{"id":103837,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/katana\/integracios-utmutato\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/","title":{"rendered":"Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez a Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a tan\u00e1csad\u00f3knak \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a Katana Cloud Inventory (Katana MRP) rendszert a SkyPlanner APS-sel. A SkyPlanner \u00e9s a Katana k\u00f6z\u00f6tt a nyilv\u00e1nos Katana API-n kereszt\u00fcl, mindk\u00e9t ir\u00e1nyban zajlik az adatcsere:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A SkyPlanner \u00e1tveszi a gy\u00e1rt\u00e1si rendel\u00e9seket, a m\u0171veleti sorokat, a term\u00e9krecepteket, a gy\u00e1rt\u00e1si m\u0171veleteket, az er\u0151forr\u00e1sokat, a k\u00e9szletadatokat \u00e9s a beszerz\u00e9si rendel\u00e9seket.<\/li>\n\n\n<li>Az \u00fctemezett sorrend visszaker\u00fcl a Katana Schedule lapj\u00e1ra, \u00e9s minden gy\u00e1rt\u00e1si rendel\u00e9shez gy\u00e1rt\u00e1si hat\u00e1rid\u0151 ker\u00fcl.<\/li>\n\n\n<li>A m\u0171veletek \u00e1llapota \u00e9s t\u00e9nyleges ideje visszaker\u00fcl a m\u0171veleti sorokba.<\/li>\n\n\n<li>A Katana webhookjai jelzik a bej\u00f6v\u0151 v\u00e1ltoz\u00e1sokat, a SkyPlanner webhookjai pedig azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv m\u00f3dos\u00edt\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1j\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata a Katana be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Ez az \u00fatmutat\u00f3 azoknak a tan\u00e1csad\u00f3knak \u00e9s fejleszt\u0151knek sz\u00f3l, akik r\u00e9szt szeretn\u00e9nek venni ebben, vagy maguk szeretn\u00e9nek fejleszteni a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra \u00e9p\u00edtve (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-katana-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A Katana API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Katana k\u00f6z\u00f6s, t\u00f6bb-b\u00e9rl\u0151s felh\u0151szolg\u00e1ltat\u00e1s, \u00edgy minden \u00fcgyf\u00e9l ugyanazt az API-t haszn\u00e1lja. Ez egy v1 verzi\u00f3j\u00fa REST API, amely a <code>https:\/\/api.katanamrp.com\/v1<\/code> c\u00edmen \u00e9rhet\u0151 el. Az OpenAPI 3.0 specifik\u00e1ci\u00f3 a <code>https:\/\/api.katanamrp.com\/v1\/openapi.json<\/code> c\u00edmen tal\u00e1lhat\u00f3. A dokument\u00e1ci\u00f3t a <a href=\"https:\/\/developer.katanamrp.com\/reference\/api-introduction\">Katana Developer Hub<\/a> tartalmazza.<\/p>\n\n\n<p>Az \u00fctemez\u00e9shez sz\u00fcks\u00e9ges v\u00e9gpontok:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>T\u00f6rzsadatok:<\/strong> <code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>, <code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>, <code>\/product_operation_rows<\/code>.<\/li>\n\n\n<li><strong>Rendel\u00e9sek:<\/strong> <code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>, <code>\/manufacturing_order_recipe_rows<\/code>, <code>\/manufacturing_order_productions<\/code>.<\/li>\n\n\n<li><strong>Sorrend:<\/strong> <code>\/manufacturing_order_rerank<\/code>.<\/li>\n\n\n<li><strong>Ell\u00e1t\u00e1s \u00e9s ig\u00e9ny:<\/strong> <code>\/inventory<\/code>, <code>\/purchase_orders<\/code>, <code>\/purchase_order_rows<\/code>, <code>\/sales_orders<\/code>, <code>\/sales_order_rows<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Nincs <code>\/resources<\/code> v\u00e9gpont. Az er\u0151forr\u00e1sok a term\u00e9kek \u00e9s a gy\u00e1rt\u00e1si rendel\u00e9sek m\u0171veleti soraiban, a <code>resource_id<\/code> \u00e9s a <code>resource_name<\/code> mez\u0151kben jelennek meg.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s \u00e9s korl\u00e1tok<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A hiteles\u00edt\u00e9shez az API-kulcsot bearer tokenk\u00e9nt kell megadni: <code>Authorization: Bearer &lt;api key&gt;<\/code>. A kulcs a <strong>Settings &gt; API &gt; Add new API key<\/strong> men\u00fcpontban hozhat\u00f3 l\u00e9tre. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-authentication\">forr\u00e1s<\/a>)<\/p>\n\n\n<p>A szinkroniz\u00e1l\u00e1s tervez\u00e9sekor figyelembe kell venni a korl\u00e1tokat:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A Katana API alap\u00e9rtelmez\u00e9s szerint 60 k\u00e9r\u00e9st enged\u00e9lyez 60 m\u00e1sodpercenk\u00e9nt (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-rate-limiting\">forr\u00e1s<\/a>)<\/li>\n\n\n<li>A korl\u00e1t t\u00fall\u00e9p\u00e9sekor az API 429-es v\u00e1laszt k\u00fcld <code>Retry-After<\/code> fejl\u00e9ccel. Az <code>X-Ratelimit-Remaining<\/code> mutatja a m\u00e9g rendelkez\u00e9sre \u00e1ll\u00f3 k\u00e9r\u00e9sek sz\u00e1m\u00e1t.<\/li>\n\n\n<li>A list\u00e1z\u00f3 v\u00e9gpontok lapozva adj\u00e1k vissza az eredm\u00e9nyeket, \u00e9s m\u00f3dos\u00edt\u00e1si d\u00e1tum szerinti sz\u0171r\u00e9st is t\u00e1mogatnak, \u00edgy csak kev\u00e9s v\u00e1ltoz\u00e1st kell \u00e1tvinni.<\/li>\n\n<\/ul>\n\n\n<p>A SkyPlanner REST API-ja API-tokent haszn\u00e1l a hiteles\u00edt\u00e9shez (SkyPlanner Settings &gt; API), dokument\u00e1ci\u00f3ja pedig Swagger\/OpenAPI form\u00e1tumban \u00e9rhet\u0151 el. Az <a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s oktat\u00f3anyag<\/a> v\u00e9gigvezeti az els\u0151 h\u00edv\u00e1sokon.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"webhooks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Webhookok<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Webhook regisztr\u00e1l\u00e1s\u00e1hoz k\u00fcldj\u00f6n POST k\u00e9r\u00e9st a <code>\/webhooks<\/code> v\u00e9gpontra, \u00e9s adjon meg egy HTTPS URL-t, valamint a sz\u00fcks\u00e9ges esem\u00e9nyeket. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/webhooks\">forr\u00e1s<\/a>) Az \u00fctemez\u00e9shez hasznos esem\u00e9nyek:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>manufacturing_order.created<\/code>, <code>.updated<\/code>, <code>.deleted<\/code>, <code>.in_progress<\/code>, <code>.blocked<\/code>, <code>.done<\/code><\/li>\n\n\n<li><code>manufacturing_order_operation_row.created<\/code>, <code>.updated<\/code>, <code>.in_progress<\/code>, <code>.paused<\/code>, <code>.completed<\/code><\/li>\n\n\n<li><code>current_inventory.material_updated<\/code>, <code>.material_out_of_stock<\/code><\/li>\n\n\n<li><code>purchase_order.*<\/code> \u00e9s <code>purchase_order_row.*<\/code>, bele\u00e9rtve a be\u00e9rkez\u00e9st is<\/li>\n\n\n<li><code>product.*<\/code>, <code>product_recipe_row.*<\/code> \u00e9s <code>sales_order.*<\/code><\/li>\n\n<\/ul>\n\n\n<p>Az \u00fczenetek kev\u00e9s adatot tartalmaznak: az er\u0151forr\u00e1s t\u00edpus\u00e1t, a m\u0171veletet \u00e9s egy <code>href<\/code> mez\u0151t. A fogad\u00f3 a href c\u00edm\u00e9r\u0151l k\u00e9ri le a teljes objektumot. Minden k\u00e9zbes\u00edt\u00e9s tartalmaz egy <code>x-sha2-signature<\/code> fejl\u00e9cet (HMAC SHA-256) az ellen\u0151rz\u00e9shez. A v\u00e9gpontnak 10 m\u00e1sodpercen bel\u00fcl 20X v\u00e1laszt kell adnia. A Katana h\u00e1romszor pr\u00f3b\u00e1lkozik \u00fajra: 30 m\u00e1sodperc, 2 perc \u00e9s 15 perc eltelt\u00e9vel.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Katana-objektum (v\u00e9gpont)<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Term\u00e9kek, anyagok, v\u00e1ltozatok (<code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>)<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd webhook hat\u00e1s\u00e1ra<\/td><\/tr><tr><td>Term\u00e9krecept \/ BOM (<code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>)<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd webhook hat\u00e1s\u00e1ra<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si m\u0171veletek (<code>\/product_operation_rows<\/code>): t\u00edpus, er\u0151forr\u00e1s, id\u0151<\/td><td>Folyamatl\u00e9p\u00e9sek id\u0151tartammal \u00e9s be\u00e1ll\u00edt\u00e1si id\u0151vel<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>Er\u0151forr\u00e1sok (<code>resource_id<\/code>, <code>resource_name<\/code> a m\u0171veleti sorokban)<\/td><td>Munka\u00e1llom\u00e1sok, munka\u00e1llom\u00e1s-csoportok<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9skor \u00e9s \u00faj er\u0151forr\u00e1s eset\u00e9n<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9s a m\u0171veleti soraival (<code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>)<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Val\u00f3s id\u0151ben, webhookon kereszt\u00fcl<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si rendel\u00e9s \u00f6sszetev\u0151i (<code>\/manufacturing_order_recipe_rows<\/code>)<\/td><td>Anyagsz\u00fcks\u00e9glet gy\u00e1rt\u00e1si feladatonk\u00e9nt<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Val\u00f3s id\u0151ben, webhookon kereszt\u00fcl<\/td><\/tr><tr><td>K\u00e9szlet, beszerz\u00e9si rendel\u00e9sek be\u00e9rkez\u00e9si d\u00e1tummal (<code>\/inventory<\/code>, <code>\/purchase_order_rows<\/code>)<\/td><td>K\u00e9szlet \u00e9s be\u00e9rkez\u0151 anyagok<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Val\u00f3s id\u0151ben, webhookon kereszt\u00fcl<\/td><\/tr><tr><td>Vev\u0151i rendel\u00e9s <code>delivery_date<\/code> mez\u0151je (<code>\/sales_orders<\/code>)<\/td><td>Rendel\u00e9si hat\u00e1rid\u0151, vev\u0151i priorit\u00e1s<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Val\u00f3s id\u0151ben, webhookon kereszt\u00fcl<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek sorrendje (POST <code>\/manufacturing_order_rerank<\/code>)<\/td><td>Nyitott gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9si sorrendje<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9s <code>production_deadline_date<\/code> mez\u0151je (PATCH <code>\/manufacturing_orders\/{id}<\/code>)<\/td><td>Tervezett befejez\u00e9s<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor<\/td><\/tr><tr><td>M\u0171veleti sor <code>status<\/code> \u00e9s <code>total_actual_time<\/code> mez\u0151je (PATCH <code>\/manufacturing_order_operation_rows\/{id}<\/code>)<\/td><td>Mobile Confirmations, id\u0151bejegyz\u00e9sek<\/td><td>SkyPlanner \u2192 Katana<\/td><td>A munka r\u00f6gz\u00edt\u00e9sekor<\/td><\/tr><tr><td>A Katan\u00e1ban nem szerepel<\/td><td>M\u0171szakok, t\u00e1voll\u00e9tek, \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, kezel\u0151i l\u00e9tsz\u00e1mok, alternat\u00edv munka\u00e1llom\u00e1sok<\/td><td>A SkyPlannerben karbantartva<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> K\u00e9rje le lapozva a term\u00e9keket, anyagokat, v\u00e1ltozatokat, receptsorokat \u00e9s term\u00e9km\u0171veleti sorokat \u00fagy, hogy ne l\u00e9pje t\u00fal a h\u00edv\u00e1skorl\u00e1tot. A m\u0171veleti sorokban szerepl\u0151 k\u00fcl\u00f6nb\u00f6z\u0151 er\u0151forr\u00e1sokb\u00f3l hozzon l\u00e9tre SkyPlanner-munka\u00e1llom\u00e1sokat, \u00e9s tartson fenn 1:1 kulcsmegfeleltet\u00e9st. A m\u0171szakokat, szabads\u00e1gokat \u00e9s t\u00fal\u00f3r\u00e1kat munka\u00e1llom\u00e1sonk\u00e9nt \u00e1ll\u00edtsa be a SkyPlannerben, mivel a Katan\u00e1ban nincs er\u0151forr\u00e1snapt\u00e1r.<\/p>\n\n\n<p><strong>2. Rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Iratkozzon fel a gy\u00e1rt\u00e1si rendel\u00e9sek, m\u0171veleti sorok, k\u00e9szletek \u00e9s beszerz\u00e9si rendel\u00e9sek esem\u00e9nyeire. Minden esem\u00e9nyn\u00e9l k\u00e9rje le az objektumot a href c\u00edm\u00e9r\u0151l, \u00e9s friss\u00edtse a gy\u00e1rt\u00e1si feladatot. A SkyPlanner a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1n tekinti el\u00e9rhet\u0151nek, \u00e9s a be\u00e9rkez\u00e9skor friss\u00edti a k\u00e9szletet. Az \u00e9jszakai, m\u00f3dos\u00edt\u00e1si d\u00e1tum szerinti sz\u0171r\u00e9ssel v\u00e9gzett egyeztet\u00e9s p\u00f3tolja az esetleg kimaradt esem\u00e9nyeket.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> K\u00e9t h\u00edv\u00e1ssal ker\u00fcl \u00e1t a terv a Katan\u00e1ba:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A POST <code>\/manufacturing_order_rerank<\/code> \u201emoves one or more manufacturing orders to an exact place in the production schedule\u201d (egy vagy t\u00f6bb gy\u00e1rt\u00e1si rendel\u00e9st a gy\u00e1rt\u00e1si \u00fctemterv pontosan megadott hely\u00e9re mozgat). K\u00e9r\u00e9senk\u00e9nt legfeljebb 250 nyitott gy\u00e1rt\u00e1si rendel\u00e9st fogad, amelyeket a sorrend elej\u00e9re, v\u00e9g\u00e9re, illetve egy megadott gy\u00e1rt\u00e1si rendel\u00e9s el\u00e9 vagy m\u00f6g\u00e9 helyez. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/rerankmanufacturingorder\">forr\u00e1s<\/a>)<\/li>\n\n\n<li>A PATCH <code>\/manufacturing_orders\/{id}<\/code> be\u00e1ll\u00edtja a <code>production_deadline_date<\/code> mez\u0151t. A Katana ezt csak akkor fogadja el, ha az adott gy\u00e1rt\u00e1si telephelyen ki van kapcsolva az automatikus hat\u00e1rid\u0151-sz\u00e1m\u00edt\u00e1s. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/updatemanufacturingorder\">forr\u00e1s<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Az \u00e1tsorol\u00e1s nem csak a lista sorrendj\u00e9t \u00e9rinti. A Katan\u00e1ban \u201ehigher-priority MOs reserve required materials and subassemblies first\u201d (a magasabb priorit\u00e1s\u00fa gy\u00e1rt\u00e1si rendel\u00e9sek foglalj\u00e1k le el\u0151sz\u00f6r a sz\u00fcks\u00e9ges anyagokat \u00e9s r\u00e9szegys\u00e9geket). \u00cdgy a SkyPlanner sorrendje azt is meghat\u00e1rozza, hogy a Katan\u00e1ban melyik gy\u00e1rt\u00e1si rendel\u00e9s kapja meg a k\u00e9szletet.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A g\u00e9pkezel\u0151k a SkyPlanner Mobile Confirmations, Production Timer vagy Quick Log Mode funkci\u00f3j\u00e1val r\u00f6gz\u00edtik a munk\u00e1t. A SkyPlanner az \u00e1llapotot \u00e9s a t\u00e9nyleges id\u0151t a gy\u00e1rt\u00e1si rendel\u00e9s m\u0171veleti sor\u00e1ba \u00edrja. Ha egy \u00fczem ink\u00e1bb a Katana Shop Floor App haszn\u00e1lat\u00e1n\u00e1l marad, a SkyPlanner a m\u0171veleti sorok esem\u00e9nyeit olvassa be. \u00dczemenk\u00e9nt egyetlen visszajelent\u00e9si csatorn\u00e1t v\u00e1lasszon.<\/p>\n\n\n<p><strong>5. Adatgazd\u00e1k \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong> Ezeket m\u00e9g az \u00e9les indul\u00e1s el\u0151tt r\u00f6gz\u00edtse:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Term\u00e9kek, receptek, gy\u00e1rt\u00e1si m\u0171veletek, k\u00e9szlet, beszerz\u00e9s, vev\u0151i rendel\u00e9sek<\/td><td>Katana<\/td><\/tr><tr><td>M\u0171veleti sorrend, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontok, m\u0171veletenk\u00e9nti munka\u00e1llom\u00e1s<\/td><td>SkyPlanner<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si rendel\u00e9s helye a Schedule lapon \u00e9s gy\u00e1rt\u00e1si hat\u00e1rideje<\/td><td>SkyPlanner, a Katan\u00e1ba vissza\u00edrva<\/td><\/tr><tr><td>M\u0171szakok, t\u00e1voll\u00e9tek, \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, alternat\u00edv er\u0151forr\u00e1sok<\/td><td>SkyPlanner<\/td><\/tr><tr><td>A m\u0171velet \u00e1llapota \u00e9s a r\u00f6gz\u00edtett id\u0151<\/td><td>Egyetlen csatorna, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A bevezet\u00e9s \u00e1ltal\u00e1ban az indul\u00e1st\u00f3l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. Ezt megel\u0151z\u0151en a 30 napos ingyenes pr\u00f3ba sor\u00e1n a Katan\u00e1b\u00f3l CSV-form\u00e1tumban export\u00e1lt saj\u00e1t adataival dolgozhat, p\u00e9ld\u00e1ul a Make k\u00e9perny\u0151 Tasks list\u00e1j\u00e1val.<\/p>\n\n\n<p>Maga a projekt a k\u00f6vetkez\u0151 l\u00e9p\u00e9sekb\u0151l \u00e1ll:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>El\u0151fizet\u00e9si csomag \u00e9s kulcs.<\/strong> Ellen\u0151rizze, hogy a Katana-csomag tartalmazza-e az API-hozz\u00e1f\u00e9r\u00e9st \u00e9s a Manufacturing Management modult, majd hozza l\u00e9tre az API-kulcsot.<\/li>\n\n\n<li><strong>A hat\u00e1rid\u0151k kezel\u00e9si m\u00f3dja.<\/strong> \u00c1llapodjanak meg az automatikus hat\u00e1rid\u0151k kikapcsol\u00e1s\u00e1r\u00f3l a gy\u00e1rt\u00e1si telephelyen, hogy a gy\u00e1rt\u00e1si hat\u00e1rid\u0151ket a SkyPlanner kezelje.<\/li>\n\n\n<li><strong>Megfeleltet\u00e9s.<\/strong> V\u00e9gleges\u00edts\u00e9k a megfeleltet\u00e9si t\u00e1bl\u00e1t, az er\u0151forr\u00e1skulcsokat, az adatgazdai szab\u00e1lyokat \u00e9s a visszajelz\u00e9si csatorn\u00e1t.<\/li>\n\n\n<li><strong>Kezdeti adatbet\u00f6lt\u00e9s.<\/strong> Term\u00e9kek, v\u00e1ltozatok, recept\u00far\u00e1k, gy\u00e1rt\u00e1si m\u0171veletek \u00e9s er\u0151forr\u00e1sok.<\/li>\n\n\n<li><strong>Esem\u00e9nyalap\u00fa szinkroniz\u00e1l\u00e1s.<\/strong> Webhookok a rendel\u00e9sekhez, m\u0171veletekhez, k\u00e9szletekhez \u00e9s beszerz\u00e9si rendel\u00e9sekhez, valamint \u00e9jszakai adategyeztet\u00e9s.<\/li>\n\n\n<li><strong>Korl\u00e1tok be\u00e1ll\u00edt\u00e1sa a SkyPlannerben.<\/strong> M\u0171szakok, \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, szersz\u00e1mok, kezel\u0151i l\u00e9tsz\u00e1mok \u00e9s alternat\u00edv munka\u00e1llom\u00e1sok.<\/li>\n\n\n<li><strong>Vissza\u00edr\u00e1s.<\/strong> A sorrend \u00e9s a hat\u00e1rid\u0151k, majd a m\u0171veletek \u00e1llapot\u00e1nak \u00e9s idej\u00e9nek vissza\u00edr\u00e1sa.<\/li>\n\n\n<li><strong>P\u00e1rhuzamos tesztel\u00e9s \u00e9s \u00e9les\u00edt\u00e9s.<\/strong> Hasonl\u00edts\u00e1k \u00f6ssze a SkyPlanner d\u00e1tumait a Schedule lapon szerepl\u0151 aktu\u00e1lis d\u00e1tumokkal, jav\u00edts\u00e1k a t\u00f6rzsadatokat, majd kapcsolj\u00e1k be a vissza\u00edr\u00e1st.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-katana-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mire figyeljen a Katana-integr\u00e1ci\u00f3 tervez\u00e9sekor?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A hat\u00e1rid\u0151kezel\u00e9si m\u00f3d fel\u00fcl\u00edrja a d\u00e1tumokat.<\/strong> &#8220;Once automatic mode is enabled, all manual deadlines will be overwritten and cannot be restored.&#8221; (Az automatikus m\u00f3d bekapcsol\u00e1sakor minden k\u00e9zi hat\u00e1rid\u0151 fel\u00fcl\u00edr\u00f3dik, \u00e9s nem \u00e1ll\u00edthat\u00f3 vissza.) A m\u00f3dot egyszer, a projekt ind\u00edt\u00e1sakor v\u00e1lassz\u00e1k ki.<\/li>\n\n\n<li><strong>Nincs er\u0151forr\u00e1snapt\u00e1r.<\/strong> Ne az egyetlen Weekly throughput \u00e9rt\u00e9kb\u0151l vezesse le a m\u0171szakokat. \u00c1ll\u00edtsa be \u0151ket munka\u00e1llom\u00e1sonk\u00e9nt a SkyPlannerben.<\/li>\n\n\n<li><strong>Er\u0151forr\u00e1sok csak a m\u0171veleti sorokban.<\/strong> Ne v\u00e1ltoztassa az er\u0151forr\u00e1sok nev\u00e9t a Katan\u00e1ban, mert ezek alapj\u00e1n kapcsol\u00f3dnak a SkyPlanner munka\u00e1llom\u00e1saihoz.<\/li>\n\n\n<li><strong>Id\u0151egys\u00e9gek.<\/strong> A <code>planned_time_parameter<\/code> m\u00e1sodpercben \u00e9rtend\u0151: az egys\u00e9genk\u00e9nti m\u0171veletekn\u00e9l egys\u00e9genk\u00e9nt, a process, setup \u00e9s fixed t\u00edpusokn\u00e1l pedig \u00f6sszesen. \u00dcgyeljen a t\u00edpus helyes megfeleltet\u00e9s\u00e9re, k\u00fcl\u00f6nben az id\u0151tartamok a mennyis\u00e9g szorz\u00f3j\u00e1val t\u00e9rnek el a helyes \u00e9rt\u00e9kt\u0151l.<\/li>\n\n\n<li><strong>Csoportok rendel\u00e9sre gy\u00e1rt\u00e1sn\u00e1l.<\/strong> A sorrend \u00e1trendez\u00e9sekor az ugyanahhoz a vev\u0151i rendel\u00e9shez kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1si rendel\u00e9sek (MO-k) egy\u00fctt maradnak, ez\u00e9rt csoportk\u00e9nt rendezze \u0151ket sorba.<\/li>\n\n\n<li><strong>Megv\u00e1ltozott a rerank m\u0171k\u00f6d\u00e9se.<\/strong> 2026. okt\u00f3ber 7. \u00f3ta a rerank v\u00e9gpontok pontosan a k\u00e9rt helyre teszik a rendel\u00e9seket. A kor\u00e1bbi m\u0171k\u00f6d\u00e9sre \u00e9p\u00fcl\u0151 integr\u00e1ci\u00f3kat \u00fajra kell tesztelni. (<a href=\"https:\/\/developer.katanamrp.com\/changelog\/breaking-change-order-rerank-endpoints-place-orders-exactly-where-asked\">forr\u00e1s<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-katana-integration-who-configures-and-suppor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana-integr\u00e1ci\u00f3: ki v\u00e9gzi a be\u00e1ll\u00edt\u00e1st \u00e9s a t\u00e1mogat\u00e1st?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A munka kiterjed az er\u0151forr\u00e1sokra, a gy\u00e1rt\u00e1si m\u0171veletekre, a rendel\u00e9sek folyamat\u00e1ra \u00e9s a hat\u00e1rid\u0151k kezel\u00e9si m\u00f3dj\u00e1ra. Ennek sor\u00e1n beker\u00fclnek a Katan\u00e1ban nem t\u00e1rolt adatok is: a m\u0171szakok, az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, a szersz\u00e1mok, a kezel\u0151i l\u00e9tsz\u00e1mok \u00e9s az alternat\u00edv er\u0151forr\u00e1sok.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n elv\u00e9gzi a be\u00e1ll\u00edt\u00e1sokat, az \u00e9les\u00edt\u00e9s ut\u00e1n pedig t\u00e1mogat\u00e1st ny\u00fajt.<\/strong> Minden \u00fczem m\u00e1sk\u00e9pp \u00e1ll\u00edtja be a Katana er\u0151forr\u00e1sait \u00e9s m\u0171veleteit; ez a helyi tud\u00e1s a be\u00e1ll\u00edt\u00e1sokban kap helyet.<\/li>\n\n\n<li><strong>Katana-tan\u00e1csad\u00f3ja vagy integr\u00e1ci\u00f3s partnere is elk\u00e9sz\u00edtheti az integr\u00e1ci\u00f3t.<\/strong> A SkyPlanner biztos\u00edtja a REST API-t, a Swagger\/OpenAPI dokument\u00e1ci\u00f3t \u00e9s a webhookokat.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek r\u00e1<\/strong> egy API-token haszn\u00e1lat\u00e1val. Az indul\u00e1shoz elegend\u0151 egy API-token, a SkyPlanner csapata pedig sz\u00fcks\u00e9g eset\u00e9n seg\u00edt. A term\u00e9k dokument\u00e1ci\u00f3ja \u2013 benne a beszerz\u00e9si rendel\u00e9sekkel, valamint a term\u00e9kek \u00e9s anyagok API-j\u00e1val \u2013 a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner dokument\u00e1ci\u00f3j\u00e1ban<\/a> tal\u00e1lhat\u00f3.<\/li>\n\n<\/ol>\n\n\n<p>A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra a folyamatainak \u00e9s ig\u00e9nyeinek megfelel\u0151en, az el\u0151fizet\u00e9si csomaggal egy\u00fctt el\u0151zetes \u00e1raj\u00e1nlatot adunk, \u00edgy m\u00e1r indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a> \u00e9s a <a href=\"\/hu\/funkciok\/\">funkci\u00f3kat<\/a>, a Katana saj\u00e1t \u00fctemez\u00e9s\u00e9vel val\u00f3 \u00f6sszehasonl\u00edt\u00e1st pedig a <a href=\"\/hu\/integraciok\/erp\/katana\/termelesutemezes\/\">Katana termel\u00e9s\u00fctemez\u00e9s\u00e9r\u0151l<\/a> sz\u00f3l\u00f3 oldalon tal\u00e1lja. Az \u00e1ttekint\u00e9s a <a href=\"\/hu\/integraciok\/erp\/katana\/\">Katana oldal\u00e1n<\/a>, a t\u00f6bbi ERP pedig az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k gy\u0171jt\u0151oldal\u00e1n<\/a> \u00e9rhet\u0151 el.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1bla-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u00f3ra<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel a gy\u00e1rt\u00e1stervez\u00e9sben az Excel-t\u00e1bl\u00e1zatokr\u00f3l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9ssel hetente 2 \u00f3ra munkaid\u0151t takar\u00edtanak meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 kezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv pedig kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Kevesebb<\/b><span>anyaghi\u00e1ny miatti le\u00e1ll\u00e1s<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e9rt\u00e9ke sz\u00e1munkra az, hogy a mindennapi munk\u00e1ban is bev\u00e1lt eszk\u00f6z, k\u00fcl\u00f6n\u00f6sen a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k meghat\u00e1roz\u00e1s\u00e1n\u00e1l.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, gy\u00e1rt\u00e1stervez\u00e9si vezet\u0151<\/b><br>Eskomatic \u00b7 B\u00e9rforg\u00e1csol\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A terhel\u00e9s automatikus \u00fctemez\u00e9s\u00e9vel pontosabb sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket tudnak megadni, az anyaghi\u00e1ny okozta gy\u00e1rt\u00e1si le\u00e1ll\u00e1sok pedig jelent\u0151sen cs\u00f6kkentek.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/eskomatic\/\">Olvassa el az Eskomatic v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, a Mamec vez\u00e9rigazgat\u00f3ja a v\u00e1llalat lohjai gy\u00e1rt\u00f3csarnok\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>T\u00f6bb 1 000<\/b><span>automatikusan \u00fctemezett gy\u00e1rt\u00e1si rendel\u00e9s<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEg\u00e9szen m\u00e1sk\u00e9pp tartjuk k\u00e9zben a gy\u00e1rt\u00e1st, \u00e9s teljesen m\u00e1s szinten l\u00e1tjuk \u00e1t a kapacit\u00e1sunkat.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, vez\u00e9rigazgat\u00f3<\/b><br>Mamec \u00b7 Ipari kever\u0151k, szivatty\u00fak \u00e9s cs\u00facstechnol\u00f3gi\u00e1s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">Gy\u00e1rt\u00e1si rendel\u00e9sek ezreit \u00fctemezik automatikusan, mik\u00f6zben az eg\u00e9sz szervezet val\u00f3s id\u0151ben k\u00f6vetheti a gy\u00e1rt\u00e1st.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/mamec\/\">Olvassa el a Mamec v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van API-ja a Katan\u00e1nak, \u00e9s melyik csomag sz\u00fcks\u00e9ges hozz\u00e1?<\/summary>\n<p class=\"sp-faq__a\">Igen. A Katana nyilv\u00e1nos REST API-t k\u00edn\u00e1l v1 verzi\u00f3val \u00e9s OpenAPI 3.0 specifik\u00e1ci\u00f3val. Az \u00e1rakat bemutat\u00f3 oldala a Free \u00e9s az Advantage csomagn\u00e1l t\u00fcntet fel API-hozz\u00e1f\u00e9r\u00e9st. A hiteles\u00edt\u00e9shez a Settings &gt; API men\u00fcpontban l\u00e9trehozott API-kulcsot kell haszn\u00e1lni Bearer tokenk\u00e9nt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vissza tudja \u00edrni a SkyPlanner az \u00fctemtervet a Katan\u00e1ba?<\/summary>\n<p class=\"sp-faq__a\">Igen. A SkyPlanner a <code>\/manufacturing_order_rerank<\/code> v\u00e9gponton kereszt\u00fcl a saj\u00e1t sorrendj\u00e9be rendezi a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket a Katana Schedule lapj\u00e1n, \u00e9s minden MO eset\u00e9ben kit\u00f6lti a <code>production_deadline_date<\/code> mez\u0151t. A m\u0171veletek \u00e1llapota \u00e9s t\u00e9nyleges ideje az MO m\u0171veleti soraiba ker\u00fcl. A munka\u00e1llom\u00e1sonk\u00e9nti, id\u0151z\u00edtett terv a SkyPlannerben tal\u00e1lhat\u00f3, ahol a kezel\u0151k a saj\u00e1t feladatsoruk alapj\u00e1n dolgoznak.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Val\u00f3s id\u0151ben k\u00fcldi a Katana a v\u00e1ltoz\u00e1sokat?<\/summary>\n<p class=\"sp-faq__a\">Igen. A Katana webhookjai lefedik a gy\u00e1rt\u00e1si rendel\u00e9seket, a m\u0171veleti sorokat, a k\u00e9szletet, a beszerz\u00e9si \u00e9s a vev\u0151i rendel\u00e9seket. A SkyPlanner lek\u00e9ri az \u00f6sszes m\u00f3dosult objektumot, \u00e9s \u00e9jszak\u00e1nk\u00e9nt adategyeztet\u00e9st v\u00e9gez, \u00edgy egy kimaradt esem\u00e9ny miatt sem marad elavult \u00e1llapotban egy gy\u00e1rt\u00e1si feladat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan lesznek a Katana er\u0151forr\u00e1saib\u00f3l SkyPlanner-munka\u00e1llom\u00e1sok?<\/summary>\n<p class=\"sp-faq__a\">A Katana m\u0171veleti soraiban szerepl\u0151 minden k\u00fcl\u00f6n\u00e1ll\u00f3 er\u0151forr\u00e1shoz egy SkyPlanner-munka\u00e1llom\u00e1s tartozik, 1:1 kulcsmegfeleltet\u00e9ssel. A m\u0171szakokat, a t\u00e1voll\u00e9teket \u00e9s az alternat\u00edv munka\u00e1llom\u00e1sokat ezut\u00e1n a SkyPlannerben kell be\u00e1ll\u00edtani.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert az integr\u00e1ci\u00f3 elk\u00e9sz\u00edt\u00e9se el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3ba legfeljebb 20 munka\u00e1llom\u00e1st t\u00e1mogat, Katan\u00e1b\u00f3l import\u00e1lt CSV-adatokkal, bankk\u00e1rtya megad\u00e1sa n\u00e9lk\u00fcl. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">l\u00e9pjen kapcsolatba \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a> az integr\u00e1ci\u00f3 felm\u00e9r\u00e9s\u00e9hez.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Katana Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel Ez a Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a tan\u00e1csad\u00f3knak \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a Katana Cloud Inventory (Katana MRP) rendszert a SkyPlanner APS-sel. A SkyPlanner \u00e9s a Katana k\u00f6z\u00f6tt a nyilv\u00e1nos Katana API-n kereszt\u00fcl, mindk\u00e9t ir\u00e1nyban zajlik az adatcsere: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s &#8230; <a title=\"Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/\" aria-label=\"Read more about Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102999,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103837","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Katana MRP\u2013APS-integr\u00e1ci\u00f3: \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/title>\n<meta name=\"description\" content=\"Katana \u00f6sszekapcsol\u00e1sa SkyPlanner APS-sel: API v1, API-kulcsok, webhookok, h\u00edv\u00e1skorl\u00e1tok, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1tsorol\u00e1sa, adatmegfeleltet\u00e9s \u00e9s projekttippek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\" \/>\n<meta property=\"og:description\" content=\"Katana \u00f6sszekapcsol\u00e1sa SkyPlanner APS-sel: API v1, API-kulcsok, webhookok, h\u00edv\u00e1skorl\u00e1tok, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1tsorol\u00e1sa, adatmegfeleltet\u00e9s \u00e9s projekttippek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/integracios-utmutato\\\/\",\"name\":\"Katana MRP\u2013APS-integr\u00e1ci\u00f3: \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Katana \u00f6sszekapcsol\u00e1sa SkyPlanner APS-sel: API v1, API-kulcsok, webhookok, h\u00edv\u00e1skorl\u00e1tok, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1tsorol\u00e1sa, adatmegfeleltet\u00e9s \u00e9s projekttippek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Katana MRP\u2013APS-integr\u00e1ci\u00f3: \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","description":"Katana \u00f6sszekapcsol\u00e1sa SkyPlanner APS-sel: API v1, API-kulcsok, webhookok, h\u00edv\u00e1skorl\u00e1tok, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1tsorol\u00e1sa, adatmegfeleltet\u00e9s \u00e9s projekttippek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel","og_description":"Katana \u00f6sszekapcsol\u00e1sa SkyPlanner APS-sel: API v1, API-kulcsok, webhookok, h\u00edv\u00e1skorl\u00e1tok, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1tsorol\u00e1sa, adatmegfeleltet\u00e9s \u00e9s projekttippek.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/","name":"Katana MRP\u2013APS-integr\u00e1ci\u00f3: \u00fatmutat\u00f3 a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Katana \u00f6sszekapcsol\u00e1sa SkyPlanner APS-sel: API v1, API-kulcsok, webhookok, h\u00edv\u00e1skorl\u00e1tok, gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1tsorol\u00e1sa, adatmegfeleltet\u00e9s \u00e9s projekttippek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/"},{"@type":"ListItem","position":5,"name":"Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Katana Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9shez a SkyPlanner APS rendszerrel Ez a Katana-integr\u00e1ci\u00f3s \u00fatmutat\u00f3 bemutatja a tan\u00e1csad\u00f3knak \u00e9s az informatikai csapatoknak, hogyan kapcsolhatj\u00e1k \u00f6ssze a Katana Cloud Inventory (Katana MRP) rendszert a SkyPlanner APS-sel. A SkyPlanner \u00e9s a Katana k\u00f6z\u00f6tt a nyilv\u00e1nos Katana API-n kereszt\u00fcl, mindk\u00e9t ir\u00e1nyban zajlik az adatcsere: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103837","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=103837"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103837\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/102999"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=103837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}