{"id":102999,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/katana\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"katana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/","title":{"rendered":"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS a Katana mell\u00e9: <span class=\"hl\">termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">A SkyPlanner APS a Katana Cloud Inventory (Katana MRP) termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151je, amely a g\u00e9pek \u00e9s a dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1val sz\u00e1mol. A gy\u00e1rt\u00e1si rendel\u00e9sekb\u0151l olyan \u00fctemtervet k\u00e9sz\u00edt, amely minden munka\u00e1llom\u00e1st, g\u00e9pkezel\u0151t, szersz\u00e1mot \u00e9s anyagot figyelembe vesz. L\u00e1thatja, melyik m\u0171velet hol \u00e9s mikor zajlik, az Autopilot pedig automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a termel\u00e9s.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner \u00e9s a Katana k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa az adatkapcsolat. A gy\u00e1rt\u00e1si rendel\u00e9sek, recept\u00far\u00e1k, m\u0171veletek, er\u0151forr\u00e1sok, k\u00e9szletek \u00e9s beszerz\u00e9si rendel\u00e9sek a SkyPlannerbe ker\u00fclnek, az \u00fctemezett sorrend, a hat\u00e1rid\u0151k \u00e9s a r\u00f6gz\u00edtett munkaadatok pedig visszajutnak a Katan\u00e1ba. A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n Katana-be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja az integr\u00e1ci\u00f3t.<\/p>\n\n\n<p>Az el\u0151fizet\u00e9s havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, ami 5 munka\u00e1llom\u00e1st tartalmaz. Minden tov\u00e1bbi munka\u00e1llom\u00e1s d\u00edja havi 20 \u20ac. Az ingyenes pr\u00f3ba 30 napig tart, legfeljebb 20 munka\u00e1llom\u00e1ssal, bankk\u00e1rtya megad\u00e1sa n\u00e9lk\u00fcl.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mi v\u00e1ltozik a termel\u00e9sben?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">G\u00e9penk\u00e9nt k\u00fcl\u00f6n id\u0151vonal, nem egyetlen lista az eg\u00e9sz gy\u00e1rnak.<\/p>\n\n\n<p class=\"fx-pain__b\">A Katana egyetlen priorit\u00e1si list\u00e1n rangsorolja a gy\u00e1rt\u00e1si rendel\u00e9seket. A SkyPlanner Arcturus motorja minden m\u0171veletet az azt v\u00e9grehajt\u00f3 munka\u00e1llom\u00e1sra, konkr\u00e9t id\u0151pontra \u00fctemez az interakt\u00edv Gantt-id\u0151vonalon.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k ellen\u0151rz\u00e9se a val\u00f3s kapacit\u00e1s alapj\u00e1n.<\/p>\n\n\n<p class=\"fx-pain__b\">Minden rendel\u00e9s befejez\u00e9si id\u0151pontj\u00e1t a g\u00e9pek \u00e9s a dolgoz\u00f3k terhel\u00e9se hat\u00e1rozza meg. M\u00e9g a hat\u00e1rid\u0151 megad\u00e1sa el\u0151tt l\u00e1thatja, hogy a CNC k\u00e9t h\u00e9tre foglalt, mik\u00f6zben az \u00f6sszeszerel\u00e9s szabad.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">M\u0171szakok az \u00fczem m\u0171k\u00f6d\u00e9s\u00e9hez igaz\u00edtva.<\/p>\n\n\n<p class=\"fx-pain__b\">Minden munka\u00e1llom\u00e1shoz \u00e9s dolgoz\u00f3hoz k\u00fcl\u00f6n adhat\u00f3k meg a m\u0171szakok, szabads\u00e1gok, t\u00e1voll\u00e9tek \u00e9s t\u00fal\u00f3r\u00e1s m\u0171szakok. Ha a sz\u0171k keresztmetszetn\u00e9l m\u00e1sodik m\u0171szakot vezet be, annak hat\u00e1sa azonnal megjelenik a hat\u00e1rid\u0151kben.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kevesebb \u00e1t\u00e1ll\u00e1s.<\/p>\n\n\n<p class=\"fx-pain__b\">A SkyPlanner minden term\u00e9kp\u00e1rhoz mindk\u00e9t ir\u00e1nyban t\u00e1rolja az \u00e1t\u00e1ll\u00e1si id\u0151t. K\u00e9kr\u0151l pirosra v\u00e1ltani 30 perc is lehet, pirosr\u00f3l k\u00e9kre pedig 60. A motor olyan sorrendbe \u00e1ll\u00edtja a gy\u00e1rt\u00e1si feladatokat, amellyel a legkevesebb id\u0151 v\u00e9sz el.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok \u00e9s csapatok beoszt\u00e1sa sem \u00fctk\u00f6zik.<\/p>\n\n\n<p class=\"fx-pain__b\">Az egyik munka\u00e1llom\u00e1son haszn\u00e1lt form\u00e1t a rendszer soha nem foglalja le ugyanarra az id\u0151re egy m\u00e1sikon. A h\u00e1rom g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladathoz h\u00e1rom olyan dolgoz\u00f3t rendel, akinek a m\u0171szakj\u00e1ban van szabad kapacit\u00e1s.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Automatikus \u00fajra\u00fctemez\u00e9s s\u00fcrg\u0151s rendel\u00e9sek \u00e9s g\u00e9phib\u00e1k eset\u00e9n.<\/p>\n\n\n<p class=\"fx-pain__b\">\u00c1ll\u00edtson be egy rendel\u00e9shez Fast Track besorol\u00e1st vagy magasabb priorit\u00e1st, \u00e9s a motor helyet k\u00e9sz\u00edt neki. Ha le\u00e1ll egy g\u00e9p, az Autopilot \u00fajratervez, a Running Time Lock pedig a hely\u00fck\u00f6n tartja a m\u00e1r megkezdett gy\u00e1rt\u00e1si feladatokat.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Anyagellen\u0151rz\u00e9s minden \u00e1t\u00fctemez\u00e9sn\u00e9l.<\/p>\n\n\n<p class=\"fx-pain__b\">A SkyPlanner ellen\u0151rzi a k\u00e9szleteket \u00e9s a v\u00e1rhat\u00f3 beszerz\u00e9si sz\u00e1ll\u00edt\u00e1sokat. A besz\u00e1ll\u00edt\u00f3i sz\u00e1ll\u00edt\u00e1sra v\u00e1r\u00f3 gy\u00e1rt\u00e1si feladatot az \u00e9rkez\u00e9s id\u0151pontja ut\u00e1nra \u00fctemezi.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A g\u00e9pkezel\u0151k l\u00e1tj\u00e1k a feladataik sorrendj\u00e9t.<\/p>\n\n\n<p class=\"fx-pain__b\">Minden g\u00e9pkezel\u0151 telefonon vagy t\u00e1blag\u00e9pen l\u00e1tja a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si feladatait, \u00e9s a Mobile Confirmations vagy a Production Timer seg\u00edts\u00e9g\u00e9vel r\u00f6gz\u00edti a munk\u00e1j\u00e1t. Az el\u0151rehalad\u00e1s adatai visszaker\u00fclnek a Katana gy\u00e1rt\u00e1si rendel\u00e9s\u00e9be.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1blagy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel a gy\u00e1rt\u00e1stervez\u00e9sben az Excel-t\u00e1bl\u00e1zatokr\u00f3l \u00e1tt\u00e9rt\u00fcnk a termel\u00e9s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, az \u00faj feladatsorrend pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri v\u00e9d\u0151ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k egy palackt\u00f6lt\u0151 sor mellett a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je egy hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner d\u00f6nt\u0151 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya a kor\u00e1bbi mintegy 50%-r\u00f3l ak\u00e1r 98%-ra n\u0151tt, az \u00fctemez\u00e9shez pedig k\u00e9t m\u0171vezet\u0151 helyett m\u00e1r egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/kjh-comp\/\">Olvassa el a KJH-Comp v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa 2021 \u00f3ta<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e1tl\u00e1that\u00f3v\u00e1 teszi a kapacit\u00e1sunkat, \u00e9s kisz\u00e1m\u00edthat\u00f3v\u00e1 a tervez\u00e9st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Vegyipari \u00e9s \u00e9lelmiszeripari gy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A SkyPlanner haszn\u00e1lat\u00e1nak kezdete, 2021 \u00f3ta a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa v\u00e9gig 100%-os volt.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/opes-corporation\/\">Olvassa el az Opes Corporation v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-katana-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy m\u0171k\u00f6dik a Katana-integr\u00e1ci\u00f3<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A Katana \u00e1tadja a gy\u00e1rt\u00e1si feladatokat.<\/strong> A gy\u00e1rt\u00e1si rendel\u00e9sek a m\u0171veletsoraikkal egy\u00fctt, valamint a term\u00e9krecept\u00far\u00e1k, gy\u00e1rt\u00e1si m\u0171veletek, er\u0151forr\u00e1sok, k\u00e9szletadatok \u00e9s beszerz\u00e9si rendel\u00e9sek beker\u00fclnek a SkyPlannerbe.<\/li>\n\n\n<li><strong>A SkyPlanner elk\u00e9sz\u00edti \u00e9s naprak\u00e9szen tartja az \u00fctemtervet.<\/strong> Az Arcturus motor m\u00e1sodpercek alatt \u00fctemezi az \u00f6sszes m\u0171veletet minden munka\u00e1llom\u00e1son, \u00e9s \u00fajratervez, ha v\u00e1ltozik a termel\u00e9s.<\/li>\n\n\n<li><strong>A terv visszaker\u00fcl a Katan\u00e1ba.<\/strong> A SkyPlanner a Katana Schedule lapj\u00e1n is az \u00fctemterv szerinti sorrendbe \u00e1ll\u00edtja a gy\u00e1rt\u00e1si rendel\u00e9seket, \u00e9s be\u00edrja mindegyik gy\u00e1rt\u00e1si hat\u00e1ridej\u00e9t. A r\u00f6gz\u00edtett munkaadatok visszaker\u00fclnek a m\u0171veletsorokba.<\/li>\n\n<\/ol>\n\n\n<p>Az integr\u00e1ci\u00f3 a Katana nyilv\u00e1nos API-j\u00e1n kereszt\u00fcl m\u0171k\u00f6dik, \u00edgy a Katan\u00e1ba nem kell semmit telep\u00edteni. A Katana webhookjai jelzik az \u00faj \u00e9s m\u00f3dos\u00edtott rendel\u00e9seket, a SkyPlanner webhookjai pedig azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait. Minden \u00fczem m\u00e1sk\u00e9nt \u00e1ll\u00edtja be a Katana er\u0151forr\u00e1sait \u00e9s m\u0171veleteit, ez\u00e9rt a SkyPlanner csapata a bevezet\u00e9s sor\u00e1n \u00f6sszerendeli az \u00d6n er\u0151forr\u00e1sait \u00e9s m\u0171veleteit a SkyPlanner megfelel\u0151 adataival, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja az integr\u00e1ci\u00f3t.<\/p>\n\n\n<p>Az integr\u00e1ci\u00f3ra el\u0151zetes \u00e1raj\u00e1nlatot adunk az \u00d6n folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n. Katana-tan\u00e1csad\u00f3ja vagy saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek a SkyPlanner dokument\u00e1lt API-j\u00e1ra (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>). A v\u00e9gpontokat, a mez\u0151megfeleltet\u00e9seket \u00e9s a vissza\u00edr\u00e1s szab\u00e1lyait a <a href=\"\/hu\/integraciok\/erp\/katana\/integracios-utmutato\/\">Katana-integr\u00e1ci\u00f3 gy\u00e1rt\u00e1s\u00fctemez\u00e9si \u00fatmutat\u00f3ja<\/a> ismerteti.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-katana-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mit \u00fctemez a Katana, \u00e9s mit tesz hozz\u00e1 a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Katana Make k\u00e9perny\u0151j\u00e9n tal\u00e1lhat\u00f3 Schedule lap &#8220;acts as a central production queue&#8221; (k\u00f6zponti gy\u00e1rt\u00e1si feladatsork\u00e9nt m\u0171k\u00f6dik). A <a href=\"https:\/\/support.katanamrp.com\/en\/articles\/5914369-managing-manufacturing-order-priorities\">Katana s\u00fag\u00f3k\u00f6zpontja<\/a> \u00edgy \u00edrja le a m\u0171k\u00f6d\u00e9s\u00e9t:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Egyetlen lista az eg\u00e9sz gy\u00e1rnak.<\/strong> &#8220;The topmost MO has the highest priority.&#8221; (A legfel\u00fcl szerepl\u0151 gy\u00e1rt\u00e1si rendel\u00e9s priorit\u00e1sa a legmagasabb.)<\/li>\n\n\n<li><strong>A tervez\u0151 hat\u00e1rozza meg a sorrendet.<\/strong> &#8220;Click and drag the MO to the desired position in the list.&#8221; (Kattintson a gy\u00e1rt\u00e1si rendel\u00e9sre, \u00e9s h\u00fazza a lista k\u00edv\u00e1nt hely\u00e9re.)<\/li>\n\n\n<li><strong>A kapacit\u00e1st egyetlen heti sz\u00e1m adja meg.<\/strong> Az automatikus hat\u00e1rid\u0151k a gy\u00e1r eg\u00e9sz\u00e9re megadott Weekly throughput \u00e9rt\u00e9ket haszn\u00e1lj\u00e1k, \u00e9s &#8220;Weekly capacity is spread evenly across 5 weekdays.&#8221; (A heti kapacit\u00e1s egyenletesen oszlik el a munkah\u00e9t napjai k\u00f6z\u00f6tt.) (<a href=\"https:\/\/support.katanamrp.com\/en\/articles\/5914341-how-to-manage-production-deadlines\">forr\u00e1s<\/a>)<\/li>\n\n\n<li><strong>A Katana saj\u00e1t tan\u00e1csa \u00f6sszetett termel\u00e9st v\u00e9gz\u0151 \u00fczemeknek.<\/strong> &#8220;For complex, long-term, or multi-stream production setups, manual deadlines might offer better control.&#8221; (\u00d6sszetett, hossz\u00fa t\u00e1v\u00fa vagy t\u00f6bb p\u00e1rhuzamos gy\u00e1rt\u00e1si folyamat eset\u00e9n a k\u00e9zzel megadott hat\u00e1rid\u0151k jobb ir\u00e1ny\u00edthat\u00f3s\u00e1got biztos\u00edthatnak.)<\/li>\n\n<\/ul>\n\n\n<p>A Katan\u00e1ban az er\u0151forr\u00e1soknak nincs saj\u00e1t m\u0171szakbeoszt\u00e1suk vagy napt\u00e1ruk, a Tasks lap pedig a gy\u00e1rt\u00e1si rendel\u00e9sek priorit\u00e1s\u00e1t k\u00f6veti. \u00cdgy a Katana nem ellen\u0151rzi, hogy egy adott g\u00e9p t\u00falterhelt-e. Az \u00e1t\u00e1ll\u00e1s k\u00f6lts\u00e9gt\u00edpusk\u00e9nt szerepel, nem pedig az el\u0151z\u0151leg gy\u00e1rtott term\u00e9kt\u0151l f\u00fcgg\u0151 m\u0171veletk\u00e9nt. Az egyes korl\u00e1tokat r\u00e9szletesen bemutatja a <a href=\"\/hu\/integraciok\/erp\/katana\/termelesutemezes\/\">K\u00e9pes a Katana val\u00f3s kapacit\u00e1sokkal sz\u00e1mol\u00f3 termel\u00e9s\u00fctemez\u00e9sre?<\/a> c\u00edm\u0171 cikk.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-moves-between-katana-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Milyen adatok \u00e1ramlanak a Katana \u00e9s a SkyPlanner k\u00f6z\u00f6tt?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Katana<\/th><th>SkyPlanner<\/th><th>Ir\u00e1ny<\/th><\/tr><\/thead><tbody><tr><td>Term\u00e9kek, anyagok, v\u00e1ltozatok<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>A SkyPlannerbe<\/td><\/tr><tr><td>Term\u00e9krecept\u00fara \/ BOM<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek<\/td><td>A SkyPlannerbe<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si m\u0171veletek: Type, Resource, Time<\/td><td>Folyamatl\u00e9p\u00e9sek, \u00e1t\u00e1ll\u00e1si id\u0151k<\/td><td>A SkyPlannerbe<\/td><\/tr><tr><td>Er\u0151forr\u00e1sok (munka\u00e1llom\u00e1s, g\u00e9p, dolgoz\u00f3)<\/td><td>Munka\u00e1llom\u00e1sok, munka\u00e1llom\u00e1s-csoportok<\/td><td>A SkyPlannerbe<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9s m\u0171veletsorokkal \u00e9s \u00f6sszetev\u0151kkel<\/td><td>Rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si feladatok<\/td><td>A SkyPlannerbe<\/td><\/tr><tr><td>K\u00e9szletadatok, beszerz\u00e9si rendel\u00e9sek \u00e9rkez\u00e9si id\u0151pontokkal<\/td><td>K\u00e9szletek \u00e9s be\u00e9rkez\u0151 anyagok<\/td><td>A SkyPlannerbe<\/td><\/tr><tr><td>Vev\u0151i rendel\u00e9s sz\u00e1ll\u00edt\u00e1si hat\u00e1rideje<\/td><td>Rendel\u00e9si hat\u00e1rid\u0151, vev\u0151i priorit\u00e1s<\/td><td>A SkyPlannerbe<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si rendel\u00e9s helye a Schedule lapon, gy\u00e1rt\u00e1si hat\u00e1rid\u0151<\/td><td>\u00dctemez\u00e9si sorrend, tervezett befejez\u00e9s<\/td><td>Vissza a Katan\u00e1ba<\/td><\/tr><tr><td>M\u0171veletsor \u00e1llapota \u00e9s t\u00e9nyleges id\u0151r\u00e1ford\u00edt\u00e1sa<\/td><td>Mobile Confirmations, id\u0151napl\u00f3k<\/td><td>Vissza a Katan\u00e1ba<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"katana-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana \u00f6nmag\u00e1ban \u00e9s SkyPlannerrel<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Katana<\/th><th>Katana SkyPlanner APS-sel<\/th><\/tr><\/thead><tbody><tr><td>Terv<\/td><td>Egyetlen priorit\u00e1si lista a gy\u00e1rt\u00e1si rendel\u00e9sekhez<\/td><td>Minden m\u0171velet a hozz\u00e1 tartoz\u00f3 munka\u00e1llom\u00e1s id\u0151vonal\u00e1n<\/td><\/tr><tr><td>Kapacit\u00e1s<\/td><td>Egyetlen adat a heti kibocs\u00e1t\u00e1sr\u00f3l<\/td><td>Minden g\u00e9p, dolgoz\u00f3 \u00e9s szersz\u00e1m saj\u00e1t m\u0171szakrenddel<\/td><\/tr><tr><td>Napt\u00e1rak<\/td><td>H\u00e9tf\u0151t\u0151l p\u00e9ntekig, az eg\u00e9sz \u00fczemre egys\u00e9gesen<\/td><td>M\u0171szakok, szabads\u00e1gok, t\u00e1voll\u00e9tek \u00e9s t\u00fal\u00f3r\u00e1k er\u0151forr\u00e1sonk\u00e9nt<\/td><\/tr><tr><td>Sorrendk\u00e9pz\u00e9s<\/td><td>A tervez\u0151 k\u00e9zi \u00e1th\u00faz\u00e1ssal rendezi a gy\u00e1rt\u00e1si rendel\u00e9seket<\/td><td>Az \u00fctemez\u0151motor priorit\u00e1s \u00e9s hat\u00e1rid\u0151 szerint sorba rendezi az \u00f6sszes nyitott rendel\u00e9st<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1sok<\/td><td>Az \u00e1t\u00e1ll\u00e1s m\u0171veleti k\u00f6lts\u00e9gk\u00e9nt szerepel<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, a lehet\u0151 legkisebb \u00f6sszes \u00e1t\u00e1ll\u00e1si id\u0151<\/td><\/tr><tr><td>V\u00e1ltoz\u00e1sok<\/td><td>Minden fennakad\u00e1s ut\u00e1n \u00fajra k\u00e9zzel kell \u00e1trendezni<\/td><td>Az Autopilot \u00fajratervezi az eg\u00e9sz \u00fczem \u00fctemez\u00e9s\u00e9t<\/td><\/tr><tr><td>Anyagok<\/td><td>Foglal\u00e1s priorit\u00e1si sorrendben<\/td><td>A k\u00e9szlet \u00e9s a v\u00e1rhat\u00f3 beszerz\u00e9sek ellen\u0151rz\u00e9se minden v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>\u00dczem<\/td><td>Feladatlista er\u0151forr\u00e1sonk\u00e9nt<\/td><td>Id\u0151z\u00edtett feladatsor, Mobile Confirmations, Production Timer<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-katana\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hogyan v\u00e1lasszon \u00fctemez\u0151t a Katan\u00e1hoz?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A Katana Schedule lapja olyan kis\u00fczemhez illik, ahol r\u00f6videk a ciklusok, egyenletes a kibocs\u00e1t\u00e1s, \u00e9s legfeljebb egy sz\u0171k keresztmetszet van. Ezen t\u00fal n\u00e9gy lehet\u0151s\u00e9get \u00e9rdemes \u00f6sszehasonl\u00edtani: a Katan\u00e1t \u00f6nmag\u00e1ban, a CSV-exportokkal felt\u00f6lt\u00f6tt t\u00e1bl\u00e1zatos \u00fctemez\u0151ket, az \u00e1llapotk\u00f6vet\u00e9sre szolg\u00e1l\u00f3 \u00fczemi eszk\u00f6z\u00f6ket, valamint a felh\u0151alap\u00fa APS-t, amely minden er\u0151forr\u00e1st \u00fctemez, \u00e9s vissza\u00edrja az eredm\u00e9nyt.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V\u00e1lassza a SkyPlannert, ha ugyanazon rendel\u00e9sek gy\u00e1rt\u00e1si feladatait t\u00f6bb g\u00e9p k\u00f6z\u00f6tt kell elosztania,<\/strong> \u00e9s az egyetlen heti kibocs\u00e1t\u00e1si adat elfedi a t\u00falterhel\u00e9st.<\/li>\n\n\n<li><strong>V\u00e1lassza a SkyPlannert, ha g\u00e9penk\u00e9nt vagy csapatonk\u00e9nt elt\u00e9r a m\u0171szakrend.<\/strong><\/li>\n\n\n<li><strong>V\u00e1lassza a SkyPlannert, ha az \u00e1t\u00e1ll\u00e1sok a sorrendt\u0151l f\u00fcggnek.<\/strong> A sorrendet az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix hat\u00e1rozza meg.<\/li>\n\n\n<li><strong>V\u00e1lassza a SkyPlannert, ha a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok \u00e9s csapatok hat\u00e1rozz\u00e1k meg, melyik feladat indulhat k\u00f6vetkez\u0151k\u00e9nt.<\/strong><\/li>\n\n\n<li><strong>V\u00e1lassza a SkyPlannert, ha vissza szeretn\u00e9 \u00edrni a sorrendet a Katan\u00e1ba,<\/strong> hogy az anyagfoglal\u00e1sok a t\u00e9nyleges tervet k\u00f6vess\u00e9k.<\/li>\n\n\n<li><strong>V\u00e1lassza a SkyPlannert, ha azt szeretn\u00e9, hogy a g\u00e9pkezel\u0151k id\u0151z\u00edtett feladatsor alapj\u00e1n dolgozzanak<\/strong> telefonon vagy t\u00e1blag\u00e9pen.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az els\u0151 l\u00e9p\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Ind\u00edtsa el az ingyenes pr\u00f3baid\u0151szakot.<\/strong> 30 nap, legfeljebb 20 munka\u00e1llom\u00e1s, a Basic csomag \u00f6sszes funkci\u00f3ja, bankk\u00e1rtya n\u00e9lk\u00fcl.<\/li>\n\n\n<li><strong>Modellezze a gy\u00e1rt\u00e1s\u00e1t.<\/strong> Hozza l\u00e9tre a munka\u00e1llom\u00e1sokat, dolgoz\u00f3kat \u00e9s m\u0171szakokat a SkyPlannerben, vagy import\u00e1lja \u0151ket. Az indul\u00e1shoz seg\u00edts\u00e9get is k\u00e9rhet.<\/li>\n\n\n<li><strong>T\u00f6ltse be a rendel\u00e9seit.<\/strong> Export\u00e1lja a Katana Make k\u00e9perny\u0151j\u00e9r\u0151l a Tasks list\u00e1t CSV-f\u00e1jlba, import\u00e1lja a nyitott rendel\u00e9seivel egy\u00fctt, majd hasonl\u00edtsa \u00f6ssze a SkyPlanner \u00fctemez\u00e9s\u00e9t a jelenlegi terv\u00e9vel.<\/li>\n\n\n<li><strong>Kapcsolja \u00f6ssze a Katan\u00e1val.<\/strong> A SkyPlanner csapata be\u00e1ll\u00edtja a k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1.<\/li>\n\n<\/ol>\n\n\n<p><strong>\u00c1rak.<\/strong> A csomagok d\u00edj\u00e1t havonta, munka\u00e1llom\u00e1sonk\u00e9nt sz\u00e1ml\u00e1zzuk. A munka\u00e1llom\u00e1sok sz\u00e1m\u00e1t b\u00e1rmikor n\u00f6velheti vagy cs\u00f6kkentheti, \u00e9s az el\u0151fizet\u00e9st is b\u00e1rmikor lemondhatja. A r\u00e9szleteket az <a href=\"\/hu\/arkepzes\/\">\u00e1rak oldal\u00e1n<\/a> tal\u00e1lja. M\u00e1s rendszert is haszn\u00e1l? Tekintse meg az \u00f6sszes <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3t<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Kapcsolat az \u00e9rt\u00e9kes\u00edt\u00e9ssel<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Melyik a legjobb \u00fctemez\u00e9si kieg\u00e9sz\u00edt\u0151 a Katan\u00e1hoz?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner APS a val\u00f3s kapacit\u00e1skorl\u00e1tokat figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9si kieg\u00e9sz\u00edt\u0151, amely k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val kapcsol\u00f3dik a Katan\u00e1hoz. \u00c1tveszi a gy\u00e1rt\u00e1si rendel\u00e9seket, recept\u00far\u00e1kat, m\u0171veleteket, er\u0151forr\u00e1sokat, k\u00e9szletadatokat \u00e9s beszerz\u00e9si rendel\u00e9seket, majd vissza\u00edrja az \u00fctemezett sorrendet, a hat\u00e1rid\u0151ket \u00e9s a r\u00f6gz\u00edtett munkav\u00e9gz\u00e9st. Minden munka\u00e1llom\u00e1s, g\u00e9pkezel\u0151 \u00e9s szersz\u00e1m kapacit\u00e1sa, valamint minden anyag mennyis\u00e9ge korl\u00e1tozott. A gy\u00e1rt\u00e1si feladatok sorrendj\u00e9t ir\u00e1nyf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix hat\u00e1rozza meg, hogy az \u00f6sszes \u00e1t\u00e1ll\u00e1si id\u0151 a lehet\u0151 legkisebb legyen. Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a gy\u00e1rt\u00e1s. Az \u00e1r havonta 199 \u20ac-t\u00f3l indul, az ingyenes pr\u00f3baid\u0151szak pedig 30 napig tart.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>T\u00e1mogatja a Katana MRP a kapacit\u00e1skorl\u00e1tokat figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9st?<\/summary>\n<p class=\"sp-faq__a\">Nem. A Katana egyetlen priorit\u00e1si list\u00e1ba rendezi a gy\u00e1rt\u00e1si rendel\u00e9seket, \u00e9s egyetlen heti kibocs\u00e1t\u00e1si adatb\u00f3l becs\u00fcli meg a hat\u00e1rid\u0151ket. Az er\u0151forr\u00e1soknak nincs saj\u00e1t kapacit\u00e1suk vagy m\u0171szakrendj\u00fck. A SkyPlanner APS minden munka\u00e1llom\u00e1sra, dolgoz\u00f3ra \u00e9s szersz\u00e1mra kiterjed\u0151, <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">kapacit\u00e1skorl\u00e1tokat figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9ssel<\/a> eg\u00e9sz\u00edti ezt ki.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kell b\u00e1rmit telep\u00edten\u00fcnk a Katan\u00e1ba?<\/summary>\n<p class=\"sp-faq__a\">Nem. A SkyPlanner a felh\u0151ben, a Katana mellett m\u0171k\u00f6dik, \u00e9s API-kulccsal kapcsol\u00f3dik a Katana API-hoz. A Katana webhookjai jelzik a rendel\u00e9sek v\u00e1ltoz\u00e1sait, \u00edgy az \u00fctemez\u00e9s naprak\u00e9sz marad.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiv\u00e1ltja a SkyPlanner a Katan\u00e1t?<\/summary>\n<p class=\"sp-faq__a\">Nem, hanem kieg\u00e9sz\u00edti. A term\u00e9kek, recept\u00far\u00e1k, k\u00e9szletek, beszerz\u00e9sek, vev\u0151i rendel\u00e9sek \u00e9s k\u00f6nyvel\u00e9si kapcsolatok tov\u00e1bbra is a Katan\u00e1ban maradnak. A SkyPlanner a val\u00f3s kapacit\u00e1s alapj\u00e1n \u00fctemezi a gy\u00e1rt\u00e1si rendel\u00e9seket, majd visszak\u00fcldi a sorrendet, a hat\u00e1rid\u0151ket \u00e9s az el\u0151rehalad\u00e1si adatokat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mennyibe ker\u00fcl a SkyPlanner a Katana mellett?<\/summary>\n<p class=\"sp-faq__a\">A havi d\u00edj 199 \u20ac-t\u00f3l indul, \u00e9s 5 munka\u00e1llom\u00e1s haszn\u00e1lat\u00e1t foglalja mag\u00e1ban. Minden tov\u00e1bbi munka\u00e1llom\u00e1s d\u00edja havonta 20 \u20ac. Egy 20 munka\u00e1llom\u00e1sos \u00fczem havi d\u00edja 499 \u20ac. Az integr\u00e1ci\u00f3ra az \u00d6n folyamataihoz \u00e9s ig\u00e9nyeihez igazod\u00f3 el\u0151zetes \u00e1raj\u00e1nlatot adunk a csomagj\u00e1val egy\u00fctt, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Melyik Katana-csomagra van sz\u00fcks\u00e9g az integr\u00e1ci\u00f3hoz?<\/summary>\n<p class=\"sp-faq__a\">A Katana \u00e1rakat ismertet\u0151 oldala szerint a Free \u00e9s az Advantage csomag is tartalmaz API-hozz\u00e1f\u00e9r\u00e9st. A gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s gy\u00e1rt\u00e1si m\u0171veletek a Katana Manufacturing Management funkci\u00f3j\u00e1val \u00e9rhet\u0151k el. Az API-kulcsot a Settings &gt; API men\u00fcpontban hozhatja l\u00e9tre.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mennyi ideig tart a bevezet\u00e9s?<\/summary>\n<p class=\"sp-faq__a\">A bevezet\u00e9s az indul\u00e1si folyamat megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtva \u00e1ltal\u00e1ban n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. A csapat megfelelteti az er\u0151forr\u00e1sokat \u00e9s a gy\u00e1rt\u00e1si m\u0171veleteket a k\u00e9t rendszerben, \u00f6sszekapcsolja a gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9seket, majd visszak\u00fcldi a sorrendet \u00e9s a hat\u00e1rid\u0151ket. Az \u00e9les indul\u00e1s el\u0151tt mindent a jelenlegi terv\u00e9hez viszony\u00edtva tesztel\u00fcnk.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk el\u0151sz\u00f6r a SkyPlannert a saj\u00e1t Katana-adatainkkal?<\/summary>\n<p class=\"sp-faq__a\">Igen. A pr\u00f3baid\u0151szak alatt import\u00e1lja munka\u00e1llom\u00e1sait \u00e9s nyitott rendel\u00e9seit a Katan\u00e1b\u00f3l export\u00e1lt CSV-f\u00e1jlb\u00f3l. \u00cdgy m\u00e1r az integr\u00e1ci\u00f3s munk\u00e1k megkezd\u00e9se el\u0151tt l\u00e1thatja saj\u00e1t gy\u00e1rt\u00e1s\u00e1nak val\u00f3s kapacit\u00e1skorl\u00e1tokat figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9s\u00e9t.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Katana SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal A SkyPlanner APS a Katana Cloud Inventory (Katana MRP) termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151je, amely a g\u00e9pek \u00e9s a dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1val sz\u00e1mol. A gy\u00e1rt\u00e1si rendel\u00e9sekb\u0151l olyan \u00fctemtervet k\u00e9sz\u00edt, amely minden munka\u00e1llom\u00e1st, g\u00e9pkezel\u0151t, szersz\u00e1mot \u00e9s anyagot figyelembe vesz. L\u00e1thatja, melyik m\u0171velet hol \u00e9s mikor zajlik, &#8230; <a title=\"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/\" aria-label=\"Read more about SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100680,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102999","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Katana MRP \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 Katana MRP-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden munka\u00e1llom\u00e1s, m\u0171szak, szersz\u00e1m \u00e9s anyag. Havi 199 \u20ac-t\u00f3l.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 Katana MRP-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden munka\u00e1llom\u00e1s, m\u0171szak, szersz\u00e1m \u00e9s anyag. Havi 199 \u20ac-t\u00f3l.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/\",\"name\":\"Katana MRP \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 Katana MRP-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden munka\u00e1llom\u00e1s, m\u0171szak, szersz\u00e1m \u00e9s anyag. Havi 199 \u20ac-t\u00f3l.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/katana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Katana MRP \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal","description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 Katana MRP-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden munka\u00e1llom\u00e1s, m\u0171szak, szersz\u00e1m \u00e9s anyag. Havi 199 \u20ac-t\u00f3l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/","og_locale":"hu_HU","og_type":"article","og_title":"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","og_description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 Katana MRP-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden munka\u00e1llom\u00e1s, m\u0171szak, szersz\u00e1m \u00e9s anyag. Havi 199 \u20ac-t\u00f3l.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/","name":"Katana MRP \u00fctemez\u00e9si integr\u00e1ci\u00f3: APS val\u00f3s kapacit\u00e1sokkal","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151 Katana MRP-hez, k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden munka\u00e1llom\u00e1s, m\u0171szak, szersz\u00e1m \u00e9s anyag. Havi 199 \u20ac-t\u00f3l.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/katana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Katana SkyPlanner APS a Katana mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal A SkyPlanner APS a Katana Cloud Inventory (Katana MRP) termel\u00e9s\u00fctemez\u0151 kieg\u00e9sz\u00edt\u0151je, amely a g\u00e9pek \u00e9s a dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1val sz\u00e1mol. A gy\u00e1rt\u00e1si rendel\u00e9sekb\u0151l olyan \u00fctemtervet k\u00e9sz\u00edt, amely minden munka\u00e1llom\u00e1st, g\u00e9pkezel\u0151t, szersz\u00e1mot \u00e9s anyagot figyelembe vesz. L\u00e1thatja, melyik m\u0171velet hol \u00e9s mikor zajlik,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/102999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=102999"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/102999\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100680"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=102999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}