{"id":42759,"date":"2024-09-17T10:45:35","date_gmt":"2024-09-17T10:45:35","guid":{"rendered":"https:\/\/skyplanner.ai\/ressources\/ameliorer-la-gestion-des-stocks-pour-la-fabrication\/"},"modified":"2026-09-03T18:57:53","modified_gmt":"2026-09-03T18:57:53","slug":"ameliorer-gestion-stocks-industrie","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/","title":{"rendered":"Am\u00e9liorer la gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-improve-inventory-management-for-manufacturing\">Am\u00e9liorer la gestion des stocks pour la fabrication<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/\">Home<\/a>\u00a0\u00bb\u00a0<a href=\"https:\/\/skyplanner.ai\/resources\/\">Resources<\/a>\u00a0\u00bb\u00a0<strong>Am\u00e9liorer la gestion des stocks pour la fabrication<\/strong><\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Temps de lecture estim\u00e9 : <\/span><span class=\"yoast-reading-time__reading-time\">14<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>La gestion des stocks pour la fabrication consiste \u00e0 superviser la commande, le stockage et l&rsquo;utilisation des mat\u00e9riaux, des composants et des produits finis de mani\u00e8re efficace.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>L&rsquo;une des principales priorit\u00e9s des planificateurs de la production est d&rsquo;\u00e9viter les p\u00e9nalit\u00e9s li\u00e9es aux retards de fabrication.\nImaginez que vous supervisez un projet crucial pour un client important.\nTout semble en bonne voie jusqu&rsquo;\u00e0 ce que vous r\u00e9alisiez qu&rsquo;un composant essentiel manque dans vos stocks et que vous devez interrompre la commande.\nDes appels t\u00e9l\u00e9phoniques fr\u00e9n\u00e9tiques sont pass\u00e9s aux fournisseurs pour voir s&rsquo;il est possible d&rsquo;obtenir ce mat\u00e9riel, mais il n&rsquo;arrivera pas avant des semaines.\nNon seulement les d\u00e9lais ne sont pas respect\u00e9s, mais l&rsquo;entreprise doit faire face \u00e0 de lourdes p\u00e9nalit\u00e9s, \u00e0 une atteinte \u00e0 sa r\u00e9putation et, pire encore, \u00e0 un client m\u00e9content.    <\/p>\n\n\n\n<p>\u00c7a vous semble familier ? Si vous travaillez dans le secteur manufacturier, il y a de fortes chances que vous ayez d\u00e9j\u00e0 v\u00e9cu ce sc\u00e9nario cauchemardesque plus d&#039;une fois. Une mauvaise gestion des stocks en fabrication, caus\u00e9e par des erreurs de planification manuelle, un manque de donn\u00e9es en temps r\u00e9el et d&#039;autres facteurs, peut entra\u00eener des ruptures de stock ou des surstocks co\u00fbteux, ce qui peut plonger m\u00eame les op\u00e9rations les mieux organis\u00e9es dans le chaos. Voici la bonne nouvelle : ce cauchemar est enti\u00e8rement \u00e9vitable.<\/p>\n\n\n\n<p>Dans cet article, nous verrons pourquoi la gestion des stocks dans l&rsquo;industrie manufacturi\u00e8re est si essentielle, quels outils et strat\u00e9gies vous pouvez utiliser pour l&rsquo;am\u00e9liorer et comment l&rsquo;adoption des bonnes pratiques peut vous aider \u00e0 \u00e9viter des erreurs co\u00fbteuses et \u00e0 faire en sorte que vos op\u00e9rations se d\u00e9roulent comme sur des roulettes.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3df69bf8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable des mati\u00e8res\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#am\u00e9liorer-la-gestion-des-stocks-pour-la-fabrication\" class=\"uagb-toc-link__trigger\">Am\u00e9liorer la gestion des stocks pour la fabrication<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#quest-ce-que-la-gestion-des-stocks-pour-lindustrie-manufacturi\u00e8re\" class=\"uagb-toc-link__trigger\">Qu&#039;est-ce que la gestion des stocks pour l&#039;industrie manufacturi\u00e8re ?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#comment-fonctionne-la-gestion-des-stocks-dans-lindustrie-manufacturi\u00e8re\" class=\"uagb-toc-link__trigger\">Comment fonctionne la gestion des stocks dans l&#039;industrie manufacturi\u00e8re ?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#quels-sont-les-5-\u00e9l\u00e9ments-de-la-gestion-des-stocks\" class=\"uagb-toc-link__trigger\">Quels sont les 5 \u00e9l\u00e9ments de la gestion des stocks ?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#3-techniques-utilis\u00e9es-pour-la-gestion-des-stocks\" class=\"uagb-toc-link__trigger\">3 techniques utilis\u00e9es pour la gestion des stocks<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#7-conseils-pour-rationaliser-la-gestion-des-stocks\" class=\"uagb-toc-link__trigger\">7 conseils pour rationaliser la gestion des stocks<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#gardez-le-contr\u00f4le-de-vos-stocks-gardez-le-contr\u00f4le-de-votre-entreprise\" class=\"uagb-toc-link__trigger\">Gardez le contr\u00f4le de vos stocks, gardez le contr\u00f4le de votre entreprise !<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-inventory-management-for-manufacturing\">Qu&rsquo;est-ce que la gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re ?<\/h2>\n\n\n\n<p><strong>La gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re consiste \u00e0 superviser la commande, le stockage et l&rsquo;utilisation des mati\u00e8res premi\u00e8res, des composants et des produits finis<\/strong>.\nCe processus comprend le suivi des niveaux de stocks, la gestion des emplacements des stocks et la garantie que les bons produits sont disponibles lorsqu&rsquo;ils sont n\u00e9cessaires.\nCette approche permet aux fabricants de maintenir l&rsquo;\u00e9quilibre en \u00e9vitant les ruptures de stock, le surstockage ou la pr\u00e9sence de stocks obsol\u00e8tes sur les \u00e9tag\u00e8res sans raison d&rsquo;\u00eatre.  <\/p>\n\n\n\n<p><strong>Dans l&rsquo;ensemble, la gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re<\/strong> <strong>ne se limite pas \u00e0 un simple suivi des stocks<\/strong>.\nIl s&rsquo;agit de comprendre l&rsquo;ensemble du cycle de vie des mat\u00e9riaux et des produits, depuis leur entr\u00e9e dans l&rsquo;usine jusqu&rsquo;\u00e0 leur sortie en tant que produits finis pr\u00eats \u00e0 \u00eatre livr\u00e9s au client.   <\/p>\n\n\n\n<p>Une bonne gestion des stocks est align\u00e9e sur la pr\u00e9vision de la demande, la coordination et la communication avec les fournisseurs, ainsi que sur la garantie que les plans de production se d\u00e9roulent sans heurts et sans retards. Heureusement, l&#039;un des avantages d&#039;un syst\u00e8me <a href=\"https:\/\/skyplanner.ai\/resources\/aps-system-benefits\/\">APS<\/a> est qu&#039;il contribue \u00e0 am\u00e9liorer la gestion des stocks et \u00e0 simplifier ce processus. Cette approche aide \u00e0 contr\u00f4ler et \u00e0 r\u00e9duire les co\u00fbts, soutient une planification de la production plus fluide et am\u00e9liore la satisfaction des clients, ce qui conduit \u00e0 une croissance commerciale \u00e0 long terme.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Comment fonctionne la gestion des stocks dans l&rsquo;industrie manufacturi\u00e8re ?<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>R\u00e9ception des stocks :<\/strong> Le processus commence lorsque les stocks sont re\u00e7us des fournisseurs.\nLes produits entrants sont inspect\u00e9s pour s&rsquo;assurer de leur qualit\u00e9 et de leur exactitude.\nIl est essentiel de comparer les quantit\u00e9s livr\u00e9es avec les bons de commande pour \u00e9viter les retards de production.  <\/li>\n\n\n\n<li><strong>Stockage des stocks :<\/strong> Apr\u00e8s l&rsquo;inspection, les produits sont stock\u00e9s dans les zones qui leur sont r\u00e9serv\u00e9es.\nUne bonne organisation \u00e0 ce stade permet de les retrouver rapidement et facilement en cas de besoin. <\/li>\n\n\n\n<li><strong>Gestion des commandes des clients :<\/strong> Lorsque les clients passent des commandes, la personne responsable suit et attribue les stocks.\nIl s&rsquo;agit de mettre \u00e0 jour les niveaux de stock et de pr\u00e9parer les articles n\u00e9cessaires \u00e0 l&rsquo;ex\u00e9cution de la commande. <\/li>\n\n\n\n<li><strong>Ex\u00e9cution des commandes et exp\u00e9dition :<\/strong> L&rsquo;\u00e9tape suivante consiste \u00e0 s\u00e9lectionner, emballer et exp\u00e9dier les bons produits aux clients.\nLe respect des d\u00e9lais permet de maintenir la satisfaction des clients, de se forger une bonne r\u00e9putation et d&rsquo;\u00e9viter les p\u00e9nalit\u00e9s en cas de retard. <\/li>\n\n\n\n<li><strong>V\u00e9rification de l&rsquo;inventaire :<\/strong> Des audits r\u00e9guliers permettent de s&rsquo;assurer que l&rsquo;inventaire physique correspond aux enregistrements du syst\u00e8me.\nL&rsquo;audit permet d&rsquo;\u00e9viter les probl\u00e8mes tels que les stocks exc\u00e9dentaires, les ruptures de stock ou les articles mal plac\u00e9s. <\/li>\n\n\n\n<li><strong>R\u00e9organisation des stocks :<\/strong> La derni\u00e8re \u00e9tape consiste \u00e0 r\u00e9organiser les stocks lorsque les niveaux atteignent un seuil pr\u00e9d\u00e9fini.\nCela permet de s&rsquo;assurer que les mat\u00e9riaux sont r\u00e9approvisionn\u00e9s avant qu&rsquo;ils ne soient \u00e9puis\u00e9s, ce qui permet \u00e0 la production de se d\u00e9rouler sans interruption. <\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-are-the-5-elements-of-inventory-management\">Quels sont les 5 \u00e9l\u00e9ments de la gestion des stocks ?<\/h2>\n\n\n\n<p><strong>Pr\u00e9vision de la demande :<\/strong> Il s&rsquo;agit de pr\u00e9voir ce que les clients voudront \u00e0 l&rsquo;avenir.\nVous \u00e9tudiez les tendances et les donn\u00e9es pour calculer la quantit\u00e9 d&rsquo;un produit que les gens ach\u00e8teront afin que l&rsquo;entreprise n&rsquo;en ait pas trop ou pas assez. <\/p>\n\n\n\n<p><strong>La planification des stocks :<\/strong> Il s&rsquo;agit ici de d\u00e9terminer exactement la quantit\u00e9 de produits que vous devez avoir sous la main.\nVous ne voulez pas en manquer, mais vous ne voulez pas non plus en avoir trop.\nVous tenez compte d&rsquo;\u00e9l\u00e9ments tels que le temps n\u00e9cessaire pour en obtenir davantage, la n\u00e9cessit\u00e9 d&rsquo;en avoir un peu plus au cas o\u00f9, et la fr\u00e9quence \u00e0 laquelle vous devez passer une nouvelle commande.  <\/p>\n\n\n\n<p><strong>Suivi et contr\u00f4le des stocks :<\/strong> Il s&rsquo;agit de garder un \u0153il sur ce qui est en stock \u00e0 tout moment.\nVous suivez les entr\u00e9es et les sorties et vous vous assurez que rien n&rsquo;est perdu ou vol\u00e9.\nSi quelque chose ne va pas, vous le corrigez.  <\/p>\n\n\n\n<p><strong>Approvisionnement :<\/strong> Il s&rsquo;agit essentiellement de la partie achats.\nVous commandez ce dont vous avez besoin pour assurer le bon fonctionnement de l&rsquo;entreprise.\nVous vous assurez que les produits vous parviennent de vos fournisseurs et qu&rsquo;ils sont pr\u00eats \u00e0 r\u00e9pondre \u00e0 la demande des clients.  <\/p>\n\n\n\n<p><strong>Optimisation des stocks :<\/strong> Il s&rsquo;agit de s&rsquo;assurer que votre entreprise fonctionne de mani\u00e8re efficace.\nVous cherchez des moyens de d\u00e9penser moins pour les stocks tout en continuant \u00e0 faire avancer les choses rapidement.\nVous pouvez r\u00e9duire la quantit\u00e9 de produits stock\u00e9s ou trouver un moyen de vendre les produits plus rapidement, soit par le biais de transactions, soit en rationalisant le processus de fabrication.\nIl s&rsquo;agit d&rsquo;\u00e9conomiser de l&rsquo;argent et de stimuler les ventes !   <\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-3-techniques-used-for-inventory-management\">3 techniques utilis\u00e9es pour la gestion des stocks<\/h2>\n\n\n\n<p><strong>Strat\u00e9gie de pouss\u00e9e :<\/strong> Les entreprises stockent des produits en fonction des pr\u00e9visions de la demande.\nElles pr\u00e9disent ce dont les clients auront besoin ; un exemple simple serait un magasin qui commanderait de nombreux grils en \u00e9t\u00e9.\nCette strat\u00e9gie fonctionne bien si vous pouvez pr\u00e9dire la demande avec pr\u00e9cision.  <\/p>\n\n\n\n<p><strong>Strat\u00e9gie d&rsquo;attraction :<\/strong> Dans ce cas, les entreprises ne commandent les produits que lorsque les clients les ach\u00e8tent, comme les robes de mari\u00e9e qui sont fabriqu\u00e9es apr\u00e8s la commande de la mari\u00e9e.\nCette strat\u00e9gie est id\u00e9ale pour les articles sp\u00e9cialis\u00e9s ou co\u00fbteux, mais pas pour les produits de tous les jours que les gens veulent obtenir rapidement. <\/p>\n\n\n\n<p>Strat\u00e9gie Just-in-Time (JIT) : Cette strat\u00e9gie est avant tout une question d&#039;innovation et d&#039;efficacit\u00e9. Vous ne d\u00e9pensez pas d&#039;argent et n&#039;occupez pas d&#039;espace pour des choses dont vous n&#039;avez pas encore besoin. Au lieu de cela, vous commandez ou fabriquez des produits uniquement lorsque vous \u00eates pr\u00eat \u00e0 les vendre. Le JIT permet d&#039;\u00e9conomiser de l&#039;argent et d&#039;\u00e9viter d&#039;avoir des articles en surplus qui s&#039;accumulent. Cependant, l&#039;inconv\u00e9nient est que vous pourriez vous retrouver en rupture de stock si vos fournisseurs ne sont pas fiables, ce qui signifie des clients m\u00e9contents. Donc, cela fonctionne tr\u00e8s bien quand tout se passe sans accroc, mais vous avez besoin que tout soit \u00e0 l&#039;heure.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-7-tips-to-streamline-inventory-management\">7 conseils pour rationaliser la gestion des stocks<\/h2>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-set-minimum-stock-levels\">Fixer des niveaux de stock minimums<\/h4>\n\n\n\n<p>C&rsquo;est l&rsquo;une des r\u00e8gles de base que tout fabricant devrait respecter, car vous ne voulez jamais \u00eatre celui qui dit \u00e0 un client : \u00ab\u00a0D\u00e9sol\u00e9, nous n&rsquo;avons plus cette pi\u00e8ce cruciale\u00a0\u00bb.\nFixez des niveaux de stock minimum pour tous les mat\u00e9riaux et produits cl\u00e9s afin d&rsquo;\u00e9viter de tels d\u00e9sastres.\nLorsque le stock tombe en dessous de ce niveau, passez une commande avant qu&rsquo;il ne soit trop tard.\nC&rsquo;est comme si vous faisiez le plein de votre voiture avant que le feu ne s&rsquo;allume &#8211; la pr\u00e9vention est toujours pr\u00e9f\u00e9rable \u00e0 la panique !   <\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-understand-your-supply-chain\">Comprendre votre cha\u00eene d&rsquo;approvisionnement<\/h4>\n\n\n\n<p>Vous ne pouvez pas g\u00e9rer ce que vous ne connaissez pas.\nVotre cha\u00eene d&rsquo;approvisionnement est en quelque sorte le GPS de votre stock.\nSachez d&rsquo;o\u00f9 viennent vos mati\u00e8res premi\u00e8res, combien de temps il faut pour les obtenir et ce qui pourrait entra\u00eener des retards.\nLes contretemps de la cha\u00eene d&rsquo;approvisionnement ne sont pas rares, mais le fait de conna\u00eetre le processus vous aidera \u00e0 \u00e9viter certains de ces obstacles inattendus.   <\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-track-all-product-information\">Suivre toutes les informations sur les produits<\/h4>\n\n\n\n<p>Les d\u00e9tails sont importants.\nPour chaque article de votre stock, suivez l&rsquo;UGS, le fournisseur, le pays d&rsquo;origine et tout autre \u00e9l\u00e9ment susceptible d&rsquo;influer sur la disponibilit\u00e9 ou le prix.\nAinsi, lorsqu&rsquo;un article devient plus cher ou plus difficile \u00e0 trouver, vous pouvez ajuster vos commandes en cons\u00e9quence.\nAm\u00e9liorez la gestion de vos stocks en connaissant les moindres d\u00e9tails afin de pouvoir agir rapidement en cas de changement.   <\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-move-slow-moving-or-obsolete-inventory-out\">\u00c9liminer les stocks \u00e0 rotation lente ou obsol\u00e8tes<\/h4>\n\n\n\n<p>Ce n&rsquo;est pas facile, mais soyez impitoyable.\nSi les stocks ne bougent pas, c&rsquo;est un poids mort.\nLes conserver ne fait qu&rsquo;engendrer des co\u00fbts et une mauvaise utilisation de l&rsquo;espace dans votre entrep\u00f4t.\nIdentifiez les articles \u00e0 faible rotation et \u00e9liminez-les.\nUtilisez les remises et les promotions, ou regroupez-les avec d&rsquo;autres articles.\nLib\u00e9rez de l&rsquo;espace sur les \u00e9tag\u00e8res et consacrez vos ressources \u00e0 ce qui se vend.     <\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-audit-your-inventory-regularly\">V\u00e9rifier r\u00e9guli\u00e8rement votre inventaire<\/h4>\n\n\n\n<p>Voici un conseil qui distingue les bons des grands : v\u00e9rifiez r\u00e9guli\u00e8rement votre inventaire.\nVous pensez peut-\u00eatre que tout est en ordre, mais vous ne savez jamais ce qui se trouve r\u00e9ellement sur les \u00e9tag\u00e8res tant que vous ne l&rsquo;avez pas v\u00e9rifi\u00e9.\nDes v\u00e9rifications r\u00e9guli\u00e8res vous permettent de rep\u00e9rer les \u00e9carts avant qu&rsquo;ils ne deviennent des probl\u00e8mes plus importants.\nC&rsquo;est un peu comme si vous v\u00e9rifiiez votre compte bancaire : il vaut mieux d\u00e9tecter les petits probl\u00e8mes \u00e0 temps que d&rsquo;\u00eatre pris au d\u00e9pourvu par un gros probl\u00e8me.   <\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-be-consistent-with-stock-receiving\">Soyez coh\u00e9rent avec les entr\u00e9es de stock<\/h4>\n\n\n\n<p>Lorsque de nouveaux stocks arrivent, il est tentant de les mettre en rayon et de passer \u00e0 autre chose.\nCependant, des processus de r\u00e9ception incoh\u00e9rents peuvent fausser vos chiffres.\nFormez votre \u00e9quipe \u00e0 traiter les stocks de la m\u00eame mani\u00e8re \u00e0 chaque fois.\nComptez, inspectez et enregistrez tout correctement.\nCette petite discipline peut vous aider \u00e0 am\u00e9liorer la gestion des stocks en vous assurant que tout est \u00e0 sa place.    <\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-use-the-right-tools\">Utilisez les bons outils<\/h4>\n\n\n\n<p>La planification manuelle et les tableurs peuvent sembler pratiques, mais ils ne suffiront pas \u00e0 long terme. Investir dans un syst\u00e8me <a href=\"https:\/\/skyplanner.ai\/resources\/advanced-planning-and-scheduling\/\">de planification et ordonnancement avanc\u00e9s (APS)<\/a> ou un logiciel de gestion des stocks vous fournira des donn\u00e9es en temps r\u00e9el et un meilleur contr\u00f4le de vos stocks. Sans surprise, l&rsquo;un des avantages de SkyPlanner APS est qu&rsquo;il met \u00e0 jour les stocks en temps r\u00e9el au fur et \u00e0 mesure que les ordres de fabrication sont planifi\u00e9s. Pour aller plus loin, la <a href=\"https:\/\/skyplanner.ai\/resources\/agentic-production-scheduling\/\">planification de production agentique<\/a> utilise des donn\u00e9es en temps r\u00e9el pour ajuster les plannings de mani\u00e8re autonome gr\u00e2ce \u00e0 sa fonctionnalit\u00e9 Consider the Material. Ne vous contentez pas de suivre le rythme \u2014 prenez de l&rsquo;avance !<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Gardez le contr\u00f4le de vos stocks, gardez le contr\u00f4le de votre entreprise !<\/h2>\n\n\n\n<p>D\u00e9couvrez comment la planification et l&#039;ordonnancement de la production SkyPlanner peuvent rationaliser vos processus, optimiser les stocks et \u00e9liminer les retards co\u00fbteux ! Ne manquez pas l&#039;occasion de le voir en action avec notre essai. R\u00c9SERVEZ UNE D\u00c9MO aujourd&#039;hui et vivez la transformation en temps r\u00e9el. Votre ligne de production optimis\u00e9e n&#039;est qu&#039;\u00e0 un clic !<\/p>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Am\u00e9liorer la gestion des stocks pour la fabrication Home\u00a0\u00bb\u00a0Resources\u00a0\u00bb\u00a0Am\u00e9liorer la gestion des stocks pour la fabrication La gestion des stocks pour la fabrication consiste \u00e0 superviser la commande, le stockage et l&rsquo;utilisation des mat\u00e9riaux, des composants et des produits finis de mani\u00e8re efficace. L&rsquo;une des principales priorit\u00e9s des planificateurs de la production est d&rsquo;\u00e9viter les &#8230; <a title=\"Am\u00e9liorer la gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/\" aria-label=\"Read more about Am\u00e9liorer la gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re\">Lire plus<\/a><\/p>\n","protected":false},"author":6,"featured_media":41850,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2551,304],"tags":[],"class_list":["post-42759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-performance-industrielle","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Am\u00e9liorer la gestion des stocks pour l&#039;industrie manufacturi\u00e8re &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"La gestion des stocks pour l&#039;industrie manufacturi\u00e8re consiste \u00e0 superviser efficacement la commande, le stockage et l&#039;utilisation des mat\u00e9riaux, des composants et des produits finis.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Am\u00e9liorer la gestion des stocks pour l&#039;industrie manufacturi\u00e8re\" \/>\n<meta property=\"og:description\" content=\"La gestion des stocks pour l&#039;industrie manufacturi\u00e8re consiste \u00e0 superviser efficacement la commande, le stockage et l&#039;utilisation des mat\u00e9riaux, des composants et des produits finis.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-17T10:45:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-03T18:57:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Am\u00e9liorer la gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re\",\"datePublished\":\"2024-09-17T10:45:35+00:00\",\"dateModified\":\"2026-09-03T18:57:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/\"},\"wordCount\":2250,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Improve-Inventory-Management.png\",\"articleSection\":[\"Performance industrielle\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/\",\"name\":\"Am\u00e9liorer la gestion des stocks pour l'industrie manufacturi\u00e8re &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Improve-Inventory-Management.png\",\"datePublished\":\"2024-09-17T10:45:35+00:00\",\"dateModified\":\"2026-09-03T18:57:53+00:00\",\"description\":\"La gestion des stocks pour l'industrie manufacturi\u00e8re consiste \u00e0 superviser efficacement la commande, le stockage et l'utilisation des mat\u00e9riaux, des composants et des produits finis.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Improve-Inventory-Management.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Improve-Inventory-Management.png\",\"width\":4990,\"height\":3327,\"caption\":\"Improve Inventory Management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/ameliorer-gestion-stocks-industrie\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Am\u00e9liorer la gestion des stocks pour l&#8217;industrie manufacturi\u00e8re\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Am\u00e9liorer la gestion des stocks pour l'industrie manufacturi\u00e8re &#8211; SkyPlanner","description":"La gestion des stocks pour l'industrie manufacturi\u00e8re consiste \u00e0 superviser efficacement la commande, le stockage et l'utilisation des mat\u00e9riaux, des composants et des produits finis.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/","og_locale":"fr_FR","og_type":"article","og_title":"Am\u00e9liorer la gestion des stocks pour l'industrie manufacturi\u00e8re","og_description":"La gestion des stocks pour l'industrie manufacturi\u00e8re consiste \u00e0 superviser efficacement la commande, le stockage et l'utilisation des mat\u00e9riaux, des composants et des produits finis.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/","og_site_name":"SkyPlanner","article_published_time":"2024-09-17T10:45:35+00:00","article_modified_time":"2026-09-03T18:57:53+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"SkyPlanner","Dur\u00e9e de lecture estim\u00e9e":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Am\u00e9liorer la gestion des stocks pour l&rsquo;industrie manufacturi\u00e8re","datePublished":"2024-09-17T10:45:35+00:00","dateModified":"2026-09-03T18:57:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/"},"wordCount":2250,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management.png","articleSection":["Performance industrielle","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/","name":"Am\u00e9liorer la gestion des stocks pour l'industrie manufacturi\u00e8re &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management.png","datePublished":"2024-09-17T10:45:35+00:00","dateModified":"2026-09-03T18:57:53+00:00","description":"La gestion des stocks pour l'industrie manufacturi\u00e8re consiste \u00e0 superviser efficacement la commande, le stockage et l'utilisation des mat\u00e9riaux, des composants et des produits finis.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management.png","width":4990,"height":3327,"caption":"Improve Inventory Management"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/ameliorer-gestion-stocks-industrie\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Am\u00e9liorer la gestion des stocks pour l&#8217;industrie manufacturi\u00e8re"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Improve-Inventory-Management.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/fr\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Am\u00e9liorer la gestion des stocks pour la fabrication Home\u00a0\u00bb\u00a0Resources\u00a0\u00bb\u00a0Am\u00e9liorer la gestion des stocks pour la fabrication La gestion des stocks pour la fabrication consiste \u00e0 superviser la commande, le stockage et l&rsquo;utilisation des mat\u00e9riaux, des composants et des produits finis de mani\u00e8re efficace. L&rsquo;une des principales priorit\u00e9s des planificateurs de la production est d&rsquo;\u00e9viter les\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/42759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=42759"}],"version-history":[{"count":6,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/42759\/revisions"}],"predecessor-version":[{"id":95592,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/42759\/revisions\/95592"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/41850"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=42759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=42759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=42759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}