja ezt a priorit\u00e1st \u00d6n helyett, az L7 pedig meg\u0151rzi.<\/li>\n\n\n<li><strong>A napt\u00e1r hi\u00e1nyoss\u00e1gaira figyelni kell.<\/strong> Az \u00fczemi napt\u00e1rb\u00f3l hi\u00e1nyz\u00f3 napok miatt a m\u0171veletek a m\u00faltba ker\u00fclhetnek (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Tehdaskalenteri\">forr\u00e1s<\/a>). A SkyPlanner olyan m\u0171szaknapt\u00e1rakkal dolgozik, amelyek tartalmazz\u00e1k a munkasz\u00fcneti napokat \u00e9s a t\u00e1voll\u00e9teket.<\/li>\n\n\n<li><strong>Az \u00e1t\u00e1ll\u00e1sokat nem veszi figyelembe.<\/strong> Az L7 finomtervez\u00e9s\u00e9ben nincs \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix. A SkyPlanner \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixa \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy az \u00e1t\u00e1ll\u00e1sok a lehet\u0151 legkevesebb id\u0151t vegy\u00e9k ig\u00e9nybe.<\/li>\n\n<\/ul>\n\n\n<p>Minden be\u00e1ll\u00edt\u00e1st \u00e9s korl\u00e1tot r\u00e9szletesen ismertet a <a href=\"\/hu\/integraciok\/erp\/visma-l7\/termelesutemezes\/\">K\u00e9pes a Visma L7 a val\u00f3s kapacit\u00e1sokat figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9sre?<\/a> c\u00edm\u0171 cikk.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma L7 \u00f6nmag\u00e1ban \u00e9s SkyPlannerrel<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>A Visma L7 finomtervez\u00e9se<\/th><th>Visma L7 SkyPlanner APS-sel<\/th><\/tr><\/thead><tbody><tr><td>Id\u0151beli felbont\u00e1s<\/td><td>Napi \u00f3rasz\u00e1m m\u0171veletenk\u00e9nt<\/td><td>Konkr\u00e9t id\u0151pontok minden m\u0171velethez, g\u00e9phez \u00e9s dolgoz\u00f3hoz<\/td><\/tr><tr><td>G\u00e9pek<\/td><td>Egyetlen er\u0151forr\u00e1s; a munka a g\u00e9pek sz\u00e1ma alapj\u00e1n oszlik meg<\/td><td>Minden g\u00e9p k\u00fcl\u00f6n munka\u00e1llom\u00e1s; az Arcturus az \u00d6n \u00e1ltal enged\u00e9lyezett alternat\u00edv\u00e1k k\u00f6z\u00fcl v\u00e1laszt<\/td><\/tr><tr><td>T\u00falterhel\u00e9s<\/td><td>A terhel\u00e9si \u00e9rt\u00e9kek pirosra v\u00e1ltanak; a tervez\u0151 helyezi \u00e1t a m\u0171veleteket<\/td><td>Nincs t\u00falterhel\u00e9s; minden er\u0151forr\u00e1sn\u00e1l betartja a kapacit\u00e1skorl\u00e1tot<\/td><\/tr><tr><td>Sorrend<\/td><td>Priorit\u00e1s \u00e9s a napi feladatok k\u00e9zi rendez\u00e9se<\/td><td>Az Arcturus m\u00e1sodpercek alatt optimaliz\u00e1lja a teljes tervet<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1sok<\/td><td>A finomtervez\u00e9sben nincs \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix<\/td><td>Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendbe rendezi a gy\u00e1rt\u00e1si feladatokat<\/td><\/tr><tr><td>Anyagok<\/td><td>Sz\u00fcks\u00e9gletsz\u00e1m\u00edt\u00e1s \u00e9s foglal\u00e1sok<\/td><td>Az el\u0151rejelzett k\u00e9szlet \u00e9s a beszerz\u00e9si t\u00e9telek v\u00e1rhat\u00f3 be\u00e9rkez\u00e9se hat\u00e1rozza meg a m\u0171velet kezd\u00e9s\u00e9t<\/td><\/tr><tr><td>V\u00e1ltoz\u00e1sok<\/td><td>A tervez\u0151 \u00fajraind\u00edtja a tervez\u00e9st<\/td><td>Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a termel\u00e9s<\/td><\/tr><tr><td>\u00dczem<\/td><td>L7 munkasorok \u00e9s LTR<\/td><td>Mobile Confirmations \u00e9s az L7 gy\u00e1rt\u00e1si esem\u00e9nyeinek visszaolvas\u00e1sa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-visma-l7-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Milyen adatok \u00e1ramlanak a Visma L7 \u00e9s a SkyPlanner k\u00f6z\u00f6tt?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma L7<\/th><th>Ir\u00e1ny<\/th><th>SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>Term\u00e9kek \u00e9s term\u00e9kstrukt\u00far\u00e1k (tuoterakenne)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Term\u00e9kek, r\u00e9szegys\u00e9gek, anyagok<\/td><\/tr><tr><td>Munkasz\u00e1mok \u00e9s munkaf\u00e1zisok (<code>\/manufphases\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok munka\u00e1llom\u00e1sonk\u00e9nt<\/td><\/tr><tr><td>Er\u0151forr\u00e1sok (<code>\/manufresources\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Munka\u00e1llom\u00e1sok \u00e9s csoportok<\/td><\/tr><tr><td>Rakt\u00e1rk\u00e9szletek \u00e9s beszerz\u00e9si rendel\u00e9sek t\u00e9telsorai<\/td><td>L7 \u2192 SkyPlanner<\/td><td>K\u00e9szletek \u00e9s be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9sek<\/td><\/tr><tr><td>Vev\u0151i rendel\u00e9sek \u00e9s t\u00e9telsoraik<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Hat\u00e1rid\u0151k \u00e9s vev\u0151i priorit\u00e1s<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si esem\u00e9nyek (<code>\/manufevents\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Az egyes gy\u00e1rt\u00e1si feladatok el\u0151rehalad\u00e1sa<\/td><\/tr><tr><td>Er\u0151forr\u00e1s, kezd\u00e9si d\u00e1tum, priorit\u00e1s, szem\u00e9ly, napi \u00f3rasz\u00e1m (<code>PUT \/manufphases\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>\u00dctemterv<\/td><\/tr><tr><td>Az er\u0151forr\u00e1snapt\u00e1r kapacit\u00e1sa (<code>POST \/resourceupdates\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>M\u0171szakkapacit\u00e1s<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-scheduling-software-and-add-ons-compare\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A Visma L7-hez haszn\u00e1lhat\u00f3 \u00fctemez\u0151szoftverek \u00e9s kieg\u00e9sz\u00edt\u0151k \u00f6sszehasonl\u00edt\u00e1sa<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Megold\u00e1s<\/th><th>Mit k\u00edn\u00e1l?<\/th><th>Mikor megfelel\u0151?<\/th><\/tr><\/thead><tbody><tr><td>A Visma L7 gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1sa<\/td><td>Sz\u00fcks\u00e9gletsz\u00e1m\u00edt\u00e1s, finomtervez\u00e9s \u00e9s terhel\u00e9si n\u00e9zetek az L7-en bel\u00fcl<\/td><td>Egy tervez\u0151 \u00e1ll\u00edtja \u00f6ssze a napi beoszt\u00e1st, \u00e9s az L7-et az \u00e9letciklusa v\u00e9g\u00e9ig haszn\u00e1lj\u00e1k<\/td><\/tr><tr><td>APS szoftvercsomagok (p\u00e9ld\u00e1ul Delfoi Planner)<\/td><td>Tervez\u0151- \u00e9s szimul\u00e1ci\u00f3s szoftver, amely az L7-et is felsorolja az integr\u00e1lt ERP-rendszerei k\u00f6z\u00f6tt<\/td><td>K\u00fcl\u00f6n tervez\u0151csapat vezeti a bevezet\u00e9si projektet<\/td><\/tr><tr><td>\u00daj ERP be\u00e9p\u00edtett tervez\u00e9si funkci\u00f3kkal (p\u00e9ld\u00e1ul Monitor ERP vagy Odoo a Collapick Tempo kieg\u00e9sz\u00edt\u0151vel)<\/td><td>Az L7 \u00e9s gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1s\u00e1nak lecser\u00e9l\u00e9se egyetlen projektben<\/td><td>Egyszerre szeretn\u00e9k lecser\u00e9lni az ERP-t \u00e9s a tervez\u0151eszk\u00f6zt<\/td><\/tr><tr><td>API-n kereszt\u00fcl csatlakoz\u00f3 felh\u0151alap\u00fa APS (SkyPlanner APS)<\/td><td>B\u00f6ng\u00e9sz\u0151ben fut\u00f3 \u00fctemez\u0151, amely beolvassa az L7 munkaf\u00e1zisait, \u00e9s vissza\u00edrja az \u00fctemtervet<\/td><td>M\u00e1r most termel\u00e9s\u00fctemez\u00e9sre van sz\u00fcks\u00e9g\u00fck, \u00e9s olyan tervet szeretn\u00e9nek, amelyet a k\u00f6vetkez\u0151 ERP mellett is megtarthatnak<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1st az L7 Hienosuunnittelu helyett, ha:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pontos id\u0151pontokra van sz\u00fcks\u00e9ge.<\/strong> Az L7 napi \u00f3rasz\u00e1mk\u00e9nt t\u00e1rolja a munkaf\u00e1zisokat. A SkyPlanner minden munkaf\u00e1zishoz kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontot rendel egy t\u00e9nyleges m\u0171szakon bel\u00fcl.<\/li>\n\n\n<li><strong>Egy er\u0151forr\u00e1shoz t\u00f6bb g\u00e9p tartozik.<\/strong> Az L7 a g\u00e9pek sz\u00e1m\u00e1val osztja el a munk\u00e1t (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">forr\u00e1s<\/a>). A SkyPlanner minden g\u00e9pet k\u00fcl\u00f6n \u00fctemez, \u00e9s a szabad g\u00e9pet v\u00e1lasztja ki.<\/li>\n\n\n<li><strong>A pirossal jelzett terhel\u00e9si \u00e9rt\u00e9kek hetente t\u00f6bb \u00f3r\u00e1j\u00e1ba ker\u00fclnek.<\/strong> Az L7 jelzi a t\u00falterhel\u00e9st (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">forr\u00e1s<\/a>). A SkyPlanner eleve t\u00falterhel\u00e9s n\u00e9lk\u00fcli tervet k\u00e9sz\u00edt.<\/li>\n\n\n<li><strong>Term\u00e9kei t\u00f6bbszint\u0171 strukt\u00far\u00e1val rendelkeznek.<\/strong> Az L7 r\u00f6gz\u00edtett munkaf\u00e1zisokra \u00e9p\u00fcl\u0151 \u00fctemez\u00e9se csak egyszint\u0171 strukt\u00far\u00e1kat kezel (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">forr\u00e1s<\/a>). A SkyPlanner egyetlen tervben \u00fctemezi a r\u00e9szegys\u00e9geket \u00e9s az \u00f6ssze\u00e1ll\u00edt\u00e1sokat.<\/li>\n\n\n<li><strong>Az \u00e1t\u00e1ll\u00e1sok hat\u00e1rozz\u00e1k meg a kibocs\u00e1t\u00e1st.<\/strong> A SkyPlanner \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixa \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy az \u00e1t\u00e1ll\u00e1si id\u0151 a lehet\u0151 legkevesebb legyen.<\/li>\n\n\n<li><strong>Hamarosan ERP-t v\u00e1ltanak.<\/strong> A Visma le\u00e1ll\u00edtotta az L7 \u00faj fejleszt\u00e9seit, \u00e9s a term\u00e9k haszn\u00e1lata 2028 v\u00e9g\u00e9n megsz\u0171nik (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/\">a Visma k\u00f6zlem\u00e9nye<\/a>). A SkyPlanner rendszerben kialak\u00edtott tervez\u00e9s az \u00e1t\u00e1ll\u00e1s sor\u00e1n is megmarad.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az els\u0151 l\u00e9p\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Ind\u00edtsa el az ingyenes pr\u00f3baid\u0151szakot.<\/strong> 30 nap, legfeljebb 20 munka\u00e1llom\u00e1s, a Basic csomag \u00f6sszes funkci\u00f3ja, bankk\u00e1rtya n\u00e9lk\u00fcl.<\/li>\n\n\n<li><strong>Modellezze a gy\u00e1rt\u00e1s\u00e1t.<\/strong> Hozza l\u00e9tre a g\u00e9peket, a dolgoz\u00f3kat \u00e9s a m\u0171szakokat a SkyPlanner rendszerben, vagy import\u00e1lja \u0151ket. A bevezet\u00e9shez seg\u00edts\u00e9get is k\u00e9rhet.<\/li>\n\n\n<li><strong>T\u00f6ltse be a gy\u00e1rt\u00e1si feladatokat.<\/strong> Export\u00e1lja a nyitott munkasz\u00e1mokat, munkaf\u00e1zisokat \u00e9s er\u0151forr\u00e1sokat az L7-b\u0151l Excel- vagy CSV-f\u00e1jlba. Import\u00e1lja \u0151ket, majd hasonl\u00edtsa \u00f6ssze a SkyPlanner \u00fctemterv\u00e9t a jelenlegi terv\u00e9vel.<\/li>\n\n\n<li><strong>Csatlakoztassa a Visma L7-et.<\/strong> Az LTR rendszergazd\u00e1ja l\u00e9trehozza az API-felhaszn\u00e1l\u00f3t. A SkyPlanner csapata be\u00e1ll\u00edtja a k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1.<\/li>\n\n<\/ol>\n\n\n<p><strong>\u00c1rak.<\/strong> A csomagokat havonta, munka\u00e1llom\u00e1sonk\u00e9nt sz\u00e1ml\u00e1zzuk. B\u00e1rmikor hozz\u00e1adhat vagy elt\u00e1vol\u00edthat munka\u00e1llom\u00e1sokat, illetve lemondhatja az el\u0151fizet\u00e9s\u00e9t. A r\u00e9szleteket az <a href=\"\/hu\/arkepzes\/\">\u00e1rak oldal\u00e1n<\/a>, a t\u00f6bbi t\u00e1mogatott rendszert pedig az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u0151 oldal\u00e1n<\/a> tal\u00e1lja. A val\u00f3s kapacit\u00e1sra \u00e9p\u00fcl\u0151 tervez\u00e9s alapjait a <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">termel\u00e9s\u00fctemez\u00e9si \u00fatmutat\u00f3<\/a> ismerteti.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Kapcsolat az \u00e9rt\u00e9kes\u00edt\u00e9ssel<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Melyik a legjobb \u00fctemez\u00e9si kieg\u00e9sz\u00edt\u0151 a Visma L7-hez?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner APS olyan termel\u00e9s\u00fctemez\u00e9si kieg\u00e9sz\u00edt\u0151, amely k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val kapcsol\u00f3dik a Visma L7-hez. Beolvassa a munkaf\u00e1zisokat, er\u0151forr\u00e1sokat, term\u00e9kstrukt\u00far\u00e1kat, anyagokat, rakt\u00e1rk\u00e9szleteket \u00e9s beszerz\u00e9si t\u00e9telsorokat, \u00e9s vissza\u00edrja az egyes munkalapokhoz tartoz\u00f3 er\u0151forr\u00e1st, kezd\u00e9si d\u00e1tumot, priorit\u00e1st, hozz\u00e1rendelt dolgoz\u00f3t \u00e9s napi \u00f3rasz\u00e1mot. Minden g\u00e9p, g\u00e9pkezel\u0151, szersz\u00e1m \u00e9s anyag korl\u00e1tozottan \u00e1ll rendelkez\u00e9sre. Az ir\u00e1nyf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy az \u00e1t\u00e1ll\u00e1si id\u0151 a lehet\u0151 legkevesebb legyen. Az \u00e1r havi 199 \u20ac-t\u00f3l indul, az ingyenes pr\u00f3baid\u0151szak pedig 30 napig tart.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Milyen \u00fctemez\u0151szoftver integr\u00e1lhat\u00f3 a Visma L7-tel?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner APS a Visma L7 REST API seg\u00edts\u00e9g\u00e9vel kapcsol\u00f3dik a Visma L7-hez. A Visma az L7 integr\u00e1ci\u00f3s oldal\u00e1n a Skycode c\u00e9get a SkyPlanner megold\u00e1ssal egy\u00fctt t\u00fcnteti fel. Az L7-hez m\u00e1s APS szoftvercsomagok, p\u00e9ld\u00e1ul a Delfoi Planner is csatlakoznak. A SkyPlanner b\u00f6ng\u00e9sz\u0151ben fut, vissza\u00edrja az \u00fctemtervet az L7 munkalapjaira, \u00e9s minden g\u00e9pkezel\u0151 munkasor\u00e1t el\u00e9rhet\u0151v\u00e9 teszi telefonon vagy t\u00e1blag\u00e9pen.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A Visma L7 Hienosuunnittelu vagy a SkyPlanner megold\u00e1st v\u00e1lasszuk?<\/summary>\n<p class=\"sp-faq__a\">Haszn\u00e1lja az L7 finomtervez\u00e9s\u00e9t, ha minden er\u0151forr\u00e1s egyetlen g\u00e9pet jelent, a term\u00e9kstrukt\u00far\u00e1k egyszint\u0171ek, \u00e9s a tervez\u0151nek van ideje \u00f6ssze\u00e1ll\u00edtani a napi beoszt\u00e1st. V\u00e1lassza a SkyPlanner megold\u00e1st, ha pontos id\u0151pontokra, er\u0151forr\u00e1sonk\u00e9nt t\u00f6bb g\u00e9p kezel\u00e9s\u00e9re, t\u00f6bbszint\u0171 strukt\u00far\u00e1kra, minim\u00e1lis \u00e1t\u00e1ll\u00e1si id\u0151t c\u00e9lz\u00f3 sorba rendez\u00e9sre vagy automatikus \u00fajratervez\u00e9sre van sz\u00fcks\u00e9ge. A SkyPlanner az L7 lecser\u00e9l\u00e9sekor is meg\u0151rzi a kialak\u00edtott tervez\u00e9st.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mi t\u00f6rt\u00e9nik a SkyPlanner rendszerrel, ha lev\u00e1ltjuk a Visma L7-et?<\/summary>\n<p class=\"sp-faq__a\">A munka\u00e1llom\u00e1sok, m\u0171veleti l\u00e9p\u00e9sek, az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, a m\u0171szakok \u00e9s a szab\u00e1lyok megmaradnak a SkyPlanner rendszerben. Az integr\u00e1ci\u00f3t az \u00faj ERP-hez csatlakoztatjuk, amely lehet p\u00e9ld\u00e1ul <a href=\"\/hu\/integraciok\/erp\/business-central\/\">Business Central<\/a>, <a href=\"\/hu\/integraciok\/erp\/visma-net\/\">Visma Net<\/a>, <a href=\"\/hu\/integraciok\/erp\/lemonsoft\/\">Lemonsoft<\/a>, <a href=\"\/hu\/integraciok\/erp\/monitor-erp\/\">Monitor ERP<\/a> vagy <a href=\"\/hu\/integraciok\/erp\/odoo\/\">Odoo<\/a>. A gy\u00e1rt\u00e1s az \u00e1t\u00e1ll\u00e1s sor\u00e1n is ugyanazt a tervet haszn\u00e1lja.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A Visma L7 ugyanaz, mint a Visma Net vagy a Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">Nem. A Visma L7 a Visma ERP-rendszere, amelyet jellemz\u0151en k\u00f6zepes \u00e9s nagy kivitelez\u0151, energetikai \u00e9s ipari v\u00e1llalatoknak sz\u00e1nnak. A <a href=\"\/hu\/integraciok\/erp\/visma-net\/\">Visma Net<\/a> a Visma felh\u0151alap\u00fa ERP-je k\u00f6z\u00e9p- \u00e9s nagyv\u00e1llalatoknak, a <a href=\"\/hu\/integraciok\/erp\/visma-nova\/\">Visma Nova<\/a> pedig a kisv\u00e1llalatokat szolg\u00e1lja ki. Mindegyiknek saj\u00e1t adatmodellje \u00e9s k\u00fcl\u00f6n SkyPlanner-oldala van.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kell b\u00e1rmit telep\u00edten\u00fcnk a Visma L7-be?<\/summary>\n<p class=\"sp-faq__a\">Nem. A SkyPlanner a felh\u0151ben fut, \u00e9s az \u00d6n Visma LTR-kiszolg\u00e1l\u00f3j\u00e1n el\u00e9rhet\u0151 L7 REST API-t h\u00edvja meg. Az LTR rendszergazd\u00e1ja l\u00e9trehozza az API-felhaszn\u00e1l\u00f3t \u00e9s a tokeneket, \u00d6n pedig beszerzi az integr\u00e1ci\u00f3 \u00e1ltal haszn\u00e1lt REST-v\u00e9gpontok licenceit.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mennyibe ker\u00fcl a SkyPlanner egy Visma L7-et haszn\u00e1l\u00f3 v\u00e1llalatnak?<\/summary>\n<p class=\"sp-faq__a\">Az \u00e1r havi 199 \u20ac-t\u00f3l indul, \u00e9s 5 munka\u00e1llom\u00e1st tartalmaz. Minden tov\u00e1bbi munka\u00e1llom\u00e1s d\u00edja havi 20 \u20ac. A munka\u00e1llom\u00e1s olyan gy\u00e1rt\u00e1si er\u0151forr\u00e1s, amelynek saj\u00e1t \u00fctemezett munkasora van. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n, az el\u0151fizet\u00e9si csomaggal egy\u00fctt el\u0151zetes \u00e1raj\u00e1nlatot adunk, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mennyi id\u0151t vesz ig\u00e9nybe a bevezet\u00e9s?<\/summary>\n<p class=\"sp-faq__a\">A bevezet\u00e9s a betan\u00edt\u00e1s \u00e9s a kezdeti be\u00e1ll\u00edt\u00e1sok megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtva \u00e1ltal\u00e1ban heteken bel\u00fcl befejez\u0151dik. A csapat megfelelteti az er\u0151forr\u00e1sokat \u00e9s a munkaf\u00e1zisokat, \u00f6sszekapcsolja a munkasz\u00e1mokat \u00e9s az anyagokat, majd vissza\u00edrja az \u00fctemtervet az L7-be. Az \u00e9les indul\u00e1s el\u0151tt mindent tesztel\u00fcnk a jelenlegi terv\u00e9vel \u00f6sszevetve.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Visma L7 SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal A SkyPlanner APS termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 a Visma L7-hez, a finn ipari, kivitelez\u0151 \u00e9s energetikai nagy- \u00e9s k\u00f6z\u00e9pv\u00e1llalatok \u00e1ltal haszn\u00e1lt ERP-rendszerhez. Minden g\u00e9p, g\u00e9pkezel\u0151, szersz\u00e1m \u00e9s anyag \u00fctemez\u00e9se konkr\u00e9t id\u0151pontokra, a t\u00e9nyleges kapacit\u00e1sok figyelembev\u00e9tel\u00e9vel t\u00f6rt\u00e9nik. Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a &#8230; <a title=\"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/\" aria-label=\"Read more about SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100680,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106269","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma L7 \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 a Visma L7-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val: m\u0171veletek, er\u0151forr\u00e1sok, dolgoz\u00f3k, anyagok. Havi 199 \u20ac-t\u00f3l.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 a Visma L7-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val: m\u0171veletek, er\u0151forr\u00e1sok, dolgoz\u00f3k, anyagok. Havi 199 \u20ac-t\u00f3l.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/\",\"name\":\"Visma L7 \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 a Visma L7-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val: m\u0171veletek, er\u0151forr\u00e1sok, dolgoz\u00f3k, anyagok. Havi 199 \u20ac-t\u00f3l.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/visma-l7\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma L7 \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal","description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 a Visma L7-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val: m\u0171veletek, er\u0151forr\u00e1sok, dolgoz\u00f3k, anyagok. Havi 199 \u20ac-t\u00f3l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/","og_locale":"hu_HU","og_type":"article","og_title":"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","og_description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 a Visma L7-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val: m\u0171veletek, er\u0151forr\u00e1sok, dolgoz\u00f3k, anyagok. Havi 199 \u20ac-t\u00f3l.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/","name":"Visma L7 \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 a Visma L7-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val: m\u0171veletek, er\u0151forr\u00e1sok, dolgoz\u00f3k, anyagok. Havi 199 \u20ac-t\u00f3l.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/visma-l7\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Visma L7 SkyPlanner APS a Visma L7-hez: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal A SkyPlanner APS termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 a Visma L7-hez, a finn ipari, kivitelez\u0151 \u00e9s energetikai nagy- \u00e9s k\u00f6z\u00e9pv\u00e1llalatok \u00e1ltal haszn\u00e1lt ERP-rendszerhez. Minden g\u00e9p, g\u00e9pkezel\u0151, szersz\u00e1m \u00e9s anyag \u00fctemez\u00e9se konkr\u00e9t id\u0151pontokra, a t\u00e9nyleges kapacit\u00e1sok figyelembev\u00e9tel\u00e9vel t\u00f6rt\u00e9nik. Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=106269"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/106269\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100680"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=106269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}