{"id":102796,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integraciok\/erp\/acumatica\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"acumatica","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/","title":{"rendered":"SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Acumatica Cloud ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS az Acumatica mell\u00e9: <span class=\"hl\">termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">A SkyPlanner APS az Acumatica Manufacturing Edition termel\u00e9s\u00fctemez\u0151 b\u0151v\u00edtm\u00e9nye. A teljes tervez\u00e9si id\u0151szakban, konkr\u00e9t id\u0151pontokra sz\u00e1mol minden munka\u00e1llom\u00e1s, g\u00e9p, g\u00e9pkezel\u0151 \u00e9s szersz\u00e1m val\u00f3s kapacit\u00e1s\u00e1val, valamint a rendelkez\u00e9sre \u00e1ll\u00f3 anyagmennyis\u00e9ggel. Az Acumatica saj\u00e1t APS rendszere nagyvonal\u00fa tervez\u00e9st v\u00e9gez. A v\u00e9ges kapacit\u00e1sokkal t\u00f6rt\u00e9n\u0151 tervez\u00e9s a Rough Cut Planning \u0171rlapon futtathat\u00f3, a Classic APS pedig minden 120 napon t\u00fal befejez\u0151d\u0151 rendel\u00e9st v\u00e9gtelen kapacit\u00e1ssal tervez (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">forr\u00e1s<\/a>). A SkyPlanner megmutatja, melyik m\u0171velet hol \u00e9s mikor fut, az Autopilot pedig automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a termel\u00e9s.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner \u00e9s az Acumatica k\u00f6z\u00f6tti integr\u00e1ci\u00f3 k\u00e9tir\u00e1ny\u00fa: a gy\u00e1rt\u00e1si rendel\u00e9sek, m\u0171veletek, munka\u00e1llom\u00e1sok, g\u00e9pek, szersz\u00e1mok, k\u00e9szletcikkek \u00e9s beszerz\u00e9si rendel\u00e9sek adatai a SkyPlannerbe \u00e9rkeznek, a m\u0171veletek tervezett id\u0151pontjai \u00e9s a r\u00f6gz\u00edtett munkav\u00e9gz\u00e9s adatai pedig visszaker\u00fclnek az Acumatic\u00e1ba. A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n Acumatica-be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja az integr\u00e1ci\u00f3t.<\/p>\n\n\n<p>Az el\u0151fizet\u00e9s havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, ami 5 munka\u00e1llom\u00e1st tartalmaz. Minden tov\u00e1bbi munka\u00e1llom\u00e1s d\u00edja havi 20 \u20ac. Az ingyenes pr\u00f3ba 30 napig tart, legfeljebb 20 munka\u00e1llom\u00e1ssal, bankk\u00e1rtya megad\u00e1sa n\u00e9lk\u00fcl.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mi v\u00e1ltozik a termel\u00e9sben?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Minden er\u0151forr\u00e1s kapacit\u00e1sa korl\u00e1tozott, mindenkor.<\/p>\n\n\n<p class=\"fx-pain__b\">Minden munka\u00e1llom\u00e1s, g\u00e9p, dolgoz\u00f3 \u00e9s szersz\u00e1m val\u00f3s \u00fctemtervet kap, amely figyelembe veszi a m\u0171szakokat, a t\u00e1voll\u00e9teket \u00e9s a t\u00fal\u00f3r\u00e1kat. A h\u00e1rom g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladathoz a rendszer h\u00e1rom, az adott m\u0171szakban szabad dolgoz\u00f3t rendel. Az egyik g\u00e9pen haszn\u00e1lt form\u00e1z\u00f3szersz\u00e1mot soha nem foglalja le egy m\u00e1sik g\u00e9pre.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kevesebbe ker\u00fclnek az \u00e1t\u00e1ll\u00e1sok.<\/p>\n\n\n<p class=\"fx-pain__b\">A SkyPlanner minden term\u00e9kp\u00e1rn\u00e1l ismeri az \u00e1t\u00e1ll\u00e1si id\u0151t, mindk\u00e9t ir\u00e1nyban. Az \u00e9lelmiszergy\u00e1rt\u00e1sban ezt p\u00e9ld\u00e1ul egy allerg\u00e9n hat\u00e1rozhatja meg: allerg\u00e9nmentes term\u00e9kr\u0151l allerg\u00e9nt tartalmaz\u00f3ra v\u00e1ltva nincs sz\u00fcks\u00e9g tiszt\u00edt\u00e1sra, ford\u00edtott ir\u00e1nyban viszont teljes tiszt\u00edt\u00e1s kell. Az \u00fctemez\u0151motor \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy a lehet\u0151 legkevesebb id\u0151 vesszen el.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">V\u00e1llalhat\u00f3 sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k.<\/p>\n\n\n<p class=\"fx-pain__b\">Az \u00fctemterv h\u00f3napokra el\u0151re megmutatja, mikor fejez\u0151dik be t\u00e9nylegesen az egyes gy\u00e1rt\u00e1si rendel\u00e9sek teljes\u00edt\u00e9se. A vev\u0151knek ennek alapj\u00e1n adhat hat\u00e1rid\u0151t.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Automatikus \u00fajra\u00fctemez\u00e9s s\u00fcrg\u0151s rendel\u00e9s vagy g\u00e9phiba eset\u00e9n.<\/p>\n\n\n<p class=\"fx-pain__b\">Ha le\u00e1ll egy g\u00e9p vagy s\u00fcrg\u0151s rendel\u00e9s \u00e9rkezik, az Autopilot \u00fajra\u00fctemez. Az \u00d6n \u00e1ltal r\u00f6gz\u00edtett id\u0151pontok \u00e9s priorit\u00e1sok tov\u00e1bbra is ir\u00e1nyad\u00f3k.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Az anyag rendelkez\u00e9sre \u00e1ll\u00e1sa szabja meg a kezd\u00e9st, nem az ut\u00f3lag kider\u00fcl\u0151 hi\u00e1ny.<\/p>\n\n\n<p class=\"fx-pain__b\">A SkyPlanner ellen\u0151rzi a k\u00e9szleteket \u00e9s a be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9seket. A besz\u00e1ll\u00edt\u00f3i sz\u00e1ll\u00edt\u00e1sra v\u00e1r\u00f3 gy\u00e1rt\u00e1si feladatot a sz\u00e1ll\u00edt\u00e1s id\u0151pontja ut\u00e1nra \u00fctemezi.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">A g\u00e9pkezel\u0151k l\u00e1tj\u00e1k a feladatsorukat.<\/p>\n\n\n<p class=\"fx-pain__b\">Minden g\u00e9pkezel\u0151 telefonon vagy t\u00e1blag\u00e9pen l\u00e1tja a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si feladatait, \u00e9s munka k\u00f6zben r\u00f6gz\u00edti az elv\u00e9gzett munk\u00e1t. Az iroda val\u00f3s id\u0151ben k\u00f6vetheti az el\u0151rehalad\u00e1st, a r\u00f6gz\u00edtett munkav\u00e9gz\u00e9s adatai pedig visszaker\u00fclnek az Acumatic\u00e1ba.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3szekr\u00e9ny-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner seg\u00edts\u00e9g\u00e9vel az Excel-t\u00e1bl\u00e1zatos gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a termel\u00e9s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3szekr\u00e9nyek \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri v\u00e9d\u0151ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations termel\u00e9si vezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra<\/b><span>el\u0151re l\u00e1tja az \u00e9rt\u00e9kes\u00edt\u00e9s a szabad kapacit\u00e1st<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner megb\u00edzhat\u00f3 alapot teremt a teljes gy\u00e1rt\u00e1stervez\u00e9shez.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, termel\u00e9si vezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerrel \u00e9rintkez\u0151 csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st. Az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1ra ir\u00e1nyul\u00f3 k\u00e9r\u00e9sekre, amelyek megv\u00e1laszol\u00e1sa kor\u00e1bban egy \u00f3r\u00e1t vagy m\u00e9g t\u00f6bbet vett ig\u00e9nybe, most m\u00e1sodpercek alatt v\u00e1laszt kapnak.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/fredman-operations\/\">Olvassa el a Fredman Operations v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa 2021 \u00f3ta<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner \u00e1tl\u00e1that\u00f3v\u00e1 teszi a kapacit\u00e1sainkat \u00e9s kisz\u00e1m\u00edthat\u00f3v\u00e1 a tervez\u00e9st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Vegyipari \u00e9s \u00e9lelmiszeripari gy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A SkyPlanner 2021-es bevezet\u00e9se \u00f3ta a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa v\u00e9gig 100%-os.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/opes-corporation\/\">Olvassa el az Opes Corporation v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-acumatica-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hogyan m\u0171k\u00f6dik az Acumatica-integr\u00e1ci\u00f3?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Az Acumatica k\u00fcldi a gy\u00e1rt\u00e1si feladatokat.<\/strong> A gy\u00e1rt\u00e1si rendel\u00e9sek a m\u0171veleteikkel egy\u00fctt, valamint a munka\u00e1llom\u00e1sok, g\u00e9pek, szersz\u00e1mok, m\u0171szakok, k\u00e9szletcikkek \u00e9s beszerz\u00e9si rendel\u00e9sek adatai beker\u00fclnek a SkyPlannerbe.<\/li>\n\n\n<li><strong>A SkyPlanner elk\u00e9sz\u00edti \u00e9s naprak\u00e9szen tartja az \u00fctemtervet.<\/strong> Az Arcturus motor m\u00e1sodpercek alatt \u00fctemez minden m\u0171veletet, \u00e9s \u00fajratervez, ha v\u00e1ltozik a termel\u00e9s.<\/li>\n\n\n<li><strong>Az id\u0151pontok \u00e9s a r\u00f6gz\u00edtett munkav\u00e9gz\u00e9s adatai visszaker\u00fclnek az Acumatic\u00e1ba.<\/strong> A tervezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontok beker\u00fclnek az Acumatica gy\u00e1rt\u00e1si rendel\u00e9seinek m\u0171veleteibe. A rendel\u00e9s r\u00f6gz\u00edtett st\u00e1tuszt kap, hogy az Acumatica meg\u0151rizze ezeket az id\u0151pontokat. A r\u00f6gz\u00edtett munkav\u00e9gz\u00e9sb\u0151l munkaid\u0151- \u00e9s m\u0171veletk\u00f6zi \u00e1tad\u00e1si t\u00e9telek keletkeznek.<\/li>\n\n<\/ol>\n\n\n<p>Az els\u0151dleges nyilv\u00e1ntart\u00e1si rendszer tov\u00e1bbra is az Acumatica marad. A k\u00e9szletcikkek, darabjegyz\u00e9kek, az MRP, a beszerz\u00e9s \u00e9s a k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1s a hely\u00fck\u00f6n maradnak. A SkyPlanner egyetlen dolog\u00e9rt felel: minden m\u0171velet sorrendj\u00e9\u00e9rt \u00e9s id\u0151z\u00edt\u00e9s\u00e9\u00e9rt, minden er\u0151forr\u00e1son.<\/p>\n\n\n<p>A SkyPlanner az Acumatica saj\u00e1t, szerz\u0151d\u00e9salap\u00fa REST API-j\u00e1n kereszt\u00fcl, a Manufacturing \u00e9s Default v\u00e9gpontokhoz csatlakozik, \u00edgy semmit sem kell telep\u00edteni az \u00d6n Acumatica-p\u00e9ld\u00e1ny\u00e1ba. Minden \u00fczem m\u00e1sk\u00e9pp haszn\u00e1lja az Acumatic\u00e1t, ez\u00e9rt a SkyPlanner csapata a bevezet\u00e9skor az \u00d6n be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Az integr\u00e1ci\u00f3ra el\u0151zetesen adunk \u00e1raj\u00e1nlatot, az \u00d6n folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n. Az \u00d6n Acumatica-partnere vagy saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek a SkyPlanner dokument\u00e1lt API-j\u00e1ra (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>).<\/p>\n\n\n<p>Az entit\u00e1sokat, az adatmegfeleltet\u00e9st \u00e9s a vissza\u00edr\u00e1s szab\u00e1lyait az <a href=\"\/hu\/integraciok\/erp\/acumatica\/integracios-utmutato\/\">Acumatica gy\u00e1rt\u00e1s\u00fctemez\u00e9si integr\u00e1ci\u00f3s \u00fatmutat\u00f3ja<\/a> ismerteti.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-acumatica-schedules-and-what-skyplanner-add\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mit \u00fctemez az Acumatica, \u00e9s mivel eg\u00e9sz\u00edti ki a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az Acumatica Manufacturing Edition Advanced Planning and Scheduling (APS) modulja nagyvonal\u00fa tervez\u00e9st v\u00e9gez, nem pedig a val\u00f3s kapacit\u00e1sokat figyelembe vev\u0151, r\u00e9szletes termel\u00e9s\u00fctemez\u00e9st. A Classic APS rendszerben a kiv\u00e1lasztott rendel\u00e9sekre a Rough Cut Planning (AM501000) \u0171rlapot kell futtatni (<a href=\"https:\/\/help.myob.com.au\/advanced\/Docs\/Published\/UserGuide\/MFG_APS_GeneralInfo.html\">forr\u00e1s<\/a>). A 2026 R2 verzi\u00f3ban az APS k\u00e9t motorral \u00e9rhet\u0151 el, \u00e9s az <a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">Acumatica k\u00f6zl\u00e9se szerint<\/a>: &#8220;The two APS engines cannot be enabled at the same time.&#8221; (A k\u00e9t APS motor nem enged\u00e9lyezhet\u0151 egyszerre.) A korl\u00e1tokat az Acumatica saj\u00e1t dokument\u00e1ci\u00f3ja r\u00f6gz\u00edti:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A Classic APS csak 120 napig sz\u00e1mol v\u00e9ges kapacit\u00e1ssal.<\/strong> &#8220;In APS, the system uses infinite capacity planning for production orders whose end date is beyond 120 days.&#8221; (Az APS v\u00e9gtelen kapacit\u00e1ssal tervezi azokat a gy\u00e1rt\u00e1si rendel\u00e9seket, amelyek befejez\u00e9si d\u00e1tuma ezen az id\u0151hat\u00e1ron t\u00falra esik.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Classic\/Advanced-Planning-and-Scheduling-Classic-Scheduling-Details?contentId=t1jzEtHyaX5ivoX4tVZaeQ\">forr\u00e1s<\/a>)<\/li>\n\n\n<li><strong>A Classic APS r\u00f6gz\u00edtett id\u0151blokkokat foglal le.<\/strong> &#8220;Operations are always scheduled in contiguous blocks skipping over non-working hours and schedule breaks.&#8221; (A m\u0171veletek \u00fctemez\u00e9se mindig \u00f6sszef\u00fcgg\u0151 blokkokban t\u00f6rt\u00e9nik, a munkaid\u0151n k\u00edv\u00fcli id\u0151szakok \u00e9s az \u00fctemezett sz\u00fcnetek kihagy\u00e1s\u00e1val.)<\/li>\n\n\n<li><strong>Az \u00faj Optimized motor nem veszi figyelembe a g\u00e9peket \u00e9s a szersz\u00e1mokat.<\/strong> &#8220;Optimized APS schedules work centers rather than individual machines, tools, or material availability.&#8221; (Az Optimized APS munka\u00e1llom\u00e1sokat \u00fctemez, nem az egyes g\u00e9peket, szersz\u00e1mokat vagy az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t.) Az Experimental Features k\u00f6z\u00f6tt szerepel. (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\">forr\u00e1s<\/a>)<\/li>\n\n\n<li><strong>Nincs term\u00e9ktulajdons\u00e1gok szerinti sorrendk\u00e9pz\u00e9s.<\/strong> &#8220;The engine does not use attribute values to determine the scheduling sequence of operations.&#8221; (A motor nem haszn\u00e1lja az attrib\u00fatum\u00e9rt\u00e9keket a m\u0171veletek \u00fctemez\u00e9si sorrendj\u00e9nek meghat\u00e1roz\u00e1s\u00e1hoz.) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-Limitations?contentId=p3YHY33jvtE3KqjTX0facg\">forr\u00e1s<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>A napi termel\u00e9sben a munkaer\u0151t a munka\u00e1llom\u00e1s adott m\u0171szakj\u00e1nak l\u00e9tsz\u00e1ma \u00e9s hat\u00e9konys\u00e1ga jelenti, nem n\u00e9v szerint kijel\u00f6lt dolgoz\u00f3k. Az \u00e1t\u00e1ll\u00e1si id\u0151 m\u0171veletenk\u00e9nt egyetlen r\u00f6gz\u00edtett \u00e9rt\u00e9k, f\u00fcggetlen\u00fcl att\u00f3l, mit gy\u00e1rtottak el\u0151tte. Az \u00fajra\u00fctemez\u00e9st \u00d6nnek kell elind\u00edtania a Rough Cut Planning vagy az APS Maintenance Process seg\u00edts\u00e9g\u00e9vel. Az eredm\u00e9ny egy nagyvonal\u00fa terv: konkr\u00e9t dolgoz\u00f3k helyett l\u00e9tsz\u00e1mokkal, m\u0171veletenk\u00e9nt egyetlen \u00e1t\u00e1ll\u00e1si id\u0151vel, \u00e9s csak 120 napig figyelembe vett kapacit\u00e1skorl\u00e1tokkal.<\/p>\n\n\n<p>A Classic APS anyagellen\u0151rz\u00e9se mindent vagy semmit alapon m\u0171k\u00f6dik. Ha be van kapcsolva, a rendel\u00e9s \u00fctemez\u00e9se el\u0151tt minden anyagnak teljes mennyis\u00e9gben rendelkez\u00e9sre kell \u00e1llnia. A rendel\u00e9sek egym\u00e1s ut\u00e1n, k\u00f6t\u00f6tt sorrendben ker\u00fclnek a tervbe: el\u0151sz\u00f6r a v\u00e9grehajt\u00e1si priorit\u00e1s, majd a korl\u00e1toz\u00f3 d\u00e1tum, v\u00e9g\u00fcl a gy\u00e1rt\u00e1si rendel\u00e9s sz\u00e1ma alapj\u00e1n. Ha a tervez\u0151 m\u00e1s sorrendet szeretne, m\u00f3dos\u00edtania kell a priorit\u00e1sokat, majd \u00fajra kell futtatnia a folyamatot.<\/p>\n\n\n<p>Minden l\u00e9p\u00e9st \u00e9s korl\u00e1tot r\u00e9szletesen ismertet a <a href=\"\/hu\/integraciok\/erp\/acumatica\/termelesutemezes\/\">K\u00e9pes az Acumatica a val\u00f3s kapacit\u00e1sokkal sz\u00e1mol\u00f3 termel\u00e9s\u00fctemez\u00e9sre?<\/a> c\u00edm\u0171 cikk.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"acumatica-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az Acumatica \u00f6nmag\u00e1ban \u00e9s SkyPlannerrel<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Acumatica APS<\/th><th>Acumatica SkyPlanner APS rendszerrel<\/th><\/tr><\/thead><tbody><tr><td>Kapacit\u00e1skorl\u00e1tos tervez\u00e9si id\u0151szak<\/td><td>Nagyvonal\u00fa tervez\u00e9s: a Classic csak a 120 napon bel\u00fcl befejez\u0151d\u0151 rendel\u00e9sekn\u00e9l sz\u00e1mol v\u00e9ges kapacit\u00e1ssal, azon t\u00fal v\u00e9gtelennel<\/td><td>A teljes tervez\u00e9si id\u0151szakban, konkr\u00e9t id\u0151pontokra sz\u00e1mol minden g\u00e9p, dolgoz\u00f3 \u00e9s szersz\u00e1m val\u00f3s kapacit\u00e1s\u00e1val, valamint a rendelkez\u00e9sre \u00e1ll\u00f3 anyagmennyis\u00e9ggel<\/td><\/tr><tr><td>Er\u0151forr\u00e1sok<\/td><td>Classic: munka\u00e1llom\u00e1sok, g\u00e9pek, szersz\u00e1mok; Optimized: csak munka\u00e1llom\u00e1sok<\/td><td>Munka\u00e1llom\u00e1sok, g\u00e9pek, dolgoz\u00f3k \u00e9s szersz\u00e1mok, mind val\u00f3s kapacit\u00e1skorl\u00e1tokkal<\/td><\/tr><tr><td>Munkaer\u0151<\/td><td>L\u00e9tsz\u00e1m \u00e9s hat\u00e9konys\u00e1g m\u0171szakonk\u00e9nt<\/td><td>N\u00e9v szerint kezelt dolgoz\u00f3k, m\u0171szakokkal, t\u00e1voll\u00e9tekkel \u00e9s t\u00fal\u00f3r\u00e1kkal<\/td><\/tr><tr><td>Sorrendk\u00e9pz\u00e9s<\/td><td>El\u0151sz\u00f6r ind\u00edt\u00e1si priorit\u00e1s, majd korl\u00e1toz\u00f3 d\u00e1tum, v\u00e9g\u00fcl rendel\u00e9ssz\u00e1m szerint<\/td><td>A motor priorit\u00e1sok, hat\u00e1rid\u0151k \u00e9s \u00e1t\u00e1ll\u00e1sok alapj\u00e1n hat\u00e1rozza meg a sorrendet<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1sok<\/td><td>M\u0171veletenk\u00e9nt egy r\u00f6gz\u00edtett \u00e1t\u00e1ll\u00e1si id\u0151<\/td><td>\u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trix: a legkisebb \u00f6sszes\u00edtett \u00e1t\u00e1ll\u00e1si id\u0151<\/td><\/tr><tr><td>Anyagok<\/td><td>Classic: minden anyagnak teljes mennyis\u00e9gben rendelkez\u00e9sre kell \u00e1llnia, k\u00fcl\u00f6nben a rendel\u00e9s v\u00e1rakozik<\/td><td>K\u00e9szlet \u00e9s be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9sek, sz\u00e1ll\u00edt\u00e1si d\u00e1tum szerint<\/td><\/tr><tr><td>V\u00e1ltoz\u00e1sok<\/td><td>A Rough Cut Planning vagy az APS Maintenance Process futtat\u00e1sa<\/td><td>Az Autopilot az \u00d6n priorit\u00e1sai szerint \u00fajratervezi a teljes \u00fczemet<\/td><\/tr><tr><td>Tervez\u0151i n\u00e9zet<\/td><td>Production Schedule Board: d\u00e1tumok \u00e9s priorit\u00e1sok m\u00f3dos\u00edt\u00e1sa<\/td><td>Interakt\u00edv Gantt-diagram: a gy\u00e1rt\u00e1si feladatok \u00e1thelyezhet\u0151k, a terv \u00f6sszhangban marad<\/td><\/tr><tr><td>\u00dczem<\/td><td>Adatr\u00f6gz\u00edt\u00e9s az Acumatica Labor, Move \u00e9s Materials fel\u00fcletein<\/td><td>A dolgoz\u00f3k telefonon vagy t\u00e1blag\u00e9pen l\u00e1tj\u00e1k a feladatsorukat, \u00e9s r\u00f6gz\u00edtik az elv\u00e9gzett munk\u00e1t<\/td><\/tr><tr><td>Indul\u00e1s<\/td><td>Az APS \u201esubject to licensing\u201d (licenchez k\u00f6t\u00f6tt); az Optimized k\u00eds\u00e9rleti funkci\u00f3<\/td><td>Saj\u00e1t rendel\u00e9sek \u00fctemez\u00e9se a 30 napos pr\u00f3baid\u0151szakban, \u00e9les indul\u00e1s heteken bel\u00fcl<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-acumatica\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hogyan v\u00e1lasszon \u00fctemez\u0151t az Acumatica mell\u00e9?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az Acumatica APS elnagyolt kapacit\u00e1stervez\u00e9sre szolg\u00e1l: a Rough Cut Planning futtat\u00e1sakor 120 napig veszi figyelembe a kapacit\u00e1skorl\u00e1tokat, a munkaer\u0151t l\u00e9tsz\u00e1mk\u00e9nt kezeli, \u00e9s m\u0171veletenk\u00e9nt egy \u00e1t\u00e1ll\u00e1si id\u0151vel sz\u00e1mol. Az, hogy egy\u00e1ltal\u00e1n haszn\u00e1lhatja-e, a licenc\u00e9t\u0151l f\u00fcgg. Az Acumatica megfogalmaz\u00e1sa szerint: &#8220;Advanced planning and scheduling is subject to licensing&#8221; (az APS haszn\u00e1lata licenchez k\u00f6t\u00f6tt) (<a href=\"https:\/\/beacon.acumatica.com\/r\/Manufacturing-Edition-Guide\/Advanced-Planning-and-Scheduling-Optimized\/Optimized-APS-General-Information?contentId=ztx3r2rEZCoQbOENm2WXRw\">forr\u00e1s<\/a>). A Manufacturing Edition r\u00e9sze, az \u00faj Optimized motor pedig a 2026 R2 k\u00eds\u00e9rleti funkci\u00f3ja. Bekapcsol\u00e1s ut\u00e1n a l\u00e9tsz\u00e1m alapj\u00e1n, r\u00f6gz\u00edtett priorit\u00e1si sorrendben terheli be a rendel\u00e9seket, \u00e9s a tervez\u0151nek minden v\u00e1ltoz\u00e1s ut\u00e1n \u00fajra kell futtatnia. Egy t\u00e1bl\u00e1zatkezel\u0151r\u0151l v\u00e1lt\u00f3 \u00fczemnek olyan \u00fctemtervre van sz\u00fcks\u00e9ge, amely mag\u00e1t\u00f3l naprak\u00e9sz marad, \u00e9s a dolgoz\u00f3khoz is eljut. Az Acumatica adatai mindk\u00e9t esetben els\u0151dlegesek maradnak.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t az Acumatica APS helyett, ha:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Val\u00f3di termel\u00e9s\u00fctemez\u00e9st szeretne elnagyolt kapacit\u00e1sterv helyett.<\/strong> Az \u00fctemez\u00e9s minden id\u0151pontban figyelembe veszi az egyes g\u00e9pek, dolgoz\u00f3k, szersz\u00e1mok \u00e9s anyagok t\u00e9nyleges korl\u00e1tait a teljes tervez\u00e9si id\u0151t\u00e1von, a 120 napon t\u00fali rendel\u00e9sekn\u00e9l is.<\/li>\n\n\n<li><strong>A tervet konkr\u00e9t dolgoz\u00f3k rendelkez\u00e9sre \u00e1ll\u00e1sa korl\u00e1tozza, nem puszt\u00e1n a l\u00e9tsz\u00e1m.<\/strong> A m\u0171szakok, t\u00e1voll\u00e9tek \u00e9s t\u00f6bb dolgoz\u00f3t ig\u00e9nyl\u0151 gy\u00e1rt\u00e1si feladatok \u00fctemez\u00e9se szem\u00e9lyenk\u00e9nt t\u00f6rt\u00e9nik.<\/li>\n\n\n<li><strong>Az \u00e1t\u00e1ll\u00e1sok hat\u00e1rozz\u00e1k meg a kibocs\u00e1t\u00e1st.<\/strong> Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix az allerg\u00e9nek, sz\u00ednek vagy anyagok szerinti v\u00e1lt\u00e1sokat \u00fagy rendezi sorba, hogy az \u00f6sszes\u00edtett \u00e1t\u00e1ll\u00e1si id\u0151 a lehet\u0151 legkisebb legyen.<\/li>\n\n\n<li><strong>A g\u00e9peket, szersz\u00e1mokat \u00e9s anyagokat egy\u00fctt kell ellen\u0151rizni.<\/strong> Minden korl\u00e1t egyetlen \u00fctemtervben, folyamatosan \u00e9rv\u00e9nyes\u00fcl, an\u00e9lk\u00fcl, hogy \u00fctemez\u0151motort kellene v\u00e1lasztania.<\/li>\n\n\n<li><strong>A terv hetente t\u00f6bbsz\u00f6r v\u00e1ltozik.<\/strong> Az Autopilot minden v\u00e1ltoz\u00e1skor \u00fajratervez, a Running Time Lock r\u00f6gz\u00edti a k\u00f6vetkez\u0151 \u00f3r\u00e1k gy\u00e1rt\u00e1si feladatait, az \u00faj d\u00e1tumok pedig visszaker\u00fclnek az Acumatica rendszer\u00e9be.<\/li>\n\n\n<li><strong>A dolgoz\u00f3knak a saj\u00e1t feladatsoruk alapj\u00e1n kell dolgozniuk.<\/strong> A Mobile Confirmations telefonon vagy t\u00e1blag\u00e9pen jelen\u00edti meg az \u00fctemtervet, a r\u00f6gz\u00edtett munka adatai pedig visszaker\u00fclnek az Acumatica rendszer\u00e9be.<\/li>\n\n\n<li><strong>Heteken bel\u00fcl szeretne eredm\u00e9nyt l\u00e1tni.<\/strong> Saj\u00e1t rendel\u00e9seit m\u00e1r a 30 napos pr\u00f3baid\u0151szakban \u00fctemezheti, a SkyPlanner csapata pedig be\u00e1ll\u00edtja az integr\u00e1ci\u00f3t, \u00e9s t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az indul\u00e1s l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Ind\u00edtsa el az ingyenes pr\u00f3b\u00e1t.<\/strong> 30 nap, legfeljebb 20 munka\u00e1llom\u00e1s, a Basic csomag \u00f6sszes funkci\u00f3ja, bankk\u00e1rtya n\u00e9lk\u00fcl.<\/li>\n\n\n<li><strong>Modellezze a gy\u00e1rt\u00e1s\u00e1t.<\/strong> Hozza l\u00e9tre a munka\u00e1llom\u00e1sokat, g\u00e9peket, dolgoz\u00f3kat \u00e9s m\u0171szakokat a SkyPlanner rendszer\u00e9ben, vagy import\u00e1lja \u0151ket a rendszerbe. Az indul\u00e1shoz seg\u00edts\u00e9get is ig\u00e9nybe vehet.<\/li>\n\n\n<li><strong>T\u00f6ltse be a rendel\u00e9seit.<\/strong> Export\u00e1lja a nyitott gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s m\u0171veleteiket az Acumatica Generic Inquiry lek\u00e9rdez\u00e9s\u00e9b\u0151l Excelbe, import\u00e1lja \u0151ket, majd hasonl\u00edtsa \u00f6ssze a SkyPlanner \u00fctemterv\u00e9t a jelenlegi terv\u00e9vel.<\/li>\n\n\n<li><strong>Kapcsolja \u00f6ssze az Acumatica rendszer\u00e9vel.<\/strong> A SkyPlanner csapata be\u00e1ll\u00edtja a k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1.<\/li>\n\n<\/ol>\n\n\n<p><strong>\u00c1rak.<\/strong> A sz\u00e1ml\u00e1z\u00e1s havonta t\u00f6rt\u00e9nik. B\u00e1rmikor hozz\u00e1adhat vagy elt\u00e1vol\u00edthat munka\u00e1llom\u00e1sokat, illetve lemondhatja az el\u0151fizet\u00e9st. A r\u00e9szleteket az <a href=\"\/hu\/arkepzes\/\">\u00e1rak<\/a> oldalon tal\u00e1lja.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Kapcsolat az \u00e9rt\u00e9kes\u00edt\u00e9ssel<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Melyik a legjobb \u00fctemez\u00e9si kieg\u00e9sz\u00edt\u0151 az Acumatica mell\u00e9?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner APS termel\u00e9s\u00fctemez\u00e9si kieg\u00e9sz\u00edt\u0151, amely k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val kapcsol\u00f3dik az Acumatica rendszer\u00e9hez: \u00e1tveszi a gy\u00e1rt\u00e1si rendel\u00e9seket, m\u0171veleteket, munka\u00e1llom\u00e1sokat, g\u00e9peket, szersz\u00e1mokat, k\u00e9szletcikkeket \u00e9s beszerz\u00e9si rendel\u00e9seket, majd visszak\u00fcldi a m\u0171veletek tervezett d\u00e1tumait \u00e9s a r\u00f6gz\u00edtett munka adatait. Minden munka\u00e1llom\u00e1s, g\u00e9p, dolgoz\u00f3, szersz\u00e1m \u00e9s anyag t\u00e9nyleges korl\u00e1tait figyelembe veszi. A v\u00e1lt\u00e1s ir\u00e1ny\u00e1t is figyelembe vev\u0151 \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix a legkisebb \u00f6sszes\u00edtett \u00e1t\u00e1ll\u00e1si id\u0151re rendezi sorba a gy\u00e1rt\u00e1si feladatokat. Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltoz\u00e1s t\u00f6rt\u00e9nik a termel\u00e9sben. A havid\u00edj 199 \u20ac-t\u00f3l indul, az ingyenes pr\u00f3baid\u0151szak 30 napos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van termel\u00e9s\u00fctemez\u00e9s az Acumatica rendszer\u00e9ben?<\/summary>\n<p class=\"sp-faq__a\">Csak durva kapacit\u00e1stervez\u00e9si szinten. A Manufacturing Edition Advanced Planning and Scheduling funkci\u00f3ja Rough Cut Planning m\u00f3dban fut. A Classic APS a 120 napon t\u00fal befejez\u0151d\u0151 rendel\u00e9seket korl\u00e1tlan kapacit\u00e1ssal tervezi, a k\u00eds\u00e9rleti Optimized motor pedig csak a munka\u00e1llom\u00e1sokat \u00fctemezi. A SkyPlanner APS a teljes tervez\u00e9si id\u0151t\u00e1von minden g\u00e9p, dolgoz\u00f3, szersz\u00e1m \u00e9s anyag t\u00e9nyleges korl\u00e1tait figyelembe v\u00e9ve \u00fctemez.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kell b\u00e1rmit telep\u00edten\u00fcnk az Acumatica rendszer\u00e9be?<\/summary>\n<p class=\"sp-faq__a\">Nem. A SkyPlanner az Acumatica mellett, a felh\u0151ben fut, \u00e9s az Acumatica szabv\u00e1nyos, szerz\u0151d\u00e9salap\u00fa REST API fel\u00fclet\u00e9n kereszt\u00fcl kapcsol\u00f3dik hozz\u00e1. Az integr\u00e1ci\u00f3 egy olyan kapcsolt alkalmaz\u00e1son kereszt\u00fcl jelentkezik be, amelyet \u00d6n regisztr\u00e1l az Acumatica rendszer\u00e9ben.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A SkyPlanner kiv\u00e1ltja az Acumatica Manufacturing Edition rendszert?<\/summary>\n<p class=\"sp-faq__a\">Nem, hanem kieg\u00e9sz\u00edti. A k\u00e9szletcikkek, darabjegyz\u00e9kek, az MRP, a beszerz\u00e9s, a k\u00e9szletgazd\u00e1lkod\u00e1s, a k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1s \u00e9s a p\u00e9nz\u00fcgy tov\u00e1bbra is az Acumatica rendszer\u00e9ben marad. A SkyPlanner a t\u00e9nyleges kapacit\u00e1s alapj\u00e1n \u00fctemezi a gy\u00e1rt\u00e1si rendel\u00e9seket, \u00e9s visszak\u00fcldi a d\u00e1tumokat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Az Acumatica APS vagy a SkyPlanner megold\u00e1s\u00e1t v\u00e1lasszuk?<\/summary>\n<p class=\"sp-faq__a\">V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha elnagyolt kapacit\u00e1sterv helyett val\u00f3di, a kapacit\u00e1skorl\u00e1tokat betart\u00f3 \u00fctemtervet szeretne. Az Acumatica a Rough Cut Planning futtat\u00e1sakor veszi figyelembe a kapacit\u00e1skorl\u00e1tokat, a Classic APS pedig 120 napon t\u00fal korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol. Az APS haszn\u00e1lata licenchez k\u00f6t\u00f6tt, a munkaer\u0151t l\u00e9tsz\u00e1mk\u00e9nt modellezi, m\u0171veletenk\u00e9nt egy r\u00f6gz\u00edtett \u00e1t\u00e1ll\u00e1si id\u0151t haszn\u00e1l, \u00e9s akkor sz\u00e1mol \u00fajra, amikor a tervez\u0151 futtatja a Rough Cut Planning vagy az APS Maintenance Process elj\u00e1r\u00e1st. A SkyPlanner minden id\u0151pontban, a teljes tervez\u00e9si id\u0151t\u00e1von figyelembe veszi az egyes g\u00e9pek, dolgoz\u00f3k, szersz\u00e1mok \u00e9s anyagok t\u00e9nyleges korl\u00e1tait. \u00c1t\u00e1ll\u00e1siid\u0151-m\u00e1trixa a v\u00e1lt\u00e1s ir\u00e1ny\u00e1t is figyelembe veszi a sorrendk\u00e9pz\u00e9sn\u00e9l, az Autopilot automatikusan \u00fajratervez, a dolgoz\u00f3k pedig telefonon vagy t\u00e1blag\u00e9pen l\u00e1tj\u00e1k a feladatsorukat. Heteken bel\u00fcl \u00e9lesben haszn\u00e1lhatja, havi 199 \u20ac-t\u00f3l, saj\u00e1t adatokkal v\u00e9gzett 30 napos pr\u00f3baid\u0151szakkal. Ha az APS bekapcsolva marad, a SkyPlanner minden \u00e1ltala \u00fctemezett rendel\u00e9st r\u00f6gz\u00edtett st\u00e1tuszba \u00e1ll\u00edt, az Acumatica termel\u00e9s\u00fctemez\u00e9se pedig nem \u00fctemezi \u00e1t a r\u00f6gz\u00edtett rendel\u00e9seket.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mennyibe ker\u00fcl a SkyPlanner egy Acumatica rendszert haszn\u00e1l\u00f3 \u00fczemnek?<\/summary>\n<p class=\"sp-faq__a\">A havid\u00edj 199 \u20ac-t\u00f3l indul, \u00e9s 5 munka\u00e1llom\u00e1st foglal mag\u00e1ban; minden tov\u00e1bbi munka\u00e1llom\u00e1s d\u00edja havi 20 \u20ac. A munka\u00e1llom\u00e1s olyan termel\u00e9si er\u0151forr\u00e1s, amelynek saj\u00e1t \u00fctemezett feladatsora van. Az integr\u00e1ci\u00f3ra a folyamatainak \u00e9s ig\u00e9nyeinek megfelel\u0151en, az el\u0151fizet\u00e9si csomaggal egy\u00fctt el\u0151re adunk \u00e1raj\u00e1nlatot, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mennyi id\u0151t vesz ig\u00e9nybe a bevezet\u00e9s?<\/summary>\n<p class=\"sp-faq__a\">A bevezet\u00e9s az indul\u00e1si folyamat megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtva \u00e1ltal\u00e1ban heteken bel\u00fcl lez\u00e1rul. A csapat megfelelteti a munka\u00e1llom\u00e1sokat, g\u00e9peket \u00e9s BOM-m\u0171veleteket, \u00f6sszekapcsolja a gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9seket, \u00e9s visszak\u00fcldi a tervezett d\u00e1tumokat. Az \u00e9les indul\u00e1s el\u0151tt mindent a jelenlegi terv\u00e9vel \u00f6sszevetve tesztel\u00fcnk.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlanner megold\u00e1s\u00e1t az Acumatica-integr\u00e1ci\u00f3 el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos pr\u00f3baid\u0151szakban az Acumatica Generic Inquiry lek\u00e9rdez\u00e9s\u00e9b\u0151l Excelbe export\u00e1lt adatokkal dolgozhat. M\u00e1r az integr\u00e1ci\u00f3s munka megkezd\u00e9se el\u0151tt l\u00e1thatja saj\u00e1t termel\u00e9s\u00e9nek <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">t\u00e9nyleges kapacit\u00e1sra \u00e9p\u00fcl\u0151 \u00fctemterv\u00e9t<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal A SkyPlanner APS az Acumatica Manufacturing Edition termel\u00e9s\u00fctemez\u0151 b\u0151v\u00edtm\u00e9nye. A teljes tervez\u00e9si id\u0151szakban, konkr\u00e9t id\u0151pontokra sz\u00e1mol minden munka\u00e1llom\u00e1s, g\u00e9p, g\u00e9pkezel\u0151 \u00e9s szersz\u00e1m val\u00f3s kapacit\u00e1s\u00e1val, valamint a rendelkez\u00e9sre \u00e1ll\u00f3 anyagmennyis\u00e9ggel. Az Acumatica saj\u00e1t APS rendszere nagyvonal\u00fa tervez\u00e9st v\u00e9gez. A v\u00e9ges kapacit\u00e1sokkal &#8230; <a title=\"SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/\" aria-label=\"Read more about SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100680,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-102796","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Acumatica-integr\u00e1ci\u00f3: termel\u00e9s\u00fctemez\u00e9s APS rendszerrel<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 Acumatica-b\u0151v\u00edtm\u00e9ny k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden g\u00e9p, ember, szersz\u00e1m \u00e9s anyag figyelembev\u00e9tel\u00e9vel. Havi 199 \u20ac-t\u00f3l.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 Acumatica-b\u0151v\u00edtm\u00e9ny k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden g\u00e9p, ember, szersz\u00e1m \u00e9s anyag figyelembev\u00e9tel\u00e9vel. Havi 199 \u20ac-t\u00f3l.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/acumatica\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/acumatica\\\/\",\"name\":\"Acumatica-integr\u00e1ci\u00f3: termel\u00e9s\u00fctemez\u00e9s APS rendszerrel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 Acumatica-b\u0151v\u00edtm\u00e9ny k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden g\u00e9p, ember, szersz\u00e1m \u00e9s anyag figyelembev\u00e9tel\u00e9vel. Havi 199 \u20ac-t\u00f3l.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/acumatica\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/acumatica\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/acumatica\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Acumatica-integr\u00e1ci\u00f3: termel\u00e9s\u00fctemez\u00e9s APS rendszerrel","description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 Acumatica-b\u0151v\u00edtm\u00e9ny k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden g\u00e9p, ember, szersz\u00e1m \u00e9s anyag figyelembev\u00e9tel\u00e9vel. Havi 199 \u20ac-t\u00f3l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/","og_locale":"hu_HU","og_type":"article","og_title":"SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal","og_description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 Acumatica-b\u0151v\u00edtm\u00e9ny k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden g\u00e9p, ember, szersz\u00e1m \u00e9s anyag figyelembev\u00e9tel\u00e9vel. Havi 199 \u20ac-t\u00f3l.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/","name":"Acumatica-integr\u00e1ci\u00f3: termel\u00e9s\u00fctemez\u00e9s APS rendszerrel","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS: termel\u00e9s\u00fctemez\u0151 Acumatica-b\u0151v\u00edtm\u00e9ny k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3val. Minden g\u00e9p, ember, szersz\u00e1m \u00e9s anyag figyelembev\u00e9tel\u00e9vel. Havi 199 \u20ac-t\u00f3l.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/acumatica\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Acumatica Cloud ERP SkyPlanner APS az Acumatica mell\u00e9: termel\u00e9s\u00fctemez\u00e9s val\u00f3s kapacit\u00e1sokkal A SkyPlanner APS az Acumatica Manufacturing Edition termel\u00e9s\u00fctemez\u0151 b\u0151v\u00edtm\u00e9nye. A teljes tervez\u00e9si id\u0151szakban, konkr\u00e9t id\u0151pontokra sz\u00e1mol minden munka\u00e1llom\u00e1s, g\u00e9p, g\u00e9pkezel\u0151 \u00e9s szersz\u00e1m val\u00f3s kapacit\u00e1s\u00e1val, valamint a rendelkez\u00e9sre \u00e1ll\u00f3 anyagmennyis\u00e9ggel. Az Acumatica saj\u00e1t APS rendszere nagyvonal\u00fa tervez\u00e9st v\u00e9gez. A v\u00e9ges kapacit\u00e1sokkal&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/102796","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=102796"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/102796\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100680"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=102796"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}