{"id":100432,"date":"2026-10-16T22:47:32","date_gmt":"2026-10-16T22:47:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100432"},"modified":"2026-10-16T22:48:08","modified_gmt":"2026-10-16T22:48:08","slug":"respect-des-delais-de-livraison","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/","title":{"rendered":"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fr\/\">Accueil<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/\">Ressources<\/a> &raquo; Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Temps de lecture estim\u00e9 : <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Le taux de respect des d\u00e9lais de livraison (OTD) mesure votre capacit\u00e9 \u00e0 tenir les dates de livraison convenues avec vos clients.<\/strong> Dans l\u2019industrie, l\u2019am\u00e9liorer consiste \u00e0 s\u2019assurer que les commandes \u00e0 livrer peuvent franchir toutes les \u00e9tapes de production, \u00eatre achev\u00e9es et parvenir au point de livraison convenu dans les d\u00e9lais.<\/p>\n\n\n<p>Cela ne revient pas \u00e0 faire tourner toutes les machines en permanence. La d\u00e9coupe peut \u00eatre en avance sur le planning alors qu\u2019il manque encore une pi\u00e8ce soud\u00e9e pour une commande \u00e0 exp\u00e9dier demain. L\u2019usine semble productive, mais le client est tout de m\u00eame livr\u00e9 en retard.<\/p>\n\n\n<p>La question concr\u00e8te est la suivante : <strong>votre planning de production permet-il encore de tenir les dates promises ?<\/strong> SkyPlanner APS vous aide \u00e0 y r\u00e9pondre : il ordonnance les op\u00e9rations interd\u00e9pendantes en fonction des capacit\u00e9s, des mati\u00e8res et des priorit\u00e9s, puis recalcule le planning lorsque la production \u00e9volue. Vous passez moins de temps \u00e0 r\u00e9organiser les files d\u2019attente des machines et davantage \u00e0 s\u00e9curiser les commandes qui demandent votre attention.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Comment calculer le taux de respect des d\u00e9lais de livraison<\/h2>\n\n\n<p>Pour que l\u2019OTD soit utile, il faut d\u2019abord s\u2019accorder sur ce que signifie \u00ab dans les d\u00e9lais \u00bb. L\u2019engagement porte-t-il sur l\u2019exp\u00e9dition des marchandises, leur livraison sur le site du client ou leur mise \u00e0 disposition pour enl\u00e8vement ? Un ordre de fabrication termin\u00e9 ne signifie pas automatiquement que le client a \u00e9t\u00e9 livr\u00e9 \u00e0 temps.<\/p>\n\n\n<p>Pour un calcul par commande, utilisez la formule suivante :<\/p>\n\n\n<p><strong>Taux de respect des d\u00e9lais de livraison (%) = Commandes \u00e0 livrer sur la p\u00e9riode livr\u00e9es dans le cr\u00e9neau convenu \u00f7 Total des commandes \u00e0 livrer sur la p\u00e9riode \u00d7 100<\/strong><\/p>\n\n\n<p>Supposons que 50 commandes devaient \u00eatre livr\u00e9es ce mois-ci. Parmi elles, 44 sont parvenues au point de livraison convenu dans le cr\u00e9neau accept\u00e9. Votre OTD est de 88 %. Les commandes \u00e9chues mais toujours non livr\u00e9es restent dans le d\u00e9nominateur ; sinon, les retards les plus importants risquent de dispara\u00eetre de l\u2019indicateur.<\/p>\n\n\n<p>Convenez des r\u00e8gles suivantes avec les personnes qui utilisent cet indicateur :<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>L\u2019unit\u00e9 de comptage :<\/strong> commandes enti\u00e8res, lignes de commande ou livraisons planifi\u00e9es. Conservez toujours la m\u00eame unit\u00e9.<\/li><li><strong>La date et le cr\u00e9neau :<\/strong> la date de livraison convenue et les \u00e9ventuelles tol\u00e9rances d\u2019avance ou de retard accept\u00e9es. Une livraison anticip\u00e9e n\u2019est pas toujours acceptable si le client ne peut pas r\u00e9ceptionner ou stocker les marchandises.<\/li><li><strong>Les livraisons partielles :<\/strong> d\u00e9finissez \u00e0 quel moment une commande est consid\u00e9r\u00e9e comme livr\u00e9e, plut\u00f4t que d\u2019assimiler la premi\u00e8re exp\u00e9dition \u00e0 une livraison achev\u00e9e.<\/li><li><strong>Les engagements modifi\u00e9s :<\/strong> conservez la date initialement convenue en plus des dates r\u00e9vis\u00e9es, afin qu\u2019un report ne masque pas un engagement non tenu.<\/li><\/ul>\n\n\n<p>L\u2019OTD porte sur les d\u00e9lais. <strong>Le taux de livraison dans les d\u00e9lais et en totalit\u00e9 (OTIF)<\/strong> associe le respect des d\u00e9lais \u00e0 la livraison de la totalit\u00e9 de la quantit\u00e9 convenue. <a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/adherence-au-planning-de-production\/\">L\u2019adh\u00e9rence au planning de production<\/a> r\u00e9pond \u00e0 une autre question : les op\u00e9rations internes ont-elles respect\u00e9 les horaires pr\u00e9vus ? Un atelier peut rattraper le retard d\u2019une op\u00e9ration et livrer \u00e0 temps, ou respecter un planning de production irr\u00e9aliste et manquer son engagement envers le client.<\/p>\n\n\n<p>Utilisez l\u2019OTD pour \u00e9valuer le r\u00e9sultat c\u00f4t\u00e9 client et les indicateurs internes pour en comprendre les causes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pourquoi une usine tr\u00e8s active livre malgr\u00e9 tout en retard<\/h2>\n\n\n<p>Les probl\u00e8mes de livraison prennent souvent naissance entre les op\u00e9rations, et pas seulement sur la machine qui termine finalement en retard. Une pi\u00e8ce attend la mati\u00e8re, manque ensuite son cr\u00e9neau au pliage, puis arrive \u00e0 l\u2019assemblage alors que les autres pi\u00e8ces n\u00e9cessaires y sont d\u00e9j\u00e0.<\/p>\n\n\n<p>La file d\u2019attente de chaque service peut sembler coh\u00e9rente. La difficult\u00e9, c\u2019est que ces files se disputent des capacit\u00e9s communes et d\u00e9pendent les unes des autres. Avancer une op\u00e9ration urgente sur une machine peut d\u00e9caler une autre commande qui dispose de moins de marge pour les \u00e9tapes en aval.<\/p>\n\n\n<p>Le regroupement en lots impose un autre arbitrage. Encha\u00eener des op\u00e9rations similaires permet de r\u00e9duire les temps de r\u00e9glage, mais fabriquer un lot important, m\u00eame de mani\u00e8re efficace, n\u2019est pas un bon choix si cela retarde une commande qui doit partir aujourd\u2019hui. L\u2019objectif est d\u2019utiliser efficacement les capacit\u00e9s tout en terminant les bonnes commandes, et non de maximiser l\u2019activit\u00e9 \u00e0 chaque poste de travail.<\/p>\n\n\n<p>Un <a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/qu-est-ce-que-l-ordonnancement-de-production\/\">planning ax\u00e9 sur les d\u00e9lais de livraison<\/a> rend ces interd\u00e9pendances visibles. Au lieu de vous demander uniquement quelle op\u00e9ration est la plus urgente \u00e0 un poste donn\u00e9, vous pouvez rechercher l\u2019encha\u00eenement qui permettra de mener \u00e0 bien l\u2019ensemble du carnet de commandes.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Traduisez l\u2019engagement de livraison en objectif de production<\/h2>\n\n\n<p>Partez du point de livraison attendu par le client et remontez jusqu\u2019\u00e0 la date \u00e0 laquelle la fabrication doit \u00eatre termin\u00e9e. Pr\u00e9voyez les \u00e9tapes qui s\u00e9parent ces deux \u00e9v\u00e9nements selon la commande : contr\u00f4le final, emballage, heures limites d\u2019exp\u00e9dition et transport.<\/p>\n\n\n<p>Si le client a besoin des marchandises vendredi et qu\u2019elles doivent quitter votre site jeudi, l\u2019usine ne peut pas elle aussi viser une fin de fabrication le vendredi. La production doit se terminer assez t\u00f4t pour permettre les pr\u00e9paratifs de l\u2019exp\u00e9dition du jeudi.<\/p>\n\n\n<p>Dans SkyPlanner, le <strong>jour de livraison<\/strong> d\u2019une commande correspond \u00e0 la date \u00e0 laquelle elle doit \u00eatre termin\u00e9e et pr\u00eate \u00e0 \u00eatre exp\u00e9di\u00e9e. Utilisez cet objectif de production pour traduire l\u2019engagement pris envers le client dans le planning. L\u2019\u00e9ch\u00e9ance de l\u2019usine reste ainsi li\u00e9e \u00e0 l\u2019accord de livraison, sans confondre fin de production et r\u00e9ception par le client.<\/p>\n\n\n<p>Avant de prendre un nouvel engagement, v\u00e9rifiez qu\u2019il est compatible avec la charge existante. Une fois la commande accept\u00e9e, continuez \u00e0 v\u00e9rifier cet engagement au fil des \u00e9volutions du planning. Une date r\u00e9alisable la semaine derni\u00e8re peut ne plus l\u2019\u00eatre apr\u00e8s une panne ou un retard fournisseur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u00e9curisez les dates promises dans le planning de production quotidien<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Pr\u00e9voyez pour chaque commande un parcours compatible avec les capacit\u00e9s<\/h3>\n\n\n<p>Ordonnancez ensemble les op\u00e9rations restantes en tenant compte des machines, des \u00e9quipes, du personnel et des d\u00e9pendances entre \u00e9tapes n\u00e9cessaires \u00e0 leur r\u00e9alisation. Un cr\u00e9neau libre \u00e0 la d\u00e9coupe n\u2019est utile que si les op\u00e9rations suivantes peuvent encore se terminer \u00e0 temps.<\/p>\n\n\n<p>Arcturus, le moteur d\u2019ordonnancement de SkyPlanner fond\u00e9 sur l\u2019IA, calcule le planning \u00e0 partir de vos ressources de production et de vos r\u00e8gles. Le diagramme de Gantt montre o\u00f9 sont positionn\u00e9es les op\u00e9rations. Au lieu de calculer chaque file d\u2019attente s\u00e9par\u00e9ment, vous disposez d\u2019une vue d\u2019ensemble des commandes et de la mani\u00e8re dont elles se partagent le temps disponible.<\/p>\n\n\n<p>Lorsque la charge d\u00e9passe les capacit\u00e9s, le planning vous donne une base pour agir : envisagez des capacit\u00e9s suppl\u00e9mentaires dot\u00e9es du personnel n\u00e9cessaire, un autre poste de travail adapt\u00e9 ou un encha\u00eenement diff\u00e9rent. Si aucune option ne permet de tenir l\u2019engagement, prenez en charge le probl\u00e8me de d\u00e9lai tant que le client a encore le temps de r\u00e9agir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Int\u00e9grez la disponibilit\u00e9 des mati\u00e8res au planning<\/h3>\n\n\n<p>Une machine libre ne suffit pas pour pouvoir lancer la fabrication d\u2019une commande. Le manque d\u2019une mati\u00e8re premi\u00e8re ou d\u2019un composant achet\u00e9 peut bloquer la fabrication, m\u00eame si la capacit\u00e9 est disponible.<\/p>\n\n\n<p>Lorsque la r\u00e8gle correspondante est activ\u00e9e, l\u2019ordonnancement de SkyPlanner tient compte des stocks et des approvisionnements attendus. La disponibilit\u00e9 des mati\u00e8res influe alors sur le positionnement des op\u00e9rations, au lieu de rester une note \u00e0 part que le planificateur doit garder en t\u00eate lorsqu\u2019il r\u00e9organise les files d\u2019attente.<\/p>\n\n\n<p>Veillez \u00e0 r\u00e9percuter les mises \u00e0 jour des achats dans la planification. Lorsqu\u2019une date d\u2019approvisionnement change, la question n\u2019est pas seulement de savoir quand la mati\u00e8re arrivera, mais aussi quels engagements de livraison n\u00e9cessitent d\u00e9sormais de revoir le planning de production.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Fixez les priorit\u00e9s de fa\u00e7on r\u00e9fl\u00e9chie, pas au gr\u00e9 du dernier appel<\/h3>\n\n\n<p>Avant de donner suite \u00e0 une demande urgente, il faut en \u00e9valuer les cons\u00e9quences. La faire passer devant peut mobiliser la capacit\u00e9 dont une autre commande a besoin pour \u00eatre livr\u00e9e \u00e0 la date promise.<\/p>\n\n\n<p>Les priorit\u00e9s dynamiques de SkyPlanner permettent aux dates de fin et aux autres priorit\u00e9s de l\u2019entreprise d\u2019influer sur l\u2019ordre de passage des op\u00e9rations. Les planificateurs d\u00e9finissent les priorit\u00e9s et les r\u00e8gles ; Arcturus les applique dans le calcul. Vous pouvez ainsi s\u00e9curiser les engagements importants sans d\u00e9placer manuellement, \u00e0 chaque fois, toutes les op\u00e9rations concern\u00e9es.<\/p>\n\n\n<p>N\u2019attribuez pas la priorit\u00e9 maximale \u00e0 toutes les commandes. Si le conflit de capacit\u00e9 est r\u00e9el, changer les \u00e9tiquettes ne le fera pas dispara\u00eetre. Servez-vous des priorit\u00e9s pour d\u00e9cider quelles op\u00e9rations doivent b\u00e9n\u00e9ficier du temps disponible, puis examinez les cons\u00e9quences sur les autres engagements.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Actualisez le planning au rythme des \u00e9volutions de l\u2019atelier<\/h3>\n\n\n<p>Enregistrez rapidement les op\u00e9rations termin\u00e9es, les dur\u00e9es r\u00e9vis\u00e9es, les arr\u00eats et les changements de capacit\u00e9. Un planning fond\u00e9 sur l\u2019avancement d\u2019hier peut fausser la discussion d\u2019aujourd\u2019hui sur les livraisons.<\/p>\n\n\n<p>Lorsque Autopilot est activ\u00e9, SkyPlanner peut recalculer le planning \u00e0 la suite d\u2019\u00e9v\u00e9nements configur\u00e9s ou \u00e0 intervalles d\u00e9finis, tout en conservant vos r\u00e8gles et vos verrouillages. La mise en \u00e9vidence des op\u00e9rations en retard dans le Gantt attire l\u2019attention sur celles qui doivent \u00eatre examin\u00e9es. Vous disposez ainsi d\u2019un planning tenu \u00e0 jour sur lequel agir, au lieu de devoir r\u00e9organiser manuellement les files d\u2019attente apr\u00e8s chaque changement.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00e9cidez face au risque de retard avant le jour d\u2019exp\u00e9dition<\/h2>\n\n\n<p>Imaginez une commande accept\u00e9e qui doit \u00eatre pr\u00eate \u00e0 exp\u00e9dier jeudi. La d\u00e9coupe est termin\u00e9e, mais un composant achet\u00e9 n\u00e9cessaire \u00e0 l\u2019assemblage arrivera finalement plus tard que pr\u00e9vu. L\u2019\u00e9quipe d\u2019assemblage doit aussi travailler sur une autre commande \u00e0 livrer la semaine suivante.<\/p>\n\n\n<p>D\u00e9clarer simplement la premi\u00e8re commande urgente ne fera pas appara\u00eetre le composant manquant. Avancer des travaux sans lien avec cette commande peut occuper le personnel, mais laisser trop peu de capacit\u00e9 d\u2019assemblage au moment o\u00f9 le composant arrivera.<\/p>\n\n\n<p>Examinez le planning d\u2019ensemble en tenant compte de la nouvelle date d\u2019approvisionnement. L\u2019assemblage et le contr\u00f4le restants peuvent-ils encore \u00eatre r\u00e9alis\u00e9s avant l\u2019exp\u00e9dition ? Peut-on d\u00e9placer les op\u00e9rations de la commande suivante sans compromettre son propre d\u00e9lai ? Des heures de travail suppl\u00e9mentaires permettraient-elles de r\u00e9soudre le conflit, ou le composant arrivera-t-il de toute fa\u00e7on trop tard ?<\/p>\n\n\n<p>SkyPlanner int\u00e8gre les donn\u00e9es de mati\u00e8res, de capacit\u00e9s et de priorit\u00e9s dans le calcul d\u2019ordonnancement. Le planificateur dispose ainsi d\u2019une base plus claire pour choisir une action de rattrapage. Si plus aucun encha\u00eenement r\u00e9alisable ne permet de tenir le d\u00e9lai, signalez le probl\u00e8me et convenez de la suite, plut\u00f4t que d\u2019attendre jeudi pour confirmer ce que le planning montre d\u00e9j\u00e0.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce que cela a chang\u00e9 chez KJH-Comp<\/h2>\n\n\n<p>KJH-Comp, sous-traitant finlandais en t\u00f4lerie, \u00e9tait confront\u00e9 \u00e0 un d\u00e9calage entre une vision hebdomadaire de la production et des engagements pris \u00e0 la journ\u00e9e. Son ERP C9000 et ses feuilles de calcul donnaient une vue globale de la charge par semaine, tandis que les responsables d\u2019atelier affectaient manuellement les op\u00e9rations aux machines.<\/p>\n\n\n<p>Avec SkyPlanner, <a href=\"https:\/\/skyplanner.ai\/fr\/ressources\/ordonnancement-a-capacite-finie\/\">l\u2019ordonnancement \u00e0 capacit\u00e9 finie<\/a> et l\u2019affectation aux machines sont devenus automatiques. Le contr\u00f4le de disponibilit\u00e9 effectu\u00e9 par l\u2019entreprise avant le soudage permet aussi de r\u00e9unir les pi\u00e8ces n\u00e9cessaires, y compris les composants achet\u00e9s, avant la mise en file d\u2019attente. Ce changement relie les op\u00e9rations pr\u00eates \u00e0 d\u00e9marrer aux capacit\u00e9s et aux dates \u00e0 respecter.<\/p>\n\n\n<p>KJH-Comp indique que son taux de respect des d\u00e9lais de livraison est pass\u00e9 d\u2019environ 50 % \u00e0 un niveau pouvant atteindre 98 % en 2026. Pour les autres industriels, l\u2019enseignement r\u00e9side dans le changement de planification \u00e0 l\u2019origine de ce r\u00e9sultat : un total de charge hebdomadaire ne suffit pas lorsque les clients attendent leurs commandes un jour pr\u00e9cis.<\/p>\n\n\n<p>D\u00e9couvrez <a href=\"https:\/\/skyplanner.ai\/fr\/temoignages-clients\/kjh-comp\/\">le retour d\u2019exp\u00e9rience de KJH-Comp avec SkyPlanner<\/a> pour en savoir plus sur le d\u00e9ploiement et les r\u00e9sultats obtenus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rep\u00e9rez les risques de retard avant qu\u2019ils ne se concr\u00e9tisent<\/h2>\n\n\n<p>Lors du point quotidien de planification, concentrez-vous sur les commandes accept\u00e9es dont les objectifs de fin de fabrication sont menac\u00e9s. Pour chacune, identifiez la mati\u00e8re, l\u2019op\u00e9ration ou la ressource qui bloque, choisissez une action et v\u00e9rifiez ses cons\u00e9quences sur les autres engagements. Rendez l\u2019ordre de passage qui en r\u00e9sulte visible pour les \u00e9quipes charg\u00e9es du travail.<\/p>\n\n\n<p>En compl\u00e9ment de l\u2019OTD, examinez l\u2019ampleur des retards de livraison et leurs causes r\u00e9currentes. Un probl\u00e8me de disponibilit\u00e9 des mati\u00e8res ne se traite pas comme une surcharge r\u00e9p\u00e9t\u00e9e sur un m\u00eame poste de travail. Suivez les r\u00e9sultats par rapport aux engagements initiaux comme aux engagements r\u00e9vis\u00e9s, afin que les progr\u00e8s portent sur les livraisons, et pas seulement sur le report des dates.<\/p>\n\n\n<p>Si, \u00e0 l\u2019issue de ce point, quelqu\u2019un doit encore r\u00e9organiser manuellement les files d\u2019attente de plusieurs machines, SkyPlanner est une solution concr\u00e8te pour aller plus loin. Gr\u00e2ce \u00e0 son interface REST API ouverte, il <a href=\"https:\/\/skyplanner.ai\/fr\/integrations\/\">s\u2019int\u00e8gre \u00e0 n\u2019importe quel ERP ou MES<\/a> et transforme vos donn\u00e9es de production en un planning qui peut rester coh\u00e9rent \u00e0 mesure que le travail \u00e9volue.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fr\/contacter-les-ventes\/\">R\u00e9servez une d\u00e9monstration<\/a> \u00e0 partir d\u2019une commande accept\u00e9e et d\u2019un al\u00e9a r\u00e9el dans votre usine. Voyez comment concilier les op\u00e9rations restantes de la gamme, la charge des autres commandes et l\u2019objectif de livraison. Vous pouvez aussi <a href=\"https:\/\/skyplanner.ai\/fr\/essai\/\">d\u00e9marrer un essai avec des donn\u00e9es de d\u00e9monstration<\/a> pour d\u00e9couvrir comment SkyPlanner peut aider votre \u00e9quipe \u00e0 tenir son prochain engagement.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements Accueil &raquo; Ressources &raquo; Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements Le taux de respect des d\u00e9lais de livraison (OTD) mesure votre capacit\u00e9 \u00e0 tenir les dates de livraison convenues avec vos clients. Dans l\u2019industrie, l\u2019am\u00e9liorer consiste \u00e0 s\u2019assurer que &#8230; <a title=\"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/\" aria-label=\"Read more about Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements\">Lire plus<\/a><\/p>\n","protected":false},"author":3,"featured_media":100454,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2551,304],"tags":[],"class_list":["post-100432","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-performance-industrielle","category-ressources","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Respect des d\u00e9lais de livraison en usine : tenez vos promesses<\/title>\n<meta name=\"description\" content=\"Usine active, livraisons en retard ? Mesurez le respect des d\u00e9lais de livraison et alignez la production sur vos engagements avec SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements\" \/>\n<meta property=\"og:description\" content=\"Usine active, livraisons en retard ? Mesurez le respect des d\u00e9lais de livraison et alignez la production sur vos engagements avec SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T22:47:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T22:48:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:48:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/\"},\"wordCount\":2491,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"articleSection\":[\"Performance industrielle\",\"ressources\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/\",\"name\":\"Respect des d\u00e9lais de livraison en usine : tenez vos promesses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T22:47:32+00:00\",\"dateModified\":\"2026-10-16T22:48:08+00:00\",\"description\":\"Usine active, livraisons en retard ? Mesurez le respect des d\u00e9lais de livraison et alignez la production sur vos engagements avec SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/on-time-delivery-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manufactured components converge into a complete shipping carton beside a waiting delivery truck.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/ressources\\\/respect-des-delais-de-livraison\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Respect des d\u00e9lais de livraison en usine : tenez vos promesses","description":"Usine active, livraisons en retard ? Mesurez le respect des d\u00e9lais de livraison et alignez la production sur vos engagements avec SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/","og_locale":"fr_FR","og_type":"article","og_title":"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements","og_description":"Usine active, livraisons en retard ? Mesurez le respect des d\u00e9lais de livraison et alignez la production sur vos engagements avec SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T22:47:32+00:00","article_modified_time":"2026-10-16T22:48:08+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Jussi M\u00e4ntyl\u00e4","Dur\u00e9e de lecture estim\u00e9e":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:48:08+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/"},"wordCount":2491,"publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","articleSection":["Performance industrielle","ressources"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/","url":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/","name":"Respect des d\u00e9lais de livraison en usine : tenez vos promesses","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","datePublished":"2026-10-16T22:47:32+00:00","dateModified":"2026-10-16T22:48:08+00:00","description":"Usine active, livraisons en retard ? Mesurez le respect des d\u00e9lais de livraison et alignez la production sur vos engagements avec SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png","width":1672,"height":941,"caption":"Manufactured components converge into a complete shipping carton beside a waiting delivery truck."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/ressources\/respect-des-delais-de-livraison\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/on-time-delivery-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements Accueil &raquo; Ressources &raquo; Respect des d\u00e9lais de livraison dans l\u2019industrie : tenez vos engagements Le taux de respect des d\u00e9lais de livraison (OTD) mesure votre capacit\u00e9 \u00e0 tenir les dates de livraison convenues avec vos clients. Dans l\u2019industrie, l\u2019am\u00e9liorer consiste \u00e0 s\u2019assurer que\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/100432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=100432"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/100432\/revisions"}],"predecessor-version":[{"id":100491,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts\/100432\/revisions\/100491"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/100454"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=100432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories?post=100432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags?post=100432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}