{"id":96094,"date":"2026-10-04T04:30:32","date_gmt":"2026-10-04T04:30:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96094"},"modified":"2026-10-19T14:42:42","modified_gmt":"2026-10-19T14:42:42","slug":"planification-production-excel-modele","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/","title":{"rendered":"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s<\/h1>\n\n\n<p>Un mod\u00e8le de planning de production donne une place \u00e0 vos ordres de fabrication sur une feuille. Reste \u00e0 savoir s\u2019ils trouvent aussi leur place dans l\u2019usine : sur une machine disponible, avec le bon op\u00e9rateur, et assez t\u00f4t pour permettre l\u2019op\u00e9ration suivante et la livraison au client.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template.csv\">T\u00e9l\u00e9chargez le mod\u00e8le de planning de production (CSV pour Excel)<\/a>. Cet exemple simple de fabrication peut \u00eatre adapt\u00e9 \u00e0 vos besoins, avec une ligne par op\u00e9ration. Le tableau ci-dessous pr\u00e9sente les deux op\u00e9rations de l\u2019exemple ; le fichier contient les dates compl\u00e8tes ainsi que les heures.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Ordre \/ op\u00e9ration<\/th>\n<th>Machine \/ op\u00e9rateur<\/th>\n<th style=\"text-align: right;\">Pr\u00e9paration (min)<\/th>\n<th style=\"text-align: right;\">Ex\u00e9cution (min)<\/th>\n<th>D\u00e9but<\/th>\n<th>Fin<\/th>\n<th>\u00c9ch\u00e9ance<\/th>\n<th>Statut<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A \/ A-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">30<\/td>\n<td style=\"text-align: right;\">120<\/td>\n<td>08:00<\/td>\n<td>10:30<\/td>\n<td>12:00<\/td>\n<td>Planifi\u00e9e<\/td>\n<\/tr>\n<tr>\n<td>B \/ B-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">15<\/td>\n<td style=\"text-align: right;\">180<\/td>\n<td>10:30<\/td>\n<td>13:45<\/td>\n<td>16:00<\/td>\n<td>Planifi\u00e9e<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Utilisez ce mod\u00e8le pour comprendre les donn\u00e9es n\u00e9cessaires et tester un encha\u00eenement simple. Pour calculer un planning qui reste exploitable malgr\u00e9 les nouvelles commandes, les retards et les variations de capacit\u00e9, utilisez SkyPlanner APS. Un tableur peut afficher les heures de d\u00e9but que vous avez choisies ; SkyPlanner se charge d\u2019ordonnancer les op\u00e9rations en respectant les capacit\u00e9s dont vous disposez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Quelles informations un mod\u00e8le de planning de production doit-il fournir ?<\/h2>\n\n\n<p>Un planning de production affecte les op\u00e9rations aux ressources dans le temps. Pour chaque op\u00e9ration, il doit r\u00e9pondre \u00e0 quatre questions :<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Quelle op\u00e9ration r\u00e9aliser ?<\/strong> Identifiez l\u2019ordre de fabrication et l\u2019op\u00e9ration pr\u00e9cise, pas seulement le nom du produit.<\/li>\n<li><strong>O\u00f9 peut-elle \u00eatre r\u00e9alis\u00e9e ?<\/strong> Indiquez la machine ou le poste de travail ainsi que les personnes n\u00e9cessaires \u00e0 sa r\u00e9alisation.<\/li>\n<li><strong>Quand peut-elle \u00eatre r\u00e9alis\u00e9e ?<\/strong> Tenez compte de la pr\u00e9paration, du temps d\u2019ex\u00e9cution, des plages de travail et de tout ce qui doit \u00eatre pr\u00eat au pr\u00e9alable.<\/li>\n<li><strong>Sera-t-elle termin\u00e9e \u00e0 temps ?<\/strong> Comparez le r\u00e9sultat \u00e0 l\u2019\u00e9ch\u00e9ance de l\u2019op\u00e9ration, en tenant compte du travail restant avant l\u2019exp\u00e9dition.<\/li>\n<\/ul>\n\n\n<p>Cette derni\u00e8re distinction est importante. La fin d\u2019une op\u00e9ration d\u2019usinage ne signifie pas que la commande est pr\u00eate \u00e0 \u00eatre exp\u00e9di\u00e9e si l\u2019assemblage, le contr\u00f4le ou l\u2019emballage restent \u00e0 faire. Fixez pour chaque op\u00e9ration une \u00e9ch\u00e9ance qui laisse le temps de r\u00e9aliser les \u00e9tapes suivantes.<\/p>\n\n\n<p>Un plan hebdomadaire des quantit\u00e9s est utile, mais il r\u00e9pond \u00e0 une autre question. Un <a href=\"\/fr\/ressources\/plan-directeur-de-production\/\">programme directeur de production<\/a> pr\u00e9cise quels produits finis sont n\u00e9cessaires et \u00e0 quelles dates. Ce mod\u00e8le porte sur le niveau suivant : les op\u00e9rations concr\u00e8tes qui se disputent le temps des machines et des op\u00e9rateurs. Le <a href=\"\/fr\/ressources\/qu-est-ce-que-l-ordonnancement-de-production\/\">guide de l\u2019ordonnancement de la production<\/a> explique comment ces donn\u00e9es permettent de construire un encha\u00eenement r\u00e9alisable.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dans cet exemple, chaque ligne r\u00e9serve de la capacit\u00e9<\/h2>\n\n\n<p>Imaginez un atelier o\u00f9 deux op\u00e9rations attendent la m\u00eame machine, M1, et le m\u00eame op\u00e9rateur, O1. Les mati\u00e8res n\u00e9cessaires aux deux op\u00e9rations sont disponibles. La machine et l\u2019op\u00e9rateur sont disponibles sans interruption de 08:00 \u00e0 16:00, et aucune des deux op\u00e9rations ne d\u00e9pend d\u2019une op\u00e9ration pr\u00e9c\u00e9dente encore inachev\u00e9e.<\/p>\n\n\n<p>L\u2019op\u00e9ration A r\u00e9serve 30 minutes de pr\u00e9paration et 120 minutes d\u2019ex\u00e9cution. Elle occupe la ressource jusqu\u2019\u00e0 10:30. L\u2019op\u00e9ration B r\u00e9serve ensuite 15 minutes de pr\u00e9paration et 180 minutes d\u2019ex\u00e9cution, pour se terminer \u00e0 13:45. Les deux op\u00e9rations ne se chevauchent pas et se terminent avant leurs \u00e9ch\u00e9ances respectives.<\/p>\n\n\n<p>Cet encha\u00eenement est r\u00e9alisable parce que les hypoth\u00e8ses le permettent. Si O1 doit intervenir sur une autre machine \u00e0 11:00, l\u2019affectation de B n\u2019est plus r\u00e9alisable, m\u00eame si M1 reste libre. Une pause d\u00e9jeuner interrompt la plage de travail continue. Et s\u2019il s\u2019agit d\u2019op\u00e9rations interm\u00e9diaires, il faudra aussi r\u00e9server de la capacit\u00e9 pour les \u00e9tapes suivantes.<\/p>\n\n\n<p>L\u2019int\u00e9r\u00eat du tableau ne tient pas \u00e0 ses couleurs. Il tient au fait que chaque ligne r\u00e9serve une partie du temps disponible d\u2019une ressource.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Adaptez le mod\u00e8le sans masquer les contraintes<\/h2>\n\n\n<p>Ouvrez le CSV dans Excel et enregistrez une copie de travail au format classeur Excel. Si tout appara\u00eet dans une seule colonne, importez le fichier en choisissant la virgule comme s\u00e9parateur. Le CSV t\u00e9l\u00e9charg\u00e9 contient des valeurs d\u2019exemple, pas un mod\u00e8le d\u2019ordonnancement automatis\u00e9.<\/p>\n\n\n<p>La date de l\u2019exemple est le <strong>5 octobre 2026<\/strong>. Remplacez-la par vos dates de travail r\u00e9elles et v\u00e9rifiez que les colonnes D\u00e9but, Fin et \u00c9ch\u00e9ance contiennent bien des valeurs de date et d\u2019heure reconnues par le tableur, et non du texte import\u00e9. Affichez la date en plus de l\u2019heure ; sinon, 08:00 demain peut \u00eatre confondu avec la m\u00eame heure aujourd\u2019hui.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Identifiez chaque op\u00e9ration et pr\u00e9cisez comment ses temps sont d\u00e9finis<\/h3>\n\n\n<p>Remplacez A et B par vos identifiants d\u2019ordres et d\u2019op\u00e9rations. Si un ordre n\u00e9cessite de la d\u00e9coupe, du pliage et du soudage, cr\u00e9ez une ligne distincte pour chaque op\u00e9ration. Leur encha\u00eenement est d\u00e9fini par la <a href=\"\/fr\/ressources\/gamme-de-fabrication\/\">gamme de fabrication<\/a>, et non par l\u2019ordre des lignes dans le tableur.<\/p>\n\n\n<p>La colonne Ex\u00e9cution (min) correspond au <strong>temps total d\u2019ex\u00e9cution du lot<\/strong>. Si votre estimation est un temps par pi\u00e8ce, multipliez-la par la quantit\u00e9 avant de la saisir. La colonne Pr\u00e9paration (min) repr\u00e9sente un temps suppl\u00e9mentaire d\u2019occupation de la machine ; ne le noyez pas dans un total inexpliqu\u00e9 et ne le comptez pas deux fois.<\/p>\n\n\n<p>Pour une op\u00e9ration r\u00e9alis\u00e9e sans interruption, remplacez la valeur de fin fixe en F2 par cette formule, puis recopiez-la vers le bas :<\/p>\n\n\n<p><code>=E2+(C2+D2)\/1440<\/code><\/p>\n\n\n<p>La formule ajoute les minutes de pr\u00e9paration et d\u2019ex\u00e9cution \u00e0 l\u2019heure de d\u00e9but. Elle ne choisit pas le d\u00e9but, n\u2019\u00e9vite pas les chevauchements avec une autre op\u00e9ration et ne reporte pas le travail hors des p\u00e9riodes de fermeture. Dans cette feuille, ces d\u00e9cisions d\u2019ordonnancement restent \u00e0 votre charge.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Notez ce qui doit \u00eatre disponible avant le d\u00e9marrage<\/h3>\n\n\n<p>Conservez, \u00e0 c\u00f4t\u00e9 de la liste des op\u00e9rations, les plages de travail dat\u00e9es de chaque machine et de chaque op\u00e9rateur. Indiquez les pauses, la maintenance et les autres p\u00e9riodes d\u2019indisponibilit\u00e9. S\u00e9parez Machine et Op\u00e9rateur en deux colonnes lorsque vous devez v\u00e9rifier leurs affectations ind\u00e9pendamment.<\/p>\n\n\n<p>Pour les ordres comportant plusieurs \u00e9tapes, ajoutez une colonne Pr\u00e9d\u00e9cesseur avec l\u2019identifiant de l\u2019op\u00e9ration pr\u00e9c\u00e9dente. Indiquez la disponibilit\u00e9 des mati\u00e8res lorsqu\u2019une livraison conditionne le d\u00e9marrage. Une ligne ne peut \u00eatre ordonnanc\u00e9e que lorsque les \u00e9l\u00e9ments n\u00e9cessaires sont disponibles et que les op\u00e9rations pr\u00e9c\u00e9dentes sont termin\u00e9es.<\/p>\n\n\n<p>Si une op\u00e9ration ne peut pas \u00eatre interrompue, elle n\u00e9cessite une plage de travail continue assez longue pour la pr\u00e9paration et l\u2019ex\u00e9cution. Si elle peut \u00eatre interrompue, la formule simple de calcul de fin ne permet pas de r\u00e9partir sa dur\u00e9e sur plusieurs plages de travail. Il faut alors un calcul distinct qui tient compte du calendrier.<\/p>\n\n\n<p>Le mod\u00e8le commence alors \u00e0 r\u00e9v\u00e9ler le v\u00e9ritable travail de planification : non pas saisir davantage de lignes, mais v\u00e9rifier leurs effets les unes sur les autres.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Testez le planning en modifiant une hypoth\u00e8se<\/h2>\n\n\n<p>Avant de vous fier \u00e0 un planning \u00e9tabli dans un tableur, observez ce qui se passe lorsque la production change.<\/p>\n\n\n<p>Supposons que A soit termin\u00e9e \u00e0 10:30, mais que M1 soit indisponible de 10:30 \u00e0 13:00. B n\u2019a pas encore commenc\u00e9. Ses 195 minutes de pr\u00e9paration et d\u2019ex\u00e9cution repousseraient d\u00e9sormais sa fin \u00e0 16:15 si elle se d\u00e9roulait sans interruption.<\/p>\n\n\n<p>Cette fin d\u00e9passe \u00e0 la fois la plage de travail qui se termine \u00e0 16:00 et l\u2019\u00e9ch\u00e9ance de B, fix\u00e9e \u00e0 16:00. C\u2019est une alerte, pas un nouveau planning valid\u00e9. Modifier la cellule de d\u00e9but de B a r\u00e9v\u00e9l\u00e9 un probl\u00e8me ; cela ne l\u2019a pas r\u00e9solu.<\/p>\n\n\n<p>Vous pouvez envisager une autre machine compatible avec un op\u00e9rateur disponible, une prolongation autoris\u00e9e des horaires de travail ou un nouvel engagement de livraison. Mais d\u00e9placer B implique aussi de v\u00e9rifier le travail d\u00e9j\u00e0 affect\u00e9 \u00e0 cette autre machine. Si une op\u00e9ration suit B, il peut \u00e9galement \u00eatre n\u00e9cessaire de d\u00e9caler son d\u00e9but.<\/p>\n\n\n<p>C\u2019est la diff\u00e9rence entre un calcul arithm\u00e9tique et l\u2019<a href=\"\/fr\/ressources\/ordonnancement-a-capacite-finie\/\">ordonnancement \u00e0 capacit\u00e9 finie<\/a>. Le calcul d\u00e9termine quand une affectation choisie se terminerait. L\u2019ordonnancement trouve une place pour le travail sans d\u00e9passer la capacit\u00e9 disponible.<\/p>\n\n\n<p>Avant de diffuser un planning \u00e9tabli dans un tableur, v\u00e9rifiez les chevauchements d\u2019affectation des machines et des op\u00e9rateurs, les mati\u00e8res, les pr\u00e9d\u00e9cesseurs, les plages de travail et les \u00e9ch\u00e9ances. Conservez les horaires r\u00e9els des op\u00e9rations termin\u00e9es et identifiez clairement la version valid\u00e9e pour \u00e9viter que l\u2019atelier ne suive une copie obsol\u00e8te.<\/p>\n\n\n<p>Ces v\u00e9rifications restent g\u00e9rables dans l\u2019exemple. Dans une usine o\u00f9 la situation \u00e9volue, les r\u00e9p\u00e9ter pour chaque ordre concern\u00e9 est pr\u00e9cis\u00e9ment le travail que vous souhaitez confier \u00e0 un logiciel d\u2019ordonnancement. Le <a href=\"\/fr\/ressources\/defis-planification-production-excel-alternative-skyplanner\/\">guide des difficult\u00e9s de la planification de production sous Excel<\/a> explique plus en d\u00e9tail pourquoi cette charge de mise \u00e0 jour augmente.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gardez la ma\u00eetrise du planning, SkyPlanner calcule l\u2019ordonnancement<\/h2>\n\n\n<p>SkyPlanner prend en compte vos postes de travail, vos \u00e9quipes et leurs horaires, vos op\u00e9rateurs, vos priorit\u00e9s et vos mati\u00e8res dans l\u2019ordonnancement. Vous d\u00e9finissez les ressources de production et les donn\u00e9es des op\u00e9rations ; Arcturus, son IA d\u2019ordonnancement, calcule l\u2019encha\u00eenement en fonction des capacit\u00e9s et des d\u00e9pendances configur\u00e9es. Le r\u00e9sultat s\u2019affiche dans le diagramme de Gantt, avec une file d\u2019attente pour chaque poste de travail et des liens entre les \u00e9tapes de fabrication associ\u00e9es.<\/p>\n\n\n<p>En cas d\u2019interruption de M1, vous enregistrez la p\u00e9riode d\u2019indisponibilit\u00e9 et recalculez le planning. Arcturus ordonnance le travail en tenant compte de la capacit\u00e9 bloqu\u00e9e, des ressources utilisables et des contraintes que vous avez d\u00e9finies. Vous pouvez ensuite examiner le r\u00e9sultat et rep\u00e9rer les ordres dont la date de fin n\u00e9cessite votre attention, plut\u00f4t que de suivre vous-m\u00eame chaque r\u00e9percussion dans les lignes du tableur.<\/p>\n\n\n<p>Lorsque la prise en compte des mati\u00e8res est activ\u00e9e, leur disponibilit\u00e9 peut \u00eatre int\u00e9gr\u00e9e au calcul d\u2019ordonnancement. Les verrouillages prot\u00e8gent les op\u00e9rations que vous ne souhaitez pas d\u00e9placer, et les priorit\u00e9s pr\u00e9d\u00e9finies indiquent les engagements les plus importants. <strong>Vous d\u00e9cidez des priorit\u00e9s ; l\u2019IA les respecte.<\/strong> Pour appliquer ces d\u00e9cisions, elle n\u2019a pas besoin que vous placiez chaque op\u00e9ration individuellement.<\/p>\n\n\n<p>Vous obtenez ainsi un planning exploitable lorsque la situation change dans l\u2019usine, et pas simplement une liste d\u2019ordres mieux pr\u00e9sent\u00e9e. Vous consacrez vos efforts aux d\u00e9cisions de production : ajouter de la capacit\u00e9, modifier une priorit\u00e9 ou discuter d\u2019une date avec un client. SkyPlanner se charge du calcul d\u2019ordonnancement qui les accompagne.<\/p>\n\n\n<p><a href=\"\/fr\/fonctionnalites\/\">D\u00e9couvrez les fonctionnalit\u00e9s d\u2019ordonnancement de SkyPlanner<\/a> pour voir comment le Gantt, la disponibilit\u00e9 des ressources et l\u2019ordonnancement automatique facilitent ce travail.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce que l\u2019abandon d\u2019Excel a chang\u00e9 pour UTU<\/h2>\n\n\n<p>L\u2019usine UTU d\u2019Ulvila fabrique des tableaux \u00e9lectriques et des appareillages de commutation. Avant SkyPlanner, les services planifiaient leur travail dans leurs propres feuilles Excel, mises \u00e0 jour manuellement. Les modifications de l\u2019ordre des op\u00e9rations dans l\u2019ERP ne parvenaient pas toujours \u00e0 l\u2019atelier, et il \u00e9tait difficile d\u2019avoir une vision r\u00e9aliste de la capacit\u00e9.<\/p>\n\n\n<p>Le probl\u00e8me ne se r\u00e9sumait pas \u00e0 une colonne manquante. Il fallait assurer la coh\u00e9rence entre les informations sur les commandes, l\u2019ordre des op\u00e9rations et le travail des \u00e9quipes.<\/p>\n\n\n<p>UTU a choisi SkyPlanner lors de sa migration vers Oracle NetSuite. Dans cette mise en \u0153uvre, SkyPlanner est connect\u00e9 \u00e0 NetSuite et au syst\u00e8me de paie, et regroupe les lignes et les services de l\u2019usine dans un m\u00eame syst\u00e8me. L\u2019\u00e9quipe souligne l\u2019int\u00e9r\u00eat d\u2019associer l\u2019ordonnancement par IA au diagramme de Gantt : l\u2019ordre des op\u00e9rations, la capacit\u00e9 et l\u2019avancement sont visibles ensemble.<\/p>\n\n\n<p>UTU indique \u00e9conomiser environ <strong>deux heures par semaine sur la mise \u00e0 jour manuelle des feuilles de calcul<\/strong>, tandis que la file d\u2019attente des op\u00e9rations actualis\u00e9e parvient aux installateurs en quelques secondes. C\u2019est l\u2019avantage concret par rapport \u00e0 un mod\u00e8le : moins d\u2019efforts pour tenir les diff\u00e9rentes copies \u00e0 jour, et un ordre des op\u00e9rations plus clair pour les \u00e9quipes qui r\u00e9alisent le travail.<\/p>\n\n\n<p><a href=\"\/fr\/temoignages-clients\/utu\/\">D\u00e9couvrez le t\u00e9moignage d\u2019UTU sur son passage d\u2019Excel \u00e0 SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gardez les donn\u00e9es utiles. Arr\u00eatez de refaire le planning.<\/h2>\n\n\n<p>Le mod\u00e8le vous aide \u00e0 identifier les donn\u00e9es n\u00e9cessaires \u00e0 l\u2019ordonnancement : op\u00e9rations, dur\u00e9es, ressources, disponibilit\u00e9s et dates de fin requises. Pour exploiter ces donn\u00e9es, vous n\u2019avez pas \u00e0 recalculer sans cesse leurs interactions dans Excel.<\/p>\n\n\n<p><strong>SkyPlanner s\u2019int\u00e8gre \u00e0 tout ERP ou MES gr\u00e2ce \u00e0 son interface REST API ouverte.<\/strong> Vous pouvez am\u00e9liorer l\u2019ordonnancement en vous appuyant sur vos syst\u00e8mes existants, tout en gardant la ma\u00eetrise des priorit\u00e9s et des d\u00e9cisions de production.<\/p>\n\n\n<p><a href=\"\/fr\/contacter-les-ventes\/\">R\u00e9servez une d\u00e9monstration de SkyPlanner<\/a> en ayant \u00e0 l\u2019esprit une gamme de fabrication typique pour une commande et une modification r\u00e9cente du planning. Ces exemples vous permettront d\u2019examiner comment ordonnancer votre production lorsque les contraintes li\u00e9es aux machines, au personnel et aux \u00e9ch\u00e9ances entrent en concurrence. Vous pouvez aussi <a href=\"\/fr\/essai\/\">essayer SkyPlanner avec des donn\u00e9es de d\u00e9monstration<\/a> et visualiser le planning dans le diagramme de Gantt avant de pr\u00e9parer votre propre configuration.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s Un mod\u00e8le de planning de production donne une place \u00e0 vos ordres de fabrication sur une feuille. Reste \u00e0 savoir s\u2019ils trouvent aussi leur place dans l\u2019usine : sur une machine disponible, avec le bon op\u00e9rateur, et assez t\u00f4t pour permettre l\u2019op\u00e9ration suivante et &#8230; <a title=\"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/\" aria-label=\"Read more about Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s\">Lire plus<\/a><\/p>\n","protected":false},"author":3,"featured_media":97779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2523,304],"tags":[],"class_list":["post-96094","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-et-ordonnancement","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mod\u00e8le de planning de production : adapter la charge<\/title>\n<meta name=\"description\" content=\"T\u00e9l\u00e9chargez un mod\u00e8le de planning de production pour Excel, v\u00e9rifiez la capacit\u00e9 et d\u00e9couvrez comment SkyPlanner adapte le planning aux changements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s\" \/>\n<meta property=\"og:description\" content=\"T\u00e9l\u00e9chargez un mod\u00e8le de planning de production pour Excel, v\u00e9rifiez la capacit\u00e9 et d\u00e9couvrez comment SkyPlanner adapte le planning aux changements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T04:30:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/\"},\"wordCount\":2385,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"articleSection\":[\"APS et ordonnancement\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/\",\"name\":\"Mod\u00e8le de planning de production : adapter la charge\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"description\":\"T\u00e9l\u00e9chargez un mod\u00e8le de planning de production pour Excel, v\u00e9rifiez la capacit\u00e9 et d\u00e9couvrez comment SkyPlanner adapte le planning aux changements.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"width\":1672,\"height\":941,\"caption\":\"Two groups of components waiting for one machining resource in a manufacturing production schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/planification-production-excel-modele\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mod\u00e8le de planning de production : adapter la charge","description":"T\u00e9l\u00e9chargez un mod\u00e8le de planning de production pour Excel, v\u00e9rifiez la capacit\u00e9 et d\u00e9couvrez comment SkyPlanner adapte le planning aux changements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/","og_locale":"fr_FR","og_type":"article","og_title":"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s","og_description":"T\u00e9l\u00e9chargez un mod\u00e8le de planning de production pour Excel, v\u00e9rifiez la capacit\u00e9 et d\u00e9couvrez comment SkyPlanner adapte le planning aux changements.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T04:30:32+00:00","article_modified_time":"2026-10-19T14:42:42+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Jussi M\u00e4ntyl\u00e4","Dur\u00e9e de lecture estim\u00e9e":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/"},"wordCount":2385,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","articleSection":["APS et ordonnancement","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/","name":"Mod\u00e8le de planning de production : adapter la charge","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","description":"T\u00e9l\u00e9chargez un mod\u00e8le de planning de production pour Excel, v\u00e9rifiez la capacit\u00e9 et d\u00e9couvrez comment SkyPlanner adapte le planning aux changements.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","width":1672,"height":941,"caption":"Two groups of components waiting for one machining resource in a manufacturing production schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/planification-production-excel-modele\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Mod\u00e8le de planning de production : adapter le travail aux capacit\u00e9s Un mod\u00e8le de planning de production donne une place \u00e0 vos ordres de fabrication sur une feuille. Reste \u00e0 savoir s\u2019ils trouvent aussi leur place dans l\u2019usine : sur une machine disponible, avec le bon op\u00e9rateur, et assez t\u00f4t pour permettre l\u2019op\u00e9ration suivante et\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/96094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=96094"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/96094\/revisions"}],"predecessor-version":[{"id":96123,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/96094\/revisions\/96123"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/97779"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=96094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=96094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=96094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}