{"id":24965,"date":"2023-10-04T11:45:15","date_gmt":"2023-10-04T11:45:15","guid":{"rendered":"https:\/\/skyplanner.ai\/ressources\/salaire-du-directeur-de-production-au-canada-2023\/"},"modified":"2026-06-19T20:56:56","modified_gmt":"2026-06-19T20:56:56","slug":"salaire-du-directeur-de-production-au-canada-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/","title":{"rendered":"Salaire d&rsquo;un responsable de production au Canada 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-manager-salary-in-canada-2026\">Salaire d&rsquo;un responsable de production au Canada 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Le salaire moyen d&rsquo;un responsable de production au Canada en 2026 est d&rsquo;environ 83,026 CAD par an, soit environ 6,919 CAD par mois avant imp\u00f4ts.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Comme dans de nombreux pays d\u00e9velopp\u00e9s, le secteur manufacturier du Canada est sur une trajectoire ascendante et ne montre aucun signe de ralentissement. Avec la croissance des industries, la demande de <a href=\"\/fr\/ressources\/fiche-metier-responsable-production\/\">responsables de production<\/a> comp\u00e9tents, ces ma\u00eetres qui assurent le fonctionnement fluide et efficace des lignes de production, a atteint de nouveaux sommets. Cet \u00e9change porte sur les perspectives financi\u00e8res qui attendent les responsables de production qui se lancent dans le paysage manufacturier dynamique du Canada en 2026.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Un pr\u00e9lude aux r\u00e9mun\u00e9rations<\/h2>\n\n\n\n<p>Avant d&rsquo;entrer dans les d\u00e9tails, il est essentiel de comprendre la situation \u00e9conomique g\u00e9n\u00e9rale au Canada. Les salaires y varient consid\u00e9rablement selon le poste, le secteur et la localisation. En moyenne, les gens gagnent environ <strong>CAD 67,104 par an<\/strong> avant imp\u00f4t.<\/p>\n\n\n\n<p>L&rsquo;attention se porte d\u00e9sormais sur la r\u00e9mun\u00e9ration d&rsquo;un responsable de production au Canada. Le salaire moyen d&rsquo;un responsable de production au Canada en 2026 tourne autour de <strong>CAD <strong>83,026<\/strong> par an<\/strong>, soit environ <strong>CAD <strong>6,919<\/strong> par mois<\/strong> avant imp\u00f4t. N\u00e9anmoins, le salaire d&rsquo;un responsable de production peut \u00eatre consid\u00e9rablement influenc\u00e9 par des facteurs tels que la situation g\u00e9ographique, l&rsquo;exp\u00e9rience et d&rsquo;autres \u00e9l\u00e9ments propres \u00e0 l&rsquo;individu ou \u00e0 l&rsquo;entreprise.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Analyse comparative des r\u00e9mun\u00e9rations : une perspective nord-am\u00e9ricaine<\/h2>\n\n\n\n<p>Lorsqu&rsquo;on la compare \u00e0 celle de pays voisins comme les \u00c9tats-Unis et le Mexique, la r\u00e9mun\u00e9ration des responsables de production au Canada appara\u00eet sous un jour particulier. Par exemple, <a href=\"\/fr\/ressources\/salaire-du-directeur-de-production-aux-etats-unis-en-2026\/\">le salaire d&rsquo;un responsable de production aux \u00c9tats-Unis<\/a> est plus \u00e9lev\u00e9 en raison de la vaste industrie manufacturi\u00e8re et du co\u00fbt de la vie plus important. \u00c0 l&rsquo;inverse, avec son secteur manufacturier en plein essor, <a href=\"\/fr\/ressources\/salaire-du-directeur-de-production-au-mexique-2026\/\">le salaire d&rsquo;un responsable de production au Mexique<\/a> offre une r\u00e9mun\u00e9ration inf\u00e9rieure, refl\u00e9tant le co\u00fbt de la vie plus bas. Ce constat confirme la position du Canada comme un territoire \u00e9quilibr\u00e9 en mati\u00e8re de co\u00fbt de la vie et de potentiel de revenus.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Les facteurs qui fa\u00e7onnent le salaire des responsables de production au Canada<\/h2>\n\n\n\n<p>Comprendre les dynamiques qui influencent le salaire d&rsquo;un responsable de production au Canada offre une vision plus claire aux personnes qui aspirent \u00e0 exercer dans ce domaine. Divers facteurs jouent un r\u00f4le d\u00e9terminant dans l&rsquo;\u00e9tablissement du paysage salarial, et ils sont d\u00e9compos\u00e9s ici pour une meilleure compr\u00e9hension :<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Formation et exp\u00e9rience :<\/strong>&nbsp;Le parcours scolaire et le niveau d&rsquo;exp\u00e9rience d&rsquo;un responsable de production ont un impact significatif sur le salaire qu&rsquo;il peut obtenir. Les personnes titulaires de dipl\u00f4mes sup\u00e9rieurs dans des domaines pertinents et dot\u00e9es d&rsquo;une riche exp\u00e9rience sont souvent en mesure de n\u00e9gocier des r\u00e9mun\u00e9rations plus \u00e9lev\u00e9es. De plus, les certifications et le perfectionnement professionnel continu contribuent \u00e0 accro\u00eetre le potentiel de revenus.<\/li>\n\n\n\n<li><strong>Comp\u00e9tences :<\/strong>&nbsp;L&rsquo;\u00e9ventail de comp\u00e9tences qu&rsquo;un responsable de production apporte est un facteur d\u00e9terminant du salaire. La ma\u00eetrise d&rsquo;outils modernes comme le syst\u00e8me APS, l&rsquo;<a href=\"\/fr\/ressources\/qu-est-ce-qu-un-erp\/\">ERP<\/a> ou le <a href=\"\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/\">syst\u00e8me MES<\/a> est tr\u00e8s appr\u00e9ci\u00e9e, car elle a un impact direct sur l&rsquo;efficacit\u00e9 et la productivit\u00e9 du processus de production. D&rsquo;autres comp\u00e9tences telles que la r\u00e9solution de probl\u00e8mes, la gestion de projet et la communication efficace jouent \u00e9galement un r\u00f4le essentiel dans la d\u00e9termination du salaire.<\/li>\n\n\n\n<li><strong>Emplacement :<\/strong>&nbsp;La situation g\u00e9ographique de l&#8217;emploi influence consid\u00e9rablement la r\u00e9mun\u00e9ration propos\u00e9e. Les provinces dot\u00e9es d&rsquo;un secteur manufacturier solide, comme l&rsquo;Ontario, le Qu\u00e9bec ou l&rsquo;Alberta, offrent souvent de meilleures r\u00e9mun\u00e9rations pour compenser le co\u00fbt de la vie plus \u00e9lev\u00e9 du Canada dans ces r\u00e9gions. Plus pr\u00e9cis\u00e9ment, les villes dot\u00e9es d&rsquo;une base industrielle dense, telles que Toronto, Montr\u00e9al et Calgary, se distinguent comme des p\u00f4les lucratifs offrant des r\u00e9mun\u00e9rations plus attractives aux responsables de production. En revanche, les r\u00e9gions o\u00f9 l&rsquo;activit\u00e9 industrielle est moindre, comme la Nouvelle-\u00c9cosse, peuvent proposer des salaires relativement plus bas en raison d&rsquo;un secteur manufacturier plus restreint et de co\u00fbts de la vie plus faibles. Ces disparit\u00e9s r\u00e9gionales mettent en lumi\u00e8re l&rsquo;importance de l&#8217;emplacement dans les perspectives financi\u00e8res des responsables de production au Canada.<\/li>\n\n\n\n<li><strong>Taille de l&rsquo;entreprise :<\/strong>&nbsp;La force financi\u00e8re d&rsquo;une entreprise, souvent refl\u00e9t\u00e9e par sa taille et l&rsquo;envergure de ses activit\u00e9s, d\u00e9termine \u00e9galement l&rsquo;\u00e9chelle salariale des responsables de production. Les grandes entreprises aux activit\u00e9s \u00e9tendues disposent des ressources n\u00e9cessaires pour offrir des r\u00e9mun\u00e9rations comp\u00e9titives. Ces entreprises valorisent l&rsquo;expertise des responsables de production qualifi\u00e9s pour assurer des processus rationalis\u00e9s, et sont ainsi dispos\u00e9es \u00e0 investir dans des r\u00e9mun\u00e9rations comp\u00e9titives.<\/li>\n\n\n\n<li><strong>Secteur de l&rsquo;entreprise :<\/strong>&nbsp;Le secteur dans lequel une entreprise \u00e9volue joue \u00e9galement un r\u00f4le crucial dans la d\u00e9termination du salaire d&rsquo;un responsable de production. Les entreprises op\u00e9rant dans des secteurs \u00e0 forte valeur ajout\u00e9e tels que l&rsquo;automobile, la pharmacie et la technologie offrent souvent des salaires plus \u00e9lev\u00e9s que celles du textile ou d&rsquo;autres industries moins capitalistiques. La complexit\u00e9 et les exigences de ces industries \u00e0 forte valeur ajout\u00e9e n\u00e9cessitent un niveau d&rsquo;expertise plus \u00e9lev\u00e9 et s&rsquo;accompagnent par cons\u00e9quent d&rsquo;une meilleure r\u00e9mun\u00e9ration.<\/li>\n<\/ol>\n\n\n\n<p>Chacun de ces facteurs interagit pour fa\u00e7onner le paysage salarial des responsables de production au Canada. En comprenant ces dynamiques, les aspirants responsables de production peuvent mieux s&rsquo;orienter sur le march\u00e9 du travail canadien, en alignant leur parcours professionnel pour optimiser leurs revenus tout en contribuant avec comp\u00e9tence au secteur manufacturier.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"Solutions de planification et d&#x27;ordonnancement avanc\u00e9es SkyPlanner aux probl\u00e8mes de production\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Que fait un responsable de production ?&nbsp;<\/h2>\n\n\n\n<p>Un responsable de production joue un r\u00f4le central dans un environnement de fabrication, en veillant \u00e0 ce que les produits soient fabriqu\u00e9s efficacement, dans les d\u00e9lais et avec la qualit\u00e9 attendue. Il planifie et coordonne les diff\u00e9rentes \u00e9tapes de la production des biens, de l&rsquo;approvisionnement en mati\u00e8res premi\u00e8res \u00e0 la supervision de la production proprement dite, en passant par le respect des normes de s\u00e9curit\u00e9. <\/p>\n\n\n\n<p>En g\u00e9rant les \u00e9quipes et les processus, il contribue \u00e0 garantir que l&rsquo;entreprise atteigne ses objectifs de production et livre les produits aux clients au moment o\u00f9 ils s&rsquo;y attendent. Le r\u00f4le d&rsquo;un responsable de production est essentiel \u00e0 la r\u00e9ussite de toute entreprise du secteur manufacturier, ce qui en fait un choix de carri\u00e8re gratifiant et marquant pour les personnes int\u00e9ress\u00e9es par ce domaine. Parmi ses responsabilit\u00e9s figurent :&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Vigilance budg\u00e9taire :<\/strong>&nbsp;Les responsables de production surveillent avec diligence les contraintes budg\u00e9taires des processus de production. Ils s&rsquo;efforcent d&rsquo;am\u00e9liorer la rentabilit\u00e9 en optimisant l&rsquo;efficacit\u00e9 \u00e0 chaque phase de la production. Gr\u00e2ce \u00e0 une gestion efficace des ressources et \u00e0 la ma\u00eetrise des co\u00fbts, ils veillent \u00e0 ce que les op\u00e9rations de production s&rsquo;alignent sur les objectifs financiers de l&rsquo;entreprise.<\/li>\n\n\n\n<li><strong>Application des protocoles de s\u00e9curit\u00e9 :<\/strong>&nbsp;L&rsquo;application des protocoles de s\u00e9curit\u00e9 est primordiale dans le r\u00f4le d&rsquo;un responsable de production. Il \u00e9tablit et fait respecter les normes de s\u00e9curit\u00e9 afin de cr\u00e9er un environnement de travail s\u00fbr. Cela implique des inspections de routine, des exercices de s\u00e9curit\u00e9 et des sessions de formation pour sensibiliser le personnel \u00e0 l&rsquo;importance de la s\u00e9curit\u00e9 et au respect des directives \u00e9tablies.<\/li>\n\n\n\n<li><strong>Collaboration interd\u00e9partementale :<\/strong>&nbsp;La performance globale d&rsquo;une entit\u00e9 de fabrication repose sur une communication et une collaboration sans faille entre les diff\u00e9rents services. Les responsables de production font office de pont, en se coordonnant avec les achats, la logistique, les ventes et d&rsquo;autres services afin d&rsquo;assurer une transition fluide des produits de la production au march\u00e9. Leur r\u00f4le dans la promotion d&rsquo;un environnement collaboratif est crucial pour la livraison dans les d\u00e9lais et la r\u00e9ussite op\u00e9rationnelle globale.<\/li>\n\n\n\n<li><strong>Int\u00e9gration d&rsquo;outils modernes :<\/strong>&nbsp;L&rsquo;int\u00e9gration d&rsquo;outils modernes est un aspect important du r\u00f4le d&rsquo;un responsable de production. Gr\u00e2ce \u00e0 l&rsquo;utilisation des technologies modernes, il favorise l&rsquo;am\u00e9lioration continue et aide l&rsquo;entreprise \u00e0 rester comp\u00e9titive dans un paysage industriel en \u00e9volution rapide. Un bon exemple est un <a href=\"\/fr\/\">syst\u00e8me APS<\/a> qui aide \u00e0 am\u00e9liorer la planification de la production, \u00e0 g\u00e9rer les ressources plus efficacement et \u00e0 augmenter consid\u00e9rablement l&rsquo;efficacit\u00e9 et la productivit\u00e9 des processus de fabrication, plut\u00f4t que d&rsquo;utiliser des <a href=\"\/fr\/ressources\/defis-planification-production-excel-alternative-skyplanner\/\">feuilles de calcul compliqu\u00e9es<\/a>.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\u00c9ventail de comp\u00e9tences : l&rsquo;arsenal essentiel<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Solides capacit\u00e9s de leadership<\/li>\n\n\n\n<li>Comp\u00e9tences pointues en r\u00e9solution de probl\u00e8mes<\/li>\n\n\n\n<li>Connaissance approfondie des processus de production<\/li>\n\n\n\n<li>Ma\u00eetrise de la gestion budg\u00e9taire<\/li>\n\n\n\n<li>Comp\u00e9tences exceptionnelles en gestion du temps<\/li>\n\n\n\n<li>Respect des r\u00e9glementations en mati\u00e8re de sant\u00e9 et de s\u00e9curit\u00e9<\/li>\n\n\n\n<li>Sens technique<\/li>\n\n\n\n<li>Comp\u00e9tences de communication efficaces<\/li>\n<\/ol>\n\n\n\n<h1 class=\"wp-block-heading\">Des avantages au-del\u00e0 du salaire : les b\u00e9n\u00e9fices suppl\u00e9mentaires<\/h1>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Avantages sant\u00e9 complets :<\/strong>&nbsp;Les responsables de production au Canada b\u00e9n\u00e9ficient souvent d&rsquo;avantages sant\u00e9 \u00e9tendus couvrant les soins m\u00e9dicaux, dentaires et optiques, garantissant leur bien-\u00eatre ainsi que celui de leurs familles.<\/li>\n\n\n\n<li><strong>R\u00e9gimes d&rsquo;\u00e9pargne-retraite :<\/strong>&nbsp;Les employeurs offrent des r\u00e9gimes d&rsquo;\u00e9pargne-retraite comme les REER (R\u00e9gimes enregistr\u00e9s d&rsquo;\u00e9pargne-retraite), aidant les responsables de production \u00e0 constituer un coussin financier pour leur vie apr\u00e8s la retraite.<\/li>\n\n\n\n<li><strong>Cong\u00e9s pay\u00e9s :<\/strong>&nbsp;Le poste s&rsquo;accompagne g\u00e9n\u00e9ralement de cong\u00e9s pay\u00e9s, permettant aux responsables de production de prendre les pauses n\u00e9cessaires pour se ressourcer personnellement ou faire face aux impr\u00e9vus de la vie sans contrainte financi\u00e8re.<\/li>\n\n\n\n<li><strong>Possibilit\u00e9s de d\u00e9veloppement professionnel :<\/strong>&nbsp;Les entreprises encouragent et financent souvent la formation continue et les possibilit\u00e9s de d\u00e9veloppement professionnel afin de favoriser l&rsquo;\u00e9volution de carri\u00e8re et le perfectionnement des comp\u00e9tences de leurs responsables de production.<\/li>\n<\/ol>\n\n\n\n<h1 class=\"wp-block-heading\">Propulsion vers l&rsquo;avenir<\/h1>\n\n\n\n<p>Au rythme actuel de l&rsquo;innovation dans le secteur manufacturier canadien, la demande de responsables de production qualifi\u00e9s devrait rester stable. L&rsquo;adoption d&rsquo;outils modernes comme le syst\u00e8me APS peut consid\u00e9rablement faciliter ce travail et contribuer \u00e0 am\u00e9liorer les processus de production, rendant le r\u00f4le des responsables de production essentiel et gratifiant dans un paysage de march\u00e9 en pleine \u00e9volution. Cet expos\u00e9 devrait servir de boussole aux aspirants responsables de production ou aux jeunes dipl\u00f4m\u00e9s d\u00e9sireux de s&rsquo;orienter dans le secteur manufacturier prometteur du Canada en 2026.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Salaire d&rsquo;un responsable de production au Canada 2026 Le salaire moyen d&rsquo;un responsable de production au Canada en 2026 est d&rsquo;environ 83,026 CAD par an, soit environ 6,919 CAD par mois avant imp\u00f4ts. Comme dans de nombreux pays d\u00e9velopp\u00e9s, le secteur manufacturier du Canada est sur une trajectoire ascendante et ne montre aucun signe de &#8230; <a title=\"Salaire d&rsquo;un responsable de production au Canada 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/\" aria-label=\"Read more about Salaire d&rsquo;un responsable de production au Canada 2026\">Lire plus<\/a><\/p>\n","protected":false},"author":6,"featured_media":23211,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2681,304],"tags":[],"class_list":["post-24965","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-carrieres-et-salaires","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Salaire d&#039;un responsable de production au Canada 2026<\/title>\n<meta name=\"description\" content=\"Le salaire moyen d&#039;un responsable de production au Canada en 2026 est d&#039;environ 83,026 CAD par an, soit environ 6,919 CAD par mois...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Salaire d&#039;un responsable de production au Canada 2026\" \/>\n<meta property=\"og:description\" content=\"Le salaire moyen d&#039;un responsable de production au Canada en 2026 est d&#039;environ 83,026 CAD par an, soit environ 6,919 CAD par mois...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-04T11:45:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:56:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Salaire d&rsquo;un responsable de production au Canada 2026\",\"datePublished\":\"2023-10-04T11:45:15+00:00\",\"dateModified\":\"2026-06-19T20:56:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/\"},\"wordCount\":1844,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Canada.png\",\"articleSection\":[\"Carri\u00e8res et salaires\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/\",\"name\":\"Salaire d'un responsable de production au Canada 2026\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Canada.png\",\"datePublished\":\"2023-10-04T11:45:15+00:00\",\"dateModified\":\"2026-06-19T20:56:56+00:00\",\"description\":\"Le salaire moyen d'un responsable de production au Canada en 2026 est d'environ 83,026 CAD par an, soit environ 6,919 CAD par mois...\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Canada.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Canada.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in Canada\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-au-canada-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Salaire d&#8217;un responsable de production au Canada 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Salaire d'un responsable de production au Canada 2026","description":"Le salaire moyen d'un responsable de production au Canada en 2026 est d'environ 83,026 CAD par an, soit environ 6,919 CAD par mois...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/","og_locale":"fr_FR","og_type":"article","og_title":"Salaire d'un responsable de production au Canada 2026","og_description":"Le salaire moyen d'un responsable de production au Canada en 2026 est d'environ 83,026 CAD par an, soit environ 6,919 CAD par mois...","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-04T11:45:15+00:00","article_modified_time":"2026-06-19T20:56:56+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"SkyPlanner","Dur\u00e9e de lecture estim\u00e9e":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Salaire d&rsquo;un responsable de production au Canada 2026","datePublished":"2023-10-04T11:45:15+00:00","dateModified":"2026-06-19T20:56:56+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/"},"wordCount":1844,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada.png","articleSection":["Carri\u00e8res et salaires","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/","name":"Salaire d'un responsable de production au Canada 2026","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada.png","datePublished":"2023-10-04T11:45:15+00:00","dateModified":"2026-06-19T20:56:56+00:00","description":"Le salaire moyen d'un responsable de production au Canada en 2026 est d'environ 83,026 CAD par an, soit environ 6,919 CAD par mois...","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada.png","width":4990,"height":3327,"caption":"Production Manager Salary in Canada"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-au-canada-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Salaire d&#8217;un responsable de production au Canada 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Canada.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/fr\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Salaire d&rsquo;un responsable de production au Canada 2026 Le salaire moyen d&rsquo;un responsable de production au Canada en 2026 est d&rsquo;environ 83,026 CAD par an, soit environ 6,919 CAD par mois avant imp\u00f4ts. Comme dans de nombreux pays d\u00e9velopp\u00e9s, le secteur manufacturier du Canada est sur une trajectoire ascendante et ne montre aucun signe de\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/24965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=24965"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/24965\/revisions"}],"predecessor-version":[{"id":94232,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/24965\/revisions\/94232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/23211"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=24965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=24965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=24965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}