{"id":23786,"date":"2023-10-03T12:38:11","date_gmt":"2023-10-03T12:38:11","guid":{"rendered":"https:\/\/skyplanner.ai\/ressources\/salaire-du-directeur-de-production-au-bresil-2023\/"},"modified":"2026-06-19T20:51:46","modified_gmt":"2026-06-19T20:51:46","slug":"salaire-directeur-production-bresil-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/","title":{"rendered":"Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-manager-salary-in-brazil-2026\">Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Le salaire moyen d&rsquo;un responsable de production au Br\u00e9sil en 2026 est d&rsquo;environ <strong>270,657<\/strong> BRL par an ou 22,555 BRL par mois avant imp\u00f4t.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Avec son vaste secteur manufacturier, le Br\u00e9sil occupe une place singuli\u00e8re sur la carte industrielle mondiale. Le secteur manufacturier du pays a toujours constitu\u00e9 un \u00e9l\u00e9ment crucial de sa structure \u00e9conomique, l&rsquo;automobile, le textile, l&rsquo;alimentation et les boissons \u00e9tant les piliers qui propulsent sa locomotive industrielle. Parmi l&rsquo;\u00e9ventail de professionnels qui alimentent ce mastodonte industriel, les <a href=\"\/fr\/ressources\/fiche-metier-responsable-production\/\">responsables de production<\/a> s&rsquo;imposent comme la pi\u00e8ce ma\u00eetresse, orchestrant le ballet incessant des lignes de production pour garantir un rendement optimal. \u00c0 mesure que nous parcourons 2026, une exploration approfondie des r\u00e9mun\u00e9rations et des dynamiques sectorielles entourant ces professionnels essentiels au Br\u00e9sil d\u00e9voile un r\u00e9cit d&rsquo;opportunit\u00e9s et de croissance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">L&rsquo;\u00e9ventail des salaires<\/h2>\n\n\n\n<p>Le panorama financier des responsables de production au Br\u00e9sil pour 2026 s&rsquo;illustre par des chiffres prometteurs qui refl\u00e8tent le caract\u00e8re indispensable de la profession. Le salaire d&rsquo;un responsable de production au Br\u00e9sil s&rsquo;\u00e9l\u00e8ve \u00e0 environ <strong>BRL 270,657 par an<\/strong> avant imp\u00f4ts, soit une r\u00e9partition mensuelle de <strong>BRL <strong>22,555<\/strong> par mois <\/strong>avant imp\u00f4ts. Compar\u00e9 au salaire moyen au Br\u00e9sil, qui s&rsquo;\u00e9tablit \u00e0 <strong>BRL 86,028 par an<\/strong> soit environ <strong>BRL <strong>7,169<\/strong> par mois<\/strong> avant imp\u00f4ts, les revenus plus \u00e9lev\u00e9s des responsables de production deviennent plus manifestes. Ces chiffres restent toutefois soumis aux al\u00e9as de divers facteurs tels que le secteur d&rsquo;activit\u00e9 sp\u00e9cifique, la localisation g\u00e9ographique et la stature de l&rsquo;entreprise, entre autres.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Un regard comparatif<\/h2>\n\n\n\n<p>En portant un regard au-del\u00e0 des fronti\u00e8res, le r\u00e9cit salarial se transforme consid\u00e9rablement. Un aper\u00e7u du <a href=\"\/fr\/ressources\/salaire-dun-directeur-de-production-au-chili-en-2026\/\">salaire du responsable de production au Chili<\/a>, du <a href=\"\/fr\/ressources\/salaire-directeur-production-perou-2026\/\">salaire du responsable de production au P\u00e9rou<\/a>, et du <a href=\"\/fr\/ressources\/salaire-du-directeur-de-production-en-colombie-2026\/\">salaire du responsable de production en Colombie<\/a> r\u00e9v\u00e8le un paysage financier variable, chacun fa\u00e7onn\u00e9 par ses dynamiques industrielles et \u00e9conomiques uniques.<\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Facteurs qui fa\u00e7onnent la mosa\u00efque salariale au Br\u00e9sil<\/h2>\n\n\n\n<p>De nombreux facteurs fa\u00e7onnent de mani\u00e8re complexe le paysage salarial des responsables de production au Br\u00e9sil. La danse entre ces variables orchestre un r\u00e9cit financier unique pour chaque professionnel de ce domaine. Voici certains de ces facteurs pr\u00e9sent\u00e9s un peu plus en d\u00e9tail :<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Sp\u00e9cificit\u00e9 du secteur :&nbsp;<\/strong>La prosp\u00e9rit\u00e9 d&rsquo;un secteur particulier se refl\u00e8te souvent directement dans les packages salariaux propos\u00e9s dans son domaine. Par exemple, des secteurs comme l&rsquo;automobile ou l&rsquo;a\u00e9rospatiale, qui sont \u00e0 forte intensit\u00e9 technologique et pr\u00e9sentent des d\u00e9penses d&rsquo;investissement plus \u00e9lev\u00e9es, offrent g\u00e9n\u00e9ralement une meilleure r\u00e9mun\u00e9ration que d&rsquo;autres. Les secteurs connaissant une croissance importante ou ceux affichant un taux d&rsquo;investissement plus \u00e9lev\u00e9 proposent souvent des packages salariaux plus avantageux pour retenir et attirer des responsables de production comp\u00e9tents. En outre, l&rsquo;importance \u00e9conomique de ces secteurs au Br\u00e9sil joue un r\u00f4le d\u00e9terminant dans la d\u00e9finition des r\u00e9compenses financi\u00e8res des professionnels qui g\u00e8rent les domaines de la production.<\/li>\n\n\n\n<li><strong>Dynamique g\u00e9ographique :<\/strong>&nbsp;Le Br\u00e9sil, avec sa vaste \u00e9tendue g\u00e9ographique, abrite une multitude de p\u00f4les industriels, chacun ayant sa propre dynamique financi\u00e8re. Des villes comme S\u00e3o Paulo et Rio de Janeiro, r\u00e9put\u00e9es pour leur robustesse industrielle, offrent souvent de meilleures grilles salariales aux responsables de production. La concentration dense d&rsquo;unit\u00e9s de fabrication dans ces localit\u00e9s cr\u00e9e un paysage concurrentiel o\u00f9 les entreprises rivalisent pour attirer les meilleurs talents en proposant une meilleure r\u00e9mun\u00e9ration. De plus, le co\u00fbt de la vie dans ces centres urbains joue \u00e9galement un r\u00f4le, des co\u00fbts de la vie plus \u00e9lev\u00e9s se refl\u00e9tant g\u00e9n\u00e9ralement par des offres salariales plus \u00e9lev\u00e9es.<\/li>\n\n\n\n<li><strong>Stature de l&rsquo;entreprise :<\/strong>&nbsp;La position sur le march\u00e9 et la solidit\u00e9 financi\u00e8re d&rsquo;une entreprise influencent consid\u00e9rablement les grilles salariales qu&rsquo;elle peut proposer. Les organisations renomm\u00e9es disposant d&rsquo;une part de march\u00e9 importante et d&rsquo;une sant\u00e9 financi\u00e8re robuste peuvent souvent proposer de meilleurs packages salariaux. Ces organisations valorisent les comp\u00e9tences des responsables de production qualifi\u00e9s et sont dispos\u00e9es \u00e0 investir dans les meilleurs talents pour maintenir leur domination sur le march\u00e9 et leur efficacit\u00e9 op\u00e9rationnelle. La taille de l&rsquo;entreprise, sa rentabilit\u00e9 et sa position sur le march\u00e9 influencent directement le salaire d&rsquo;un responsable de production.<\/li>\n\n\n\n<li><strong>Exp\u00e9rience et expertise :&nbsp;<\/strong>La gestion de la production n&rsquo;\u00e9chappe pas \u00e0 la dynamique classique de l&rsquo;exp\u00e9rience et de l&rsquo;expertise qui influence les structures salariales. Un responsable de production chevronn\u00e9, fort d&rsquo;une riche exp\u00e9rience et d&rsquo;une solide formation, se voit souvent attribuer de meilleures r\u00e9compenses financi\u00e8res. Sa capacit\u00e9 \u00e9prouv\u00e9e \u00e0 piloter les processus de production en toute fluidit\u00e9 et \u00e0 surmonter les d\u00e9fis sans effort justifie un \u00e9chelon de r\u00e9mun\u00e9ration plus \u00e9lev\u00e9. De plus, le fait de poss\u00e9der des comp\u00e9tences ou des certifications sp\u00e9cialis\u00e9es, notamment dans les technologies de fabrication modernes telles que les <a href=\"\/fr\/ressources\/systeme-mes-definition-et-fonctionnement\/\">MES (syst\u00e8mes d\u2019ex\u00e9cution de la production) <\/a>ou les <a href=\"\/fr\/ressources\/erp-manufacturier\/\">ERP (planification des ressources de l\u2019entreprise)<\/a>, peut consid\u00e9rablement renforcer la position de n\u00e9gociation d&rsquo;un responsable de production lors des discussions salariales.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"Solutions de planification et d&#x27;ordonnancement avanc\u00e9s SkyPlanner pour les probl\u00e8mes de production\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Que fait un responsable de production ?<\/h2>\n\n\n\n<p>Les responsables de production sont les maestros qui orchestrent un processus de production fluide. Leur r\u00f4le s&rsquo;\u00e9tend \u00e0 l&rsquo;\u00e9laboration de strat\u00e9gies, \u00e0 la coordination et \u00e0 l&rsquo;ex\u00e9cution afin de garantir que les objectifs de fabrication soient atteints efficacement.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Efficacit\u00e9 des co\u00fbts :&nbsp;<\/strong>Les responsables de production assument la responsabilit\u00e9 financi\u00e8re dans le domaine de la fabrication. Leur ma\u00eetrise dans la gestion m\u00e9ticuleuse du navire budg\u00e9taire t\u00e9moigne de leur r\u00f4le central. Assurer la rentabilit\u00e9 tout en ne compromettant ni la qualit\u00e9 ni les d\u00e9lais de production constitue un d\u00e9licat exercice d&rsquo;\u00e9quilibre qu&rsquo;ils accomplissent. Gr\u00e2ce \u00e0 une planification minutieuse, une surveillance vigilante et des strat\u00e9gies adaptatives, ils visent \u00e0 r\u00e9duire les d\u00e9penses excessives, \u00e0 exploiter les ressources de mani\u00e8re optimale et \u00e0 accro\u00eetre la rentabilit\u00e9. L&rsquo;effet d&rsquo;entra\u00eenement de leurs man\u0153uvres d&rsquo;efficacit\u00e9 des co\u00fbts se r\u00e9percute sur la sant\u00e9 financi\u00e8re de l&rsquo;organisation, contribuant souvent de mani\u00e8re significative au r\u00e9sultat net.<\/li>\n\n\n\n<li><strong>Vigilance en mati\u00e8re de s\u00e9curit\u00e9 :&nbsp;<\/strong>Dans l&rsquo;environnement effervescent de la production, la s\u00e9curit\u00e9 ne peut jamais \u00eatre rel\u00e9gu\u00e9e au second plan. Les responsables de production agissent comme des sentinelles de la s\u00e9curit\u00e9, instaurant une culture de vigilance et de respect des protocoles de s\u00e9curit\u00e9. Leur effort va au-del\u00e0 du simple respect des consignes de s\u00e9curit\u00e9 ; il s&rsquo;agit de favoriser une atmosph\u00e8re de travail o\u00f9 la s\u00e9curit\u00e9 est int\u00e9gr\u00e9e aux op\u00e9rations quotidiennes. L&rsquo;entretien r\u00e9gulier des machines, les exercices de s\u00e9curit\u00e9 r\u00e9alis\u00e9s en temps voulu et la cr\u00e9ation d&rsquo;un canal ouvert pour signaler et traiter les pr\u00e9occupations en mati\u00e8re de s\u00e9curit\u00e9 figurent parmi les mesures qu&rsquo;ils adoptent. Leur vigilance constitue un rempart solide contre les dangers potentiels, garantissant le bien-\u00eatre de la main-d&rsquo;\u0153uvre et l&rsquo;int\u00e9grit\u00e9 des actifs de production.<\/li>\n\n\n\n<li><strong>Collaboration interd\u00e9partementale :&nbsp;<\/strong>Le parcours d&rsquo;un produit, de sa conception jusqu&rsquo;au client, implique une chor\u00e9graphie sans faille entre les diff\u00e9rents services. Les responsables de production sont les pivots qui favorisent cette relation symbiotique. Ils collaborent \u00e9troitement avec les achats pour assurer la disponibilit\u00e9 en temps voulu des mati\u00e8res premi\u00e8res, avec la logistique pour rationaliser le transit des produits finis, et avec les ventes pour aligner les calendriers de production sur les demandes du march\u00e9. Cette collaboration interd\u00e9partementale est essentielle pour aplanir les goulets d&rsquo;\u00e9tranglement potentiels, garantir une r\u00e9ponse rapide au march\u00e9 et nourrir une culture de travail d&rsquo;\u00e9quipe et de r\u00e9alisation d&rsquo;objectifs collectifs au sein de l&rsquo;organisation.<\/li>\n\n\n\n<li><strong>Int\u00e9gration technologique :<\/strong>&nbsp;\u00c0 une \u00e9poque o\u00f9 la technologie est l&rsquo;\u00e9toile polaire qui guide l&rsquo;efficacit\u00e9 op\u00e9rationnelle, les responsables de production sont les navigateurs qui int\u00e8grent les outils modernes dans l&rsquo;environnement de production. En supervisant l&rsquo;int\u00e9gration des <a href=\"\/fr\/\">syst\u00e8mes de planification et d&rsquo;ordonnancement avanc\u00e9s (APS)<\/a>, ils renforcent consid\u00e9rablement le savoir-faire en mati\u00e8re de planification de la production, optimisant l&rsquo;allocation des ressources et acc\u00e9l\u00e9rant les processus de prise de d\u00e9cision. Outre l&rsquo;APS, leur champ d&rsquo;action s&rsquo;\u00e9tend \u00e0 l&rsquo;exploitation du potentiel des syst\u00e8mes d&rsquo;ex\u00e9cution de la fabrication (MES) et des syst\u00e8mes de planification des ressources de l&rsquo;entreprise (ERP), cr\u00e9ant un environnement technologiquement enrichi, utile pour les donn\u00e9es en temps r\u00e9el, l&rsquo;analyse pr\u00e9dictive et des r\u00e9ponses op\u00e9rationnelles agiles. Ces outils propulsent l&rsquo;unit\u00e9 de fabrication vers une efficacit\u00e9 accrue et un avantage concurrentiel.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Comp\u00e9tences dont un responsable de production a besoin<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Solides capacit\u00e9s de leadership<\/li>\n\n\n\n<li>Comp\u00e9tences pointues en r\u00e9solution de probl\u00e8mes<\/li>\n\n\n\n<li>Connaissance approfondie des processus de production<\/li>\n\n\n\n<li>Ma\u00eetrise de la gestion budg\u00e9taire<\/li>\n\n\n\n<li>Comp\u00e9tences en gestion du temps<\/li>\n\n\n\n<li>Connaissance des r\u00e9glementations en mati\u00e8re de sant\u00e9 et de s\u00e9curit\u00e9<\/li>\n\n\n\n<li>Aptitude technique<\/li>\n\n\n\n<li>Comp\u00e9tences en communication efficace<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Au-del\u00e0 du salaire au Br\u00e9sil<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Avantages li\u00e9s \u00e0 la sant\u00e9 :<\/strong>&nbsp;Les avantages complets en mati\u00e8re de sant\u00e9 fournis par les employeurs constituent un atout important.<\/li>\n\n\n\n<li><strong>Cotisations au r\u00e9gime de retraite :<\/strong>&nbsp;Un autre avantage consiste \u00e0 garantir une s\u00e9curit\u00e9 financi\u00e8re \u00e0 long terme gr\u00e2ce \u00e0 des r\u00e9gimes de retraite solides.<\/li>\n\n\n\n<li><strong>Possibilit\u00e9s d&rsquo;avancement professionnel :<\/strong>&nbsp;Les investissements dans la formation et le d\u00e9veloppement au sein de l&rsquo;entreprise offrent une voie vers l&rsquo;\u00e9volution de carri\u00e8re.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Que r\u00e9serve l&rsquo;avenir aux responsables de production au Br\u00e9sil ?<\/h2>\n\n\n\n<p>Le secteur manufacturier br\u00e9silien ne montrant aucun signe de ralentissement, l&rsquo;horizon s&rsquo;annonce prometteur pour les responsables de production. L&rsquo;adoption d&rsquo;outils sophistiqu\u00e9s comme les syst\u00e8mes APS dot\u00e9s de technologies d&rsquo;IA telles que SkyPlanner peut aider \u00e0 rationaliser les processus de production et \u00e0 accro\u00eetre l&rsquo;efficacit\u00e9 et la productivit\u00e9, facilitant ainsi le travail d&rsquo;un responsable de production. Cette trajectoire ascendante illustre un avenir prometteur, conjuguant une structure salariale favorable et un terrain fertile pour l&rsquo;\u00e9volution professionnelle dans un paysage industriel en constante \u00e9volution.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026 Le salaire moyen d&rsquo;un responsable de production au Br\u00e9sil en 2026 est d&rsquo;environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t. Avec son vaste secteur manufacturier, le Br\u00e9sil occupe une place singuli\u00e8re sur la carte industrielle mondiale. Le secteur manufacturier du pays a toujours &#8230; <a title=\"Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/\" aria-label=\"Read more about Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026\">Lire plus<\/a><\/p>\n","protected":false},"author":6,"featured_media":23260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2681,304],"tags":[],"class_list":["post-23786","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-carrieres-et-salaires","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Salaire d&#039;un responsable de production au Br\u00e9sil 2026<\/title>\n<meta name=\"description\" content=\"Le salaire moyen d&#039;un responsable de production au Br\u00e9sil en 2026 est d&#039;environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Salaire d&#039;un responsable de production au Br\u00e9sil 2026\" \/>\n<meta property=\"og:description\" content=\"Le salaire moyen d&#039;un responsable de production au Br\u00e9sil en 2026 est d&#039;environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-03T12:38:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:51:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026\",\"datePublished\":\"2023-10-03T12:38:11+00:00\",\"dateModified\":\"2026-06-19T20:51:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/\"},\"wordCount\":1795,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Brazil.png\",\"articleSection\":[\"Carri\u00e8res et salaires\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/\",\"name\":\"Salaire d'un responsable de production au Br\u00e9sil 2026\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Brazil.png\",\"datePublished\":\"2023-10-03T12:38:11+00:00\",\"dateModified\":\"2026-06-19T20:51:46+00:00\",\"description\":\"Le salaire moyen d'un responsable de production au Br\u00e9sil en 2026 est d'environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Brazil.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Brazil.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary Brazil\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/salaire-directeur-production-bresil-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Salaire d&#8217;un responsable de production au Br\u00e9sil 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Salaire d'un responsable de production au Br\u00e9sil 2026","description":"Le salaire moyen d'un responsable de production au Br\u00e9sil en 2026 est d'environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/","og_locale":"fr_FR","og_type":"article","og_title":"Salaire d'un responsable de production au Br\u00e9sil 2026","og_description":"Le salaire moyen d'un responsable de production au Br\u00e9sil en 2026 est d'environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-03T12:38:11+00:00","article_modified_time":"2026-06-19T20:51:46+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"SkyPlanner","Dur\u00e9e de lecture estim\u00e9e":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026","datePublished":"2023-10-03T12:38:11+00:00","dateModified":"2026-06-19T20:51:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/"},"wordCount":1795,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil.png","articleSection":["Carri\u00e8res et salaires","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/","name":"Salaire d'un responsable de production au Br\u00e9sil 2026","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil.png","datePublished":"2023-10-03T12:38:11+00:00","dateModified":"2026-06-19T20:51:46+00:00","description":"Le salaire moyen d'un responsable de production au Br\u00e9sil en 2026 est d'environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil.png","width":4990,"height":3327,"caption":"Production Manager Salary Brazil"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/salaire-directeur-production-bresil-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Salaire d&#8217;un responsable de production au Br\u00e9sil 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Brazil.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/fr\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Salaire d&rsquo;un responsable de production au Br\u00e9sil 2026 Le salaire moyen d&rsquo;un responsable de production au Br\u00e9sil en 2026 est d&rsquo;environ 270,657 BRL par an ou 22,555 BRL par mois avant imp\u00f4t. Avec son vaste secteur manufacturier, le Br\u00e9sil occupe une place singuli\u00e8re sur la carte industrielle mondiale. Le secteur manufacturier du pays a toujours\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/23786","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=23786"}],"version-history":[{"count":5,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/23786\/revisions"}],"predecessor-version":[{"id":94132,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/23786\/revisions\/94132"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/23260"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=23786"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=23786"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=23786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}