{"id":7102,"date":"2022-09-01T11:45:00","date_gmt":"2022-09-01T11:45:00","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=7102"},"modified":"2026-10-10T14:05:53","modified_gmt":"2026-10-10T14:05:53","slug":"systeme-mes-definition-et-fonctionnement","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/","title":{"rendered":"Syst\u00e8me MES \u2013 Ce que c&rsquo;est et ce qu&rsquo;il fait"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f special-color\">\n<div class=\"gb-grid-column gb-grid-column-fb47f507\"><div class=\"gb-container gb-container-fb47f507 special-color\">\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-fc5995b1 gb-headline-text\"><strong>Syst\u00e8me MES<\/strong><\/h4>\n\n\n\n<p class=\"special-color has-contrast-color has-base-3-background-color has-text-color has-background\"><strong><a href=\"\/fr\/ressources\/mes-vs-erp-quelle-est-la-difference\/\">MES vs ERP<\/a><\/strong><br><br><strong><a href=\"\/fr\/ressources\/la-puissance-de-lintegration-mes-erp\/\">Int\u00e9gration MES ERP<\/a><\/strong><br><br><a href=\"\/fr\/ressources\/les-avantages-des-fonctions-mes\/\"><strong>Fonctionnalit\u00e9s MES<\/strong><\/a><br>\u00b7 <a href=\"\/fr\/ressources\/mes-suivi-de-la-fabrication\/\">Surveillance de la fabrication<\/a><br>\u00b7 <a href=\"\/fr\/ressources\/mes-controle-de-la-qualite-dans-la-fabrication\/\">Contr\u00f4le qualit\u00e9<\/a><br>\u00b7 <a href=\"\/fr\/ressources\/mes-optimisation-des-stocks\/\">Optimisation des stocks<\/a><br>\u00b7 <a href=\"\/fr\/ressources\/gestion-des-flux-de-donnees-mes\/\">Gestion des flux de donn\u00e9es<\/a><br>\u00b7<a href=\"\/fr\/ressources\/mes-analyse-de-la-production\/\"> Analyse de la fabrication<\/a><br>\u00b7<a href=\"\/fr\/ressources\/suivi-de-la-production-mes\/\"> Suivi de la production<\/a><br><br><strong><a href=\"\/fr\/ressources\/solutions-mes-comment-choisir-la-bonne\/\">Solutions MES<\/a><\/strong><br>\u00b7<a href=\"\/fr\/ressources\/mes-en-nuage\/\"> MES bas\u00e9 sur le cloud<\/a><br>\u00b7 <a href=\"\/fr\/ressources\/mes-sur-site\/\">MES sur site<\/a><br>\u00b7 <a href=\"\/fr\/ressources\/mes-pour-les-petites-entreprises\/\">MES pour petites entreprises<\/a><br>\u00b7 <a href=\"\/fr\/ressources\/mes-pilote-par-lia\/\">MES pilot\u00e9 par l&rsquo;AI<\/a><br>\u00b7 <a href=\"\/fr\/ressources\/mes-dentreprise\/\">MES d&rsquo;entreprise<\/a><br>\u00b7<a href=\"\/fr\/ressources\/mes-specifique-a-lindustrie\/\"> MES sp\u00e9cifique \u00e0 l&rsquo;industrie<\/a><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/fr\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/\">Articles<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">Syst\u00e8me MES \u2013 Ce que c&#8217;est et ce qu&#8217;il fait<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mes-system-what-it-is-and-what-it-does\" style=\"color:#1f1f33\">Syst\u00e8me MES \u2013 Ce que c&rsquo;est et ce qu&rsquo;il fait<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Temps de lecture estim\u00e9 : <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\">Lorsque l&rsquo;automatisation a commenc\u00e9 \u00e0 \u00eatre int\u00e9gr\u00e9e \u00e0 la fabrication, le terme Manufacturing Execution System (MES) a \u00e9t\u00e9 invent\u00e9. Le MES \u00e9tait un outil de gestion des syst\u00e8mes automatis\u00e9s permettant aux usines de fabrication de fonctionner de mani\u00e8re fluide. Il y parvenait en rationalisant les processus, en les suivant en production et en documentant les \u00e9v\u00e9nements automatiquement.<\/p>\n\n\n\n<p>Au fil du temps, les entreprises ont trouv\u00e9 de nouvelles fa\u00e7ons d&rsquo;utiliser ce nouvel outil. Avec la demande croissante de produits personnalis\u00e9s, les processus devaient \u00eatre rationalis\u00e9s pour fonctionner avec une plus grande efficacit\u00e9, et la&nbsp;<a href=\"\/fr\/\" target=\"_blank\" rel=\"noreferrer noopener\">planification de la production<\/a>&nbsp;n\u00e9cessitait une optimisation. Pour cela, le MES s&rsquo;est av\u00e9r\u00e9 \u00eatre un outil fantastique.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-613f9f62      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable des mati\u00e8res\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#quest-ce-que-le-mes\" class=\"uagb-toc-link__trigger\">Qu&#039;est-ce que le MES ?<\/a><li class=\"uagb-toc__list\"><a href=\"#fonctions-du-mes\" class=\"uagb-toc-link__trigger\">Fonctions du MES<\/a><li class=\"uagb-toc__list\"><a href=\"#fonctionnalit\u00e9s-du-mes\" class=\"uagb-toc-link__trigger\">Fonctionnalit\u00e9s du MES<\/a><li class=\"uagb-toc__list\"><a href=\"#solutions-mes\" class=\"uagb-toc-link__trigger\">Solutions MES<\/a><li class=\"uagb-toc__list\"><a href=\"#conseils-pour-choisir-la-bonne-solution\" class=\"uagb-toc-link__trigger\">Conseils pour choisir la bonne solution<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-et-erp\" class=\"uagb-toc-link__trigger\">MES et ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#avantages-de-lutilisation-du-mes\" class=\"uagb-toc-link__trigger\">Avantages de l&#039;utilisation du MES<\/a><li class=\"uagb-toc__list\"><a href=\"#applications-futures-du-manufacturing-execution-system\" class=\"uagb-toc-link__trigger\">Applications futures du Manufacturing Execution System<\/a><li class=\"uagb-toc__list\"><a href=\"#faites-passer-la-gestion-des-processus-de-votre-entreprise-au-niveau-sup\u00e9rieur\" class=\"uagb-toc-link__trigger\">Faites passer la gestion des processus de votre entreprise au niveau sup\u00e9rieur !<\/a><li class=\"uagb-toc__list\"><a href=\"#foire-aux-questions\" class=\"uagb-toc-link__trigger\">Foire aux questions<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-a28df297 gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>Un logiciel MES suit et documente la production en atelier, fournissant aux \u00e9quipes des informations \u00e0 jour sur les op\u00e9rations, les mati\u00e8res et la qualit\u00e9. L\u2019ERP assure la planification \u00e0 l\u2019\u00e9chelle de l\u2019entreprise, tandis que le MES accompagne l\u2019ex\u00e9cution de la production. ISA-95 fournit des mod\u00e8les et une terminologie pour les \u00e9changes d\u2019informations entre le pilotage de la production et les fonctions de l\u2019entreprise ; ce n\u2019est pas une liste de fonctionnalit\u00e9s obligatoires pour un MES. Les syst\u00e8mes MES modernes proposent notamment le suivi de la fabrication, le suivi des stocks et l\u2019analyse de la production. Connecter un MES \u00e0 SkyPlanner APS permet d\u2019y ajouter un ordonnancement fond\u00e9 sur les donn\u00e9es de production et les priorit\u00e9s d\u00e9finies par les planificateurs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-mes\">Qu&rsquo;est-ce que le MES ?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>Un MES est un logiciel qui suit, documente et accompagne l\u2019ex\u00e9cution de la production en atelier. Il collecte des donn\u00e9es aupr\u00e8s des op\u00e9rateurs, des \u00e9quipements et des syst\u00e8mes connect\u00e9s pour permettre aux \u00e9quipes de suivre l\u2019avancement des op\u00e9rations, l\u2019utilisation des mati\u00e8res et la qualit\u00e9.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p class=\"has-text-align-left\">Le MES et l\u2019ERP ont des r\u00f4les compl\u00e9mentaires. L\u2019ERP prend en charge les processus de l\u2019entreprise, comme les commandes, les achats et la finance ; le MES fournit des informations plus d\u00e9taill\u00e9es sur l\u2019ex\u00e9cution de la production. Leur int\u00e9gration permet aux deux syst\u00e8mes d\u2019\u00e9changer les besoins et les r\u00e9sultats de production.<\/p>\n\n\n\n<p>Le MES est un syst\u00e8me int\u00e9gr\u00e9 de capteurs et de logiciels qui suit l&rsquo;\u00e9quipement, les mat\u00e9riaux et les travailleurs. Il signale les goulots d&rsquo;\u00e9tranglement dans les processus, aide \u00e0 planifier la maintenance des \u00e9quipements \u00e0 l&rsquo;avance et peut \u00e9galement \u00eatre utilis\u00e9 pour fournir des instructions personnalis\u00e9es aux travailleurs et aux \u00e9quipements en fonction de la commande. Cela aide \u00e0 maintenir les processus rationalis\u00e9s et fournit une planification plus fiable.<\/p>\n\n\n\n<p>Lorsque le MES en \u00e9tait encore \u00e0 ses d\u00e9buts, il \u00e9tait d\u00e9fini de mani\u00e8re assez vague. Presque toute m\u00e9thode de suivi, de documentation ou de gestion d&rsquo;un processus pouvait \u00eatre appel\u00e9e MES. Cela causait des probl\u00e8mes lors de l&rsquo;exploitation des interfaces entre le MES et d&rsquo;autres syst\u00e8mes.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.isa.org\/standards-and-publications\/isa-standards\/isa-standards-committees\/isa95\">ISA-95<\/a> d\u00e9finit des mod\u00e8les, une terminologie et des \u00e9changes d\u2019informations pour int\u00e9grer le pilotage de la production aux fonctions de l\u2019entreprise. Ce p\u00e9rim\u00e8tre d\u2019int\u00e9gration est distinct des mod\u00e8les historiques des fonctions MES \u00e9labor\u00e9s par <a href=\"https:\/\/mesa.org\/topics-resources\/mesa-model\/\">MESA<\/a>. La liste ci-dessous pr\u00e9sente les fonctions courantes d\u2019un MES, et non des exigences obligatoires d\u2019ISA-95 :<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-functions\">Fonctions du MES<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Acquisition de donn\u00e9es<\/li>\n\n\n\n<li>Contr\u00f4le qualit\u00e9<\/li>\n\n\n\n<li>Ordonnancement de production<\/li>\n\n\n\n<li>Analyse des performances<\/li>\n\n\n\n<li>Flux de produits<\/li>\n\n\n\n<li>G\u00e9n\u00e9alogie et tra\u00e7abilit\u00e9<\/li>\n\n\n\n<li>Gestion des processus<\/li>\n\n\n\n<li>Gestion des ressources<\/li>\n\n\n\n<li>Gestion du personnel<\/li>\n\n\n\n<li>Gestion de la maintenance<\/li>\n\n\n\n<li>Gestion documentaire<\/li>\n<\/ol>\n\n\n\n<p>Les fonctions d\u2019un MES d\u00e9pendent du produit et de sa mise en \u0153uvre. D\u00e9finissez quel syst\u00e8me prend en charge chaque t\u00e2che et comment les donn\u00e9es circulent entre le MES, l\u2019ERP et les logiciels d\u2019ordonnancement tels que les APS.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ca25f6c8 gb-headline-text\">Fonctionnalit\u00e9s du MES<\/h2>\n\n\n\n<p>En plongeant plus profond\u00e9ment dans le domaine de ce syst\u00e8me, nous rencontrons une facette plus r\u00e9cente et passionnante :&nbsp;<a href=\"\/fr\/ressources\/les-avantages-des-fonctions-mes\/\">les fonctionnalit\u00e9s MES<\/a>. Tant que nous comprenons les nuances de cet outil, il reste crucial de distinguer une fonction MES d&rsquo;une fonctionnalit\u00e9 MES.<\/p>\n\n\n\n<p>En termes simples, une fonction MES fait r\u00e9f\u00e9rence aux op\u00e9rations ou t\u00e2ches de base que le syst\u00e8me peut effectuer. Ces fonctions forment l&rsquo;\u00e9pine dorsale du syst\u00e8me MES. Parall\u00e8lement, ses fonctionnalit\u00e9s mettent en \u00e9vidence les outils ou capacit\u00e9s sp\u00e9cifiques du syst\u00e8me, am\u00e9liorant son potentiel fonctionnel. Au cours de notre exploration des syst\u00e8mes MES, nous avons identifi\u00e9 six fonctionnalit\u00e9s innovantes qui se d\u00e9marquent :<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/fr\/ressources\/mes-suivi-de-la-fabrication\/\">Suivi de la production<\/a><\/strong>: Cette fonctionnalit\u00e9 offre une supervision en temps r\u00e9el du processus de fabrication, garantissant que tout fonctionne de mani\u00e8re fluide et efficace. Gr\u00e2ce \u00e0 ce suivi, les planificateurs de production obtiennent des informations pr\u00e9cieuses et peuvent proc\u00e9der aux ajustements n\u00e9cessaires.<\/li>\n\n\n\n<li><a href=\"\/fr\/ressources\/mes-controle-de-la-qualite-dans-la-fabrication\/\"><strong>Contr\u00f4le qualit\u00e9 en fabrication<\/strong> :<\/a> Au-del\u00e0 du simple suivi, un syst\u00e8me MES robuste examine la qualit\u00e9 des produits fabriqu\u00e9s. Il enregistre les contr\u00f4les qualit\u00e9 et signale les \u00e9carts pour permettre \u00e0 l\u2019\u00e9quipe d\u2019agir en fonction des normes requises.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/mes-optimisation-des-stocks\/\">Optimisation des stocks<\/a><\/strong> : La gestion des stocks est presque aussi essentielle que la fabrication elle-m\u00eame. Les syst\u00e8mes MES suivent les mouvements et la consommation de mati\u00e8res pour aider les \u00e9quipes \u00e0 rep\u00e9rer les p\u00e9nuries et les exc\u00e9dents de stock.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/gestion-des-flux-de-donnees-mes\/\">Gestion des flux de donn\u00e9es<\/a><\/strong>: \u00c0 l&#039;\u00e8re du num\u00e9rique, les donn\u00e9es sont reines. G\u00e9rer le flux de donn\u00e9es devient donc primordial. Un syst\u00e8me MES dot\u00e9 de cette fonctionnalit\u00e9 assure une circulation, un stockage et un acc\u00e8s aux donn\u00e9es sans heurts, facilitant ainsi la prise de d\u00e9cision.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/mes-analyse-de-la-production\/\">Analyse de la production<\/a><\/strong>: En explorant les donn\u00e9es, les syst\u00e8mes MES peuvent en extraire des analyses essentielles. Gr\u00e2ce \u00e0 ces analyses, les planificateurs de production peuvent d\u00e9celer des sch\u00e9mas, anticiper les tendances et prendre des d\u00e9cisions \u00e9clair\u00e9es.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/suivi-de-la-production-mes\/\">Suivi de la fabrication<\/a><\/strong>: Enfin, et ce n&#039;est pas le moindre des atouts, le suivi de la fabrication reste un v\u00e9ritable joyau. Il offre une vision claire de l&#039;avancement de chaque produit sur la ligne de production, ouvrant la voie \u00e0 une meilleure allocation des ressources et \u00e0 une efficacit\u00e9 accrue.<\/li>\n<\/ol>\n\n\n\n<p>Examinons l&rsquo;une de ces fonctionnalit\u00e9s pour une meilleure compr\u00e9hension. Surveillance de la fabrication \u2013 Cette fonctionnalit\u00e9 offre une vue d&rsquo;ensemble compl\u00e8te du processus de fabrication. Consid\u00e9rez-la comme un garde vigilant. Cette fonctionnalit\u00e9 d\u00e9tecte activement les irr\u00e9gularit\u00e9s, les inefficacit\u00e9s potentielles et les signes de pannes du syst\u00e8me. <\/p>\n\n\n\n<p>En fournissant des donn\u00e9es de derni\u00e8re minute, la surveillance de la fabrication garantit que les planificateurs de production sont toujours inform\u00e9s, leur permettant d&rsquo;agir rapidement et d&rsquo;am\u00e9liorer les processus selon les besoins.<br><br>Le monde des syst\u00e8mes MES continue d&rsquo;\u00e9voluer, offrant des outils et des fonctionnalit\u00e9s plus sophistiqu\u00e9s. En restant \u00e0 jour et inform\u00e9s, les planificateurs de production peuvent exploiter tout le potentiel de ces syst\u00e8mes, propulsant leurs op\u00e9rations vers un avenir meilleur.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS \u2013 Image produit de la planification et de l&#x27;ordonnancement de la production, vue de face\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Planification de production avanc\u00e9e avec l&rsquo;AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">En savoir plus sur notre approche de la planification et de l&rsquo;optimisation de la production exploitant la puissance de l&rsquo;AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/fr\/\" aria-label=\"R\u00e9server une d\u00e9mo\">Planification de la production avec AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-3a1286ae gb-headline-text\">Solutions MES<\/h2>\n\n\n\n<p>Diverses <a href=\"\/fr\/ressources\/solutions-mes-comment-choisir-la-bonne\/\">solutions MES <\/a>sont pr\u00eates \u00e0 relever des d\u00e9fis op\u00e9rationnels distincts dans le vaste domaine des syst\u00e8mes MES. Chacune pr\u00e9sente sa proposition de valeur unique, des capacit\u00e9s rationalis\u00e9es des syst\u00e8mes bas\u00e9s sur le cloud aux offres sp\u00e9cialis\u00e9es des MES sp\u00e9cifiques \u00e0 l&rsquo;industrie. Voyageons ensemble \u00e0 travers ces options, en identifiant comment chacune peut soutenir et am\u00e9liorer de mani\u00e8re optimale les besoins de fabrication sp\u00e9cifiques de votre entreprise.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/fr\/ressources\/mes-en-nuage\/\">MES dans le cloud<\/a><\/strong>: Fonctionne dans le cloud, ce qui signifie que vous pouvez y acc\u00e9der de n&#039;importe o\u00f9 avec une connexion internet. Il offre de la flexibilit\u00e9 et pr\u00e9sente souvent des co\u00fbts initiaux plus faibles. En revanche, il d\u00e9pend d&#039;une connexion internet stable.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/mes-sur-site\/\">MES sur site<\/a><\/strong>: Ce syst\u00e8me est install\u00e9 sur le mat\u00e9riel et les serveurs de votre entreprise. Bien qu&#039;il puisse exiger un investissement initial plus \u00e9lev\u00e9, il offre un meilleur contr\u00f4le des donn\u00e9es et peut \u00eatre personnalis\u00e9 selon les besoins de votre entreprise.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/mes-pour-les-petites-entreprises\/\">MES pour petites entreprises<\/a><\/strong>: Con\u00e7us sp\u00e9cifiquement pour les structures de plus petite taille, ces syst\u00e8mes sont g\u00e9n\u00e9ralement plus simples et plus \u00e9conomiques. Ils se concentrent sur les fonctionnalit\u00e9s essentielles dont une petite entreprise a besoin, sans la submerger de fonctions complexes.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/mes-pilote-par-lia\/\">MES pilot\u00e9 par l&#039;AI<\/a><\/strong>: En int\u00e9grant l&#039;intelligence artificielle, ces syst\u00e8mes peuvent anticiper les tendances, automatiser les t\u00e2ches et optimiser les processus. C&#039;est un excellent choix pour les entreprises qui souhaitent rester \u00e0 la pointe de l&#039;innovation.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/mes-dentreprise\/\">MES d&#039;entreprise<\/a><\/strong>: Con\u00e7ue pour les grandes entreprises aux besoins complexes, cette solution offre des fonctionnalit\u00e9s \u00e9tendues, g\u00e8re de grands volumes de donn\u00e9es et s&#039;int\u00e8gre parfaitement aux autres syst\u00e8mes de l&#039;entreprise.<\/li>\n\n\n\n<li><strong><a href=\"\/fr\/ressources\/mes-specifique-a-lindustrie\/\">MES sectoriel<\/a><\/strong>: Ceux-ci sont adapt\u00e9s \u00e0 des secteurs sp\u00e9cifiques, comme la pharmacie ou l&#039;automobile. Ils sont d&#039;embl\u00e9e \u00e9quip\u00e9s d&#039;outils et de fonctionnalit\u00e9s propres \u00e0 ces secteurs.<\/li>\n<\/ol>\n\n\n\n<p>Choisir la bonne solution MES pour votre entreprise peut \u00eatre d\u00e9terminant pour l&rsquo;efficacit\u00e9 et le succ\u00e8s de votre processus de fabrication.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cf0e0d5 gb-headline-text\">Conseils pour choisir la bonne solution<\/h2>\n\n\n\n<p>Faire le meilleur choix parmi cette gamme diversifi\u00e9e de syst\u00e8mes MES peut sembler intimidant au premier abord. Il est essentiel d&rsquo;aligner le syst\u00e8me choisi sur les besoins op\u00e9rationnels distincts et les objectifs futurs de votre entreprise. Pour vous guider dans cette d\u00e9cision critique, voici quelques conseils pr\u00e9cieux \u00e0 prendre en compte :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Comprenez vos besoins<\/strong>: Avant de d\u00e9cider, recensez les exigences sp\u00e9cifiques de votre entreprise. Avez-vous besoin de fonctionnalit\u00e9s complexes ou simplement de l&#039;essentiel ?<\/li>\n\n\n\n<li><strong>Consid\u00e9rations budg\u00e9taires<\/strong>: S&#039;il est essentiel de choisir un syst\u00e8me r\u00e9pondant \u00e0 vos besoins, il est tout aussi important de d\u00e9terminer le montant que vous \u00eates pr\u00eat \u00e0 investir.<\/li>\n\n\n\n<li><strong>\u00c9volutivit\u00e9<\/strong>: Voyez \u00e0 long terme. Choisissez un syst\u00e8me MES capable de grandir avec votre entreprise.<\/li>\n\n\n\n<li><strong>Int\u00e9gration<\/strong>: Assurez-vous que le Manufacturing Execution System s&#039;int\u00e8gre bien aux autres logiciels que vous utilisez.<\/li>\n\n\n\n<li><strong>Facilit\u00e9 d&#039;utilisation<\/strong>: Un syst\u00e8me difficile \u00e0 prendre en main peut nuire \u00e0 la productivit\u00e9. Optez pour une solution intuitive et conviviale.<\/li>\n\n\n\n<li><strong>Support et formation<\/strong>: V\u00e9rifiez si le fournisseur propose un support suffisant et des sessions de formation pour aider votre \u00e9quipe \u00e0 se familiariser avec le syst\u00e8me.<\/li>\n<\/ul>\n\n\n\n<p>Bien que plusieurs options de syst\u00e8mes MES soient disponibles, le bon choix sera toujours celui qui s&rsquo;aligne le mieux avec les besoins uniques et les plans de croissance de votre entreprise.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-and-erp\">MES et ERP<\/h2>\n\n\n\n<p>En plongeant dans les complexit\u00e9s des logiciels industriels, le d\u00e9bat \u00ab <a href=\"\/fr\/ressources\/mes-vs-erp-quelle-est-la-difference\/\">MES vs ERP<\/a> \u00bb surgit fr\u00e9quemment, et il est facile de comprendre pourquoi.<\/p>\n\n\n\n<p class=\"has-text-align-left\">Le MES et l&rsquo;&nbsp;<a href=\"\/fr\/ressources\/erp-manufacturier\/\" target=\"_blank\" rel=\"noreferrer noopener\">ERP<\/a>&nbsp;n\u00e9cessitent souvent des \u00e9claircissements car il est difficile de dire o\u00f9 l&rsquo;un s&rsquo;arr\u00eate et l&rsquo;autre commence. Les deux syst\u00e8mes ont des fonctions qui se chevauchent et, dans certains cas rudimentaires, le MES n&rsquo;est m\u00eame pas requis. N\u00e9anmoins, optimiser le fonctionnement d&rsquo;une usine peut s&rsquo;av\u00e9rer difficile avec l&rsquo;ERP seul.<\/p>\n\n\n\n<p>L&rsquo;ERP (Enterprise Resource Planning) est un syst\u00e8me logiciel con\u00e7u pour g\u00e9rer l&rsquo;ensemble d&rsquo;une entreprise. Il tente d&rsquo;int\u00e9grer et de g\u00e9rer tous les aspects des activit\u00e9s d&rsquo;une soci\u00e9t\u00e9. L&rsquo;ERP fonctionne comme une base de donn\u00e9es d&rsquo;\u00e9v\u00e9nements constamment mise \u00e0 jour \u00e0 tous les niveaux. Cette information peut \u00eatre utilis\u00e9e manuellement ou automatiquement pour g\u00e9rer les ressources n\u00e9cessaires \u00e0 un fonctionnement optimal.<\/p>\n\n\n\n<p>Le MES, en revanche, ne s\u2019\u00e9tend pas au-del\u00e0 de l\u2019environnement de l\u2019usine. Sa mission principale est d\u2019\u00e9valuer les ressources dont il dispose (mati\u00e8res premi\u00e8res, personnel, \u00e9quipements) et de d\u00e9terminer comment les utiliser pour fabriquer au mieux les produits command\u00e9s. Cela comprend notamment l\u2019<a href=\"\/fr\/ressources\/qu-est-ce-que-l-ordonnancement-de-production\/\">ordonnancement de production<\/a>, la maintenance des \u00e9quipements, la gestion des stocks, le contr\u00f4le qualit\u00e9 et la documentation.<\/p>\n\n\n\n<p>Dans une situation optimale, les ERP peuvent faire des pr\u00e9dictions bas\u00e9es sur les projections du march\u00e9 pour la demande future de certains produits et transmettre ces informations au MES. Le MES peut alors ajuster la production pour r\u00e9pondre aux besoins de l&rsquo;ERP. Le Manufacturing Execution System peut allouer plus de ressources pour fabriquer des produits \u00e0 forte demande de mani\u00e8re optimale et automatique. De cette fa\u00e7on, l&rsquo;ERP et le MES peuvent travailler ensemble de mani\u00e8re transparente.<\/p>\n\n\n\n<p>Bien qu&rsquo;un ERP&nbsp;<em>puisse&nbsp;<\/em>\u00eatre utilis\u00e9 pour g\u00e9rer m\u00eame les plus petits d\u00e9tails d&rsquo;un processus de fabrication, cette t\u00e2che est souvent mieux laiss\u00e9e au Manufacturing Execution System. Le logiciel ERP g\u00e8re id\u00e9alement ce qui entre dans l&rsquo;usine et ce qui en sort, tandis que le MES g\u00e8re tout ce qui se passe \u00e0 l&rsquo;int\u00e9rieur du b\u00e2timent de l&rsquo;usine.<\/p>\n\n\n\n<p>L&rsquo;int\u00e9gration des syst\u00e8mes MES et ERP n&rsquo;est pas seulement une question de commodit\u00e9, c&rsquo;est une d\u00e9cision strat\u00e9gique qui peut r\u00e9volutionner les op\u00e9rations d&rsquo;une entreprise. Lorsque ces deux syst\u00e8mes puissants se synchronisent, ils offrent une vue harmonis\u00e9e des op\u00e9rations de fabrication et des processus commerciaux, garantissant que les d\u00e9cisions sont bas\u00e9es sur des donn\u00e9es compl\u00e8tes et en temps r\u00e9el. Une telle int\u00e9gration \u00e9limine les t\u00e2ches redondantes, comble les lacunes d&rsquo;information et booste l&rsquo;efficacit\u00e9 globale.<\/p>\n\n\n\n<p>L&rsquo;<a href=\"\/fr\/ressources\/la-puissance-de-lintegration-mes-erp\/\" target=\"_blank\" rel=\"noreferrer noopener\">int\u00e9gration MES ERP<\/a>&nbsp;apporte une perspective unifi\u00e9e et coh\u00e9rente, positionnant les entreprises pour \u00eatre plus agiles, r\u00e9actives et comp\u00e9titives.&nbsp;<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-benefits-of-using-mes\">Avantages de l&rsquo;utilisation du MES<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Un MES collecte les donn\u00e9es de production aupr\u00e8s des \u00e9quipements connect\u00e9s, des op\u00e9rateurs et des autres syst\u00e8mes, puis les met \u00e0 disposition de l\u2019\u00e9quipe. Les responsables peuvent s\u2019appuyer sur ces informations pour rep\u00e9rer les retards et d\u00e9cider des changements \u00e0 apporter. Les enregistrements des activit\u00e9s de production, de l\u2019utilisation des mati\u00e8res et des contr\u00f4les qualit\u00e9 contribuent au contr\u00f4le de la qualit\u00e9 et des stocks.<\/p>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"720\" height=\"560\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png\" alt=\"SkyPlanner planification et ordonnancement avanc\u00e9s planification de la production\" class=\"wp-image-2061\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png 720w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1-300x233.png 300w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n<\/div><\/div>\n\n\n<p><a href=\"\/fr\/ressources\/comment-optimiser-le-delai-dexecution-dans-la-fabrication\/\" target=\"_blank\" rel=\"noreferrer noopener\">Optimiser les d\u00e9lais de fabrication est essentiel \u00e0 la r\u00e9ussite<\/a>, et un syst\u00e8me MES y contribue en rendant visibles l\u2019avancement des op\u00e9rations et les retards. Lorsqu\u2019une commande change, les donn\u00e9es de production \u00e0 jour aident l\u2019\u00e9quipe \u00e0 d\u00e9terminer les op\u00e9rations restantes et \u00e0 \u00e9valuer la faisabilit\u00e9 du changement. L\u2019effet sur les d\u00e9lais de fabrication d\u00e9pend de la capacit\u00e9 disponible, des mati\u00e8res et du travail d\u00e9j\u00e0 r\u00e9alis\u00e9 ; la personnalisation n\u2019est pas sans perturbations.<\/p>\n\n\n\n<p>Le MES peut transmettre les r\u00e9sultats de production \u00e0 l\u2019ERP pour que les donn\u00e9es de l\u2019entreprise restent coh\u00e9rentes avec l\u2019activit\u00e9 de l\u2019atelier. L\u2019ERP prend en charge les processus \u00e0 l\u2019\u00e9chelle de l\u2019entreprise, tandis que le MES fournit les d\u00e9tails de l\u2019ex\u00e9cution. Ces deux syst\u00e8mes sont compl\u00e9mentaires et communiquent gr\u00e2ce \u00e0 leur int\u00e9gration.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-future-applications-of-manufacturing-execution-system\">Applications futures du Manufacturing Execution System<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Les futures applications du MES pourraient associer les donn\u00e9es de production \u00e0 des outils d\u2019analyse et \u00e0 l\u2019IA pour aider les \u00e9quipes \u00e0 rep\u00e9rer des tendances et \u00e0 r\u00e9agir aux changements. Les outils de pr\u00e9vision doivent \u00eatre \u00e9valu\u00e9s \u00e0 partir des donn\u00e9es de production r\u00e9elles et des d\u00e9cisions qu\u2019ils sont cens\u00e9s \u00e9clairer.<\/p>\n\n\n\n<p>L\u2019ordonnancement fond\u00e9 sur l\u2019IA joue d\u00e9j\u00e0 un r\u00f4le concret aux c\u00f4t\u00e9s du MES. Dans SkyPlanner APS, les planificateurs d\u00e9finissent les priorit\u00e9s et les contraintes, puis Arcturus calcule l\u2019ordonnancement \u00e0 partir des donn\u00e9es de production, des capacit\u00e9s et des mati\u00e8res. Les planificateurs gardent la ma\u00eetrise gr\u00e2ce \u00e0 ces r\u00e8gles et \u00e0 ces verrouillages. Il s\u2019agit d\u2019automatiser l\u2019ordonnancement, et non de g\u00e9rer l\u2019ensemble de l\u2019entreprise de mani\u00e8re autonome.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-take-your-company-s-process-management-to-the-next-level\">Faites passer la gestion des processus de votre entreprise au niveau sup\u00e9rieur !<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Int\u00e9grer un syst\u00e8me MES \u00e0 un <a href=\"\/fr\/\">APS comme SkyPlanner<\/a> permet de relier les donn\u00e9es d\u2019ex\u00e9cution de la production \u00e0 l\u2019ordonnancement. <a href=\"\/fr\/fonctionnalites\/\">SkyPlanner APS<\/a> s\u2019int\u00e8gre \u00e0 tout syst\u00e8me ERP ou MES via son interface REST API ouverte, pour exploiter ces donn\u00e9es dans une planification fond\u00e9e sur les priorit\u00e9s d\u00e9finies par les planificateurs de production.<\/p>\n\n\n\n<p>Lorsque les commandes, les capacit\u00e9s ou l\u2019avancement de la production changent, SkyPlanner APS utilise Arcturus pour recalculer l\u2019ordonnancement en respectant les r\u00e8gles et les priorit\u00e9s du planificateur. Lorsque Autopilot est activ\u00e9, ces changements peuvent d\u00e9clencher un r\u00e9ordonnancement automatique, tout en maintenant les r\u00e8gles et les verrouillages en vigueur. Le diagramme de Gantt affiche le travail ordonnanc\u00e9 sur les diff\u00e9rents postes de travail, afin que l\u2019\u00e9quipe puisse consulter le plan de production actualis\u00e9.<\/p>\n\n\n\n<p>Vous souhaitez tirer parti de la puissance combin\u00e9e du <a href=\"\/fr\/ressources\/planification-et-ordonnancement-avances\/\">MES et de l\u2019APS<\/a> pour vos op\u00e9rations ? <a href=\"\/fr\/contacter-les-ventes\/\">Contactez-nous pour en savoir plus !<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner planification et ordonnancement avanc\u00e9s Solutions to production problems\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-907bb0ac gb-headline-text\">Foire aux questions<\/h2>\n\n\n\n<p>Voici quelques questions fr\u00e9quemment pos\u00e9es sur les Manufacturing Execution Systems (MES) pour vous aider \u00e0 approfondir cet aspect vital des processus de fabrication modernes. Ces FAQ offrent un regard complet sur le Manufacturing Execution System, de sa d\u00e9finition de base \u00e0 la mani\u00e8re dont il se distingue d&rsquo;autres syst\u00e8mes comme l&rsquo;ERP. Que vous vous interrogiez sur ses fonctions, que vous souhaitiez comprendre les caract\u00e9ristiques des syst\u00e8mes MES contemporains ou que vous vouliez d\u00e9couvrir les complexit\u00e9s de son \u00e9volution, cette section FAQ a toutes les r\u00e9ponses. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6030632f gb-headline-text\">Qu&rsquo;est-ce qu&rsquo;un Manufacturing Execution System (MES) ?<\/h4>\n\n\n\n<p>Un MES est un logiciel qui suit, documente et accompagne l\u2019ex\u00e9cution de la production en atelier. Il collecte des donn\u00e9es aupr\u00e8s des op\u00e9rateurs, des \u00e9quipements et des syst\u00e8mes connect\u00e9s pour rendre visibles l\u2019avancement des op\u00e9rations, l\u2019utilisation des mati\u00e8res et la qualit\u00e9.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-60855819 gb-headline-text\">En quoi le MES diff\u00e8re-t-il de l&rsquo;ERP ?<\/h4>\n\n\n\n<p>Alors que l&rsquo;Enterprise Resource Planning (ERP) est con\u00e7u pour g\u00e9rer l&rsquo;ensemble d&rsquo;une entreprise en int\u00e9grant et en g\u00e9rant tous les aspects, le MES se concentre sp\u00e9cifiquement sur les activit\u00e9s au sein de l&rsquo;environnement de l&rsquo;usine de fabrication, optimisant les ressources et les processus.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-357c70af gb-headline-text\">Quelles sont les fonctions primaires du Manufacturing Execution System ?<\/h4>\n\n\n\n<p>Certaines fonctions de base de cet outil incluent l&rsquo;acquisition de donn\u00e9es, le contr\u00f4le qualit\u00e9, l&rsquo;ordonnancement, l&rsquo;analyse de performance, le flux de produits et la gestion des ressources, entre autres.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-33cf3c20 gb-headline-text\">Quelles fonctionnalit\u00e9s les syst\u00e8mes MES modernes offrent-ils ?<\/h4>\n\n\n\n<p>Les syst\u00e8mes MES modernes disposent de fonctionnalit\u00e9s telles que la surveillance de la fabrication en temps r\u00e9el, le contr\u00f4le qualit\u00e9 dans la fabrication, l&rsquo;optimisation des stocks, la gestion des flux de donn\u00e9es, l&rsquo;analyse de la fabrication et le suivi de la production.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-68c7368f gb-headline-text\">Comment la d\u00e9finition du MES a-t-elle \u00e9volu\u00e9 au fil du temps ?<\/h4>\n\n\n\n<p>Les mod\u00e8les des fonctions MES ont contribu\u00e9, au fil du temps, \u00e0 d\u00e9crire les activit\u00e9s d\u2019ex\u00e9cution de la production. MESA a publi\u00e9 plusieurs mod\u00e8les destin\u00e9s aux entreprises industrielles. ISA-95 traite de l\u2019int\u00e9gration du pilotage de la production et des fonctions de l\u2019entreprise \u00e0 travers des mod\u00e8les, une terminologie et des \u00e9changes d\u2019informations communs ; ce n\u2019est pas une liste fig\u00e9e de fonctionnalit\u00e9s obligatoires pour un MES.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-457889a7 gb-headline-text\">Quels types de solutions MES sont disponibles ?<\/h4>\n\n\n\n<p>Les solutions de Manufacturing Execution System peuvent \u00eatre bas\u00e9es sur le cloud, sur site, adapt\u00e9es aux petites entreprises, pilot\u00e9es par l&rsquo;AI, con\u00e7ues pour les grandes entreprises ou sp\u00e9cifiques \u00e0 certaines industries comme la pharmacie.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-834d5e64 gb-headline-text\">Comment l&rsquo;int\u00e9gration du MES avec d&rsquo;autres syst\u00e8mes peut-elle b\u00e9n\u00e9ficier \u00e0 une entreprise ?<\/h4>\n\n\n\n<p>Le MES fournit les donn\u00e9es d\u2019ex\u00e9cution de la production, tandis que l\u2019APS calcule l\u2019ordonnancement. SkyPlanner APS se connecte \u00e0 tout syst\u00e8me ERP ou MES via son interface REST API ouverte. Arcturus ordonnance le travail \u00e0 partir des donn\u00e9es de production et des priorit\u00e9s d\u00e9finies par les planificateurs, et le diagramme de Gantt affiche le plan de production obtenu.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e467a7a gb-headline-text\">Comment le MES s&rsquo;adaptera-t-il \u00e0 l&rsquo;avenir ?<\/h4>\n\n\n\n<p>Le MES pourrait associer de plus en plus les donn\u00e9es de production \u00e0 des outils d\u2019analyse et d\u2019aide fond\u00e9s sur l\u2019IA. L\u2019ordonnancement APS aux c\u00f4t\u00e9s du MES en est d\u00e9j\u00e0 une application concr\u00e8te : les planificateurs d\u00e9finissent les priorit\u00e9s, et un moteur d\u2019ordonnancement recalcule le plan de production \u00e0 mesure que celle-ci \u00e9volue. L\u2019automatisation de l\u2019ordonnancement reste encadr\u00e9e par les r\u00e8gles et les contraintes du planificateur.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS \u2013 Vue de la planification et de l&#x27;ordonnancement de la production\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">Propulsez votre production avec SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">R\u00e9servez une d\u00e9monstration avec notre \u00e9quipe technique pour voir comment SkyPlanner APS fonctionne en conditions r\u00e9elles.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/fr\/contacter-les-ventes\/\" aria-label=\"R\u00e9server une d\u00e9mo\">R\u00e9server une d\u00e9mo<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":7047,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[304,2679],"tags":[],"class_list":["post-7102","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ressources","category-systemes-mes","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Syst\u00e8me MES \u2013 Ce que c&#039;est et ce qu&#039;il fait | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"MES (Manufacturing Execution System) est un syst\u00e8me int\u00e9gr\u00e9 de capteurs et de logiciels qui suit, documente et contr\u00f4le la production.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Syst\u00e8me MES \u2013 Ce que c&#039;est et ce qu&#039;il fait\" \/>\n<meta property=\"og:description\" content=\"MES (Manufacturing Execution System) est un syst\u00e8me int\u00e9gr\u00e9 de capteurs et de logiciels qui suit, documente et contr\u00f4le la production.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-01T11:45:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T14:05:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"Syst\u00e8me MES \u2013 Ce que c&rsquo;est et ce qu&rsquo;il fait\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/\"},\"wordCount\":3687,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"articleSection\":[\"ressources\",\"Syst\u00e8mes MES\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/\",\"name\":\"Syst\u00e8me MES \u2013 Ce que c'est et ce qu'il fait | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"description\":\"MES (Manufacturing Execution System) est un syst\u00e8me int\u00e9gr\u00e9 de capteurs et de logiciels qui suit, documente et contr\u00f4le la production.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"MES - What it is and what it does header image\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/systeme-mes-definition-et-fonctionnement\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Articles\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Syst\u00e8me MES \u2013 Ce que c&#8217;est et ce qu&#8217;il fait\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Syst\u00e8me MES \u2013 Ce que c'est et ce qu'il fait | SkyPlanner APS","description":"MES (Manufacturing Execution System) est un syst\u00e8me int\u00e9gr\u00e9 de capteurs et de logiciels qui suit, documente et contr\u00f4le la production.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/","og_locale":"fr_FR","og_type":"article","og_title":"Syst\u00e8me MES \u2013 Ce que c'est et ce qu'il fait","og_description":"MES (Manufacturing Execution System) est un syst\u00e8me int\u00e9gr\u00e9 de capteurs et de logiciels qui suit, documente et contr\u00f4le la production.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/","og_site_name":"SkyPlanner","article_published_time":"2022-09-01T11:45:00+00:00","article_modified_time":"2026-10-10T14:05:53+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","type":"image\/jpeg"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Jesse Sinisalo","Dur\u00e9e de lecture estim\u00e9e":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"Syst\u00e8me MES \u2013 Ce que c&rsquo;est et ce qu&rsquo;il fait","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/"},"wordCount":3687,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","articleSection":["ressources","Syst\u00e8mes MES"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/","name":"Syst\u00e8me MES \u2013 Ce que c'est et ce qu'il fait | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","description":"MES (Manufacturing Execution System) est un syst\u00e8me int\u00e9gr\u00e9 de capteurs et de logiciels qui suit, documente et contr\u00f4le la production.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","width":1920,"height":1280,"caption":"MES - What it is and what it does header image"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Articles","item":"https:\/\/skyplanner.ai\/fr\/ressources\/"},{"@type":"ListItem","position":3,"name":"Syst\u00e8me MES \u2013 Ce que c&#8217;est et ce qu&#8217;il fait"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",360,240,false]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/fr\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/7102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=7102"}],"version-history":[{"count":4,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/7102\/revisions"}],"predecessor-version":[{"id":95231,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/7102\/revisions\/95231"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/7047"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=7102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=7102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=7102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}