{"id":101335,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101335"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/","title":{"rendered":"Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">\u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez az \u00fatmutat\u00f3 az Infor CloudSuite Industrial (CSI, kor\u00e1bban SyteLine) partnereinek \u00e9s informatikai csapatainak mutatja be, hogyan kapcsolhat\u00f3 \u00f6ssze a CSI a SkyPlanner APS rendszerrel. A SkyPlanner \u00e9s a CSI k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3 m\u0171k\u00f6dik az Infor OS-en kereszt\u00fcl:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A gy\u00e1rt\u00e1si feladatok, m\u0171veletek, er\u0151forr\u00e1sok, k\u00e9szletek \u00e9s beszerz\u00e9si rendel\u00e9sek adatai a SkyPlannerbe \u00e9rkeznek.<\/li>\n\n\n<li>A m\u0171veletek tervezett id\u0151pontjai visszaker\u00fclnek a CSI gy\u00e1rt\u00e1si feladataihoz.<\/li>\n\n\n<li>A g\u00e9pkezel\u0151k munkaid\u0151adatai gy\u00e1rt\u00e1si tranzakci\u00f3k\u00e9nt ker\u00fclnek vissza a CSI-ba k\u00f6nyvel\u00e9sre.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1j\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n CSI-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Ez az \u00fatmutat\u00f3 azoknak a partnereknek \u00e9s fejleszt\u0151knek sz\u00f3l, akik r\u00e9szt szeretn\u00e9nek venni a munk\u00e1ban, vagy \u00f6n\u00e1ll\u00f3an fejleszten\u00e9nek a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra \u00e9p\u00edtve.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-shapes-every-csi-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A CSI-integr\u00e1ci\u00f3k k\u00f6z\u00f6s alapjai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner a felh\u0151ben fut, ez\u00e9rt a CSI-ba nem kell SkyPlanner-szoftvert telep\u00edteni. T\u00f6bb-b\u00e9rl\u0151s CSI-k\u00f6rnyezetben az integr\u00e1ci\u00f3k az Infor OS-en kereszt\u00fcl, az al\u00e1bbi k\u00e9t m\u00f3d egyik\u00e9n m\u0171k\u00f6dnek:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mongoose IDO REST API az ION API Gateway \u00e1tj\u00e1r\u00f3n kereszt\u00fcl.<\/strong> A CSI \u00fczleti objektumai a Mongoose keretrendszerre \u00e9p\u00fcl\u0151 IDO-k (Intelligent Data Objects). A REST szolg\u00e1ltat\u00e1s az <code>IDORequestService<\/code> alatt \u00e9rhet\u0151 el, \u00e9s az Infor az ION API-katal\u00f3gus\u00e1ban teszi k\u00f6zz\u00e9. A REST 1-es verzi\u00f3ja a <code>LoadCollection<\/code>, <code>AddItem(s)<\/code>, <code>UpdateItem(s)<\/code>, <code>DeleteItem(s)<\/code>, <code>InvokeMethod<\/code>, <code>IDOInfo<\/code> \u00e9s <code>FireAESEvent<\/code> h\u00edv\u00e1sokat k\u00edn\u00e1lja, XML- vagy JSON-v\u00e1laszokkal. A REST 2-es verzi\u00f3j\u00e1hoz is tartozik v\u00e9gpontk\u00e9szlet.<\/li>\n\n\n<li><strong>ION BOD-ok (Business Object Documents)<\/strong>, amelyeket az ION kapcsol\u00f3d\u00e1si pontokon kereszt\u00fcl tov\u00e1bb\u00edt. A CSI kimen\u0151 <code>Sync<\/code> BOD-okat tesz k\u00f6zz\u00e9 a <code>ProductionOrder<\/code>, <code>ItemMaster<\/code> \u00e9s <code>PurchaseOrder<\/code> objektumokhoz, valamint k\u00e9szletdokumentumokat is, p\u00e9ld\u00e1ul <code>InventoryAdjustment<\/code>, <code>InventoryCount<\/code> \u00e9s <code>InventoryHold<\/code> dokumentumokat.<\/li>\n\n<\/ol>\n\n\n<p>A 2026.10 verzi\u00f3 kimen\u0151 BOD-list\u00e1j\u00e1n nincs darabjegyz\u00e9khez, technol\u00f3giai \u00fatvonalhoz vagy munkak\u00f6zponthoz tartoz\u00f3 elem. Ez\u00e9rt az \u00fctemez\u00e9si integr\u00e1ci\u00f3 els\u0151sorban IDO-kra \u00e9p\u00fcl; a BOD-ok opcion\u00e1lisan jelezhetik a gy\u00e1rt\u00e1si feladatok v\u00e1ltoz\u00e1sait.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s \u00e9s licencel\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az \u00e1tj\u00e1r\u00f3n kereszt\u00fcl a CSI az ION API \u00e1ltal kiadott OAuth 2.0 bearer tokeneket haszn\u00e1lja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Hozzon l\u00e9tre egy <strong>Backend Service<\/strong> alkalmaz\u00e1st az ION API-ban, \u00e9s t\u00f6ltse le a hozz\u00e1 tartoz\u00f3 <code>.ionapi<\/code> f\u00e1jlt. Ez tartalmazza a kliens hiteles\u00edt\u0151 adatait \u00e9s a szolg\u00e1ltat\u00e1sfi\u00f3k kulcsait (<code>saak<\/code>, <code>sask<\/code>). Ezek n\u00e9lk\u00fcl a tokenlek\u00e9r\u00e9sek sikertelenek lesznek.<\/li>\n\n\n<li>Minden ION-on kereszt\u00fcl ind\u00edtott h\u00edv\u00e1sban k\u00fcldje el az <code>X-Infor-MongooseConfig<\/code> fejl\u00e9cet. Ez adja meg a megc\u00e9lzott CSI-konfigur\u00e1ci\u00f3t (telephelyet).<\/li>\n\n\n<li>Minden k\u00f6rnyezethez k\u00fcl\u00f6n <code>.ionapi<\/code> f\u00e1jlt tartson fenn. Az \u00e9les k\u00f6rnyezet f\u00e1jlj\u00e1val nem lehet hiteles\u00edteni a sandbox b\u00e9rl\u0151ben.<\/li>\n\n<\/ul>\n\n\n<p>A helyben telep\u00edtett SyteLine ugyanezt az IDO-alap\u00fa megold\u00e1st haszn\u00e1lja. A Mongoose dokument\u00e1ci\u00f3ja ismerteti az IDO REST API k\u00f6zvetlen h\u00edv\u00e1s\u00e1t a <code>GetSecurityToken<\/code> \u00e1ltal kiadott biztons\u00e1gi tokennel, az ION API Gateway haszn\u00e1lata n\u00e9lk\u00fcl.<\/p>\n\n\n<p>Az IDO-r\u00e9tegen kereszt\u00fcl csatlakoz\u00f3 k\u00fcls\u0151 alkalmaz\u00e1sok az <strong>Automation<\/strong> licencmodult haszn\u00e1lj\u00e1k, amelyhez mindig IDO munkamenett\u00edpus tartozik. Az Infor saj\u00e1t alkalmaz\u00e1saihoz, p\u00e9ld\u00e1ul az APS-hez nem kell k\u00fcl\u00f6n ilyen licenc. A SkyPlanner-kapcsolathoz egy ilyen licenc sz\u00fcks\u00e9ges, valamint ION API-hozz\u00e1f\u00e9r\u00e9s az \u00d6n b\u00e9rl\u0151i k\u00f6rnyezet\u00e9ben.<\/p>\n\n\n<p>A SkyPlanner oldal\u00e1n a REST API rendel\u00e9sek, term\u00e9kek, anyagok, m\u0171veletek, beszerz\u00e9si rendel\u00e9sek \u00e9s id\u0151napl\u00f3k olvas\u00e1s\u00e1t \u00e9s \u00edr\u00e1s\u00e1t teszi lehet\u0151v\u00e9. A hiteles\u00edt\u00e9s az Authorization-Token fejl\u00e9cben k\u00fcld\u00f6tt API-tokennel t\u00f6rt\u00e9nik. A dokument\u00e1ci\u00f3 Swagger\/OpenAPI form\u00e1tumban \u00e9rhet\u0151 el (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>); l\u00e1sd m\u00e9g a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner dokument\u00e1ci\u00f3j\u00e1t<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-bod-triggers-aes-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">V\u00e1ltoz\u00e1sok \u00e9szlel\u00e9se: BOD-esem\u00e9nyind\u00edt\u00f3k, AES \u00e9s rendszeres lek\u00e9rdez\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A v\u00e1ltoz\u00e1sok ION BOD-okk\u00e9nt jutnak ki a CSI-b\u00f3l; az \u00fctemez\u00e9s szempontj\u00e1b\u00f3l a <code>ProductionOrder<\/code> BOD a l\u00e9nyeges. Ezt a <strong>Replication Document Outbound Cross References<\/strong> \u0171rlapon, k\u00f6zz\u00e9t\u00e9teli defin\u00edci\u00f3kkal \u00e1ll\u00edthatja be:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Kiv\u00e1lt\u00f3 elj\u00e1r\u00e1s<\/th><th>K\u00f6zz\u00e9tett adatok<\/th><\/tr><\/thead><tbody><tr><td><code>TriggerProductionOrderSyncSp<\/code><\/td><td>Minden gy\u00e1rt\u00e1si rendel\u00e9s, csak el\u0151t\u00e9rben futtatva<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSyncSp<\/code><\/td><td>A frissen \u00fctemezett rendel\u00e9sek; h\u00e1tt\u00e9rfeladatk\u00e9nt is futtathat\u00f3<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSchSyncSp<\/code><\/td><td>A m\u00f3dosult gy\u00e1rt\u00e1si rendel\u00e9sek; h\u00e1tt\u00e9rfeladatk\u00e9nt is futtathat\u00f3<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az Infor p\u00e9ld\u00e1i a gy\u00e1rt\u00e1si feladat \u00e1llapota szerint sz\u0171rnek: \u00fctemez\u00e9si v\u00e1ltoz\u00e1sokn\u00e1l <code>'Firm'<\/code>, anyag- \u00e9s munkaid\u0151-v\u00e1ltoz\u00e1sokn\u00e1l opcion\u00e1lisan <code>'Released'<\/code> \u00e1llapotra. Emellett csak azokat a rekordokat v\u00e1lasztj\u00e1k ki, amelyek <code>RecordDate<\/code> \u00e9rt\u00e9ke k\u00e9s\u0151bbi a h\u00e1tt\u00e9rfeladat legut\u00f3bbi k\u00e9zi k\u00f6zz\u00e9t\u00e9tel\u00e9nek d\u00e1tum\u00e1n\u00e1l.<\/p>\n\n\n<p>A Mongoose <strong>Application Event System (AES)<\/strong> rendszere esem\u00e9nym\u0171veleteket is futtathat, a REST API pedig el\u00e9rhet\u0151v\u00e9 teszi a <code>FireAESEvent<\/code> h\u00edv\u00e1st. Az alapmegold\u00e1s az IDO-k id\u0151szakos lek\u00e9rdez\u00e9se: n\u00e9h\u00e1ny percenk\u00e9nt <code>LoadCollection<\/code> h\u00edv\u00e1s az <code>SLJobs<\/code> \u00e9s <code>SLJobRoutes<\/code> objektumokon, a rekord d\u00e1tum\u00e1ra sz\u0171rve. Ezt a <code>ProductionOrder<\/code> BOD eg\u00e9sz\u00edti ki ott, ahol a telephely k\u00f6zvetlen \u00e9rtes\u00edt\u00e9st k\u00e9r a v\u00e1ltoz\u00e1sokr\u00f3l.<\/p>\n\n\n<p>Az ellenkez\u0151 ir\u00e1nyban a SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait, \u00e9s mindegyik elind\u00edtja a CSI-ba t\u00f6rt\u00e9n\u0151 vissza\u00edr\u00e1st.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az al\u00e1bbi nevek a standard IDO-kat jel\u00f6lik. Az IDO-kat kib\u0151v\u00edt\u0151 b\u00e9rl\u0151i k\u00f6rnyezetekben ugyanezek az objektumok maradnak meg, tov\u00e1bbi tulajdons\u00e1gokkal kieg\u00e9sz\u00edtve. Ezek megfeleltet\u00e9s\u00e9t a SkyPlanner csapata v\u00e9gzi el a bevezet\u00e9s sor\u00e1n.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>CSI-objektum (IDO \/ BOD \/ \u0171rlap)<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td>Cikkek (<code>SLItems<\/code>), <code>Sync ItemMaster<\/code> BOD<\/td><td>Term\u00e9kek \u00e9s anyagok<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd BOD vagy a napi v\u00e1ltoz\u00e1sok \u00e1tvitele<\/td><\/tr><tr><td>A cikk technol\u00f3giai \u00fatvonala (<code>SLItemRoutes<\/code>)<\/td><td>M\u0171veletek az el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s megmunk\u00e1l\u00e1si id\u0151kkel<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td>El\u0151k\u00e9sz\u00edt\u00e9si er\u0151forr\u00e1scsoportok \u00e9s el\u0151k\u00e9sz\u00edt\u00e9si keres\u0151t\u00e1bl\u00e1k<\/td><td>El\u0151k\u00e9sz\u00edt\u00e9si id\u0151m\u00e1trix (a term\u00e9kek k\u00f6z\u00f6tti, sorrendt\u0151l f\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sok)<\/td><td>CSI \u2192 SkyPlanner, ut\u00e1na a SkyPlanner a m\u00e9rvad\u00f3 rendszer<\/td><td>Kezdeti bet\u00f6lt\u00e9s<\/td><\/tr><tr><td>Cikk-BOM, a gy\u00e1rt\u00e1si feladat anyagai (<code>SLJobmatls<\/code>)<\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek, gy\u00e1rt\u00e1si feladatonk\u00e9nti anyagsz\u00fcks\u00e9glet<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd minden gy\u00e1rt\u00e1si feladattal<\/td><\/tr><tr><td>Er\u0151forr\u00e1scsoportok \u00e9s er\u0151forr\u00e1sok (a csoporttagok sorrendj\u00e9vel)<\/td><td>Munka\u00e1llom\u00e1s-csoportok, munka\u00e1llom\u00e1sok, alternat\u00edv munka\u00e1llom\u00e1sok<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, ut\u00e1na ritk\u00e1n<\/td><\/tr><tr><td>M\u0171veletenk\u00e9nti szersz\u00e1mok \u00e9s l\u00e9tsz\u00e1m<\/td><td>Szersz\u00e1mok mint korl\u00e1tozottan rendelkez\u00e9sre \u00e1ll\u00f3 k\u00f6z\u00f6s er\u0151forr\u00e1sok, kezel\u0151k sz\u00e1ma munka\u00e1llom\u00e1sonk\u00e9nt<\/td><td>A SkyPlannerben karbantartva<\/td><td>Be\u00e1ll\u00edt\u00e1s a bevezet\u00e9s sor\u00e1n<\/td><\/tr><tr><td>Munka\u00e1llom\u00e1sok (<code>SLWcs<\/code>)<\/td><td>Nem \u00fctemez\u00e9si objektum; csak a k\u00f6lts\u00e9gadatok miatt tartsa meg<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Opcion\u00e1lis<\/td><\/tr><tr><td>M\u0171szakok \u00e9s munkasz\u00fcneti napok<\/td><td>M\u0171szakok \u00e9s t\u00e1voll\u00e9tek<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Hetente, vagy a SkyPlanner a m\u00e9rvad\u00f3 rendszer<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si rendel\u00e9sek (<code>SLJobs<\/code>), <code>Sync ProductionOrder<\/code> BOD<\/td><td>Rendel\u00e9sek hat\u00e1rid\u0151vel \u00e9s priorit\u00e1ssal<\/td><td>CSI \u2192 SkyPlanner<\/td><td>BOD-esem\u00e9nyre vagy n\u00e9h\u00e1ny percenk\u00e9nti lek\u00e9rdez\u00e9ssel<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si feladat m\u0171veletei (<code>SLJobRoutes<\/code>)<\/td><td>Gy\u00e1rt\u00e1si feladatok m\u0171veletenk\u00e9nt, er\u0151forr\u00e1scsoport minden m\u0171velethez<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Minden gy\u00e1rt\u00e1si feladattal<\/td><\/tr><tr><td>Vev\u0151i rendel\u00e9si sorok (<code>SLCoItems<\/code>), vev\u0151k (<code>SLCustomers<\/code>)<\/td><td>Vev\u0151i hat\u00e1rid\u0151k \u00e9s vev\u0151i priorit\u00e1s<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Id\u0151szakos lek\u00e9rdez\u00e9s<\/td><\/tr><tr><td>Cikkek rakt\u00e1rk\u00e9szlete, k\u00e9szlet-BOD-ok<\/td><td>K\u00e9szlet (k\u00e9szletegyenlegek)<\/td><td>CSI \u2192 SkyPlanner<\/td><td>\u00d3r\u00e1nk\u00e9nt vagy minden \u00fctemez\u00e9si fut\u00e1s el\u0151tt<\/td><\/tr><tr><td>Beszerz\u00e9si rendel\u00e9sek (nyitott rendel\u00e9si sorok), <code>Sync PurchaseOrder<\/code> BOD<\/td><td>Beszerz\u00e9si rendel\u00e9sek \u00e9s be\u00e9rkez\u0151 anyagok a v\u00e1rhat\u00f3 sz\u00e1ll\u00edt\u00e1si d\u00e1tummal<\/td><td>CSI \u2192 SkyPlanner<\/td><td>\u00d3r\u00e1nk\u00e9nt vagy BOD \u00e9rkez\u00e9sekor, minden \u00fctemez\u00e9si fut\u00e1s el\u0151tt<\/td><\/tr><tr><td>A gy\u00e1rt\u00e1si feladat m\u0171veleti \u00fctemterve (m\u0171veletenk\u00e9nti kezd\u00e9s \u00e9s befejez\u00e9s), valamint a feladat Start \u00e9s End d\u00e1tuma az <code>SLJobs<\/code> objektumon, <code>UpdateItems<\/code> h\u00edv\u00e1ssal<\/td><td>Tervezett kezd\u00e9s \u00e9s befejez\u00e9s m\u0171veletenk\u00e9nt<\/td><td>SkyPlanner \u2192 CSI<\/td><td>Minden \u00fctemtervv\u00e1ltoz\u00e1skor, SkyPlanner-webhook hat\u00e1s\u00e1ra<\/td><\/tr><tr><td>Nem k\u00f6nyvelt gy\u00e1rt\u00e1si tranzakci\u00f3k (<code>SLJobtrans<\/code>) <code>AddItems<\/code> h\u00edv\u00e1ssal, dolgoz\u00f3k (<code>SLEmployees<\/code>), okok (<code>SLReasons<\/code>)<\/td><td>Id\u0151napl\u00f3k, megfelel\u0151 min\u0151s\u00e9g\u0171 term\u00e9kek mennyis\u00e9ge \u00e9s selejtmennyis\u00e9g, okk\u00f3dok<\/td><td>SkyPlanner \u2192 CSI<\/td><td>Visszajelent\u00e9senk\u00e9nt<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. A t\u00f6rzsadatok kezdeti bet\u00f6lt\u00e9se.<\/strong> Olvassa be a cikkeket, a cikkek technol\u00f3giai \u00fatvonalait, a BOM-okat, az er\u0151forr\u00e1scsoportokat, az er\u0151forr\u00e1sokat \u00e9s a m\u0171szakokat a <code>LoadCollection<\/code> h\u00edv\u00e1ssal. A SkyPlanner munka\u00e1llom\u00e1sait er\u0151forr\u00e1sokb\u00f3l \u00e9s er\u0151forr\u00e1scsoportokb\u00f3l alak\u00edtsa ki, ne a CSI munka\u00e1llom\u00e1saib\u00f3l. Az Infor egy\u00e9rtelm\u0171en fogalmaz: a munka\u00e1llom\u00e1s \u201ecaptures costs only and does not affect the actual planning or scheduling.\u201d (Csak a k\u00f6lts\u00e9geket r\u00f6gz\u00edti, a t\u00e9nyleges tervez\u00e9st vagy \u00fctemez\u00e9st nem befoly\u00e1solja.)<\/p>\n\n\n<p><strong>2. Rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> A v\u00e9gleges\u00edtett \u00e9s kiadott gy\u00e1rt\u00e1si rendel\u00e9seket k\u00fcldje \u00e1t a hozz\u00e1juk tartoz\u00f3 m\u0171veletekkel \u00e9s anyagokkal egy\u00fctt. Az APS tervezett rendel\u00e9sei maradjanak a CSI-ban. Az APS Planning minden fut\u00e1skor t\u00f6rli \u00e9s \u00fajragener\u00e1lja a terv\u00e9t, \u00edgy a tervezett rendel\u00e9seknek nincs olyan \u00e1lland\u00f3 azonos\u00edt\u00f3juk, amelyre az \u00fctemez\u00e9s \u00e9p\u00fclhetne. El\u0151sz\u00f6r a <strong>Planning Detail<\/strong> fel\u00fcleten v\u00e9gleges\u00edtse \u0151ket gy\u00e1rt\u00e1si feladatt\u00e1.<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Az \u00edr\u00e1st a SkyPlanner \u00fctemtervhez tartoz\u00f3 webhookja ind\u00edtja. Az integr\u00e1ci\u00f3 a SkyPlanner REST API-b\u00f3l olvassa ki az egyes m\u0171veletek \u00faj tervezett kezd\u00e9s\u00e9t \u00e9s befejez\u00e9s\u00e9t. Ezeket az <code>UpdateItems<\/code> h\u00edv\u00e1ssal \u00edrja be a gy\u00e1rt\u00e1si feladat m\u0171veleti \u00fctemterv\u00e9be; a kulcsot a feladat, az ut\u00f3tag \u00e9s a m\u0171veletsz\u00e1m adja. Ezek ugyanazok a m\u0171veleti d\u00e1tumok, amelyeket a Scheduler \u00e1ll\u00edt be \u00e9s a Resource Gantt m\u00f3dos\u00edt; az <code>SLJobs<\/code> objektumon a feladat Start \u00e9s End d\u00e1tuma is k\u00f6veti \u0151ket.<\/p>\n\n\n<p>Egyes telephelyeken v\u00e9dik az \u00fctemez\u00e9si mez\u0151ket, vagy minden v\u00e1ltoztat\u00e1skor CSI-oldali logik\u00e1t k\u00edv\u00e1nnak futtatni. Ilyenkor az \u00edr\u00e1s egy egyedi IDO-met\u00f3duson kereszt\u00fcl t\u00f6rt\u00e9nik, amelyet az <code>InvokeMethod<\/code> h\u00edv meg. A met\u00f3dus ugyanazt a friss\u00edt\u00e9st v\u00e9gzi el, a CSI saj\u00e1t \u00e9rv\u00e9nyes\u00edt\u00e9si szab\u00e1lyai szerint.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A kezel\u0151k telefonon vagy t\u00e1blag\u00e9pen r\u00f6gz\u00edtik az id\u0151ket \u00e9s a mennyis\u00e9geket (Mobile Confirmations, Production Timer, Quick Log Mode). Minden lez\u00e1rt id\u0151napl\u00f3b\u00f3l egy nem k\u00f6nyvelt <code>SLJobtrans<\/code> sor j\u00f6n l\u00e9tre az <code>AddItems<\/code> h\u00edv\u00e1ssal. Ez tartalmazza a gy\u00e1rt\u00e1si feladatot, az ut\u00f3tagot, a m\u0171veletet, a dolgoz\u00f3t, az \u00f3rasz\u00e1mot, valamint a megfelel\u0151 min\u0151s\u00e9g\u0171 term\u00e9kek mennyis\u00e9g\u00e9t \u00e9s a selejtmennyis\u00e9get. A CSI Job Labor Transaction Posting funkci\u00f3ja ezut\u00e1n az \u00d6n \u00e1ltal v\u00e1lasztott gyakoris\u00e1ggal k\u00f6nyveli a munkak\u00f6lts\u00e9get \u00e9s az \u00e1ltal\u00e1nos k\u00f6lts\u00e9get a feladat befejezetlen termel\u00e9s\u00e9re.<\/p>\n\n\n<p><strong>5. Adatgazd\u00e1k, \u00fajrapr\u00f3b\u00e1lkoz\u00e1sok \u00e9s \u00fctk\u00f6z\u00e9skezel\u00e9si szab\u00e1lyok.<\/strong><\/p>\n\n\n<p>Minden rekord kulcsa a CSI saj\u00e1t azonos\u00edt\u00f3ira \u00e9p\u00fcl (gy\u00e1rt\u00e1si feladat, ut\u00f3tag, m\u0171veletsz\u00e1m, tranzakci\u00f3azonos\u00edt\u00f3), \u00edgy egy ism\u00e9telt webhook vagy lek\u00e9rdez\u00e9s ugyanazt a sort friss\u00edti, nem hoz l\u00e9tre m\u00e1solatot. A sikertelen \u00edr\u00e1sokat a rendszer \u00fajrapr\u00f3b\u00e1lja, \u00e9s a CSI hiba\u00fczenet\u00e9vel egy\u00fctt napl\u00f3zza. A CSI-ban Complete vagy History \u00e1llapot\u00fara \u00e1ll\u00edtott gy\u00e1rt\u00e1si feladat a k\u00f6vetkez\u0151 szinkroniz\u00e1l\u00e1skor kiker\u00fcl a SkyPlanner \u00fctemterv\u00e9b\u0151l, a SkyPlannerben visszavont feladatot pedig a rendszer soha nem \u00edrja vissza.<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Adatok<\/th><th>Adatgazda<\/th><\/tr><\/thead><tbody><tr><td>Cikkek, technol\u00f3giai \u00fatvonalak, darabjegyz\u00e9kek, mennyis\u00e9gek, gy\u00e1rt\u00e1si feladatok \u00e1llapota, k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1s<\/td><td>CSI<\/td><\/tr><tr><td>M\u0171veletek sorrendje, kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontok, er\u0151forr\u00e1sok hozz\u00e1rendel\u00e9se<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Hossz\u00fa t\u00e1v\u00fa anyagterv, Get CTP\/ATP<\/td><td>CSI APS, ha rendelkez\u00e9sre \u00e1ll a licenc<\/td><\/tr><tr><td>M\u0171szakok \u00e9s munkasz\u00fcneti napok<\/td><td>Egyetlen rendszer, amelyet a felm\u00e9r\u00e9s sor\u00e1n v\u00e1lasztanak ki<\/td><\/tr><tr><td>Munkaid\u0151 \u00e9s gy\u00e1rtott mennyis\u00e9g<\/td><td>A SkyPlanner id\u0151napl\u00f3ib\u00f3l ker\u00fclnek a CSI-ba<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az \u00fctk\u00f6z\u00e9sek f\u0151 forr\u00e1sai a CSI be\u00e9p\u00edtett \u00fctemez\u0151i. Az APS Planning r\u00f6gz\u00edtettnek tekinti az \u00fctemezett m\u0171veleteket, a <strong>Scheduler<\/strong> k\u00e9s\u0151bbi fut\u00e1sai azonban ism\u00e9t \u00e1thelyezhetik \u0151ket. Ez \u00e1ltal\u00e1ban napi fut\u00e1st jelent, egynapos id\u0151horizonttal. Ha bizonyos er\u0151forr\u00e1scsoportok r\u00e9szletes sorrendj\u00e9t a SkyPlanner hat\u00e1rozza meg, ezeket z\u00e1rja ki a CSI Scheduler hat\u00f3k\u00f6r\u00e9b\u0151l. Ezut\u00e1n kapcsolja ki a <strong>Shop Floor Control Parameters<\/strong> azon be\u00e1ll\u00edt\u00e1s\u00e1t, amely miatt a Scheduler a tervezett rendel\u00e9seket ig\u00e9nyk\u00e9nt kezeli. Az MRP, a rendel\u00e9sek APS-alap\u00fa tervez\u00e9se \u00e9s a Get CTP maradhat a CSI-ban. A SkyPlanner Running Time Lock funkci\u00f3ja r\u00f6gz\u00edtve tartja a megkezdett m\u0171veleteket. A SkyPlannerben az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a gy\u00e1rt\u00e1s, az \u00d6n \u00e1ltal megadott z\u00e1rol\u00e1sok \u00e9s priorit\u00e1sok betart\u00e1s\u00e1val.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A projekt jellemz\u0151 l\u00e9p\u00e9sei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s a bevezet\u00e9s megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtva \u00e1ltal\u00e1ban heteken bel\u00fcl lez\u00e1rul, m\u00e9g nagyv\u00e1llalatokn\u00e1l is. Egy CSI-projekt az al\u00e1bbiakat foglalja mag\u00e1ban:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kipr\u00f3b\u00e1l\u00e1s export\u00e1lt adatokkal.<\/strong> A CSI-ban a gy\u00e1rt\u00e1si feladatok, m\u0171veletek \u00e9s er\u0151forr\u00e1sok list\u00e1j\u00e1t export\u00e1lja a <strong>Save to Excel<\/strong> funkci\u00f3val, alak\u00edtsa az exportot CSV-v\u00e9, majd import\u00e1lja a SkyPlannerbe. Ellen\u0151rizze az \u00fctemtervet m\u00e9g az interf\u00e9sz kialak\u00edt\u00e1sa el\u0151tt.<\/li>\n\n\n<li><strong>Felm\u00e9r\u00e9s \u00e9s a t\u00f6rzsadatok megfeleltet\u00e9se.<\/strong> R\u00f6gz\u00edtse a megfeleltet\u00e9si t\u00e1bl\u00e1t, az egyes mez\u0151k adatgazd\u00e1j\u00e1t, a szinkroniz\u00e1l\u00e1s gyakoris\u00e1g\u00e1t, a k\u00f6nyvel\u00e9si csatorn\u00e1t \u00e9s a be\u00e9p\u00edtett Scheduler hat\u00f3k\u00f6r\u00e9nek sz\u0171k\u00edt\u00e9s\u00e9t.<\/li>\n\n\n<li><strong>Az Infor OS be\u00e1ll\u00edt\u00e1sa.<\/strong> Backend Service alkalmaz\u00e1s, b\u00e9rl\u0151nk\u00e9nti <code>.ionapi<\/code> f\u00e1jlok, Automation licenc \u00e9s IDO REST hozz\u00e1f\u00e9r\u00e9s. M\u00e1r a projekt elej\u00e9n k\u00e9rje az IDO REST hozz\u00e1f\u00e9r\u00e9s ki\u00e9p\u00edt\u00e9s\u00e9t az Infor Cloud t\u00e1mogat\u00e1s\u00e1t\u00f3l, mert egyes b\u00e9rl\u0151kn\u00e9l ezt k\u00fcl\u00f6n enged\u00e9lyezni kell.<\/li>\n\n\n<li><strong>Kezdeti bet\u00f6lt\u00e9s.<\/strong> Cikkek, BOM-ok, a cikkek technol\u00f3giai \u00fatvonalai, er\u0151forr\u00e1sok, er\u0151forr\u00e1scsoportok \u00e9s m\u0171szakok bet\u00f6lt\u00e9se a <code>LoadCollection<\/code> h\u00edv\u00e1ssal, tov\u00e1bb\u00e1 az el\u0151k\u00e9sz\u00edt\u00e9si id\u0151m\u00e1trix, a szersz\u00e1mok \u00e9s a l\u00e9tsz\u00e1mok be\u00e1ll\u00edt\u00e1sa a SkyPlannerben.<\/li>\n\n\n<li><strong>A gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Els\u0151k\u00e9nt a gy\u00e1rt\u00e1si feladatok, m\u0171veletek, anyagok \u00e9s nyitott beszerz\u00e9si rendel\u00e9sek id\u0151szakos IDO-lek\u00e9rdez\u00e9se, majd sz\u00fcks\u00e9g eset\u00e9n a <code>ProductionOrder<\/code> BOD-esem\u00e9ny be\u00e1ll\u00edt\u00e1sa.<\/li>\n\n\n<li><strong>Tesztel\u00e9s a jelenlegi tervvel p\u00e1rhuzamosan.<\/strong> Futtassa a SkyPlannert a megl\u00e9v\u0151 gy\u00e1rt\u00e1si feladatlista mellett, \u00e9s jav\u00edtsa a technol\u00f3giai \u00fatvonalak id\u0151adatait \u00e9s az er\u0151forr\u00e1sadatokat.<\/li>\n\n\n<li><strong>Az \u00fctemterv vissza\u00edr\u00e1sa \u00e9s az \u00fczemi visszajelent\u00e9sek.<\/strong> Ha a d\u00e1tumok \u00e9s az adatok m\u00e1r egyeznek, kapcsolja be az \u00fctemterv vissza\u00edr\u00e1s\u00e1t \u00e9s a munkaid\u0151adatok \u00e1tad\u00e1s\u00e1t az <code>SLJobtrans<\/code> objektumba.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s<\/strong> a SkyPlanner \u00e1ltal \u00fctemezett er\u0151forr\u00e1scsoportokn\u00e1l.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"csi-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">A CSI-integr\u00e1ci\u00f3 buktat\u00f3i<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A CSI munka\u00e1llom\u00e1sainak g\u00e9pk\u00e9nt val\u00f3 megfeleltet\u00e9se.<\/strong> Az <code>SLWcs<\/code> k\u00e9zenfekv\u0151 IDO-nak t\u0171nik, de kapacit\u00e1stervez\u00e9shez nem megfelel\u0151. Az \u00fctemez\u00e9s az er\u0151forr\u00e1sokra \u00e9s az er\u0151forr\u00e1scsoportokra \u00e9p\u00fcl, a csoporttagok sorrendj\u00e9t is figyelembe v\u00e9ve.<\/li>\n\n\n<li><strong>Gy\u00e1rt\u00e1si feladatokat kihagy\u00f3 vagy ism\u00e9telten tov\u00e1bb\u00edt\u00f3 BOD-sz\u0171r\u0151k.<\/strong> A <code>ProductionOrder<\/code> k\u00f6zz\u00e9t\u00e9tele a kiv\u00e1lasztott kiv\u00e1lt\u00f3 elj\u00e1r\u00e1st\u00f3l \u00e9s az \u00e1llapotsz\u0171r\u0151kt\u0151l f\u00fcgg. Ha csak a <code>'Firm'<\/code> \u00e1llapotra sz\u0171r, kimaradnak a kiadott feladatok anyag- \u00e9s munkaid\u0151-v\u00e1ltoz\u00e1sai; ha pedig hi\u00e1nyzik a legut\u00f3bbi k\u00f6zz\u00e9t\u00e9tel d\u00e1tum\u00e1ra vonatkoz\u00f3 sz\u0171r\u0151, a rendszer mindent \u00fajrak\u00fcld.<\/li>\n\n\n<li><strong>Munkaid\u0151adatok elutas\u00edt\u00e1sa vissza\u00edr\u00e1skor.<\/strong> A CSI elutas\u00edtja a munkaid\u0151adatokat, ha a gy\u00e1rt\u00e1si feladat \u00e1llapota nem Released vagy Scheduled, ha a m\u0171velet m\u00e1r befejez\u0151d\u00f6tt, vagy ha a dolgoz\u00f3 inakt\u00edv. El\u0151bb ellen\u0151rizze az adatokat, az elutas\u00edt\u00e1sokat pedig napl\u00f3zza.<\/li>\n\n\n<li><strong>Egy adatsor m\u00e9g nem k\u00f6nyvelt tranzakci\u00f3.<\/strong> Az <code>SLJobtrans<\/code> sor a Job Labor Transaction Posting futtat\u00e1s\u00e1ig nem k\u00f6nyvelt marad. A k\u00f6nyvel\u00e9s gyakoris\u00e1g\u00e1t egyeztesse a p\u00e9nz\u00fcggyel, hogy a munkaid\u0151adatok a v\u00e1rt id\u0151pontban jelenjenek meg a befejezetlen termel\u00e9sben \u00e9s a b\u00e9rsz\u00e1mfejt\u00e9sben.<\/li>\n\n\n<li><strong>K\u00e9s\u00e9sben l\u00e9v\u0151 feladatok az APS-b\u0151l.<\/strong> Az APS a hat\u00e1rid\u0151t\u0151l visszafel\u00e9 tervez, ha pedig ez nem siker\u00fcl, a mai napt\u00f3l el\u0151re; a m\u00faltba soha nem tervez. A be\u00e9rkez\u0151 kezd\u00e9si d\u00e1tumra hagyatkoz\u00e1s helyett b\u00edzza a SkyPlannerre a k\u00e9s\u0151 rendel\u00e9sek \u00fctemez\u00e9s\u00e9t a t\u00e9nyleges kapacit\u00e1s alapj\u00e1n.<\/li>\n\n\n<li><strong>A Mongoose technikai r\u00e9szletei.<\/strong> Az <code>InvokeMethod<\/code> param\u00e9ter\u00e9rt\u00e9keiben szerepl\u0151 vessz\u0151ket a <code>\\x2c<\/code> escape-szekvenci\u00e1val adja meg.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-cloudsuite-industrial-integra\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be a CloudSuite Industrial integr\u00e1ci\u00f3j\u00e1t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n be\u00e1ll\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja.<\/strong> Ez a SkyPlanner oldal\u00e1ra, valamint az \u00d6n b\u00e9rl\u0151i k\u00f6rnyezet\u00e9hez igaz\u00edtott IDO- \u00e9s BOD-interf\u00e9szre is kiterjed. A csapat karbantartja az integr\u00e1ci\u00f3t, ha v\u00e1ltoznak az er\u0151forr\u00e1scsoportok, az IDO-b\u0151v\u00edt\u00e9sek vagy a gy\u00e1rt\u00e1si feladatok \u00e1llapotai. Minden \u00fczem m\u00e1sk\u00e9nt haszn\u00e1lja a CSI-t; ezeknek a saj\u00e1toss\u00e1goknak a megfeleltet\u00e9se a csapat szakter\u00fclete.<\/li>\n\n\n<li><strong>Az \u00d6n Infor-partnere is r\u00e9szt vehet a munk\u00e1ban.<\/strong> A partner ismeri az \u00d6n IDO-b\u0151v\u00edt\u00e9seit \u00e9s ION-be\u00e1ll\u00edt\u00e1sait, a SkyPlanner Swagger\/OpenAPI dokument\u00e1ci\u00f3ja alapj\u00e1n dolgozik, \u00e9s feliratkozik a webhookokra.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek r\u00e1<\/strong> ugyanazon a tokenalap\u00fa hiteles\u00edt\u00e9st haszn\u00e1l\u00f3 REST API-n kereszt\u00fcl. Az indul\u00e1shoz elegend\u0151 egy SkyPlanner API-kulcs (<a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s \u00fatmutat\u00f3<\/a>), a SkyPlanner csapata pedig sz\u00fcks\u00e9g eset\u00e9n seg\u00edt.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"why-csi-teams-add-skyplanner-instead-of-tuning-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mi\u00e9rt v\u00e1lasztj\u00e1k a CSI-csapatok a SkyPlannert egy \u00fajabb k\u00f6tegelt fut\u00e1s finomhangol\u00e1sa helyett?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner kev\u00e9s feladatot hagy a CSI oldal\u00e1n. Beolvassa a gy\u00e1rt\u00e1si feladatokat, m\u0171veleteket, anyagokat \u00e9s er\u0151forr\u00e1sokat, \u00e9s k\u00e9t dolgot \u00edr vissza: a m\u0171veletek tervezett id\u0151pontjait \u00e9s az <code>SLJobtrans<\/code> munkaid\u0151adatait. A kett\u0151 k\u00f6z\u00f6tt elv\u00e9gzi azt az \u00fajra\u00fctemez\u00e9st, amelyet a CSI a tervez\u0151 Resource Gantt fel\u00fcleten v\u00e9gzett m\u00f3dos\u00edt\u00e1saira \u00e9s a Scheduler k\u00f6vetkez\u0151 fut\u00e1s\u00e1ra b\u00edz:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Esem\u00e9nyvez\u00e9relt \u00fctemez\u00e9s.<\/strong> Az Arcturus m\u00e1sodpercek alatt elv\u00e9gzi a termel\u00e9s\u00fctemez\u00e9st, az Autopilot pedig automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a gy\u00e1rt\u00e1s: ak\u00e1r m\u00f3dosult feladat \u00e9rkezik a CSI-b\u00f3l, ak\u00e1r egy g\u00e9pkezel\u0151 r\u00f6gz\u00edti az el\u0151rehalad\u00e1st. A webhookok ezut\u00e1n tov\u00e1bb\u00edtj\u00e1k az \u00faj id\u0151pontokat.<\/li>\n\n\n<li><strong>Munkaid\u0151r\u00f6gz\u00edt\u00e9s k\u00f6zvetlen\u00fcl a munkav\u00e9gz\u00e9s hely\u00e9n.<\/strong> A Mobile Confirmations, a Production Timer \u00e9s a Quick Log Mode a kezel\u0151k \u00e1ltal megadott adatokb\u00f3l id\u0151napl\u00f3kat k\u00e9sz\u00edt, amelyek <code>SLJobtrans<\/code> soroknak feleltethet\u0151k meg. \u00cdgy a munkaid\u0151adatok \u00fajb\u00f3li beg\u00e9pel\u00e9s n\u00e9lk\u00fcl jutnak el a CSI-ba.<\/li>\n\n\n<li><strong>Az \u00fczem val\u00f3s korl\u00e1taihoz igazodva.<\/strong> Az el\u0151k\u00e9sz\u00edt\u00e9si id\u0151m\u00e1trix a legkevesebb el\u0151k\u00e9sz\u00edt\u00e9st ig\u00e9nyl\u0151 \u00e1t\u00e1ll\u00e1si sorrendet v\u00e1lasztja ki. A szersz\u00e1mok korl\u00e1tozott kapacit\u00e1s\u00fa, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok. Egy munka\u00e1llom\u00e1son egyszerre t\u00f6bb g\u00e9pkezel\u0151 is dolgozhat, az els\u0151dleges g\u00e9p vagy munkat\u00e1rs foglalts\u00e1ga eset\u00e9n pedig alternat\u00edv g\u00e9pek \u00e9s munkat\u00e1rsak vehetik \u00e1t a feladatot.<\/li>\n\n\n<li><strong>Anyagell\u00e1t\u00e1shoz igaz\u00edtott sorrend.<\/strong> A gy\u00e1rt\u00e1si feladatok anyagig\u00e9nye, a k\u00e9szlet \u00e9s a CSI nyitott beszerz\u00e9si rendel\u00e9sei alapj\u00e1n az \u00fctemez\u00e9s ellen\u0151rzi az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t. A megrendelt anyag a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l sz\u00e1m\u00edt el\u00e9rhet\u0151nek, a k\u00e9szlet pedig akkor friss\u00fcl, amikor a rendel\u00e9s Delivered jel\u00f6l\u00e9st kap.<\/li>\n\n\n<li><strong>Kisebb projektkock\u00e1zat pr\u00f3baid\u0151szakkal.<\/strong> T\u00f6ltse be a Save to Excel exportj\u00e1t a 30 napos pr\u00f3baverzi\u00f3ba, \u00e9s n\u00e9zze meg saj\u00e1t gy\u00e1rt\u00e1si feladatait egy, a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st figyelembe vev\u0151 \u00fctemtervben. \u00c1ll\u00edtson le egy sz\u0171k keresztmetszetet jelent\u0151 er\u0151forr\u00e1st, adjon hozz\u00e1 s\u00fcrg\u0151s rendel\u00e9st, \u00e9s k\u00e9sleltessen egy beszerz\u00e9si rendel\u00e9st. Az itt ellen\u0151rz\u00f6tt adatmegfeleltet\u00e9s hat\u00e1rozza meg az IDO-fejleszt\u00e9s terjedelm\u00e9t.<\/li>\n\n<\/ul>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> a cikkek, gy\u00e1rt\u00e1si feladatok \u00e9s k\u00f6lts\u00e9gek els\u0151dleges nyilv\u00e1ntart\u00e1s\u00e1nak tov\u00e1bbra is a CSI-nak kell maradnia. \u00dctemez\u0151t \u00e9s \u00fczemi alkalmaz\u00e1st kap, sz\u0171k, \u00e1ttekinthet\u0151 interf\u00e9sszel: befel\u00e9 gy\u00e1rt\u00e1si feladatok \u00e9s t\u00f6rzsadatok, kifel\u00e9 tervezett id\u0151pontok \u00e9s munkaid\u0151adatok. A SkyPlanner havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal, \u00e9s b\u00e1rmikor lemondhat\u00f3. Az integr\u00e1ci\u00f3ra a folyamatok \u00e9s ig\u00e9nyek alapj\u00e1n el\u0151re adunk \u00e1raj\u00e1nlatot, a v\u00e1lasztott csomaggal egy\u00fctt, \u00edgy indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n\n\n<p>Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, a <a href=\"\/hu\/funkciok\/\">funkci\u00f3kat<\/a> \u00e9s a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner dokument\u00e1ci\u00f3j\u00e1t<\/a>. Az <a href=\"\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/termelesutemezes\/\">Infor CloudSuite Industrial termel\u00e9s\u00fctemez\u00e9s\u00e9r\u0151l<\/a> sz\u00f3l\u00f3 oldalon \u00f6sszehasonl\u00edthatja a CSI APS-t \u00e9s a Schedulert egy felh\u0151alap\u00fa \u00fctemez\u0151vel. Felkeresheti az <a href=\"\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/\">Infor CloudSuite Industrial oldal\u00e1t<\/a> \u00e9s az <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k gy\u0171jt\u0151oldal\u00e1t<\/a> is.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1bla-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 dolgoz\u00f3k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napos optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied besz\u00e1mol\u00f3j\u00e1t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je egy hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>-os hat\u00e1rid\u0151-betart\u00e1si ar\u00e1ny a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner d\u00f6nt\u0151 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, az \u00fctemez\u00e9shez pedig ma m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/kjh-comp\/\">Olvassa el a KJH-Comp besz\u00e1mol\u00f3j\u00e1t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations termel\u00e9svezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra el\u0151re<\/b><span>l\u00e1that\u00f3 szabad kapacit\u00e1s az \u00e9rt\u00e9kes\u00edt\u00e9s sz\u00e1m\u00e1ra<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner megb\u00edzhat\u00f3 alapot teremt a teljes gy\u00e1rt\u00e1stervez\u00e9shez.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, termel\u00e9svezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerrel \u00e9rintkez\u0151 csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st. Az \u00fctemez\u00e9s m\u00f3dos\u00edt\u00e1s\u00e1ra vonatkoz\u00f3 k\u00e9r\u00e9sekre m\u00e1sodpercek alatt v\u00e1laszt kapnak, m\u00edg kor\u00e1bban ez egy \u00f3r\u00e1t vagy ann\u00e1l is t\u00f6bbet vett ig\u00e9nybe.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/fredman-operations\/\">Olvassa el a Fredman Operations besz\u00e1mol\u00f3j\u00e1t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ki k\u00e9sz\u00edti el a CloudSuite Industrial vagy a SyteLine integr\u00e1ci\u00f3j\u00e1t?<\/summary>\n<p class=\"sp-faq__a\">A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n CSI-k\u00f6rnyezet\u00e9hez konfigur\u00e1lja a k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3t az IDO REST API \u00e9s az ION BOD-ok haszn\u00e1lat\u00e1val, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Infor-partnere vagy saj\u00e1t fejleszt\u0151i is elk\u00e9sz\u00edthetik az integr\u00e1ci\u00f3t a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra \u00e9p\u00edtve, mind\u00f6ssze egy API-kulccsal. A pr\u00f3baid\u0151szakban CSV- vagy Excel-exportokkal is elindulhat.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Melyik API-t \u00e9rdemes haszn\u00e1lni a CSI-ben a gy\u00e1rt\u00e1s\u00fctemez\u00e9si integr\u00e1ci\u00f3hoz?<\/summary>\n<p class=\"sp-faq__a\">A Mongoose IDO REST API-t az ION API Gateway \u00e1tj\u00e1r\u00f3n kereszt\u00fcl, egy Backend Service <code>.ionapi<\/code> f\u00e1jlj\u00e1b\u00f3l sz\u00e1rmaz\u00f3 OAuth 2.0 hiteles\u00edt\u00e9ssel. Ha az id\u0151szakos lek\u00e9rdez\u00e9s nem el\u00e9g gyors, eg\u00e9sz\u00edtse ki a <code>ProductionOrder<\/code> BOD-dal a gy\u00e1rt\u00e1si feladatok v\u00e1ltoz\u00e1sainak \u00e9szlel\u00e9s\u00e9hez.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan ker\u00fclnek vissza a tervezett id\u0151pontok \u00e9s a munkaid\u0151adatok a CSI-be?<\/summary>\n<p class=\"sp-faq__a\">A m\u0171veletek tervezett kezd\u00e9se \u00e9s befejez\u00e9se az IDO <code>UpdateItems<\/code> h\u00edv\u00e1s\u00e1val ker\u00fcl vissza a gy\u00e1rt\u00e1si feladat m\u0171veleti \u00fctemterv\u00e9be, \u00e9s az <code>SLJobs<\/code> objektumon is friss\u00fcl a feladat Start \u00e9s End d\u00e1tuma. Azokon a telephelyeken, ahol ezek a mez\u0151k v\u00e9dettek, egyedi IDO-met\u00f3dust haszn\u00e1lnak az <code>InvokeMethod<\/code> h\u00edv\u00e1son kereszt\u00fcl. A munkaid\u0151adatok az <code>AddItems<\/code> h\u00edv\u00e1ssal, nem k\u00f6nyvelt <code>SLJobtrans<\/code> sorokk\u00e9nt ker\u00fclnek be, majd a Job Labor Transaction Posting k\u00f6nyveli \u0151ket a befejezetlen termel\u00e9sre.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sz\u00fcks\u00e9ges k\u00fcl\u00f6n Infor-licenc egy k\u00fcls\u0151 \u00fctemez\u0151 csatlakoztat\u00e1s\u00e1hoz?<\/summary>\n<p class=\"sp-faq__a\">Igen, Automation-licenc sz\u00fcks\u00e9ges. Az Infor licencel\u00e9si dokument\u00e1ci\u00f3ja szerint az IDO-r\u00e9tegen kereszt\u00fcl csatlakoz\u00f3 k\u00fcls\u0151 alkalmaz\u00e1sok ezt a licencet haszn\u00e1lj\u00e1k, IDO munkamenett\u00edpussal.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Megtarthatjuk a CSI APS-t a SkyPlanner bevezet\u00e9se mellett?<\/summary>\n<p class=\"sp-faq__a\">Igen. Az anyagterv \u00e9s a Get CTP\/ATP tov\u00e1bbra is a CSI APS feladata marad, m\u00edg az \u00e1tadott er\u0151forr\u00e1scsoportokban a SkyPlanner hat\u00e1rozza meg a gy\u00e1rt\u00e1si sorrendet.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mennyi ideig tart egy CSI-integr\u00e1ci\u00f3s projekt?<\/summary>\n<p class=\"sp-faq__a\">A megval\u00f3s\u00edt\u00e1s rendszerint a bevezet\u00e9s megkezd\u00e9s\u00e9t\u0151l sz\u00e1m\u00edtott n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. A projekt l\u00e9p\u00e9sei az adatmegfeleltet\u00e9s, a kezdeti bet\u00f6lt\u00e9s, a gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa, az \u00fctemterv vissza\u00edr\u00e1sa, az <code>SLJobtrans<\/code> visszajelent\u00e9sek, a p\u00e1rhuzamos futtat\u00e1s \u00e9s az \u00e9les indul\u00e1s.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk a SkyPlannert, miel\u0151tt b\u00e1rmit is fejleszten\u00e9nk?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3baid\u0151szak legfeljebb 20 munka\u00e1llom\u00e1sra \u00e9s a Basic csomag \u00f6sszes funkci\u00f3j\u00e1ra kiterjed, bankk\u00e1rtya megad\u00e1sa n\u00e9lk\u00fcl. Kezdje a CSI-b\u0151l export\u00e1lt CSV- vagy Excel-f\u00e1jlokkal. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el az ingyenes pr\u00f3baid\u0151szakot<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">egyeztessen \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a> a saj\u00e1t b\u00e9rl\u0151i k\u00f6rnyezet\u00e9r\u0151l.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Infor CloudSuite Industrial Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel Ez az \u00fatmutat\u00f3 az Infor CloudSuite Industrial (CSI, kor\u00e1bban SyteLine) partnereinek \u00e9s informatikai csapatainak mutatja be, hogyan kapcsolhat\u00f3 \u00f6ssze a CSI a SkyPlanner APS rendszerrel. A SkyPlanner \u00e9s a CSI k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3 m\u0171k\u00f6dik az Infor OS-en &#8230; <a title=\"Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/\" aria-label=\"Read more about Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100888,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101335","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor CloudSuite Industrial: \u00fctemez\u00e9si integr\u00e1ci\u00f3s \u00fatmutat\u00f3<\/title>\n<meta name=\"description\" content=\"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST ION-on \u00e1t, ProductionOrder BOD, \u00fctemterv-vissza\u00edr\u00e1s, SLJobtrans munkaid\u0151adatok \u00e9s buktat\u00f3k.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel\" \/>\n<meta property=\"og:description\" content=\"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST ION-on \u00e1t, ProductionOrder BOD, \u00fctemterv-vissza\u00edr\u00e1s, SLJobtrans munkaid\u0151adatok \u00e9s buktat\u00f3k.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"24 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/infor-cloudsuite-industrial\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/infor-cloudsuite-industrial\\\/integracios-utmutato\\\/\",\"name\":\"Infor CloudSuite Industrial: \u00fctemez\u00e9si integr\u00e1ci\u00f3s \u00fatmutat\u00f3\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST ION-on \u00e1t, ProductionOrder BOD, \u00fctemterv-vissza\u00edr\u00e1s, SLJobtrans munkaid\u0151adatok \u00e9s buktat\u00f3k.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/infor-cloudsuite-industrial\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/infor-cloudsuite-industrial\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/infor-cloudsuite-industrial\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS az Infor CloudSuite Industrial (SyteLine) mell\u00e9: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/infor-cloudsuite-industrial\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor CloudSuite Industrial: \u00fctemez\u00e9si integr\u00e1ci\u00f3s \u00fatmutat\u00f3","description":"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST ION-on \u00e1t, ProductionOrder BOD, \u00fctemterv-vissza\u00edr\u00e1s, SLJobtrans munkaid\u0151adatok \u00e9s buktat\u00f3k.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel","og_description":"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST ION-on \u00e1t, ProductionOrder BOD, \u00fctemterv-vissza\u00edr\u00e1s, SLJobtrans munkaid\u0151adatok \u00e9s buktat\u00f3k.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"24 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/","name":"Infor CloudSuite Industrial: \u00fctemez\u00e9si integr\u00e1ci\u00f3s \u00fatmutat\u00f3","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Infor CloudSuite Industrial (SyteLine)\u2013SkyPlanner APS: IDO REST ION-on \u00e1t, ProductionOrder BOD, \u00fctemterv-vissza\u00edr\u00e1s, SLJobtrans munkaid\u0151adatok \u00e9s buktat\u00f3k.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS az Infor CloudSuite Industrial (SyteLine) mell\u00e9: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/infor-cloudsuite-industrial\/"},{"@type":"ListItem","position":5,"name":"Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Infor CloudSuite Industrial Infor CloudSuite Industrial integr\u00e1ci\u00f3s \u00fatmutat\u00f3 \u2013 gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner APS rendszerrel Ez az \u00fatmutat\u00f3 az Infor CloudSuite Industrial (CSI, kor\u00e1bban SyteLine) partnereinek \u00e9s informatikai csapatainak mutatja be, hogyan kapcsolhat\u00f3 \u00f6ssze a CSI a SkyPlanner APS rendszerrel. A SkyPlanner \u00e9s a CSI k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa integr\u00e1ci\u00f3 m\u0171k\u00f6dik az Infor OS-en&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=101335"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101335\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100888"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=101335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}