{"id":24421,"date":"2023-10-04T12:57:54","date_gmt":"2023-10-04T12:57:54","guid":{"rendered":"https:\/\/skyplanner.ai\/ressources\/salaire-du-directeur-de-production-en-australie-20233\/"},"modified":"2026-06-19T20:55:09","modified_gmt":"2026-06-19T20:55:09","slug":"salaire-du-directeur-de-production-en-australie-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/","title":{"rendered":"Salaire d&rsquo;un responsable de production en Australie 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-manager-salary-in-australia-2026\">Salaire d&rsquo;un responsable de production en Australie 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Le salaire moyen d&rsquo;un responsable de production en Australie en 2026 s&rsquo;\u00e9tablit autour de <strong>110,000<\/strong> AUD par an ou 9,166 AUD par mois avant imp\u00f4ts. <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>L&rsquo;Australie : la force dominante de l&rsquo;\u00e9conomie de l&rsquo;Oc\u00e9anie. Sa diversit\u00e9 manufacturi\u00e8re couvre les secteurs de l&rsquo;automobile, des machines, de la chimie, de la transformation alimentaire et bien plus encore. Sydney, Melbourne et Brisbane font partie des centres d&rsquo;expertise manufacturi\u00e8re. Gr\u00e2ce \u00e0 ses abondantes ressources mini\u00e8res, l&rsquo;Australie se distingue dans l&rsquo;industrie manufacturi\u00e8re \u00e0 forte intensit\u00e9 de mati\u00e8res premi\u00e8res.<\/p>\n\n\n\n<p>En 2026, l&rsquo;industrie manufacturi\u00e8re australienne a connu une croissance soutenue, et le besoin en <a href=\"\/fr\/ressources\/fiche-metier-responsable-production\/\">responsables de production<\/a> comp\u00e9tents a fortement augment\u00e9. Ces experts sont essentiels pour garantir une production efficace et rationalis\u00e9e. Mais combien gagne un responsable de production en Australie cette ann\u00e9e ?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Le salaire moyen d&rsquo;un responsable de production en Australie<\/h2>\n\n\n\n<p>En 2026, les responsables de production en Australie peuvent s&rsquo;attendre \u00e0 un salaire moyen de <strong>AUD 110,000 par an<\/strong>, ce qui correspond \u00e0 <strong>AUD 9,166 par mois <\/strong>avant imp\u00f4ts. Pendant ce temps, le salaire de r\u00e9f\u00e9rence g\u00e9n\u00e9ral en Australie est de AUD <strong>88,392 par an <\/strong>ou <strong>AUD <strong>7,366<\/strong> par mois<\/strong> avant imp\u00f4ts. Cependant, ces chiffres sont des estimations. Le salaire pr\u00e9cis d&rsquo;un responsable de production peut varier en fonction de plusieurs \u00e9l\u00e9ments d&rsquo;influence, tels que le secteur, la localisation et d&rsquo;autres facteurs dynamiques.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Analyse comparative avec les pays voisins<\/h2>\n\n\n\n<p>Lorsqu&rsquo;on examine les salaires des responsables de production dans la r\u00e9gion de l&rsquo;Oc\u00e9anie, l&rsquo;Australie offre un ensemble de r\u00e9mun\u00e9ration comp\u00e9titif. Par exemple, <a href=\"\/fr\/ressources\/salaire-du-directeur-de-production-en-nouvelle-zelande-2026\/\">le salaire d&rsquo;un responsable de production en Nouvelle-Z\u00e9lande<\/a> pr\u00e9sente des moyennes salariales l\u00e9g\u00e8rement plus \u00e9lev\u00e9es, influenc\u00e9es par leur co\u00fbt de la vie un peu plus \u00e9lev\u00e9. \u00c0 l&rsquo;inverse, <a href=\"\/fr\/ressources\/salaire-du-directeur-de-production-aux-fidji-2026\/\">le salaire d&rsquo;un responsable de production aux Fidji<\/a> pourrait enregistrer des salaires r\u00e9duits. Cette diff\u00e9rence fait de l&rsquo;Australie une perspective attrayante pour les professionnels visant une \u00e9volution de carri\u00e8re dans la gestion de production.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Facteurs influen\u00e7ant le salaire d&rsquo;un responsable de production en Australie<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Type de secteur :&nbsp;<\/strong>Diff\u00e9rents secteurs en Australie disposent de budgets variables selon leur rentabilit\u00e9 et leur envergure. Par exemple, des secteurs importants comme l&rsquo;exploitation mini\u00e8re ou la technologie peuvent disposer de ressources financi\u00e8res substantielles parce qu&rsquo;ils contribuent de mani\u00e8re significative \u00e0 l&rsquo;\u00e9conomie. Ces secteurs ont les moyens d&rsquo;offrir des salaires plus \u00e9lev\u00e9s \u00e0 leurs employ\u00e9s. En revanche, les secteurs plus petits ou les start-ups, comme une marque de v\u00eatements de boutique locale ou une nouvelle \u00e9quipe de d\u00e9veloppement d&rsquo;applications, peuvent avoir des budgets plus serr\u00e9s, ce qui peut se refl\u00e9ter dans les salaires qu&rsquo;ils proposent.<\/li>\n\n\n\n<li><strong>Situation g\u00e9ographique :&nbsp;<\/strong>L&rsquo;Australie est vaste, et le co\u00fbt de la vie n&rsquo;est pas uniforme partout. Les zones m\u00e9tropolitaines comme Sydney ou Melbourne sont connues pour leur co\u00fbt de la vie plus \u00e9lev\u00e9, du loyer aux d\u00e9penses quotidiennes. Compte tenu de ces co\u00fbts, les entreprises de ces villes offrent souvent des salaires plus \u00e9lev\u00e9s afin d&rsquo;attirer et de fid\u00e9liser les talents, garantissant que les employ\u00e9s puissent confortablement s&rsquo;offrir le mode de vie urbain. Pendant ce temps, les salaires peuvent \u00eatre ajust\u00e9s en cons\u00e9quence dans les petites villes ou les r\u00e9gions o\u00f9 les frais de subsistance sont relativement plus bas.<\/li>\n\n\n\n<li><strong>Formation et exp\u00e9rience :&nbsp;<\/strong>Dans le monde professionnel, la formation initiale et l&rsquo;exp\u00e9rience acquise sur le terrain ont toutes deux de la valeur. Un responsable de production titulaire de dipl\u00f4mes avanc\u00e9s peut poss\u00e9der une connaissance approfondie d&rsquo;aspects sp\u00e9cifiques du m\u00e9tier, ce qui en fait un atout pour l&rsquo;entreprise. De m\u00eame, un responsable dot\u00e9 de nombreuses ann\u00e9es d&rsquo;exp\u00e9rience pratique apporte des perspectives et un savoir-faire qui ne s&rsquo;acqui\u00e8rent qu&rsquo;avec le temps. Les entreprises reconnaissent cette valeur dans les deux cas et offrent souvent des salaires plus \u00e9lev\u00e9s aux personnes au parcours de formation impressionnant ou \u00e0 l&rsquo;exp\u00e9rience \u00e9tendue.<\/li>\n\n\n\n<li><strong>Taille de l&rsquo;entreprise :&nbsp;<\/strong>Les grandes entreprises, en particulier celles qui sont bien \u00e9tablies et reconnues, disposent souvent de davantage de ressources. Ces soci\u00e9t\u00e9s plus importantes peuvent proposer des salaires plus \u00e9lev\u00e9s, ainsi que d&rsquo;autres avantages et b\u00e9n\u00e9fices, dans leur course pour recruter les meilleurs talents. \u00c0 l&rsquo;inverse, les petites entreprises ou les start-ups peuvent avoir besoin de plus de ressources, ce qui signifie parfois proposer un salaire modeste. Cependant, elles peuvent offrir d&rsquo;autres incitations, comme des parts dans l&rsquo;entreprise ou des am\u00e9nagements de travail flexibles.<\/li>\n\n\n\n<li><strong>Niveau de comp\u00e9tence :&nbsp;<\/strong>L&rsquo;ensemble des comp\u00e9tences d&rsquo;un responsable de production peut influencer consid\u00e9rablement son potentiel de r\u00e9mun\u00e9ration. Ceux qui peuvent d\u00e9montrer une ma\u00eetrise dans des domaines essentiels du poste, une expertise des outils indispensables ou des aptitudes au leadership peuvent n\u00e9gocier de meilleurs salaires. Dans le paysage manufacturier moderne de l&rsquo;Australie, la familiarit\u00e9 avec les syst\u00e8mes avanc\u00e9s est inestimable. La connaissance et l&rsquo;exp\u00e9rience de l&rsquo;utilisation de syst\u00e8mes tels que <a href=\"\/fr\/\">APS (planification et ordonnancement avanc\u00e9s)<\/a>,<a href=\"\/fr\/ressources\/erp-manufacturier\/\"> ERP (planification des ressources de l\u2019entreprise)<\/a> ou <a href=\"\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/\">MES (syst\u00e8me d\u2019ex\u00e9cution de la production) <\/a>constituent toujours un atout. Ces syst\u00e8mes sont essentiels pour rationaliser les op\u00e9rations et garantir l&rsquo;efficacit\u00e9. Les responsables comp\u00e9tents dans l&rsquo;utilisation de ces syst\u00e8mes apportent des avantages op\u00e9rationnels \u00e0 une entreprise et se distinguent comme \u00e9tant plus attractifs sur le march\u00e9, ce qui se traduit souvent par des offres de salaire plus \u00e9lev\u00e9es.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"Solutions de planification et d&#x27;ordonnancement avanc\u00e9s SkyPlanner aux probl\u00e8mes de production\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">R\u00f4le d&rsquo;un responsable de production<\/h2>\n\n\n\n<p>Un responsable de production est un pilier de la fabrication qui dirige le parcours des mati\u00e8res premi\u00e8res aux produits finis. Il pilote le processus de production, en veillant \u00e0 ce que les d\u00e9lais, la qualit\u00e9 et les budgets soient align\u00e9s sur les objectifs de l&rsquo;entreprise. Ces missions d\u00e9crivent ses responsabilit\u00e9s cl\u00e9s et mettent en lumi\u00e8re son r\u00f4le essentiel dans la r\u00e9ussite du secteur :<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Rentabilit\u00e9 :&nbsp;<\/strong>Au c\u0153ur du r\u00f4le d&rsquo;un responsable de production se trouve la garantie que les op\u00e9rations se d\u00e9roulent efficacement tout en respectant le budget. Il poss\u00e8de un sens aigu pour identifier les gaspillages ou les inefficacit\u00e9s au sein de la ligne de production. En analysant continuellement les co\u00fbts de production, en affinant les processus et en s&rsquo;appuyant sur les meilleures pratiques, ces responsables veillent \u00e0 ce que le processus de fabrication soit le plus rentable possible. Leur surveillance financi\u00e8re rigoureuse permet aux entreprises de produire des biens \u00e0 des prix comp\u00e9titifs, ce qui conduit \u00e0 un meilleur positionnement sur le march\u00e9 et \u00e0 une meilleure rentabilit\u00e9.<\/li>\n\n\n\n<li><strong>Garantir les protocoles de s\u00e9curit\u00e9 :&nbsp;<\/strong>La s\u00e9curit\u00e9 n&rsquo;est pas qu&rsquo;un simple mot \u00e0 la mode ; c&rsquo;est un aspect essentiel de tout environnement de fabrication. Les responsables de production sont les gardiens de la s\u00e9curit\u00e9 sur le plancher de l&rsquo;usine. Ils ne se contentent pas d&rsquo;imposer des normes de s\u00e9curit\u00e9 ; ils cultivent une culture de la s\u00e9curit\u00e9. Cela implique des inspections r\u00e9guli\u00e8res des machines pour pr\u00e9venir les pannes, des s\u00e9ances de formation m\u00e9ticuleuses pour le personnel et l&rsquo;organisation d&rsquo;exercices de s\u00e9curit\u00e9 fr\u00e9quents. Leur approche vigilante garantit que chaque employ\u00e9 rentre chez lui dans le m\u00eame \u00e9tat qu&rsquo;\u00e0 son arriv\u00e9e et que l&rsquo;entreprise conserve une bonne r\u00e9putation, en \u00e9vitant des complications juridiques co\u00fbteuses.<\/li>\n\n\n\n<li><strong>Collaboration et coordination :&nbsp;<\/strong>Un responsable de production ne travaille pas de mani\u00e8re isol\u00e9e. Il est la figure centrale qui relie les diff\u00e9rents services. Il assure un flux de travail coh\u00e9rent en collaborant \u00e9troitement avec des services tels que les achats, la logistique et les ventes. Cette harmonie interservices est essentielle pour garantir que les produits soient fabriqu\u00e9s, stock\u00e9s et exp\u00e9di\u00e9s en temps voulu et de mani\u00e8re efficace. Son r\u00f4le dans la coordination agit comme un pont, minimisant les malentendus ou les retards et garantissant que le consommateur final re\u00e7oive un produit conforme aux normes de qualit\u00e9 de l&rsquo;entreprise.<\/li>\n\n\n\n<li><strong>Int\u00e9gration d&rsquo;outils modernes :&nbsp;<\/strong>Le secteur manufacturier en Australie, comme le reste du monde, \u00e9volue rapidement gr\u00e2ce \u00e0 la technologie. Les responsables de production sont \u00e0 l&rsquo;avant-garde de l&rsquo;int\u00e9gration des innovations technologiques dans le processus de production. Des syst\u00e8mes comme l&rsquo;APS (planification et ordonnancement avanc\u00e9s) sont d\u00e9sormais consid\u00e9r\u00e9s comme des outils standard dans de nombreux secteurs. La capacit\u00e9 d&rsquo;un responsable \u00e0 int\u00e9grer de mani\u00e8re transparente de tels outils, ainsi que d&rsquo;autres comme l&rsquo;ERP (planification des ressources de l\u2019entreprise) et le MES (syst\u00e8me d\u2019ex\u00e9cution de la production), souligne son r\u00f4le central dans la conduite d&rsquo;op\u00e9rations de fabrication modernes, efficaces et comp\u00e9titives. En tirant parti de ces outils, il peut rationaliser les processus, r\u00e9duire les erreurs humaines et prendre des d\u00e9cisions \u00e9clair\u00e9es qui profitent aux r\u00e9sultats financiers de l&rsquo;entreprise.<\/li>\n<\/ol>\n\n\n\n<h4 class=\"wp-block-heading\">Comp\u00e9tences requises pour un responsable de production<\/h4>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Leadership d\u00e9cisif<\/li>\n\n\n\n<li>Capacit\u00e9s aigu\u00ebs de r\u00e9solution de probl\u00e8mes<\/li>\n\n\n\n<li>Compr\u00e9hension approfondie des m\u00e9thodologies de production<\/li>\n\n\n\n<li>Expertise en gestion budg\u00e9taire<\/li>\n\n\n\n<li>Ma\u00eetrise de la gestion du temps<\/li>\n\n\n\n<li>Connaissance des r\u00e9glementations en mati\u00e8re de sant\u00e9 et de s\u00e9curit\u00e9<\/li>\n\n\n\n<li>Comp\u00e9tences techniques<\/li>\n\n\n\n<li>Solides capacit\u00e9s de communication<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Avantages au-del\u00e0 du salaire pour un responsable de production en Australie<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Avantages li\u00e9s \u00e0 la sant\u00e9 et \u00e0 l&rsquo;assurance :<\/strong>&nbsp;De nombreuses entreprises proposent des forfaits sant\u00e9 complets.<\/li>\n\n\n\n<li><strong>Plans de retraite :<\/strong>&nbsp;Cotisation \u00e0 des r\u00e9gimes de pension ou de retraite.<\/li>\n\n\n\n<li><strong>Cong\u00e9s pay\u00e9s :<\/strong>&nbsp;Des politiques de cong\u00e9s g\u00e9n\u00e9reuses, incluant les vacances, les cong\u00e9s maladie, et plus encore.<\/li>\n\n\n\n<li><strong>Primes :<\/strong>&nbsp;Primes annuelles ou semestrielles bas\u00e9es sur la performance.<\/li>\n\n\n\n<li><strong>Opportunit\u00e9s d&rsquo;apprentissage continu :<\/strong>&nbsp;S\u00e9minaires, ateliers et cours pour d\u00e9velopper les comp\u00e9tences.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">L&rsquo;avenir des responsables de production en Australie<\/h2>\n\n\n\n<p>L&rsquo;industrie manufacturi\u00e8re en Australie reste \u00e0 la pointe de l&rsquo;innovation. \u00c0 mesure que les avanc\u00e9es se poursuivent, les responsables de production seront toujours recherch\u00e9s. Les outils modernes, comme le syst\u00e8me APS, r\u00e9volutionnent la planification de la production. Ces syst\u00e8mes, en particulier ceux combin\u00e9s \u00e0 des technologies d&rsquo;IA comme SkyPlanner, peuvent consid\u00e9rablement am\u00e9liorer l&rsquo;efficacit\u00e9 de la production, garantissant un avenir prometteur aux responsables de production. L&rsquo;adoption de tels outils simplifie non seulement la t\u00e2che d&rsquo;un responsable, mais r\u00e9duit \u00e9galement les erreurs commises avec l&rsquo;ancienne planification complexe sur tableurs, pr\u00e9parant le terrain pour un horizon manufacturier prosp\u00e8re en Australie.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Salaire d&rsquo;un responsable de production en Australie 2026 Le salaire moyen d&rsquo;un responsable de production en Australie en 2026 s&rsquo;\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts. L&rsquo;Australie : la force dominante de l&rsquo;\u00e9conomie de l&rsquo;Oc\u00e9anie. Sa diversit\u00e9 manufacturi\u00e8re couvre les secteurs de l&rsquo;automobile, des machines, de la chimie, &#8230; <a title=\"Salaire d&rsquo;un responsable de production en Australie 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/\" aria-label=\"Read more about Salaire d&rsquo;un responsable de production en Australie 2026\">Lire plus<\/a><\/p>\n","protected":false},"author":6,"featured_media":23922,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2681,304],"tags":[],"class_list":["post-24421","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-carrieres-et-salaires","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Salaire d&#039;un responsable de production en Australie 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Le salaire moyen d&#039;un responsable de production en Australie en 2026 s&#039;\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Salaire d&#039;un responsable de production en Australie 2026\" \/>\n<meta property=\"og:description\" content=\"Le salaire moyen d&#039;un responsable de production en Australie en 2026 s&#039;\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-04T12:57:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:55:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Salaire d&rsquo;un responsable de production en Australie 2026\",\"datePublished\":\"2023-10-04T12:57:54+00:00\",\"dateModified\":\"2026-06-19T20:55:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/\"},\"wordCount\":1855,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Australia.png\",\"articleSection\":[\"Carri\u00e8res et salaires\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/\",\"name\":\"Salaire d'un responsable de production en Australie 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Australia.png\",\"datePublished\":\"2023-10-04T12:57:54+00:00\",\"dateModified\":\"2026-06-19T20:55:09+00:00\",\"description\":\"Le salaire moyen d'un responsable de production en Australie en 2026 s'\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Australia.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Australia.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary Australia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-du-directeur-de-production-en-australie-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Salaire d&#8217;un responsable de production en Australie 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Salaire d'un responsable de production en Australie 2026 \u2013 SkyPlanner","description":"Le salaire moyen d'un responsable de production en Australie en 2026 s'\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/","og_locale":"fr_FR","og_type":"article","og_title":"Salaire d'un responsable de production en Australie 2026","og_description":"Le salaire moyen d'un responsable de production en Australie en 2026 s'\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-04T12:57:54+00:00","article_modified_time":"2026-06-19T20:55:09+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"SkyPlanner","Dur\u00e9e de lecture estim\u00e9e":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Salaire d&rsquo;un responsable de production en Australie 2026","datePublished":"2023-10-04T12:57:54+00:00","dateModified":"2026-06-19T20:55:09+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/"},"wordCount":1855,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia.png","articleSection":["Carri\u00e8res et salaires","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/","name":"Salaire d'un responsable de production en Australie 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia.png","datePublished":"2023-10-04T12:57:54+00:00","dateModified":"2026-06-19T20:55:09+00:00","description":"Le salaire moyen d'un responsable de production en Australie en 2026 s'\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia.png","width":4990,"height":3327,"caption":"Production Manager Salary Australia"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-du-directeur-de-production-en-australie-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Salaire d&#8217;un responsable de production en Australie 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Australia.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/fr\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Salaire d&rsquo;un responsable de production en Australie 2026 Le salaire moyen d&rsquo;un responsable de production en Australie en 2026 s&rsquo;\u00e9tablit autour de 110,000 AUD par an ou 9,166 AUD par mois avant imp\u00f4ts. L&rsquo;Australie : la force dominante de l&rsquo;\u00e9conomie de l&rsquo;Oc\u00e9anie. Sa diversit\u00e9 manufacturi\u00e8re couvre les secteurs de l&rsquo;automobile, des machines, de la chimie,\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/24421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=24421"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/24421\/revisions"}],"predecessor-version":[{"id":94198,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/24421\/revisions\/94198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/23922"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=24421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=24421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=24421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}