{"id":103566,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"termelesutemezes","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/","title":{"rendered":"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ IFS Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? <span class=\"hl\">Shop Order Scheduling, MSO \u00e9s SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Az IFS Cloud a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9se \u00e9s a kapacit\u00e1ssz\u00fcks\u00e9glet-tervez\u00e9s (CRP) sor\u00e1n korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol. A t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9s k\u00fcl\u00f6n funkci\u00f3k\u00e9nt \u00e9rhet\u0151 el: az IFS PSO motoron m\u0171k\u00f6d\u0151 Manufacturing Scheduling and Optimization (MSO), illetve a r\u00e9gebbi Advanced Planning Board (APB) r\u00e9v\u00e9n. Azok az \u00fczemek, amelyek MSO bevezet\u00e9se n\u00e9lk\u00fcl szeretn\u00e9nek <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">minden korl\u00e1tot figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9st<\/a>, az IFS Cloud mellett SkyPlanner APS-t haszn\u00e1lnak.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-ifs-cloud-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy tervezi a kapacit\u00e1st az IFS Cloud, l\u00e9p\u00e9sr\u0151l l\u00e9p\u00e9sre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Munka\u00e1llom\u00e1sok \u00e9s er\u0151forr\u00e1sok<\/h3>\n\n\n<p>A kapacit\u00e1s a <strong>Work Center<\/strong> munka\u00e1llom\u00e1shoz \u00e9s annak <strong>Work Center Resources<\/strong> er\u0151forr\u00e1saihoz tartozik, amelyek g\u00e9pek vagy fizikai helyek lehetnek. Minden munka\u00e1llom\u00e1shoz tartozik napt\u00e1r (<strong>Calendar<\/strong>), kihaszn\u00e1lts\u00e1g (<strong>Utilization<\/strong>), hat\u00e9konys\u00e1g (<strong>Efficiency<\/strong>) \u00e9s \u00e9rv\u00e9nyess\u00e9gi id\u0151szak (<strong>Validity Periods<\/strong>). A <strong>Scheduling Capacity<\/strong> mez\u0151 \u00e9rt\u00e9ke Finite vagy Infinite lehet.<\/p>\n\n\n<p>A kapacit\u00e1s kisz\u00e1m\u00edt\u00e1sa a <strong>Calculate Work Center Resource Capacity<\/strong> p\u00e1rbesz\u00e9dablakban t\u00f6rt\u00e9nik. A dolgoz\u00f3kat a rendszer <strong>Labor Classes<\/strong> munkaer\u0151csoportokba sorolja, az egyes szem\u00e9lyek ezekhez tartoznak. A szersz\u00e1mokat a <strong>Manufacturing Tools<\/strong> kezeli, szersz\u00e1mp\u00e9ld\u00e1nyokkal \u00e9s szersz\u00e1mcsoportokkal. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Term\u00e9kstrukt\u00far\u00e1k \u00e9s technol\u00f3giai \u00fatvonalak<\/h3>\n\n\n<p>A darabjegyz\u00e9ket a <strong>Product Structure<\/strong> tartalmazza, strukt\u00farafejl\u00e9ccel, strukt\u00farav\u00e1ltozatokkal \u00e9s strukt\u00farasorokkal. A <strong>Routing<\/strong> a technol\u00f3giai \u00fatvonal v\u00e1ltozatait \u00e9s m\u0171veleteit (<strong>Routing Operations<\/strong>) tartalmazza. Az IFS dokument\u00e1ci\u00f3ja szerint: &#8220;All time information entered for operations (such as setup time, move time, and efficiency) affects operation scheduling.&#8221; (A m\u0171veletekhez megadott minden id\u0151adat \u2013 p\u00e9ld\u00e1ul az \u00e1t\u00e1ll\u00e1si id\u0151, a mozgat\u00e1si id\u0151 \u00e9s a hat\u00e9konys\u00e1g \u2013 befoly\u00e1solja a m\u0171veletek \u00fctemez\u00e9s\u00e9t.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutRoutings.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. MRP, CRP \u00e9s gy\u00e1rt\u00e1si rendel\u00e9sek<\/h3>\n\n\n<p>Az MRP \u00e9s a f\u0151termel\u00e9si terv k\u00e9sz\u00edt\u00e9se tervezett gy\u00e1rt\u00e1si rendel\u00e9seket (<strong>Shop Orders<\/strong>) hoz l\u00e9tre. Egy gy\u00e1rt\u00e1si rendel\u00e9s t\u00f6bb st\u00e1tuszon halad \u00e1t, ilyen p\u00e9ld\u00e1ul a Planned, Released, Reserved, Started \u00e9s Closed. Minden <strong>Shop Order Operation<\/strong> tartalmazza az \u00e1t\u00e1ll\u00e1s \u00e9s a v\u00e9grehajt\u00e1s g\u00e9pid\u0151- \u00e9s munkaer\u0151ig\u00e9ny\u00e9t, a sz\u00fcks\u00e9ges l\u00e9tsz\u00e1mot, az el\u0151nyben r\u00e9szes\u00edtett er\u0151forr\u00e1st (<strong>Preferred Resource<\/strong>), valamint a m\u0171veletek \u00e1tfed\u00e9s\u00e9t \u00e9s a m\u0171veletblokkokat.<\/p>\n\n\n<p>A CRP megmutatja, mekkora terhel\u00e9st jelentenek ezek a rendel\u00e9sek a munka\u00e1llom\u00e1soknak. A terhel\u00e9st azonban nem korl\u00e1tozza. Az IFS egy\u00e9rtelm\u0171en fogalmaz: &#8220;Operations scheduled with CRP and shop order are always scheduled infinite.&#8221; (A CRP-vel \u00e9s a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9s\u00e9vel tervezett m\u0171veletekn\u00e9l a rendszer mindig korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. A gy\u00e1rt\u00e1si rendel\u00e9sek Infinite Scheduler \u00fctemez\u0151je<\/h3>\n\n\n<p>Az Infinite Scheduler minden m\u0171velethez id\u0151pontot rendel. Figyelembe veszi a munka\u00e1llom\u00e1s napt\u00e1r\u00e1t, kihaszn\u00e1lts\u00e1g\u00e1t, a m\u0171velet \u00e9s az er\u0151forr\u00e1s hat\u00e9konys\u00e1g\u00e1t, a v\u00e1rakoz\u00e1si \u00e9s sz\u00e1ll\u00edt\u00e1si id\u0151t, az \u00e1tfed\u00e9seket, a p\u00e1rhuzamos m\u0171veleteket \u00e9s a Preferred Resource be\u00e1ll\u00edt\u00e1st. El\u0151re- vagy visszafel\u00e9 \u00fctemez, \u00e9s ezt v\u00e1lasztja: &#8220;the least loaded resource for the work center.&#8221; (A munka\u00e1llom\u00e1s legkev\u00e9sb\u00e9 terhelt er\u0151forr\u00e1s\u00e1t.)<\/p>\n\n\n<p>A dokument\u00e1ci\u00f3 szerint &#8220;always treats each shop order as if it is the only one in the system, with few constraints on resources and capacity.&#8221; (Minden gy\u00e1rt\u00e1si rendel\u00e9st mindig \u00fagy kezel, mintha az lenne az egyetlen a rendszerben, kev\u00e9s er\u0151forr\u00e1s- \u00e9s kapacit\u00e1skorl\u00e1tot figyelembe v\u00e9ve.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSOInfiniteScheduling.htm\">forr\u00e1s<\/a>) \u00cdgy k\u00e9t gy\u00e1rt\u00e1si rendel\u00e9s is ugyanarra a g\u00e9pre, ugyanarra az \u00f3r\u00e1ra ker\u00fclhet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. A termel\u00e9s\u00fctemez\u00e9s els\u0151 lehet\u0151s\u00e9ge: MSO \u00e9s Smart Manufacturing Planning Board<\/h3>\n\n\n<p>Az MSO &#8220;is a solution designed to generate finite production schedules by optimizing the use of manufacturing resource constraints.&#8221; (Olyan megold\u00e1s, amely a gy\u00e1rt\u00e1si er\u0151forr\u00e1sok korl\u00e1tait figyelembe v\u00e9ve optimaliz\u00e1lja azok haszn\u00e1lat\u00e1t, \u00e9s a t\u00e9nyleges kapacit\u00e1shoz igazod\u00f3 \u00fctemterveket k\u00e9sz\u00edt.) A m\u0171k\u00f6d\u00e9s\u00e9r\u0151l: &#8220;leverages the IFS PSO (Planning, Scheduling, and Optimization) engine.&#8221; (Az IFS PSO \u2013 Planning, Scheduling, and Optimization \u2013 motorj\u00e1t haszn\u00e1lja.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">forr\u00e1s<\/a>) A munka\u00e1llom\u00e1sokat, a munkaer\u0151csoportokat \u00e9s a szersz\u00e1mokat \u00fctemez\u00e9si korl\u00e1tk\u00e9nt kezeli, \u00e9s csak akkor \u00fctemez be egy m\u0171veletet, ha a sz\u00fcks\u00e9ges anyagmennyis\u00e9g rendelkez\u00e9sre \u00e1ll. Figyelembe veszi tov\u00e1bb\u00e1 a cikkspecifikus \u00e1t\u00e1ll\u00e1si id\u0151ket, a gy\u00e1rt\u00e1si rendel\u00e9sek priorit\u00e1s\u00e1t, az er\u0151forr\u00e1snapt\u00e1rakat \u00e9s a karbantart\u00e1si munk\u00e1kat. Automatic m\u00f3dban sz\u00fcks\u00e9g szerint \u00fajra\u00fctemez, p\u00e9ld\u00e1ul \u00faj gy\u00e1rt\u00e1si rendel\u00e9s l\u00e9trehoz\u00e1sakor.<\/p>\n\n\n<p>A be\u00e1ll\u00edt\u00e1s r\u00f6viden:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Be\u00e1ll\u00edt\u00e1s<\/th><th>Szerepe<\/th><\/tr><\/thead><tbody><tr><td>Finite Scheduling Basic Data<\/td><td>Enged\u00e9lyezi a funkci\u00f3t a telephelyen; &#8220;the dataset must be activated&#8221; (az adatk\u00e9szletet aktiv\u00e1lni kell)<\/td><\/tr><tr><td>Mode<\/td><td>K\u00e9zi vagy automatikus \u00fctemez\u00e9s<\/td><\/tr><tr><td>Time Horizon (Days), Scheduling Start Time<\/td><td>Az MSO \u00e1ltal \u00fctemezett id\u0151szak<\/td><\/tr><tr><td>Use Setup Matrices for Scheduling<\/td><td>Cikkspecifikus \u00e1t\u00e1ll\u00e1si id\u0151k<\/td><\/tr><tr><td>Exempt Labor, Exempt Tools, Exempt Shop Order Types<\/td><td>Az MSO \u00e1ltal figyelmen k\u00edv\u00fcl hagyott korl\u00e1tok<\/td><\/tr><tr><td>MSO Advanced Parameters<\/td><td>Szabv\u00e1nyos sablon ellen\u0151rz\u00f6tt alap\u00e9rt\u00e9kekkel; m\u00f3dos\u00edt\u00e1sa: &#8220;For modification by PSO\/MSO SMEs only&#8221; (kiz\u00e1r\u00f3lag az \u00e9rintett rendszerek szak\u00e9rt\u0151i m\u00f3dos\u00edthatj\u00e1k)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A gy\u00e1rt\u00e1si rendel\u00e9sen a <strong>Need Date<\/strong> adja meg azt a hat\u00e1rid\u0151t, amelyhez k\u00e9pest a k\u00e9s\u00e9st sz\u00e1m\u00edtja a rendszer. Az <strong>Earliest Start Date<\/strong> &#8220;a hard time constraint&#8221; (szigor\u00faan betartand\u00f3 id\u0151korl\u00e1t), a <strong>Priority Category<\/strong> pedig az MSO priorit\u00e1si pontsz\u00e1m\u00e1t befoly\u00e1solja. A tervez\u0151k a <strong>Smart Manufacturing Planning Board<\/strong> fel\u00fclet\u00e9n dolgoznak. Itt a Resources \u00e9s Operations Gantt-oldalak, a fogd \u00e9s vidd kezel\u00e9s, a m\u0171veletek feloszt\u00e1sa \u00e9s a szelekt\u00edv optimaliz\u00e1l\u00e1s seg\u00edti a munk\u00e1jukat. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSmartManufacturingPlanningBoard.htm\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. A termel\u00e9s\u00fctemez\u00e9s m\u00e1sodik lehet\u0151s\u00e9ge: Advanced Planning Board<\/h3>\n\n\n<p>Az IFS Applications 10-b\u0151l ismert APB a Constraint Based Scheduling (CBS) megold\u00e1st haszn\u00e1lja. A dokument\u00e1ci\u00f3 szerint &#8220;allows you to perform finite scheduling of shop orders on sites that have enabled the use of the APB in scheduling basic data.&#8221; (Lehet\u0151v\u00e9 teszi a gy\u00e1rt\u00e1si rendel\u00e9sek t\u00e9nyleges kapacit\u00e1shoz igazod\u00f3 \u00fctemez\u00e9s\u00e9t azokon a telephelyeken, ahol az \u00fctemez\u00e9si alapadatokban enged\u00e9lyezt\u00e9k az APB haszn\u00e1lat\u00e1t.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutCBSSchedulingTheory.htm\">forr\u00e1s<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mi marad a tervez\u0151 feladata?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Alap\u00e9rtelmez\u00e9sben korl\u00e1tlan kapacit\u00e1s.<\/strong> A gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9se \u00e9s a CRP soha nem ellen\u0151rzi a rendel\u00e9sek egy\u00fcttes kapacit\u00e1sig\u00e9ny\u00e9t. A termel\u00e9s\u00fctemez\u00e9shez k\u00fcl\u00f6n be kell \u00e1ll\u00edtani az MSO-t vagy az APB-t (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">AboutWorkCenter<\/a>).<\/li>\n\n\n<li><strong>Az MSO-hoz k\u00fcl\u00f6n hozz\u00e1f\u00e9r\u00e9s sz\u00fcks\u00e9ges.<\/strong> A dokument\u00e1ci\u00f3 szerint &#8220;is available for customers with access to Manufacturing Scheduling and Optimization.&#8221; (Azon \u00fcgyfelek sz\u00e1m\u00e1ra \u00e9rhet\u0151 el, akik hozz\u00e1f\u00e9rnek a Manufacturing Scheduling and Optimization megold\u00e1shoz.) Hibrid vagy hosztolt telephelyek eset\u00e9n IFS.ai Activation Pass sz\u00fcks\u00e9ges. Felh\u0151s telephelyek eset\u00e9n a k\u00f6vetelm\u00e9ny: &#8220;PSO sizing and purchase of PSO Cloud Service&#8221; (a PSO m\u00e9retez\u00e9se \u00e9s a PSO Cloud Service megv\u00e1s\u00e1rl\u00e1sa) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">26R2 MSO<\/a>).<\/li>\n\n\n<li><strong>Az IFS.ai platformszolg\u00e1ltat\u00e1sain az MSO k\u00e9zi m\u0171k\u00f6d\u00e9s\u0171 \u00e9s haszn\u00e1latar\u00e1nyos elsz\u00e1mol\u00e1s\u00fa.<\/strong> &#8220;Automatic scheduling mode is not available for users on the IFS.ai-based platform services.&#8221; (Az IFS.ai-alap\u00fa platformszolg\u00e1ltat\u00e1sok felhaszn\u00e1l\u00f3i sz\u00e1m\u00e1ra nem \u00e9rhet\u0151 el az automatikus \u00fctemez\u00e9si m\u00f3d.) A felhaszn\u00e1l\u00f3kra az al\u00e1bbi felt\u00e9tel vonatkozik: &#8220;must have a number of dedicated tokens on hand to do a finite schedule or to do a simulation in MSO&#8221; (megfelel\u0151 sz\u00e1m\u00fa, erre elk\u00fcl\u00f6n\u00edtett tokennel kell rendelkezni\u00fck ahhoz, hogy termel\u00e9s\u00fctemez\u00e9st vagy szimul\u00e1ci\u00f3t futtassanak az MSO-ban) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">26R1 MSO<\/a>). Az Automatic m\u00f3d nem \u00e9rhet\u0151 el az IFS.ai Activation Pass haszn\u00e1lat\u00e1val m\u0171k\u00f6d\u0151 hibrid vagy hosztolt telephelyeken (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">26R2 MSO<\/a>).<\/li>\n\n\n<li><strong>A halad\u00f3 param\u00e9terek be\u00e1ll\u00edt\u00e1sa szak\u00e9rt\u0151i feladat.<\/strong> Az IFS szabv\u00e1nyos sablont biztos\u00edt, \u00e9s nyomat\u00e9kosan javasolja az alap\u00e9rt\u00e9kek megtart\u00e1s\u00e1t. M\u00f3dos\u00edt\u00e1st kiz\u00e1r\u00f3lag PSO- \u00e9s MSO-szak\u00e9rt\u0151k v\u00e9gezhetnek.<\/li>\n\n\n<li><strong>Az MSO dokument\u00e1lt korl\u00e1tai.<\/strong> &#8220;MSO schedules the first operation on a work center using a setup matrix without a setup time.&#8221; (\u00c1t\u00e1ll\u00e1si m\u00e1trix haszn\u00e1latakor az MSO \u00e1t\u00e1ll\u00e1si id\u0151 n\u00e9lk\u00fcl \u00fctemezi a munka\u00e1llom\u00e1s els\u0151 m\u0171velet\u00e9t.) &#8220;Parallel shop order operations are not considered for optimization in a compressed manner.&#8221; (A gy\u00e1rt\u00e1si rendel\u00e9sek p\u00e1rhuzamos m\u0171veleteit az optimaliz\u00e1l\u00e1s sor\u00e1n nem t\u00f6m\u00f6r\u00edti id\u0151ben.) Az Exempt Labor be\u00e1ll\u00edt\u00e1s mellett &#8220;operations that have only labor time and no machine time will remain untouched.&#8221; (Azok a m\u0171veletek, amelyeknek csak munkaidej\u00fck van, g\u00e9pidej\u00fck nincs, v\u00e1ltozatlanok maradnak.)<\/li>\n\n\n<li><strong>R\u00f6vid tervez\u00e9si horizont.<\/strong> Az IFS az MSO-t r\u00e9szletes, r\u00f6vid t\u00e1v\u00fa \u00fctemez\u00e9sre aj\u00e1nlja. Hosszabb t\u00e1vra a CRP-t, az MRP-t \u00e9s a f\u0151termel\u00e9si terv k\u00e9sz\u00edt\u00e9s\u00e9t javasolja.<\/li>\n\n\n<li><strong>Az APB csak a bet\u00f6lt\u00f6tt adatokkal tervez.<\/strong> A dokument\u00e1ci\u00f3 szerint &#8220;only considers the constraints placed by shop orders and resources that are actually loaded to the APB at a given time.&#8221; (Csak az adott id\u0151pontban az APB-be t\u00e9nylegesen bet\u00f6lt\u00f6tt gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s er\u0151forr\u00e1sok korl\u00e1tait veszi figyelembe.)<\/li>\n\n<\/ul>\n\n\n<p>A gyakorlatban az alap\u00fctemez\u00e9st haszn\u00e1l\u00f3 \u00fczemek egym\u00e1sra cs\u00fasz\u00f3 m\u0171veletekkel, k\u00e9zi sorrendm\u00f3dos\u00edt\u00e1ssal \u00e9s az IFS-b\u0151l export\u00e1lt adatokb\u00f3l Excelben vezetett p\u00e1rhuzamos tervvel dolgoznak.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-ifs-cloud-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor el\u00e9g az IFS Cloud saj\u00e1t \u00fctemez\u00e9se?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A gy\u00e1rt\u00e1si rendel\u00e9sek alap\u00fctemez\u00e9se a CRP-vel egy\u00fctt elegend\u0151, ha:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Az \u00fczemben van szabad kapacit\u00e1s, \u00e9s ritk\u00e1k a val\u00f3di sz\u0171k keresztmetszetek.<\/li>\n\n\n<li>A technol\u00f3giai \u00fatvonalak r\u00f6videk \u00e9s \u00e1lland\u00f3ak, a tervez\u00e9s pedig heti szinten t\u00f6rt\u00e9nik.<\/li>\n\n\n<li>A m\u0171vezet\u0151 hat\u00e1rozza meg a sorrendet a g\u00e9pn\u00e9l.<\/li>\n\n\n<li>A k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok, a munkacsoportok \u00e9s az anyagok be\u00e9rkez\u00e9se nem hat\u00e1rozz\u00e1k meg a munk\u00e1k sorrendj\u00e9t.<\/li>\n\n<\/ul>\n\n\n<p>Az MSO olyan telephelynek megfelel\u0151, amely megv\u00e1s\u00e1rolja az MSO-hozz\u00e1f\u00e9r\u00e9st \u00e9s a hozz\u00e1 tartoz\u00f3 PSO- vagy IFS.ai-k\u00f6rnyezet ki\u00e9p\u00edt\u00e9s\u00e9t, \u00e9s r\u00f6vid t\u00e1vra \u00fctemez az IFS-en bel\u00fcl.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor van sz\u00fcks\u00e9g termel\u00e9s\u00fctemez\u0151re?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az alap\u00fctemez\u00e9s m\u00e1r nem elegend\u0151, ha az al\u00e1bbiak k\u00f6z\u00fcl t\u00f6bb is igaz:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A v\u00e1llalt hat\u00e1rid\u0151k cs\u00fasznak, pedig a CRP szerint minden rendben volt.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1si id\u0151 att\u00f3l f\u00fcgg, hogy el\u0151tte melyik term\u00e9ket gy\u00e1rtott\u00e1k.<\/li>\n\n\n<li>A l\u00e9tsz\u00e1m, a m\u0171szakok \u00e9s a hi\u00e1nyz\u00e1sok ugyan\u00fagy korl\u00e1tozz\u00e1k a tervet, mint a g\u00e9pek.<\/li>\n\n\n<li>T\u00f6bb g\u00e9p haszn\u00e1lja ugyanazokat az \u00f6nt\u0151form\u00e1kat, alak\u00edt\u00f3szersz\u00e1mokat vagy befog\u00f3k\u00e9sz\u00fcl\u00e9keket.<\/li>\n\n\n<li>Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa d\u00f6nti el, melyik gy\u00e1rt\u00e1si rendel\u00e9s indulhat el.<\/li>\n\n\n<li>A s\u00fcrg\u0151s rendel\u00e9sek \u00e9s a g\u00e9phib\u00e1k miatt hetente t\u00f6bbsz\u00f6r is \u00fajra kell tervezni.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mire \u00e9rdemes figyelni a v\u00e1laszt\u00e1sn\u00e1l?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Minden er\u0151forr\u00e1s kapacit\u00e1skorl\u00e1tj\u00e1t egyszerre kezelje<\/strong>, ne csak a tervez\u0151t\u00e1bl\u00e1ra bet\u00f6lt\u00f6tt r\u00e9szhalmaz\u00e9t.<\/li>\n\n\n<li><strong>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix<\/strong>: a term\u00e9kek k\u00f6z\u00f6tti, sorrendf\u00fcgg\u0151 \u00e9s ir\u00e1nyonk\u00e9nt elt\u00e9r\u0151 \u00e1t\u00e1ll\u00e1si id\u0151kkel minimaliz\u00e1lja az \u00f6sszes \u00e1t\u00e1ll\u00e1si id\u0151t.<\/li>\n\n\n<li><strong>A szersz\u00e1mokat korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3, k\u00f6z\u00f6s er\u0151forr\u00e1sk\u00e9nt kezelje<\/strong>, hogy egy \u00f6nt\u0151forma soha ne ker\u00fclj\u00f6n egyszerre k\u00e9t g\u00e9pre.<\/li>\n\n\n<li><strong>T\u00f6bb dolgoz\u00f3t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatok<\/strong>: a sz\u00fcks\u00e9ges l\u00e9tsz\u00e1mot \u00fagy biztos\u00edtsa a feladathoz, hogy minden dolgoz\u00f3 saj\u00e1t m\u0171szakbeoszt\u00e1s\u00e1t figyelembe veszi.<\/li>\n\n\n<li><strong>Az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s<\/strong>, amely ellen\u0151rzi a k\u00e9szletet \u00e9s a nyitott beszerz\u00e9si rendel\u00e9seket.<\/li>\n\n\n<li><strong>Automatikus \u00fajra\u00fctemez\u00e9s<\/strong>, ha v\u00e1ltozik a gy\u00e1rt\u00e1s el\u0151rehalad\u00e1sa vagy a rendel\u00e9s\u00e1llom\u00e1ny, futtat\u00e1sonk\u00e9nti tokenkeret n\u00e9lk\u00fcl.<\/li>\n\n\n<li><strong>Rendezett vissza\u00edr\u00e1s az IFS-be<\/strong> az IFS saj\u00e1t OData-projekci\u00f3in kereszt\u00fcl, egy\u00e9rtelm\u0171en meghat\u00e1rozva, melyik rendszer kezeli a m\u0171veletek id\u0151pontjait.<\/li>\n\n<\/ul>\n\n\n<p>A lehet\u0151s\u00e9gek n\u00e9gy csoportba sorolhat\u00f3k:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Az IFS Cloud alap\u00e9rtelmezett \u00fctemez\u00e9se<\/strong> korl\u00e1tlan kapacit\u00e1st felt\u00e9telezve hat\u00e1rozza meg a gy\u00e1rt\u00e1si rendel\u00e9sek id\u0151pontjait az IFS-en bel\u00fcl.<\/li>\n\n\n<li><strong>Az IFS MSO<\/strong> a g\u00e9pek, a munkaer\u0151, a szersz\u00e1mok \u00e9s az anyagok t\u00e9nyleges rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe v\u00e9ve \u00fctemez. A PSO motorra \u00e9p\u00fcl\u0151 modulhoz k\u00fcl\u00f6n hozz\u00e1f\u00e9r\u00e9s sz\u00fcks\u00e9ges.<\/li>\n\n\n<li><strong>A nagyv\u00e1llalati APS-rendszereket<\/strong> bevezet\u00e9si projekt keret\u00e9ben kapcsolj\u00e1k \u00f6ssze az ERP-vel, \u00e9s tervez\u0151csapat m\u0171k\u00f6dteti \u0151ket.<\/li>\n\n\n<li><strong>A felh\u0151alap\u00fa, \u00fczemi v\u00e9grehajt\u00e1st is t\u00e1mogat\u00f3 APS<\/strong> \u2013 ebbe a csoportba tartozik a SkyPlanner \u2013 az IFS Cloud mellett minden er\u0151forr\u00e1st automatikusan \u00fctemez, \u00e9s k\u00f6zvetlen\u00fcl a g\u00e9pkezel\u0151k rendelkez\u00e9s\u00e9re bocs\u00e1tja az \u00fctemtervet.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hol kap szerepet a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner APS ezeket a hi\u00e1nyoss\u00e1gokat p\u00f3tolja. Minden munka\u00e1llom\u00e1s kapacit\u00e1sa korl\u00e1tozott, \u00e9s az \u00f6sszes gy\u00e1rt\u00e1si rendel\u00e9s ugyanaz\u00e9rt a kapacit\u00e1s\u00e9rt verseng. Az Arcturus AI motor m\u00e1sodpercek alatt k\u00e9sz\u00edt m\u0171veletszint\u0171 \u00fctemtervet, a sorrendet pedig az \u00d6n priorit\u00e1sai \u00e9s hat\u00e1rid\u0151i alapj\u00e1n hat\u00e1rozza meg.<\/p>\n\n\n<p>Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix minden term\u00e9kp\u00e1rhoz mindk\u00e9t ir\u00e1nyban t\u00e1rolja az \u00e1t\u00e1ll\u00e1s idej\u00e9t, a motor pedig a legkisebb \u00f6sszes \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja. A szersz\u00e1mok korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok, \u00e9s egy gy\u00e1rt\u00e1si feladathoz egyszerre t\u00f6bb g\u00e9pkezel\u0151re is sz\u00fcks\u00e9g lehet. Ha egy g\u00e9p vagy dolgoz\u00f3 nem el\u00e9rhet\u0151, a motor az \u00d6n \u00e1ltal megadott alternat\u00edv er\u0151forr\u00e1sokra helyezi \u00e1t a munk\u00e1t.<\/p>\n\n\n<p>Az anyagvez\u00e9relt \u00fctemez\u00e9s az aktu\u00e1lis k\u00e9szlet \u00e9s a be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9sek alapj\u00e1n szimul\u00e1lja a j\u00f6v\u0151beli k\u00e9szletet, \u00edgy a munka csak olyan id\u0151pontra ker\u00fcl, amikor az anyag rendelkez\u00e9sre \u00e1ll. A Running Time Lock a hely\u00fck\u00f6n tartja a m\u00e1r fut\u00f3 gy\u00e1rt\u00e1si feladatokat.<\/p>\n\n\n<p>Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltoz\u00e1s t\u00f6rt\u00e9nik a termel\u00e9sben, az \u00d6n \u00e1ltal be\u00e1ll\u00edtott z\u00e1rol\u00e1sok \u00e9s priorit\u00e1sok betart\u00e1s\u00e1val. A tervez\u0151k interakt\u00edv Gantt-id\u0151vonalon m\u00f3dos\u00edtj\u00e1k a gy\u00e1rt\u00e1si feladatokat, a g\u00e9pkezel\u0151k pedig telefonon vagy t\u00e1blag\u00e9pen r\u00f6gz\u00edtik a munk\u00e1t a Mobile Confirmations seg\u00edts\u00e9g\u00e9vel.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t az IFS MSO helyett, ha<\/strong> le szeretn\u00e9 v\u00e1ltani a t\u00e1bl\u00e1zatokat, \u00e9s a val\u00f3s kapacit\u00e1shoz igazod\u00f3, \u00f6nm\u0171k\u00f6d\u0151 \u00fctemtervet szeretne:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1tfedik egym\u00e1st a k\u00f6z\u00f6sen haszn\u00e1lt g\u00e9peken, a CRP pedig csak ut\u00f3lag mutatja ki a t\u00falterhel\u00e9st.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1sok, a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok vagy a t\u00f6bb g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatok hat\u00e1rozz\u00e1k meg, melyik munka indulhat k\u00f6vetkez\u0151k\u00e9nt.<\/li>\n\n\n<li>Minden v\u00e1ltoz\u00e1sn\u00e1l \u00fajra kell tervezni. Az Autopilot ezt automatikusan elv\u00e9gzi, futtat\u00e1sonk\u00e9nti tokenkeret n\u00e9lk\u00fcl, \u00e9s nincs k\u00e9zi \u00fczemm\u00f3dra korl\u00e1tozva.<\/li>\n\n\n<li>Az \u00e9rt\u00e9kes\u00edt\u00e9snek h\u00f3napokra el\u0151re sz\u00fcks\u00e9ge van a val\u00f3s kapacit\u00e1s alapj\u00e1n sz\u00e1m\u00edtott id\u0151pontokra, t\u00fal az MSO r\u00f6vid t\u00e1v\u00fa tervez\u00e9si horizontj\u00e1n.<\/li>\n\n\n<li>Minden korl\u00e1tot egyetlen motorral szeretne kezelni, nyilv\u00e1nosan k\u00f6zz\u00e9tett \u00e1ron, k\u00fcl\u00f6n MSO-hozz\u00e1f\u00e9r\u00e9s, PSO Cloud Service vagy IFS.ai Activation Pass n\u00e9lk\u00fcl, \u00e9s nem szeretne kiz\u00e1r\u00f3lag PSO-szak\u00e9rt\u0151k \u00e1ltal kezelhet\u0151 param\u00e9terekkel dolgozni.<\/li>\n\n<\/ul>\n\n\n<p>M\u00e1r a pr\u00f3baid\u0151szak alatt l\u00e1thatja saj\u00e1t gy\u00e1rt\u00e1si rendel\u00e9seit a val\u00f3s kapacit\u00e1s szerint \u00fctemezve, \u00e9s a bevezet\u00e9s kezdet\u00e9t\u0151l sz\u00e1m\u00edtott heteken bel\u00fcl \u00e9lesben haszn\u00e1lhatja a rendszert.<\/p>\n\n\n<p>Kezdje a <a href=\"\/hu\/proba\/\">30 napos ingyenes pr\u00f3b\u00e1t<\/a> a gy\u00e1rt\u00e1si rendel\u00e9sek Excel-exportj\u00e1val (legfeljebb 20 munka\u00e1llom\u00e1s, bankk\u00e1rtya n\u00e9lk\u00fcl). A havonta sz\u00e1ml\u00e1zott d\u00edj 199 \u20ac-t\u00f3l indul, \u00e9s 5 munka\u00e1llom\u00e1st tartalmaz. Az integr\u00e1ci\u00f3ra el\u0151re adunk \u00e1raj\u00e1nlatot az \u00d6n folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n\n\n<p>A SkyPlanner az IFS saj\u00e1t OData-projekci\u00f3in kereszt\u00fcl, k\u00e9tir\u00e1ny\u00faan kapcsol\u00f3dik az IFS Cloud rendszerhez. Az integr\u00e1ci\u00f3t a SkyPlanner csapata \u00e1ll\u00edtja be a bevezet\u00e9s sor\u00e1n, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja. Tekintse meg a <a href=\"\/hu\/integraciok\/erp\/ifs-cloud\/\">SkyPlanner az IFS Cloud mellett<\/a> oldalt, az <a href=\"\/hu\/integraciok\/erp\/ifs-cloud\/integracios-utmutato\/\">IFS Cloud integr\u00e1ci\u00f3s \u00fatmutat\u00f3t<\/a>, vagy ismerje meg a t\u00f6bbi t\u00e1mogatott rendszert az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k \u00e1ttekint\u0151 oldal\u00e1n<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3c\u00e9gek v\u00e9lem\u00e9nye a SkyPlanner megold\u00e1s\u00e1r\u00f3l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3szekr\u00e9nygy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner seg\u00edts\u00e9g\u00e9vel az Excel-t\u00e1bl\u00e1zatokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a termel\u00e9s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Villamos kapcsol\u00f3szekr\u00e9nyek \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, az \u00faj munkasorrend pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 dolgoz\u00f3k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sora mellett\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napos optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa, a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner meghat\u00e1roz\u00f3 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, \u00e9s az \u00fctemez\u00e9shez most m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/kjh-comp\/\">Olvassa el a KJH-Comp v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa 2021 \u00f3ta<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e1tl\u00e1that\u00f3v\u00e1 teszi a kapacit\u00e1sunkat \u00e9s kisz\u00e1m\u00edthat\u00f3v\u00e1 a tervez\u00e9st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Vegyipari \u00e9s \u00e9lelmiszeripari gy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa a SkyPlanner haszn\u00e1lat\u00e1nak teljes id\u0151tartama alatt, 2021 \u00f3ta 100%-os.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/opes-corporation\/\">Olvassa el az Opes Corporation v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mi a k\u00fcl\u00f6nbs\u00e9g az IFS MSO \u00e9s a PSO k\u00f6z\u00f6tt?<\/summary>\n<p class=\"sp-faq__a\">A PSO (Planning and Scheduling Optimization) az IFS \u00fctemez\u0151motorja, amelyet helysz\u00edni szervizfeladatok \u00fctemez\u00e9s\u00e9re is \u00e9rt\u00e9kes\u00edtenek. Az MSO (Manufacturing Scheduling and Optimization) a PSO motorra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1s\u00fctemez\u0151. A 26R2 dokument\u00e1ci\u00f3j\u00e1ban IFS.ai Manufacturing Scheduling and Optimization n\u00e9ven szerepel.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Az MSO az IFS Cloud r\u00e9sze?<\/summary>\n<p class=\"sp-faq__a\">Az IFS dokument\u00e1ci\u00f3ja szerint az MSO azoknak az \u00fcgyfeleknek \u00e9rhet\u0151 el, akik rendelkeznek hozz\u00e1f\u00e9r\u00e9ssel. A bevezet\u00e9shez hibrid vagy hosztolt k\u00f6rnyezetben IFS.ai Activation Pass sz\u00fcks\u00e9ges, felh\u0151ben pedig PSO-m\u00e9retez\u00e9s \u00e9s a PSO Cloud Service megv\u00e1s\u00e1rl\u00e1sa. Az IFS.ai platformszolg\u00e1ltat\u00e1sokon az MSO k\u00e9zi \u00fczemm\u00f3dban m\u0171k\u00f6dik \u00e9s tokeneket fogyaszt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u00e9pes az IFS Cloud a munkaer\u0151t \u00e9s a szersz\u00e1mokat a t\u00e9nyleges kapacit\u00e1suk szerint \u00fctemezni?<\/summary>\n<p class=\"sp-faq__a\">Az MSO-ban igen: a munka\u00e1llom\u00e1sokat, a munkaer\u0151-kateg\u00f3ri\u00e1kat \u00e9s a szersz\u00e1mokat \u00fctemez\u00e9si korl\u00e1tk\u00e9nt kezeli, kiv\u00e9ve, ha az Exempt Labor vagy az Exempt Tools be\u00e1ll\u00edt\u00e1s akt\u00edv. Az alap\u00e9rtelmezett gy\u00e1rt\u00e1sirendel\u00e9s-\u00fctemez\u00e9s nem korl\u00e1tozza a munkaer\u0151-kateg\u00f3ri\u00e1k vagy a szersz\u00e1mok ig\u00e9nybev\u00e9tel\u00e9t a rendel\u00e9sek k\u00f6z\u00f6tt. A SkyPlanner minden futtat\u00e1skor a t\u00e9nyleges rendelkez\u00e9sre \u00e1ll\u00e1s szerint \u00fctemezi a dolgoz\u00f3kat, a m\u0171szakokat \u00e9s a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mokat, a t\u00e1voll\u00e9teket is figyelembe v\u00e9ve.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kezeli az IFS Cloud a sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1si id\u0151ket?<\/summary>\n<p class=\"sp-faq__a\">Az MSO \u00e1t\u00e1ll\u00e1si m\u00e1trixokkal k\u00e9pes erre, b\u00e1r a munka\u00e1llom\u00e1s els\u0151 m\u0171velet\u00e9t \u00e1t\u00e1ll\u00e1si id\u0151 n\u00e9lk\u00fcl \u00fctemezi. Az alap\u00e9rtelmezett \u00fctemez\u00e9s a technol\u00f3giai \u00fatvonal m\u0171velet\u00e9n megadott \u00e1t\u00e1ll\u00e1si id\u0151t haszn\u00e1lja. A SkyPlanner \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixa term\u00e9kp\u00e1ronk\u00e9nt t\u00e1rolja az \u00e1t\u00e1ll\u00e1sokat: p\u00e9ld\u00e1ul k\u00e9kr\u0151l pirosra 30 perc, pirosr\u00f3l k\u00e9kre 60.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatom a SkyPlanner megold\u00e1s\u00e1t az IFS Cloud-integr\u00e1ci\u00f3 el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. Export\u00e1lja a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket, m\u0171veleteket \u00e9s munka\u00e1llom\u00e1sokat az IFS Cloud rendszerb\u0151l Excelbe, import\u00e1lja \u0151ket a 30 napos pr\u00f3baid\u0151szak alatt, \u00e9s hasonl\u00edtsa \u00f6ssze az \u00fctemtervet a jelenlegi terv\u00e9vel. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, <a href=\"\/hu\/proba\/\">ind\u00edtsa el a pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">l\u00e9pjen kapcsolatba \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ IFS Cloud T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS Az IFS Cloud a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9se \u00e9s a kapacit\u00e1ssz\u00fcks\u00e9glet-tervez\u00e9s (CRP) sor\u00e1n korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol. A t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9s k\u00fcl\u00f6n funkci\u00f3k\u00e9nt \u00e9rhet\u0151 el: az IFS PSO motoron m\u0171k\u00f6d\u0151 Manufacturing Scheduling and Optimization (MSO), illetve &#8230; <a title=\"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/\" aria-label=\"Read more about T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102883,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103566","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st?<\/title>\n<meta name=\"description\" content=\"IFS Cloud: gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s CRP korl\u00e1tlan kapacit\u00e1ssal. Termel\u00e9s\u00fctemez\u00e9s: MSO a PSO motoron vagy APB. Mire j\u00f3k, hol a hat\u00e1ruk, mikor kell APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"IFS Cloud: gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s CRP korl\u00e1tlan kapacit\u00e1ssal. Termel\u00e9s\u00fctemez\u00e9s: MSO a PSO motoron vagy APB. Mire j\u00f3k, hol a hat\u00e1ruk, mikor kell APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/ifs-cloud\\\/termelesutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/ifs-cloud\\\/termelesutemezes\\\/\",\"name\":\"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"IFS Cloud: gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s CRP korl\u00e1tlan kapacit\u00e1ssal. Termel\u00e9s\u00fctemez\u00e9s: MSO a PSO motoron vagy APB. Mire j\u00f3k, hol a hat\u00e1ruk, mikor kell APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/ifs-cloud\\\/termelesutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/ifs-cloud\\\/termelesutemezes\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/ifs-cloud\\\/termelesutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS az IFS Cloudhoz: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/ifs-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st?","description":"IFS Cloud: gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s CRP korl\u00e1tlan kapacit\u00e1ssal. Termel\u00e9s\u00fctemez\u00e9s: MSO a PSO motoron vagy APB. Mire j\u00f3k, hol a hat\u00e1ruk, mikor kell APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS","og_description":"IFS Cloud: gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s CRP korl\u00e1tlan kapacit\u00e1ssal. Termel\u00e9s\u00fctemez\u00e9s: MSO a PSO motoron vagy APB. Mire j\u00f3k, hol a hat\u00e1ruk, mikor kell APS?","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/","name":"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"IFS Cloud: gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s CRP korl\u00e1tlan kapacit\u00e1ssal. Termel\u00e9s\u00fctemez\u00e9s: MSO a PSO motoron vagy APB. Mire j\u00f3k, hol a hat\u00e1ruk, mikor kell APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/termelesutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS az IFS Cloudhoz: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/ifs-cloud\/"},{"@type":"ListItem","position":5,"name":"T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ IFS Cloud T\u00e1mogatja az IFS Cloud a termel\u00e9s\u00fctemez\u00e9st? Shop Order Scheduling, MSO \u00e9s SkyPlanner APS Az IFS Cloud a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9se \u00e9s a kapacit\u00e1ssz\u00fcks\u00e9glet-tervez\u00e9s (CRP) sor\u00e1n korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol. A t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9s k\u00fcl\u00f6n funkci\u00f3k\u00e9nt \u00e9rhet\u0151 el: az IFS PSO motoron m\u0171k\u00f6d\u0151 Manufacturing Scheduling and Optimization (MSO), illetve&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=103566"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/103566\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/102883"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=103566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}