{"id":103984,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/monitor-erp\/termelesutemezes\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"termelesutemezes","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/","title":{"rendered":"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? <span class=\"hl\">Priority Planning vagy SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">A Monitor ERP munka\u00e1llom\u00e1sonk\u00e9nt tervez kapacit\u00e1st, de nem k\u00e9sz\u00edt az eg\u00e9sz \u00fczemre olyan \u00fctemtervet, amely betartja a kapacit\u00e1skorl\u00e1tokat. A Monitor G5 a Loading plan n\u00e9zetben munka\u00e1llom\u00e1sonk\u00e9nt mutatja a terhel\u00e9st, a Priority planning funkci\u00f3val pedig m\u0171veletenk\u00e9nt sz\u00e1m\u00edtja ki a New finish \u00e9rt\u00e9k\u00e9t, egyszerre egy munka\u00e1llom\u00e1sra. A t\u00falterhel\u00e9seket a tervez\u0151 oldja fel, \u00e9s \u0151 hat\u00e1rozza meg a sorrendet. Azok az \u00fczemek, amelyek minden munka\u00e1llom\u00e1st, dolgoz\u00f3t, szersz\u00e1mot \u00e9s anyagot <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">a t\u00e9nyleges korl\u00e1tok figyelembev\u00e9tel\u00e9vel szeretn\u00e9nek \u00fctemezni<\/a>, a Monitor mellett SkyPlanner APS-t haszn\u00e1lnak.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-monitor-g5-plans-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy tervezi a gy\u00e1rt\u00e1st a Monitor G5, l\u00e9p\u00e9sr\u0151l l\u00e9p\u00e9sre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A tervez\u00e9s minden Monitor csomagban a Manufacturing modul r\u00e9sze. A dokument\u00e1ci\u00f3 szerint ez a k\u00f6vetkez\u0151ket tartalmazza: &#8220;procedures for handling manufacturing order\/subcontract including loading plans and priority planning.&#8221; (A gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s az alv\u00e1llalkoz\u00f3i munk\u00e1k kezel\u00e9s\u00e9re szolg\u00e1l\u00f3 elj\u00e1r\u00e1sok, k\u00f6zt\u00fck terhel\u00e9stervek \u00e9s priorit\u00e1salap\u00fa tervez\u00e9s.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Home.htm\">Monitor s\u00fag\u00f3<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Munka\u00e1llom\u00e1sok \u00e9s kapacit\u00e1s<\/h3>\n\n\n<p>Minden <strong>munka\u00e1llom\u00e1snak<\/strong> (produktionsgrupp) van t\u00edpusa: Machine, Manual work, Subcontract, Pool, Pick vagy Staffing. A kapacit\u00e1s sz\u00e1m\u00edt\u00e1sa: <strong>Basic time<\/strong> x <strong>Number of machines<\/strong> (vagy a szem\u00e9lyek sz\u00e1ma) x <strong>Availability factor<\/strong>.<\/p>\n\n\n<p>A Monitor \u00edgy magyar\u00e1zza a t\u00e9nyez\u0151t: &#8220;The availability factor reduces the gross capacity to a net capacity. The default value is 80 % when creating a new work center.&#8221; (A rendelkez\u00e9sre \u00e1ll\u00e1si t\u00e9nyez\u0151 a brutt\u00f3 kapacit\u00e1st nett\u00f3 kapacit\u00e1sra cs\u00f6kkenti. \u00daj munka\u00e1llom\u00e1s l\u00e9trehoz\u00e1sakor az id\u00e9zetben megadott sz\u00e1zal\u00e9k\u00e9rt\u00e9k az alap\u00e9rtelmezett.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/WorkCenters\/WorkCenterRegister\/bPlanningInformation.htm\">Monitor s\u00fag\u00f3<\/a>)<\/p>\n\n\n<p>A <strong>Time precision<\/strong> be\u00e1ll\u00edt\u00e1s munka\u00e1llom\u00e1sonk\u00e9nt adhat\u00f3 meg:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Day planning:<\/strong> a kapacit\u00e1st a napi alapid\u0151 adja meg.<\/li>\n\n\n<li><strong>Hourly planning:<\/strong> rendszerbe\u00e1ll\u00edt\u00e1ssal kapcsolhat\u00f3 be, a terhel\u00e9s \u00f3r\u00e1nk\u00e9nt l\u00e1that\u00f3.<\/li>\n\n\n<li><strong>Capacity via schedule:<\/strong> a brutt\u00f3 kapacit\u00e1st egy ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si munkarend hat\u00e1rozza meg.<\/li>\n\n<\/ul>\n\n\n<p>A napt\u00e1rban megadott kiv\u00e9telek az adott napokra fel\u00fcl\u00edrj\u00e1k a kapacit\u00e1st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. BOM \u00e9s technol\u00f3giai \u00fatvonal<\/h3>\n\n\n<p>A gy\u00e1rtott alkatr\u00e9szhez <strong>BOM \u00e9s technol\u00f3giai \u00fatvonal<\/strong> (beredning) tartozik, anyag- \u00e9s m\u0171veletsorokkal. Minden m\u0171veletsor tartalmazza a munka\u00e1llom\u00e1st, az \u00e1t\u00e1ll\u00e1si id\u0151t, a darabid\u0151t, a v\u00e1rakoz\u00e1si id\u0151t \u00e9s az \u00e1tfed\u00e9st %-ban. M\u0171veletsoronk\u00e9nt alternat\u00edv munka\u00e1llom\u00e1sok is megadhat\u00f3k.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Gy\u00e1rt\u00e1si rendel\u00e9s r\u00f6gz\u00edt\u00e9se<\/h3>\n\n\n<p>Egy <strong>gy\u00e1rt\u00e1si rendel\u00e9s<\/strong> (tillverkningsorder) r\u00f6gz\u00edt\u00e9sekor a Monitor az utols\u00f3 m\u0171velet tervezett befejez\u00e9s\u00e9t\u0151l visszafel\u00e9 tervezi a m\u0171veleteket. &#8220;The calculation for planned start date takes queue time, setup time, unit time, and overlap of the operations, into consideration.&#8221; (A tervezett kezd\u00e9s kisz\u00e1m\u00edt\u00e1sakor figyelembe veszi a m\u0171veletek v\u00e1rakoz\u00e1si idej\u00e9t, \u00e1t\u00e1ll\u00e1si idej\u00e9t, darabidej\u00e9t \u00e9s \u00e1tfed\u00e9s\u00e9t.) (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Orders\/RegisterManufacturingOrder\/bOperations.htm\">Monitor s\u00fag\u00f3<\/a>)<\/p>\n\n\n<p>A kapacit\u00e1s figyelembev\u00e9tel\u00e9t a <strong>Check capacity during manufacturing order registration<\/strong> rendszerbe\u00e1ll\u00edt\u00e1s szab\u00e1lyozza. K\u00e9t \u00e9rt\u00e9ke lehet:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u00c9rt\u00e9k<\/th><th>A Monitor m\u0171k\u00f6d\u00e9se<\/th><\/tr><\/thead><tbody><tr><td>Nem<\/td><td>&#8220;The order is registered as per the requirement date in BOM and routing regardless of the work center&#8217;s capacity.&#8221; (A rendel\u00e9st a BOM-ban \u00e9s a technol\u00f3giai \u00fatvonalban megadott sz\u00fcks\u00e9gleti d\u00e1tum szerint r\u00f6gz\u00edti, a munka\u00e1llom\u00e1s kapacit\u00e1s\u00e1t\u00f3l f\u00fcggetlen\u00fcl.)<\/td><\/tr><tr><td>Igen (rendel\u00e9sen bel\u00fcl)<\/td><td>&#8220;The work center&#8217;s capacity is taken into account when the order contains multiple nodes with the same work center.&#8221; (A munka\u00e1llom\u00e1s kapacit\u00e1s\u00e1t akkor veszi figyelembe, ha a rendel\u00e9s t\u00f6bb csom\u00f3pontj\u00e1hoz is ugyanaz a munka\u00e1llom\u00e1s tartozik.)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Egyik be\u00e1ll\u00edt\u00e1s sem veszi figyelembe a t\u00f6bbi rendel\u00e9sb\u0151l ered\u0151 terhel\u00e9st. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/GeneralRegisters\/BasicSettings\/SystemSettings\/bOrderManufacturing.htm\">Monitor s\u00fag\u00f3<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Loading plan \u00e9s Master planning<\/h3>\n\n\n<p>A <strong>Loading plan<\/strong> (bel\u00e4ggningsplan) havi, heti vagy napi bont\u00e1sban mutatja meg: &#8220;how different work centers&#8217; loading is affected by manufacturing orders over time,&#8221; (hogyan hatnak a gy\u00e1rt\u00e1si rendel\u00e9sek az egyes munka\u00e1llom\u00e1sok terhel\u00e9s\u00e9re az id\u0151 f\u00fcggv\u00e9ny\u00e9ben). A diagram csak megtekinthet\u0151: &#8220;It is not possible to update the loading chart.&#8221; (A terhel\u00e9si diagram nem m\u00f3dos\u00edthat\u00f3.) A kezd\u00e9st \u00e9s a befejez\u00e9st a List lapon lehet \u00fajratervezni. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/LoadingPlan\/wLoadingPlan.htm\">Monitor s\u00fag\u00f3<\/a>)<\/p>\n\n\n<p>A <strong>Master planning<\/strong> ugyan\u00edgy m\u0171k\u00f6dik. A Monitor le\u00edr\u00e1sa szerint: &#8220;a loading plan where any overload might require the entire order to be replanned with regard to quantity and dates.&#8221; (Olyan terhel\u00e9sterv, amelyben a t\u00falterhel\u00e9s miatt sz\u00fcks\u00e9g lehet a teljes rendel\u00e9s \u00fajratervez\u00e9s\u00e9re a mennyis\u00e9g \u00e9s a d\u00e1tumok szempontj\u00e1b\u00f3l.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Priority planning \u00e9s Priority plan chart<\/h3>\n\n\n<p>A <strong>Priority planning<\/strong> (k\u00f6rplan) le\u00edr\u00e1sa: &#8220;shows all operations for the work center in all manufacturing orders,&#8221; (az \u00f6sszes gy\u00e1rt\u00e1si rendel\u00e9s adott munka\u00e1llom\u00e1shoz tartoz\u00f3 valamennyi m\u0171velet\u00e9t megjelen\u00edti). A m\u0171veletek priorit\u00e1s \u00e9s kezd\u00e9si d\u00e1tum szerint rendezve jelennek meg. A tervez\u0151 a sorok \u00e1th\u00faz\u00e1s\u00e1val v\u00e1ltoztatja meg a sorrendet.<\/p>\n\n\n<p>A Monitor ezut\u00e1n kisz\u00e1m\u00edtja a <strong>New finish<\/strong> \u00e9rt\u00e9k\u00e9t: &#8220;an expected finish date\/time considering capacity and remaining time on the operations and their priority in the priority plan.&#8221; (V\u00e1rhat\u00f3 befejez\u00e9si d\u00e1tum \u00e9s id\u0151, amely figyelembe veszi a kapacit\u00e1st, a m\u0171veletek h\u00e1tral\u00e9v\u0151 idej\u00e9t \u00e9s a priorit\u00e1si tervben elfoglalt hely\u00fcket.) A tervez\u0151 ezt a <strong>Rescheduling according to New finish<\/strong> funkci\u00f3val \u00e9rv\u00e9nyes\u00edti. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PriorityPlanning\/bPriorityPlan.htm\">Monitor s\u00fag\u00f3<\/a>)<\/p>\n\n\n<p>A <strong>Priority plan chart<\/strong> (k\u00f6rplansgraf) munka\u00e1llom\u00e1sonk\u00e9nt, blokkokk\u00e9nt jelen\u00edti meg a m\u0171veleteket, \u00f3r\u00e1s vagy napi id\u0151sk\u00e1l\u00e1n. A Replanning n\u00e9zet le\u00edr\u00e1sa: &#8220;shows if operations are overloaded and thereby need to be replanned.&#8221; (Megmutatja, ha a m\u0171veletek t\u00falterhel\u00e9st okoznak, \u00e9s ez\u00e9rt \u00fajra kell tervezni \u0151ket.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Pool planning, CDT \u00e9s Daily management<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A <strong>Pool planning<\/strong> az egyen\u00e9rt\u00e9k\u0171 g\u00e9peket egy Pool t\u00edpus\u00fa munka\u00e1llom\u00e1shoz kapcsolja. A <strong>Suggest new work center<\/strong> javaslata: &#8220;the work center that gets the earliest date for New finish,&#8221; (az a munka\u00e1llom\u00e1s, amelyen a New finish \u00e9rt\u00e9ke a legkor\u00e1bbi d\u00e1tumra esik). A tervez\u0151 minden m\u0171veletn\u00e9l elfogadja a javaslatot, vagy m\u00e1shov\u00e1 helyezi a m\u0171veletet.<\/li>\n\n\n<li>A <strong>Check delivery times<\/strong> (CDT, LTK) egyetlen rendel\u00e9si sorhoz keres szabad kapacit\u00e1st, m\u0171veletr\u0151l m\u0171veletre. Ellen\u0151rzi az anyagfedezetet, \u00e9s alternat\u00edv munka\u00e1llom\u00e1st is javasolhat.<\/li>\n\n\n<li>A <strong>Daily management<\/strong> (daglig styrning) k\u00f6z\u00f6s haszn\u00e1lat\u00fa \u00e9rint\u0151k\u00e9perny\u0151k\u00f6n jelen\u00edti meg a priorit\u00e1si terveket a napi nyomon k\u00f6vet\u00e9shez.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mi marad a tervez\u0151 feladata?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Nincs az eg\u00e9sz \u00fczemre kiterjed\u0151 termel\u00e9s\u00fctemez\u00e9s.<\/strong> Alap\u00e9rtelmez\u00e9s szerint a rendel\u00e9sek r\u00f6gz\u00edt\u00e9se &#8220;regardless of the work center&#8217;s capacity&#8221; (a munka\u00e1llom\u00e1s kapacit\u00e1s\u00e1t\u00f3l f\u00fcggetlen\u00fcl) t\u00f6rt\u00e9nik, a rendel\u00e9sen bel\u00fcli ellen\u0151rz\u00e9s pedig figyelmen k\u00edv\u00fcl hagyja az \u00f6sszes t\u00f6bbi rendel\u00e9st.<\/li>\n\n\n<li><strong>A t\u00falterhel\u00e9sek felold\u00e1sa a tervez\u0151 feladata.<\/strong> A Master planning jelzi a t\u00falterhel\u00e9seket, amelyek &#8220;might require the entire order to be replanned.&#8221; (sz\u00fcks\u00e9gess\u00e9 tehetik a teljes rendel\u00e9s \u00fajratervez\u00e9s\u00e9t). A Loading plan nem szerkeszthet\u0151.<\/li>\n\n\n<li><strong>Egyszerre egy munka\u00e1llom\u00e1s.<\/strong> A New finish \u00e9rt\u00e9k\u00e9t munka\u00e1llom\u00e1sonk\u00e9nt, az ott v\u00e1rakoz\u00f3 m\u0171veletek alapj\u00e1n sz\u00e1m\u00edtja ki. A Monitor megjegyzi: &#8220;the new finish date is not always in the same order as the rows.&#8221; (Az \u00faj befejez\u00e9si d\u00e1tumok sorrendje nem mindig egyezik meg a sorok sorrendj\u00e9vel.)<\/li>\n\n\n<li><strong>A g\u00e9pcsoportok kezel\u00e9se k\u00fcl\u00f6n t\u00f6rt\u00e9nik.<\/strong> A Pool t\u00edpus\u00fa munka\u00e1llom\u00e1sra ez vonatkozik: &#8220;must be handled in the Pool planning procedure,&#8221; (a Pool planning elj\u00e1r\u00e1sban kell kezelni), nem a Priority planning keret\u00e9ben. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PoolPlanning\/wPoolPlanning.htm\">Monitor s\u00fag\u00f3<\/a>)<\/li>\n\n\n<li><strong>A CDT egyetlen rendel\u00e9si sort ellen\u0151riz.<\/strong> A CDT egy rendel\u00e9si sort tervez meg, az eredm\u00e9nyben v\u00e9gzett k\u00e9zi \u00fajratervez\u00e9s m\u00f3dos\u00edt\u00e1sai pedig &#8220;are not saved.&#8221; (nem ker\u00fclnek ment\u00e9sre). (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Using\/CheckDeliveryTimes\/CheckCapacityAvailability.htm\">Monitor s\u00fag\u00f3<\/a>)<\/li>\n\n\n<li><strong>A g\u00e9pbe\u00e1ll\u00edt\u00f3k \u00e9s a dolgoz\u00f3i csoportok ellen\u0151rz\u00e9se a diagramon t\u00f6rt\u00e9nik.<\/strong> A Priority plan chart seg\u00edt \u00e9szrevenni az ilyen helyzeteket: &#8220;two setups should not be planned at the same time if there is only one machine setter.&#8221; (K\u00e9t \u00e1t\u00e1ll\u00e1st nem szabad egy id\u0151pontra tervezni, ha csak egy g\u00e9pbe\u00e1ll\u00edt\u00f3 \u00e1ll rendelkez\u00e9sre.) Az \u00fctk\u00f6z\u00e9st a tervez\u0151 oldja fel. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/PriorityPlanChart\/tPriorityPlanChart.htm\">Monitor s\u00fag\u00f3<\/a>)<\/li>\n\n\n<li><strong>Sz\u0171r\u00e9ssel cs\u00f6kkenthet\u0151 az \u00e1t\u00e1ll\u00e1si id\u0151.<\/strong> A Tools &amp; Maintenance opci\u00f3val &#8220;you can also filter orders that use the same tool in order to save set-up time.&#8221; (Az azonos szersz\u00e1mot haszn\u00e1l\u00f3 rendel\u00e9sek is sz\u0171rhet\u0151k az \u00e1t\u00e1ll\u00e1si id\u0151 cs\u00f6kkent\u00e9se \u00e9rdek\u00e9ben.) Maga a csoportos\u00edt\u00e1s k\u00e9zzel t\u00f6rt\u00e9nik. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/UserGuide\/Options\/ToolsMaintenance.htm\">Monitor s\u00fag\u00f3<\/a>)<\/li>\n\n\n<li><strong>A Daily management napi pontoss\u00e1ggal m\u0171k\u00f6dik.<\/strong> &#8220;Daily management currently supports day planning.&#8221; (A Daily management jelenleg napi tervez\u00e9st t\u00e1mogat.) A megjelen\u00edt\u00e9shez haszn\u00e1lt minden sz\u00e1m\u00edt\u00f3g\u00e9phez k\u00fcl\u00f6n Daily management licenc sz\u00fcks\u00e9ges. (<a href=\"https:\/\/help.monitorerp.com\/SE-MONITOR_G5\/en-us\/Content\/Topics\/Manufacturing\/Planning\/DailyManagement\/wDailyManagement.htm\">Monitor s\u00fag\u00f3<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>A gyakorlatban a tervez\u0151 minden reggel sorokat h\u00faz \u00e1t, \u00e9s a tervet \u00e1tn\u00e9zve ellen\u0151rzi a g\u00e9pbe\u00e1ll\u00edt\u00f3k \u00e9s a szersz\u00e1mok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-monitor-s-own-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor el\u00e9g a Monitor saj\u00e1t tervez\u00e9se?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Priority planning \u00e9s a CDT egy\u00fctt elegend\u0151, ha:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Egy vagy k\u00e9t munka\u00e1llom\u00e1s jelenti a val\u00f3di sz\u0171k keresztmetszetet, a t\u00f6bbin van szabad kapacit\u00e1s.<\/li>\n\n\n<li>Van felel\u0151se a priorit\u00e1si tervnek: egy tervez\u0151, aki naponta karbantartja.<\/li>\n\n\n<li>Kev\u00e9s az egyen\u00e9rt\u00e9k\u0171 g\u00e9p, \u00e9s ezeket lefedi a Pool planning.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1sok sorrendje, a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok \u00e9s a g\u00e9pkezel\u0151k rendelkez\u00e9sre \u00e1ll\u00e1sa ritk\u00e1n hat\u00e1rozza meg, mi ker\u00fcl sorra legk\u00f6zelebb.<\/li>\n\n\n<li>Els\u0151sorban arra van sz\u00fcks\u00e9ge, hogy a CDT re\u00e1lis sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t adjon az egyes rendel\u00e9si sorokhoz.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor van sz\u00fcks\u00e9g termel\u00e9s\u00fctemez\u0151re?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kin\u0151tte a Monitor tervez\u00e9si lehet\u0151s\u00e9geit, ha az al\u00e1bbiak k\u00f6z\u00fcl t\u00f6bb is igaz:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A term\u00e9k\u00f6sszet\u00e9telt\u0151l f\u00fcgg\u0151en m\u00e1s-m\u00e1s munka\u00e1llom\u00e1s v\u00e1lik sz\u0171k keresztmetszett\u00e9.<\/li>\n\n\n<li>Cs\u00fasznak a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k, pedig minden munka\u00e1llom\u00e1s priorit\u00e1si terve rendben l\u00e9v\u0151nek t\u0171nik.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1si id\u0151 att\u00f3l f\u00fcgg, milyen term\u00e9ket gy\u00e1rtottak el\u0151tte.<\/li>\n\n\n<li>A g\u00e9pkezel\u0151k, a g\u00e9pbe\u00e1ll\u00edt\u00f3k \u00e9s a m\u0171szakok ugyan\u00fagy korl\u00e1tozz\u00e1k a tervet, mint a g\u00e9pek.<\/li>\n\n\n<li>T\u00f6bb g\u00e9p haszn\u00e1lja ugyanazokat a pr\u00e9sszersz\u00e1mokat, \u00f6nt\u0151form\u00e1kat vagy befog\u00f3k\u00e9sz\u00fcl\u00e9keket.<\/li>\n\n\n<li>Az anyag be\u00e9rkez\u00e9se d\u00f6nti el, melyik gy\u00e1rt\u00e1si feladat indulhat el.<\/li>\n\n\n<li>A s\u00fcrg\u0151s rendel\u00e9sek \u00e9s a g\u00e9phib\u00e1k hetente t\u00f6bbsz\u00f6r is \u00fajratervez\u00e9st tesznek sz\u00fcks\u00e9gess\u00e9.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mire figyeljen a v\u00e1laszt\u00e1sn\u00e1l?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Minden er\u0151forr\u00e1s kapacit\u00e1skorl\u00e1tj\u00e1t egyszerre vegye figyelembe<\/strong>, az \u00f6sszes munka\u00e1llom\u00e1sra, egyetlen \u00fctemez\u00e9si futtat\u00e1sban.<\/li>\n\n\n<li><strong>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix<\/strong>: sorrendf\u00fcgg\u0151, aszimmetrikus \u00e1t\u00e1ll\u00e1si id\u0151k, amelyekkel az \u00fctemez\u0151motor cs\u00f6kkenti az \u00f6sszes \u00e1t\u00e1ll\u00e1si id\u0151t.<\/li>\n\n\n<li><strong>A szersz\u00e1mokat korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3, k\u00f6z\u00f6s er\u0151forr\u00e1sk\u00e9nt kezelje<\/strong>, hogy egy befog\u00f3k\u00e9sz\u00fcl\u00e9k soha ne szerepeljen egyszerre k\u00e9t g\u00e9pen.<\/li>\n\n\n<li><strong>T\u00f6bb g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatokhoz is rendeljen dolgoz\u00f3kat<\/strong>, mindegyik\u00fck saj\u00e1t m\u0171szakbeoszt\u00e1sa alapj\u00e1n.<\/li>\n\n\n<li><strong>Az anyagell\u00e1t\u00e1st is vegye figyelembe az \u00fctemez\u00e9sben<\/strong>, a k\u00e9szletek \u00e9s a be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9sek alapj\u00e1n.<\/li>\n\n\n<li><strong>Alternat\u00edv g\u00e9pek \u00e9s munkat\u00e1rsak<\/strong>, amelyeket az \u00fctemez\u0151motor ig\u00e9nybe vesz, ha az els\u0151dleges er\u0151forr\u00e1s foglalt.<\/li>\n\n\n<li><strong>Automatikus \u00fajra\u00fctemez\u00e9s<\/strong>, ha v\u00e1ltozik a gy\u00e1rt\u00e1s el\u0151rehalad\u00e1sa vagy m\u00f3dosulnak a rendel\u00e9sek.<\/li>\n\n\n<li><strong>Az adatok t\u00e9nyleges vissza\u00edr\u00e1sa a Monitor rendszerbe.<\/strong> K\u00e9rdezzen r\u00e1, hogyan jut vissza a tervezett kezd\u00e9s \u00e9s befejez\u00e9s a gy\u00e1rt\u00e1si rendel\u00e9s m\u0171velet\u00e9hez a Monitor ERP API-n kereszt\u00fcl, \u00e9s ehhez melyik Monitor-verzi\u00f3 sz\u00fcks\u00e9ges.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hol kap szerepet a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner APS a fenti hi\u00e1nyoss\u00e1gok mindegyik\u00e9t p\u00f3tolja. Minden munka\u00e1llom\u00e1s kapacit\u00e1s\u00e1t korl\u00e1tosk\u00e9nt kezeli, az Arcturus AI motor pedig m\u00e1sodpercek alatt, egy\u00fcttesen \u00fctemezi a munk\u00e1jukat. A tervez\u0151 az \u00fctemtervet ellen\u0151rzi ahelyett, hogy munka\u00e1llom\u00e1sonk\u00e9nt h\u00fazogatn\u00e1 a sorokat.<\/p>\n\n\n<p>Az \u00e1t\u00e1ll\u00e1si m\u00e1trix minden term\u00e9kp\u00e1rhoz mindk\u00e9t ir\u00e1nyban t\u00e1rolja az \u00e1t\u00e1ll\u00e1si id\u0151t, a motor pedig a legkisebb \u00f6sszes \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja. A szersz\u00e1mok korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok, \u00e9s egy gy\u00e1rt\u00e1si feladathoz egyszerre t\u00f6bb g\u00e9pkezel\u0151re is sz\u00fcks\u00e9g lehet. Ha egy g\u00e9p vagy munkat\u00e1rs nem \u00e1ll rendelkez\u00e9sre, a motor az \u00d6n \u00e1ltal megadott alternat\u00edv er\u0151forr\u00e1sokra helyezi \u00e1t a munk\u00e1t, bele\u00e9rtve a Monitor er\u0151forr\u00e1scsoportjainak tagjait is.<\/p>\n\n\n<p>Az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s a rakt\u00e1rk\u00e9szlet \u00e9s a be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9sek alapj\u00e1n szimul\u00e1lja a j\u00f6v\u0151beli k\u00e9szletszinteket. A megrendelt anyag a sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l sz\u00e1m\u00edt el\u00e9rhet\u0151nek, \u00edgy a rendszer csak olyan id\u0151pontra tervezi a munk\u00e1t, amikor az anyag m\u00e1r rendelkez\u00e9sre \u00e1ll.<\/p>\n\n\n<p>Az Autopilot a gy\u00e1rt\u00e1s v\u00e1ltoz\u00e1sakor automatikusan \u00fajra\u00fctemez, az \u00d6n \u00e1ltal r\u00f6gz\u00edtett elemek \u00e9s megadott priorit\u00e1sok betart\u00e1s\u00e1val. A g\u00e9pkezel\u0151k telefonon vagy t\u00e1blag\u00e9pen l\u00e1thatj\u00e1k a feladatsorukat \u00e9s r\u00f6gz\u00edthetik az elv\u00e9gzett munk\u00e1t a Mobile Confirmations, a Production Timer \u00e9s a Quick Log Mode funkci\u00f3val.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha<\/strong> a priorit\u00e1si terv hetente t\u00f6bb\u00f3r\u00e1s munk\u00e1t ig\u00e9nyel, \u00e9s a sz\u0171k keresztmetszet munka\u00e1llom\u00e1sr\u00f3l munka\u00e1llom\u00e1sra helyez\u0151dik \u00e1t.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha<\/strong> az \u00e1t\u00e1ll\u00e1sok, a g\u00e9pbe\u00e1ll\u00edt\u00f3k \u00e9s a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok hat\u00e1rozz\u00e1k meg, melyik munka indulhat k\u00f6vetkez\u0151k\u00e9nt.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha<\/strong> hetente t\u00f6bbsz\u00f6r \u00fajratervez, \u00e9s heteken bel\u00fcl m\u0171k\u00f6d\u0151 \u00fctemtervet szeretne a saj\u00e1t gy\u00e1rt\u00e1s\u00e1hoz.<\/p>\n\n\n<p>Kezdje a <a href=\"\/hu\/proba\/\">30 napos ingyenes pr\u00f3baid\u0151szakot<\/a> a nyitott gy\u00e1rt\u00e1si rendel\u00e9sek Excel-exportj\u00e1val (legfeljebb 20 munka\u00e1llom\u00e1s, bankk\u00e1rtya n\u00e9lk\u00fcl). Ezt k\u00f6vet\u0151en az \u00e1r havonta 199 \u20ac-t\u00f3l indul, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal, \u00e9s b\u00e1rmikor lemondhat\u00f3. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151re adunk \u00e1raj\u00e1nlatot, a v\u00e1lasztott csomaggal egy\u00fctt.<\/p>\n\n\n<p>A SkyPlanner k\u00e9tir\u00e1ny\u00fa kapcsolatot biztos\u00edt a Monitor ERP rendszerrel a Monitor ERP API-n kereszt\u00fcl. A tervezett kezd\u00e9s \u00e9s befejez\u00e9s visszaker\u00fcl a gy\u00e1rt\u00e1si rendel\u00e9sek m\u0171veleteihez, az integr\u00e1ci\u00f3t pedig a SkyPlanner csapata \u00e1ll\u00edtja be a bevezet\u00e9s sor\u00e1n. Tov\u00e1bbi inform\u00e1ci\u00f3t a <a href=\"\/hu\/integraciok\/erp\/monitor-erp\/\">SkyPlanner a Monitor ERP-hez<\/a> oldalon, a <a href=\"\/hu\/integraciok\/erp\/monitor-erp\/integracios-utmutato\/\">Monitor ERP integr\u00e1ci\u00f3s \u00fatmutat\u00f3j\u00e1ban<\/a> vagy az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u0151 oldal\u00e1n<\/a> tal\u00e1l.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlanner megold\u00e1s\u00e1r\u00f3l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1bla-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner seg\u00edts\u00e9g\u00e9vel a gy\u00e1rt\u00e1stervez\u00e9sben az Excel-t\u00e1bl\u00e1zatokr\u00f3l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k egy palackt\u00f6lt\u0151 sor mellett a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv pedig kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"L\u00e9gifelv\u00e9tel a Piristeel tet\u0151biztons\u00e1gi term\u00e9keket gy\u00e1rt\u00f3 kauhavai \u00fczem\u00e9r\u0151l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner l\u00e1that\u00f3v\u00e1 tette a sz\u0171k keresztmetszeteket, \u00e9s \u00e1tl\u00e1that\u00f3bb\u00e1 tette a termel\u00e9sir\u00e1ny\u00edt\u00e1st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, termel\u00e9svezet\u0151<\/b><br>Piristeel \u00b7 Tet\u0151biztons\u00e1gi \u00e9s es\u0151v\u00edz-elvezet\u0151 rendszerek<\/p>\n\n\n<p class=\"ind-cust__result\">A hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya id\u00e9n el\u00e9rte a 99,2%-ot, az \u00fctemez\u00e9s pedig naponta ak\u00e1r n\u00e9gy \u00f3ra munkaid\u0151t takar\u00edt meg.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/piristeel\/\">Olvassa el a Piristeel v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa 2021 \u00f3ta<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e1tl\u00e1that\u00f3v\u00e1 teszi a kapacit\u00e1sunkat \u00e9s kisz\u00e1m\u00edthat\u00f3v\u00e1 a tervez\u00e9st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Vegyipari \u00e9s \u00e9lelmiszeripari gy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya a SkyPlanner haszn\u00e1lat\u00e1nak teljes ideje alatt, 2021 \u00f3ta 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/opes-corporation\/\">Olvassa el az Opes Corporation v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van tervez\u0151t\u00e1bla a Monitor G5 rendszerben?<\/summary>\n<p class=\"sp-faq__a\">A Monitor G5 a Loading plan, a Priority plan chart diagrammal kieg\u00e9sz\u00edtett Priority planning, a Pool planning \u00e9s a Check delivery times funkci\u00f3t k\u00edn\u00e1lja. A keres\u00e9si tal\u00e1latokban megjelen\u0151 \u201ePlanning Board\u201d a r\u00e9gebbi MONITOR 8 \u00e9s 9 s\u00fag\u00f3j\u00e1hoz tartozik, nem a G5-h\u00f6z.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mit jelent a New finish a Monitor Priority planning funkci\u00f3j\u00e1ban?<\/summary>\n<p class=\"sp-faq__a\">A New finish a Monitor \u00e1ltal m\u0171veletenk\u00e9nt sz\u00e1m\u00edtott v\u00e1rhat\u00f3 befejez\u00e9si id\u0151pont. A sz\u00e1m\u00edt\u00e1s a kapacit\u00e1st, a h\u00e1tral\u00e9v\u0151 id\u0151t \u00e9s a m\u0171veletnek az adott munka\u00e1llom\u00e1s priorit\u00e1si terv\u00e9ben elfoglalt hely\u00e9t veszi alapul. A tervez\u0151 a Rescheduling according to New finish funkci\u00f3val alkalmazhatja ezt az id\u0151pontot. A sz\u00e1m\u00edt\u00e1s munka\u00e1llom\u00e1sonk\u00e9nt t\u00f6rt\u00e9nik, \u00edgy nem m\u00f3dos\u00edtja a t\u00f6bbi munka\u00e1llom\u00e1son v\u00e9gzend\u0151 m\u0171veletek sorrendj\u00e9t.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Tudja a Monitor egyszerre tervezni a g\u00e9pek \u00e9s a g\u00e9pkezel\u0151k munk\u00e1j\u00e1t?<\/summary>\n<p class=\"sp-faq__a\">A Monitor munka\u00e1llom\u00e1sonk\u00e9nt tervez, \u00e9s egy munka\u00e1llom\u00e1s g\u00e9pekkel vagy szem\u00e9lyekkel sz\u00e1mol. A g\u00e9pbe\u00e1ll\u00edt\u00f3k \u00e9s a dolgoz\u00f3i csapatok \u00fctk\u00f6z\u0151 beoszt\u00e1sai a Priority plan chart diagramon jelennek meg; ezeket a tervez\u0151nek kell feloldania. A SkyPlanner APS egy\u00fctt \u00fctemezi a g\u00e9peket, a munkat\u00e1rsakat \u00e9s a szersz\u00e1mokat, bele\u00e9rtve a t\u00f6bb g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatokat is.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatom a SkyPlanner megold\u00e1s\u00e1t a Monitor ERP-integr\u00e1ci\u00f3 el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. Export\u00e1lja a nyitott gy\u00e1rt\u00e1si rendel\u00e9sek m\u0171veleteit \u00e9s a munka\u00e1llom\u00e1sokat a Monitor rendszerb\u0151l Excelbe, majd import\u00e1lja \u0151ket a 30 napos pr\u00f3baid\u0151szak alatt. Hasonl\u00edtsa \u00f6ssze az eredm\u00e9nyt a priorit\u00e1si terv\u00e9vel. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, <a href=\"\/hu\/proba\/\">ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">l\u00e9pjen kapcsolatba \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Monitor ERP Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS A Monitor ERP munka\u00e1llom\u00e1sonk\u00e9nt tervez kapacit\u00e1st, de nem k\u00e9sz\u00edt az eg\u00e9sz \u00fczemre olyan \u00fctemtervet, amely betartja a kapacit\u00e1skorl\u00e1tokat. A Monitor G5 a Loading plan n\u00e9zetben munka\u00e1llom\u00e1sonk\u00e9nt mutatja a terhel\u00e9st, a Priority planning funkci\u00f3val pedig m\u0171veletenk\u00e9nt sz\u00e1m\u00edtja ki a New &#8230; <a title=\"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/\" aria-label=\"Read more about Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103086,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103984","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP?<\/title>\n<meta name=\"description\" content=\"Monitor G5: Loading plan \u2013 terhel\u00e9s; Priority planning \u2013 New finish. A t\u00falterhel\u00e9st a tervez\u0151 oldja fel. Hogyan m\u0171k\u00f6dik, \u00e9s mikor kell APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Monitor G5: Loading plan \u2013 terhel\u00e9s; Priority planning \u2013 New finish. A t\u00falterhel\u00e9st a tervez\u0151 oldja fel. Hogyan m\u0171k\u00f6dik, \u00e9s mikor kell APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/monitor-erp\\\/termelesutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/monitor-erp\\\/termelesutemezes\\\/\",\"name\":\"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Monitor G5: Loading plan \u2013 terhel\u00e9s; Priority planning \u2013 New finish. A t\u00falterhel\u00e9st a tervez\u0151 oldja fel. Hogyan m\u0171k\u00f6dik, \u00e9s mikor kell APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/monitor-erp\\\/termelesutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/monitor-erp\\\/termelesutemezes\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/monitor-erp\\\/termelesutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Monitor ERP-hez: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/monitor-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP?","description":"Monitor G5: Loading plan \u2013 terhel\u00e9s; Priority planning \u2013 New finish. A t\u00falterhel\u00e9st a tervez\u0151 oldja fel. Hogyan m\u0171k\u00f6dik, \u00e9s mikor kell APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS","og_description":"Monitor G5: Loading plan \u2013 terhel\u00e9s; Priority planning \u2013 New finish. A t\u00falterhel\u00e9st a tervez\u0151 oldja fel. Hogyan m\u0171k\u00f6dik, \u00e9s mikor kell APS?","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/","name":"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Monitor G5: Loading plan \u2013 terhel\u00e9s; Priority planning \u2013 New finish. A t\u00falterhel\u00e9st a tervez\u0151 oldja fel. Hogyan m\u0171k\u00f6dik, \u00e9s mikor kell APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/termelesutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Monitor ERP-hez: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/monitor-erp\/"},{"@type":"ListItem","position":5,"name":"Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Monitor ERP Tud-e termel\u00e9s\u00fctemez\u00e9st a Monitor ERP? Priority Planning vagy SkyPlanner APS A Monitor ERP munka\u00e1llom\u00e1sonk\u00e9nt tervez kapacit\u00e1st, de nem k\u00e9sz\u00edt az eg\u00e9sz \u00fczemre olyan \u00fctemtervet, amely betartja a kapacit\u00e1skorl\u00e1tokat. A Monitor G5 a Loading plan n\u00e9zetben munka\u00e1llom\u00e1sonk\u00e9nt mutatja a terhel\u00e9st, a Priority planning funkci\u00f3val pedig m\u0171veletenk\u00e9nt sz\u00e1m\u00edtja ki a New&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=103984"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103984\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103086"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=103984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}