{"id":98295,"date":"2026-10-15T08:04:36","date_gmt":"2026-10-15T08:04:36","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=98295"},"modified":"2026-10-15T08:05:11","modified_gmt":"2026-10-15T08:05:11","slug":"heijunka","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/","title":{"rendered":"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fr\/\">Accueil<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/\">Ressources<\/a> &raquo; Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Temps de lecture estim\u00e9 : <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>La grosse commande du lundi mobilise toute la ligne. D\u00e8s le mercredi, un autre produit vient \u00e0 manquer : l\u2019\u00e9quipe interrompt le lot, change d\u2019outillage et r\u00e9organise toute la production qui suit. L\u2019usine tourne \u00e0 plein r\u00e9gime, mais chaque service subit des pics de charge diff\u00e9rents.<\/p>\n\n\n<p><strong>Le lissage de la production, aussi appel\u00e9 heijunka, consiste \u00e0 r\u00e9partir plus r\u00e9guli\u00e8rement les volumes et les diff\u00e9rents produits \u00e0 fabriquer sur une p\u00e9riode donn\u00e9e.<\/strong> Au lieu de r\u00e9percuter directement chaque fluctuation des commandes sur l\u2019atelier, vous \u00e9tablissez un rythme plus r\u00e9gulier qui r\u00e9pond toujours aux besoins des clients.<\/p>\n\n\n<p>L\u2019objectif est de rendre les journ\u00e9es de production plus r\u00e9guli\u00e8res : moins de variations brutales de charge, un r\u00e9approvisionnement plus fr\u00e9quent des produits demand\u00e9s et un moindre recours aux tr\u00e8s gros lots. Mais un nombre constant de pi\u00e8ces ne repr\u00e9sente pas n\u00e9cessairement une charge de travail constante. Le rythme retenu doit aussi \u00eatre compatible avec vos machines, vos temps de r\u00e9glage et vos engagements de livraison.<\/p>\n\n\n<p>C\u2019est l\u00e0 que SkyPlanner APS intervient. Vous d\u00e9finissez les priorit\u00e9s de production ; Arcturus, son IA d\u2019ordonnancement, calcule l\u2019encha\u00eenement des op\u00e9rations en fonction des ressources et des contraintes que vous avez param\u00e9tr\u00e9es. Vous pouvez ainsi confronter votre objectif de lissage \u00e0 un v\u00e9ritable planning de production, plut\u00f4t que de vous en tenir \u00e0 un sch\u00e9ma s\u00e9duisant que l\u2019usine ne peut pas suivre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce que change le lissage de la production<\/h2>\n\n\n<p>Le heijunka repose sur deux d\u00e9cisions li\u00e9es :<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Le lissage des volumes :<\/strong> r\u00e9partir plus r\u00e9guli\u00e8rement dans le temps les quantit\u00e9s \u00e0 fabriquer, plut\u00f4t que de suivre les commandes re\u00e7ues chaque jour.<\/li><li><strong>Le lissage du mix produit :<\/strong> fabriquer plus r\u00e9guli\u00e8rement les diff\u00e9rents produits n\u00e9cessaires, en lots plus petits, plut\u00f4t que de terminer une tr\u00e8s longue s\u00e9rie avant de passer au produit suivant.<\/li><\/ul>\n\n\n<p>Une usine peut lisser ses volumes sans lisser son mix produit. Fabriquer la m\u00eame quantit\u00e9 totale chaque jour ne sert pas le client qui attend le produit B si toute la semaine est consacr\u00e9e au produit A.<\/p>\n\n\n<p>Le lissage du mix produit r\u00e9duit cette attente en faisant revenir B plus souvent dans le cycle de production. Il rend aussi les besoins en composants de B plus r\u00e9guliers pour les op\u00e9rations en amont. En contrepartie, les changements de s\u00e9rie sont plus fr\u00e9quents et doivent tenir dans le temps de production disponible.<\/p>\n\n\n<p>Lisser la production ne signifie pas refuser de s\u2019adapter lorsque la demande \u00e9volue. Le lissage absorbe les variations \u00e0 court terme sur une p\u00e9riode de planification convenue ; une \u00e9volution durable de la demande impose de revoir la cadence ou le mix produit.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Un exemple de lissage : compter les minutes autant que les pi\u00e8ces<\/h2>\n\n\n<p>Imaginez une famille de produits dont les besoins hebdomadaires sont de 300 unit\u00e9s de A, 150 de B et 150 de C. Sur cinq jours de production, cela repr\u00e9sente 600 unit\u00e9s, soit <strong>120 unit\u00e9s par jour<\/strong>.<\/p>\n\n\n<p>Une r\u00e9partition quotidienne possible est de 60 A, 30 B et 30 C. Chaque produit est ainsi fabriqu\u00e9 tous les jours, au lieu de reporter B et C \u00e0 la fin de la semaine.<\/p>\n\n\n<p>V\u00e9rifiez maintenant le temps n\u00e9cessaire sur la ressource commune :<\/p>\n\n\n<ul class=\"wp-block-list\"><li>A demande deux minutes par unit\u00e9 : il faut 120 minutes pour 60 unit\u00e9s.<\/li><li>B demande trois minutes par unit\u00e9 : il faut 90 minutes pour 30 unit\u00e9s.<\/li><li>C demande cinq minutes par unit\u00e9 : il faut 150 minutes pour 30 unit\u00e9s.<\/li><li>Supposons trois r\u00e9glages de 15 minutes chacun : il faut ajouter 45 minutes.<\/li><\/ul>\n\n\n<p>Le besoin quotidien est de <strong>405 minutes<\/strong>, r\u00e9glages compris. Avec 420 minutes de production disponibles, ce calcul simplifi\u00e9 montre que la charge tient sur cette ressource, avec une marge de 15 minutes.<\/p>\n\n\n<p>Un m\u00eame total quotidien peut pourtant masquer une situation tr\u00e8s diff\u00e9rente. Une journ\u00e9e de 30 A, 30 B et 60 C repr\u00e9sente toujours 120 unit\u00e9s, mais exige <strong>495 minutes<\/strong>, en conservant le m\u00eame temps de r\u00e9glage. Derri\u00e8re un nombre identique de pi\u00e8ces se cache une surcharge.<\/p>\n\n\n<p>Prenez le mix liss\u00e9 comme point de d\u00e9part, puis v\u00e9rifiez la charge sur les ressources qui limitent r\u00e9ellement la production. Tenez compte des r\u00e9glages n\u00e9cessaires et du calendrier des op\u00e9rations pr\u00e9c\u00e9dentes. Le premier mix respecte le temps disponible dans cet exemple ; cela ne prouve pas que les mati\u00e8res, le personnel et toutes les autres op\u00e9rations seront pr\u00eats.<\/p>\n\n\n<p>Cette distinction est particuli\u00e8rement importante lorsque la production comporte une grande vari\u00e9t\u00e9 de produits. Lisser une famille fabriqu\u00e9e de fa\u00e7on r\u00e9currente peut \u00eatre utile, m\u00eame si les temps de fabrication diff\u00e8rent d\u2019un produit \u00e0 l\u2019autre. En revanche, consid\u00e9rer que des unit\u00e9s diff\u00e9rentes consomment la m\u00eame capacit\u00e9 ne l\u2019est pas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O\u00f9 les variations sont-elles absorb\u00e9es ?<\/h2>\n\n\n<p>Si les commandes des clients sont irr\u00e9guli\u00e8res mais que la production reste stable, il faut bien absorber l\u2019\u00e9cart quelque part. D\u00e9terminez o\u00f9 avant de vous engager sur ce rythme.<\/p>\n\n\n<p><strong>Pour les produits fabriqu\u00e9s sur stock, le stock de produits finis peut jouer ce r\u00f4le.<\/strong> Un stock tampon ma\u00eetris\u00e9 r\u00e9pond aux pics \u00e0 court terme, tandis que la production le reconstitue \u00e0 un rythme plus r\u00e9gulier. V\u00e9rifiez le niveau de service requis, la dur\u00e9e de conservation, le co\u00fbt du stock et le risque d\u2019obsolescence. Le lissage ne justifie pas de fabriquer des produits sans d\u00e9bouch\u00e9 uniquement pour occuper la ligne.<\/p>\n\n\n<p><strong>Pour les produits configurables, ce r\u00f4le peut revenir \u00e0 un stock de semi-finis communs.<\/strong> Vous pouvez r\u00e9approvisionner r\u00e9guli\u00e8rement une base standard, puis r\u00e9aliser plus tard les op\u00e9rations propres au client, \u00e0 condition que les op\u00e9rations restantes tiennent dans le d\u00e9lai de r\u00e9ponse promis.<\/p>\n\n\n<p><strong>En fabrication \u00e0 la commande, la marge de temps avant la date de livraison convenue avec le client peut absorber l\u2019\u00e9cart.<\/strong> Si la fabrication peut se terminer bien avant la date promise, certaines commandes peuvent attendre un cr\u00e9neau de production planifi\u00e9. Si chaque commande est d\u00e9j\u00e0 urgente, cette marge n\u2019existe pas.<\/p>\n\n\n<p>Une hausse durable de la demande ne peut pas \u00eatre absorb\u00e9e ind\u00e9finiment en puisant dans les stocks ou en allongeant la file d\u2019attente. R\u00e9examinez la cadence et la capacit\u00e9 de production. La bonne question n\u2019est pas seulement \u00ab Pouvons-nous lisser cette semaine ? \u00bb, mais \u00ab Pouvons-nous maintenir ce rythme tout en respectant nos engagements de livraison ? \u00bb<\/p>\n\n\n<h2 class=\"wp-block-heading\">Comment mettre en place le heijunka sans perturber davantage la production<\/h2>\n\n\n<p>Commencez par une famille de produits dont les gammes de fabrication ont suffisamment d\u2019\u00e9tapes communes et dont la demande r\u00e9currente permet d\u2019\u00e9tablir un cycle r\u00e9gulier. Chercher \u00e0 int\u00e9grer toutes les fabrications ponctuelles dans le m\u00eame cycle r\u00e9p\u00e9titif brouille g\u00e9n\u00e9ralement les d\u00e9cisions \u00e0 prendre.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Choisir un intervalle de r\u00e9p\u00e9tition r\u00e9aliste<\/h3>\n\n\n<p>D\u00e9terminez \u00e0 quelle fr\u00e9quence la famille et ses principaux produits doivent revenir en production. Un r\u00e9approvisionnement quotidien peut \u00eatre s\u00e9duisant, mais sa faisabilit\u00e9 d\u00e9pend du temps n\u00e9cessaire aux changements de s\u00e9rie. Un cycle plus long peut \u00eatre un bon point de d\u00e9part, le temps de <a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/temps-de-changement-de-serie\/\">r\u00e9duire les temps de r\u00e9glage<\/a>.<\/p>\n\n\n<p>V\u00e9rifiez que l\u2019intervalle envisag\u00e9 est compatible avec les exigences de livraison des clients et les r\u00e9serves de stock ou de temps que vous \u00eates pr\u00eat \u00e0 pr\u00e9voir. Un rythme pratique pour l\u2019usine pr\u00e9sente peu d\u2019int\u00e9r\u00eat s\u2019il fait r\u00e9guli\u00e8rement attendre le client.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00c9valuer le temps n\u00e9cessaire sans rien omettre<\/h3>\n\n\n<p>Tenez compte des temps de fabrication, des r\u00e9glages et des indisponibilit\u00e9s connues. Utilisez le mix produit r\u00e9el, et non un temps de cycle moyen unique qui masque les produits plus longs \u00e0 fabriquer. V\u00e9rifiez aussi les ressources que cette famille partage avec d\u2019autres productions.<\/p>\n\n\n<p>Si des changements de produit plus fr\u00e9quents consomment la capacit\u00e9 n\u00e9cessaire \u00e0 la fabrication, r\u00e9duisez les temps de r\u00e9glage, revoyez l\u2019organisation des lots ou ajoutez de la capacit\u00e9 lorsque cela se justifie. Ne partez pas du principe que le lissage acc\u00e9l\u00e8re \u00e0 lui seul les changements de s\u00e9rie.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Convenir du traitement des exceptions dans le planning<\/h3>\n\n\n<p>D\u00e9terminez qui peut modifier les priorit\u00e9s et ce qui constitue une exception. Gardez une marge r\u00e9aliste pour les variations auxquelles votre processus est soumis. Si chaque minute disponible est occup\u00e9e sur le papier, m\u00eame une petite interruption devient difficile \u00e0 rattraper.<\/p>\n\n\n<p>Apr\u00e8s un changement, examinez son effet sur le reste du planning plut\u00f4t que d\u2019ajouter simplement une nouvelle op\u00e9ration urgente en t\u00eate de file. C\u2019est l\u00e0 que la gestion manuelle des files d\u2019attente devient co\u00fbteuse : les cons\u00e9quences se limitent rarement \u00e0 un seul poste de travail.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Examiner ensemble les livraisons, les stocks et la stabilit\u00e9<\/h3>\n\n\n<p>V\u00e9rifiez si les produits sont disponibles au moment voulu, si les stocks augmentent, si le mix pr\u00e9vu est effectivement r\u00e9alis\u00e9 et \u00e0 quelle fr\u00e9quence la production doit s\u2019\u00e9carter du cycle \u00e9tabli. Lisser les lancements n\u2019est utile que si cela am\u00e9liore le service client sans d\u00e9placer le probl\u00e8me vers des stocks excessifs ou des commandes en retard.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce que permet un tableau heijunka, et ses limites<\/h2>\n\n\n<p>Un tableau heijunka est un outil visuel qui r\u00e9partit les signaux de lancement en production dans le temps. En g\u00e9n\u00e9ral, les types de produits figurent en lignes et les intervalles de temps en colonnes. Les cartes kanban indiquent le travail \u00e0 lancer pendant ces intervalles. Dans les syst\u00e8mes \u00e0 cadence impos\u00e9e, l\u2019intervalle de lancement est souvent exprim\u00e9 par le \u00ab pitch \u00bb : le takt time multipli\u00e9 par la quantit\u00e9 par conditionnement.<\/p>\n\n\n<p>Le tableau rend visible le rythme choisi. Il ne prouve pas que les machines, les mati\u00e8res et le personnel n\u00e9cessaires seront disponibles. Le lissage de la production ne doit pas non plus \u00eatre confondu avec l\u2019\u00e9quilibrage de ligne : ce dernier r\u00e9partit le travail entre les postes ou les op\u00e9rateurs, tandis que le lissage r\u00e9gularise les volumes et le mix produit dans le temps.<\/p>\n\n\n<p>Lorsque les gammes, les dur\u00e9es et les priorit\u00e9s varient, le cycle de production liss\u00e9 doit s\u2019appuyer sur un <a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/qu-est-ce-que-l-ordonnancement-de-production\/\">ordonnancement d\u00e9taill\u00e9<\/a>. Le r\u00f4le de SkyPlanner est ici de calculer et de tenir \u00e0 jour ce planning, pas de remplacer votre politique de production par une r\u00e8gle automatique de tableau heijunka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Utiliser SkyPlanner pour rendre le cycle r\u00e9alisable<\/h2>\n\n\n<p>Une politique de lissage utile d\u00e9finit ce que vous attendez de la production. SkyPlanner vous aide \u00e0 voir comment r\u00e9partir le travail dans le temps et sur les ressources disponibles pour atteindre cet objectif.<\/p>\n\n\n<p>Arcturus ordonnance les op\u00e9rations en tenant compte de la capacit\u00e9 des postes de travail, des horaires d\u2019\u00e9quipe, des d\u00e9pendances entre op\u00e9rations et des priorit\u00e9s que vous d\u00e9finissez. Les dur\u00e9es de fabrication et de r\u00e9glage d\u00e9terminent le temps n\u00e9cessaire. Lorsque la prise en compte des mati\u00e8res dans l\u2019ordonnancement est activ\u00e9e, leur disponibilit\u00e9 intervient aussi dans le calcul. <a href=\"https:\/\/skyplanner.ai\/fr\/fonctionnalites\/\">La vue Gantt<\/a> pr\u00e9sente les files d\u2019attente des op\u00e9rations ainsi obtenues et les horaires pr\u00e9vus sur les diff\u00e9rents postes de travail.<\/p>\n\n\n<p>Vous disposez ainsi d\u2019un moyen concret de g\u00e9rer les changements qui perturbent un planning liss\u00e9 :<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Une commande prioritaire arrive : d\u00e9finissez sa priorit\u00e9 et examinez les cons\u00e9quences sur le reste du travail.<\/li><li>La disponibilit\u00e9 d\u2019une ressource diminue : enregistrez le changement et laissez Arcturus recalculer le planning en fonction de la capacit\u00e9 actualis\u00e9e.<\/li><li>Un encha\u00eenement d\u2019op\u00e9rations \u00e0 court terme doit rester stable : utilisez les verrouillages du planning pour pr\u00e9server les d\u00e9cisions prises pendant que le reste du travail est replanifi\u00e9.<\/li><\/ul>\n\n\n<p>L\u2019int\u00e9r\u00eat ne se limite pas \u00e0 un diagramme plus lisible. Vous passez moins de temps \u00e0 d\u00e9placer des op\u00e9rations d\u2019une file \u00e0 l\u2019autre et davantage \u00e0 v\u00e9rifier que le mix produit, les engagements de livraison et la capacit\u00e9 disponible restent compatibles. SkyPlanner s\u2019int\u00e8gre \u00e0 tout ERP ou MES gr\u00e2ce \u00e0 sa REST API ouverte : vous pouvez ainsi am\u00e9liorer l\u2019ordonnancement en vous appuyant sur vos donn\u00e9es de commande et de production existantes.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Un exemple client : une production pr\u00e9visible qui laisse place aux impr\u00e9vus<\/h3>\n\n\n<p>Opes Corporation fabrique des produits de sp\u00e9cialit\u00e9 sur stock, g\u00e9n\u00e9ralement sur la base d\u2019engagements clients pr\u00e9visibles \u00e0 trois mois. Ce contexte se pr\u00eate \u00e0 un rythme de production r\u00e9gulier, mais il faut aussi y int\u00e9grer les s\u00e9ries destin\u00e9es au d\u00e9veloppement de produits et les petites commandes urgentes.<\/p>\n\n\n<p>Dans son <a href=\"https:\/\/skyplanner.ai\/fr\/temoignages-clients\/opes-corporation\/\">t\u00e9moignage client SkyPlanner<\/a>, Opes explique comment la vue des capacit\u00e9s et le planning de production actualis\u00e9 permettent de mesurer l\u2019effet de ces ajouts sur les dates de fin de fabrication et de livraison. L\u2019\u00e9quipe peut voir quand les op\u00e9rations seront termin\u00e9es et modifier le planning plus rapidement qu\u2019auparavant.<\/p>\n\n\n<p>C\u2019est cette souplesse qu\u2019exige un rythme de production r\u00e9gulier : garder une vision claire de la charge pr\u00e9visible et comprendre ce qu\u2019une exception va changer avant qu\u2019elle ne perturbe le reste des op\u00e9rations en attente.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stabilisez vos journ\u00e9es de production avec un planning applicable<\/h2>\n\n\n<p>Le lissage de la production fonctionne lorsque la r\u00e9partition r\u00e9currente des produits, les changements de s\u00e9rie et les marges pr\u00e9vues pour absorber les variations de la demande sont coh\u00e9rents entre eux. Dans une usine soumise aux variations, appliquez-le l\u00e0 o\u00f9 la r\u00e9p\u00e9tition est utile, puis ordonnancez les op\u00e9rations r\u00e9elles en tenant compte des contraintes r\u00e9elles.<\/p>\n\n\n<p>Choisissez SkyPlanner lorsque la mise \u00e0 jour de ce planning vous prend le temps dont vous avez besoin pour vos d\u00e9cisions de production. Arcturus se charge du calcul de l\u2019ordonnancement, tandis que vous gardez la ma\u00eetrise des priorit\u00e9s et des op\u00e9rations \u00e0 pr\u00e9server.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fr\/contacter-les-ventes\/\">R\u00e9servez une d\u00e9monstration de SkyPlanner<\/a> pour \u00e9changer sur une famille de produits r\u00e9currente, ses besoins en r\u00e9glage et une perturbation r\u00e9cente. D\u00e9couvrez comment vos priorit\u00e9s de production se traduisent dans le planning et ce qui change lorsqu\u2019une commande urgente arrive ou qu\u2019une p\u00e9riode de travail en \u00e9quipe est supprim\u00e9e. Si vous pr\u00e9f\u00e9rez d\u2019abord explorer le logiciel, <a href=\"https:\/\/skyplanner.ai\/fr\/essai\/\">essayez SkyPlanner avec des donn\u00e9es de d\u00e9monstration<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable Accueil &raquo; Ressources &raquo; Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable La grosse commande du lundi mobilise toute la ligne. D\u00e8s le mercredi, un autre produit vient \u00e0 manquer : l\u2019\u00e9quipe interrompt le lot, change d\u2019outillage et r\u00e9organise toute la production qui suit. L\u2019usine &#8230; <a title=\"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/\" aria-label=\"Read more about Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable\">Lire plus<\/a><\/p>\n","protected":false},"author":3,"featured_media":98331,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2523,304],"tags":[],"class_list":["post-98295","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-et-ordonnancement","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable<\/title>\n<meta name=\"description\" content=\"Le heijunka lisse volumes et mix produit. D\u00e9couvrez quand l\u2019utiliser, l\u2019effet des r\u00e9glages sur la capacit\u00e9 et comment SkyPlanner maintient un planning r\u00e9alisable.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable\" \/>\n<meta property=\"og:description\" content=\"Le heijunka lisse volumes et mix produit. D\u00e9couvrez quand l\u2019utiliser, l\u2019effet des r\u00e9glages sur la capacit\u00e9 et comment SkyPlanner maintient un planning r\u00e9alisable.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T08:04:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T08:05:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable\",\"datePublished\":\"2026-10-15T08:04:36+00:00\",\"dateModified\":\"2026-10-15T08:05:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/\"},\"wordCount\":2495,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"articleSection\":[\"APS et ordonnancement\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/\",\"name\":\"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"datePublished\":\"2026-10-15T08:04:36+00:00\",\"dateModified\":\"2026-10-15T08:05:11+00:00\",\"description\":\"Le heijunka lisse volumes et mix produit. D\u00e9couvrez quand l\u2019utiliser, l\u2019effet des r\u00e9glages sur la capacit\u00e9 et comment SkyPlanner maintient un planning r\u00e9alisable.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-leveling-hero.png\",\"width\":1776,\"height\":999},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/heijunka\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable","description":"Le heijunka lisse volumes et mix produit. D\u00e9couvrez quand l\u2019utiliser, l\u2019effet des r\u00e9glages sur la capacit\u00e9 et comment SkyPlanner maintient un planning r\u00e9alisable.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/","og_locale":"fr_FR","og_type":"article","og_title":"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable","og_description":"Le heijunka lisse volumes et mix produit. D\u00e9couvrez quand l\u2019utiliser, l\u2019effet des r\u00e9glages sur la capacit\u00e9 et comment SkyPlanner maintient un planning r\u00e9alisable.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T08:04:36+00:00","article_modified_time":"2026-10-15T08:05:11+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Jussi M\u00e4ntyl\u00e4","Dur\u00e9e de lecture estim\u00e9e":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable","datePublished":"2026-10-15T08:04:36+00:00","dateModified":"2026-10-15T08:05:11+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/"},"wordCount":2495,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","articleSection":["APS et ordonnancement","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/","name":"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","datePublished":"2026-10-15T08:04:36+00:00","dateModified":"2026-10-15T08:05:11+00:00","description":"Le heijunka lisse volumes et mix produit. D\u00e9couvrez quand l\u2019utiliser, l\u2019effet des r\u00e9glages sur la capacit\u00e9 et comment SkyPlanner maintient un planning r\u00e9alisable.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png","width":1776,"height":999},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/heijunka\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-leveling-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable Accueil &raquo; Ressources &raquo; Heijunka : un mix plus r\u00e9gulier, un planning r\u00e9alisable La grosse commande du lundi mobilise toute la ligne. D\u00e8s le mercredi, un autre produit vient \u00e0 manquer : l\u2019\u00e9quipe interrompt le lot, change d\u2019outillage et r\u00e9organise toute la production qui suit. L\u2019usine\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/98295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=98295"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/98295\/revisions"}],"predecessor-version":[{"id":98358,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/98295\/revisions\/98358"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/98331"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=98295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=98295"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=98295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}