{"id":101365,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101365"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"termelesutemezes","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/","title":{"rendered":"T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Sage X3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? <span class=\"hl\">MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">A Sage X3 alapfunkci\u00f3k\u00e9nt nem veszi figyelembe a g\u00e9pek \u00e9s dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1t a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9sekor. Ezt a hi\u00e1nyt p\u00f3tolja a SkyPlanner APS termel\u00e9s\u00fctemez\u00e9se. Az X3 az MRP-vel tervezi az anyagsz\u00fcks\u00e9gletet, a Scheduling (FUNMAUTJ) funkci\u00f3val pedig meghat\u00e1rozza a gy\u00e1rt\u00e1si rendel\u00e9sek d\u00e1tumait. A Sage brit t\u00e1mogat\u00e1si csapata korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol\u00f3 \u00fctemez\u0151k\u00e9nt \u00edrja le: \u201eeach work order independently\u201d (minden gy\u00e1rt\u00e1si rendel\u00e9st egym\u00e1st\u00f3l f\u00fcggetlen\u00fcl) \u00fctemez, \u00e9s nem tolja el a rendel\u00e9seket az er\u0151forr\u00e1sok terhel\u00e9se alapj\u00e1n.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A termel\u00e9s\u00fctemez\u00e9s k\u00fcl\u00f6n r\u00e9tegk\u00e9nt \u00e9rhet\u0151 el. A Sage ehhez a helyben telep\u00edtett Production Scheduler megold\u00e1st k\u00edn\u00e1lja, vagy a generikus Finite scheduler interface (GFS) interf\u00e9szt, amely a Sage X3 Web Scheduling rendszerhez vagy k\u00fcls\u0151 \u00fctemez\u0151h\u00f6z kapcsol\u00f3dik. Azok az \u00fczemek, ahol minden g\u00e9pet, dolgoz\u00f3t \u00e9s szersz\u00e1mot <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">a t\u00e9nyleges kapacit\u00e1s figyelembev\u00e9tel\u00e9vel kell \u00fctemezni<\/a>, a SkyPlanner APS-t haszn\u00e1lj\u00e1k az X3 mellett.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sage-x3-plans-and-schedules-production-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy tervezi \u00e9s \u00fctemezi a gy\u00e1rt\u00e1st a Sage X3, l\u00e9p\u00e9sr\u0151l l\u00e9p\u00e9sre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. A kapacit\u00e1st a munka\u00e1llom\u00e1sokon kell megadni<\/h3>\n\n\n<p>A kapacit\u00e1s a munka\u00e1llom\u00e1shoz tartozik (<strong>GESMWS<\/strong> funkci\u00f3, WORKSTATIO t\u00e1bla). Az \u00fctemez\u00e9s szempontj\u00e1b\u00f3l ezek a l\u00e9nyeges mez\u0151k:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Structure<\/strong> (TWD): a heti munkarend, amely meghat\u00e1rozza a m\u0171szakbeoszt\u00e1st.<\/li>\n\n\n<li><strong>No. of resources<\/strong> (WSTNBR): az adott m\u0171velethez sz\u00fcks\u00e9ges er\u0151forr\u00e1sok sz\u00e1ma a munka\u00e1llom\u00e1son. A Sage p\u00e9ld\u00e1j\u00e1ban egy k\u00e9zi munka\u00e1llom\u00e1son h\u00e1rom emberre van sz\u00fcks\u00e9g.<\/li>\n\n\n<li><strong>% efficiency<\/strong> (EFF) \u00e9s <strong>Shrinkage in %<\/strong> (SHR): a technol\u00f3giai \u00fatvonal id\u0151adatait korrig\u00e1l\u00f3 mez\u0151k.<\/li>\n\n\n<li><strong>Work center type<\/strong> (WSTTYP): g\u00e9p, munkaer\u0151 vagy alv\u00e1llalkoz\u00e1s.<\/li>\n\n\n<li>A <strong>Constraint<\/strong> jel\u00f6l\u0151n\u00e9gyzet, valamint a Replacement lap, amelyen a helyettes\u00edt\u0151 munka\u00e1llom\u00e1sokhoz k\u00fcl\u00f6n <strong>Work center type<\/strong> (RPLWSTTYP) \u00e9s egyenk\u00e9nt priorit\u00e1s adhat\u00f3 meg.<\/li>\n\n\n<li>A kapacit\u00e1sv\u00e1ltoz\u00e1sok t\u00e1bl\u00e1zata az ideiglenes m\u0171szakok \u00e9s \u00e1ll\u00e1sid\u0151k r\u00f6gz\u00edt\u00e9s\u00e9re szolg\u00e1l. Kezd\u0151- \u00e9s z\u00e1r\u00f3d\u00e1tum, indok, m\u00f3dos\u00edtott munkarend \u00e9s m\u00f3dos\u00edtott er\u0151forr\u00e1ssz\u00e1m adhat\u00f3 meg benne.<\/li>\n\n<\/ul>\n\n\n<p>A Load lap Firm, Planned, MRP \u00e9s MPS kateg\u00f3ri\u00e1kra bontja a terhel\u00e9st. A tervez\u0151 \u00edgy l\u00e1tja, mi v\u00e9gleges m\u00e1r, \u00e9s mi csup\u00e1n javaslat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Az MRP l\u00e9trehozza a javaslatokat<\/h3>\n\n\n<p>Az MRP (<strong>FUNMRP<\/strong>) referenciad\u00e1tum \u00e9s rakt\u00e1roz\u00e1si telephely szerint egyenl\u00edti ki az ell\u00e1t\u00e1st \u00e9s az ig\u00e9nyt. Beolvassa a vev\u0151i rendel\u00e9seket, a gy\u00e1rt\u00e1si rendel\u00e9sek anyagig\u00e9ny\u00e9t, a beszerz\u00e9si, gy\u00e1rt\u00e1si \u00e9s alv\u00e1llalkoz\u00f3i rendel\u00e9seket, valamint az \u00e1tt\u00e1rol\u00e1sokat, majd gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9si javaslatokat hoz l\u00e9tre. Az eredm\u00e9nyt a term\u00e9k\u2013telephely adatokn\u00e1l megadott Suggestion type, Reorder quantity \u00e9s Splitting mez\u0151k szab\u00e1lyozz\u00e1k.<\/p>\n\n\n<p>A d\u00e1tumokat az \u00e1tfut\u00e1si id\u0151k hat\u00e1rozz\u00e1k meg. A javasolt gy\u00e1rt\u00e1si rendel\u00e9s z\u00e1r\u00f3d\u00e1tuma az ig\u00e9ny d\u00e1tuma, cs\u00f6kkentve a min\u0151s\u00e9gellen\u0151rz\u00e9s \u00e1tfut\u00e1si idej\u00e9vel. A kezd\u0151d\u00e1tumhoz ebb\u0151l levonja a gy\u00e1rt\u00e1s \u00e1tfut\u00e1si idej\u00e9t, vagy a technol\u00f3giai \u00fatvonal idej\u00e9t, ha a term\u00e9kn\u00e9l ez alapj\u00e1n t\u00f6rt\u00e9nik a sz\u00e1m\u00edt\u00e1s. Ha az \u00edgy kapott kezd\u0151d\u00e1tum megel\u0151zi a feldolgoz\u00e1s d\u00e1tum\u00e1t, az X3 a feldolgoz\u00e1s d\u00e1tum\u00e1t haszn\u00e1lja.<\/p>\n\n\n<p>Az MRP s\u00fag\u00f3ja egyetlen mondatban t\u00e9r ki a kapacit\u00e1sra: &#8220;An appropriate MRP setup is used, in parallel with the MRP process, to generate a workload.&#8221; (Megfelel\u0151 MRP-be\u00e1ll\u00edt\u00e1ssal az MRP-folyamattal p\u00e1rhuzamosan terhel\u00e9s gener\u00e1lhat\u00f3.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNMRP.htm\">Sage X3 s\u00fag\u00f3, FUNMRP<\/a>) Terhel\u00e9s k\u00e9sz\u00fcl, nem kapacit\u00e1sellen\u0151rz\u00e9s.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. A Scheduling (FUNMAUTJ) meghat\u00e1rozza a m\u0171veletek d\u00e1tumait<\/h3>\n\n\n<p>A Scheduling a technol\u00f3giai \u00fatvonal (<strong>GESROU<\/strong>) alapj\u00e1n \u00fctemezi az egyes gy\u00e1rt\u00e1si rendel\u00e9sek m\u0171veleteit. A rendel\u00e9sen megadott k\u00e9rt d\u00e1tumokt\u00f3l f\u00fcgg\u0151en el\u0151re vagy visszafel\u00e9 sz\u00e1mol. A m\u0171veletek kezd\u0151- \u00e9s z\u00e1r\u00f3d\u00e1tuma a gy\u00e1rt\u00e1si rendel\u00e9s m\u0171veleteihez (MFGOPE) ker\u00fcl, a fejl\u00e9cben (MFGHEAD) pedig a Scheduling \u00e1llapot Scheduled \u00e9rt\u00e9kre v\u00e1lt.<\/p>\n\n\n<p>A Sage brit t\u00e1mogat\u00e1si csapata egy\u00e9rtelm\u0171en le\u00edrja a m\u0171k\u00f6d\u00e9st a V12 \u00fctemez\u00e9si \u00fatmutat\u00f3j\u00e1ban: &#8220;The function schedules each work order independently.&#8221; (A funkci\u00f3 minden gy\u00e1rt\u00e1si rendel\u00e9st egym\u00e1st\u00f3l f\u00fcggetlen\u00fcl \u00fctemez.) Majd hozz\u00e1teszi: &#8220;It does not delay or stagger work orders based on overall resource load.&#8221; (Az er\u0151forr\u00e1sok \u00f6sszterhel\u00e9se alapj\u00e1n nem k\u00e9slelteti \u00e9s nem tolja el egym\u00e1shoz k\u00e9pest a gy\u00e1rt\u00e1si rendel\u00e9seket.) (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>) Ha t\u00edz rendel\u00e9s halad \u00e1t ugyanazon a CNC-cell\u00e1n, mindegyik az ide\u00e1lis d\u00e1tumokat kapja, f\u00fcggetlen\u00fcl att\u00f3l, mennyit k\u00e9pes t\u00e9nylegesen legy\u00e1rtani a cella.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. A Loads megmutatja a t\u00falterhel\u00e9st, a tervez\u0151 pedig megoldja<\/h3>\n\n\n<p>A <strong>Loads<\/strong> (<strong>CONSMWK<\/strong>) munka\u00e1llom\u00e1sonk\u00e9nt \u00e9s id\u0151szakonk\u00e9nt hasonl\u00edtja \u00f6ssze a terhel\u00e9st a kapacit\u00e1ssal. A <strong>Recalculate the loads<\/strong> (<strong>FUNMIWL<\/strong>, Manufacturing &gt; Batch processes) \u00fajrasz\u00e1m\u00edtja a terhel\u00e9si adatokat. A piros s\u00e1v azt jelzi, hogy az adott id\u0151szakban a munka\u00e1llom\u00e1s terhel\u00e9se meghaladja a kapacit\u00e1s\u00e1t. A tervez\u0151 ezut\u00e1n a <strong>Planning workbench<\/strong> fel\u00fclet\u00e9n \u00e1t\u00fctemezi a rendel\u00e9seket vagy t\u00f6rli az \u00fctemez\u00e9s\u00fcket, szabad munka\u00e1llom\u00e1sra helyezi \u00e1t a m\u0171veleteket, illetve k\u00e9zzel eltolja egym\u00e1shoz k\u00e9pest a rendel\u00e9seket.<\/p>\n\n\n<p>Az X3 megmutatja a probl\u00e9m\u00e1t. A megold\u00e1s az emberre marad.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. A termel\u00e9s\u00fctemez\u00e9s k\u00fcl\u00f6n kieg\u00e9sz\u00edt\u0151<\/h3>\n\n\n<p>A Sage k\u00e9t megold\u00e1st k\u00edn\u00e1l, mindkett\u0151 tev\u00e9kenys\u00e9gk\u00f3dokkal kapcsolhat\u00f3 be:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production Scheduler<\/strong> (POPS tev\u00e9kenys\u00e9gk\u00f3d, az Active be\u00e1ll\u00edt\u00e1s kijel\u00f6l\u00e9s\u00e9vel; FUNPSSCH funkci\u00f3). Olyan tervez\u0151eszk\u00f6z, amely a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9s\u00e9t \u201ein the form of a Gantt chart\u201d (Gantt-diagram form\u00e1j\u00e1ban) jelen\u00edti meg. A k\u00fcl\u00f6n\u00e1ll\u00f3 <strong>Finite Capacity<\/strong> tev\u00e9kenys\u00e9gk\u00f3d aktiv\u00e1lja a t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9si m\u00f3dot a gy\u00e1rt\u00e1s\u00fctemez\u00e9si funkci\u00f3kban. A gy\u00e1rt\u00e1si rendel\u00e9sek a Submit for scheduling m\u0171velettel ker\u00fclnek be.<\/li>\n\n\n<li><strong>Generic Finite scheduler interface<\/strong> (<strong>GFS<\/strong> tev\u00e9kenys\u00e9gk\u00f3d). A Sage \u00e1ltal fejlesztett \u00e1ltal\u00e1nos interf\u00e9sz, amely a felh\u0151ben vagy helyben fut\u00f3 X3-at a Sage kieg\u00e9sz\u00edt\u0151 \u00fctemez\u0151j\u00e9hez, a <strong>Sage X3 Web Scheduling<\/strong> rendszerhez, vagy egy f\u00fcggetlen szoftversz\u00e1ll\u00edt\u00f3 webes \u00fctemez\u0151j\u00e9hez kapcsolja. Az X3 a Submit for scheduling, Resubmit for scheduling \u00e9s Remove from scheduling m\u0171veletekkel vez\u00e9rli (Manufacturing &gt; Finite scheduler).<\/li>\n\n<\/ul>\n\n\n<p>Az X3 az alkatr\u00e9szek rendelkez\u00e9sre \u00e1ll\u00e1sa alapj\u00e1n m\u0171veletenk\u00e9nt kisz\u00e1m\u00edtja a legkor\u00e1bbi kezd\u0151d\u00e1tumot is (<strong>Earliest start<\/strong>; First Date of Material Availability, FDMA). Ezt a d\u00e1tumot korl\u00e1tk\u00e9nt adja \u00e1t a Production Scheduler vagy a webes \u00fctemez\u0151 sz\u00e1m\u00e1ra. Az alap\u00fctemez\u00e9s azonban nem haszn\u00e1lja: a gy\u00e1rt\u00e1si rendel\u00e9sek s\u00fag\u00f3ja szerint &#8220;The Sage X3 scheduling process does not consider component availability when determining operation start dates.&#8221; (A Sage X3 \u00fctemez\u00e9si folyamata a m\u0171veletek kezd\u0151d\u00e1tum\u00e1nak meghat\u00e1roz\u00e1sakor nem veszi figyelembe az alkatr\u00e9szek rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sage-x3-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A Sage X3 korl\u00e1tai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Az alap\u00fctemez\u00e9s korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol.<\/strong> A Sage t\u00e1mogat\u00e1si \u00fatmutat\u00f3ja szerint a t\u00falterhel\u00e9sek felold\u00e1s\u00e1hoz \u201ewould require finite capacity scheduling or manual adjustment\u201d (termel\u00e9s\u00fctemez\u00e9sre vagy k\u00e9zi m\u00f3dos\u00edt\u00e1sra lenne sz\u00fcks\u00e9g). (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>)<\/li>\n\n\n<li><strong>A terhel\u00e9si adatok elavulnak.<\/strong> \u00daj m\u0171szak hozz\u00e1ad\u00e1sakor vagy a napt\u00e1r m\u00f3dos\u00edt\u00e1sakor \u201eexisting load buckets won&#8217;t automatically adjust\u201d (a megl\u00e9v\u0151 id\u0151szaki terhel\u00e9sek nem m\u00f3dosulnak automatikusan), am\u00edg le nem fut a Recalculate the loads m\u0171velet. A lek\u00e9rdez\u00e9s alap\u00e9rtelmez\u00e9s szerint csak az \u00fctemezett rendel\u00e9seket mutatja; az MRP-javaslatok csak az ALL lek\u00e9rdez\u00e9si k\u00f3ddal jelennek meg. (Ugyanaz a forr\u00e1s.)<\/li>\n\n\n<li><strong>A Production Scheduler csak helyben telep\u00edtve \u00e9rhet\u0151 el.<\/strong> &#8220;Production Scheduler is only available for on-premises instances of Sage X3.&#8221; (A Production Scheduler csak a Sage X3 helyben telep\u00edtett p\u00e9ld\u00e1nyaihoz \u00e9rhet\u0151 el.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/OBJ\/ACV_POPS.htm\">Sage X3 s\u00fag\u00f3 V12, POPS<\/a>) A V11 oldala enn\u00e9l is tov\u00e1bb megy: &#8220;Production Scheduler is not available for new Sage X3 installations.&#8221; (A Production Scheduler nem \u00e9rhet\u0151 el \u00faj Sage X3-telep\u00edt\u00e9sekhez.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/11\/en-US\/OBJ\/ACV_POPS.htm\">Sage X3 s\u00fag\u00f3 V11<\/a>)<\/li>\n\n\n<li><strong>A Production Schedulernek dokument\u00e1lt hi\u00e1nyoss\u00e1gai vannak.<\/strong> A Sage a k\u00f6vetkez\u0151ket sorolja fel jelenleg nem el\u00e9rhet\u0151 funkci\u00f3k\u00e9nt (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSSCH.htm\">Sage X3 s\u00fag\u00f3, FUNPSSCH<\/a>):<\/li>\n\n<\/ul>\n\n\n<p>&#8211; az \u00e1t\u00e1ll\u00e1si id\u0151k optimaliz\u00e1l\u00e1sa t\u00f6bb cikkparam\u00e9ter \u00e9s \u00e1t\u00e1ll\u00e1si m\u00e1trix alapj\u00e1n &#8211; gy\u00e1rt\u00e1si megrendel\u00e9sek \u00f6sszekapcsol\u00e1sa &#8211; t\u00f6bb er\u0151forr\u00e1s \u00fctemez\u00e9se p\u00e1rhuzamos m\u0171veletek szinkroniz\u00e1l\u00e1s\u00e1val &#8211; az ig\u00e9nybe vehet\u0151, elt\u00e9r\u0151 termel\u00e9si sebess\u00e9g\u0171 er\u0151forr\u00e1sok list\u00e1z\u00e1sa<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Optimaliz\u00e1l\u00e1s k\u00f6zben a gy\u00e1rt\u00e1si rendel\u00e9sek z\u00e1rolva vannak.<\/strong> A Production Schedulerbe k\u00fcld\u00f6tt gy\u00e1rt\u00e1si rendel\u00e9s <strong>Being optimized<\/strong> \u00e1llapotot kap, \u00e9s a s\u00fag\u00f3 szerint &#8220;You cannot modify the work order at these statuses.&#8221; (Ezekben az \u00e1llapotokban nem m\u00f3dos\u00edthat\u00f3 a gy\u00e1rt\u00e1si rendel\u00e9s.) A z\u00e1rol\u00e1s mindaddig megmarad, am\u00edg a rendel\u00e9st el nem t\u00e1vol\u00edtj\u00e1k az \u00fctemez\u00e9sb\u0151l. (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSMOPT.htm\">Sage X3 s\u00fag\u00f3, FUNPSMOPT<\/a>)<\/li>\n\n\n<li><strong>A GFS fejlett interf\u00e9sze m\u0171veletenk\u00e9nt egy er\u0151forr\u00e1st v\u00e1r.<\/strong> A No. of resources mez\u0151 s\u00fag\u00f3ja szerint: &#8220;You must set this field to 1 if you are using the generic Finite scheduler advanced interface.&#8221; (Ezt a mez\u0151t 1 \u00e9rt\u00e9kre kell \u00e1ll\u00edtani a generikus termel\u00e9s\u00fctemez\u0151 fejlett interf\u00e9sz\u00e9nek haszn\u00e1latakor.) Az indokl\u00e1s: &#8220;Sage X3 Web Scheduling cannot optimize production times when multiple resources are assigned to a work center.&#8221; (A Sage X3 Web Scheduling nem tudja optimaliz\u00e1lni a gy\u00e1rt\u00e1si id\u0151ket, ha egy munka\u00e1llom\u00e1shoz t\u00f6bb er\u0151forr\u00e1s van hozz\u00e1rendelve.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/GESMWS.htm\">Sage X3 s\u00fag\u00f3, GESMWS<\/a>) Ha egy m\u0171velethez h\u00e1romf\u0151s csapat sz\u00fcks\u00e9ges, ezt nem lehet jelezni az \u00fctemez\u0151nek.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sage-x3-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor elegend\u0151k a Sage X3 saj\u00e1t tervez\u00e9si funkci\u00f3i?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Sok Sage X3-at haszn\u00e1l\u00f3 \u00fczemnek nincs sz\u00fcks\u00e9ge termel\u00e9s\u00fctemez\u0151re.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Az anyagok dikt\u00e1lj\u00e1k a temp\u00f3t, nem a g\u00e9pek.<\/strong> A k\u00e9szletre vagy ism\u00e9tl\u0151d\u0151 jelleggel gy\u00e1rt\u00f3 \u00fczemekben a val\u00f3di kock\u00e1zat a k\u00e9s\u0151i beszerz\u00e9s. A probl\u00e9m\u00e1k nagy r\u00e9sz\u00e9t megoldja, ha az MRP-ben rendben vannak az anyagjegyz\u00e9kek, a technol\u00f3giai \u00fatvonalak, az \u00e1tfut\u00e1si id\u0151k, a t\u00e9telnagys\u00e1gok \u00e9s a biztons\u00e1gi k\u00e9szletek.<\/li>\n\n\n<li><strong>El\u00e9g, ha \u00e1tl\u00e1that\u00f3 a terhel\u00e9s.<\/strong> A Loads heti ellen\u0151rz\u00e9se \u00e9s n\u00e9h\u00e1ny k\u00e9zi \u00e1thelyez\u00e9s a Planning workbench fel\u00fclet\u00e9n elegend\u0151 ahhoz, hogy az \u00fczem tartsa a hat\u00e1rid\u0151ket.<\/li>\n\n\n<li><strong>A helyben telep\u00edtett Production Scheduler m\u00e1r rendelkez\u00e9sre \u00e1ll.<\/strong> Ha Gantt-alap\u00fa sorrendtervez\u00e9sre van sz\u00fcks\u00e9g \u00e1t\u00e1ll\u00e1si m\u00e1trixok, rendel\u00e9skapcsolatok \u00e9s szinkroniz\u00e1lt p\u00e1rhuzamos m\u0171veletek n\u00e9lk\u00fcl, ez a megold\u00e1s elv\u00e9gzi a feladatot.<\/li>\n\n\n<li><strong>M\u00e1r haszn\u00e1lj\u00e1k a Web Scheduling rendszert,<\/strong> a No. of resources mez\u0151 \u00e9rt\u00e9ke 1, \u00e9s a terv megfelel az \u00fczemi val\u00f3s\u00e1gnak.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">N\u00e9gy lehet\u0151s\u00e9g a gy\u00e1rt\u00e1s \u00fctemez\u00e9s\u00e9re Sage X3 mellett<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tervez\u0151t\u00e1bl\u00e1k az X3-kliensen bel\u00fcl:<\/strong> a Planning workbench \u00e9s a Loads, vagy egy fogd \u00e9s vidd m\u00f3dszerrel kezelhet\u0151 t\u00e1bla az X3 k\u00e9perny\u0151in. Akkor megfelel\u0151ek, ha a terhel\u00e9s \u00e1tl\u00e1that\u00f3s\u00e1g\u00e1val \u00e9s k\u00e9zi \u00e1thelyez\u00e9sekkel tarthat\u00f3k az \u00fczem hat\u00e1rid\u0151i.<\/li>\n\n\n<li><strong>A Sage saj\u00e1t termel\u00e9s\u00fctemez\u00e9se:<\/strong> a helyben telep\u00edtett Production Scheduler, vagy a Sage X3 Web Scheduling a GFS interf\u00e9szen kereszt\u00fcl, a No. of resources mez\u0151 1 \u00e9rt\u00e9ke mellett.<\/li>\n\n\n<li><strong>Nagyv\u00e1llalati APS-rendszerek:<\/strong> \u00e1tfog\u00f3 tervez\u00e9si rendszerek, amelyeket egy rendszerintegr\u00e1tor t\u00f6bb h\u00f3napos projekt keret\u00e9ben vezet be, saj\u00e1t tervez\u00e9si r\u00e9szleggel rendelkez\u0151 \u00fczemek sz\u00e1m\u00e1ra.<\/li>\n\n\n<li><strong>Felh\u0151alap\u00fa APS a gy\u00e1rt\u00e1si feladatok \u00fczemi v\u00e9grehajt\u00e1s\u00e1hoz is:<\/strong> a SkyPlanner APS m\u00e1sodpercek alatt \u00fctemez minden munka\u00e1llom\u00e1st, g\u00e9pkezel\u0151t, szersz\u00e1mot \u00e9s anyagot, a g\u00e9pkezel\u0151k pedig telefonon vagy t\u00e1blag\u00e9pen haszn\u00e1lj\u00e1k. Azoknak az X3-at haszn\u00e1l\u00f3 gy\u00e1rt\u00f3knak megfelel\u0151, akik heteken bel\u00fcl \u00e9lesben szeretn\u00e9k haszn\u00e1lni.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor van sz\u00fcks\u00e9g termel\u00e9s\u00fctemez\u0151re?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li>A legt\u00f6bb h\u00e9ten piros a Loads, \u00e9s a Planning workbench kezel\u00e9se m\u00e1r teljes munkaid\u0151s feladatt\u00e1 v\u00e1lt.<\/li>\n\n\n<li>A v\u00e1llalt hat\u00e1rid\u0151k az \u00e1tfut\u00e1si id\u0151kb\u0151l sz\u00e1rmaznak, ez\u00e9rt az \u00e9rt\u00e9kes\u00edt\u00e9s \u00e9s a gy\u00e1rt\u00e1s nem \u00e9rt egyet abban, mi re\u00e1lis.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1sok hat\u00e1rozz\u00e1k meg az \u00e1tbocs\u00e1t\u00f3k\u00e9pess\u00e9get, az X3 alap\u00fctemez\u00e9se pedig nem \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy cs\u00f6kkentse az \u00e1t\u00e1ll\u00e1sokat.<\/li>\n\n\n<li>A gy\u00e1rt\u00e1si feladatokhoz egyszerre t\u00f6bb g\u00e9pkezel\u0151re van sz\u00fcks\u00e9g, vagy a g\u00e9pek k\u00f6z\u00f6s szersz\u00e1mokat \u00e9s k\u00e9sz\u00fcl\u00e9keket haszn\u00e1lnak.<\/li>\n\n\n<li>A Sage X3-at felh\u0151ben haszn\u00e1lja, ez\u00e9rt a helyben telep\u00edtett Production Scheduler nem j\u00f6het sz\u00f3ba.<\/li>\n\n\n<li>A s\u00fcrg\u0151s rendel\u00e9sek \u00e9s a g\u00e9phib\u00e1k miatt k\u00e9zzel kell \u00fajratervezni a gy\u00e1rt\u00e1st, gyakran Excelben.<\/li>\n\n\n<li>A g\u00e9pkezel\u0151knek saj\u00e1t feladatsorra van sz\u00fcks\u00e9g\u00fck, nem nyomtatott list\u00e1ra a gy\u00e1rt\u00e1si rendel\u00e9sekr\u0151l.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mire figyeljen a v\u00e1laszt\u00e1sn\u00e1l?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A t\u00e9nyleges kapacit\u00e1s figyelembev\u00e9tele er\u0151forr\u00e1sonk\u00e9nt, m\u0171szakonk\u00e9nt \u00e9s szem\u00e9lyenk\u00e9nt<\/strong>, a t\u00e1voll\u00e9tekkel \u00e9s t\u00fal\u00f3r\u00e1kkal egy\u00fctt.<\/li>\n\n\n<li><strong>Sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sok<\/strong>: \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix, amelyben az A-r\u00f3l B-re v\u00e1lt\u00e1s tov\u00e1bb tarthat, mint a B-r\u0151l A-ra v\u00e1lt\u00e1s, \u00e9s olyan \u00fctemez\u0151motor, amely a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja.<\/li>\n\n\n<li><strong>Szersz\u00e1mok \u00e9s munkacsoportok mint korl\u00e1tok<\/strong>: a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1m egyszerre csak egy g\u00e9phez foglalhat\u00f3 le, \u00e9s a rendszer kezeli azokat a m\u0171veleteket is, amelyekhez egyszerre t\u00f6bb g\u00e9pkezel\u0151 kell.<\/li>\n\n\n<li><strong>Anyagell\u00e1totts\u00e1g ellen\u0151rz\u00e9se az \u00fctemez\u00e9s sor\u00e1n<\/strong>, a k\u00e9szlet, valamint a nyitott beszerz\u00e9si rendel\u00e9sek \u00e9s azok v\u00e1rhat\u00f3 sz\u00e1ll\u00edt\u00e1si d\u00e1tumai alapj\u00e1n.<\/li>\n\n\n<li><strong>Alternat\u00edv g\u00e9pek \u00e9s munkat\u00e1rsak<\/strong>, valamint t\u00f6bbszint\u0171 term\u00e9kek kezel\u00e9se az \u00fctemez\u0151motorral, nem a tervez\u0151 k\u00e9zi munk\u00e1j\u00e1val.<\/li>\n\n\n<li><strong>\u00dajratervez\u00e9s k\u00e9zi \u00fajraind\u00edt\u00e1s n\u00e9lk\u00fcl<\/strong>, amikor visszajelent\u00e9s \u00e9rkezik egy gy\u00e1rt\u00e1si rendel\u00e9sr\u0151l, vagy \u00faj rendel\u00e9s fut be \u2013 k\u00fcl\u00f6n \u00fctemez\u00e9si futtat\u00e1s helyett.<\/li>\n\n\n<li><strong>Egy\u00e9rtelm\u0171 feladatmegoszt\u00e1s az X3-mal<\/strong>: melyik rendszer kezeli a d\u00e1tumokat, hogyan kezeli a z\u00e1rolt gy\u00e1rt\u00e1si rendel\u00e9seket, \u00e9s milyen adatok ker\u00fclnek vissza az X3-ba (m\u0171veleti d\u00e1tumok, \u00e1llapot, gy\u00e1rt\u00e1si visszajelent\u00e9sek).<\/li>\n\n\n<li><strong>Az \u00d6n k\u00f6rnyezet\u00e9hez illeszked\u0151 telep\u00edt\u00e9s.<\/strong> A felh\u0151alap\u00fa X3 nem ad k\u00f6zvetlen hozz\u00e1f\u00e9r\u00e9st a f\u00e1jlrendszerhez vagy az adatb\u00e1zishoz, ez\u00e9rt az \u00fctemez\u0151nek a GraphQL API-n, webszolg\u00e1ltat\u00e1sokon vagy hosztolt f\u00e1jl\u00e1tvitelen kereszt\u00fcl kell m\u0171k\u00f6dnie.<\/li>\n\n\n<li><strong>Gyorsan megmutatkoz\u00f3 el\u0151ny\u00f6k<\/strong>: tesztel\u00e9s saj\u00e1t adatokkal, m\u00e9g az integr\u00e1ci\u00f3s projekt megkezd\u00e9se el\u0151tt.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hol j\u00f6n k\u00e9pbe a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner APS felh\u0151alap\u00fa termel\u00e9s\u00fctemez\u0151. A Sage X3 mellett haszn\u00e1lva a fent felsorolt hi\u00e1nyoss\u00e1gok mindegyik\u00e9t p\u00f3tolja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Mindig naprak\u00e9sz \u00fctemterv.<\/strong> Az Arcturus AI motor m\u00e1sodpercek alatt k\u00e9sz\u00edt a t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 termel\u00e9si \u00fctemtervet, az Autopilot pedig automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a gy\u00e1rt\u00e1s. Nincs k\u00fcl\u00f6n Recalculate the loads l\u00e9p\u00e9s, \u00e9s nem marad t\u00falterhel\u00e9s, amelyet a tervez\u0151nek k\u00e9zzel kellene feloldania.<\/li>\n\n\n<li><strong>Munkacsoportok \u00e9s alternat\u00edv\u00e1k, a modell \u00e1talak\u00edt\u00e1sa n\u00e9lk\u00fcl.<\/strong> Egy munka\u00e1llom\u00e1son egyszerre t\u00f6bb g\u00e9pkezel\u0151 is dolgozhat, \u00edgy a h\u00e1romf\u0151s m\u0171velet egyetlen m\u0171velet marad. A p\u00e1rhuzamos g\u00e9pek egy csoportba tartoz\u00f3, saj\u00e1t hat\u00e9konys\u00e1gi \u00e9rt\u00e9kkel rendelkez\u0151 munka\u00e1llom\u00e1sok. Ha az els\u0151dleges g\u00e9p vagy munkat\u00e1rs nem el\u00e9rhet\u0151, a motor m\u00e1sikhoz rendeli a gy\u00e1rt\u00e1si feladatot, vagy t\u00f6bb g\u00e9p, illetve munkat\u00e1rs k\u00f6z\u00f6tt osztja sz\u00e9t.<\/li>\n\n\n<li><strong>A Production Schedulerb\u0151l hi\u00e1nyz\u00f3 \u00e1t\u00e1ll\u00e1si m\u00e1trix.<\/strong> Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix a term\u00e9kek k\u00f6z\u00f6tti, sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1si id\u0151ket t\u00e1rolja (k\u00e9kr\u0151l pirosra 30 min, pirosr\u00f3l k\u00e9kre 60 min), a motor pedig a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja. A modell az el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s leszerel\u00e9si id\u0151ket is tartalmazza.<\/li>\n\n\n<li><strong>Szersz\u00e1mok mint v\u00e9ges er\u0151forr\u00e1sok.<\/strong> Az egyik munka\u00e1llom\u00e1son haszn\u00e1lt szersz\u00e1mot a rendszer nem \u00fctemezi be egy m\u00e1sikra ugyanabban az id\u0151ben.<\/li>\n\n\n<li><strong>Anyagell\u00e1totts\u00e1ghoz igazod\u00f3 \u00fctemez\u00e9s.<\/strong> A motor szimul\u00e1lja a j\u00f6v\u0151beli k\u00e9szletet, \u00edgy csak olyan id\u0151pontra \u00fctemezi a munk\u00e1t, amikor a sz\u00fcks\u00e9ges anyagok rendelkez\u00e9sre \u00e1llnak. A megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l tekinti el\u00e9rhet\u0151nek, a k\u00e9szlet pedig akkor friss\u00fcl, amikor a beszerz\u00e9si rendel\u00e9s Delivered \u00e1llapotba ker\u00fcl (<a href=\"\/hu\/docs\/mi-az-es-hogyan-kell-hasznalni-a-beszerzesi-rendelesek-funkciot\/\">beszerz\u00e9si rendel\u00e9sek a SkyPlanner dokument\u00e1ci\u00f3j\u00e1ban<\/a>).<\/li>\n\n\n<li><strong>Priorit\u00e1sok \u00e9s z\u00e1rol\u00e1sok az \u00d6n kez\u00e9ben.<\/strong> A motort a gy\u00e1rt\u00e1si feladatok priorit\u00e1sa, a befejez\u00e9si d\u00e1tum szerinti rangsorol\u00e1s, az \u00fcgyf\u00e9lpriorit\u00e1s, valamint a Fast Track \u00e9s a Dynamic Priorities ir\u00e1ny\u00edtja. A Running Time Lock \u00e9s a k\u00e9s\u0151bbi gy\u00e1rt\u00e1si feladatokat el\u0151retol\u00f3 Bulldozer r\u00e9v\u00e9n a tervez\u0151k kez\u00e9ben marad az ir\u00e1ny\u00edt\u00e1s.<\/li>\n\n\n<li><strong>V\u00e9grehajt\u00e1s az \u00fczemben.<\/strong> A g\u00e9pkezel\u0151k telefonon vagy t\u00e1blag\u00e9pen l\u00e1tj\u00e1k a feladatsorukat, \u00e9s a Mobile Confirmations, a Production Timer \u00e9s a Quick Log Mode funkci\u00f3val r\u00f6gz\u00edthetik az elv\u00e9gzett munk\u00e1t.<\/li>\n\n\n<li><strong>Felh\u0151alap\u00fa m\u0171k\u00f6d\u00e9s, b\u00e1rmilyen X3-telep\u00edt\u00e9s mellett.<\/strong> A SkyPlanner ugyan\u00fagy m\u0171k\u00f6dik a Sage felh\u0151j\u00e9ben fut\u00f3 X3-mal, mint a saj\u00e1t szerverre telep\u00edtett v\u00e1ltozattal.<\/li>\n\n<\/ul>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha termel\u00e9s\u00fctemez\u00e9sre van sz\u00fcks\u00e9ge a felh\u0151alap\u00fa X3 mellett<\/strong>, \u00e9s a Production Scheduler nem j\u00f6het sz\u00f3ba.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha a m\u0171veletekhez munkacsoportokra vagy alternat\u00edv g\u00e9pekre van sz\u00fcks\u00e9g<\/strong>, \u00e9s nem szeretn\u00e9 k\u00e9nyszer\u0171s\u00e9gb\u0151l 1-re \u00e1ll\u00edtani a No. of resources mez\u0151t.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha egyetlen eszk\u00f6zben szeretn\u00e9 megoldani a tervez\u00e9st \u00e9s a g\u00e9pkezel\u0151k id\u0151r\u00e1ford\u00edt\u00e1s\u00e1nak r\u00f6gz\u00edt\u00e9s\u00e9t,<\/strong> \u00e9s azt szeretn\u00e9, hogy az id\u0151adatok gy\u00e1rt\u00e1si visszajelent\u00e9sk\u00e9nt ker\u00fcljenek vissza az X3-ba.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha heteken bel\u00fcl szeretn\u00e9 \u00e9lesben haszn\u00e1lni a termel\u00e9s\u00fctemez\u00e9st,<\/strong> nem egy h\u00f3napokig tart\u00f3 APS-projekt ut\u00e1n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Integr\u00e1ci\u00f3 a Sage X3-mal<\/h3>\n\n\n<p>A SkyPlanner \u00e9s a Sage X3 k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa az integr\u00e1ci\u00f3. A gy\u00e1rt\u00e1si rendel\u00e9sek (MFGHEAD, MFGOPE), a technol\u00f3giai \u00fatvonalak, a munka\u00e1llom\u00e1sok, a napt\u00e1rak, a k\u00e9szlet \u00e9s a nyitott beszerz\u00e9si rendel\u00e9sek adatai az X3-b\u00f3l \u00e9rkeznek. A m\u0171veletek tervezett d\u00e1tumai a Work order webszolg\u00e1ltat\u00e1son (GESMFG) kereszt\u00fcl ker\u00fclnek vissza, a r\u00f6gz\u00edtett \u00f3r\u00e1k pedig Production tracking (GESMTK) bejegyz\u00e9sk\u00e9nt. A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtanak minden \u00fctemtervv\u00e1ltoz\u00e1st.<\/p>\n\n\n<p>Nincs k\u00e9t \u00fczem, amely ugyan\u00fagy haszn\u00e1ln\u00e1 az X3-at, ez\u00e9rt a SkyPlanner csapata az \u00d6n be\u00e1ll\u00edt\u00e1saihoz igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja. Az \u00d6n Sage X3-partnere vagy bels\u0151 fejleszt\u0151i is \u00e9p\u00edthetnek a dokument\u00e1lt SkyPlanner REST API-ra (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>). Az indul\u00e1shoz el\u00e9g egy API-kulcs.<\/p>\n\n\n<p>Az MRP, a term\u00e9kek, a darabjegyz\u00e9kek, a technol\u00f3giai \u00fatvonalak, a beszerz\u00e9s \u00e9s a k\u00e9szlet kezel\u00e9se tov\u00e1bbra is az X3-ban marad.<\/p>\n\n\n<p>Kezdje CSV-importtal a 30 napos ingyenes pr\u00f3baid\u0151szakot. A havid\u00edj 199 \u20ac-t\u00f3l indul, \u00e9s 5 munka\u00e1llom\u00e1st tartalmaz. Az integr\u00e1ci\u00f3ra a folyamataihoz \u00e9s ig\u00e9nyeihez igazod\u00f3 el\u0151zetes \u00e1raj\u00e1nlatot adunk a v\u00e1lasztott csomaggal egy\u00fctt, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n\n\n<p>Tekintse meg a <a href=\"\/hu\/integraciok\/erp\/sage-x3\/\">SkyPlanner APS Sage X3-hoz k\u00e9sz\u00fclt megold\u00e1s\u00e1t<\/a>, az adatok megfeleltet\u00e9s\u00e9t bemutat\u00f3 <a href=\"\/hu\/integraciok\/erp\/sage-x3\/integracios-utmutato\/\">Sage X3 integr\u00e1ci\u00f3s \u00fatmutat\u00f3t<\/a>, a <a href=\"\/hu\/funkciok\/\">funkci\u00f3kat<\/a> \u00e9s az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3szekr\u00e9ny-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatok helyett m\u00e1r val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1sra \u00e9p\u00fcl a gy\u00e1rt\u00e1stervez\u00e9s\u00fcnk.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3szekr\u00e9nyek \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9sen hetente 2 munka\u00f3r\u00e1t takar\u00edtanak meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1ba \u00f6lt\u00f6z\u00f6tt g\u00e9pkezel\u0151k egy palackt\u00f6lt\u0151 sor mellett a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napra optimaliz\u00e1lt terv pedig kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations gy\u00e1rt\u00e1svezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra<\/b><span>el\u0151re l\u00e1tja az \u00e9rt\u00e9kes\u00edt\u00e9s a szabad kapacit\u00e1st<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner megb\u00edzhat\u00f3 alapot teremt a teljes gy\u00e1rt\u00e1stervez\u00e9shez.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gy\u00e1rt\u00e1svezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerrel \u00e9rintkez\u00e9sre alkalmas csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st. Az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1ra vonatkoz\u00f3 k\u00e9r\u00e9sekre m\u00e1sodpercek alatt v\u00e1laszt kapnak a kor\u00e1bbi egy \u00f3ra vagy m\u00e9g hosszabb v\u00e1rakoz\u00e1s helyett.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/fredman-operations\/\">Olvassa el a Fredman Operations v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"L\u00e9gi felv\u00e9tel a Piristeel tet\u0151biztons\u00e1gi term\u00e9keket gy\u00e1rt\u00f3 kauhavai \u00fczem\u00e9r\u0151l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>a hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner l\u00e1that\u00f3v\u00e1 tette a sz\u0171k keresztmetszeteket, \u00e9s \u00e1tl\u00e1that\u00f3bb\u00e1 tette a gy\u00e1rt\u00e1s ir\u00e1ny\u00edt\u00e1s\u00e1t.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gy\u00e1rt\u00e1svezet\u0151<\/b><br>Piristeel \u00b7 Tet\u0151biztons\u00e1gi \u00e9s es\u0151v\u00edz-elvezet\u0151 rendszerek<\/p>\n\n\n<p class=\"ind-cust__result\">Id\u00e9n a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya el\u00e9rte a 99,2%-ot, az \u00fctemez\u00e9ssel pedig naponta ak\u00e1r n\u00e9gy munka\u00f3r\u00e1t takar\u00edtanak meg.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/piristeel\/\">Olvassa el a Piristeel v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A Sage X3 v\u00e9ges vagy v\u00e9gtelen kapacit\u00e1ssal \u00fctemez?<\/summary>\n<p class=\"sp-faq__a\">Az alapterm\u00e9k korl\u00e1tlan kapacit\u00e1ssal dolgozik. A Scheduling (FUNMAUTJ) minden gy\u00e1rt\u00e1si rendel\u00e9s d\u00e1tumait a technol\u00f3giai \u00fatvonal alapj\u00e1n hat\u00e1rozza meg, an\u00e9lk\u00fcl, hogy az er\u0151forr\u00e1sok terhel\u00e9se szerint id\u0151ben eltoln\u00e1 a rendel\u00e9seket. A Loads (CONSMWK) megmutatja a t\u00falterhel\u00e9st, amelyet a tervez\u0151 k\u00e9zzel old fel. A termel\u00e9s\u00fctemez\u00e9shez Production Scheduler vagy a GFS interf\u00e9szen kereszt\u00fcl csatlakoztatott \u00fctemez\u0151 sz\u00fcks\u00e9ges.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Megv\u00e1s\u00e1rolhat\u00f3 m\u00e9g a Sage X3 Production Scheduler?<\/summary>\n<p class=\"sp-faq__a\">A V12 s\u00fag\u00f3ja szerint csak helyben telep\u00edtett X3-hoz. A V11 s\u00fag\u00f3ja azt \u00edrja, hogy \u00faj telep\u00edt\u00e9sekhez nem \u00e9rhet\u0151 el, ez\u00e9rt az aktu\u00e1lis k\u00edn\u00e1latr\u00f3l a Sage-partnere tud biztos t\u00e1j\u00e9koztat\u00e1st adni. A felh\u0151alap\u00fa Sage X3 eset\u00e9n az \u00e1ltal\u00e1nos Finite scheduler interf\u00e9sz haszn\u00e1lata a dokument\u00e1lt megold\u00e1s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mi a k\u00fcl\u00f6nbs\u00e9g a Production Scheduler \u00e9s a Sage X3 Web Scheduling k\u00f6z\u00f6tt?<\/summary>\n<p class=\"sp-faq__a\">A Production Scheduler a be\u00e9p\u00edtett, helyben telep\u00edtett Gantt-\u00fctemez\u0151, amelyet a POPS aktivit\u00e1sk\u00f3ddal lehet aktiv\u00e1lni. A Web Scheduling k\u00fcl\u00f6n Sage-kieg\u00e9sz\u00edt\u0151, amely az \u00e1ltal\u00e1nos Finite scheduler interf\u00e9szen (GFS) kereszt\u00fcl m\u0171k\u00f6dik, felh\u0151alap\u00fa \u00e9s helyben telep\u00edtett X3-mal egyar\u00e1nt. A Web Scheduling 2023.3.4 verzi\u00f3j\u00e1ban jelent meg a GraphQL-integr\u00e1ci\u00f3, amelyhez Sage X3 2024 R1 sz\u00fcks\u00e9ges.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u0171k\u00f6dik a SkyPlanner APS a Sage X3-mal?<\/summary>\n<p class=\"sp-faq__a\">Igen. A SkyPlanner k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t biztos\u00edt a Sage X3-mal, felh\u0151alap\u00fa \u00e9s helyben telep\u00edtett X3 eset\u00e9n is. A gy\u00e1rt\u00e1si rendel\u00e9sek, a technol\u00f3giai \u00fatvonalak \u00e9s a munka\u00e1llom\u00e1sok adatai a SkyPlannerbe \u00e9rkeznek, a tervezett d\u00e1tumok \u00e9s a gy\u00e1rt\u00e1si visszajelent\u00e9sek pedig visszaker\u00fclnek az X3-ba. Kezdje az <a href=\"\/hu\/proba\/\">ingyenes pr\u00f3b\u00e1t<\/a> CSV-exportokkal; a SkyPlanner csapata a bevezet\u00e9s sor\u00e1n \u00e1ll\u00edtja be az integr\u00e1ci\u00f3t.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u00c1t kell alak\u00edtanom a munka\u00e1llom\u00e1sok modellj\u00e9t a termel\u00e9s\u00fctemez\u00e9shez?<\/summary>\n<p class=\"sp-faq__a\">Az \u00e1ltal\u00e1nos Finite scheduler advanced interface haszn\u00e1lat\u00e1hoz igen. A Sage minden munka\u00e1llom\u00e1sn\u00e1l megk\u00f6veteli a No. of resources = 1 be\u00e1ll\u00edt\u00e1st, \u00edgy elv\u00e9sz az az inform\u00e1ci\u00f3, hogy egy m\u0171velethez t\u00f6bbf\u0151s csapatra van sz\u00fcks\u00e9g. A SkyPlanner eset\u00e9ben nincs sz\u00fcks\u00e9g \u00e1talak\u00edt\u00e1sra. Egy munka\u00e1llom\u00e1son egyszerre t\u00f6bb g\u00e9pkezel\u0151 is dolgozhat, a p\u00e1rhuzamosan m\u0171k\u00f6d\u0151 g\u00e9pek munka\u00e1llom\u00e1s-csoportot alkotnak, az X3-ban r\u00f6gz\u00edtett munka\u00e1llom\u00e1sok pedig v\u00e1ltozatlanok maradnak.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>A Sage X3 \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy cs\u00f6kkenjen az \u00e1t\u00e1ll\u00e1si id\u0151?<\/summary>\n<p class=\"sp-faq__a\">Az alap\u00fctemez\u00e9s nem, a Production Scheduler pedig jelenleg nem el\u00e9rhet\u0151 funkci\u00f3k\u00e9nt t\u00fcnteti fel az \u00e1t\u00e1ll\u00e1si m\u00e1trix alapj\u00e1n v\u00e9gzett optimaliz\u00e1l\u00e1st. A SkyPlanner \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixa minden term\u00e9kp\u00e1rhoz mindk\u00e9t ir\u00e1nyban t\u00e1rolja az \u00e1t\u00e1ll\u00e1si id\u0151t, az \u00fctemez\u0151motor pedig \u00fagy rendezi sorba a gy\u00e1rt\u00e1si feladatokat, hogy az \u00f6sszes \u00e1t\u00e1ll\u00e1si id\u0151 a lehet\u0151 legr\u00f6videbb legyen.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Sage X3 T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS A Sage X3 alapfunkci\u00f3k\u00e9nt nem veszi figyelembe a g\u00e9pek \u00e9s dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1t a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9sekor. Ezt a hi\u00e1nyt p\u00f3tolja a SkyPlanner APS termel\u00e9s\u00fctemez\u00e9se. Az X3 az MRP-vel tervezi az anyagsz\u00fcks\u00e9gletet, a Scheduling (FUNMAUTJ) funkci\u00f3val pedig &#8230; <a title=\"T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/\" aria-label=\"Read more about T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100918,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101365","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Van termel\u00e9s\u00fctemez\u00e9s a Sage X3-ban?<\/title>\n<meta name=\"description\" content=\"A Sage X3 alapb\u00f3l korl\u00e1tlan kapacit\u00e1ssal \u00fctemez. Termel\u00e9s\u00fctemez\u00e9shez Production Scheduler vagy GFS interf\u00e9sz kell. Mi m\u0171k\u00f6dik, \u00e9s mikor kell APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"A Sage X3 alapb\u00f3l korl\u00e1tlan kapacit\u00e1ssal \u00fctemez. Termel\u00e9s\u00fctemez\u00e9shez Production Scheduler vagy GFS interf\u00e9sz kell. Mi m\u0171k\u00f6dik, \u00e9s mikor kell APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"23 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-x3\\\/termelesutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-x3\\\/termelesutemezes\\\/\",\"name\":\"Van termel\u00e9s\u00fctemez\u00e9s a Sage X3-ban?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"A Sage X3 alapb\u00f3l korl\u00e1tlan kapacit\u00e1ssal \u00fctemez. Termel\u00e9s\u00fctemez\u00e9shez Production Scheduler vagy GFS interf\u00e9sz kell. Mi m\u0171k\u00f6dik, \u00e9s mikor kell APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-x3\\\/termelesutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-x3\\\/termelesutemezes\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-x3\\\/termelesutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS a Sage X3 mell\u00e9: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sage-x3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Van termel\u00e9s\u00fctemez\u00e9s a Sage X3-ban?","description":"A Sage X3 alapb\u00f3l korl\u00e1tlan kapacit\u00e1ssal \u00fctemez. Termel\u00e9s\u00fctemez\u00e9shez Production Scheduler vagy GFS interf\u00e9sz kell. Mi m\u0171k\u00f6dik, \u00e9s mikor kell APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS","og_description":"A Sage X3 alapb\u00f3l korl\u00e1tlan kapacit\u00e1ssal \u00fctemez. Termel\u00e9s\u00fctemez\u00e9shez Production Scheduler vagy GFS interf\u00e9sz kell. Mi m\u0171k\u00f6dik, \u00e9s mikor kell APS?","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"23 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/","name":"Van termel\u00e9s\u00fctemez\u00e9s a Sage X3-ban?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"A Sage X3 alapb\u00f3l korl\u00e1tlan kapacit\u00e1ssal \u00fctemez. Termel\u00e9s\u00fctemez\u00e9shez Production Scheduler vagy GFS interf\u00e9sz kell. Mi m\u0171k\u00f6dik, \u00e9s mikor kell APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/termelesutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS a Sage X3 mell\u00e9: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sage-x3\/"},{"@type":"ListItem","position":5,"name":"T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Sage X3 T\u00e1mogatja a Sage X3 a termel\u00e9s\u00fctemez\u00e9st? MRP, terhel\u00e9sek, termel\u00e9s\u00fctemez\u0151k \u00e9s SkyPlanner APS A Sage X3 alapfunkci\u00f3k\u00e9nt nem veszi figyelembe a g\u00e9pek \u00e9s dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1t a gy\u00e1rt\u00e1si rendel\u00e9sek \u00fctemez\u00e9sekor. Ezt a hi\u00e1nyt p\u00f3tolja a SkyPlanner APS termel\u00e9s\u00fctemez\u00e9se. Az X3 az MRP-vel tervezi az anyagsz\u00fcks\u00e9gletet, a Scheduling (FUNMAUTJ) funkci\u00f3val pedig&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=101365"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101365\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100918"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=101365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}