{"id":96588,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96588"},"modified":"2026-10-08T10:55:09","modified_gmt":"2026-10-08T10:55:09","slug":"production-a-la-commande","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/","title":{"rendered":"Production \u00e0 la commande : comment planifier les dates de livraison"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Production \u00e0 la commande : comment planifier les dates de livraison<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fr\/\">Accueil<\/a> &raquo; <a href=\"\/fr\/ressources\/\">Ressources<\/a> &raquo; Production \u00e0 la commande : comment planifier les dates de livraison<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Temps de lecture estim\u00e9 : <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>La production \u00e0 la commande (MTO) est un mode de production o\u00f9 la fabrication ne d\u00e9marre qu&rsquo;apr\u00e8s r\u00e9ception de la commande client. Au lieu d&rsquo;exp\u00e9dier un produit fini pr\u00e9lev\u00e9 sur le stock, le fabricant le fabrique pour cette commande. Le client attend donc la production en plus de la livraison.<\/p>\n\n\n<p>Pour un planificateur de production, tout l&rsquo;enjeu est de transformer la date de livraison demand\u00e9e en un plan r\u00e9aliste. Disposer des mati\u00e8res ne suffit pas si le travail doit passer par des ressources d\u00e9j\u00e0 engag\u00e9es sur d&rsquo;autres commandes. Avant de promettre une date, v\u00e9rifiez l&rsquo;ensemble du parcours de production et l&rsquo;effet sur les engagements existants.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Qu&rsquo;est-ce que la production \u00e0 la commande ?<\/h2>\n\n\n<p>En production \u00e0 la commande, c&rsquo;est une commande client qui d\u00e9clenche la fabrication. Le produit peut d\u00e9j\u00e0 \u00eatre con\u00e7u et ses \u00e9tapes de production d\u00e9j\u00e0 d\u00e9finies. La MTO n&rsquo;impose pas que chaque commande soit un nouveau projet d&rsquo;ing\u00e9nierie ou un produit unique.<\/p>\n\n\n<p>Cela ne signifie pas non plus que l&rsquo;usine n&rsquo;a aucun stock. Mati\u00e8res premi\u00e8res, composants achet\u00e9s et encours peuvent tous \u00eatre stock\u00e9s. La diff\u00e9rence tient au produit fini : il est fabriqu\u00e9 pour une commande, et non produit \u00e0 l&rsquo;avance en attendant un acheteur.<\/p>\n\n\n<p>Une commande justifie de fabriquer, mais elle ne prouve pas que la fabrication peut d\u00e9marrer tout de suite. Les mati\u00e8res peuvent ne pas \u00eatre encore arriv\u00e9es, et les postes de travail n\u00e9cessaires sont peut-\u00eatre d\u00e9j\u00e0 occup\u00e9s. Il faut encore trouver une place \u00e0 la commande dans le <a href=\"\/fr\/ressources\/qu-est-ce-que-l-ordonnancement-de-production\/\">planning de production<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Production \u00e0 la commande face \u00e0 la fabrication sur stock, \u00e0 l&rsquo;assemblage \u00e0 la commande et \u00e0 l&rsquo;ing\u00e9nierie \u00e0 la commande<\/h2>\n\n\n<p>Ces approches se distinguent par la part du travail r\u00e9alis\u00e9e avant la commande du client et par ce qui reste \u00e0 couvrir dans son d\u00e9lai d&rsquo;attente.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Approche<\/th><th>Avant la commande client<\/th><th>Ce que d\u00e9clenche la commande<\/th><th>Ce qu&rsquo;attend le client<\/th><\/tr><\/thead><tbody><tr><td>Fabrication \u00e0 la commande (MTO)<\/td><td>La conception du produit et la pr\u00e9paration de la production peuvent d\u00e9j\u00e0 exister ; les mati\u00e8res ou composants peuvent \u00eatre en stock<\/td><td>La fabrication pour la commande<\/td><td>La disponibilit\u00e9 des mati\u00e8res si n\u00e9cessaire, la production et la livraison<\/td><\/tr><tr><td>Fabrication sur stock (MTS)<\/td><td>Les produits finis sont fabriqu\u00e9s pour une demande anticip\u00e9e<\/td><td>L&rsquo;affectation et l&rsquo;exp\u00e9dition d&rsquo;un produit en stock<\/td><td>Le traitement de la commande et la livraison si le stock est disponible<\/td><\/tr><tr><td>Assemblage \u00e0 la commande (ATO)<\/td><td>Composants ou modules pr\u00e9par\u00e9s et mis en stock<\/td><td>L&rsquo;assemblage final selon la configuration choisie<\/td><td>L&rsquo;assemblage et la livraison, plus les \u00e9ventuels composants manquants<\/td><\/tr><tr><td>Ing\u00e9nierie \u00e0 la commande (ETO)<\/td><td>Des comp\u00e9tences g\u00e9n\u00e9rales ou des \u00e9l\u00e9ments de conception peuvent exister<\/td><td>Un travail d&rsquo;ing\u00e9nierie cons\u00e9quent, propre \u00e0 la commande, en plus de la fabrication<\/td><td>L&rsquo;ing\u00e9nierie, l&rsquo;approvisionnement, la production et la livraison<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Les fronti\u00e8res ne sont pas toujours rigides. Un produit MTO peut n\u00e9cessiter une petite modification de conception sans devenir un v\u00e9ritable projet ETO. Un fabricant peut aussi appliquer des approches diff\u00e9rentes selon les familles de produits.<\/p>\n\n\n<p>Le job shop est un concept diff\u00e9rent. Il d\u00e9crit la mani\u00e8re dont des op\u00e9rations vari\u00e9es passent par des ressources partag\u00e9es. La production \u00e0 la commande d\u00e9crit le lien entre la commande client et le d\u00e9but de la fabrication. Un job shop peut produire \u00e0 la commande, mais les deux termes ne sont pas synonymes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Avantages et compromis de la production \u00e0 la commande<\/h2>\n\n\n<p>La MTO peut r\u00e9duire le risque de stocker des variantes de produits finis que les clients n&rsquo;ach\u00e8tent pas. Elle permet aussi \u00e0 la production de suivre la commande r\u00e9elle plut\u00f4t que de reposer enti\u00e8rement sur une pr\u00e9vision du mix de produits finis.<\/p>\n\n\n<p>En contrepartie, le client attend pendant la fabrication. Un stock tampon de produits finis ne peut pas absorber un retard comme il le ferait si le produit MTS voulu \u00e9tait d\u00e9j\u00e0 en stock. La disponibilit\u00e9 des mati\u00e8res, la charge des ressources et l&rsquo;arriv\u00e9e d&rsquo;autres commandes p\u00e8sent toutes sur la date promise.<\/p>\n\n\n<p>Les volumes de commandes et les mix de produits varient : le d\u00e9lai de fabrication d&rsquo;hier n&rsquo;est donc pas automatiquement une estimation fiable pour la commande d&rsquo;aujourd&rsquo;hui. La MTO n&rsquo;est pas intrins\u00e8quement moins ch\u00e8re et n&rsquo;\u00e9limine pas les co\u00fbts de stock. Son int\u00e9r\u00eat d\u00e9pend en partie de la vari\u00e9t\u00e9 dont les clients ont besoin et du temps qu&rsquo;ils peuvent attendre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Comment planifier une date de livraison avant de lancer la commande<\/h2>\n\n\n<p>Distinguez la date demand\u00e9e par le client de celle que le plan de production actuel permet de tenir. Passez ensuite en revue les v\u00e9rifications suivantes avant de lancer la fabrication ou de confirmer l&rsquo;engagement de livraison commercial.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Confirmer ce qu&rsquo;il faut fabriquer<\/h3>\n\n\n<p>V\u00e9rifiez le produit, la quantit\u00e9, la configuration et les \u00e9tapes de production n\u00e9cessaires. Pr\u00e9cisez les sp\u00e9cifications manquantes avant de consid\u00e9rer que <a href=\"\/fr\/ressources\/ordre-de-fabrication\/\">la commande est pr\u00eate \u00e0 \u00eatre ordonnanc\u00e9e<\/a>. Notez la date de livraison demand\u00e9e, mais ne la prenez pas pour une preuve que la charge de travail tient.<\/p>\n\n\n<p>Un changement de quantit\u00e9 ou de configuration peut modifier le travail \u00e0 r\u00e9aliser. Planifiez la commande r\u00e9elle, et non le d\u00e9lai de fabrication dont on se souvient pour une op\u00e9ration similaire.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. V\u00e9rifier les mati\u00e8res et les composants achet\u00e9s<\/h3>\n\n\n<p>Identifiez ce qui est disponible et ce qu&rsquo;il faut acheter ou r\u00e9approvisionner. Pour les articles manquants, v\u00e9rifiez quand ils seront utilisables \u00e0 l&rsquo;\u00e9tape de production concern\u00e9e. Une commande ne doit pas para\u00eetre pr\u00eate \u00e0 d\u00e9marrer du simple fait qu&rsquo;une commande d&rsquo;achat a \u00e9t\u00e9 pass\u00e9e.<\/p>\n\n\n<p>Distinguez une disponibilit\u00e9 confirm\u00e9e d&rsquo;une hypoth\u00e8se qui reste \u00e0 v\u00e9rifier. Si la date d&rsquo;arriv\u00e9e d&rsquo;un article critique est incertaine, rendez cette incertitude visible avant de vous engager aupr\u00e8s du client.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. V\u00e9rifier la gamme et les ressources disponibles<\/h3>\n\n\n<p>Confirmez l&rsquo;encha\u00eenement des op\u00e9rations, les postes de travail utilisables, les \u00e9quipes et les horaires de travail. Int\u00e9grez les temps de changement de s\u00e9rie lorsqu&rsquo;ils p\u00e8sent sur l&rsquo;ordonnancement. Chaque op\u00e9ration exige que le travail qui la pr\u00e9c\u00e8de et les ressources n\u00e9cessaires soient disponibles.<\/p>\n\n\n<p>Un poste de travail libre au d\u00e9but de la gamme ne suffit pas \u00e0 \u00e9tablir une date d&rsquo;ach\u00e8vement. L&rsquo;op\u00e9ration peut encore attendre une ressource partag\u00e9e plus en aval.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Int\u00e9grer la commande \u00e0 la charge existante<\/h3>\n\n\n<p>Placez la commande \u00e0 c\u00f4t\u00e9 du travail d\u00e9j\u00e0 planifi\u00e9, en tenant compte de la charge de tout <a href=\"\/fr\/ressources\/goulot-d-etranglement\/\">goulot d&rsquo;\u00e9tranglement<\/a>. N&rsquo;estimez pas sa date d&rsquo;ach\u00e8vement comme si l&rsquo;atelier \u00e9tait vide.<\/p>\n\n\n<p>Prenons un exemple hypoth\u00e9tique : la mati\u00e8re d&rsquo;une nouvelle commande est pr\u00eate et sa premi\u00e8re op\u00e9ration a de la place. Mais la ressource de finition partag\u00e9e est d\u00e9j\u00e0 engag\u00e9e sur une autre commande. Lancer imm\u00e9diatement la nouvelle commande ne fait pas dispara\u00eetre cette file d&rsquo;attente en finition. L&rsquo;estimation de livraison doit en tenir compte.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. V\u00e9rifier s\u00e9par\u00e9ment l&rsquo;ach\u00e8vement et la livraison<\/h3>\n\n\n<p>Examinez quand l&rsquo;ensemble de la gamme de production peut se terminer, et non la seule premi\u00e8re ou derni\u00e8re op\u00e9ration prise isol\u00e9ment. Ajoutez ensuite les \u00e9ventuelles t\u00e2ches distinctes de contr\u00f4le, d&#8217;emballage, d&rsquo;exp\u00e9dition ou de transport n\u00e9cessaires pour cette commande.<\/p>\n\n\n<p>La date d&rsquo;ach\u00e8vement en usine et la date d&rsquo;arriv\u00e9e chez le client sont deux jalons diff\u00e9rents. Confirmez lequel le client attend avant de communiquer un engagement de livraison.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. D\u00e9cider quoi modifier si la date demand\u00e9e ne tient pas<\/h3>\n\n\n<p>Le planificateur peut avoir \u00e0 changer la priorit\u00e9, \u00e0 envisager une ressource alternative disponible ou \u00e0 discuter d&rsquo;une autre date de livraison. V\u00e9rifiez l&rsquo;effet sur les autres commandes avant de vous engager. Avancer une commande urgente peut repousser celle d&rsquo;un autre client.<\/p>\n\n\n<p>Le r\u00e9sultat utile est un plan de production r\u00e9alisable, une vision claire des incertitudes restantes et une d\u00e9cision de livraison \u00e9clair\u00e9e. Une date demand\u00e9e seule n&rsquo;apporte rien de tout cela.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Que change l&rsquo;arriv\u00e9e d&rsquo;une commande urgente ou d&rsquo;un retard ?<\/h2>\n\n\n<p>Une commande urgente, une livraison de mati\u00e8res en retard ou une variation de capacit\u00e9 peuvent toucher plusieurs commandes qui partagent les m\u00eames ressources. Rev\u00e9rifiez les gammes de production concern\u00e9es plut\u00f4t que de d\u00e9placer dans l&rsquo;ordonnancement une seule op\u00e9ration finale.<\/p>\n\n\n<p>Commencez par ce qui a chang\u00e9. Si une mati\u00e8re est en retard, identifiez les op\u00e9rations qui en d\u00e9pendent. Si une capacit\u00e9 n&rsquo;est pas disponible, examinez le travail affect\u00e9 \u00e0 cette ressource et les cons\u00e9quences sur les \u00e9tapes suivantes. Pour une commande urgente, d\u00e9cidez de sa priorit\u00e9 et examinez quels engagements existants elle repousse.<\/p>\n\n\n<p>Le planificateur d\u00e9cide des priorit\u00e9s ; l&rsquo;ordonnancement par l&rsquo;IA les suit. Un ordonnancement mis \u00e0 jour aide \u00e0 voir les cons\u00e9quences, mais une promesse client modifi\u00e9e reste une d\u00e9cision commerciale \u00e0 traiter comme telle. Gardez le plan de production et les engagements de livraison communiqu\u00e9s align\u00e9s \u00e0 mesure que les conditions \u00e9voluent.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Comment SkyPlanner aide \u00e0 ordonnancer la production \u00e0 la commande<\/h2>\n\n\n<p><a href=\"\/fr\/\">SkyPlanner APS<\/a> \u00e9tablit un ordonnancement de production \u00e0 partir des commandes, des \u00e9tapes de process et des ressources disponibles. Son moteur d&rsquo;ordonnancement par IA, Arcturus, affecte le travail aux postes de travail en tenant compte de la disponibilit\u00e9 des mati\u00e8res, des \u00e9quipes, des priorit\u00e9s et des dates de livraison. La vue Gantt pr\u00e9sente le plan obtenu, afin que le planificateur voie comment les op\u00e9rations se partagent la capacit\u00e9.<\/p>\n\n\n<p>SkyPlanner s&rsquo;int\u00e8gre \u00e0 n&rsquo;importe quel ERP ou MES via sa REST API ouverte. Les commandes, les mati\u00e8res et les donn\u00e9es de production peuvent relier le syst\u00e8me de gestion existant \u00e0 l&rsquo;ordonnancement. SkyPlanner ne remplace pas l&rsquo;ERP, et une int\u00e9gration par l&rsquo;API ne doit pas \u00eatre confondue avec un connecteur natif pr\u00eat \u00e0 l&#8217;emploi pour chaque syst\u00e8me.<\/p>\n\n\n<p>Lorsque Autopilot est activ\u00e9, SkyPlanner peut mettre \u00e0 jour l&rsquo;ordonnancement \u00e0 l&rsquo;arriv\u00e9e de nouvelles commandes, \u00e0 l&rsquo;enregistrement d&rsquo;ach\u00e8vements ou en cas de changement de capacit\u00e9. Les planificateurs gardent la main gr\u00e2ce aux priorit\u00e9s et aux verrouillages. Produire un ordonnancement n&rsquo;\u00e9quivaut pas \u00e0 confirmer automatiquement une promesse de livraison au client.<\/p>\n\n\n<p>Pour \u00e9valuer comment l&rsquo;ordonnancement arbitre entre des commandes concurrentes, <a href=\"\/fr\/essai\/\">d\u00e9marrez votre essai gratuit<\/a>. Explorez le produit avec des donn\u00e9es de d\u00e9monstration ou suivez le parcours de prise en main assist\u00e9 par l&rsquo;IA dans SkyPlanner Assistant. V\u00e9rifiez surtout si le plan rend lisibles les d\u00e9pendances mati\u00e8res, la charge des ressources partag\u00e9es et les cons\u00e9quences de vos priorit\u00e9s.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Questions fr\u00e9quentes<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Que signifie la fabrication \u00e0 la commande ?<\/h3>\n\n\n<p>La fabrication \u00e0 la commande signifie que la fabrication d\u00e9marre apr\u00e8s r\u00e9ception d&rsquo;une commande client. Le produit fini est fabriqu\u00e9 pour cette commande, et non exp\u00e9di\u00e9 depuis un stock de produits fabriqu\u00e9s \u00e0 l&rsquo;avance.<\/p>\n\n\n<h3 class=\"wp-block-heading\">La fabrication \u00e0 la commande signifie-t-elle l&rsquo;absence de stock ?<\/h3>\n\n\n<p>Non. Un fabricant en MTO peut d\u00e9tenir des mati\u00e8res, des composants et des en-cours. La distinction essentielle concerne les produits finis : ils sont fabriqu\u00e9s pour des commandes clients, et non stock\u00e9s en pr\u00e9vision de celles-ci.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Quelle est la diff\u00e9rence entre la fabrication \u00e0 la commande et la fabrication sur stock ?<\/h3>\n\n\n<p>En MTO, la fabrication d\u00e9marre en r\u00e9ponse \u00e0 une commande : le client attend donc la production. En MTS, les produits finis sont fabriqu\u00e9s avant les commandes, ce qui permet de livrer depuis le stock lorsque le produit demand\u00e9 est disponible.<\/p>\n\n\n<h3 class=\"wp-block-heading\">La fabrication \u00e0 la commande, est-ce la m\u00eame chose que l&rsquo;ing\u00e9nierie \u00e0 la commande ?<\/h3>\n\n\n<p>Non. L&rsquo;ETO comprend un travail d&rsquo;ing\u00e9nierie substantiel propre \u00e0 chaque commande, avant ou pendant la fabrication. Le MTO peut s&rsquo;appuyer sur une conception de produit existante, m\u00eame si de petites modifications sp\u00e9cifiques \u00e0 la commande restent possibles.<\/p>\n\n\n<h3 class=\"wp-block-heading\">La fabrication \u00e0 la commande, est-ce la m\u00eame chose qu&rsquo;un job shop ?<\/h3>\n\n\n<p>Non. Le MTO d\u00e9crit le moment o\u00f9 la fabrication d\u00e9marre par rapport \u00e0 la commande client. Un job shop d\u00e9crit le flux d&rsquo;op\u00e9rations vari\u00e9es \u00e0 travers des ressources partag\u00e9es. Une usine peut combiner les deux, mais ils d\u00e9crivent des aspects diff\u00e9rents de la production.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Comment planifier la date de livraison d&rsquo;une commande fabriqu\u00e9e \u00e0 la commande ?<\/h3>\n\n\n<p>V\u00e9rifiez la disponibilit\u00e9 des mati\u00e8res, l&rsquo;encha\u00eenement des op\u00e9rations, les ressources \u00e9ligibles et leur charge existante. Contr\u00f4lez l&rsquo;ach\u00e8vement de toute la gamme de fabrication, puis prenez en compte s\u00e9par\u00e9ment l&rsquo;exp\u00e9dition et le transport. Si les priorit\u00e9s changent, v\u00e9rifiez l&rsquo;effet sur les autres commandes avant de promettre la date.<\/p>\n\n\n<h3 class=\"wp-block-heading\">SkyPlanner peut-il fonctionner avec notre ERP existant ?<\/h3>\n\n\n<p>Oui. SkyPlanner s&rsquo;int\u00e8gre \u00e0 tout syst\u00e8me ERP ou MES via sa REST API ouverte. La connexion doit \u00eatre r\u00e9alis\u00e9e pour le syst\u00e8me et le flux de donn\u00e9es concern\u00e9s ; cela ne signifie pas que chaque ERP dispose du m\u00eame connecteur natif pr\u00eat \u00e0 l&#8217;emploi.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What does make to order mean?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Make to order means manufacturing starts after a customer order arrives. The finished product is made for that order rather than shipped from a stock of products manufactured in advance.\"}},{\"@type\":\"Question\",\"name\":\"Does make to order mean there is no inventory?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO manufacturer can hold materials, components and work in progress. The main distinction concerns finished products: they are manufactured for customer orders rather than stocked in anticipation of those orders.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between make to order and make to stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"MTO starts manufacturing in response to an order, so the customer waits for production. MTS manufactures finished products ahead of orders, allowing fulfilment from stock when the required product is available.\"}},{\"@type\":\"Question\",\"name\":\"Is make to order the same as engineer to order?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. ETO includes substantial engineering for the individual order before or alongside manufacturing. MTO can use an existing product design, although smaller order-specific changes are possible.\"}},{\"@type\":\"Question\",\"name\":\"Is make to order the same as a job shop?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. MTO describes when manufacturing starts in relation to the customer order. A job shop describes the flow of varied jobs through shared resources. A factory can use both, but they describe different aspects of production.\"}},{\"@type\":\"Question\",\"name\":\"How do you plan a delivery date for a make-to-order job?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Check material availability, the sequence of operations, eligible resources and their existing workload. Review completion of the whole production route, then account separately for dispatch and transport. If priorities change, check the effect on other orders before promising the date.\"}},{\"@type\":\"Question\",\"name\":\"Can SkyPlanner work with our existing ERP?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. SkyPlanner integrates with any ERP or MES system through its open REST API. The connection needs to be implemented for the relevant system and data flow; this does not mean every ERP has the same ready-made native connector.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Production \u00e0 la commande : comment planifier les dates de livraison Accueil &raquo; Ressources &raquo; Production \u00e0 la commande : comment planifier les dates de livraison La production \u00e0 la commande (MTO) est un mode de production o\u00f9 la fabrication ne d\u00e9marre qu&rsquo;apr\u00e8s r\u00e9ception de la commande client. Au lieu d&rsquo;exp\u00e9dier un produit fini pr\u00e9lev\u00e9 &#8230; <a title=\"Production \u00e0 la commande : comment planifier les dates de livraison\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/\" aria-label=\"Read more about Production \u00e0 la commande : comment planifier les dates de livraison\">Lire plus<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2523,304],"tags":[],"class_list":["post-96588","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Production \u00e0 la commande : planifier la livraison &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"La production \u00e0 la commande d\u00e9marre apr\u00e8s r\u00e9ception de la commande. V\u00e9rifiez mati\u00e8res, capacit\u00e9 et priorit\u00e9s avant de promettre une date de livraison.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Production \u00e0 la commande : comment planifier les dates de livraison\" \/>\n<meta property=\"og:description\" content=\"La production \u00e0 la commande d\u00e9marre apr\u00e8s r\u00e9ception de la commande. V\u00e9rifiez mati\u00e8res, capacit\u00e9 et priorit\u00e9s avant de promettre une date de livraison.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T10:55:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Production \u00e0 la commande : comment planifier les dates de livraison\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-08T10:55:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/\"},\"wordCount\":2312,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/\",\"name\":\"Production \u00e0 la commande : planifier la livraison &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-08T10:55:09+00:00\",\"description\":\"La production \u00e0 la commande d\u00e9marre apr\u00e8s r\u00e9ception de la commande. V\u00e9rifiez mati\u00e8res, capacit\u00e9 et priorit\u00e9s avant de promettre une date de livraison.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/production-a-la-commande\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Production \u00e0 la commande : comment planifier les dates de livraison\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Production \u00e0 la commande : planifier la livraison &#8211; SkyPlanner","description":"La production \u00e0 la commande d\u00e9marre apr\u00e8s r\u00e9ception de la commande. V\u00e9rifiez mati\u00e8res, capacit\u00e9 et priorit\u00e9s avant de promettre une date de livraison.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/","og_locale":"fr_FR","og_type":"article","og_title":"Production \u00e0 la commande : comment planifier les dates de livraison","og_description":"La production \u00e0 la commande d\u00e9marre apr\u00e8s r\u00e9ception de la commande. V\u00e9rifiez mati\u00e8res, capacit\u00e9 et priorit\u00e9s avant de promettre une date de livraison.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-08T10:55:09+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Jussi M\u00e4ntyl\u00e4","Dur\u00e9e de lecture estim\u00e9e":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Production \u00e0 la commande : comment planifier les dates de livraison","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-08T10:55:09+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/"},"wordCount":2312,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS &amp; Scheduling","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/","name":"Production \u00e0 la commande : planifier la livraison &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-08T10:55:09+00:00","description":"La production \u00e0 la commande d\u00e9marre apr\u00e8s r\u00e9ception de la commande. V\u00e9rifiez mati\u00e8res, capacit\u00e9 et priorit\u00e9s avant de promettre une date de livraison.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/production-a-la-commande\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Production \u00e0 la commande : comment planifier les dates de livraison"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Production \u00e0 la commande : comment planifier les dates de livraison Accueil &raquo; Ressources &raquo; Production \u00e0 la commande : comment planifier les dates de livraison La production \u00e0 la commande (MTO) est un mode de production o\u00f9 la fabrication ne d\u00e9marre qu&rsquo;apr\u00e8s r\u00e9ception de la commande client. Au lieu d&rsquo;exp\u00e9dier un produit fini pr\u00e9lev\u00e9\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/96588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=96588"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/96588\/revisions"}],"predecessor-version":[{"id":96886,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/96588\/revisions\/96886"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=96588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=96588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=96588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}