{"id":101156,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101156"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integracios-utmutato","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/","title":{"rendered":"SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 <span class=\"hl\">a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ez az \u00fatmutat\u00f3 SAP-partnereknek, informatikai csapatoknak \u00e9s m\u0171szaki beszerz\u00e9si d\u00f6nt\u00e9shoz\u00f3knak mutatja be, hogyan kapcsol\u00f3dik a SkyPlanner APS az SAP S\/4HANA rendszerhez. A SkyPlanner az SAP \u00e1ltal kiadott OData API-kon kereszt\u00fcl, k\u00e9tir\u00e1ny\u00faan integr\u00e1l\u00f3dik az S\/4HANA rendszerrel:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>A gy\u00e1rt\u00e1si rendel\u00e9sek, m\u0171veletek, munka\u00e1llom\u00e1s-kapacit\u00e1sok, k\u00e9szletek \u00e9s nyitott beszerz\u00e9si rendel\u00e9sek adatai beker\u00fclnek a SkyPlannerbe.<\/li>\n\n\n<li>A tervezett kezd\u00e9si id\u0151pontok visszaker\u00fclnek a gy\u00e1rt\u00e1si rendel\u00e9sek egyes m\u0171veleteihez.<\/li>\n\n\n<li>A g\u00e9pkezel\u0151k id\u0151elsz\u00e1mol\u00e1sai a gy\u00e1rt\u00e1si rendel\u00e9sek visszajelent\u00e9seik\u00e9nt ker\u00fclnek k\u00f6nyvel\u00e9sre.<\/li>\n\n\n<li>A SkyPlanner webhookjai azonnal tov\u00e1bb\u00edtj\u00e1k az \u00fctemterv v\u00e1ltoz\u00e1sait.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-diagramja a munka\u00e1llom\u00e1sokra \u00fctemezett feladatokkal \u00e9s az alattuk l\u00e1that\u00f3 rendel\u00e9slist\u00e1val.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az anyagok, darabjegyz\u00e9kek, technol\u00f3giai \u00fatvonalak, gy\u00e1rt\u00e1si rendel\u00e9sek, k\u00e9szletek \u00e9s k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1s kezel\u00e9se az S\/4HANA rendszerben marad. A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n S\/4HANA-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. Az \u00fczleti el\u0151ny\u00f6ket az <a href=\"\/hu\/integraciok\/erp\/sap-s4hana\/\">SAP S\/4HANA gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9t bemutat\u00f3 oldalon<\/a> tal\u00e1lja. Az S\/4HANA \u00f6n\u00e1ll\u00f3 \u00fctemez\u00e9si k\u00e9pess\u00e9geir\u0151l a <a href=\"\/hu\/integraciok\/erp\/sap-s4hana\/termelesutemezes\/\">K\u00e9pes az SAP S\/4HANA termel\u00e9s\u00fctemez\u00e9sre?<\/a> c\u00edm\u0171 cikkben olvashat.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az SAP S\/4HANA integr\u00e1ci\u00f3s lehet\u0151s\u00e9gei<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Az S\/4HANA kiadott OData-szolg\u00e1ltat\u00e1sokon kereszt\u00fcl biztos\u00edt integr\u00e1ci\u00f3s hozz\u00e1f\u00e9r\u00e9st; ezek az SAP Business Accelerator Hub (api.sap.com) oldal\u00e1n tal\u00e1lhat\u00f3k. Az \u00fctemez\u00e9si integr\u00e1ci\u00f3 OData V2 szolg\u00e1ltat\u00e1sokra \u00e9p\u00fcl. Az IDoc \u00e9s a BAPI tov\u00e1bbra is el\u00e9rhet\u0151, de ez az \u00fatmutat\u00f3 a kiadott OData API-kat haszn\u00e1lja.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hiteles\u00edt\u00e9s kiad\u00e1sonk\u00e9nt<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Helysz\u00edni telep\u00edt\u00e9s \u00e9s Private Edition.<\/strong> A szolg\u00e1ltat\u00e1sokat az SAP Gateway rendszerben, a <code>\/IWFND\/MAINT_SERVICE<\/code> tranzakci\u00f3val kell aktiv\u00e1lni. Az integr\u00e1ci\u00f3s felhaszn\u00e1l\u00f3nak rendelkeznie kell a megfelel\u0151 jogosults\u00e1gi objektumokkal: p\u00e9ld\u00e1ul <code>C_AFRU_AWK<\/code> a visszajelent\u00e9sekhez, <code>C_AFKO_AWK<\/code> az ezekkel egy\u00fctt k\u00f6nyvelt anyagmozg\u00e1si t\u00e9telekhez \u00e9s <code>M_PLAF_ORG<\/code> a tervrendel\u00e9sekhez.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> A szolg\u00e1ltat\u00e1sok csak kommunik\u00e1ci\u00f3s meg\u00e1llapod\u00e1sokon kereszt\u00fcl \u00e9rhet\u0151k el. Az <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">SAP bej\u00f6v\u0151 kommunik\u00e1ci\u00f3ra vonatkoz\u00f3 be\u00e1ll\u00edt\u00e1si \u00fatmutat\u00f3ja<\/a> alapj\u00e1n hozzon l\u00e9tre egy kommunik\u00e1ci\u00f3s felhaszn\u00e1l\u00f3t, egy kommunik\u00e1ci\u00f3s rendszert \u00e9s egy kommunik\u00e1ci\u00f3s meg\u00e1llapod\u00e1st a <strong>Communication Arrangements<\/strong> alkalmaz\u00e1sban, egy SAP kommunik\u00e1ci\u00f3s forgat\u00f3k\u00f6nyvre (<code>SAP_COM_xxxx<\/code>) \u00e9p\u00edtve. A forgat\u00f3k\u00f6nyv hat\u00e1rozza meg, mely szolg\u00e1ltat\u00e1sok \u00e9rhet\u0151k el, \u00e9s milyen hiteles\u00edt\u00e9si m\u00f3dok haszn\u00e1lhat\u00f3k:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; tokenalap\u00fa: OAuth, SAML vagy OpenID Connect szerinti hiteles\u00edt\u00e9s bearer tokennel, az identit\u00e1s \u00fczleti felhaszn\u00e1l\u00f3hoz t\u00f6rt\u00e9n\u0151 tov\u00e1bb\u00edt\u00e1s\u00e1val &#8211; \u00fcgyf\u00e9ltan\u00fas\u00edtv\u00e1ny &#8211; alapszint\u0171 hiteles\u00edt\u00e9s technikai kommunik\u00e1ci\u00f3s felhaszn\u00e1l\u00f3val<\/p>\n\n\n<p>Az SAP token- vagy tan\u00fas\u00edtv\u00e1nyalap\u00fa hiteles\u00edt\u00e9st javasol.<\/p>\n\n\n<p>A SkyPlanner oldal\u00e1n egy API-tokenes hiteles\u00edt\u00e9st haszn\u00e1l\u00f3 REST API \u00e1ll rendelkez\u00e9sre, amelynek dokument\u00e1ci\u00f3ja Swagger\/OpenAPI form\u00e1tumban \u00e9rhet\u0151 el (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>). A k\u00f6ztes szoftver \u00edgy az egyik oldalon az SAP-hiteles\u00edt\u00e9st, a m\u00e1sikon a SkyPlanner API-tokenj\u00e9t kezeli.<\/p>\n\n\n<h3 class=\"wp-block-heading\">API-k a gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Szolg\u00e1ltat\u00e1s<\/th><th>Haszn\u00e1lt entit\u00e1sok \u00e9s akci\u00f3k<\/th><th>Rendeltet\u00e9s<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; akci\u00f3k: <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>Rendel\u00e9sek, m\u0171veletek, komponensek, PRT-k, st\u00e1tusz, az \u00fctemterv vissza\u00edr\u00e1sa<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>Munka\u00e1llom\u00e1sok, kapacit\u00e1skateg\u00f3ri\u00e1k, id\u0151intervallumok \u00e9s m\u0171szakok<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>Standard technol\u00f3giai \u00fatvonalak a rendel\u00e9sek l\u00e9trehoz\u00e1s\u00e1t megel\u0151z\u0151 tervez\u00e9shez<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>T\u00f6bbszint\u0171 term\u00e9kstrukt\u00fara<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Anyagok (az API-ban Product n\u00e9ven). Az SAP a legt\u00f6bb term\u00e9kentit\u00e1shoz m\u00e1r a Product (Version 2) API-t aj\u00e1nlja<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>Az MRP Live eredm\u00e9nye az \u00e1talak\u00edt\u00e1s el\u0151tt<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>K\u00e9szlet gy\u00e1rank\u00e9nt \u00e9s rakt\u00e1rhelyenk\u00e9nt, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1nak meghat\u00e1roz\u00e1s\u00e1hoz<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>A be\u00e9rkez\u0151 anyagok nyitott beszerz\u00e9si rendel\u00e9sei<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; akci\u00f3k: <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>\u00dczemi visszajelent\u00e9sek \u00e9s anyagmozg\u00e1sok<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A gy\u00e1rt\u00e1si rendel\u00e9s API-j\u00e1ban a m\u0171veleteket az <code>OrderInternalBillOfOperations<\/code> \u00e9s az <code>OrderIntBillOfOperationsItem<\/code> egy\u00fcttesen azonos\u00edtja, nem a tervez\u0151 \u00e1ltal l\u00e1tott m\u0171veletsz\u00e1m. A visszajelent\u00e9si API <code>GetConfProposal<\/code> akci\u00f3ja ugyanezt a m\u0171veletet az <code>OrderID<\/code> \u00e9s az <code>OrderOperation<\/code> alapj\u00e1n \u00e9ri el. A bels\u0151 kulcsokat \u00e9s a m\u0171veletsz\u00e1mot m\u00e1r az els\u0151 bet\u00f6lt\u00e9st\u0151l kezdve t\u00e1rolja a SkyPlanner rendszerben.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Esem\u00e9nyek<\/h3>\n\n\n<p>Az S\/4HANA <strong>Production Order Created<\/strong> \u00e9s <strong>Production Order Changed<\/strong> <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">\u00fczleti esem\u00e9nyeket<\/a> gener\u00e1l, amelyek adattartalm\u00e1ban a <code>ManufacturingOrder<\/code>, a <code>ProductionOrder<\/code>, a <code>ProductionOrderType<\/code> \u00e9s a <code>ProductionPlant<\/code> szerepel. Az esem\u00e9ny csak kulcsokat tartalmaz, ez\u00e9rt az integr\u00e1ci\u00f3 \u00fajra beolvassa a rendel\u00e9st \u00e9s a m\u0171veleteit. A Changed esem\u00e9ny a rendel\u00e9s minden m\u00f3dos\u00edt\u00e1sakor kiv\u00e1lt\u00f3dik, ez\u00e9rt alkalmazzon debounce-kezel\u00e9st. A m\u00e1sik ir\u00e1nyban a SkyPlanner webhookjai val\u00f3s id\u0151ben k\u00fcldenek \u00e9rtes\u00edt\u00e9st az \u00fctemterv vagy a gy\u00e1rt\u00e1si feladat \u00e1llapot\u00e1nak v\u00e1ltoz\u00e1sakor.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kezd\u00e9s f\u00e1jlos adat\u00e1tvitellel<\/h3>\n\n\n<p>A pr\u00f3ba sor\u00e1n export\u00e1lja a gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s a munka\u00e1llom\u00e1sokat az S\/4HANA listariportjaib\u00f3l Excel- vagy CSV-f\u00e1jlba, majd import\u00e1lja \u0151ket a SkyPlannerbe. \u00cdgy m\u00e9g azel\u0151tt ellen\u0151rizhet\u0151 az \u00fctemterv, hogy b\u00e1rki hozz\u00e1ny\u00falna a Gateway vagy a kommunik\u00e1ci\u00f3 be\u00e1ll\u00edt\u00e1saihoz.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Adatmegfeleltet\u00e9s az SAP S\/4HANA \u00e9s a SkyPlanner k\u00f6z\u00f6tt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>S\/4HANA-entit\u00e1s \/ v\u00e9gpont<\/th><th>SkyPlanner-objektum<\/th><th>Ir\u00e1ny<\/th><th>Gyakoris\u00e1g<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (anyag)<\/td><td>Term\u00e9k vagy anyag<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd a v\u00e1ltoz\u00e1sok \u00fctemezett \u00e1tvitele<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>Term\u00e9kstrukt\u00fara, r\u00e9szterm\u00e9kek<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd \u00fctemezetten<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>Munka\u00e1llom\u00e1s<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd v\u00e1ltoz\u00e1skor<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>Kapacit\u00e1s \u00e9s m\u0171szakok<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd \u00fctemezetten<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Folyamatl\u00e9p\u00e9sek \u00e9s normaid\u0151k<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Kezdeti bet\u00f6lt\u00e9s, majd \u00fctemezetten<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (enged\u00e9lyezett vagy l\u00e9trehozott)<\/td><td>Rendel\u00e9s hat\u00e1rid\u0151vel<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>K\u00f6zel val\u00f3s id\u0151ben a Created\/Changed esem\u00e9nyekre, vagy \u00fctemezett lek\u00e9rdez\u00e9ssel<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>Gy\u00e1rt\u00e1si feladat (egy munka\u00e1llom\u00e1son v\u00e9gzett folyamatl\u00e9p\u00e9s)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>A rendel\u00e9ssel egy\u00fctt<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (gy\u00e1rt\u00e1si seg\u00e9deszk\u00f6z\u00f6k\/szersz\u00e1mok)<\/td><td>Szersz\u00e1mok, korl\u00e1tozott kapacit\u00e1s\u00fa k\u00f6z\u00f6s er\u0151forr\u00e1sk\u00e9nt \u00fctemezve<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>A rendel\u00e9ssel egy\u00fctt<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Anyagsz\u00fcks\u00e9glet \u00e9s k\u00e9szlet<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00dctemezetten, a felm\u00e9r\u00e9s sor\u00e1n egyeztetett id\u0151k\u00f6z\u00f6nk\u00e9nt<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): nyitott mennyis\u00e9g \u00e9s az \u00fctemez\u00e9si sorban megadott sz\u00e1ll\u00edt\u00e1si d\u00e1tum<\/td><td>Beszerz\u00e9si rendel\u00e9sek \/ be\u00e9rkez\u0151 anyagok v\u00e1rhat\u00f3 sz\u00e1ll\u00edt\u00e1si d\u00e1tummal<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>\u00dctemezetten, a felm\u00e9r\u00e9s sor\u00e1n egyeztetett id\u0151k\u00f6z\u00f6nk\u00e9nt<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (opcion\u00e1lis)<\/td><td>Az \u00e1talak\u00edt\u00e1s el\u0151tt megtervezett rendel\u00e9sek<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Minden MRP Live-fut\u00e1s ut\u00e1n<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (m\u0171veletkezd\u00e9s, el\u0151re \u00fctemez\u00e9s)<\/td><td>\u00dctemterv<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Az \u00fctemterv v\u00e1ltoz\u00e1sakor, webhookon kereszt\u00fcl<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (j\u00f3 mennyis\u00e9g, selejt, tev\u00e9kenys\u00e9gek)<\/td><td>Id\u0151bejegyz\u00e9sek \u00e9s mennyis\u00e9gek<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Bejegyz\u00e9senk\u00e9nt vagy k\u00f6tegelve<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integr\u00e1ci\u00f3s mint\u00e1k<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. T\u00f6rzsadatok bet\u00f6lt\u00e9se.<\/strong> T\u00f6ltse be az anyagokat, darabjegyz\u00e9keket, a munka\u00e1llom\u00e1sokat a kapacit\u00e1sintervallumaikkal \u00e9s m\u0171szakjaikkal egy\u00fctt, valamint a technol\u00f3giai \u00fatvonalakat. Ekkor d\u00f6ntse el, melyik rendszer kezeli a m\u0171szakokat. Egy m\u0171k\u00f6d\u0151 feloszt\u00e1s: az \u00fczemi napt\u00e1r az S\/4HANA rendszerben marad, a r\u00e9szletes m\u0171szakbeoszt\u00e1sok, t\u00e1voll\u00e9tek \u00e9s t\u00fal\u00f3r\u00e1k pedig a SkyPlannerbe ker\u00fclnek, ahol a tervez\u0151k naponta m\u00f3dos\u00edtj\u00e1k \u0151ket.<\/p>\n\n\n<p><strong>2. Rendel\u00e9sek szinkroniz\u00e1l\u00e1sa.<\/strong> Iratkozzon fel a Production Order Created\/Changed esem\u00e9nyekre, vagy ahol nincsenek be\u00e1ll\u00edtva \u00fczleti esem\u00e9nyek, k\u00e9rdezze le rendszeresen az <code>A_ProductionOrder_2<\/code> entit\u00e1st a m\u00f3dos\u00edt\u00e1s id\u0151b\u00e9lyege alapj\u00e1n. Sz\u0171rj\u00f6n gy\u00e1rra, rendel\u00e9st\u00edpusra \u00e9s st\u00e1tuszra. A rendel\u00e9seket m\u00e1r l\u00e9trehoz\u00e1sukkor k\u00fcldje \u00e1t, hogy a SkyPlanner el\u0151re tudjon tervezni, \u00e9s miut\u00e1n a SkyPlanner \u00fctemezte \u0151ket, enged\u00e9lyezze \u0151ket az S\/4HANA rendszerben (<code>ReleaseOrder<\/code> vagy <code>ReleaseOperation<\/code>).<\/p>\n\n\n<p><strong>3. Az \u00fctemterv vissza\u00edr\u00e1sa.<\/strong> Amikor egy SkyPlanner-webhook az \u00fctemterv v\u00e1ltoz\u00e1s\u00e1t jelzi, az integr\u00e1ci\u00f3 minden m\u00f3dosult m\u0171velethez megh\u00edvja az <code>API_PRODUCTION_ORDER_2_SRV<\/code> API <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a> akci\u00f3j\u00e1t. A k\u00f6vetkez\u0151ket k\u00fcldi el:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>kulcsk\u00e9nt a <code>ManufacturingOrder<\/code>, az <code>OrderInternalBillOfOperations<\/code> \u00e9s az <code>OrderIntBillOfOperationsItem<\/code> \u00e9rt\u00e9k\u00e9t<\/li>\n\n\n<li>az <code>OpSchedulingMode<\/code> mez\u0151ben F (el\u0151re \u00fctemez\u00e9s), a SkyPlanner szerinti kezd\u00e9si d\u00e1tummal \u00e9s id\u0151vel az <code>OpSchedldStartDate<\/code> \u00e9s az <code>OpSchedldStartTime<\/code> mez\u0151ben<\/li>\n\n\n<li>az <code>OpSchedulingStatus<\/code> mez\u0151ben DISP (kioszt\u00e1s), a k\u00f6telez\u0151 <code>OpSchedulingStrategy<\/code> mez\u0151ben pedig M<\/li>\n\n\n<li>az ETag \u00e9rt\u00e9k\u00e9t az <code>if-match<\/code> fejl\u00e9cben<\/li>\n\n<\/ul>\n\n\n<p>Egy rendel\u00e9s \u00f6sszes m\u0171velete egyetlen v\u00e1ltoz\u00e1scsomagba ker\u00fcl, a SkyPlannerben meghat\u00e1rozott sorrendben, \u00edgy az S\/4HANA egyetlen h\u00edv\u00e1ssal \u00fctemezi be a rendel\u00e9s teljes terv\u00e9t. A K m\u00f3dot soha nem haszn\u00e1ljuk: ez megtartja a m\u0171veletek eredeti id\u0151pontjait, \u00e9s figyelmen k\u00edv\u00fcl hagyja az elk\u00fcld\u00f6tt id\u0151pontokat.<\/p>\n\n\n<p>A SkyPlanner a technol\u00f3giai \u00fatvonalak ugyanazon norma\u00e9rt\u00e9kei \u00e9s a munka\u00e1llom\u00e1sok ugyanazon kapacit\u00e1sk\u00e9pletei alapj\u00e1n sz\u00e1m\u00edtja ki a m\u0171veletek id\u0151tartam\u00e1t, mint az S\/4HANA. Az S\/4HANA \u00e1ltal az \u00e1tvett kezd\u00e9si id\u0151pontb\u00f3l sz\u00e1m\u00edtott befejez\u00e9s \u00edgy \u00f6sszhangban lesz a SkyPlanner \u00fctemterv\u00e9vel. Az integr\u00e1ci\u00f3 minden v\u00e1ltoz\u00e1scsomag ut\u00e1n \u00fajra beolvassa a m\u0171veleteket, \u00e9s megjel\u00f6li az elt\u00e9r\u0151 id\u0151pontokat, \u00edgy a tervez\u0151 m\u00e9g a k\u00f6vetkez\u0151 m\u0171szak el\u0151tt l\u00e1tja az elt\u00e9r\u00e9seket.<\/p>\n\n\n<p><strong>4. \u00dczemi visszajelent\u00e9sek.<\/strong> A Mobile Confirmations vagy a Production Timer minden id\u0151bejegyz\u00e9s\u00e9b\u0151l S\/4HANA-visszajelent\u00e9s lesz. A SkyPlanner webhookja egy <code>ProdnOrdConf2<\/code> POST-k\u00e9r\u00e9st v\u00e1lt ki, amely tartalmazza a j\u00f3 mennyis\u00e9get, a selejtet \u00e9s a tev\u00e9kenys\u00e9gid\u0151ket. Az integr\u00e1ci\u00f3 el\u0151sz\u00f6r a <code>GetConfProposal<\/code> akci\u00f3t h\u00edvja meg, \u00edgy az S\/4HANA javaslatot ad a mennyis\u00e9gekre, tev\u00e9kenys\u00e9gekre, d\u00e1tumokra \u00e9s szem\u00e9lyzeti adatokra. Az anyagmozg\u00e1sokra a <code>GetGdsMvtProposal<\/code> ad javaslatot.<\/p>\n\n\n<p><strong>Be\u00e9rkez\u0151 anyagok.<\/strong> A nyitott beszerz\u00e9si rendel\u00e9sek is r\u00e9szei a bej\u00f6v\u0151 szinkroniz\u00e1l\u00e1snak. A SkyPlanner a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s v\u00e1rhat\u00f3 sz\u00e1ll\u00edt\u00e1si napj\u00e1t\u00f3l tekinti el\u00e9rhet\u0151nek. A v\u00e1s\u00e1rolt alkatr\u00e9szekre v\u00e1r\u00f3 feladatokat az anyag be\u00e9rkez\u00e9s\u00e9nek napj\u00e1ra \u00fctemezi; ezt a jelenlegi k\u00e9szletszint nem akad\u00e1lyozza meg.<\/p>\n\n\n<p>Az \u00e1rube\u00e9rkez\u00e9sek hiteles nyilv\u00e1ntart\u00e1sa tov\u00e1bbra is az S\/4HANA rendszerben marad: az \u00e1rube\u00e9rkez\u00e9s k\u00f6nyvel\u00e9sekor n\u0151 a k\u00e9szlet, \u00e9s cs\u00f6kken a beszerz\u00e9si rendel\u00e9s t\u00e9tel\u00e9nek nyitott mennyis\u00e9ge. A k\u00f6vetkez\u0151 szinkroniz\u00e1l\u00e1s friss\u00edti a SkyPlanner k\u00e9szletadatait, \u00e9s a teljes eg\u00e9sz\u00e9ben be\u00e9rkezett beszerz\u00e9si rendel\u00e9st Delivered \u00e1llapot\u00fara \u00e1ll\u00edtja. R\u00e9szleges be\u00e9rkez\u00e9s ut\u00e1n a fennmarad\u00f3 nyitott mennyis\u00e9g tov\u00e1bbra is v\u00e1rhat\u00f3 be\u00e9rkez\u00e9sk\u00e9nt szerepel, a sz\u00e1ll\u00edt\u00e1si \u00fctemez\u00e9s sor\u00e1ban megadott d\u00e1tummal. A beszerz\u00e9si rendel\u00e9sek SkyPlannerben t\u00f6rt\u00e9n\u0151 kezel\u00e9s\u00e9t a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner dokument\u00e1ci\u00f3ja<\/a> ismerteti.<\/p>\n\n\n<p><strong>5. Adatgazdai szab\u00e1lyok.<\/strong> Az S\/4HANA kezeli a mennyis\u00e9geket, a darabjegyz\u00e9ket, a technol\u00f3giai \u00fatvonalat, a k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1st \u00e9s az \u00e1llapotot. A SkyPlanner hat\u00e1rozza meg a sorrendet, a munka\u00e1llom\u00e1sokhoz rendel\u00e9st \u00e9s a m\u0171veletek id\u0151pontjait. Soha ne engedje, hogy mindk\u00e9t rendszer ugyanazt a mez\u0151t \u00edrja. Ha a tervez\u0151k tov\u00e1bbra is \u00e1thelyeznek m\u0171veleteket a Capacity Scheduling Board fel\u00fclet\u00e9n, d\u00f6ntse el, melyik m\u00f3dos\u00edt\u00e1s \u00e9lvez els\u0151bbs\u00e9get. Vagy a k\u00f6vetkez\u0151 rendel\u00e9sszinkroniz\u00e1l\u00e1s viszi \u00e1t a m\u00f3dos\u00edt\u00e1sukat a SkyPlannerbe, vagy az adott munka\u00e1llom\u00e1s kimarad a SkyPlanner hat\u00f3k\u00f6r\u00e9b\u0151l.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mit tartalmaz a projekt?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A megval\u00f3s\u00edt\u00e1s a bevezet\u00e9s megkezd\u00e9se ut\u00e1n \u00e1ltal\u00e1ban heteken bel\u00fcl lez\u00e1rul, m\u00e9g nagyv\u00e1llalatokn\u00e1l is. A legt\u00f6bb \u00fczem a 30 napos ingyenes pr\u00f3b\u00e1val, CSV- vagy Excel-exportokkal kezd, \u00edgy az \u00fctemtervet m\u00e9g az API-val kapcsolatos munka el\u0151tt saj\u00e1t adatokon ellen\u0151rzik. Az ezt k\u00f6vet\u0151 S\/4HANA-projekt az al\u00e1bbiakat foglalja mag\u00e1ban:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Felm\u00e9r\u00e9s:<\/strong> \u00fczemek, rendel\u00e9st\u00edpusok, kiad\u00e1s \u00e9s hiteles\u00edt\u00e9si modell, valamint az egyes mez\u0151k\u00e9rt felel\u0151s rendszer meghat\u00e1roz\u00e1sa.<\/li>\n\n\n<li><strong>SAP-hozz\u00e1f\u00e9r\u00e9s:<\/strong> a Gateway-szolg\u00e1ltat\u00e1s aktiv\u00e1l\u00e1sa vagy a kommunik\u00e1ci\u00f3 be\u00e1ll\u00edt\u00e1sa, tov\u00e1bb\u00e1 a technikai felhaszn\u00e1l\u00f3k \u00e9s jogosults\u00e1gi objektumok.<\/li>\n\n\n<li><strong>T\u00f6rzsadatok megfeleltet\u00e9se:<\/strong> a munka\u00e1llom\u00e1sok kapacit\u00e1skateg\u00f3ri\u00e1i, intervallumai \u00e9s m\u0171szakjai, a technol\u00f3giai \u00fatvonalak norma\u00e9rt\u00e9keinek megfeleltet\u00e9se a SkyPlanner id\u0151tartamainak, valamint a m\u00e9rt\u00e9kegys\u00e9gek.<\/li>\n\n\n<li><strong>Kezdeti bet\u00f6lt\u00e9s:<\/strong> anyagok, darabjegyz\u00e9kek, technol\u00f3giai \u00fatvonalak \u00e9s munka\u00e1llom\u00e1sok a kapacit\u00e1saikkal egy\u00fctt.<\/li>\n\n\n<li><strong>Gy\u00e1rt\u00e1si \u00e9s beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa:<\/strong> a gy\u00e1rt\u00e1si rendel\u00e9sek \u00e9s m\u0171veletek szinkroniz\u00e1l\u00e1sa Created\/Changed esem\u00e9nyek hat\u00e1s\u00e1ra vagy rendszeres lek\u00e9rdez\u00e9ssel, a k\u00e9szletek \u00e9s a nyitott beszerz\u00e9si rendel\u00e9sek szinkroniz\u00e1l\u00e1sa pedig \u00fctemezetten.<\/li>\n\n\n<li><strong>Az \u00fctemterv vissza\u00edr\u00e1sa:<\/strong> <code>ScheduleProductionOrderOperation<\/code>, ETag-kezel\u00e9ssel \u00e9s az \u00fajrapr\u00f3b\u00e1lkoz\u00e1sokat kezel\u0151 v\u00e1r\u00f3list\u00e1val.<\/li>\n\n\n<li><strong>\u00dczemi visszajelent\u00e9sek:<\/strong> id\u0151bejegyz\u00e9sek k\u00f6nyvel\u00e9se <code>ProdnOrdConf2<\/code> visszajelent\u00e9sk\u00e9nt.<\/li>\n\n\n<li><strong>Tesztel\u00e9s a jelenlegi tervvel p\u00e1rhuzamosan:<\/strong> a SkyPlanner \u00fctemterv\u00e9t a megl\u00e9v\u0151 kapacit\u00e1skiegyenl\u00edt\u00e9s mellett haszn\u00e1lj\u00e1k, am\u00edg a tervez\u0151k meg nem b\u00edznak benne.<\/li>\n\n\n<li><strong>\u00c9les indul\u00e1s.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Az SAP S\/4HANA buktat\u00f3i<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A vissza\u00edr\u00e1s ETag-et haszn\u00e1l\u00f3 akci\u00f3h\u00edv\u00e1s.<\/strong> Egy m\u0171velet \u00fctemez\u00e9s\u00e9nek dokument\u00e1lt m\u00f3dja a <code>ScheduleProductionOrderOperation<\/code>, nem pedig az <code>A_ProductionOrderOperation_2<\/code> entit\u00e1sra k\u00fcld\u00f6tt PATCH-k\u00e9r\u00e9s. Az F m\u00f3d a kezd\u00e9st\u0151l el\u0151re, a B m\u00f3d a befejez\u00e9st\u0151l visszafel\u00e9 \u00fctemez, m\u00edg a K \u00e9s az S megtartja a megl\u00e9v\u0151 d\u00e1tumokat, \u00e9s figyelmen k\u00edv\u00fcl hagyja az \u00d6n \u00e1ltal k\u00fcld\u00f6tteket. Az <code>if-match<\/code> fejl\u00e9c ETag-je a rendel\u00e9s <code>LastChangeDateTime<\/code> \u00e9rt\u00e9k\u00e9b\u0151l (YYYYMMDDHHMMSS) k\u00e9sz\u00fcl, ez\u00e9rt a rendel\u00e9s b\u00e1rmely m\u00f3dos\u00edt\u00e1sa elavultt\u00e1 teszi. \u00c9p\u00edtsen be \u00edr\u00e1s el\u0151tti beolvas\u00e1st \u00e9s az \u00fajrapr\u00f3b\u00e1lkoz\u00e1sokat kezel\u0151 v\u00e1r\u00f3list\u00e1t.<\/li>\n\n\n<li><strong>A kapacit\u00e1s nem a munka\u00e1llom\u00e1s fejl\u00e9c\u00e9ben tal\u00e1lhat\u00f3.<\/strong> A rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st a kapacit\u00e1skateg\u00f3ria (001 g\u00e9p, 002 munkaer\u0151), a gy\u00e1ri napt\u00e1r, valamint az azt fel\u00fcl\u00edr\u00f3 id\u0151intervallumok \u00e9s m\u0171szakok hat\u00e1rozz\u00e1k meg. A kapacit\u00e1sk\u00e9pletek a technol\u00f3giai \u00fatvonal standard \u00e9rt\u00e9keib\u0151l sz\u00e1m\u00edtj\u00e1k ki az el\u0151k\u00e9sz\u00edt\u00e9s, a megmunk\u00e1l\u00e1s \u00e9s a lez\u00e1r\u00e1s kapacit\u00e1sig\u00e9ny\u00e9t. Olvassa be az <code>A_WorkCenterCapacityInterval_2<\/code> entit\u00e1s \u00e9s a m\u0171szakentit\u00e1sok adatait, \u00e9s egyeztesse, hogyan sz\u00e1m\u00edtj\u00e1k ki a k\u00e9pletek alapj\u00e1n a SkyPlannerben haszn\u00e1lt id\u0151tartamokat.<\/li>\n\n\n<li><strong>A norma\u00e9rt\u00e9keket rendbe kell tenni.<\/strong> A k\u00f6lts\u00e9gsz\u00e1m\u00edt\u00e1shoz karbantartott technol\u00f3giai \u00fatvonalak gyakran \u00e1tlagolt el\u0151k\u00e9sz\u00edt\u00e9si id\u0151ket tartalmaznak, vagy az el\u0151k\u00e9sz\u00edt\u00e9st rossz kapacit\u00e1skateg\u00f3ri\u00e1hoz rendelik.<\/li>\n\n\n<li><strong>A visszajelent\u00e9si szab\u00e1lyok szigor\u00faak.<\/strong> T\u00f6meges k\u00f6nyvel\u00e9shez az SAP k\u00f6tegelt h\u00edv\u00e1sokat aj\u00e1nl. Egy m\u00f3dos\u00edt\u00e1sk\u00e9szlet vagy teljes eg\u00e9sz\u00e9ben v\u00e9grehajt\u00f3dik, vagy egy\u00e1ltal\u00e1n nem, \u00edgy egyetlen hib\u00e1s id\u0151jegy blokkolja a k\u00e9szlet t\u00f6bbi elem\u00e9t is. A k\u00f6tegen bel\u00fcli sztorn\u00f3z\u00e1sokat a <code>ConfirmationCount<\/code> szerinti ford\u00edtott sorrendben kell v\u00e9grehajtani. Egy rendel\u00e9sen bel\u00fcl nem keverhet\u0151k a visszajelent\u00e9st\u00edpusok, nem k\u00f6nyvelhet\u0151 anyagmozg\u00e1s visszajelent\u00e9s n\u00e9lk\u00fcl, \u00e9s nem jelenthet\u0151k vissza olyan m\u0171veletek, amelyek kapcsol\u00f3pontjai p\u00e1rbesz\u00e9dablakot ig\u00e9nyelnek.<\/li>\n\n\n<li><strong>Ellen\u0151rizze, hogy akt\u00edv-e a PP\/DS.<\/strong> A be\u00e1gyazott PP\/DS haszn\u00e1lat\u00e1hoz sz\u00fcks\u00e9g van az <strong>Activate Advanced Planning and Scheduling<\/strong> Customizing-tev\u00e9kenys\u00e9gre \u00e9s az SAP HANA integrated liveCache-re. Az SAP ezt k\u00fcl\u00f6n term\u00e9kk\u00e9nt \u00e9rt\u00e9kes\u00edti, <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a> n\u00e9ven. Ahol akt\u00edv, anyagonk\u00e9nt d\u00f6ntse el, melyik rendszer \u00fctemez: az emelt szint\u0171 tervez\u00e9sre megjel\u00f6lt anyagok a PP\/DS-hez tartoznak. A tervezett rendel\u00e9sek API-j\u00e1r\u00f3l az SAP azt is kijelenti: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (Ezen az API-n kereszt\u00fcl nincs enged\u00e9lyezve az automatikus integr\u00e1ci\u00f3 ehhez a tervez\u0151rendszerhez.)<\/li>\n\n\n<li><strong>M\u00e9rt\u00e9kegys\u00e9gek.<\/strong> A m\u0171veleti mennyis\u00e9gek, a technol\u00f3giai \u00fatvonal alapmennyis\u00e9gei \u00e9s a visszajelent\u00e9sek m\u00e9rt\u00e9kegys\u00e9gei elt\u00e9rhetnek. Az \u00e1tv\u00e1lt\u00e1st kifejezetten a m\u0171velet m\u00e9rt\u00e9kegys\u00e9ge alapj\u00e1n v\u00e9gezze, ne az anyag alap-m\u00e9rt\u00e9kegys\u00e9ge alapj\u00e1n.<\/li>\n\n\n<li><strong>Kiad\u00e1sok k\u00f6z\u00f6tti elt\u00e9r\u00e9sek.<\/strong> Az <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a> bemutatja, hogyan v\u00e1ltja fel a klasszikus CM21\/CM22 tervez\u0151t\u00e1bl\u00e1t a Manage Work Center Capacity, a Capacity Scheduling Table \u00e9s a Capacity Scheduling Board. A Public Edition kiz\u00e1r\u00f3lag kommunik\u00e1ci\u00f3s forgat\u00f3k\u00f6nyveken kereszt\u00fcl tesz el\u00e9rhet\u0151v\u00e9 API-kat, \u00e9s az \u00e1ltala k\u00edn\u00e1lt szolg\u00e1ltat\u00e1sverzi\u00f3k elt\u00e9rhetnek a helyben telep\u00edtett v\u00e1ltozat\u00e9it\u00f3l. A technol\u00f3giai \u00fatvonalak API-ja nem tud \u00fatvonalakat t\u00f6r\u00f6lni vagy anyag-hozz\u00e1rendel\u00e9seket friss\u00edteni. A SkyPlanner csapata a felm\u00e9r\u00e9s sor\u00e1n \u00fcgyf\u00e9lrendszerenk\u00e9nt r\u00f6gz\u00edti a szolg\u00e1ltat\u00e1sverzi\u00f3kat, az API Business Accelerator Hub adott kiad\u00e1shoz tartoz\u00f3 bejegyz\u00e9se alapj\u00e1n.<\/li>\n\n\n<li><strong>A technol\u00f3giai \u00fatvonalakban nem szerepl\u0151 korl\u00e1tok.<\/strong> A sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sokat, a szersz\u00e1m\u00fctk\u00f6z\u00e9seket \u00e9s a t\u00f6bb g\u00e9pkezel\u0151t ig\u00e9nyl\u0151 m\u0171veleteket a SkyPlannerben kezelje, ne a technol\u00f3giai \u00fatvonal norma\u00e9rt\u00e9keiben. Az el\u0151k\u00e9sz\u00edt\u00e9si id\u0151k m\u00e1trixa term\u00e9kp\u00e1ronk\u00e9nt tartalmazza az \u00e1t\u00e1ll\u00e1si id\u0151ket. A rendel\u00e9s PRT-i k\u00f6z\u00f6tt szerepl\u0151 szersz\u00e1mok korl\u00e1tozott er\u0151forr\u00e1sok: egyszerre csak egy munka\u00e1llom\u00e1son haszn\u00e1lhat\u00f3k, egy m\u0171velethez pedig t\u00f6bb emberre is sz\u00fcks\u00e9g lehet egyidej\u0171leg.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ki \u00e1ll\u00edtja be az integr\u00e1ci\u00f3t?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A fenti buktat\u00f3k miatt a be\u00e1ll\u00edt\u00e1s jelenti az igazi munk\u00e1t. Minden \u00fczem m\u00e1sk\u00e9nt haszn\u00e1lja az S\/4HANA rendszert: a rendel\u00e9st\u00edpusok, kapacit\u00e1skateg\u00f3ri\u00e1k, a technol\u00f3giai \u00fatvonalak norma\u00e9rt\u00e9kei, a user exitek \u00e9s a kiad\u00e1s mind befoly\u00e1solj\u00e1k az adatmegfeleltet\u00e9st.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A SkyPlanner csapata \u00e1ll\u00edtja be az integr\u00e1ci\u00f3t<\/strong> a bevezet\u00e9s sor\u00e1n az \u00d6n S\/4HANA-k\u00f6rnyezet\u00e9hez, a kiadott S\/4HANA API-k, valamint a SkyPlanner REST API-ja \u00e9s webhookjai haszn\u00e1lat\u00e1val. Az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja az integr\u00e1ci\u00f3t. Ez az alap\u00e9rtelmezett megold\u00e1s: \u00edgy egyetlen felel\u0151se van az \u00fctemez\u0151nek \u00e9s az S\/4HANA-kapcsolatnak.<\/li>\n\n\n<li><strong>Az \u00d6n SAP-partnere<\/strong> is megval\u00f3s\u00edthatja az integr\u00e1ci\u00f3t a SkyPlanner Swagger\/OpenAPI dokument\u00e1ci\u00f3ja alapj\u00e1n, az \u00d6n rendel\u00e9st\u00edpusainak \u00e9s Basis-be\u00e1ll\u00edt\u00e1sainak ismeret\u00e9ben.<\/li>\n\n\n<li><strong>Saj\u00e1t fejleszt\u0151i<\/strong> k\u00f6zvetlen\u00fcl, illetve SAP Integration Suite vagy SAP BTP alapon is megval\u00f3s\u00edthatj\u00e1k az integr\u00e1ci\u00f3t a dokument\u00e1lt REST API, az API-tokenes hiteles\u00edt\u00e9s \u00e9s webhookok haszn\u00e1lat\u00e1val (<a href=\"\/hu\/docs\/integracios-bemutato\/\">integr\u00e1ci\u00f3s \u00fatmutat\u00f3<\/a>). Az indul\u00e1shoz elegend\u0151 egy API-kulcs, a SkyPlanner csapata pedig seg\u00edt, ha a fejleszt\u0151k ezt k\u00e9rik.<\/li>\n\n<\/ul>\n\n\n<p>A SkyPlanner m\u00e1r m\u0171k\u00f6dik SAP mellett: a Laboratory &amp; Allied bels\u0151 informatikai csapata a SkyPlanner seg\u00edts\u00e9g\u00e9vel kapcsolta \u00f6ssze a HANA-alap\u00fa SAP Business One rendszert a SkyPlannerrel. A funkci\u00f3k dokument\u00e1ci\u00f3ja nyilv\u00e1nosan el\u00e9rhet\u0151 a <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner dokument\u00e1ci\u00f3j\u00e1ban<\/a>.<\/p>\n\n\n<p>B\u00e1rmelyik megold\u00e1st v\u00e1lasztja, el\u0151sz\u00f6r ellen\u0151rizze az \u00fctemtervet a 30 napos ingyenes pr\u00f3ba sor\u00e1n (legfeljebb 20 munka\u00e1llom\u00e1ssal, bankk\u00e1rtya n\u00e9lk\u00fcl). \u00cdgy az integr\u00e1ci\u00f3 m\u00e1r egy olyan tervhez k\u00e9sz\u00fcl, amelyben a tervez\u0151i megb\u00edznak. A pr\u00f3ba ut\u00e1n az \u00e1r havi 199 \u20ac-t\u00f3l indul, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal. Az integr\u00e1ci\u00f3ra a folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n el\u0151zetes \u00e1raj\u00e1nlatot adunk a csomagj\u00e1val egy\u00fctt, \u00edgy m\u00e1r a kezd\u00e9s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get.<\/p>\n\n\n<p>A teljes k\u00e9phez tekintse meg az <a href=\"\/hu\/arkepzes\/\">\u00e1rakat<\/a>, a <a href=\"\/hu\/funkciok\/\">funkci\u00f3kat<\/a> \u00e9s az <a href=\"\/hu\/ugyfeltortenetek\/\">\u00fcgyf\u00e9lv\u00e9lem\u00e9nyeket<\/a>.<\/p>\n\n\n<p><a href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a> <a href=\"\/hu\/kapcsolat-ertekesites\/\">Kapcsolatfelv\u00e9tel az \u00e9rt\u00e9kes\u00edt\u00e9ssel<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3v\u00e1llalatok v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1bla-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatok helyett val\u00f3s idej\u0171 gy\u00e1rt\u00e1soptimaliz\u00e1l\u00e1sra \u00e1lltunk \u00e1t a gy\u00e1rt\u00e1stervez\u00e9sben.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Elektromos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 munka\u00f3r\u00e1t takar\u00edt meg, az \u00faj munkasorrend pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/utu\/\">Az UTU v\u00e9lem\u00e9ny\u00e9nek elolvas\u00e1sa<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k egy palackt\u00f6lt\u0151 sor mellett a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201e90%-kal n\u0151tt a termel\u00e9s hat\u00e9konys\u00e1ga.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A termel\u00e9s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1rom h\u00f3napos optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied tapasztalatait<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"L\u00e9gi felv\u00e9tel a Piristeel kauhavai, tet\u0151biztons\u00e1gi term\u00e9keket gy\u00e1rt\u00f3 \u00fczem\u00e9r\u0151l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner l\u00e1that\u00f3v\u00e1 tette a sz\u0171k keresztmetszeteket, \u00e9s \u00e1tl\u00e1that\u00f3bb\u00e1 tette a termel\u00e9sir\u00e1ny\u00edt\u00e1st.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, termel\u00e9si vezet\u0151<\/b><br>Piristeel \u00b7 Tet\u0151biztons\u00e1gi \u00e9s es\u0151v\u00edz-elvezet\u0151 rendszerek<\/p>\n\n\n<p class=\"ind-cust__result\">Id\u00e9n a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa el\u00e9rte a 99,2%-ot, az \u00fctemez\u00e9s pedig naponta ak\u00e1r n\u00e9gy \u00f3ra munkaid\u0151t takar\u00edt meg.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/piristeel\/\">Olvassa el a Piristeel tapasztalatait<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je egy hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa, a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner d\u00f6nt\u0151 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, \u00e9s az \u00fctemez\u00e9shez most m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/kjh-comp\/\">Olvassa el a KJH-Comp tapasztalatait<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan kapcsol\u00f3dik a SkyPlanner APS az SAP S\/4HANA rendszerhez?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner APS \u00e9s az SAP S\/4HANA k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa az integr\u00e1ci\u00f3. A gy\u00e1rt\u00e1si rendel\u00e9sek, m\u0171veletek, technol\u00f3giai \u00fatvonalak, munka\u00e1llom\u00e1sok, k\u00e9szletek \u00e9s beszerz\u00e9si rendel\u00e9sek az SAP kiadott OData API-jain kereszt\u00fcl \u00e9rkeznek. A m\u0171veletek d\u00e1tumai a <code>ScheduleProductionOrderOperation<\/code> akci\u00f3n kereszt\u00fcl, a r\u00f6gz\u00edtett munka\u00f3r\u00e1k pedig <code>ProdnOrdConf2<\/code> visszajelent\u00e9sk\u00e9nt ker\u00fclnek vissza, a SkyPlanner webhookjainak hat\u00e1s\u00e1ra.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ki k\u00e9sz\u00edti el \u00e9s tartja karban az integr\u00e1ci\u00f3t?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner csapata a bevezet\u00e9s sor\u00e1n az \u00d6n S\/4HANA-k\u00f6rnyezet\u00e9hez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogat\u00e1st ny\u00fajt hozz\u00e1. Az integr\u00e1ci\u00f3ra el\u0151zetes \u00e1raj\u00e1nlatot adunk az \u00d6n folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n. Ha az SAP-partnere vagy a saj\u00e1t fejleszt\u0151i k\u00e9sz\u00edtik el a REST API haszn\u00e1lat\u00e1val, akkor \u0151k felelnek \u00e9rte, a SkyPlanner csapata pedig sz\u00fcks\u00e9g eset\u00e9n seg\u00edt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan ker\u00fclnek vissza a m\u0171veletek id\u0151pontjai az S\/4HANA rendszerbe, \u00e9s megmarad-e a sorrendj\u00fck?<\/summary>\n<p class=\"sp-faq__a\">A <code>ScheduleProductionOrderOperation<\/code> akci\u00f3val az <code>API_PRODUCTION_ORDER_2_SRV<\/code> API-ban, el\u0151re \u00fctemez\u00e9ssel, kioszt\u00e1si st\u00e1tusszal \u00e9s a SkyPlanner szerinti kezd\u00e9si d\u00e1tummal \u00e9s id\u0151vel. Egy rendel\u00e9s m\u0171veletei egyetlen m\u00f3dos\u00edt\u00e1sk\u00e9szletbe ker\u00fclnek, a SkyPlanner szerinti sorrendben. Az id\u0151tartamok ugyanazokb\u00f3l a technol\u00f3giai \u00fatvonalhoz tartoz\u00f3 standard \u00e9rt\u00e9kekb\u0151l sz\u00e1rmaznak, amelyeket az S\/4HANA is haszn\u00e1l. Az integr\u00e1ci\u00f3 minden m\u0171veletet \u00fajra beolvas, \u00e9s jelzi az elt\u00e9r\u00e9seket.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Hogyan jutnak el a visszajelent\u00e9sek az S\/4HANA rendszerbe?<\/summary>\n<p class=\"sp-faq__a\">A g\u00e9pkezel\u0151k r\u00f6gz\u00edtik a munk\u00e1t a SkyPlanner rendszerben, ami kiv\u00e1lt egy webhookot. Az integr\u00e1ci\u00f3 ezut\u00e1n az <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code> API-n kereszt\u00fcl visszajelent\u00e9st k\u00f6nyvel a j\u00f3 mennyis\u00e9ggel, a selejttel \u00e9s a tev\u00e9kenys\u00e9gid\u0151kkel.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u0171k\u00f6dik az integr\u00e1ci\u00f3 az S\/4HANA Cloud Public Edition rendszerrel is?<\/summary>\n<p class=\"sp-faq__a\">Igen. A hozz\u00e1f\u00e9r\u00e9st a megfelel\u0151 kommunik\u00e1ci\u00f3s forgat\u00f3k\u00f6nyvekhez tartoz\u00f3 kommunik\u00e1ci\u00f3s meg\u00e1llapod\u00e1s biztos\u00edtja. A felm\u00e9r\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n Public Edition kiad\u00e1s\u00e1hoz igaz\u00edtja a gy\u00e1rt\u00e1si rendel\u00e9sekhez haszn\u00e1lt API verzi\u00f3j\u00e1t. Helyben telep\u00edtett rendszerekn\u00e9l \u00e9s a Private Edition eset\u00e9ben ehelyett a Gateway szolg\u00e1ltat\u00e1sait kell aktiv\u00e1lni.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1r haszn\u00e1lunk PP\/DS-t. Sz\u00fcks\u00e9g\u00fcnk van SkyPlannerre?<\/summary>\n<p class=\"sp-faq__a\">A SkyPlanner azokban az \u00fczemekben \u00e9s telephelyeken haszn\u00e1lhat\u00f3, ahol nincs PP\/DS-licenc, vagy nincs hozz\u00e1 megfelel\u0151 szem\u00e9lyzet. Nem ig\u00e9nyel Customizing-kapcsol\u00f3t, liveCache-t vagy optimaliz\u00e1l\u00f3 szervert, az SAP oldal\u00e1n csak kiadott OData API-kra van sz\u00fcks\u00e9g. Az Arcturus motor m\u00e1sodpercek alatt elk\u00e9sz\u00edti a termel\u00e9si \u00fctemtervet a g\u00e9pek \u00e9s a szem\u00e9lyzet t\u00e9nyleges kapacit\u00e1s\u00e1nak figyelembev\u00e9tel\u00e9vel, az Autopilot pedig automatikusan \u00fajra\u00fctemez, ha v\u00e1ltoz\u00e1s t\u00f6rt\u00e9nik a termel\u00e9sben.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kipr\u00f3b\u00e1lhatjuk az integr\u00e1ci\u00f3s munka megkezd\u00e9se el\u0151tt, \u00e9s mennyi ideig tart a projekt?<\/summary>\n<p class=\"sp-faq__a\">Igen. A 30 napos ingyenes pr\u00f3baid\u0151szak alatt import\u00e1lja a gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s a munka\u00e1llom\u00e1sokat az S\/4HANA rendszerb\u0151l export\u00e1lt adatokb\u00f3l, majd ha m\u00e1r m\u0171k\u00f6dik az \u00fctemez\u00e9s, \u00e9p\u00edtse ki az API-integr\u00e1ci\u00f3t. A megval\u00f3s\u00edt\u00e1s a bevezet\u00e9s kezdet\u00e9t\u0151l sz\u00e1m\u00edtva \u00e1ltal\u00e1ban n\u00e9h\u00e1ny h\u00e9ten bel\u00fcl lez\u00e1rul. Rendszerk\u00f6rnyezete felm\u00e9r\u00e9s\u00e9hez <a href=\"\/hu\/kapcsolat-ertekesites\/\">egyeztessen \u00e9rt\u00e9kes\u00edt\u0151inkkel<\/a>, vagy <a href=\"\/hu\/proba\/\">ind\u00edtsa el az ingyenes pr\u00f3b\u00e1t<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ SAP S\/4HANA SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez az \u00fatmutat\u00f3 SAP-partnereknek, informatikai csapatoknak \u00e9s m\u0171szaki beszerz\u00e9si d\u00f6nt\u00e9shoz\u00f3knak mutatja be, hogyan kapcsol\u00f3dik a SkyPlanner APS az SAP S\/4HANA rendszerhez. A SkyPlanner az SAP \u00e1ltal kiadott OData API-kon kereszt\u00fcl, k\u00e9tir\u00e1ny\u00faan integr\u00e1l\u00f3dik az S\/4HANA rendszerrel: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s Az anyagok, darabjegyz\u00e9kek, &#8230; <a title=\"SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/\" aria-label=\"Read more about SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100799,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101156","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SAP S\/4HANA integr\u00e1ci\u00f3 APS-\u00fctemez\u00e9shez | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS\u2013SAP S\/4HANA: OData API-k, kommunik\u00e1ci\u00f3be\u00e1ll\u00edt\u00e1sok, ScheduleProductionOrderOperation-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s \u00e9s buktat\u00f3k.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS\u2013SAP S\/4HANA: OData API-k, kommunik\u00e1ci\u00f3be\u00e1ll\u00edt\u00e1sok, ScheduleProductionOrderOperation-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s \u00e9s buktat\u00f3k.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"23 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sap-s4hana\\\/integracios-utmutato\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sap-s4hana\\\/integracios-utmutato\\\/\",\"name\":\"SAP S\\\/4HANA integr\u00e1ci\u00f3 APS-\u00fctemez\u00e9shez | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS\u2013SAP S\\\/4HANA: OData API-k, kommunik\u00e1ci\u00f3be\u00e1ll\u00edt\u00e1sok, ScheduleProductionOrderOperation-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s \u00e9s buktat\u00f3k.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sap-s4hana\\\/integracios-utmutato\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sap-s4hana\\\/integracios-utmutato\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sap-s4hana\\\/integracios-utmutato\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS SAP S\\\/4HANA-hoz: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"SAP S\\\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SAP S\/4HANA integr\u00e1ci\u00f3 APS-\u00fctemez\u00e9shez | SkyPlanner","description":"SkyPlanner APS\u2013SAP S\/4HANA: OData API-k, kommunik\u00e1ci\u00f3be\u00e1ll\u00edt\u00e1sok, ScheduleProductionOrderOperation-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s \u00e9s buktat\u00f3k.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/","og_locale":"hu_HU","og_type":"article","og_title":"SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez","og_description":"SkyPlanner APS\u2013SAP S\/4HANA: OData API-k, kommunik\u00e1ci\u00f3be\u00e1ll\u00edt\u00e1sok, ScheduleProductionOrderOperation-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s \u00e9s buktat\u00f3k.","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"23 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/","name":"SAP S\/4HANA integr\u00e1ci\u00f3 APS-\u00fctemez\u00e9shez | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS\u2013SAP S\/4HANA: OData API-k, kommunik\u00e1ci\u00f3be\u00e1ll\u00edt\u00e1sok, ScheduleProductionOrderOperation-vissza\u00edr\u00e1s, adatmegfeleltet\u00e9s \u00e9s buktat\u00f3k.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/integracios-utmutato\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS SAP S\/4HANA-hoz: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ SAP S\/4HANA SAP S\/4HANA integr\u00e1ci\u00f3s \u00fatmutat\u00f3 a SkyPlanner APS gy\u00e1rt\u00e1s\u00fctemez\u00e9s\u00e9hez Ez az \u00fatmutat\u00f3 SAP-partnereknek, informatikai csapatoknak \u00e9s m\u0171szaki beszerz\u00e9si d\u00f6nt\u00e9shoz\u00f3knak mutatja be, hogyan kapcsol\u00f3dik a SkyPlanner APS az SAP S\/4HANA rendszerhez. A SkyPlanner az SAP \u00e1ltal kiadott OData API-kon kereszt\u00fcl, k\u00e9tir\u00e1ny\u00faan integr\u00e1l\u00f3dik az S\/4HANA rendszerrel: skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s Az anyagok, darabjegyz\u00e9kek,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=101156"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101156\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100799"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=101156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}