{"id":101186,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101186"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"termelesutemezes","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/","title":{"rendered":"Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? <span class=\"hl\">\u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Az Odoo alapszinten k\u00e9pes a t\u00e9nyleges g\u00e9p- \u00e9s l\u00e9tsz\u00e1mkapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9sre. Az Odoo Manufacturing <strong>Plan<\/strong> gombja minden gy\u00e1rt\u00e1si rendel\u00e9st a hozz\u00e1 tartoz\u00f3 munka\u00e1llom\u00e1s napt\u00e1r\u00e1nak els\u0151 szabad id\u0151s\u00e1vj\u00e1ba \u00fctemez. \u00cdgy egy munka\u00e1llom\u00e1son k\u00e9t \u00fctemezett gy\u00e1rt\u00e1si rendel\u00e9s soha nem fedi egym\u00e1st. Egyszerre azonban csak egy termel\u00e9si rendel\u00e9st tervez, egyetlen korl\u00e1tot figyelembe v\u00e9ve. A rendel\u00e9sek k\u00f6z\u00f6tt nem m\u00f3dos\u00edtja a sorrendet, nem optimaliz\u00e1l \u00e9s nem \u00fctemez \u00fajra. Azok az \u00fczemek, ahol minden rendel\u00e9s sorrendj\u00e9t a hat\u00e1rid\u0151k \u00e9s az \u00e1t\u00e1ll\u00e1sok alapj\u00e1n kell meghat\u00e1rozni, az Odoo mellett SkyPlanner APS-t haszn\u00e1lnak.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az Odoo saj\u00e1t marketinganyaga szerint a rendszerrel \u201eplan resources with finite capacity planning\u201d (az er\u0151forr\u00e1sok a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1s figyelembev\u00e9tel\u00e9vel tervezhet\u0151k) (<a href=\"https:\/\/www.odoo.com\/app\/manufacturing\">odoo.com\/app\/manufacturing<\/a>). Az al\u00e1bbiakban a hivatalos dokument\u00e1ci\u00f3 \u00e9s a forr\u00e1sk\u00f3d alapj\u00e1n mutatjuk be, mit jelent ez az Odoo 19.0 eset\u00e9ben: hogyan m\u0171k\u00f6dik a Plan, hol vannak a korl\u00e1tai, \u00e9s mikor elegend\u0151 \u00f6nmag\u00e1ban.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-odoo-plans-work-orders-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy tervezi az Odoo a gy\u00e1rt\u00e1si rendel\u00e9seket, l\u00e9p\u00e9sr\u0151l l\u00e9p\u00e9sre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Enged\u00e9lyezze a gy\u00e1rt\u00e1si rendel\u00e9sek haszn\u00e1lat\u00e1t, \u00e9s \u00e1ll\u00edtsa be a munka\u00e1llom\u00e1sokat<\/h3>\n\n\n<p>Nyissa meg a <strong>Manufacturing &gt; Configuration &gt; Settings<\/strong> men\u00fcpontot, \u00e9s enged\u00e9lyezze a <strong>Work Orders<\/strong> funkci\u00f3t. Ezut\u00e1n a <strong>Configuration<\/strong> men\u00fcben megjelenik a <strong>Work Centers<\/strong> men\u00fcpont. Minden munka\u00e1llom\u00e1s (<code>mrp.workcenter<\/code>) tartalmazza az \u00fctemez\u0151 \u00e1ltal haszn\u00e1lt mez\u0151ket:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Mez\u0151<\/th><th>Szerepe a tervez\u00e9sben<\/th><\/tr><\/thead><tbody><tr><td>Working Hours<\/td><td>A munka\u00e1llom\u00e1s munkarendj\u00e9t meghat\u00e1roz\u00f3 er\u0151forr\u00e1snapt\u00e1r. Alap\u00e9rtelmez\u00e9s szerint \u201eStandard 40 hours\/week\u201d (norm\u00e1l munkah\u00e9t), h\u00e9tf\u0151t\u0151l p\u00e9ntekig<\/td><\/tr><tr><td>Time Efficiency<\/td><td>Sz\u00e1zal\u00e9kos \u00e9rt\u00e9k, amely gyors\u00edtja vagy lass\u00edtja az adott munka\u00e1llom\u00e1son v\u00e9gzett \u00f6sszes gy\u00e1rt\u00e1si rendel\u00e9s teljes\u00edt\u00e9s\u00e9t<\/td><\/tr><tr><td>Setup Time \/ Cleanup Time<\/td><td>Minden gy\u00e1rt\u00e1si rendel\u00e9s el\u00e9 \u00e9s ut\u00e1n hozz\u00e1adott id\u0151, percben<\/td><\/tr><tr><td>Alternative Workcenters<\/td><td>M\u00e1s munka\u00e1llom\u00e1sok, amelyeket a Tervez\u00e9s funkci\u00f3 az eredeti helyett ig\u00e9nybe vehet<\/td><\/tr><tr><td>Product Capacities lap<\/td><td>Ciklusonk\u00e9nti darabsz\u00e1m, valamint term\u00e9kenk\u00e9nt megadott \u00e1t\u00e1ll\u00e1si \u00e9s tiszt\u00edt\u00e1si id\u0151 percben (<code>mrp.workcenter.capacity<\/code>)<\/td><\/tr><tr><td>OEE Target<\/td><td>A jelent\u00e9sekben haszn\u00e1lt teljes\u00edtm\u00e9nyc\u00e9l; nem tervez\u00e9si bemen\u0151 adat<\/td><\/tr><tr><td>Allowed Employees<\/td><td>Meghat\u00e1rozza, ki dolgozhat itt. Sz\u0171r\u0151, nem kapacit\u00e1sadat<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">2. M\u0171veletek a darabjegyz\u00e9ken<\/h3>\n\n\n<p>A technol\u00f3giai \u00fatvonalakhoz nincs k\u00f6z\u00f6s t\u00f6rzsadat\u00e1llom\u00e1ny. A m\u0171veletek az egyes darabjegyz\u00e9kek <strong>Operations<\/strong> lapj\u00e1n tal\u00e1lhat\u00f3k (<code>mrp.routing.workcenter<\/code>). Minden m\u0171velethez tartozik egy <strong>Work Center<\/strong> mez\u0151 \u00e9s egy <strong>Duration Computation<\/strong> be\u00e1ll\u00edt\u00e1s: az id\u0151tartam lehet k\u00e9zzel megadott, r\u00f6gz\u00edtett \u00e9rt\u00e9k, vagy a legut\u00f3bbi gy\u00e1rt\u00e1si rendel\u00e9sekb\u0151l sz\u00e1m\u00edtott id\u0151 (alap\u00e9rtelmez\u00e9s szerint 10 rendel\u00e9s alapj\u00e1n). A v\u00e1rhat\u00f3 id\u0151tartam az \u00e1t\u00e1ll\u00e1si id\u0151, a tiszt\u00edt\u00e1si id\u0151 \u00e9s a ciklussz\u00e1mmal megszorzott ciklusid\u0151 \u00f6sszege; a ciklusokra jut\u00f3 r\u00e9szt a Time Efficiency \u00e9rt\u00e9k\u00e9vel osztja a rendszer (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_routing.py\">mrp_routing.py<\/a>).<\/p>\n\n\n<p>Ha a <strong>Work Order Dependencies<\/strong> be\u00e1ll\u00edt\u00e1s akt\u00edv, egy m\u0171velet v\u00e9grehajt\u00e1sa egy m\u00e1sik m\u0171velett\u0151l tehet\u0151 f\u00fcgg\u0151v\u00e9 a <strong>Blocked By<\/strong> mez\u0151ben. Az Odoo dokument\u00e1ci\u00f3ja szerint: \u201eA blocked work order is scheduled at the end of the time period specified in the Expected Duration field of the work order that precedes it.\u201d (A f\u00fcgg\u0151 gy\u00e1rt\u00e1si rendel\u00e9s az el\u0151tte \u00e1ll\u00f3 gy\u00e1rt\u00e1si rendel\u00e9s Expected Duration mez\u0151j\u00e9ben megadott id\u0151tartam v\u00e9g\u00e9re ker\u00fcl az \u00fctemtervben.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/work_order_dependencies.html\">forr\u00e1s<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Er\u0151s\u00edtse meg a termel\u00e9si rendel\u00e9st (MO), majd kattintson a Plan gombra<\/h3>\n\n\n<p>A termel\u00e9si rendel\u00e9s (<code>mrp.production<\/code>) visszaigazol\u00e1sakor l\u00e9trej\u00f6nnek a hozz\u00e1 tartoz\u00f3 gy\u00e1rt\u00e1si rendel\u00e9sek (<code>mrp.workorder<\/code>). A termel\u00e9si rendel\u00e9s <strong>Tervez\u00e9s<\/strong> gombj\u00e1ra kattintva a rendszer az utols\u00f3 gy\u00e1rt\u00e1si rendel\u00e9sekb\u0151l indul ki, \u00e9s a f\u00fcgg\u0151s\u00e9gi l\u00e1ncot rekurz\u00edvan bej\u00e1rva el\u0151sz\u00f6r mindig az el\u0151felt\u00e9telt jelent\u0151 rendel\u00e9seket \u00fctemezi. Minden gy\u00e1rt\u00e1si rendel\u00e9st id\u0151ben el\u0151refel\u00e9, az el\u0151dei ut\u00e1n helyez el. Az Odoo minden gy\u00e1rt\u00e1si rendel\u00e9sn\u00e9l:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>A termel\u00e9si rendel\u00e9s kezdete, a jelenlegi id\u0151pont \u00e9s a v\u00e9grehajt\u00e1st blokkol\u00f3 gy\u00e1rt\u00e1si rendel\u00e9sek befejez\u00e9se k\u00f6z\u00fcl a legk\u00e9s\u0151bbit veszi alapul.<\/li>\n\n\n<li>Megvizsg\u00e1lja az els\u0151dleges munka\u00e1llom\u00e1st \u00e9s az \u00f6sszes Alternative Workcenter be\u00e1ll\u00edt\u00e1sn\u00e1l megadott alternat\u00edv\u00e1t.<\/li>\n\n\n<li>Minden napt\u00e1rban el\u0151refel\u00e9 haladva megkeresi az els\u0151 olyan szabad id\u0151s\u00e1vot, amelybe belef\u00e9r a v\u00e1rhat\u00f3 id\u0151tartam.<\/li>\n\n\n<li>Kiv\u00e1lasztja azt a munka\u00e1llom\u00e1st, amelyen a munka a leghamarabb befejez\u0151dik, \u00e9s az id\u0151s\u00e1vot <code>resource.calendar.leaves<\/code> rekordk\u00e9nt lefoglalja az adott napt\u00e1rban.<\/li>\n\n<\/ol>\n\n\n<p>A 19.0 forr\u00e1sk\u00f3dja egy\u00e9rtelm\u0171en fogalmaz: \u201eThe available interval is disjoinct with all other workorders planned on this workcenter\u201d (A rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151s\u00e1v nem fedi az erre a munka\u00e1llom\u00e1sra \u00fctemezett t\u00f6bbi gy\u00e1rt\u00e1si rendel\u00e9st) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_workcenter.py\">mrp_workcenter.py<\/a>). Ebben \u00e9rv\u00e9nyes\u00fcl a v\u00e9ges kapacit\u00e1s. Ha egy gy\u00e1rt\u00e1si rendel\u00e9s munkaid\u0151n k\u00edv\u00fcli id\u0151szakba \u00fctk\u00f6zik, a k\u00f6vetkez\u0151 munkaid\u0151s\u00e1vban folytat\u00f3dik. Ha 700 napon bel\u00fcl \u2013 ez az alap\u00e9rtelmezett keres\u00e9si id\u0151t\u00e1v \u2013 nem tal\u00e1l megfelel\u0151 helyet, a Plan le\u00e1ll ezzel az \u00fczenettel: \u201eImpossible to plan the workorder.\u201d (A gy\u00e1rt\u00e1si rendel\u00e9s nem \u00fctemezhet\u0151.)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Kies\u0151 id\u0151szakok \u00e9s alternat\u00edv munka\u00e1llom\u00e1sok<\/h3>\n\n\n<p>A <strong>Time Off<\/strong> alkalmaz\u00e1ssal, fejleszt\u0151i m\u00f3dban karbantart\u00e1s vagy munkasz\u00fcneti nap idej\u00e9re letilthat egy munka\u00e1llom\u00e1st. A Plan ekkor az Alternative Workcenters be\u00e1ll\u00edt\u00e1sban megadott alternat\u00edv munka\u00e1llom\u00e1sokra ir\u00e1ny\u00edtja a gy\u00e1rt\u00e1si rendel\u00e9seket. Alternat\u00edva hi\u00e1ny\u00e1ban az Odoo dokument\u00e1ci\u00f3ja szerint \u201ework orders begin to pile up at the work center until it is operational again\u201d (a gy\u00e1rt\u00e1si rendel\u00e9sek felhalmoz\u00f3dnak a munka\u00e1llom\u00e1son, am\u00edg az \u00fajra \u00fczemk\u00e9pes nem lesz) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/work_center_time_off.html\">forr\u00e1s<\/a>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Ellen\u0151rz\u00e9s \u00e9s m\u00f3dos\u00edt\u00e1s<\/h3>\n\n\n<p>A <strong>Manufacturing &gt; Planning &gt; Planning by Production<\/strong> \u00e9s a <strong>Planning by Workcenter<\/strong> men\u00fcpontok nyitj\u00e1k meg a gy\u00e1rt\u00e1si rendel\u00e9sek tervez\u00e9si n\u00e9zeteit. Az Enterprise kiad\u00e1sban h\u00faz\u00e1ssal m\u00f3dos\u00edthat\u00f3 Gantt-diagram jelenik meg. A Community kiad\u00e1s lista-, napt\u00e1r-, kimutat\u00e1s- \u00e9s grafikonn\u00e9zetet k\u00edn\u00e1l. A dokument\u00e1ci\u00f3 k\u00e9zi m\u00f3dos\u00edt\u00e1st \u00edr le: \u201eTimes and planned work centers can be changed by clicking to access the individual work order.\u201d (Az id\u0151pontok \u00e9s a tervezett munka\u00e1llom\u00e1sok az adott gy\u00e1rt\u00e1si rendel\u00e9st kattint\u00e1ssal megnyitva m\u00f3dos\u00edthat\u00f3k.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">forr\u00e1s<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-odoo-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az Odoo korl\u00e1tai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Aki el\u0151bb ker\u00fcl a tervbe, el\u0151bb kap helyet.<\/strong> A Plan termel\u00e9si rendel\u00e9senk\u00e9nt halad, \u00e9s az els\u0151k\u00e9nt tervezett rendel\u00e9s kapja a legkor\u00e1bbi id\u0151s\u00e1vokat. T\u00f6bb termel\u00e9si rendel\u00e9s kijel\u00f6l\u00e9sekor az Odoo alap\u00e9rtelmezett sorrendj\u00e9ben tervezi \u0151ket: el\u0151sz\u00f6r priorit\u00e1s, majd kezd\u00e9si d\u00e1tum szerint. A rendszer nem m\u00e9rlegeli egy\u00fctt a hat\u00e1rid\u0151ket \u00e9s az \u00e1t\u00e1ll\u00e1sokat, \u00e9s egy m\u00e1r \u00fctemezett termel\u00e9si rendel\u00e9st sem tol f\u00e9lre egy s\u00fcrg\u0151sebb kedv\u00e9\u00e9rt.<\/li>\n\n\n<li><strong>Nincs \u00e1t\u00e1ll\u00e1s szerinti sorrendk\u00e9pz\u00e9s.<\/strong> A Setup Time minden gy\u00e1rt\u00e1si rendel\u00e9shez r\u00f6gz\u00edtett t\u00f6bbletid\u0151t ad hozz\u00e1: ugyanannyi percet, f\u00fcggetlen\u00fcl att\u00f3l, mi futott el\u0151tte. Az Odoo-ban nincs \u00e1t\u00e1ll\u00e1si m\u00e1trix, \u00e9s az \u00e1t\u00e1ll\u00e1sok elker\u00fcl\u00e9se \u00e9rdek\u00e9ben nem csoportos\u00edtja a hasonl\u00f3 gy\u00e1rt\u00e1si feladatokat.<\/li>\n\n\n<li><strong>Egyetlen korl\u00e1t.<\/strong> A tervet csak a munka\u00e1llom\u00e1s napt\u00e1ra korl\u00e1tozza. A g\u00e9pkezel\u0151ket csup\u00e1n az Allowed Employees sz\u0171r\u0151 kezeli. Amikor a Plan lefoglal egy id\u0151s\u00e1vot, nem ellen\u0151rzi a szersz\u00e1mok \u00e9s az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t. Az alkatr\u00e9szfoglal\u00e1sokat \u00e9s a beszerz\u00e9si rendel\u00e9sek d\u00e1tumait csak az ut\u00e1np\u00f3tl\u00e1s-tervez\u00e9s haszn\u00e1lja.<\/li>\n\n\n<li><strong>Az MRP nem veszi figyelembe a kapacit\u00e1st.<\/strong> Az \u00fajrarendel\u00e9si szab\u00e1lyok \u00e9s az MTO a darabjegyz\u00e9k <strong>Manuf. Lead Time<\/strong> mez\u0151j\u00e9ben megadott, napt\u00e1ri napokban sz\u00e1molt id\u0151 alapj\u00e1n hozz\u00e1k l\u00e9tre a termel\u00e9si rendel\u00e9seket. A dokument\u00e1ci\u00f3 szerint: \u201eLead times do not consider weekends, holidays, or work center capacity\u201d (Az \u00e1tfut\u00e1si id\u0151k nem veszik figyelembe a h\u00e9tv\u00e9g\u00e9ket, a munkasz\u00fcneti napokat \u00e9s a munka\u00e1llom\u00e1sok kapacit\u00e1s\u00e1t) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/inventory\/warehouses_storage\/replenishment\/lead_times.html\">forr\u00e1s<\/a>). A termel\u00e9si rendel\u00e9sek hat\u00e1rideje \u00e9s a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si id\u0151pontok napt\u00e1ri napokb\u00f3l ad\u00f3dnak, nem a t\u00e9nyleges v\u00e1rakoz\u00f3 rendel\u00e9sekb\u0151l.<\/li>\n\n\n<li><strong>Az MPS csak javaslatokat ad.<\/strong> A Master Production Schedule (Enterprise) sem veszi figyelembe a terhel\u00e9st. \u201eThe MPS only suggests the amount of product to be replenished, requiring the user to actually create the replenishing POs\/MOs.\u201d (Az MPS csak javaslatot tesz a p\u00f3tland\u00f3 term\u00e9kmennyis\u00e9gre; a kapcsol\u00f3d\u00f3 beszerz\u00e9si \u00e9s termel\u00e9si rendel\u00e9seket a felhaszn\u00e1l\u00f3nak kell l\u00e9trehoznia.) (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/workflows\/use_mps.html\">forr\u00e1s<\/a>)<\/li>\n\n\n<li><strong>Nincs automatikus \u00fajratervez\u00e9s.<\/strong> Egy meghib\u00e1sod\u00e1s vagy s\u00fcrg\u0151s rendel\u00e9s \u00f6nmag\u00e1ban semmit nem mozd\u00edt el a tervben. Ha egy gy\u00e1rt\u00e1si rendel\u00e9s m\u00e1r elindult, az Odoo nem engedi visszavonni a termel\u00e9si rendel\u00e9s \u00fctemez\u00e9s\u00e9t: \u201eSome work orders have already started, so you cannot unplan this manufacturing order.\u201d (N\u00e9h\u00e1ny gy\u00e1rt\u00e1si rendel\u00e9s m\u00e1r elindult, ez\u00e9rt ennek a termel\u00e9si rendel\u00e9snek az \u00fctemez\u00e9se nem vonhat\u00f3 vissza.) (<a href=\"https:\/\/github.com\/odoo\/odoo\/blob\/19.0\/addons\/mrp\/models\/mrp_production.py\">mrp_production.py<\/a>)<\/li>\n\n\n<li><strong>A r\u00e9szegys\u00e9geket k\u00fcl\u00f6n kell tervezni.<\/strong> A t\u00f6bbszint\u0171 darabjegyz\u00e9kekb\u0151l k\u00fcl\u00f6n al\u00e1rendelt termel\u00e9si rendel\u00e9sek j\u00f6nnek l\u00e9tre, \u00e9s mindegyiket \u00f6n\u00e1ll\u00f3an kell \u00fctemezni. A tervez\u0151nek kell gondoskodnia a megfelel\u0151 sorrendr\u0151l, hogy a r\u00e9szegys\u00e9g elk\u00e9sz\u00fclj\u00f6n, mire a f\u00f6l\u00e9rendelt m\u0171veletnek sz\u00fcks\u00e9ge van r\u00e1.<\/li>\n\n\n<li><strong>A Gantt \u00e9s az MPS csak az Enterprise kiad\u00e1sban \u00e9rhet\u0151 el.<\/strong> A kiad\u00e1sokat \u00f6sszehasonl\u00edt\u00f3 oldal a Manufacturing \u201eScheduling\u201d (\u00dctemez\u00e9s) \u00e9s \u201eShopfloor\u201d (\u00dczemi v\u00e9grehajt\u00e1s) funkci\u00f3j\u00e1t kiz\u00e1r\u00f3lag az Enterprise kiad\u00e1shoz jel\u00f6li el\u00e9rhet\u0151nek (<a href=\"https:\/\/www.odoo.com\/page\/editions\">odoo.com\/page\/editions<\/a>). A Community kiad\u00e1sban a tervez\u0151k list\u00e1kkal \u00e9s napt\u00e1rral dolgoznak.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-odoo-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor el\u00e9g az Odoo be\u00e9p\u00edtett tervez\u00e9se?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az Odoo Plan gombja elegend\u0151, ha:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Minden m\u0171velethez egy\u00e9rtelm\u0171en adott egy munka\u00e1llom\u00e1s, \u00e9s a gy\u00e1rt\u00e1si volumen m\u00e9rs\u00e9kelt.<\/li>\n\n\n<li>Kev\u00e9s rendel\u00e9s verseng ugyanaz\u00e9rt a sz\u0171k keresztmetszet\u00e9rt, \u00edgy a tervez\u00e9si sorrend szerinti kiszolg\u00e1l\u00e1s elfogadhat\u00f3 id\u0151pontokat ad.<\/li>\n\n\n<li>Az alternat\u00edv g\u00e9pek azonosak, \u00edgy az Alternative Workcenters \u00e9s a Time Off a legt\u00f6bb fennakad\u00e1st kezelni tudja.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1sok r\u00f6videk, vagy nem f\u00fcggnek az el\u0151z\u0151 gy\u00e1rt\u00e1si feladatt\u00f3l.<\/li>\n\n\n<li>A tervez\u0151nek el\u00e9g naponta egyszer \u00e1tn\u00e9znie a Planning by Workcenter n\u00e9zetet, \u00e9s k\u00e9zzel feloldania a n\u00e9h\u00e1ny \u00fctk\u00f6z\u00e9st.<\/li>\n\n<\/ul>\n\n\n<p>Ha az \u00d6n \u00fczem\u00e9re ez jellemz\u0151, ford\u00edtsa az energi\u00e1t az adatok rendbet\u00e9tel\u00e9re. Minden munka\u00e1llom\u00e1shoz rendeljen napt\u00e1rt, \u00e9s adjon meg re\u00e1lis \u00e9rt\u00e9keket a Setup \u00e9s a Cleanup Time mez\u0151ben. Ahol a kor\u00e1bbi adatok er\u0151sen sz\u00f3rnak, haszn\u00e1ljon r\u00f6gz\u00edtett id\u0151tartamokat. Kapcsolja be a f\u00fcgg\u0151s\u00e9geket, \u00e9s priorit\u00e1si sorrendben tervezze a termel\u00e9si rendel\u00e9seket.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor kell termel\u00e9s\u00fctemez\u0151?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kin\u0151tte a Plan lehet\u0151s\u00e9geit, ha az al\u00e1bbiak k\u00f6z\u00fcl t\u00f6bb is igaz:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Sok rendel\u00e9s verseng k\u00e9t vagy t\u00f6bb sz\u0171k keresztmetszet\u00e9rt, \u00e9s a sorrendet a hat\u00e1rid\u0151knek kell meghat\u00e1rozniuk.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1s att\u00f3l f\u00fcgg, mi futott el\u0151tte, ez\u00e9rt a gy\u00e1rt\u00e1si feladatok sorrendje befoly\u00e1solja a kibocs\u00e1t\u00e1st.<\/li>\n\n\n<li>A l\u00e9tsz\u00e1m \u00e9s a m\u0171szakbeoszt\u00e1s ugyan\u00fagy korl\u00e1tozza a tervet, mint a g\u00e9pek.<\/li>\n\n\n<li>Az anyag be\u00e9rkez\u00e9se d\u00f6nti el, mikor indulhat egy gy\u00e1rt\u00e1si feladat.<\/li>\n\n\n<li>A s\u00fcrg\u0151s rendel\u00e9sek, a meghib\u00e1sod\u00e1sok \u00e9s a k\u00e9s\u0151 sz\u00e1ll\u00edt\u00e1sok hetente t\u00f6bbsz\u00f6r is \u00fajratervez\u00e9st k\u00e9nyszer\u00edtenek ki.<\/li>\n\n\n<li>Az \u00e9rt\u00e9kes\u00edt\u00e9snek a t\u00e9nylegesen v\u00e1rakoz\u00f3 rendel\u00e9sek alapj\u00e1n meghat\u00e1rozott sz\u00e1ll\u00edt\u00e1si id\u0151pontokra van sz\u00fcks\u00e9ge, nem a Manuf. Lead Time \u00e9rt\u00e9k\u00e9b\u0151l sz\u00e1m\u00edtott d\u00e1tumokra.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mire figyeljen a v\u00e1laszt\u00e1sn\u00e1l?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Termel\u00e9s\u00fctemez\u00e9s egyszerre minden munka\u00e1llom\u00e1son, a t\u00e9nyleges kapacit\u00e1s alapj\u00e1n<\/strong>, a m\u0171szakok, a l\u00e9tsz\u00e1m \u00e9s a t\u00e1voll\u00e9tek figyelembev\u00e9tel\u00e9vel.<\/li>\n\n\n<li><strong>Az \u00f6sszes rendel\u00e9s k\u00f6z\u00f6s sorrendbe \u00e1ll\u00edt\u00e1sa<\/strong> hat\u00e1rid\u0151 \u00e9s priorit\u00e1s alapj\u00e1n, nem termel\u00e9si rendel\u00e9senk\u00e9nt k\u00fcl\u00f6n.<\/li>\n\n\n<li><strong>\u00c1t\u00e1ll\u00e1si id\u0151m\u00e1trix<\/strong> a sorrendt\u0151l f\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sokhoz, hogy az \u00fctemez\u0151motor a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lassza.<\/li>\n\n\n<li><strong>A szersz\u00e1mok \u00e9s a munkacsoportok mint korl\u00e1tok:<\/strong> az egyik g\u00e9pen haszn\u00e1lt k\u00f6z\u00f6s szersz\u00e1m nem \u00e1llhat egy m\u00e1sik g\u00e9p rendelkez\u00e9s\u00e9re, \u00e9s egy gy\u00e1rt\u00e1si feladathoz egyszerre t\u00f6bb g\u00e9pkezel\u0151re is sz\u00fcks\u00e9g lehet.<\/li>\n\n\n<li><strong>Az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s<\/strong>, amely ellen\u0151rzi a k\u00e9szletet \u00e9s a be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9seket.<\/li>\n\n\n<li><strong>Alternat\u00edv munka\u00e1llom\u00e1sok<\/strong>, amelyeket az \u00fctemez\u0151motor a teljes tervhez v\u00e1laszt ki, nem gy\u00e1rt\u00e1si rendel\u00e9senk\u00e9nt k\u00fcl\u00f6n.<\/li>\n\n\n<li><strong>T\u00f6bbszint\u0171 term\u00e9kek kezel\u00e9se<\/strong>, hogy a r\u00e9szegys\u00e9gek elk\u00e9sz\u00fcljenek, miel\u0151tt a f\u00f6l\u00e9rendelt term\u00e9k gy\u00e1rt\u00e1s\u00e1hoz sz\u00fcks\u00e9g lenne r\u00e1juk.<\/li>\n\n\n<li><strong>Automatikus \u00fajra\u00fctemez\u00e9s<\/strong> a gy\u00e1rt\u00e1s el\u0151rehalad\u00e1sakor vagy a rendel\u00e9sek v\u00e1ltoz\u00e1sakor.<\/li>\n\n\n<li><strong>Gantt-diagram a tervez\u0151knek, feladatsor a g\u00e9pkezel\u0151knek<\/strong>, a Community kiad\u00e1s mellett is.<\/li>\n\n\n<li><strong>Egy\u00e9rtelm\u0171 felel\u0151ss\u00e9gmegoszt\u00e1s az Odoo \u00e9s az \u00fctemez\u0151 k\u00f6z\u00f6tt.<\/strong> Az Odoo a napt\u00e1ri foglal\u00e1sb\u00f3l sz\u00e1m\u00edtja ki a gy\u00e1rt\u00e1si rendel\u00e9sek id\u0151pontjait, a Tervez\u00e9s gomb \u00fajb\u00f3li megnyom\u00e1sa pedig fel\u00fcl\u00edrja \u0151ket. R\u00f6gz\u00edts\u00e9k, hogy a sorrendet az \u00fctemez\u0151 hat\u00e1rozza meg. Az id\u0151pontokat \u00e9s a munka\u00e1llom\u00e1sokat a <code>mrp.workorder<\/code> objektumon kereszt\u00fcl \u00edrj\u00e1k vissza, a m\u00e1r folyamatban l\u00e9v\u0151 gy\u00e1rt\u00e1si rendel\u00e9seket pedig hagyj\u00e1k ki.<\/li>\n\n\n<li><strong>Az \u00d6n verzi\u00f3j\u00e1hoz \u00e9s el\u0151fizet\u00e9s\u00e9hez ill\u0151 API.<\/strong> Az Odoo 19 az External JSON-2 API-t k\u00edn\u00e1lja. Az XML-RPC \u00e9s a JSON-RPC <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">tervezett kivezet\u00e9se<\/a> az Odoo 22-ben (Odoo Online 21.1) esed\u00e9kes. K\u00fcls\u0151 API-hozz\u00e1f\u00e9r\u00e9s csak a Custom d\u00edjcsomagokban \u00e9rhet\u0151 el, a One App Free \u00e9s a Standard csomagban nem (<a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">a k\u00fcls\u0151 API dokument\u00e1ci\u00f3ja<\/a>). Az egyedi modulokhoz Odoo.sh vagy helysz\u00edni \u00fczemeltet\u00e9s sz\u00fcks\u00e9ges (<a href=\"https:\/\/www.odoo.com\/pricing-plan\">Odoo d\u00edjcsomagok<\/a>).<\/li>\n\n<\/ul>\n\n\n<p>A lehet\u0151s\u00e9gek n\u00e9gy csoportba sorolhat\u00f3k:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Az Odoo saj\u00e1t tervez\u00e9se<\/strong> a Plan gombot \u00e9s az Enterprise kiad\u00e1sban a Gantt-n\u00e9zetet foglalja mag\u00e1ban.<\/li>\n\n\n<li><strong>Az Odoo kliens\u00e9ben fut\u00f3 kieg\u00e9sz\u00edt\u0151 modulok<\/strong> a tervez\u0151t\u00e1bl\u00e1t vagy az id\u0151s\u00e1vok kioszt\u00e1s\u00e1nak logik\u00e1j\u00e1t fejlesztik tov\u00e1bb. Karbantart\u00e1sukr\u00f3l egy Odoo-partner gondoskodik.<\/li>\n\n\n<li><strong>Az ell\u00e1t\u00e1si l\u00e1ncot tervez\u0151 motorok \u00e9s a nagyv\u00e1llalati APS-rendszerek<\/strong> bevezet\u00e9si projekt keret\u00e9ben kapcsol\u00f3dnak az Odoo-hoz, \u00e9s k\u00fcl\u00f6n tervez\u0151csapat m\u0171k\u00f6dteti \u0151ket.<\/li>\n\n\n<li><strong>Az \u00fczemi v\u00e9grehajt\u00e1st is t\u00e1mogat\u00f3 felh\u0151alap\u00fa APS<\/strong> \u2013 ebbe a csoportba tartozik a SkyPlanner \u2013 az Odoo mellett minden er\u0151forr\u00e1st automatikusan \u00fctemez. A gy\u00e1rt\u00e1s v\u00e1ltoz\u00e1sait k\u00f6vetve folyamatosan \u00fajratervez, \u00e9s az \u00fctemtervet a g\u00e9pkezel\u0151k sz\u00e1m\u00e1ra is el\u00e9rhet\u0151v\u00e9 teszi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hol kap szerepet a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner APS a fent felsorolt minden korl\u00e1tra megold\u00e1st ad:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00c9rkez\u00e9si sorrend helyett tudatos \u00fctemez\u00e9s.<\/strong> Az Arcturus AI motor m\u00e1sodpercek alatt, egy\u00fcttesen \u00fctemezi az \u00f6sszes nyitott rendel\u00e9st a t\u00e9nylegesen rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1s figyelembev\u00e9tel\u00e9vel. A sorrendet a befejez\u00e9si d\u00e1tum, a priorit\u00e1s, az \u00fcgyf\u00e9l priorit\u00e1sa, a Fast Track \u00e9s a Dynamic Priorities alapj\u00e1n hat\u00e1rozza meg.<\/li>\n\n\n<li><strong>R\u00f6gz\u00edtett \u00e1t\u00e1ll\u00e1sok helyett r\u00f6videbb \u00e1t\u00e1ll\u00e1sok.<\/strong> Az \u00e1t\u00e1ll\u00e1si id\u0151m\u00e1trix minden term\u00e9kp\u00e1rhoz t\u00e1rolja az \u00e1t\u00e1ll\u00e1s idej\u00e9t, amely ir\u00e1nyonk\u00e9nt elt\u00e9rhet: k\u00e9kr\u0151l pirosra 30 perc, pirosr\u00f3l k\u00e9kre 60. Az \u00fctemez\u0151 a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja, \u00e9s a hasonl\u00f3 gy\u00e1rt\u00e1si feladatokat egym\u00e1s ut\u00e1n futtatja.<\/li>\n\n\n<li><strong>Egyetlen korl\u00e1t helyett minden korl\u00e1tot figyelembe vesz.<\/strong> A rendszer ugyanabban az \u00fctemtervben ellen\u0151rzi a munka\u00e1llom\u00e1sokat, m\u0171szakokat, dolgoz\u00f3kat, t\u00e1voll\u00e9teket, szersz\u00e1mokat \u00e9s anyagokat. A szersz\u00e1mok v\u00e9ges er\u0151forr\u00e1sok, \u00edgy az egyik g\u00e9pen haszn\u00e1lt befog\u00f3k\u00e9sz\u00fcl\u00e9ket nem foglalja le egyidej\u0171leg egy m\u00e1sik g\u00e9pre. Egy gy\u00e1rt\u00e1si feladathoz egyszerre t\u00f6bb g\u00e9pkezel\u0151re is sz\u00fcks\u00e9g lehet, \u00e9s ha az els\u0151dleges er\u0151forr\u00e1s nem el\u00e9rhet\u0151, az \u00fctemez\u0151motor alternat\u00edv g\u00e9pet vagy dolgoz\u00f3t v\u00e1laszt. Ugyanez a modell kezeli a munka\u00e1llom\u00e1scsoportokat, a hat\u00e9konys\u00e1got \u00e9s egy feladat t\u00f6bb munka\u00e1llom\u00e1s k\u00f6z\u00f6tti megoszt\u00e1s\u00e1t is. Az anyagellen\u0151rz\u00e9s kiterjed a rendelkez\u00e9sre \u00e1ll\u00f3 k\u00e9szletre \u00e9s a nyitott <code>purchase.order<\/code> sorokra: a megrendelt alkatr\u00e9szeket a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l tekinti el\u00e9rhet\u0151nek, a k\u00e9szlet pedig akkor friss\u00fcl, amikor a beszerz\u00e9si rendel\u00e9st Lesz\u00e1ll\u00edtva \u00e1llapot\u00fara \u00e1ll\u00edtj\u00e1k.<\/li>\n\n\n<li><strong>\u00d6sszehangolt r\u00e9szegys\u00e9ggy\u00e1rt\u00e1s.<\/strong> A r\u00e9szegys\u00e9gek \u00e9s a t\u00f6bbszint\u0171 term\u00e9kek \u00fctemez\u00e9se biztos\u00edtja, hogy az alkatr\u00e9szek elk\u00e9sz\u00fcljenek, mire az \u00f6sszeszerel\u00e9shez sz\u00fcks\u00e9g van r\u00e1juk.<\/li>\n\n\n<li><strong>K\u00e9zi \u00fajratervez\u00e9s helyett Autopilot.<\/strong> Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltozik a termel\u00e9s, az \u00d6n \u00e1ltal megadott z\u00e1rol\u00e1sok, a Running Time Lock \u00e9s a priorit\u00e1sok figyelembev\u00e9tel\u00e9vel.<\/li>\n\n\n<li><strong>Gantt \u00e9s \u00fczemi fel\u00fclet a Community mell\u00e9.<\/strong> A tervez\u0151k interakt\u00edv Gantt-id\u0151vonalon szerkesztik az \u00fctemtervet. A g\u00e9pkezel\u0151k telefonon vagy t\u00e1blag\u00e9pen l\u00e1tj\u00e1k a feladataik sorrendj\u00e9t, \u00e9s a Mobile Confirmations, a Production Timer \u00e9s a Quick Log Mode funkci\u00f3kkal r\u00f6gz\u00edtik a munk\u00e1t.<\/li>\n\n<\/ul>\n\n\n<p>A term\u00e9kek, darabjegyz\u00e9kek, k\u00e9szletek, beszerz\u00e9sek \u00e9s k\u00f6nyvel\u00e9si adatok els\u0151dleges nyilv\u00e1ntart\u00e1sa tov\u00e1bbra is az Odoo marad. A SkyPlanner k\u00e9tir\u00e1ny\u00faan kapcsol\u00f3dik hozz\u00e1 az External JSON-2 API-n kereszt\u00fcl, r\u00e9gebbi verzi\u00f3kn\u00e1l pedig XML-RPC \u00e9s JSON-RPC haszn\u00e1lat\u00e1val:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Bemen\u0151 adatok:<\/strong> <code>mrp.production<\/code>, <code>mrp.workorder<\/code>, <code>mrp.workcenter<\/code>, <code>mrp.bom<\/code> \u00e9s a nyitott <code>purchase.order<\/code> sorok.<\/li>\n\n\n<li><strong>Vissza\u00edrt adatok:<\/strong> a tervezett kezd\u00e9s, befejez\u00e9s \u00e9s a kiv\u00e1lasztott munka\u00e1llom\u00e1s, egy-egy <code>write<\/code> m\u0171velettel minden <code>mrp.workorder<\/code> rekordon (<code>date_start<\/code>, <code>date_finished<\/code>, <code>workcenter_id<\/code>). Ez az Odoo saj\u00e1t napt\u00e1ri foglal\u00e1s\u00e1t is \u00e1thelyezi, \u00edgy az Odoo tervez\u00e9si n\u00e9zeteiben a SkyPlanner \u00e1ltal megadott id\u0151pontok jelennek meg.<\/li>\n\n\n<li><strong>\u00dczem:<\/strong> a g\u00e9pkezel\u0151k visszajelent\u00e9sei <code>mrp.workcenter.productivity<\/code> rekordokk\u00e9nt, a Time Logs id\u0151bejegyz\u00e9seik\u00e9nt j\u00f6nnek l\u00e9tre.<\/li>\n\n<\/ul>\n\n\n<p>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait. Minden \u00fczem m\u00e1sk\u00e9pp haszn\u00e1lja az Odoo-t, saj\u00e1t m\u0171veletekkel, napt\u00e1rakkal \u00e9s egyedi modulokkal. A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n\u00f6k rendszer\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Odoo-partnere vagy saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>). A kezd\u00e9shez elegend\u0151 egy API-kulcs. Az API \u00e9s a funkci\u00f3k r\u00e9szleteit a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner dokument\u00e1ci\u00f3j\u00e1ban<\/a> tal\u00e1lja.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> sok rendel\u00e9s verseng ugyanazok\u00e9rt a sz\u0171k keresztmetszetet jelent\u0151 er\u0151forr\u00e1sok\u00e9rt, \u00e9s az \u00f6sszes rendel\u00e9s sorrendj\u00e9t a hat\u00e1rid\u0151knek kell meghat\u00e1rozniuk.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> az \u00e1t\u00e1ll\u00e1sok a sorrendt\u0151l f\u00fcggnek, vagy a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok \u00e9s a t\u00f6bb kezel\u0151t ig\u00e9nyl\u0151 feladatok hat\u00e1rozz\u00e1k meg, mi indulhat el k\u00f6vetkez\u0151k\u00e9nt.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> hetente t\u00f6bbsz\u00f6r \u00fajratervez, \u00e9s hossz\u00fa projekt helyett heteken bel\u00fcl szeretne m\u0171k\u00f6d\u0151 \u00fctemtervet kapni a saj\u00e1t termel\u00e9s\u00e9re.<\/p>\n\n\n<p>Kezdje egy CSV- vagy XLSX-exporttal a <a href=\"\/hu\/proba\/\">30 napos ingyenes pr\u00f3baid\u0151szakot<\/a> (legfeljebb 20 munka\u00e1llom\u00e1ssal, bankk\u00e1rtya n\u00e9lk\u00fcl), \u00e9s hasonl\u00edtsa \u00f6ssze a SkyPlanner \u00fctemterv\u00e9t a Plan gomb eredm\u00e9nyeivel. Ezt k\u00f6vet\u0151en az el\u0151fizet\u00e9s havi 199 \u20ac-t\u00f3l \u00e9rhet\u0151 el, 5 munka\u00e1llom\u00e1st tartalmaz, havonta sz\u00e1ml\u00e1zzuk, \u00e9s b\u00e1rmikor lemondhat\u00f3. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151zetes \u00e1raj\u00e1nlatot kap a csomagj\u00e1val egy\u00fctt, \u00edgy m\u00e1r a kezd\u00e9s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get. A rendszer bevezet\u00e9se a bevezet\u00e9si folyamat megkezd\u00e9se ut\u00e1n rendszerint heteken bel\u00fcl befejez\u0151dik. Tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a> \u00e9s a <a href=\"\/hu\/funkciok\/\">funkci\u00f3kat<\/a>.<\/p>\n\n\n<p>Tov\u00e1bbi inform\u00e1ci\u00f3k: <a href=\"\/hu\/integraciok\/erp\/odoo\/\">SkyPlanner az Odoo mell\u00e9<\/a>, <a href=\"\/hu\/integraciok\/erp\/odoo\/integracios-utmutato\/\">Odoo-integr\u00e1ci\u00f3s \u00fatmutat\u00f3<\/a> \u00e9s tov\u00e1bbi <a href=\"\/hu\/integraciok\/erp\/\">ERP-integr\u00e1ci\u00f3k<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1blagy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner seg\u00edts\u00e9g\u00e9vel az Excel-t\u00e1bl\u00e1zatokra \u00e9p\u00fcl\u0151 gy\u00e1rt\u00e1stervez\u00e9sr\u0151l \u00e1tt\u00e9rt\u00fcnk a termel\u00e9s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, \u00e9s az \u00faj feladatsorrend m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k egy palackt\u00f6lt\u0151 sor mellett a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>termel\u00e9si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9si hat\u00e9konys\u00e1g 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napos optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations termel\u00e9si vezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra<\/b><span>el\u0151re l\u00e1tja az \u00e9rt\u00e9kes\u00edt\u00e9s a szabad kapacit\u00e1st<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner megb\u00edzhat\u00f3 alapot teremt a teljes gy\u00e1rt\u00e1stervez\u00e9shez.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, termel\u00e9si vezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerrel \u00e9rintkez\u0151 csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st. Az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1ra vonatkoz\u00f3 k\u00e9r\u00e9sekre m\u00e1sodpercek alatt v\u00e1laszt kapnak, m\u00edg kor\u00e1bban ez egy \u00f3r\u00e1t vagy t\u00f6bbet vett ig\u00e9nybe.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/fredman-operations\/\">Olvassa el a Fredman Operations v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je egy hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa, a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner meghat\u00e1roz\u00f3 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1nak ar\u00e1nya mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, az \u00fctemez\u00e9shez pedig ma m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/ugyfeltortenetek\/kjh-comp\/\">Olvassa el a KJH-Comp v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van gy\u00e1rt\u00e1s\u00fctemez\u00e9s az Odoo Communityben?<\/summary>\n<p class=\"sp-faq__a\">Igen, alapszinten. A Community tartalmaz termel\u00e9si rendel\u00e9seket, gy\u00e1rt\u00e1si rendel\u00e9seket, munka\u00e1llom\u00e1sokat \u00e9s Plan gombot; az adatok list\u00e1ban, napt\u00e1rban, kimutat\u00e1sban \u00e9s grafikonon jelen\u00edthet\u0151k meg. A Gantt-\u00fctemez\u00e9si n\u00e9zet, a Shop Floor \u00e9s a Master Production Schedule az Enterprise funkci\u00f3i. A SkyPlanner Gantt-diagramot \u00e9s a g\u00e9pkezel\u0151knek feladatsorrendet biztos\u00edt a Community-t haszn\u00e1l\u00f3 \u00fczemeknek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Figyelembe veszi az Odoo MRP a munka\u00e1llom\u00e1sok kapacit\u00e1s\u00e1t?<\/summary>\n<p class=\"sp-faq__a\">Nem. Az ut\u00e1np\u00f3tl\u00e1s-tervez\u00e9s napt\u00e1ri napokban megadott \u00e1tfut\u00e1si id\u0151kkel sz\u00e1mol. Az Odoo dokument\u00e1ci\u00f3ja szerint ezek az \u00e1tfut\u00e1si id\u0151k &#8220;do not consider weekends, holidays, or work center capacity&#8221; (nem veszik figyelembe a h\u00e9tv\u00e9g\u00e9ket, az \u00fcnnepnapokat \u00e9s a munka\u00e1llom\u00e1sok kapacit\u00e1s\u00e1t). A kapacit\u00e1st csak akkor veszi figyelembe a rendszer, amikor egy termel\u00e9si rendel\u00e9sen (MO) megnyomja a Plan gombot.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Futtathat az Odoo egyszerre t\u00f6bb feladatot egy munka\u00e1llom\u00e1son?<\/summary>\n<p class=\"sp-faq__a\">Az \u00fctemez\u0151ben nem. A 19.0 verzi\u00f3 k\u00f3dja minden gy\u00e1rt\u00e1si rendel\u00e9snek olyan id\u0151intervallumot foglal, amely nem fedi \u00e1t az adott munka\u00e1llom\u00e1s t\u00f6bbi gy\u00e1rt\u00e1si rendel\u00e9s\u00e9t. A Product Capacities lapon az egy gy\u00e1rt\u00e1si rendel\u00e9sen bel\u00fcli ciklusonk\u00e9nti darabsz\u00e1m \u00e1ll\u00edthat\u00f3 be, nem pedig p\u00e1rhuzamos gy\u00e1rt\u00e1si rendel\u00e9sek.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kezeli az Odoo a sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1si id\u0151ket?<\/summary>\n<p class=\"sp-faq__a\">Nem. A Setup Time \u00e9s a Cleanup Time munka\u00e1llom\u00e1sonk\u00e9nt r\u00f6gz\u00edtett perc\u00e9rt\u00e9k, illetve a Product Capacities lapon term\u00e9kenk\u00e9nt is megadhat\u00f3. Az Odoo ezeket minden gy\u00e1rt\u00e1si rendel\u00e9shez hozz\u00e1adja, f\u00fcggetlen\u00fcl att\u00f3l, milyen feladat futott el\u0151tte. A SkyPlanner \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixa term\u00e9kp\u00e1ronk\u00e9nt \u00e9s ir\u00e1nyonk\u00e9nt t\u00e1rolja az \u00e1t\u00e1ll\u00e1si id\u0151ket, \u00e9s \u00fagy rendezi sorba a feladatokat, hogy ezeket minimaliz\u00e1lja.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan kapcsol\u00f3dik a SkyPlanner APS az Odoo-hoz?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner k\u00e9tir\u00e1ny\u00fa kapcsolatot tart fenn az Odoo rendszerrel a k\u00fcls\u0151 JSON-2 API-n kereszt\u00fcl, a 16.0\u201318.0 verzi\u00f3kban pedig az XML-RPC vagy JSON-RPC protokollon kereszt\u00fcli <code>execute_kw<\/code> h\u00edv\u00e1sokkal. A tervezett id\u0151pontokat \u00e9s munka\u00e1llom\u00e1sokat az egyes <code>mrp.workorder<\/code> rekordokba \u00edrja vissza, a r\u00f6gz\u00edtett munkaid\u0151b\u0151l pedig az Odoo Time Logs id\u0151bejegyz\u00e9sei k\u00e9sz\u00fclnek. A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n konfigur\u00e1lja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1. A r\u00e9szleteket az <a href=\"\/hu\/integraciok\/erp\/odoo\/integracios-utmutato\/\">Odoo-integr\u00e1ci\u00f3s \u00fatmutat\u00f3ban<\/a> tal\u00e1lja.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatom a SkyPlannert az Odoo-integr\u00e1ci\u00f3 el\u0151tt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos pr\u00f3baid\u0151szakban az Odoo listan\u00e9zeteib\u0151l export\u00e1lt CSV- vagy XLSX-f\u00e1jlokkal dolgozhat, legfeljebb 20 munka\u00e1llom\u00e1ssal, bankk\u00e1rtya n\u00e9lk\u00fcl. M\u00e9g az \u00f6sszekapcsol\u00e1s el\u0151tt \u00f6sszehasonl\u00edthatja a SkyPlanner \u00fctemterv\u00e9t a Plan gomb eredm\u00e9nyeivel. <a href=\"\/hu\/proba\/\">Ind\u00edtsa el az ingyenes pr\u00f3b\u00e1t<\/a>, vagy <a href=\"\/hu\/kapcsolat-ertekesites\/\">l\u00e9pjen kapcsolatba \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Odoo Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni Az Odoo alapszinten k\u00e9pes a t\u00e9nyleges g\u00e9p- \u00e9s l\u00e9tsz\u00e1mkapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9sre. Az Odoo Manufacturing Plan gombja minden gy\u00e1rt\u00e1si rendel\u00e9st a hozz\u00e1 tartoz\u00f3 munka\u00e1llom\u00e1s napt\u00e1r\u00e1nak els\u0151 szabad id\u0151s\u00e1vj\u00e1ba \u00fctemez. \u00cdgy egy munka\u00e1llom\u00e1son k\u00e9t \u00fctemezett gy\u00e1rt\u00e1si &#8230; <a title=\"Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/\" aria-label=\"Read more about Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100829,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101186","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Odoo: termel\u00e9s\u00fctemez\u00e9s \u00e9s a Plan gomb<\/title>\n<meta name=\"description\" content=\"Az Odoo Plan gombja a munka\u00e1llom\u00e1s els\u0151 szabad idej\u00e9re \u00fctemez minden gy\u00e1rt\u00e1si rendel\u00e9st. Mire k\u00e9pes, hol vannak a korl\u00e1tai, \u00e9s mikor kell APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni\" \/>\n<meta property=\"og:description\" content=\"Az Odoo Plan gombja a munka\u00e1llom\u00e1s els\u0151 szabad idej\u00e9re \u00fctemez minden gy\u00e1rt\u00e1si rendel\u00e9st. Mire k\u00e9pes, hol vannak a korl\u00e1tai, \u00e9s mikor kell APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"23 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/odoo\\\/termelesutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/odoo\\\/termelesutemezes\\\/\",\"name\":\"Odoo: termel\u00e9s\u00fctemez\u00e9s \u00e9s a Plan gomb\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Az Odoo Plan gombja a munka\u00e1llom\u00e1s els\u0151 szabad idej\u00e9re \u00fctemez minden gy\u00e1rt\u00e1si rendel\u00e9st. Mire k\u00e9pes, hol vannak a korl\u00e1tai, \u00e9s mikor kell APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/odoo\\\/termelesutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/odoo\\\/termelesutemezes\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/odoo\\\/termelesutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS az Odoo mell\u00e9: termel\u00e9s\u00fctemez\u00e9s \u00e9s integr\u00e1ci\u00f3\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Odoo: termel\u00e9s\u00fctemez\u00e9s \u00e9s a Plan gomb","description":"Az Odoo Plan gombja a munka\u00e1llom\u00e1s els\u0151 szabad idej\u00e9re \u00fctemez minden gy\u00e1rt\u00e1si rendel\u00e9st. Mire k\u00e9pes, hol vannak a korl\u00e1tai, \u00e9s mikor kell APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni","og_description":"Az Odoo Plan gombja a munka\u00e1llom\u00e1s els\u0151 szabad idej\u00e9re \u00fctemez minden gy\u00e1rt\u00e1si rendel\u00e9st. Mire k\u00e9pes, hol vannak a korl\u00e1tai, \u00e9s mikor kell APS?","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"23 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/","name":"Odoo: termel\u00e9s\u00fctemez\u00e9s \u00e9s a Plan gomb","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Az Odoo Plan gombja a munka\u00e1llom\u00e1s els\u0151 szabad idej\u00e9re \u00fctemez minden gy\u00e1rt\u00e1si rendel\u00e9st. Mire k\u00e9pes, hol vannak a korl\u00e1tai, \u00e9s mikor kell APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/termelesutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS az Odoo mell\u00e9: termel\u00e9s\u00fctemez\u00e9s \u00e9s integr\u00e1ci\u00f3","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Odoo Van az Odoo-ban termel\u00e9s\u00fctemez\u00e9s? \u00cdgy m\u0171k\u00f6dik a Plan gomb, \u00e9s ekkor \u00e9rdemes SkyPlanner APS-sel kieg\u00e9sz\u00edteni Az Odoo alapszinten k\u00e9pes a t\u00e9nyleges g\u00e9p- \u00e9s l\u00e9tsz\u00e1mkapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9sre. Az Odoo Manufacturing Plan gombja minden gy\u00e1rt\u00e1si rendel\u00e9st a hozz\u00e1 tartoz\u00f3 munka\u00e1llom\u00e1s napt\u00e1r\u00e1nak els\u0151 szabad id\u0151s\u00e1vj\u00e1ba \u00fctemez. \u00cdgy egy munka\u00e1llom\u00e1son k\u00e9t \u00fctemezett gy\u00e1rt\u00e1si&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=101186"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101186\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100829"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=101186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}