{"id":104187,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/proalpha\/integracios-utmutato\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/","title":{"rendered":"proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez a Proalpha-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a Proalpha ERP a SkyPlanner APS rendszerrel. A SkyPlanner \u00e9s a Proalpha k\u00f6z\u00f6tti integr\u00e1ci\u00f3 k\u00e9tir\u00e1ny\u00fa:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlanner \u00e1tveszi a cikkeket, a gy\u00e1rt\u00e1si rendel\u00e9seket a m\u0171veleteikkel egy\u00fctt, az er\u0151forr\u00e1sokat, a napt\u00e1rakat, a k\u00e9szletadatokat \u00e9s a beszerz\u00e9si rendel\u00e9seket.<\/li>\n\n\n<li>A m\u0171veletenk\u00e9nt tervezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontokat a setWorkOrderOperationDates h\u00edv\u00e1ssal \u00edrja vissza.<\/li>\n\n\n<li>Az er\u0151forr\u00e1s-v\u00e1ltoz\u00e1sokat a changeWorkOrderOperationResource h\u00edv\u00e1ssal \u00edrja vissza.<\/li>\n\n\n<li>A g\u00e9pkezel\u0151i visszajelent\u00e9seket az operationDataEntry h\u00edv\u00e1ssal \u00edrja vissza.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta rendel\u00e9slist\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n Proalpha-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Ez az \u00fatmutat\u00f3 azoknak a partnereknek \u00e9s fejleszt\u0151knek sz\u00f3l, akik r\u00e9szt szeretn\u00e9nek venni a munk\u00e1ban, vagy saj\u00e1t maguk szeretn\u00e9nek fejleszteni a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra \u00e9p\u00edtve (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-proalpha-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A Proalpha interf\u00e9szei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Proalpha ERP Progress OpenEdge alapon fut; a Release 9 verzi\u00f3val a platform OpenEdge 12-re v\u00e1ltott. (<a href=\"https:\/\/www.proalpha.com\/en\/blog\/proalpha-release-9-integration-is-the-key-to-success\">Proalpha<\/a>) Az \u00fctemez\u00e9s szempontj\u00e1b\u00f3l n\u00e9gy interf\u00e9sz l\u00e9nyeges.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Proalpha ERP REST API-k.<\/strong> A nyilv\u00e1nos <a href=\"https:\/\/api.proalpha.services\/\">Proalpha API Portal<\/a> 108 OpenAPI 3.0 specifik\u00e1ci\u00f3t sorol fel az <code>api\/web\/v1<\/code> alatt. Ezen az \u00fatvonalon t\u00f6rt\u00e9nik a vissza\u00edr\u00e1s, valamint a cikkek \u00e9s k\u00e9szletadatok olvas\u00e1sa.<\/li>\n\n\n<li><strong>Integration Workbench (INWB).<\/strong> A Proalpha le\u00edr\u00e1sa szerint az INWB \u201eis a central platform which connects different IT systems, machines, sites\u201d (k\u00fcl\u00f6nb\u00f6z\u0151 informatikai rendszereket, g\u00e9peket \u00e9s telephelyeket \u00f6sszekapcsol\u00f3 k\u00f6zponti platform), \u00e9s \u201econverts the data into the format of the target system.\u201d (az adatokat a c\u00e9lrendszer form\u00e1tum\u00e1ra alak\u00edtja). (<a href=\"https:\/\/www.proalpha.com\/en\/areas\/business-partners-system-integration\">Proalpha<\/a>) A pAX-\u00fczeneteket a <code>POST \/api\/web\/v1\/inwb\/message<\/code> v\u00e9gponton fogadja. Ezt haszn\u00e1lja a gy\u00e1rt\u00e1si rendel\u00e9sek adatainak tov\u00e1bb\u00edt\u00e1s\u00e1ra a Proalpha rendszerb\u0151l \u00e9s a Proalpha rendszerbe.<\/li>\n\n\n<li><strong>Proalpha Integration Platform.<\/strong> A 2026 \u00e1prilis\u00e1ban bejelentett, n8n-alap\u00fa platform \u201ewill be available to customers either on-premises or in the cloud.\u201d (az \u00fcgyfelek sz\u00e1m\u00e1ra helyben telep\u00edtve \u00e9s felh\u0151ben is el\u00e9rhet\u0151 lesz). A Proalpha \u201ewill rely on an API-centric reference architecture and REST interfaces.\u201d (API-k\u00f6zpont\u00fa referenciaarchitekt\u00far\u00e1ra \u00e9s REST-interf\u00e9szekre fog t\u00e1maszkodni). (<a href=\"https:\/\/www.proalpha.com\/en\/blog\/proalpha-enters-into-strategic-partnership-with-n8n\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>EDI \u00e9s f\u00e1jlexport.<\/strong> Az INWB kezeli az ipar\u00e1gspecifikus f\u00e1jlform\u00e1tumokat, a SkyPlanner kipr\u00f3b\u00e1l\u00e1s\u00e1hoz pedig elegend\u0151 a f\u00e1jlexport.<\/li>\n\n<\/ol>\n\n\n<h3 class=\"wp-block-heading\">Gy\u00e1rt\u00e1si v\u00e9gpontok<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Proalpha API<\/th><th>V\u00e9gpont<\/th><th>Szerepe az integr\u00e1ci\u00f3ban<\/th><\/tr><\/thead><tbody><tr><td>Production Workorder Operation Dates API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/setWorkOrderOperationDates<\/code><\/td><td>M\u0171veletenk\u00e9nt tervezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pont (guid, startTimePoint, endTimePoint)<\/td><\/tr><tr><td>Production Workorder Operation Resource API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/changeWorkOrderOperationResource<\/code><\/td><td>Az \u00fctemez\u00e9s sor\u00e1n kiv\u00e1lasztott er\u0151forr\u00e1s (guid, resourceGUID)<\/td><\/tr><tr><td>Production Workorder Operation API V1<\/td><td><code>POST \/api\/web\/v1\/pps\/prod\/operationDataEntry\/{combined, setup, process}<\/code><\/td><td>Visszajelent\u00e9sek: postingQty, scrapQty, finishOperation, employeeID, resourceTime<\/td><\/tr><tr><td>Part API<\/td><td><code>GET\/POST \/api\/web\/v1\/master\/part<\/code><\/td><td>Cikkek a partNumber, partType, quantityUnitCode mez\u0151kkel<\/td><\/tr><tr><td>Material API V1<\/td><td><code>GET \/api\/web\/v1\/mawi\/MRPArea\/{mrpAreaGuid}\/part\/{partGuid}\/stock<\/code><\/td><td>K\u00e9szlet MRP-ter\u00fcletenk\u00e9nt<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A k\u00f6zz\u00e9tett Proalpha-specifik\u00e1ci\u00f3k HTTP Basic hiteles\u00edt\u00e9st haszn\u00e1lnak. A v\u00e9gpontok k\u00f6rnyezetf\u00fcgg\u0151k: <code>{schema}:\/\/{host}:{port}\/api\/web\/v1\/...<\/code>, \u00e9s az \u00d6n Proalpha-szerver\u00e9n vagy a Proalpha Cloud k\u00f6rnyezetben \u00e9rhet\u0151k el. Hozzon l\u00e9tre k\u00fcl\u00f6n technikai felhaszn\u00e1l\u00f3t, amelynek jogosults\u00e1gai csak a megfeleltet\u00e9si t\u00e1bl\u00e1zatban szerepl\u0151 objektumokra terjednek ki. Informatikai csapat\u00e1val tervezze meg a h\u00e1l\u00f3zati hozz\u00e1f\u00e9r\u00e9st a SkyPlanner felh\u0151j\u00e9b\u0151l ehhez a v\u00e9gponthoz.<\/p>\n\n\n<p>A SkyPlanner oldal\u00e1n a REST API API-tokennel hiteles\u00edt (SkyPlanner Settings &gt; API), dokument\u00e1ci\u00f3ja Swagger\/OpenAPI form\u00e1tum\u00fa. Az indul\u00e1shoz elegend\u0151 egy API-token. Az <a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s oktat\u00f3anyag<\/a> v\u00e9gigvezeti az els\u0151 h\u00edv\u00e1sokon.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Esem\u00e9nyek \u00e9s id\u0151szakos lek\u00e9rdez\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Proalpha API Portal nem sorol fel webhook-feliratkoz\u00e1si API-t. A kimen\u0151 v\u00e1ltoz\u00e1sokat az al\u00e1bbi m\u00f3dokon lehet tov\u00e1bb\u00edtani:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>INWB-\u00fczenetfolyamattal<\/strong>, amely az \u00faj \u00e9s m\u00f3dos\u00edtott gy\u00e1rt\u00e1si rendel\u00e9seket a m\u0171veleteikkel egy\u00fctt k\u00fcldi el<\/li>\n\n\n<li>a Proalpha Integration Platform <strong>n8n-munkafolyamat\u00e1val<\/strong><\/li>\n\n\n<li>a k\u00e9szletadatok <strong>\u00fctemezett lek\u00e9rdez\u00e9s\u00e9vel<\/strong> a Material API-n kereszt\u00fcl<\/li>\n\n<\/ul>\n\n\n<p>A SkyPlanner webhookokat k\u00fcld, amikor az \u00e1llapot vagy az \u00fctemterv megv\u00e1ltozik, \u00edgy a Proalpha rendszerbe t\u00f6rt\u00e9n\u0151 vissza\u00edr\u00e1s esem\u00e9nyvez\u00e9relt.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Proalpha-objektum vagy API<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Part (Part API)<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Term\u00e9kfolyamat-modell: process, activities; a gy\u00e1rt\u00e1si rendel\u00e9s BOM-sorai<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek, folyamatl\u00e9p\u00e9sek<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9s (Fertigungsauftrag) mennyis\u00e9ggel \u00e9s hat\u00e1rid\u0151vel<\/td><td>Rendel\u00e9s \u00e9s gy\u00e1rt\u00e1si feladatok hat\u00e1rid\u0151vel \u00e9s priorit\u00e1ssal<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>INWB- vagy n8n-adatk\u00fcld\u00e9ssel, illetve n\u00e9h\u00e1ny percenk\u00e9nt<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si rendel\u00e9s m\u0171veletei: targetSetupTime, targetProcessTime, resource<\/td><td>Folyamatl\u00e9p\u00e9sek \u00e1t\u00e1ll\u00e1si id\u0151kkel \u00e9s id\u0151tartamokkal<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>A gy\u00e1rt\u00e1si rendel\u00e9ssel egy\u00fctt<\/td><\/tr><tr><td>Er\u0151forr\u00e1sok, er\u0151forr\u00e1scsoportok, alternat\u00edv er\u0151forr\u00e1scsoportok<\/td><td>Munka\u00e1llom\u00e1sok, munka\u00e1llom\u00e1s-csoportok, alternat\u00edv munka\u00e1llom\u00e1sok<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s<\/td><\/tr><tr><td>Az er\u0151forr\u00e1snapt\u00e1r id\u0151blokkjai intensity \u00e9s overloadIntensity mez\u0151kkel<\/td><td>M\u0171szakok \u00e9s a munka\u00e1llom\u00e1sok hat\u00e9konys\u00e1ga<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s; ut\u00e1na naponta vagy a SkyPlannerben karbantartva<\/td><\/tr><tr><td>K\u00e9szlet MRP-ter\u00fcletenk\u00e9nt<\/td><td>Anyagk\u00e9szlet<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>\u00d3r\u00e1nk\u00e9nt vagy minden \u00fctemez\u00e9si futtat\u00e1s el\u0151tt<\/td><\/tr><tr><td>Beszerz\u00e9si rendel\u00e9sek sz\u00e1ll\u00edt\u00e1si d\u00e1tummal<\/td><td>Be\u00e9rkez\u0151 anyag a sz\u00e1ll\u00edt\u00e1s d\u00e1tum\u00e1n<\/td><td>Proalpha \u2192 SkyPlanner<\/td><td>\u00d3r\u00e1nk\u00e9nt vagy minden \u00fctemez\u00e9si futtat\u00e1s el\u0151tt<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>\u00dctemezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pont m\u0171veletenk\u00e9nt<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, SkyPlanner-webhookon kereszt\u00fcl<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Az \u00fctemez\u0151motor \u00e1ltal kiv\u00e1lasztott munka\u00e1llom\u00e1s<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor<\/td><\/tr><tr><td>operationDataEntry (setup, process, combined)<\/td><td>Mobile Confirmations: id\u0151bejegyz\u00e9sek \u00e9s mennyis\u00e9gek<\/td><td>SkyPlanner \u2192 Proalpha<\/td><td>Visszajelent\u00e9senk\u00e9nt vagy m\u0171szakonk\u00e9nt<\/td><\/tr><tr><td>A SkyPlanner \u00fctemez\u00e9si szab\u00e1lyai<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok korl\u00e1tozott kapacit\u00e1s\u00fa er\u0151forr\u00e1sk\u00e9nt, g\u00e9pkezel\u0151i l\u00e9tsz\u00e1mok<\/td><td>A SkyPlannerben karbantartva<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be a cikkeket a Part API-n kereszt\u00fcl, az er\u0151forr\u00e1sokat, er\u0151forr\u00e1scsoportokat \u00e9s napt\u00e1rakat pedig t\u00f6ltse be egyszer az INWB vagy f\u00e1jlexport seg\u00edts\u00e9g\u00e9vel. K\u00f6r\u00fcltekint\u0151en rendelje hozz\u00e1 az egyes Proalpha-er\u0151forr\u00e1sokat a SkyPlanner munka\u00e1llom\u00e1saihoz. Az alternat\u00edv er\u0151forr\u00e1scsoportokb\u00f3l alternat\u00edv munka\u00e1llom\u00e1sok lesznek.<\/p>\n\n\n<p><strong>2. Rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Egy INWB-\u00fczenetfolyam vagy n8n-munkafolyamat tov\u00e1bb\u00edtja a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket a m\u0171veleteikkel, c\u00e9lid\u0151ikkel \u00e9s er\u0151forr\u00e1saikkal egy\u00fctt. A k\u00e9szletadatok MRP-ter\u00fcletenk\u00e9nt a Material API-b\u00f3l, a nyitott beszerz\u00e9si rendel\u00e9sek pedig az INWB-n kereszt\u00fcl \u00e9rkeznek. A SkyPlanner a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l tekinti el\u00e9rhet\u0151nek, \u00e9s akkor friss\u00edti a k\u00e9szletet, amikor a rendel\u00e9s Delivered \u00e1llapotba ker\u00fcl.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Az integr\u00e1ci\u00f3 minden olyan m\u0171velethez megh\u00edvja a setWorkOrderOperationDates f\u00fcggv\u00e9nyt, amelyet az \u00fctemez\u0151motor elhelyezett vagy \u00e1thelyezett. A h\u00edv\u00e1sban \u00e1tadja a m\u0171velet guid azonos\u00edt\u00f3j\u00e1t, valamint a kezd\u0151 \u00e9s befejez\u0151 id\u0151pontot. Ha a motor m\u00e1sik er\u0151forr\u00e1st v\u00e1lasztott, ezt a changeWorkOrderOperationResource h\u00edv\u00e1sa k\u00f6veti.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations vagy a Production Timer seg\u00edts\u00e9g\u00e9vel r\u00f6gz\u00edtik a munk\u00e1t. Az id\u0151bejegyz\u00e9sek naprak\u00e9szen tartj\u00e1k az \u00fctemtervet, \u00e9s az operationDataEntry h\u00edv\u00e1son kereszt\u00fcl beker\u00fclnek a Proalpha rendszerbe. Ha az \u00fczemben m\u00e1r PDC-termin\u00e1lokon v\u00e9gzik a visszajelent\u00e9st, csak egy csatorn\u00e1t haszn\u00e1ljon, hogy elker\u00fclje a k\u00e9tszeres k\u00f6nyvel\u00e9st.<\/p>\n\n\n<p><strong>5. Adatgazdai \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong> Az \u00e9les indul\u00e1s el\u0151tt r\u00f6gz\u00edtse \u0151ket \u00edr\u00e1sban:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Cikkek, folyamatmodellek, mennyis\u00e9gek, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1llapota<\/td><td>Proalpha<\/td><\/tr><tr><td>M\u0171veleti sorrend, kezd\u0151 \u00e9s befejez\u0151 id\u0151pontok, er\u0151forr\u00e1s-hozz\u00e1rendel\u00e9s<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, g\u00e9pkezel\u0151i l\u00e9tsz\u00e1mok<\/td><td>SkyPlanner<\/td><\/tr><tr><td>M\u0171szakok \u00e9s t\u00e1voll\u00e9tek<\/td><td>Egyetlen rendszer, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><tr><td>Visszajelent\u00e9sek \u00e9s k\u00e9szletk\u00f6nyvel\u00e9sek<\/td><td>Proalpha, a SkyPlanner id\u0151bejegyz\u00e9seib\u0151l vagy a PDC-b\u0151l kapott adatokkal<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ha a Proalpha APS vagy a Feinplanung akt\u00edv, d\u00f6ntse el, melyik rendszer kezeli a m\u0171veletek id\u0151pontjait. Ha k\u00e9t \u00fctemez\u0151 ugyanazokat az id\u0151pontokat \u00edrja, fel\u00fcl\u00edrj\u00e1k egym\u00e1s adatait. Az Autopilot seg\u00edts\u00e9g\u00e9vel a SkyPlanner automatikusan \u00fajra\u00fctemez, amikor v\u00e1ltoz\u00e1s t\u00f6rt\u00e9nik a termel\u00e9sben.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A bevezet\u00e9s rendszerint a betanul\u00e1si \u00e9s be\u00e1ll\u00edt\u00e1si folyamat kezdet\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. Ezt megel\u0151z\u0151en a 30 napos ingyenes pr\u00f3ba sor\u00e1n a saj\u00e1t adataival dolgozhat. Export\u00e1lja a Proalpha rendszerb\u0151l a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket, m\u0171veleteket \u00e9s er\u0151forr\u00e1sokat CSV- vagy Excel-f\u00e1jlba, import\u00e1lja \u0151ket, majd ellen\u0151rizze az \u00fctemtervet.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Adatmegfeleltet\u00e9si m\u0171helymunka.<\/strong> Proalpha partner\u00e9vel k\u00f6z\u00f6sen v\u00e9gleges\u00edtse a megfeleltet\u00e9si t\u00e1bl\u00e1t, az adatgazdai szab\u00e1lyokat, a szinkroniz\u00e1l\u00e1s gyakoris\u00e1g\u00e1t \u00e9s a visszajelent\u00e9si csatorn\u00e1t.<\/li>\n\n\n<li><strong>Interf\u00e9szek be\u00e1ll\u00edt\u00e1sa.<\/strong> Enged\u00e9lyezze a REST API-kat \u00e9s az INWB-folyamatokat, hozza l\u00e9tre a technikai felhaszn\u00e1l\u00f3t, \u00e9s biztos\u00edtsa a h\u00e1l\u00f3zati hozz\u00e1f\u00e9r\u00e9st. El\u0151sz\u00f6r a tesztrendszerben, majd az \u00e9les rendszerben v\u00e9gezze el a be\u00e1ll\u00edt\u00e1sokat.<\/li>\n\n\n<li><strong>Kezdeti adatbet\u00f6lt\u00e9s.<\/strong> Cikkek, er\u0151forr\u00e1sok, er\u0151forr\u00e1scsoportok \u00e9s napt\u00e1rak.<\/li>\n\n\n<li><strong>Rendel\u00e9sek, k\u00e9szletek \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> A gy\u00e1rt\u00e1si rendel\u00e9sek tov\u00e1bb\u00edt\u00e1sa INWB-n vagy n8n-en kereszt\u00fcl, a k\u00e9szletadatok id\u0151szakos lek\u00e9rdez\u00e9se, \u00fajrapr\u00f3b\u00e1lkoz\u00e1sokkal.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlanner rendszerben.<\/strong> \u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, g\u00e9pkezel\u0151i l\u00e9tsz\u00e1mok \u00e9s alternat\u00edv munka\u00e1llom\u00e1sok.<\/li>\n\n\n<li><strong>Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> setWorkOrderOperationDates \u00e9s changeWorkOrderOperationResource; ebben a l\u00e9p\u00e9sben kapcsol\u00f3dik be az operationDataEntry is.<\/li>\n\n\n<li><strong>P\u00e1rhuzamos m\u0171k\u00f6d\u00e9s.<\/strong> Hasonl\u00edtsa \u00f6ssze a SkyPlanner id\u0151pontjait a jelenlegi tervvel, \u00e9s jav\u00edtsa a t\u00f6rzsadatokat.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s.<\/strong> Kapcsolja be a vissza\u00edr\u00e1st, amint az adatok egyeznek.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-proalpha-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire figyeljen a Proalpha-integr\u00e1ci\u00f3 tervez\u00e9sekor?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nincs technol\u00f3giai \u00fatvonalat le\u00edr\u00f3 objektum.<\/strong> A Proalpha a term\u00e9kek folyamatmodelljei alapj\u00e1n tervez. Az SAP- vagy Business Central-projektekb\u0151l \u00e1tvett eszk\u00f6z\u00f6k technol\u00f3giai \u00fatvonalakat keresnek, ez\u00e9rt egyes adatok kimaradnak. A m\u0171veleteket \u00e9s a BOM-sorokat a gy\u00e1rt\u00e1si rendel\u00e9sb\u0151l olvassa ki.<\/li>\n\n\n<li><strong>Napt\u00e1rintenzit\u00e1s.<\/strong> A napt\u00e1rblokkok tartalmazz\u00e1k az intensity \u00e9s overloadIntensity mez\u0151ket. A nyers \u00f3rasz\u00e1mok m\u00e1sol\u00e1sa helyett feleltesse meg ezeket a SkyPlanner m\u0171szakjainak \u00e9s hat\u00e9konys\u00e1gi \u00e9rt\u00e9keinek.<\/li>\n\n\n<li><strong>M\u00e9rt\u00e9kegys\u00e9gek.<\/strong> Ellen\u0151rizze a quantityUnitCode mez\u0151t, valamint azt, hogy a tervezett \u00e1t\u00e1ll\u00e1si id\u0151 rendel\u00e9sre vagy darabra vonatkozik-e. A hib\u00e1s m\u00e9rt\u00e9kegys\u00e9gek minden id\u0151tartamot eltorz\u00edtanak.<\/li>\n\n\n<li><strong>Az \u00fcgyf\u00e9l szerver\u00e9n fut\u00f3 v\u00e9gpontok.<\/strong> A REST-r\u00e9teg az \u00d6n Proalpha szerver\u00e9n fut. A projekt kezdete a t\u0171zfalak, portok \u00e9s tan\u00fas\u00edtv\u00e1nyok be\u00e1ll\u00edt\u00e1s\u00e1t\u00f3l f\u00fcgg, ez\u00e9rt id\u0151ben gondoskodjon a hozz\u00e1f\u00e9r\u00e9sr\u0151l.<\/li>\n\n\n<li><strong>Verzi\u00f3.<\/strong> A megfeleltet\u00e9sek v\u00e9gleges\u00edt\u00e9se el\u0151tt egyeztesse partner\u00e9vel, hogy az \u00d6n Proalpha-verzi\u00f3j\u00e1ban mely REST API-k \u00e9rhet\u0151k el.<\/li>\n\n\n<li><strong>Bejelentkez\u00e9shez k\u00f6t\u00f6tt dokument\u00e1ci\u00f3.<\/strong> A Proalpha online s\u00fag\u00f3ja a Documentation Portal fel\u00fclet\u00e9n \u00e9rhet\u0151 el. Tal\u00e1lgat\u00e1s helyett egyeztesse a mez\u0151neveket a partner\u00e9vel.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-proalpha-integration-who-configures-and-supp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be \u00e9s t\u00e1mogatja a Proalpha-integr\u00e1ci\u00f3t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata v\u00e9gzi a be\u00e1ll\u00edt\u00e1st a bevezet\u00e9s sor\u00e1n, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt.<\/strong> Minden Proalpha-rendszer modellez\u00e9se elt\u00e9r\u0151; a csapat szak\u00e9rtelme ezeknek a k\u00fcl\u00f6nbs\u00e9geknek a kezel\u00e9s\u00e9ben hasznosul.<\/li>\n\n\n<li><strong>Proalpha-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az \u00d6n folyamatmodelljeit, INWB-folyamatait \u00e9s rendszerverzi\u00f3j\u00e1t, \u00e9s be tudja \u00e1ll\u00edtani az API-hozz\u00e1f\u00e9r\u00e9st. A SkyPlanner biztos\u00edtja a REST API-t, a Swagger\/OpenAPI-dokument\u00e1ci\u00f3t \u00e9s a webhookokat.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek r\u00e1,<\/strong> ugyanazt a REST API-t haszn\u00e1lva, API-tokennel. A SkyPlanner csapata sz\u00fcks\u00e9g eset\u00e9n seg\u00edt. A term\u00e9k dokument\u00e1ci\u00f3ja nyilv\u00e1nosan el\u00e9rhet\u0151 a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner dokument\u00e1ci\u00f3s oldal\u00e1n<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner havi d\u00edja 199 \u20ac-t\u00f3l indul, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151re adunk \u00e1raj\u00e1nlatot a csomagj\u00e1val egy\u00fctt, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get. A <a href=\"\/hu\/integraciok\/erp\/proalpha\/termelesutemezes\/\">T\u00e1mogatja a proALPHA a termel\u00e9s\u00fctemez\u00e9st?<\/a> c\u00edm\u0171 cikkb\u0151l megismerheti a Proalpha kapacit\u00e1stervez\u00e9s\u00e9t. \u00c1ttekint\u00e9st a <a href=\"\/hu\/integraciok\/erp\/proalpha\/\">proALPHA oldal\u00e1n<\/a>, tov\u00e1bbi rendszereket pedig az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k gy\u0171jt\u0151oldal\u00e1n<\/a> tal\u00e1l.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1blagy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a termel\u00e9s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k egy palackt\u00f6lt\u0151 sor mellett a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9si hat\u00e9konys\u00e1g 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napot lefed\u0151 optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"L\u00e9gifelv\u00e9tel a Piristeel tet\u0151biztons\u00e1gi term\u00e9keket gy\u00e1rt\u00f3 kauhavai \u00fczem\u00e9r\u0151l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner l\u00e1that\u00f3v\u00e1 tette a sz\u0171k keresztmetszeteket, \u00e9s \u00e1tl\u00e1that\u00f3bb\u00e1 tette a termel\u00e9sir\u00e1ny\u00edt\u00e1st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, termel\u00e9si vezet\u0151<\/b><br>Piristeel \u00b7 Tet\u0151biztons\u00e1gi \u00e9s es\u0151v\u00edz-elvezet\u0151 rendszerek<\/p>\n\n\n<p class=\"ind-cust__result\">A hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya id\u00e9n el\u00e9rte a 99,2%-ot, az \u00fctemez\u00e9s pedig naponta ak\u00e1r n\u00e9gy \u00f3ra munkaid\u0151t takar\u00edt meg.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/piristeel\/\">Olvassa el a Piristeel v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Kevesebb<\/b><span>anyaghi\u00e1ny miatti le\u00e1ll\u00e1s<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSz\u00e1munkra a SkyPlanner \u00e9rt\u00e9k\u00e9t az adja, hogy a napi munk\u00e1ban j\u00f3l haszn\u00e1lhat\u00f3 eszk\u00f6z, k\u00fcl\u00f6n\u00f6sen a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k meghat\u00e1roz\u00e1s\u00e1hoz.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, gy\u00e1rt\u00e1stervez\u00e9si vezet\u0151<\/b><br>Eskomatic \u00b7 B\u00e9rforg\u00e1csol\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A terhel\u00e9sek automatikus \u00fctemez\u00e9se pontosabb sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket eredm\u00e9nyez, az anyaghi\u00e1ny okozta termel\u00e9si le\u00e1ll\u00e1sok pedig jelent\u0151sen cs\u00f6kkentek.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/eskomatic\/\">Olvassa el az Eskomatic v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mely Proalpha-interf\u00e9szeket haszn\u00e1lja az integr\u00e1ci\u00f3?<\/summary>\n<p class=\"sp-faq__a\">A cikkek \u00e9s k\u00e9szletek lek\u00e9r\u00e9s\u00e9hez, valamint az id\u0151pontok, er\u0151forr\u00e1sok \u00e9s visszajelent\u00e9sek vissza\u00edr\u00e1s\u00e1hoz a Proalpha REST API-kat haszn\u00e1lja. A gy\u00e1rt\u00e1si rendel\u00e9seket a m\u0171veleteikkel egy\u00fctt INWB-\u00fczenetfolyamok vagy az n8n-alap\u00fa Integration Platform tov\u00e1bb\u00edtja. A pr\u00f3baid\u0151szakhoz \u00e9s a t\u00f6meges bet\u00f6lt\u00e9sekhez f\u00e1jlexportok haszn\u00e1lhat\u00f3k.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hov\u00e1 ker\u00fclnek a tervezett id\u0151pontok a Proalpha rendszerben?<\/summary>\n<p class=\"sp-faq__a\">A gy\u00e1rt\u00e1si rendel\u00e9s m\u0171velet\u00e9hez, a kezd\u0151 \u00e9s befejez\u0151 id\u0151pontot \u00e1tad\u00f3 setWorkOrderOperationDates h\u00edv\u00e1ssal. Ha a motor m\u00e1sik g\u00e9pre helyezte \u00e1t a gy\u00e1rt\u00e1si feladatot, a changeWorkOrderOperationResource friss\u00edti az er\u0151forr\u00e1st.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>T\u00e1mogatja a Proalpha a webhookokat?<\/summary>\n<p class=\"sp-faq__a\">A Proalpha API Portal nem sorol fel webhook-feliratkoz\u00e1si API-t. A v\u00e1ltoz\u00e1sok INWB-\u00fczenetfolyamokon, n8n-munkafolyamatokon vagy id\u0151szakos lek\u00e9rdez\u00e9seken kereszt\u00fcl jutnak el a SkyPlannerhez. A SkyPlanner saj\u00e1t webhookjai esem\u00e9nyvez\u00e9reltt\u00e9 teszik a vissza\u00edr\u00e1st.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c1tadhat\u00f3k a g\u00e9pkezel\u0151i visszajelent\u00e9sek a Proalpha rendszernek?<\/summary>\n<p class=\"sp-faq__a\">Igen. A SkyPlanner Mobile Confirmations id\u0151bejegyz\u00e9sei az operationDataEntry h\u00edv\u00e1son kereszt\u00fcl ker\u00fclnek \u00e1t, a mennyis\u00e9ggel, valamint a dolgoz\u00f3i \u00e9s er\u0151forr\u00e1sid\u0151vel egy\u00fctt. Ha PDC-termin\u00e1lokat is haszn\u00e1lnak, csak egy visszajelent\u00e9si csatorn\u00e1t tartson meg.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sz\u00fcks\u00e9g\u00fcnk van a Proalpha APS-re, \u00e9s mi a teend\u0151, ha m\u00e1r haszn\u00e1ljuk?<\/summary>\n<p class=\"sp-faq__a\">Nincs r\u00e1 sz\u00fcks\u00e9g. A SkyPlanner a gy\u00e1rt\u00e1si rendel\u00e9sekb\u0151l, m\u0171veletekb\u0151l \u00e9s er\u0151forr\u00e1sokb\u00f3l maga k\u00e9sz\u00edti el a kapacit\u00e1skorl\u00e1tokat figyelembe vev\u0151 \u00fctemtervet, az Autopilot pedig naprak\u00e9szen tartja azt. Ha a Proalpha APS akt\u00edv, a felm\u00e9r\u00e9s sor\u00e1n d\u00f6ntse el, melyik rendszer kezeli a m\u0171veletek id\u0151pontjait. A SkyPlanner ezut\u00e1n csak a hozz\u00e1 rendelt id\u0151pontokat \u00edrja vissza, \u00edgy a k\u00e9t terv soha nem \u00edrja fel\u00fcl egym\u00e1st.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert az integr\u00e1ci\u00f3 ki\u00e9p\u00edt\u00e9se el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3ba sor\u00e1n legfeljebb 20 munka\u00e1llom\u00e1ssal pr\u00f3b\u00e1lhatja ki a SkyPlannert, a gy\u00e1rt\u00e1si rendel\u00e9sek CSV- vagy Excel-exportj\u00e1t haszn\u00e1lva. Bankk\u00e1rtya megad\u00e1sa nem sz\u00fcks\u00e9ges. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">egyeztessen \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a> az integr\u00e1ci\u00f3 felm\u00e9r\u00e9s\u00e9r\u0151l.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ proALPHA ERP proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez a Proalpha-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a Proalpha ERP a SkyPlanner APS rendszerrel. A SkyPlanner \u00e9s a Proalpha k\u00f6z\u00f6tti integr\u00e1ci\u00f3 k\u00e9tir\u00e1ny\u00fa: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n Proalpha-k\u00f6rnyezet\u00e9hez igaz\u00edtja az &#8230; <a title=\"proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/\" aria-label=\"Read more about proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103175,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104187","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>proALPHA APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"proALPHA\u2013SkyPlanner APS: Proalpha REST API-k, Integration Workbench, gy\u00e1rt\u00e1sirendel\u00e9s-lek\u00e9pez\u00e9s, setWorkOrderOperationDates-vissza\u00edr\u00e1s \u00e9s projekttippek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" \/>\n<meta property=\"og:description\" content=\"proALPHA\u2013SkyPlanner APS: Proalpha REST API-k, Integration Workbench, gy\u00e1rt\u00e1sirendel\u00e9s-lek\u00e9pez\u00e9s, setWorkOrderOperationDates-vissza\u00edr\u00e1s \u00e9s projekttippek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/proalpha\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/proalpha\\\/integracios-utmutato\\\/\",\"name\":\"proALPHA APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"proALPHA\u2013SkyPlanner APS: Proalpha REST API-k, Integration Workbench, gy\u00e1rt\u00e1sirendel\u00e9s-lek\u00e9pez\u00e9s, setWorkOrderOperationDates-vissza\u00edr\u00e1s \u00e9s projekttippek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/proalpha\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/proalpha\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/proalpha\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a proALPHA mell\u00e9: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/proalpha\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"proALPHA APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"proALPHA\u2013SkyPlanner APS: Proalpha REST API-k, Integration Workbench, gy\u00e1rt\u00e1sirendel\u00e9s-lek\u00e9pez\u00e9s, setWorkOrderOperationDates-vissza\u00edr\u00e1s \u00e9s projekttippek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez","og_description":"proALPHA\u2013SkyPlanner APS: Proalpha REST API-k, Integration Workbench, gy\u00e1rt\u00e1sirendel\u00e9s-lek\u00e9pez\u00e9s, setWorkOrderOperationDates-vissza\u00edr\u00e1s \u00e9s projekttippek.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/","name":"proALPHA APS-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"proALPHA\u2013SkyPlanner APS: Proalpha REST API-k, Integration Workbench, gy\u00e1rt\u00e1sirendel\u00e9s-lek\u00e9pez\u00e9s, setWorkOrderOperationDates-vissza\u00edr\u00e1s \u00e9s projekttippek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a proALPHA mell\u00e9: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/proalpha\/"},{"@type":"ListItem","position":5,"name":"proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ proALPHA ERP proALPHA-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez a Proalpha-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a partnereknek \u00e9s az informatikai csapatoknak, hogyan kapcsolhat\u00f3 \u00f6ssze a Proalpha ERP a SkyPlanner APS rendszerrel. A SkyPlanner \u00e9s a Proalpha k\u00f6z\u00f6tti integr\u00e1ci\u00f3 k\u00e9tir\u00e1ny\u00fa: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n Proalpha-k\u00f6rnyezet\u00e9hez igaz\u00edtja az&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/104187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=104187"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/104187\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103175"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=104187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}