{"id":79224,"date":"2025-05-13T09:37:46","date_gmt":"2025-05-13T09:37:46","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/megrendelt-tetelek\/"},"modified":"2025-10-08T07:30:00","modified_gmt":"2025-10-08T07:30:00","password":"","slug":"megrendelt-tetelek","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/","title":{"rendered":"Megrendelt t\u00e9telek"},"content":{"rendered":"\n<p>Itt r\u00e9szletesen bemutatjuk a rendel\u00e9si t\u00e9telek lek\u00e9rdez\u00e9s\u00e9t, l\u00e9trehoz\u00e1s\u00e1t, friss\u00edt\u00e9s\u00e9t \u00e9s t\u00f6rl\u00e9s\u00e9t.<\/p>\n\n<p>A rendel\u00e9si t\u00e9telek a <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> v\u00e9gponton kereszt\u00fcl \u00e9rhet\u0151k el.<\/p>\n\n<h4 class=\"wp-block-heading\" id=\"h-fetching-order-items\">Rendel\u00e9si t\u00e9telek lek\u00e9r\u00e9se<\/h4>\n\n<p>A rendel\u00e9si t\u00e9teleket a <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> v\u00e9gpontra k\u00fcld\u00f6tt GET-k\u00e9relemmel lehet lek\u00e9rni:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"825\" height=\"995\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" alt=\"\" class=\"wp-image-69594\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png 825w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-249x300.png 249w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-768x926.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-360x434.png 360w\" sizes=\"(max-width: 825px) 100vw, 825px\" \/><figcaption class=\"wp-element-caption\"><strong>1. \u00e1bra.<\/strong>  Rendel\u00e9si t\u00e9telek lek\u00e9r\u00e9se<\/figcaption><\/figure>\n\n<p>A rendel\u00e9si t\u00e9teleket sz\u00e1mos k\u00fcl\u00f6nb\u00f6z\u0151 param\u00e9ter alapj\u00e1n keresheti:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id  <\/strong>\n<ul class=\"wp-block-list\">\n<li>a Skyplanner bels\u0151 <strong>rendel\u00e9si <\/strong>azonos\u00edt\u00f3j\u00e1t a <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-orders-endpoint-on<\/mark> kereszt\u00fcl tal\u00e1lja meg.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel k\u00fcls\u0151 azonos\u00edt\u00f3ja<\/li>\n\n\n\n<li>P\u00e9ld\u00e1ul a k\u00fcls\u0151 rendszer (ERP stb.) egyedi azonos\u00edt\u00f3ja.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Bels\u0151 Skyplanner term\u00e9k azonos\u00edt\u00f3<\/li>\n\n\n\n<li>Megtal\u00e1lhat\u00f3 a <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/products-endponton<\/mark> kereszt\u00fcl<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Ha egy rendel\u00e9si t\u00e9telnek vannak alt\u00e9telei (pl. alterm\u00e9kek), akkor az alt\u00e9telek a parent_id mez\u0151ben a sz\u00fcl\u0151i rendel\u00e9si t\u00e9tel azonos\u00edt\u00f3j\u00e1val rendelkeznek.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel indexsz\u00e1ma<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"278\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png\" alt=\"\" class=\"wp-image-69624\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-300x81.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-768x208.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-360x98.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6.png 1238w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>2. \u00e1bra.<\/strong>  Rendel\u00e9si t\u00e9tel sorindexek<\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>worknumber<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel munkasz\u00e1m\u00e1nak \u00e9rt\u00e9ke<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>st\u00e1tusz<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel st\u00e1tusza<\/li>\n\n\n\n<li>Megengedett \u00e9rt\u00e9kek: <strong>\u00faj<\/strong>, <strong>megkezdett<\/strong> vagy <strong>befejezett<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>poz\u00edci\u00f3<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel poz\u00edci\u00f3j\u00e1nak \u00e9rt\u00e9ke<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"252\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png\" alt=\"\" class=\"wp-image-69653\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-300x74.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-768x189.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-360x89.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7.png 1225w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">3. \u00e1bra. A rendel\u00e9si t\u00e9tel poz\u00edci\u00f3j\u00e1nak \u00e9rt\u00e9kei <\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel sz\u00e1ll\u00edt\u00e1si d\u00e1tuma<\/li>\n\n\n\n<li>Form\u00e1tum: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date_condition<\/strong>\n<ul class=\"wp-block-list\">\n<li>A sz\u00e1ll\u00edt\u00e1si d\u00e1tum keres\u00e9s\u00e9nek v\u00e1laszthat\u00f3 felt\u00e9tele<\/li>\n\n\n\n<li>Lehet\u0151s\u00e9gek: &gt;, =, &lt;=, =, !=<\/li>\n\n\n\n<li>Ha nincs \u00e9rt\u00e9k megadva, a <strong>&gt;= felt\u00e9tel lesz haszn\u00e1lva<\/strong> <strong>.<\/strong> <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>Vissza csak rendel\u00e9si t\u00e9telek, amelyek kil\u00e1t\u00e1sok<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>include_archived<\/strong>\n<ul class=\"wp-block-list\">\n<li>Archiv\u00e1lt (l\u00e1gy t\u00f6r\u00f6lt) rendel\u00e9si t\u00e9telek bevon\u00e1sa a lek\u00e9rdez\u00e9sbe<\/li>\n\n\n\n<li>Az <strong>is_archive<\/strong> \u00e9rt\u00e9kkel jel\u00f6lve<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>m\u00f3dos\u00edtott<\/strong>\n<ul class=\"wp-block-list\">\n<li>Adott d\u00e1tum ut\u00e1n m\u00f3dos\u00edtott rendel\u00e9si t\u00e9telek visszak\u00fcld\u00e9se<\/li>\n\n\n\n<li>Form\u00e1tum: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>modifiedCondition<\/strong>\n<ul class=\"wp-block-list\">\n<li>A m\u00f3dos\u00edtott \u00e9rt\u00e9kek keres\u00e9s\u00e9nek v\u00e1laszthat\u00f3 felt\u00e9tele<\/li>\n\n\n\n<li>Lehet\u0151s\u00e9gek: &gt;, =, &lt;=, =, !=<\/li>\n\n\n\n<li>Ha nincs \u00e9rt\u00e9k megadva, a <strong>&gt;= felt\u00e9tel lesz haszn\u00e1lva<\/strong> <strong>.<\/strong> <\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>A keres\u00e9si param\u00e9tereket keverheti \u00e9s \u00f6sszev\u00e1logathatja a k\u00f6vetkez\u0151k szerint:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"784\" height=\"777\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png\" alt=\"\" class=\"wp-image-69732\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png 784w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-300x297.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-150x150.png 150w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-768x761.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-360x357.png 360w\" sizes=\"(max-width: 784px) 100vw, 784px\" \/><figcaption class=\"wp-element-caption\"><strong>4. \u00e1bra. <\/strong>Rendel\u00e9si t\u00e9telek lek\u00e9r\u00e9se <strong>phaser_order_id <\/strong>\u00e9s <strong>row_index<\/strong> alapj\u00e1n<\/figcaption><\/figure>\n\n<p>Egy adott rendel\u00e9si t\u00e9tel lek\u00e9rdez\u00e9s\u00e9hez a Skyplanner bels\u0151 azonos\u00edt\u00f3j\u00e1val egy ilyen k\u00e9r\u00e9st v\u00e9gezhet:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"621\" height=\"664\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png\" alt=\"\" class=\"wp-image-70681\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png 621w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-281x300.png 281w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-360x385.png 360w\" sizes=\"(max-width: 621px) 100vw, 621px\" \/><figcaption class=\"wp-element-caption\"><strong>5. \u00e1bra.<\/strong>  Skyplanner azonos\u00edt\u00f3val rendelkez\u0151 megrendel\u00e9si t\u00e9tel lek\u00e9r\u00e9se 4<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-creating-order-items\">Megrendel\u00e9si t\u00e9telek l\u00e9trehoz\u00e1sa<\/h4>\n\n<p>Ne feledje, hogy a <strong>rendel\u00e9si<\/strong> t\u00e9tel l\u00e9trehoz\u00e1sa el\u0151tt l\u00e9tre kell hoznia egy <strong>megrendel\u00e9st<\/strong>!<\/p>\n\n<p>Egy rendel\u00e9si t\u00e9tel l\u00e9trehoz\u00e1s\u00e1hoz k\u00fcldj\u00f6n egy POST-k\u00e9r\u00e9st a <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> v\u00e9gpontra:<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"669\" height=\"1024\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png\" alt=\"\" class=\"wp-image-69818\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png 669w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-196x300.png 196w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-768x1175.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-335x512.png 335w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10.png 815w\" sizes=\"(max-width: 669px) 100vw, 669px\" \/><figcaption class=\"wp-element-caption\"><strong>6.<\/strong> <strong>\u00e1bra<\/strong> <strong>.<\/strong> Megrendel\u00e9si t\u00e9tel l\u00e9trehoz\u00e1sa<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png\" alt=\"\" class=\"wp-image-69909\" style=\"width:1024px;height:auto\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1536x803.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13.png 1807w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>7. \u00e1bra.<\/strong>  L\u00e9trehozott rendel\u00e9si t\u00e9tel<\/figcaption><\/figure>\n\n<p>Az al\u00e1bbiakban \u00e1ttekintj\u00fck a megrendel\u00e9si t\u00e9telek l\u00e9trehoz\u00e1sakor haszn\u00e1lhat\u00f3 mez\u0151ket:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>A <strong>megrendel\u00e9s<\/strong> bels\u0151 Skyplanner azonos\u00edt\u00f3ja a <strong>megrendel\u00e9shez<\/strong>, amelyhez a megrendel\u00e9si t\u00e9tel kapcsol\u00f3dik.<\/li>\n\n\n\n<li><strong>K\u00f6telez\u0151 mez\u0151<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_order_row_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Miut\u00e1n a megrendel\u00e9s export\u00e1l\u00e1sra ker\u00fclt a Skyplanner gy\u00e1rt\u00e1s\u00fctemez\u00e9si modulj\u00e1ba, egy k\u00fcl\u00f6n\u00e1ll\u00f3 egys\u00e9g, a <strong>gy\u00e1rt\u00e1stervez\u00e9si megrendel\u00e9s sora<\/strong> j\u00f6n l\u00e9tre, \u00e9s az azonos\u00edt\u00f3j\u00e1t ebbe a mez\u0151be kell be\u00e1ll\u00edtani<\/li>\n\n\n\n<li><strong>Nem aj\u00e1nlott haszn\u00e1lni <\/strong>(hagyja nullak\u00e9nt, vagy egy\u00e1ltal\u00e1n ne k\u00fcldje el ezt a mez\u0151t a k\u00e9relem mez\u0151ben).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Skyplanner term\u00e9k azonos\u00edt\u00f3ja a term\u00e9khez, amelyet a rendel\u00e9si t\u00e9tel el\u0151\u00e1ll\u00edt.<\/li>\n\n\n\n<li>Sz\u00fcks\u00e9ges, ha alap\u00e9rtelmezett folyamatl\u00e9p\u00e9seket szeretne \u00e1tvenni egy term\u00e9kb\u0151l.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel egyedi azonos\u00edt\u00f3ja<\/li>\n\n\n\n<li>Haszn\u00e1lja ezt a Skyplanner rendel\u00e9si t\u00e9tel \u00f6sszekapcsol\u00e1s\u00e1ra a k\u00fcls\u0151 rendszerb\u0151l (ERP stb.) sz\u00e1rmaz\u00f3 rendel\u00e9si t\u00e9tel\u00e9vel.<\/li>\n\n\n\n<li><strong>Egyed\u00fcl\u00e1ll\u00f3nak kell lennie<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Ha a rendel\u00e9si t\u00e9tel egy m\u00e1sik rendel\u00e9si t\u00e9tel alt\u00e9tele, itt adja meg a sz\u00fcl\u0151i azonos\u00edt\u00f3 \u00e9rt\u00e9k\u00e9t.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9telek list\u00e1j\u00e1n bel\u00fcl hol tal\u00e1lhat\u00f3 ez a t\u00e9tel a rendel\u00e9sen bel\u00fcl.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>worknumber<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kiz\u00e1r\u00f3lag t\u00e1j\u00e9koztat\u00f3 jelleg\u0171 munkasz\u00e1m \u00e9rt\u00e9kk\u00e9nt haszn\u00e1latos a rendel\u00e9si t\u00e9telhez.<\/li>\n\n\n\n<li>Nem l\u00e1that\u00f3 a Skyplanner felhaszn\u00e1l\u00f3i fel\u00fclet\u00e9n<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>st\u00e1tusz<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel \u00e1llapota<\/li>\n\n\n\n<li>Megengedett \u00e9rt\u00e9kek: <strong>\u00faj, megkezdett, k\u00e9sz, szakaszos<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_archive<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel archiv\u00e1lva van (l\u00e1gy t\u00f6rl\u00e9s)?<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>poz\u00edci\u00f3<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel azonos\u00edt\u00f3 \u00e9rt\u00e9ke (l\u00e1sd a 3. \u00e1br\u00e1t).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u00f6sszeg<\/strong>\n<ul class=\"wp-block-list\">\n<li>A term\u00e9k teljes gy\u00e1rtott mennyis\u00e9ge<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>ordered_amount<\/strong>\n<ul class=\"wp-block-list\">\n<li>A term\u00e9k megrendelt mennyis\u00e9ge<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>\u00e1r<\/strong>\n<ul class=\"wp-block-list\">\n<li>A term\u00e9k egys\u00e9g\u00e1ra<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials<\/strong>\n<ul class=\"wp-block-list\">\n<li>Ha nem szeretn\u00e9 haszn\u00e1lni a term\u00e9kadatokb\u00f3l sz\u00e1rmaz\u00f3 alap\u00e9rtelmezett anyagbe\u00e1ll\u00edt\u00e1st, \u00e1ll\u00edtsa ezt az \u00e9rt\u00e9ket true-ra.<\/li>\n\n\n\n<li>Alap\u00e9rtelmezett: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials_calculated (egy\u00e9ni_anyagok_sz\u00e1m\u00edt\u00e1sa)<\/strong>\n<ul class=\"wp-block-list\">\n<li>Az egyedi anyagmennyis\u00e9gek kisz\u00e1m\u00edt\u00e1sa a gy\u00e1rtott term\u00e9kmennyis\u00e9g alapj\u00e1n t\u00f6rt\u00e9nik.<\/li>\n\n\n\n<li>Ha false-ra van \u00e1ll\u00edtva, az anyagmennyis\u00e9gek fixek<\/li>\n\n\n\n<li>Alap\u00e9rtelmezett: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>get_default_steps<\/strong>\n<ul class=\"wp-block-list\">\n<li>A term\u00e9k alap\u00e9rtelmezett folyamatl\u00e9p\u00e9sei alapj\u00e1n folyamatl\u00e9p\u00e9seket hozhat l\u00e9tre a term\u00e9k megrendel\u00e9s\u00e9hez.<\/li>\n\n\n\n<li>Alap\u00e9rtelmezett: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_calculated_job_durations<\/strong>\n<ul class=\"wp-block-list\">\n<li>A folyamatl\u00e9p\u00e9s id\u0151tartam\u00e1nak kisz\u00e1m\u00edt\u00e1sa a m\u00faltbeli id\u0151napl\u00f3-adatok alapj\u00e1n<\/li>\n\n\n\n<li>Ha nem \u00e1ll rendelkez\u00e9sre elegend\u0151 adat a sz\u00e1m\u00edt\u00e1shoz, akkor alap\u00e9rtelmezett id\u0151tartamokat haszn\u00e1lnak.<\/li>\n\n\n\n<li>Alap\u00e9rtelmezett: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>sub_items<\/strong>\n<ul class=\"wp-block-list\">\n<li>L\u00e9trehozza a term\u00e9k alelemeit is, ha rendelkez\u00e9sre \u00e1llnak<\/li>\n\n\n\n<li>Alap\u00e9rtelmezett: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Form\u00e1tum: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>start_eligibility_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Form\u00e1tum: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>drawing_identifier<\/strong>\n<ul class=\"wp-block-list\">\n<li>Rajz\/tervrajz\/utas\u00edt\u00e1sok azonos\u00edt\u00f3ja<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>le\u00edr\u00e1s<\/strong>\n<ul class=\"wp-block-list\">\n<li>Megrendel\u00e9si t\u00e9tel le\u00edr\u00e1sa<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>additional_description<\/strong>\n<ul class=\"wp-block-list\">\n<li>Tov\u00e1bbi le\u00edr\u00e1s a rendel\u00e9si t\u00e9telhez<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>A rendel\u00e9si t\u00e9tel egy prospektus<\/li>\n\n\n\n<li>Alap\u00e9rtelmezett: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\" id=\"h-updating-order-items\">Megrendel\u00e9si t\u00e9telek friss\u00edt\u00e9se<\/h4>\n\n<p>A rendel\u00e9si t\u00e9telek adatainak friss\u00edt\u00e9s\u00e9hez PUT-k\u00e9r\u00e9st k\u00fcldhet a <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> v\u00e9gpontra:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"802\" height=\"1000\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png\" alt=\"\" class=\"wp-image-70065\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png 802w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-241x300.png 241w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-768x958.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-360x449.png 360w\" sizes=\"(max-width: 802px) 100vw, 802px\" \/><figcaption class=\"wp-element-caption\"><strong>8. \u00e1bra.  <\/strong>Megrendel\u00e9si t\u00e9tel friss\u00edt\u00e9se<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png\" alt=\"\" class=\"wp-image-70003\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15.png 1816w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>9. \u00e1bra.  <\/strong>Friss\u00edtett rendel\u00e9si t\u00e9tel<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-deleting-order-items\">Megrendel\u00e9si t\u00e9telek t\u00f6rl\u00e9se<\/h4>\n\n<p>A rendel\u00e9si t\u00e9telek t\u00f6rl\u00e9se &#8220;l\u00e1gy t\u00f6rl\u00e9s&#8221; m\u00f3dszerrel t\u00f6rt\u00e9nik. A rendel\u00e9si t\u00e9tel t\u00f6rl\u00e9se az <g id=\"gid_0\">is_archive<\/g> \u00e9rt\u00e9k\u00e9t true-ra v\u00e1ltoztatja. Ez azt jelenti, hogy a t\u00f6r\u00f6lt rendel\u00e9si t\u00e9telek vissza\u00e1ll\u00edthat\u00f3k az is_archive \u00e9rt\u00e9k hamisra val\u00f3 friss\u00edt\u00e9s\u00e9vel.  <\/p>\n\n<p>Egy rendel\u00e9si t\u00e9tel t\u00f6rl\u00e9sekor a rendszer t\u00f6rli a hozz\u00e1 tartoz\u00f3 folyamatl\u00e9p\u00e9seket is.<\/p>\n\n<p>A rendel\u00e9si t\u00e9telek t\u00f6rl\u00e9se a <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> v\u00e9gpontra k\u00fcld\u00f6tt DELETE-k\u00e9relemmel t\u00f6rt\u00e9nik:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"675\" height=\"633\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png\" alt=\"\" class=\"wp-image-70149\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png 675w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-300x281.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-360x338.png 360w\" sizes=\"(max-width: 675px) 100vw, 675px\" \/><figcaption class=\"wp-element-caption\"><strong>10. \u00e1bra.  <\/strong>Megrendel\u00e9si t\u00e9telek t\u00f6rl\u00e9se<\/figcaption><\/figure>\n\n<p>A rendel\u00e9si t\u00e9telek t\u00f6rl\u00e9se a Skyplanner bels\u0151 azonos\u00edt\u00f3inak megad\u00e1s\u00e1val az <strong>&#8220;ids&#8221;<\/strong> t\u00f6mbben vagy a k\u00fcls\u0151_id-ek megad\u00e1s\u00e1val az <strong>&#8220;external_ids&#8221;<\/strong> t\u00f6mbben lehets\u00e9ges.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Itt r\u00e9szletesen bemutatjuk a rendel\u00e9si t\u00e9telek lek\u00e9rdez\u00e9s\u00e9t, l\u00e9trehoz\u00e1s\u00e1t, friss\u00edt\u00e9s\u00e9t \u00e9s t\u00f6rl\u00e9s\u00e9t. A rendel\u00e9si t\u00e9telek a \/phaser-order-rows v\u00e9gponton kereszt\u00fcl \u00e9rhet\u0151k el. Rendel\u00e9si t\u00e9telek lek\u00e9r\u00e9se A rendel\u00e9si t\u00e9teleket a \/phaser-order-rows v\u00e9gpontra k\u00fcld\u00f6tt GET-k\u00e9relemmel lehet lek\u00e9rni: A rendel\u00e9si t\u00e9teleket sz\u00e1mos k\u00fcl\u00f6nb\u00f6z\u0151 param\u00e9ter alapj\u00e1n keresheti: A keres\u00e9si param\u00e9tereket keverheti \u00e9s \u00f6sszev\u00e1logathatja a k\u00f6vetkez\u0151k szerint: Egy adott rendel\u00e9si t\u00e9tel lek\u00e9rdez\u00e9s\u00e9hez &#8230; <a title=\"Megrendelt t\u00e9telek\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/\" aria-label=\"Read more about Megrendelt t\u00e9telek\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[633],"doc_tag":[634,1523],"class_list":["post-79224","docs","type-docs","status-publish","hentry","doc_category-integraciok","doc_tag-api-hu","doc_tag-integracio"],"acf":[],"year_month":"2026-11","word_count":1294,"total_views":"176","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/hu\/author\/sami\/"},"doc_category_info":[{"term_name":"Integr\u00e1ci\u00f3k","term_url":"https:\/\/skyplanner.ai\/hu\/docs-category\/integraciok\/"}],"doc_tag_info":[{"term_name":"API","term_url":"https:\/\/skyplanner.ai\/hu\/docs-tag\/api-hu\/"},{"term_name":"Integr\u00e1ci\u00f3","term_url":"https:\/\/skyplanner.ai\/hu\/docs-tag\/integracio\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Megrendelt t\u00e9telek &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Megrendelt t\u00e9telek\" \/>\n<meta property=\"og:description\" content=\"Itt r\u00e9szletesen bemutatjuk a rendel\u00e9si t\u00e9telek lek\u00e9rdez\u00e9s\u00e9t, l\u00e9trehoz\u00e1s\u00e1t, friss\u00edt\u00e9s\u00e9t \u00e9s t\u00f6rl\u00e9s\u00e9t. A rendel\u00e9si t\u00e9telek a \/phaser-order-rows v\u00e9gponton kereszt\u00fcl \u00e9rhet\u0151k el. Rendel\u00e9si t\u00e9telek lek\u00e9r\u00e9se A rendel\u00e9si t\u00e9teleket a \/phaser-order-rows v\u00e9gpontra k\u00fcld\u00f6tt GET-k\u00e9relemmel lehet lek\u00e9rni: A rendel\u00e9si t\u00e9teleket sz\u00e1mos k\u00fcl\u00f6nb\u00f6z\u0151 param\u00e9ter alapj\u00e1n keresheti: A keres\u00e9si param\u00e9tereket keverheti \u00e9s \u00f6sszev\u00e1logathatja a k\u00f6vetkez\u0151k szerint: Egy adott rendel\u00e9si t\u00e9tel lek\u00e9rdez\u00e9s\u00e9hez ... Olvass tov\u00e1bb\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T07:30:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" \/>\n\t<meta property=\"og:image:width\" content=\"825\" \/>\n\t<meta property=\"og:image:height\" content=\"995\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/\",\"name\":\"Megrendelt t\u00e9telek &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"datePublished\":\"2025-05-13T09:37:46+00:00\",\"dateModified\":\"2025-10-08T07:30:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/megrendelt-tetelek\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Megrendelt t\u00e9telek\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Megrendelt t\u00e9telek &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/","og_locale":"hu_HU","og_type":"article","og_title":"Megrendelt t\u00e9telek","og_description":"Itt r\u00e9szletesen bemutatjuk a rendel\u00e9si t\u00e9telek lek\u00e9rdez\u00e9s\u00e9t, l\u00e9trehoz\u00e1s\u00e1t, friss\u00edt\u00e9s\u00e9t \u00e9s t\u00f6rl\u00e9s\u00e9t. A rendel\u00e9si t\u00e9telek a \/phaser-order-rows v\u00e9gponton kereszt\u00fcl \u00e9rhet\u0151k el. Rendel\u00e9si t\u00e9telek lek\u00e9r\u00e9se A rendel\u00e9si t\u00e9teleket a \/phaser-order-rows v\u00e9gpontra k\u00fcld\u00f6tt GET-k\u00e9relemmel lehet lek\u00e9rni: A rendel\u00e9si t\u00e9teleket sz\u00e1mos k\u00fcl\u00f6nb\u00f6z\u0151 param\u00e9ter alapj\u00e1n keresheti: A keres\u00e9si param\u00e9tereket keverheti \u00e9s \u00f6sszev\u00e1logathatja a k\u00f6vetkez\u0151k szerint: Egy adott rendel\u00e9si t\u00e9tel lek\u00e9rdez\u00e9s\u00e9hez ... Olvass tov\u00e1bb","og_url":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-08T07:30:00+00:00","og_image":[{"width":825,"height":995,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Becs\u00fclt olvas\u00e1si id\u0151":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/","url":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/","name":"Megrendelt t\u00e9telek &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","datePublished":"2025-05-13T09:37:46+00:00","dateModified":"2025-10-08T07:30:00+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/docs\/megrendelt-tetelek\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/hu\/docs\/"},{"@type":"ListItem","position":3,"name":"Megrendelt t\u00e9telek"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/hu\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"Itt r\u00e9szletesen bemutatjuk a rendel\u00e9si t\u00e9telek lek\u00e9rdez\u00e9s\u00e9t, l\u00e9trehoz\u00e1s\u00e1t, friss\u00edt\u00e9s\u00e9t \u00e9s t\u00f6rl\u00e9s\u00e9t. A rendel\u00e9si t\u00e9telek a \/phaser-order-rows v\u00e9gponton kereszt\u00fcl \u00e9rhet\u0151k el. Rendel\u00e9si t\u00e9telek lek\u00e9r\u00e9se A rendel\u00e9si t\u00e9teleket a \/phaser-order-rows v\u00e9gpontra k\u00fcld\u00f6tt GET-k\u00e9relemmel lehet lek\u00e9rni: A rendel\u00e9si t\u00e9teleket sz\u00e1mos k\u00fcl\u00f6nb\u00f6z\u0151 param\u00e9ter alapj\u00e1n keresheti: A keres\u00e9si param\u00e9tereket keverheti \u00e9s \u00f6sszev\u00e1logathatja a k\u00f6vetkez\u0151k szerint: Egy adott rendel\u00e9si t\u00e9tel lek\u00e9rdez\u00e9s\u00e9hez&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/docs\/79224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=79224"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/docs\/79224\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=79224"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/doc_category?post=79224"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/doc_tag?post=79224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}