{"id":101007,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101007"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"termelesutemezes","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/","title":{"rendered":"Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/hu\/integraciok\/\">Integr\u00e1ci\u00f3k<\/a> \/ <a href=\"\/hu\/integraciok\/erp\/\">ERP<\/a> \/ Oracle NetSuite<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? <span class=\"hl\">Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Az Oracle NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemezi a gy\u00e1rt\u00e1st, hacsak nem eg\u00e9sz\u00edti ki az Advanced Manufacturing SuiteApp alkalmaz\u00e1ssal. Az <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">Oracle saj\u00e1t dokument\u00e1ci\u00f3ja<\/a> szerint a v\u00e9gtelen kapacit\u00e1s\u00fa \u00fctemez\u00e9s \u201edoesn&#8217;t account for current work center capacity or resource use.\u201d (nem veszi figyelembe a munka\u00e1llom\u00e1s aktu\u00e1lis kapacit\u00e1s\u00e1t vagy az er\u0151forr\u00e1sok haszn\u00e1lat\u00e1t). Az Advanced Manufacturing egy Finite Scheduling futtat\u00e1ssal eg\u00e9sz\u00edti ki a rendszert, amely a tervez\u0151 \u00e1ltal megadott sorrendben bocs\u00e1tja ki a gy\u00e1rt\u00e1si rendel\u00e9seket.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3baid\u0151szak ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 k\u00e9r\u00e9se<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"A SkyPlanner APS Gantt-id\u0151vonala a munka\u00e1llom\u00e1sokra \u00fctemezett gy\u00e1rt\u00e1si feladatokkal, alatta a rendel\u00e9sek list\u00e1ja.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Enn\u00e9l a futtat\u00e1sn\u00e1l a tervez\u0151 adja meg a kibocs\u00e1t\u00e1si sorrendet, \u00e9s v\u00e1ltoz\u00e1s eset\u00e9n \u00fajra lefuttatja a kibocs\u00e1t\u00e1st. Azok az \u00fczemek, amelyek sz\u00e1m\u00edtott \u00fctemtervet szeretn\u00e9nek, a NetSuite mellett SkyPlanner APS-t haszn\u00e1lnak az al\u00e1bbiakhoz:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>sz\u00e1m\u00edtott feladatsorrend minden g\u00e9phez, dolgoz\u00f3hoz \u00e9s szersz\u00e1mhoz<\/li>\n\n\n<li>sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sok, k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mok \u00e9s gy\u00e1rt\u00e1si feladatonk\u00e9nt t\u00f6bb g\u00e9pkezel\u0151 figyelembev\u00e9tele<\/li>\n\n\n<li>az anyagok rendelkez\u00e9sre \u00e1ll\u00e1si idej\u00e9nek figyelembev\u00e9tele a tervben<\/li>\n\n\n<li>az \u00fczemi v\u00e1ltoz\u00e1sokhoz automatikusan igazod\u00f3 \u00fctemterv<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-netsuite-schedules-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00cdgy \u00fctemezi a NetSuite a gy\u00e1rt\u00e1st, l\u00e9p\u00e9sr\u0151l l\u00e9p\u00e9sre<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Munka\u00e1llom\u00e1sok \u00e9s munkanapt\u00e1rak<\/h3>\n\n\n<p>A NetSuite-ban a munka\u00e1llom\u00e1s nem g\u00e9prekord. Hanem egy statikus <strong>Group<\/strong> (Lists &gt; Relationships &gt; Groups, <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/subsect_158618203997.html\">Oracle<\/a>), amelyen be van jel\u00f6lve a <strong>Manufacturing Work Center<\/strong> jel\u00f6l\u0151n\u00e9gyzet. A csoport <strong>Manufacturing Work Center Settings<\/strong> allapj\u00e1n tal\u00e1lhat\u00f3k a <strong>Machine Resources<\/strong>, <strong>Labor Resources<\/strong> \u00e9s <strong>Work Calendar<\/strong> mez\u0151k. Az er\u0151forr\u00e1sok darabsz\u00e1m\u00e1nak alap\u00e9rt\u00e9ke 0, a napt\u00e1r alap\u00e9rt\u00e9ke pedig <strong>Default Work Calendar<\/strong>.<\/p>\n\n\n<p>Az alap gy\u00e1rt\u00e1si funkci\u00f3kban a kapacit\u00e1st munka\u00e1llom\u00e1sonk\u00e9nt a g\u00e9pek sz\u00e1ma, a l\u00e9tsz\u00e1m \u00e9s egy napt\u00e1r adja meg. Az egyedi eszk\u00f6z\u00f6k kezel\u00e9s\u00e9t az Advanced Manufacturing Work Bench teszi lehet\u0151v\u00e9 (5. l\u00e9p\u00e9s).<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Manufacturing Routing<\/h3>\n\n\n<p>A <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Manufacturing Routing<\/a> rekord (REST: <code>manufacturingRouting<\/code>) a szerelv\u00e9ny gy\u00e1rt\u00e1s\u00e1nak l\u00e9p\u00e9seit sorolja fel. Minden l\u00e9p\u00e9shez a k\u00f6vetkez\u0151 mez\u0151k tartoznak: <strong>Operation Sequence<\/strong>, <strong>Operation Name<\/strong>, <strong>Manufacturing Work Center<\/strong>, <strong>Setup Time<\/strong>, <strong>Run Rate<\/strong>, valamint a k\u00e9sleltet\u00e9s be\u00e1ll\u00edt\u00e1sai (<strong>Auto-calculate Lag<\/strong>, <strong>Lag Type<\/strong>, <strong>Lag Amount<\/strong>, <strong>Lag Unit<\/strong>). A Setup Time a rendel\u00e9senk\u00e9nti \u00e1t\u00e1ll\u00e1si id\u0151t adja meg percben, a Run Rate pedig az egys\u00e9genk\u00e9nti m\u0171veleti id\u0151t, szint\u00e9n percben. A NetSuite ezek \u00e9s a munkanapt\u00e1r alapj\u00e1n \u00fctemezi az egyes l\u00e9p\u00e9seket. Ha egy gy\u00e1rt\u00e1si rendel\u00e9s technol\u00f3giai \u00fatvonalat haszn\u00e1l, a NetSuite minden l\u00e9p\u00e9shez l\u00e9trehoz egy <strong>Manufacturing Operation Task<\/strong> rekordot (REST: <code>manufacturingOperationTask<\/code>).<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. El\u0151re- vagy visszafel\u00e9 \u00fctemez\u00e9s<\/h3>\n\n\n<p>Minden gy\u00e1rt\u00e1si rendel\u00e9st <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_4000988757.html\">k\u00e9t m\u00f3dszer<\/a> egyik\u00e9vel \u00fctemez a rendszer. <strong>Forward Scheduling<\/strong>: \u00d6n megadja a <strong>Production Start Date<\/strong> \u00e9rt\u00e9k\u00e9t, a NetSuite pedig kisz\u00e1m\u00edtja a befejez\u00e9si d\u00e1tumot. <strong>Backward Scheduling<\/strong>: \u00d6n megadja a <strong>Production End Date<\/strong> \u00e9rt\u00e9k\u00e9t, a NetSuite pedig a technol\u00f3giai \u00fatvonal \u00e9s a munka\u00e1llom\u00e1s napt\u00e1ra alapj\u00e1n visszafel\u00e9 sz\u00e1molja ki a kezd\u00e9si d\u00e1tumot. Ahhoz, hogy a m\u00f3dszer be\u00e1ll\u00edthat\u00f3 legyen a gy\u00e1rt\u00e1si rendel\u00e9seken, el\u0151sz\u00f6r enged\u00e9lyezni kell a <strong>Generate Work Orders in Supply Planning<\/strong> be\u00e1ll\u00edt\u00e1st.<\/p>\n\n\n<p>Mindk\u00e9t m\u00f3dszer v\u00e9gtelen kapacit\u00e1s\u00fa \u00fctemez\u00e9s. Az Oracle egy\u00e9rtelm\u0171en fogalmaz: \u201eNetSuite uses infinite capacity scheduling to schedule work\u201d (a NetSuite v\u00e9gtelen kapacit\u00e1s\u00fa \u00fctemez\u00e9ssel \u00fctemezi a munk\u00e1t), \u00e9s ez a m\u00f3dszer \u201ecan result in resource overloads.\u201d (az er\u0151forr\u00e1sok t\u00falterhel\u00e9s\u00e9hez vezethet). A rendszer minden gy\u00e1rt\u00e1si rendel\u00e9st a saj\u00e1t technol\u00f3giai \u00fatvonala \u00e9s napt\u00e1ra alapj\u00e1n id\u0151z\u00edt, mintha a munka\u00e1llom\u00e1s kiz\u00e1r\u00f3lag annak \u00e1llna rendelkez\u00e9s\u00e9re. \u00cdgy t\u00edz, p\u00e9ntekre esed\u00e9kes gy\u00e1rt\u00e1si rendel\u00e9s mind ugyanarra a munka\u00e1llom\u00e1sra ker\u00fclhet cs\u00fct\u00f6rt\u00f6kre. Az Oracle arra is figyelmeztet, hogy a visszafel\u00e9 \u00fctemezett kezd\u00e9si d\u00e1tum \u201emay be a date in the past, prior to the current date.\u201d (lehet m\u00faltbeli, az aktu\u00e1lis d\u00e1tumn\u00e1l kor\u00e1bbi id\u0151pont).<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Supply Planning \u00e9s Rough-Cut Capacity Planning<\/h3>\n\n\n<p>A <strong>Demand Planning<\/strong>, a <strong>Supply Planning<\/strong> \u00e9s a <strong>Master Production Schedule<\/strong> hat\u00e1rozza meg, hogy mit kell gy\u00e1rtani, \u00e9s mikorra van r\u00e1 sz\u00fcks\u00e9g. A kapacit\u00e1s ellen\u0151rz\u00e9s\u00e9re k\u00e9t lehet\u0151s\u00e9g van:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_0707031656.html\">Rough-Cut Capacity Planning<\/a> (RCCP)<\/strong> az alap gy\u00e1rt\u00e1si funkci\u00f3kban (Transactions &gt; Manufacturing &gt; Capacity Planning). \u00d6sszeveti a munka\u00e1llom\u00e1s kapacit\u00e1s\u00e1t a gy\u00e1rt\u00e1si rendel\u00e9seken \u00e9s a tervezett gy\u00e1rt\u00e1si rendel\u00e9seken szerepl\u0151 tervezett id\u0151vel. C\u00e9lja \u201ea mid- to long-term view,\u201d (k\u00f6z\u00e9p- \u00e9s hossz\u00fa t\u00e1v\u00fa \u00e1ttekint\u00e9s) biztos\u00edt\u00e1sa, \u00e9s jelzi a t\u00falterhel\u00e9st, illetve az alulterhel\u00e9st.<\/li>\n\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338018.html\">Rough Cut Capacity Planning<\/a> (RCP)<\/strong> az Advanced Manufacturing modulban (Advanced Manufacturing &gt; Capacity Planning &gt; Capacity Planning &gt; Create Plan). Kimutatja a munka\u00e1llom\u00e1sok sz\u00e1zal\u00e9kos kihaszn\u00e1lts\u00e1g\u00e1t a tervez\u00e9si id\u0151szakban, \u00e9s lehet\u0151v\u00e9 teszi \u201emi lenne, ha\u201d forgat\u00f3k\u00f6nyvek k\u00e9sz\u00edt\u00e9s\u00e9t.<\/li>\n\n<\/ul>\n\n\n<p>Mindkett\u0151 kapacit\u00e1skimutat\u00e1s. Egyetlen m\u0171veletet sem \u00fctemeznek \u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Advanced Manufacturing: Work Bench \u00e9s eszk\u00f6z\u00f6k<\/h3>\n\n\n<p>Az <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/chapter_1506100009.html\">Advanced Manufacturing SuiteApp<\/a> minden technol\u00f3giai l\u00e9p\u00e9st egy <strong>Manufacturing Work Bench<\/strong> rekorddal eg\u00e9sz\u00edt ki. Ebben adhat\u00f3k meg az eszk\u00f6z\u00f6k, a v\u00e1rakoz\u00e1si id\u0151k, a munkaer\u0151ig\u00e9ny, a munkautas\u00edt\u00e1sok, az anyagfelhaszn\u00e1l\u00e1s \u00e9s a tervezett id\u0151k. A Work Bench m\u0171veleti sorrendj\u00e9nek, m\u0171veletnev\u00e9nek \u00e9s munka\u00e1llom\u00e1s\u00e1nak egyeznie kell a NetSuite technol\u00f3giai \u00fatvonal\u00e1ban megadottakkal.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Finite Scheduling: sorrend \u00e9s kibocs\u00e1t\u00e1s<\/h3>\n\n\n<p>Itt l\u00e9p be a g\u00e9pek \u00e9s a dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1t figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9s. A tervez\u0151 megnyitja az <strong>Advanced Manufacturing &gt; Finite Scheduling &gt; Release Work Orders<\/strong> k\u00e9perny\u0151t, \u00e9s elv\u00e9gzi az al\u00e1bbi l\u00e9p\u00e9seket:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>Be\u00e1ll\u00edtja a megjelen\u00edt\u00e9si sz\u0171r\u0151ket: <strong>Location<\/strong>, <strong>Production Class<\/strong>, <strong>Horizon Start<\/strong> (h\u00e9tf\u0151nek kell lennie) \u00e9s <strong>Horizon End<\/strong>, <strong>Planned Orders<\/strong>, <strong>Released Orders<\/strong>.<\/li>\n\n\n<li>Kiv\u00e1lasztja a <strong>Schedule Date<\/strong> \u00e9s a <strong>Schedule Method<\/strong> \u00e9rt\u00e9k\u00e9t (el\u0151re- vagy visszafel\u00e9), valamint a <strong>Child Work Orders<\/strong> kezel\u00e9s\u00e9nek m\u00f3dj\u00e1t.<\/li>\n\n\n<li>A k\u00edv\u00e1nt kibocs\u00e1t\u00e1si sorrendben bejel\u00f6li a <strong>WO Release<\/strong> jel\u00f6l\u0151n\u00e9gyzetet az egyes gy\u00e1rt\u00e1si rendel\u00e9seken. A <strong>Sequence<\/strong> mez\u0151 kit\u00f6lt\u0151dik, \u00e9s az \u00e9rt\u00e9ke m\u00f3dos\u00edthat\u00f3.<\/li>\n\n\n<li>A <strong>Sort Demand<\/strong> gombra kattint, ig\u00e9ny szerint megnyitja a <strong>Preview Schedule<\/strong> el\u0151n\u00e9zetet, majd a <strong>Release Work Orders<\/strong> gombra kattint.<\/li>\n\n<\/ol>\n\n\n<p>Kibocs\u00e1t\u00e1skor a NetSuite a termel\u00e9s\u00fctemez\u00e9s eredm\u00e9ny\u00e9hez igaz\u00edtja a m\u0171veletek kezd\u00e9si \u00e9s befejez\u00e9si d\u00e1tum\u00e1t. Alap\u00e9rtelmez\u00e9s szerint minden m\u0171velet egyetlen eszk\u00f6zre ker\u00fcl: arra, amelyik a legkor\u00e1bban el\u00e9rhet\u0151. A tervez\u0151 p\u00e1rhuzamos v\u00e9grehajt\u00e1st is be\u00e1ll\u00edthat, \u00edgy egy m\u0171velet egyszerre t\u00f6bb eszk\u00f6z\u00f6n futhat.<\/p>\n\n\n<p>Az Oracle szerint az Advanced Manufacturing termel\u00e9s\u00fctemez\u00e9se \u201eoptimizes work center throughput\u201d (optimaliz\u00e1lja a munka\u00e1llom\u00e1s \u00e1tbocs\u00e1t\u00f3k\u00e9pess\u00e9g\u00e9t), \u00e9s \u201econsiders the facility&#8217;s current and future capacity.\u201d (figyelembe veszi az \u00fczem jelenlegi \u00e9s j\u00f6v\u0151beli kapacit\u00e1s\u00e1t). Hozz\u00e1teszi: \u201ePlanners can influence both the work order sequence and the number of assets that a work order can use at one time.\u201d (A tervez\u0151k a gy\u00e1rt\u00e1si rendel\u00e9sek sorrendj\u00e9t \u00e9s az egy gy\u00e1rt\u00e1si rendel\u00e9s \u00e1ltal egyidej\u0171leg haszn\u00e1lhat\u00f3 eszk\u00f6z\u00f6k sz\u00e1m\u00e1t is befoly\u00e1solhatj\u00e1k.) Ez a k\u00e9t beavatkoz\u00e1si lehet\u0151s\u00e9g\u00fck.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-oracle-documents-and-what-it-leaves-to-the\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mit dokument\u00e1l az Oracle, \u00e9s mit b\u00edz a tervez\u0151re?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Az alap gy\u00e1rt\u00e1si funkci\u00f3k v\u00e9gtelen kapacit\u00e1ssal sz\u00e1molnak.<\/strong> Advanced Manufacturing n\u00e9lk\u00fcl a t\u00falterhel\u00e9s az \u00fczemben jelentkezik, nem a tervben. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>A sorrendet a tervez\u0151 hat\u00e1rozza meg.<\/strong> Az Oracle szerint: \u201ework orders must be released in sequence after they are created.\u201d (a gy\u00e1rt\u00e1si rendel\u00e9seket l\u00e9trehoz\u00e1suk ut\u00e1n sorrendben kell kibocs\u00e1tani). A tervez\u0151 bejel\u00f6li a WO Release jel\u00f6l\u0151n\u00e9gyzetet vagy m\u00f3dos\u00edtja a Sequence mez\u0151t. Az Oracle a gy\u00e1rt\u00e1si rendel\u00e9sek sorrendj\u00e9t a tervez\u0151 egyik beavatkoz\u00e1si lehet\u0151s\u00e9gek\u00e9nt nevezi meg. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>R\u00f6vid tervez\u00e9si id\u0151horizont aj\u00e1nlott.<\/strong> Az Oracle tan\u00e1csa a feldolgoz\u00e1si id\u0151re vonatkoz\u00f3an: \u201ekeep horizon periods as short as possible. Generally less than one week.\u201d (a tervez\u00e9si id\u0151horizont legyen a lehet\u0151 legr\u00f6videbb, \u00e1ltal\u00e1ban egy h\u00e9tn\u00e9l r\u00f6videbb). A gyakorlatban ez heti rendszeress\u00e9g\u0171 kibocs\u00e1t\u00e1st jelent a Finite Scheduling haszn\u00e1lat\u00e1val. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Az \u00e1t\u00fctemez\u00e9s \u00fajabb kibocs\u00e1t\u00e1st jelent.<\/strong> \u201eThe planner can review existing commitments to capacity and re-schedule them when necessary.\u201d (A tervez\u0151 \u00e1ttekintheti a megl\u00e9v\u0151 kapacit\u00e1slek\u00f6t\u00e9seket, \u00e9s sz\u00fcks\u00e9g eset\u00e9n \u00e1t\u00fctemezheti \u0151ket.) A Released Orders sz\u0171r\u0151 c\u00e9lja: \u201eto reschedule released work orders,\u201d (a kibocs\u00e1tott gy\u00e1rt\u00e1si rendel\u00e9sek \u00e1t\u00fctemez\u00e9se), ehhez a tervez\u0151 ism\u00e9t lefuttatja a kibocs\u00e1t\u00e1st. (ugyanaz a forr\u00e1s)<\/li>\n\n\n<li><strong>A tervezett gy\u00e1rt\u00e1si rendel\u00e9sek t\u00e1mogat\u00e1sa csak r\u00e9szleges.<\/strong> \u201ePlanned status work orders don&#8217;t support full or end-to-end scheduling, even when Auto-Scheduling is enabled.\u201d (A Planned \u00e1llapot\u00fa gy\u00e1rt\u00e1si rendel\u00e9sek nem t\u00e1mogatj\u00e1k a teljes vagy a folyamat eg\u00e9sz\u00e9re kiterjed\u0151 \u00fctemez\u00e9st, m\u00e9g akkor sem, ha az Auto-Scheduling enged\u00e9lyezve van.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Technol\u00f3giai \u00fatvonal n\u00e9lk\u00fcl nincs termel\u00e9s\u00fctemez\u00e9s.<\/strong> \u201eWork orders not associated with a NetSuite routing should not be scheduled.\u201d (A NetSuite technol\u00f3giai \u00fatvonal\u00e1hoz nem kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1si rendel\u00e9seket nem szabad \u00fctemezni.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>A p\u00e1rhuzamos v\u00e9grehajt\u00e1snak van fels\u0151 hat\u00e1ra.<\/strong> \u201eThe number of concurrent assets shouldn&#8217;t exceed the number of assets assigned to the manufacturing work bench operation sequence.\u201d (Az egyidej\u0171leg haszn\u00e1lt eszk\u00f6z\u00f6k sz\u00e1ma nem haladhatja meg a Manufacturing Work Bench adott m\u0171veleti sorsz\u00e1m\u00e1hoz rendelt eszk\u00f6z\u00f6k sz\u00e1m\u00e1t.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Az \u00e1t\u00e1ll\u00e1si id\u0151 a technol\u00f3giai \u00fatvonalon r\u00f6gz\u00edtett \u00e9rt\u00e9k.<\/strong> A technol\u00f3giai l\u00e9p\u00e9s Setup Time mez\u0151je rendel\u00e9senk\u00e9nt, percben adja meg az id\u0151t. Az \u00e9rt\u00e9k azonos, f\u00fcggetlen\u00fcl att\u00f3l, hogy el\u0151tte mit gy\u00e1rtottak az adott munka\u00e1llom\u00e1son. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>A technol\u00f3giai \u00fatvonal minden m\u00f3dos\u00edt\u00e1s\u00e1t k\u00e9tszer kell elv\u00e9gezni.<\/strong> Minden technol\u00f3giai l\u00e9p\u00e9shez k\u00fcl\u00f6n Work Bench rekord sz\u00fcks\u00e9ges, egyez\u0151 sorsz\u00e1mmal, m\u0171veletn\u00e9vvel \u00e9s munka\u00e1llom\u00e1ssal. Ez\u00e9rt a technol\u00f3giai \u00fatvonal m\u00f3dos\u00edt\u00e1s\u00e1t a Work Bench rekordban is meg kell ism\u00e9telni. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508337105.html\">Oracle<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>A gyakorlatban teh\u00e1t a tervez\u0151 ir\u00e1ny\u00edtja a kibocs\u00e1t\u00e1s ritmus\u00e1t, a saj\u00e1t tapasztalat\u00e1ra \u00e9p\u00edtve \u00e1ll\u00edtja \u00f6ssze a sorrendet, \u00e9s minden g\u00e9ple\u00e1ll\u00e1sn\u00e1l vagy s\u00fcrg\u0151s rendel\u00e9s \u00e9rkez\u00e9sekor \u00fajra lefuttatja a kibocs\u00e1t\u00e1st.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-netsuite-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor elegend\u0151 a NetSuite be\u00e9p\u00edtett \u00fctemez\u00e9se?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A NetSuite saj\u00e1t eszk\u00f6zei elegend\u0151k az al\u00e1bbi esetekben:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kev\u00e9s er\u0151forr\u00e1ssal, sz\u0171k term\u00e9kv\u00e1laszt\u00e9kot gy\u00e1rt.<\/strong> Egy-k\u00e9t sz\u0171k keresztmetszet, \u00e1lland\u00f3 technol\u00f3giai \u00fatvonalak \u00e9s visszat\u00e9r\u0151 term\u00e9kek. Ilyenkor el\u00e9g a v\u00e9gtelen kapacit\u00e1s\u00fa \u00fctemez\u00e9s, a Rough-Cut Capacity Planning \u00e9s egy tervez\u0151, aki szemrev\u00e9telez\u00e9ssel ellen\u0151rzi a terhel\u00e9st.<\/li>\n\n\n<li><strong>M\u00e1r haszn\u00e1lja az Advanced Manufacturing modult, \u00e9s az \u00fczem m\u0171k\u00f6d\u00e9se egyszer\u0171.<\/strong> M\u0171veletenk\u00e9nt egy eszk\u00f6z, r\u00f6vid technol\u00f3giai \u00fatvonalak, heti ritmus, \u00e9s egy tervez\u0151, akinek megfelel a sorrend k\u00e9zi megad\u00e1sa. Erre a Finite Scheduling elegend\u0151.<\/li>\n\n\n<li><strong>K\u00e9szletre gy\u00e1rt, hossz\u00fa \u00e1tfut\u00e1si id\u0151kkel.<\/strong> Ha a beszerz\u00e9st a Supply Planning vez\u00e9rli, \u00e9s el\u00e9g a kapacit\u00e1s hozz\u00e1vet\u0151leges ellen\u0151rz\u00e9se, a r\u00e9szletes m\u0171veleti \u00fctemterv kev\u00e9s t\u00f6bbletet ad.<\/li>\n\n<\/ul>\n\n\n<p>Amint b\u0151v\u00fcl a term\u00e9kv\u00e1laszt\u00e9k, h\u00e9t k\u00f6zben s\u00fcrg\u0151s rendel\u00e9sek \u00e9rkeznek, vagy a g\u00e9pkezel\u0151k rendelkez\u00e9sre \u00e1ll\u00e1sa v\u00e1lik korl\u00e1tt\u00e1, megjelennek az al\u00e1bbi jelek.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mikor van sz\u00fcks\u00e9g termel\u00e9s\u00fctemez\u0151re?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kin\u0151tte a be\u00e9p\u00edtett eszk\u00f6z\u00f6ket, ha az al\u00e1bbiak k\u00f6z\u00fcl t\u00f6bb is igaz:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>A heti kibocs\u00e1t\u00e1si sorrend keddre m\u00e1r nem megfelel\u0151, \u00e9s a tervez\u0151 hetente t\u00f6bbsz\u00f6r is \u00fajra \u00f6ssze\u00e1ll\u00edtja.<\/li>\n\n\n<li>A sz\u00e1ll\u00edt\u00e1si d\u00e1tumokat az \u00e1tfut\u00e1si id\u0151kb\u0151l sz\u00e1m\u00edtj\u00e1k, az \u00e9rt\u00e9kes\u00edt\u00e9s pedig rendre olyan hat\u00e1rid\u0151ket \u00edg\u00e9r, amelyeket az \u00fczem nem tud tartani.<\/li>\n\n\n<li>Az \u00e1t\u00e1ll\u00e1si id\u0151 att\u00f3l f\u00fcgg, hogy el\u0151z\u0151leg melyik term\u00e9ket gy\u00e1rtott\u00e1k, \u00e9s a megfelel\u0151 sorrend hetente t\u00f6bb \u00f3r\u00e1t takar\u00edtana meg.<\/li>\n\n\n<li>A gy\u00e1rt\u00e1si feladatok olyan szersz\u00e1mra, befog\u00f3k\u00e9sz\u00fcl\u00e9kre vagy anyagra v\u00e1rnak, amellyel az \u00fctemterv nem sz\u00e1molt, vagy k\u00e9t g\u00e9pnek egyszerre van sz\u00fcks\u00e9ge ugyanarra a szersz\u00e1mra.<\/li>\n\n\n<li>Egyes gy\u00e1rt\u00e1si feladatokhoz egyszerre k\u00e9t vagy h\u00e1rom g\u00e9pkezel\u0151 kell, de a tervb\u0151l nem l\u00e1tszik, ki \u00e1ll rendelkez\u00e9sre.<\/li>\n\n\n<li>A t\u00e9nyleges kapacit\u00e1st a g\u00e9pkezel\u0151k, a m\u0171szakok \u00e9s a t\u00e1voll\u00e9tek hat\u00e1rozz\u00e1k meg, nem a munka\u00e1llom\u00e1s csoportj\u00e1n megadott Labor Resources l\u00e9tsz\u00e1m\u00e9rt\u00e9k.<\/li>\n\n\n<li>Nem haszn\u00e1lja az Advanced Manufacturing modult, \u00e9s nem szeretn\u00e9 kiz\u00e1r\u00f3lag az \u00fctemez\u00e9s kedv\u00e9\u00e9rt bevezetni.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Mire \u00e9rdemes figyelni?<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>A t\u00e9nyleges kapacit\u00e1s figyelembev\u00e9tele er\u0151forr\u00e1sonk\u00e9nt<\/strong>, a m\u0171szakok, a dolgoz\u00f3k, a szabads\u00e1gok \u00e9s a t\u00fal\u00f3r\u00e1k figyelembev\u00e9tel\u00e9vel, nem csup\u00e1n munka\u00e1llom\u00e1s-csoportonk\u00e9nt.<\/li>\n\n\n<li><strong>Automatikus sorrendk\u00e9pz\u00e9s<\/strong> a hat\u00e1rid\u0151k \u00e9s priorit\u00e1sok alapj\u00e1n: a sorrendet a rendszer sz\u00e1m\u00edtsa ki, ne k\u00e9zzel kelljen kijel\u00f6lni.<\/li>\n\n\n<li><strong>Sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sok<\/strong>: a rendszer term\u00e9kp\u00e1ronk\u00e9nt, mindk\u00e9t ir\u00e1nyra megadott \u00e1t\u00e1ll\u00e1si id\u0151kkel hat\u00e1rozza meg a sorrendet.<\/li>\n\n\n<li><strong>A szersz\u00e1mok korl\u00e1tozott rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1nak figyelembev\u00e9tele<\/strong>, hogy ugyanazt a szersz\u00e1mot soha ne \u00fctemezze k\u00e9t munka\u00e1llom\u00e1sra egy id\u0151ben.<\/li>\n\n\n<li><strong>T\u00f6bb g\u00e9pkezel\u0151 hozz\u00e1rendel\u00e9se egy gy\u00e1rt\u00e1si feladathoz<\/strong>, valamint <strong>helyettes\u00edt\u0151 g\u00e9pek \u00e9s dolgoz\u00f3k haszn\u00e1lata<\/strong>, ha az els\u0151dleges er\u0151forr\u00e1s nem \u00e1ll rendelkez\u00e9sre.<\/li>\n\n\n<li><strong>Az anyagell\u00e1totts\u00e1g ellen\u0151rz\u00e9se<\/strong> minden m\u0171velet tervezett kezd\u00e9si id\u0151pontj\u00e1ra, a rakt\u00e1rk\u00e9szlet \u00e9s a m\u00e9g be\u00e9rkez\u00e9sre v\u00e1r\u00f3, megrendelt anyagok figyelembev\u00e9tel\u00e9vel.<\/li>\n\n\n<li><strong>Folyamatos \u00fajra\u00fctemez\u00e9s<\/strong>, ha egy feladat k\u00e9sve fejez\u0151dik be, le\u00e1ll egy g\u00e9p vagy m\u00f3dosul egy rendel\u00e9s.<\/li>\n\n\n<li><strong>A tervez\u0151k \u00e1ltal szerkeszthet\u0151 vizu\u00e1lis id\u0151vonal<\/strong> \u00e9s <strong>\u00fczemi visszajelz\u00e9sek<\/strong>, amelyekre az \u00fctemterv reag\u00e1l.<\/li>\n\n\n<li><strong>2026-ban \u00e9s azt k\u00f6vet\u0151en is megfelel\u0151 NetSuite-integr\u00e1ci\u00f3s megold\u00e1s.<\/strong> Az <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_2104046421.html\">Oracle aj\u00e1nl\u00e1sa szerint<\/a> a 2026.1-es verzi\u00f3t\u00f3l az \u00faj integr\u00e1ci\u00f3kat REST webszolg\u00e1ltat\u00e1sokra \u00e9rdemes \u00e9p\u00edteni, OAuth 2.0 hiteles\u00edt\u00e9ssel. A 2027.1-es verzi\u00f3t\u00f3l m\u00e1r nem hozhat\u00f3k l\u00e9tre \u00faj SOAP- vagy TBA-integr\u00e1ci\u00f3k, a 2028.2-es verzi\u00f3ban pedig minden SOAP-v\u00e9gpontot letiltanak. A t\u00f6meges adatlek\u00e9rdez\u00e9sek a <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_157909186990.html\">SuiteQL<\/a> haszn\u00e1lat\u00e1val t\u00f6rt\u00e9nnek (<code>POST \/services\/rest\/query\/v1\/suiteql<\/code>, lek\u00e9rdez\u00e9senk\u00e9nt legfeljebb 100 000 tal\u00e1lattal).<\/li>\n\n\n<li><strong>R\u00f6vid pr\u00f3ba saj\u00e1t adatokkal<\/strong>, m\u00e9g az integr\u00e1ci\u00f3s k\u00f3d meg\u00edr\u00e1sa el\u0151tt.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hol kap szerepet a SkyPlanner?<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>A SkyPlanner APS felh\u0151alap\u00fa termel\u00e9s\u00fctemez\u0151 rendszer, amely a NetSuite mellett m\u0171k\u00f6dik, \u00e9s a g\u00e9pek \u00e9s a dolgoz\u00f3k t\u00e9nyleges kapacit\u00e1s\u00e1hoz igaz\u00edtja az \u00fctemtervet. A cikkt\u00f6rzs, a darabjegyz\u00e9kek, a beszerz\u00e9s, a k\u00e9szletkezel\u00e9s \u00e9s a p\u00e9nz\u00fcgy tov\u00e1bbra is a NetSuite-ban marad. A SkyPlanner minden munka\u00e1llom\u00e1sra, dolgoz\u00f3ra \u00e9s szersz\u00e1mra kisz\u00e1m\u00edtja a sorrendet, \u00e9s elv\u00e9gzi azt az \u00fajratervez\u00e9st, amelyet a Finite Scheduling a tervez\u0151re b\u00edz.<\/p>\n\n\n<p>A fenti szempontok alapj\u00e1n \u00edgy teljes\u00edt:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kisz\u00e1m\u00edtott sorrend, k\u00e9zi kijel\u00f6l\u00e9s helyett.<\/strong> Az Arcturus motor m\u00e1sodpercek alatt v\u00e9gzi el a termel\u00e9s\u00fctemez\u00e9st a hat\u00e1rid\u0151k, a priorit\u00e1sok, az \u00fcgyf\u00e9lpriorit\u00e1s \u00e9s az \u00d6n szab\u00e1lyai alapj\u00e1n. A tervez\u0151k interakt\u00edv Gantt-id\u0151vonalon m\u00f3dos\u00edthatj\u00e1k az eredm\u00e9nyt.<\/li>\n\n\n<li><strong>Folyamatosan friss\u00fcl\u0151 terv, heti kibocs\u00e1t\u00e1s helyett.<\/strong> Az Autopilot automatikusan \u00fajra\u00fctemez, ha v\u00e1ltoz\u00e1s t\u00f6rt\u00e9nik a gy\u00e1rt\u00e1sban. A z\u00e1rol\u00e1sok \u00e9s a priorit\u00e1sok tov\u00e1bbra is az \u00d6n kez\u00e9ben maradnak.<\/li>\n\n\n<li><strong>Sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sok.<\/strong> Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix ir\u00e1nyonk\u00e9nt elt\u00e9r\u0151 id\u0151ket t\u00e1rol a term\u00e9kek k\u00f6z\u00f6tt (k\u00e9kr\u0151l pirosra 30 perc, pirosr\u00f3l k\u00e9kre 60), a motor pedig a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja. Az el\u0151k\u00e9sz\u00edt\u00e9si \u00e9s a bont\u00e1si id\u0151k gy\u00e1rt\u00e1si feladatonk\u00e9nt \u00e9rv\u00e9nyes\u00fclnek.<\/li>\n\n\n<li><strong>Szersz\u00e1mok, dolgoz\u00f3k \u00e9s helyettes\u00edt\u0151 er\u0151forr\u00e1sok.<\/strong> A szersz\u00e1mok v\u00e9ges kapacit\u00e1s\u00fa, k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok: az egyik munka\u00e1llom\u00e1son haszn\u00e1lt szersz\u00e1mot a rendszer nem \u00fctemezi ugyanarra az id\u0151pontra egy m\u00e1sikra. Egy gy\u00e1rt\u00e1si feladathoz egyszerre t\u00f6bb g\u00e9pkezel\u0151 is hozz\u00e1rendelhet\u0151. Ha az els\u0151dleges g\u00e9p vagy dolgoz\u00f3 nem \u00e1ll rendelkez\u00e9sre, a motor figyelembe veszi a helyettes\u00edt\u0151 er\u0151forr\u00e1sokat. A modell a munka\u00e1llom\u00e1s-csoportokat \u00e9s a hat\u00e9konys\u00e1gi \u00e9rt\u00e9keket is kezeli.<\/li>\n\n\n<li><strong>Anyagell\u00e1totts\u00e1g a tervben.<\/strong> A rendszer minden m\u0171veletn\u00e9l ellen\u0151rzi a rakt\u00e1rk\u00e9szletet \u00e9s a be\u00e9rkez\u0151 beszerz\u00e9si rendel\u00e9seket: a megrendelt anyagot a beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tum\u00e1t\u00f3l tekinti rendelkez\u00e9sre \u00e1ll\u00f3nak.<\/li>\n\n\n<li><strong>Nincs sz\u00fcks\u00e9g a Work Bench lek\u00e9pez\u00e9s\u00e9re.<\/strong> A SkyPlanner saj\u00e1t m\u0171veleti l\u00e9p\u00e9seket kezel, \u00edgy nincs sz\u00fcks\u00e9g sem az Advanced Manufacturing modulra, sem a technol\u00f3giai \u00fatvonal minden l\u00e9p\u00e9s\u00e9hez k\u00fcl\u00f6n Work Bench-rekordra.<\/li>\n\n\n<li><strong>\u00dczemi visszajelz\u00e9sek ugyanabban a rendszerben.<\/strong> A g\u00e9pkezel\u0151k telefonon vagy t\u00e1blag\u00e9pen l\u00e1tj\u00e1k a feladatsorukat, \u00e9s a Mobile Confirmations, a Production Timer \u00e9s a Quick Log Mode funkci\u00f3kkal r\u00f6gz\u00edtik az elv\u00e9gzett munk\u00e1t.<\/li>\n\n<\/ul>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> a tervez\u0151 hetente t\u00f6bbsz\u00f6r is \u00fajra \u00f6ssze\u00e1ll\u00edtja a gy\u00e1rt\u00e1sba ad\u00e1s sorrendj\u00e9t.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> az \u00e1t\u00e1ll\u00e1sok a term\u00e9kek sorrendj\u00e9t\u0151l f\u00fcggnek, vagy egy k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1m, illetve egy h\u00e1romf\u0151s csapat rendelkez\u00e9sre \u00e1ll\u00e1sa d\u00f6nti el, mi gy\u00e1rthat\u00f3.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> az \u00fctemez\u00e9sn\u00e9l meg kell v\u00e1rni a beszerz\u00e9si rendel\u00e9sek alapj\u00e1n \u00e9rkez\u0151 anyagokat.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlannert, ha<\/strong> nem szeretn\u00e9 kiz\u00e1r\u00f3lag az \u00fctemez\u00e9s kedv\u00e9\u00e9rt bevezetni az Advanced Manufacturing modult.<\/p>\n\n\n<p>A finnorsz\u00e1gi Ulvil\u00e1ban m\u0171k\u00f6d\u0151, kapcsol\u00f3t\u00e1bl\u00e1kat \u00e9s kapcsol\u00f3berendez\u00e9seket gy\u00e1rt\u00f3 UTU Oy az Oracle NetSuite mellett a SkyPlannerrel \u00fctemezi a gy\u00e1rt\u00e1st. ERP-tan\u00e1csad\u00f3 c\u00e9ge h\u00e1rom \u00fctemez\u00e9si megold\u00e1st mutatott be, az UTU pedig a rugalmass\u00e1ga \u00e9s modularit\u00e1sa miatt v\u00e1lasztotta a SkyPlannert. Az \u00e9les indul\u00e1sra 2025 szeptember\u00e9ben ker\u00fclt sor; a SkyPlannert a NetSuite-tal \u00e9s az UTU b\u00e9rsz\u00e1mfejt\u00e9si rendszer\u00e9vel is integr\u00e1lt\u00e1k.<\/p>\n\n\n<p>A SkyPlanner \u00e9s a NetSuite k\u00f6z\u00f6tt k\u00e9tir\u00e1ny\u00fa az integr\u00e1ci\u00f3. A gy\u00e1rt\u00e1si rendel\u00e9sek, a technol\u00f3giai \u00fatvonalak, a munka\u00e1llom\u00e1sok, a cikkek \u00e9s a beszerz\u00e9si rendel\u00e9sek a NetSuite-b\u00f3l \u00e9rkeznek. A m\u0171veletek tervezett id\u0151pontjai, az el\u0151rehalad\u00e1si adatok \u00e9s a r\u00f6gz\u00edtett munka\u00f3r\u00e1k visszaker\u00fclnek a NetSuite-ba, az \u00fctemterv v\u00e1ltoz\u00e1sait pedig webhookok tov\u00e1bb\u00edtj\u00e1k, amint azok megt\u00f6rt\u00e9nnek.<\/p>\n\n\n<p>Nincs k\u00e9t egyform\u00e1n be\u00e1ll\u00edtott NetSuite-k\u00f6rnyezet. A bevezet\u00e9s sor\u00e1n a SkyPlanner csapata az \u00d6n technol\u00f3giai \u00fatvonalaihoz, munka\u00e1llom\u00e1saihoz \u00e9s egy\u00e9ni mez\u0151ihez igaz\u00edtja az integr\u00e1ci\u00f3t, \u00e9s az \u00e9les indul\u00e1s ut\u00e1n is t\u00e1mogatja azt. NetSuite-partnere vagy saj\u00e1t fejleszt\u0151i is \u00e9p\u00edthetnek integr\u00e1ci\u00f3t a SkyPlanner dokument\u00e1lt REST API-j\u00e1ra (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API-referencia<\/a>, <a href=\"\/hu\/docs\/integracios-bemutato\/\">SkyPlanner-dokument\u00e1ci\u00f3<\/a>), mind\u00f6ssze egy API-kulccsal.<\/p>\n\n\n<p>Kezdje a NetSuite-b\u00f3l export\u00e1lt CSV-f\u00e1jlokkal a <a href=\"\/hu\/proba\/\">30 napos ingyenes pr\u00f3baid\u0151szakot<\/a> (legfeljebb 20 munka\u00e1llom\u00e1s, bankk\u00e1rtya n\u00e9lk\u00fcl), \u00e9s m\u00e9g az integr\u00e1ci\u00f3s projekt el\u0151tt n\u00e9zze meg saj\u00e1t termel\u00e9s\u00fctemez\u00e9s\u00e9nek eredm\u00e9ny\u00e9t. Ezt k\u00f6vet\u0151en az el\u0151fizet\u00e9s <a href=\"\/hu\/arkepzes\/\">havi 199 \u20ac-t\u00f3l<\/a> indul, 5 munka\u00e1llom\u00e1ssal, havi sz\u00e1ml\u00e1z\u00e1ssal, \u00e9s b\u00e1rmikor lemondhat\u00f3. Az integr\u00e1ci\u00f3ra el\u0151zetes \u00e1raj\u00e1nlatot adunk az \u00d6n folyamatai \u00e9s ig\u00e9nyei alapj\u00e1n, az el\u0151fizet\u00e9si csomaggal egy\u00fctt, \u00edgy m\u00e1r az indul\u00e1s el\u0151tt l\u00e1tja a teljes k\u00f6lts\u00e9get. A megval\u00f3s\u00edt\u00e1s rendszerint a bevezet\u00e9s kezdet\u00e9t\u0151l sz\u00e1m\u00edtott heteken bel\u00fcl lez\u00e1rul, \u00edgy hossz\u00fa projekt helyett m\u00e1r n\u00e9h\u00e1ny h\u00e9t m\u00falva \u00e9lesben \u00fctemezhet.<\/p>\n\n\n<p>Az \u00e1ttekint\u00e9st a <a href=\"\/hu\/integraciok\/erp\/netsuite\/\">SkyPlanner APS a NetSuite-hoz<\/a> oldalon, a technikai megval\u00f3s\u00edt\u00e1s r\u00e9szleteit pedig a <a href=\"\/hu\/integraciok\/erp\/netsuite\/integracios-utmutato\/\">NetSuite-integr\u00e1ci\u00f3s \u00fatmutat\u00f3ban<\/a> tal\u00e1lja.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/proba\/\">Ingyenes pr\u00f3ba ind\u00edt\u00e1sa<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/hu\/kapcsolat-ertekesites\/\">Bemutat\u00f3 foglal\u00e1sa<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00f3c\u00e9gek v\u00e9lem\u00e9nye a SkyPlannerr\u0151l<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, az UTU ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151je az ulvilai kapcsol\u00f3t\u00e1bla-gy\u00e1rt\u00f3 \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u00f3ra<\/b><span>megtakar\u00edt\u00e1s hetente<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlannerrel az Excel-t\u00e1bl\u00e1zatokr\u00f3l \u00e1tt\u00e9rt\u00fcnk a gy\u00e1rt\u00e1s val\u00f3s idej\u0171 optimaliz\u00e1l\u00e1s\u00e1ra.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, ell\u00e1t\u00e1sil\u00e1nc-szak\u00e9rt\u0151<\/b><br>UTU \u00b7 Villamos kapcsol\u00f3t\u00e1bl\u00e1k \u00e9s kapcsol\u00f3berendez\u00e9sek<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1stervez\u00e9s hetente 2 \u00f3ra munkaid\u0151t takar\u00edt meg, az \u00faj feladatsor pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/utu\/\">Olvassa el az UTU v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Tisztat\u00e9ri ruh\u00e1t visel\u0151 g\u00e9pkezel\u0151k a Laboratory &amp; Allied nairobi gy\u00f3gyszergy\u00e1r\u00e1nak palackt\u00f6lt\u0151 sor\u00e1n\u00e1l\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, informatikai vezet\u0151<\/b><br>Laboratory &amp; Allied \u00b7 Gy\u00f3gyszergy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A gy\u00e1rt\u00e1s hat\u00e9konys\u00e1ga 90%-kal n\u0151tt, \u00e9s az \u00f6sszes munka\u00e1llom\u00e1sra kiterjed\u0151, h\u00e1romhavi optimaliz\u00e1lt terv kevesebb mint 30 perc alatt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/laboratory-allied\/\">Olvassa el a Laboratory &amp; Allied v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, a Fredman Operations termel\u00e9svezet\u0151je egy robotiz\u00e1lt raklapoz\u00f3cella mellett Raum\u00e1ban\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 h\u00f3napra el\u0151re<\/b><span>l\u00e1that\u00f3 szabad kapacit\u00e1s az \u00e9rt\u00e9kes\u00edt\u00e9s sz\u00e1m\u00e1ra<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner megb\u00edzhat\u00f3 alapot teremt a teljes gy\u00e1rt\u00e1stervez\u00e9shez.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, termel\u00e9svezet\u0151<\/b><br>Fredman Operations \u00b7 \u00c9lelmiszerrel val\u00f3 \u00e9rintkez\u00e9sre alkalmas csomagol\u00f3pap\u00edrok<\/p>\n\n\n<p class=\"ind-cust__result\">Az \u00e9rt\u00e9kes\u00edt\u00e9s hat h\u00f3napra el\u0151re l\u00e1tja a szabad kapacit\u00e1st, \u00e9s az \u00fctemterv m\u00f3dos\u00edt\u00e1s\u00e1ra ir\u00e1nyul\u00f3 k\u00e9r\u00e9sekre m\u00e1sodpercek alatt v\u00e1laszt kapnak a kor\u00e1bbi egy \u00f3ra vagy m\u00e9g hosszabb id\u0151 helyett.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/fredman-operations\/\">Olvassa el a Fredman Operations v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"A KJH-Comp hegeszt\u0151je egy hegesztett ac\u00e9lszerkezetet csiszol az alah\u00e4rm\u00e4i \u00fczemben\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa a kor\u00e1bbi mintegy 50% helyett<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eA SkyPlanner d\u00f6nt\u0151 szerepet j\u00e1tszik abban, hogy tartani tudjuk a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u00fcgyvezet\u0151 igazgat\u00f3<\/b><br>KJH-Comp \u00b7 Lemezmegmunk\u00e1l\u00e1s \u00e9s b\u00e9rgy\u00e1rt\u00e1s<\/p>\n\n\n<p class=\"ind-cust__result\">A hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, az \u00fctemez\u00e9shez pedig ma m\u00e1r k\u00e9t m\u0171vezet\u0151 helyett egy is elegend\u0151.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/hu\/customers\/kjh-comp\/\">Olvassa el a KJH-Comp v\u00e9lem\u00e9ny\u00e9t<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gyakori k\u00e9rd\u00e9sek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van \u00fctemez\u0151eszk\u00f6z a NetSuite-ban?<\/summary>\n<p class=\"sp-faq__a\">Igen. Az alap NetSuite a Manufacturing Routing \u00e9s a munka\u00e1llom\u00e1sok napt\u00e1rai alapj\u00e1n, v\u00e9gtelen kapacit\u00e1ssal \u00fctemezi el\u0151re vagy visszafel\u00e9 a gy\u00e1rt\u00e1si rendel\u00e9seket. Az Advanced Manufacturing SuiteApp ezt a Finite Scheduling funkci\u00f3val eg\u00e9sz\u00edti ki, amelyben a tervez\u0151 az eszk\u00f6z\u00f6k rendelkez\u00e9sre \u00e1ll\u00e1sa alapj\u00e1n \u00e1ll\u00edtja sorrendbe \u00e9s adja gy\u00e1rt\u00e1sba a gy\u00e1rt\u00e1si rendel\u00e9seket.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mi a k\u00fcl\u00f6nbs\u00e9g a t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9s \u00e9s a korl\u00e1tlan kapacit\u00e1ssal sz\u00e1mol\u00f3 \u00fctemez\u00e9s k\u00f6z\u00f6tt a NetSuite-ban?<\/summary>\n<p class=\"sp-faq__a\">A v\u00e9gtelen kapacit\u00e1s\u00fa \u00fctemez\u00e9s minden gy\u00e1rt\u00e1si rendel\u00e9s id\u0151z\u00edt\u00e9s\u00e9t annak technol\u00f3giai \u00fatvonala \u00e9s napt\u00e1ra alapj\u00e1n hat\u00e1rozza meg, \u00e9s figyelmen k\u00edv\u00fcl hagyja a munka\u00e1llom\u00e1s t\u00f6bbi terhel\u00e9s\u00e9t. Az Advanced Manufacturing Finite Scheduling funkci\u00f3ja a rendelkez\u00e9sre \u00e1ll\u00f3 eszk\u00f6z\u00f6kre \u00fctemezi a gy\u00e1rt\u00e1si rendel\u00e9seket, abban a sorrendben, ahogyan a tervez\u0151 gy\u00e1rt\u00e1sba adja \u0151ket. Az Oracle ehhez \u00e1ltal\u00e1ban egy h\u00e9tn\u00e9l r\u00f6videbb tervez\u00e9si id\u0151t\u00e1vot javasol.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Van a NetSuite-ban durva kapacit\u00e1stervez\u00e9s?<\/summary>\n<p class=\"sp-faq__a\">Igen, k\u00e9t helyen is. Az alap gy\u00e1rt\u00e1si funkci\u00f3k k\u00f6z\u00f6tt a Rough-Cut Capacity Planning a Transactions &gt; Manufacturing &gt; Capacity Planning men\u00fcpontban \u00e9rhet\u0151 el, az Advanced Manufacturing pedig saj\u00e1t RCP-terveket k\u00edn\u00e1l. Mindkett\u0151 munka\u00e1llom\u00e1sonk\u00e9nt mutatja meg a terhel\u00e9st a kapacit\u00e1shoz viszony\u00edtva. M\u0171veleti \u00fctemtervet egyik sem k\u00e9sz\u00edt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sz\u00fcks\u00e9gem van az Advanced Manufacturing modulra ahhoz, hogy a SkyPlanner APS-t a NetSuite-tal haszn\u00e1ljam?<\/summary>\n<p class=\"sp-faq__a\">Nem. A termel\u00e9s\u00fctemez\u00e9st maga a SkyPlanner v\u00e9gzi, ez\u00e9rt bemeneti adatk\u00e9nt elegend\u0151k az alap NetSuite gy\u00e1rt\u00e1si rendel\u00e9sei, technol\u00f3giai \u00fatvonalai \u00e9s munka\u00e1llom\u00e1sai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kezeli a SkyPlanner a sorrendf\u00fcgg\u0151 \u00e1t\u00e1ll\u00e1sokat \u00e9s a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mokat?<\/summary>\n<p class=\"sp-faq__a\">Igen. Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trix minden term\u00e9kp\u00e1rhoz mindk\u00e9t ir\u00e1nyban meghat\u00e1rozza az \u00e1t\u00e1ll\u00e1si id\u0151t, a motor pedig a legkevesebb \u00e1t\u00e1ll\u00e1si id\u0151t ig\u00e9nyl\u0151 sorrendet v\u00e1lasztja. A szersz\u00e1mok v\u00e9ges kapacit\u00e1s\u00fa er\u0151forr\u00e1sok, ez\u00e9rt az egyik munka\u00e1llom\u00e1son haszn\u00e1lt szersz\u00e1mot a rendszer nem \u00fctemezi ugyanarra az id\u0151pontra egy m\u00e1sikra. A gy\u00e1rt\u00e1si feladatokhoz egyszerre t\u00f6bb g\u00e9pkezel\u0151re is sz\u00fcks\u00e9g lehet, \u00e9s a motor helyettes\u00edt\u0151 g\u00e9peket vagy dolgoz\u00f3kat haszn\u00e1l, ha az els\u0151dleges er\u0151forr\u00e1s nem \u00e1ll rendelkez\u00e9sre.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1ci\u00f3k \/ ERP \/ Oracle NetSuite Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS Az Oracle NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemezi a gy\u00e1rt\u00e1st, hacsak nem eg\u00e9sz\u00edti ki az Advanced Manufacturing SuiteApp alkalmaz\u00e1ssal. Az Oracle saj\u00e1t dokument\u00e1ci\u00f3ja szerint a v\u00e9gtelen kapacit\u00e1s\u00fa \u00fctemez\u00e9s \u201edoesn&#8217;t account for current work center capacity or resource use.\u201d (nem veszi figyelembe a &#8230; <a title=\"Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/\" aria-label=\"Read more about Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100740,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101007","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>NetSuite: van termel\u00e9s\u00fctemez\u00e9s? | SkyPlanner<\/title>\n<meta name=\"description\" content=\"A NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemez. Advanced Manufacturing: tervez\u0151 vez\u00e9relte Finite Scheduling. Mit tudnak, \u00e9s mikor j\u00f3 a SkyPlanner APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"A NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemez. Advanced Manufacturing: tervez\u0151 vez\u00e9relte Finite Scheduling. Mit tudnak, \u00e9s mikor j\u00f3 a SkyPlanner APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"23 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/netsuite\\\/termelesutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/netsuite\\\/termelesutemezes\\\/\",\"name\":\"NetSuite: van termel\u00e9s\u00fctemez\u00e9s? | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"A NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemez. Advanced Manufacturing: tervez\u0151 vez\u00e9relte Finite Scheduling. Mit tudnak, \u00e9s mikor j\u00f3 a SkyPlanner APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/netsuite\\\/termelesutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/netsuite\\\/termelesutemezes\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/netsuite\\\/termelesutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS az Oracle NetSuite-hoz: termel\u00e9s\u00fctemez\u00e9s\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/integraciok\\\/erp\\\/netsuite\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"NetSuite: van termel\u00e9s\u00fctemez\u00e9s? | SkyPlanner","description":"A NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemez. Advanced Manufacturing: tervez\u0151 vez\u00e9relte Finite Scheduling. Mit tudnak, \u00e9s mikor j\u00f3 a SkyPlanner APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS","og_description":"A NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemez. Advanced Manufacturing: tervez\u0151 vez\u00e9relte Finite Scheduling. Mit tudnak, \u00e9s mikor j\u00f3 a SkyPlanner APS?","og_url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"23 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/","name":"NetSuite: van termel\u00e9s\u00fctemez\u00e9s? | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"A NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemez. Advanced Manufacturing: tervez\u0151 vez\u00e9relte Finite Scheduling. Mit tudnak, \u00e9s mikor j\u00f3 a SkyPlanner APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/termelesutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP- \u00e9s MES-szoftverintegr\u00e1ci\u00f3k a SkyPlannerrel","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS az \u00d6n ERP-rendszer\u00e9hez","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS az Oracle NetSuite-hoz: termel\u00e9s\u00fctemez\u00e9s","item":"https:\/\/skyplanner.ai\/hu\/integraciok\/erp\/netsuite\/"},{"@type":"ListItem","position":5,"name":"Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1ci\u00f3k \/ ERP \/ Oracle NetSuite Van termel\u00e9s\u00fctemez\u00e9s a NetSuite-ban? Be\u00e9p\u00edtett lehet\u0151s\u00e9gek \u00e9s SkyPlanner APS Az Oracle NetSuite v\u00e9gtelen kapacit\u00e1ssal \u00fctemezi a gy\u00e1rt\u00e1st, hacsak nem eg\u00e9sz\u00edti ki az Advanced Manufacturing SuiteApp alkalmaz\u00e1ssal. Az Oracle saj\u00e1t dokument\u00e1ci\u00f3ja szerint a v\u00e9gtelen kapacit\u00e1s\u00fa \u00fctemez\u00e9s \u201edoesn&#8217;t account for current work center capacity or resource use.\u201d (nem veszi figyelembe a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=101007"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/101007\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/pages\/100740"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=101007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}