{"id":106555,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrations\/erp\/delmiaworks\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"delmiaworks","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/","title":{"rendered":"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement \u00e0 capacit\u00e9 finie"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/fr\/integrations\/\">Int\u00e9grations<\/a> \/ <a href=\"\/fr\/integrations\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pour DELMIAWorks (IQMS) : <span class=\"hl\">un ordonnancement adapt\u00e9 aux capacit\u00e9s r\u00e9elles<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS compl\u00e8te DELMIAWorks, l\u2019ERP anciennement appel\u00e9 IQMS, avec un ordonnancement qui respecte les capacit\u00e9s r\u00e9elles. Il planifie l\u2019utilisation de chaque presse, moule, op\u00e9rateur et mati\u00e8re \u00e0 des horaires pr\u00e9cis. Arcturus optimise l\u2019ensemble du planning en quelques secondes, et Autopilot le recalcule automatiquement lorsque la production \u00e9volue.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/essai\/\">Commencer l\u2019essai gratuit<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/contacter-les-ventes\/\">R\u00e9server une d\u00e9mo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ordonnancement de la production<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagramme de Gantt de SkyPlanner APS montrant les op\u00e9rations ordonnanc\u00e9es par poste de travail, avec une liste des commandes en dessous.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner s\u2019int\u00e8gre \u00e0 DELMIAWorks dans les deux sens. Il re\u00e7oit les ordres de fabrication, les Bills of Manufacturing avec les op\u00e9rations des pi\u00e8ces, les postes de charge, les outils et moules, les articles en stock et les commandes fournisseurs. Il renvoie les dates de d\u00e9but et de fin pr\u00e9vues, le poste de charge affect\u00e9, les d\u00e9clarations de production et les temps de main-d\u2019\u0153uvre point\u00e9s par t\u00e2che. Lors de la mise en route, l\u2019\u00e9quipe SkyPlanner adapte l\u2019int\u00e9gration \u00e0 votre configuration DELMIAWorks.<\/p>\n\n\n<p>Les tarifs d\u00e9marrent \u00e0 199 \u20ac par mois avec 5 postes de travail inclus. Chaque poste suppl\u00e9mentaire co\u00fbte 20 \u20ac par mois. L\u2019essai gratuit dure 30 jours et comprend jusqu\u2019\u00e0 20 postes de travail ainsi que toutes les fonctionnalit\u00e9s Basic, sans carte bancaire.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce qui change dans votre production<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Chaque presse suit une s\u00e9quence r\u00e9alisable.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner affecte chaque ordre de fabrication \u00e0 une presse, une extrudeuse ou une cellule d\u2019assemblage pr\u00e9cise, \u00e0 un horaire d\u00e9fini. Les horaires des \u00e9quipes, les absences et les heures suppl\u00e9mentaires d\u00e9terminent la capacit\u00e9 : le planning correspond donc \u00e0 ce que l\u2019atelier peut r\u00e9ellement produire.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Les changements de moule et de couleur co\u00fbtent moins cher.<\/p>\n\n\n<p class=\"fx-pain__b\">La matrice des temps de pr\u00e9paration contient le temps de changement de s\u00e9rie entre chaque paire de produits, dans les deux sens. Passer du bleu au rouge peut prendre 30 minutes, contre 60 minutes du rouge au bleu, car le fourreau n\u00e9cessite une purge compl\u00e8te. Arcturus choisit la s\u00e9quence qui minimise le temps perdu sur l\u2019ensemble des presses.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">La disponibilit\u00e9 des moules est respect\u00e9e.<\/p>\n\n\n<p class=\"fx-pain__b\">Un moule mont\u00e9 sur une presse n\u2019est jamais r\u00e9serv\u00e9 sur une seconde presse au m\u00eame moment. Les pi\u00e8ces d\u2019un moule famille sont regroup\u00e9es dans une seule op\u00e9ration. Lorsque la presse pr\u00e9vue en premier choix est occup\u00e9e, le travail est affect\u00e9 \u00e0 une autre presse compatible avec le moule.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Les \u00e9quipes sont planifi\u00e9es avec les machines.<\/p>\n\n\n<p class=\"fx-pain__b\">Une op\u00e9ration qui n\u00e9cessite trois op\u00e9rateurs est affect\u00e9e \u00e0 trois personnes disponibles sur les plages horaires concern\u00e9es. Monteurs de moules, techniciens proc\u00e9d\u00e9s et op\u00e9rateurs de presse sont planifi\u00e9s dans le m\u00eame planning.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">La r\u00e9sine et les inserts arrivent avant le d\u00e9but de l\u2019op\u00e9ration.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner v\u00e9rifie le stock et les commandes fournisseurs en cours pour chaque mati\u00e8re. Un ordre de fabrication en attente d\u2019une livraison de r\u00e9sine est planifi\u00e9 apr\u00e8s la date de livraison, au lieu d\u2019\u00eatre lanc\u00e9 puis bloqu\u00e9 \u00e0 la presse.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Le planning s\u2019adapte automatiquement aux pannes et aux urgences.<\/p>\n\n\n<p class=\"fx-pain__b\">Lorsqu\u2019une presse tombe en panne ou qu\u2019une commande urgente arrive, Autopilot recalcule le planning. Running Time Lock fige les prochaines heures de production : les moules d\u00e9j\u00e0 mont\u00e9s restent donc en place.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Chaque op\u00e9rateur voit les op\u00e9rations \u00e0 venir.<\/p>\n\n\n<p class=\"fx-pain__b\">Les op\u00e9rateurs consultent leurs prochaines op\u00e9rations sur t\u00e9l\u00e9phone ou tablette et d\u00e9clarent leur travail au fur et \u00e0 mesure. Le nombre d\u2019utilisateurs est illimit\u00e9 : toutes les \u00e9quipes travaillent donc \u00e0 partir du m\u00eame planning.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">L\u2019avis des industriels sur SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, sp\u00e9cialiste de la cha\u00eene logistique chez UTU, dans l\u2019atelier de fabrication de tableaux \u00e9lectriques \u00e0 Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>gagn\u00e9es chaque semaine<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab Avec SkyPlanner, nous sommes pass\u00e9s d\u2019une planification de la production sur des feuilles Excel \u00e0 une optimisation de la production en temps r\u00e9el. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, sp\u00e9cialiste de la cha\u00eene logistique<\/b><br>UTU \u00b7 Tableaux et appareillages \u00e9lectriques<\/p>\n\n\n<p class=\"ind-cust__result\">La planification de la production permet de gagner 2 heures de travail chaque semaine, et une nouvelle liste d\u2019op\u00e9rations parvient \u00e0 la ligne en quelques secondes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/utu\/\">Lire le t\u00e9moignage d\u2019UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Op\u00e9rateurs en tenue de salle blanche sur une ligne de remplissage de flacons dans l\u2019usine pharmaceutique de Laboratory &amp; Allied \u00e0 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>d\u2019efficacit\u00e9 en production<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab L\u2019efficacit\u00e9 en production a augment\u00e9 de 90 %. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, directeur informatique<\/b><br>Laboratory &amp; Allied \u00b7 Fabrication pharmaceutique<\/p>\n\n\n<p class=\"ind-cust__result\">L\u2019efficacit\u00e9 en production a augment\u00e9 de 90 %, et il faut moins de 30 minutes pour \u00e9tablir un planning optimis\u00e9 sur trois mois couvrant tous les postes de travail.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/laboratory-allied\/\">Lire le t\u00e9moignage de Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, directeur g\u00e9n\u00e9ral de Mamec, dans l\u2019atelier de production de l\u2019entreprise \u00e0 Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 et plus<\/b><span>ordres de fabrication ordonnanc\u00e9s automatiquement<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab Nous ma\u00eetrisons la production d\u2019une tout autre mani\u00e8re, et notre compr\u00e9hension de la capacit\u00e9 a compl\u00e8tement chang\u00e9 de dimension. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, directeur g\u00e9n\u00e9ral<\/b><br>Mamec \u00b7 M\u00e9langeurs industriels, pompes et sous-traitance de haute technologie<\/p>\n\n\n<p class=\"ind-cust__result\">Des milliers d\u2019ordres de fabrication sont ordonnanc\u00e9s automatiquement, et toute l\u2019entreprise dispose d\u2019une vue en temps r\u00e9el de la production.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/mamec\/\">Lire le t\u00e9moignage de Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>de livraisons dans les d\u00e9lais depuis 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab SkyPlanner nous donne une visibilit\u00e9 sur les capacit\u00e9s et rend la planification pr\u00e9visible. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Industries chimique et agroalimentaire<\/p>\n\n\n<p class=\"ind-cust__result\">Depuis la mise en place de SkyPlanner en 2021, le taux de respect des d\u00e9lais de livraison est rest\u00e9 \u00e0 100 %.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/opes-corporation\/\">Lire le t\u00e9moignage d\u2019Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-delmiaworks-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comment fonctionne l\u2019int\u00e9gration avec DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>DELMIAWorks transmet le travail \u00e0 r\u00e9aliser.<\/strong> SkyPlanner re\u00e7oit les ordres de fabrication, les Bills of Manufacturing avec les op\u00e9rations des pi\u00e8ces, les postes de charge, les outils et moules, les articles en stock, les niveaux de stock et les commandes fournisseurs.<\/li>\n\n\n<li><strong>SkyPlanner construit le planning et le tient \u00e0 jour.<\/strong> Arcturus planifie chaque ordre de fabrication sur chaque presse en quelques secondes et recalcule le planning \u00e0 mesure que la production \u00e9volue.<\/li>\n\n\n<li><strong>Les dates, les presses et le travail d\u00e9clar\u00e9 sont renvoy\u00e9s.<\/strong> Les dates de d\u00e9but et de fin pr\u00e9vues ainsi que le poste de charge affect\u00e9 sont report\u00e9s dans les ordres de fabrication de DELMIAWorks. Les pi\u00e8ces bonnes sont enregistr\u00e9es dans les d\u00e9clarations de production, et les temps de pr\u00e9paration et de production dans les pointages de main-d\u2019\u0153uvre par t\u00e2che.<\/li>\n\n<\/ol>\n\n\n<p>DELMIAWorks reste votre syst\u00e8me de r\u00e9f\u00e9rence. Les articles en stock, les nomenclatures, le MRP, les achats, la qualit\u00e9, le suivi RealTime, le calcul des co\u00fbts et la comptabilit\u00e9 restent l\u00e0 o\u00f9 ils sont. SkyPlanner se charge d\u2019une seule chose : d\u00e9finir la s\u00e9quence et les horaires de chaque ordre de fabrication pour chaque presse, moule et op\u00e9rateur.<\/p>\n\n\n<p>SkyPlanner lit les donn\u00e9es de DELMIAWorks via DELMIAWorks WebAPI, qui dispose de SDK REST et GraphQL. Il renvoie les donn\u00e9es via les contr\u00f4leurs REST de WebAPI : le contr\u00f4leur Manufacturing WorkOrders transmet les dates pr\u00e9vues et le poste de charge de chaque ordre de fabrication, AddProductionRecords enregistre les pi\u00e8ces bonnes, et les appels de t\u00e2ches Time &amp; Attendance enregistrent les temps de main-d\u2019\u0153uvre. Les champs exacts des ordres de fabrication sont d\u00e9finis lors du cadrage de la mise en route. Les webhooks SkyPlanner transmettent chaque modification du planning d\u00e8s qu\u2019elle intervient, et la fr\u00e9quence de synchronisation avec DELMIAWorks est d\u00e9finie pour chaque usine.<\/p>\n\n\n<p>Chaque usine utilise DELMIAWorks diff\u00e9remment. Lors de la mise en route, l\u2019\u00e9quipe SkyPlanner configure donc l\u2019int\u00e9gration via la REST API en fonction de votre installation, puis en assure le support apr\u00e8s le d\u00e9marrage. Un devis est \u00e9tabli au pr\u00e9alable pour l\u2019int\u00e9gration, selon vos processus et vos besoins. Votre partenaire DELMIAWorks ou vos propres d\u00e9veloppeurs peuvent \u00e9galement s\u2019appuyer sur l\u2019API document\u00e9e de SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documentation de r\u00e9f\u00e9rence de l\u2019API<\/a>).<\/p>\n\n\n<p>Les contr\u00f4leurs WebAPI, la correspondance des donn\u00e9es et les r\u00e8gles de renvoi vers DELMIAWorks sont d\u00e9taill\u00e9s dans le <a href=\"\/fr\/integrations\/erp\/delmiaworks\/guide-dintegration\/\">guide d\u2019int\u00e9gration APS \u00e0 DELMIAWorks pour l\u2019ordonnancement de la production<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-delmiaworks-schedules-and-what-skyplanner-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce que DELMIAWorks ordonnance et ce que SkyPlanner apporte<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>DELMIAWorks propose un v\u00e9ritable ordonnancement qui tient compte des capacit\u00e9s disponibles. Son module Advanced Planning and Scheduling est \u00ab\u00a0a core component\u00a0\u00bb (un composant central) de l\u2019ERP. La <a href=\"https:\/\/www.solidworks.com\/product\/delmiaworks\/manufacturing-erp\/manufacturing\/scheduling\/aps-software\/\">page APS<\/a> de Dassault en d\u00e9crit le fonctionnement :<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Le chargement suit des r\u00e8gles.<\/strong> Auto Load place les \u00ab\u00a0work orders based on priority and \u00ab\u00a0runs the best\u00a0\u00bb machine information.\u00a0\u00bb (ordres de fabrication selon leur priorit\u00e9 et les informations sur la machine la mieux adapt\u00e9e). Les r\u00e8gles sont d\u00e9finies au niveau du Bill of Manufacturing.<\/li>\n\n\n<li><strong>Les mati\u00e8res et les outils font l\u2019objet d\u2019exceptions.<\/strong> Les \u00ab\u00a0Exceptions lists\u00a0\u00bb (listes d\u2019exceptions) affichent les \u00ab\u00a0materials and tools or other constraints associated with a work order that will be unavailable or need to be expedited.\u00a0\u00bb (mati\u00e8res, outils ou autres contraintes li\u00e9s \u00e0 un ordre de fabrication qui seront indisponibles ou n\u00e9cessiteront une action pour acc\u00e9l\u00e9rer leur mise \u00e0 disposition). Le planificateur intervient \u00e0 partir de cette liste.<\/li>\n\n\n<li><strong>Le court terme est prot\u00e9g\u00e9.<\/strong> \u00ab\u00a0User-defined \u00ab\u00a0time fences\u00a0\u00bb protect the current schedule against repositioning.\u00a0\u00bb (Des horizons de gel d\u00e9finis par l\u2019utilisateur prot\u00e8gent le planning en cours contre les d\u00e9placements.)<\/li>\n\n\n<li><strong>Les contr\u00f4les de capacit\u00e9 sont globaux.<\/strong> Les \u00ab\u00a0Rough Cut Capacity Tools\u00a0\u00bb (outils de v\u00e9rification globale des capacit\u00e9s) comparent les \u00ab\u00a0work center daily and weekly required hours to available hours.\u00a0\u00bb (heures requises par jour et par semaine pour chaque poste de charge aux heures disponibles).<\/li>\n\n<\/ul>\n\n\n<p>Au quotidien, le planificateur d\u00e9place les ordres de fabrication d\u2019un poste de charge \u00e0 l\u2019autre par glisser-d\u00e9poser pour \u00e9quilibrer la charge, puis relance Update Schedule et Auto Load apr\u00e8s les modifications. SkyPlanner ajoute une optimisation de l\u2019ensemble du planning : Arcturus d\u00e9finit simultan\u00e9ment la s\u00e9quence de tous les ordres de fabrication sur toutes les presses. Un m\u00eame calcul prend en compte les temps de changement de s\u00e9rie selon le sens de transition, la disponibilit\u00e9 limit\u00e9e des moules, les effectifs n\u00e9cessaires et les arriv\u00e9es de mati\u00e8res. Autopilot maintient ensuite le planning \u00e0 jour.<\/p>\n\n\n<p>Retrouvez les \u00e9tapes et les situations o\u00f9 un outil d\u2019ordonnancement devient rentable dans l\u2019article <a href=\"\/fr\/integrations\/erp\/delmiaworks\/ordonnancement-production\/\">DELMIAWorks permet-il un ordonnancement qui respecte les capacit\u00e9s r\u00e9elles ?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks aujourd\u2019hui et avec SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>DELMIAWorks APS<\/th><th>DELMIAWorks avec SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Capacit\u00e9<\/td><td>Planning limit\u00e9 \u00e0 la capacit\u00e9 de chaque poste de charge ; contr\u00f4les globaux par jour et par semaine<\/td><td>Capacit\u00e9 r\u00e9elle de chaque presse, personne et moule respect\u00e9e, avec les horaires d\u2019\u00e9quipe et des heures pr\u00e9cises<\/td><\/tr><tr><td>S\u00e9quence<\/td><td>Auto Load selon la priorit\u00e9 et le poste de charge \u00ab\u00a0runs best\u00a0\u00bb (le mieux adapt\u00e9)<\/td><td>Arcturus optimise l\u2019ensemble du planning en quelques secondes<\/td><\/tr><tr><td>Changements de s\u00e9rie<\/td><td>Mod\u00e8les et listes de contr\u00f4le pour la prochaine pr\u00e9paration<\/td><td>Matrice des temps de pr\u00e9paration : bleu\u2192rouge 30 min, rouge\u2192bleu 60 min, temps total de pr\u00e9paration minimal<\/td><\/tr><tr><td>Moules et outils<\/td><td>Conflits d\u2019outillage signal\u00e9s dans les listes d\u2019exceptions<\/td><td>Moules et outils r\u00e9serv\u00e9s comme ressources partag\u00e9es \u00e0 disponibilit\u00e9 limit\u00e9e<\/td><\/tr><tr><td>\u00c9quipes<\/td><td>Capacit\u00e9 de main-d\u2019\u0153uvre compar\u00e9e au standard<\/td><td>Une op\u00e9ration n\u00e9cessitant trois op\u00e9rateurs est affect\u00e9e \u00e0 trois personnes disponibles sur les plages horaires concern\u00e9es<\/td><\/tr><tr><td>Mati\u00e8res<\/td><td>Liste des exceptions mati\u00e8res permettant au planificateur d\u2019acc\u00e9l\u00e9rer les approvisionnements<\/td><td>Les op\u00e9rations d\u00e9marrent d\u00e8s que les mati\u00e8res sont disponibles en stock ou que les commandes fournisseurs sont livr\u00e9es<\/td><\/tr><tr><td>Planning \u00e0 court terme<\/td><td>Des horizons de gel prot\u00e8gent le planning en cours<\/td><td>Running Time Lock fige les prochaines heures de production<\/td><\/tr><tr><td>Modifications<\/td><td>Update Schedule et Auto Load, puis d\u00e9placements manuels<\/td><td>Autopilot recalcule le planning en respectant vos priorit\u00e9s et vos verrouillages<\/td><\/tr><tr><td>Atelier<\/td><td>Shopworks et RealTime au pied de la presse<\/td><td>Les op\u00e9rateurs consultent aussi leurs op\u00e9rations \u00e0 venir et d\u00e9clarent leur travail sur t\u00e9l\u00e9phone ou tablette, sans limite d\u2019utilisateurs<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"delmiaworks-scheduling-software-and-add-ons-comp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comparatif des solutions d\u2019ordonnancement pour DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Solution<\/th><th>Description<\/th><th>\u00c0 privil\u00e9gier si<\/th><\/tr><\/thead><tbody><tr><td>DELMIAWorks APS<\/td><td>Le planning \u00e0 capacit\u00e9 finie, Auto Load et les outils de gestion de la capacit\u00e9 int\u00e9gr\u00e9s \u00e0 DELMIAWorks<\/td><td>Un seul ordonnanceur g\u00e8re le planning et les changements de s\u00e9rie sont simples<\/td><\/tr><tr><td>DELMIA Ortems<\/td><td>La solution distincte de planification et d\u2019ordonnancement de Dassault pour les entreprises, connect\u00e9e \u00e0 l\u2019ERP et au MES<\/td><td>Une \u00e9quipe centrale de planification pilote un projet d\u2019optimisation multisite<\/td><\/tr><tr><td>Outils de pilotage de la production par priorit\u00e9s (par exemple LillyWorks)<\/td><td>Des listes d\u2019op\u00e9rations class\u00e9es selon les risques li\u00e9s aux commandes, plut\u00f4t qu\u2019un planning avec des horaires<\/td><td>Un atelier de fabrication \u00e0 la commande souhaite une liste de priorit\u00e9s, pas un encha\u00eenement d\u2019op\u00e9rations avec des horaires pr\u00e9cis<\/td><\/tr><tr><td>APS cloud connect\u00e9 par API (SkyPlanner APS)<\/td><td>Un outil d\u2019ordonnancement accessible dans le navigateur, avec synchronisation bidirectionnelle des ordres de fabrication DELMIAWorks<\/td><td>Le planning doit s\u2019optimiser automatiquement, rester \u00e0 jour et \u00eatre accessible \u00e0 chaque op\u00e9rateur<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Choisissez SkyPlanner plut\u00f4t que DELMIAWorks APS si :<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vous voulez optimiser l\u2019ensemble du planning.<\/strong> Auto Load applique des r\u00e8gles de priorit\u00e9 et s\u00e9lectionne la machine la plus performante pour le travail \u00e0 r\u00e9aliser. Arcturus optimise l\u2019ensemble du planning en quelques secondes, et Autopilot le recalcule \u00e0 chaque changement significatif.<\/li>\n\n\n<li><strong>Les changements de moule et de couleur d\u00e9terminent votre volume de production.<\/strong> La matrice des temps de r\u00e9glage d\u00e9finit un temps de changement de s\u00e9rie pour chaque paire de produits, dans chaque sens. Elle retient l\u2019ordre qui minimise le temps total de r\u00e9glage.<\/li>\n\n\n<li><strong>Les moules, les \u00e9quipes et la r\u00e9sine contraignent le planning autant que les presses.<\/strong> Un m\u00eame moteur prend en compte les capacit\u00e9s limit\u00e9es de chaque presse, personne, moule et mati\u00e8re. Les effectifs n\u00e9cessaires sont affect\u00e9s aux op\u00e9rations \u00e0 plusieurs op\u00e9rateurs, et les op\u00e9rations d\u00e9marrent lorsque la mati\u00e8re est disponible.<\/li>\n\n\n<li><strong>Les listes d\u2019anomalies prennent trop de temps \u00e0 l\u2019ordonnanceur.<\/strong> SkyPlanner tient compte des outillages indisponibles et des retards de mati\u00e8re dans son planning, au lieu de les lister pour que quelqu\u2019un les r\u00e9solve.<\/li>\n\n\n<li><strong>Chaque op\u00e9rateur doit travailler \u00e0 partir du planning.<\/strong> Mobile Confirmations affiche la file d\u2019op\u00e9rations \u00e0 jour sur un t\u00e9l\u00e9phone ou une tablette. Le nombre d\u2019utilisateurs est illimit\u00e9 : le prix d\u00e9pend des postes de travail, pas du nombre de comptes.<\/li>\n\n\n<li><strong>Vous voulez un tarif clair.<\/strong> \u00c0 partir de 199 \u20ac par mois, avec un devis \u00e9tabli \u00e0 l\u2019avance pour l\u2019int\u00e9gration bidirectionnelle, dont l\u2019assistance est assur\u00e9e par l\u2019\u00e9quipe SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comment d\u00e9marrer<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>D\u00e9marrez l\u2019essai gratuit.<\/strong> 30 jours, jusqu\u2019\u00e0 20 postes de travail, toutes les fonctionnalit\u00e9s Basic, sans carte bancaire.<\/li>\n\n\n<li><strong>Mod\u00e9lisez votre production.<\/strong> Cr\u00e9ez vos presses, moules, op\u00e9rateurs et horaires d\u2019\u00e9quipe dans SkyPlanner, ou importez vos postes de charge DELMIAWorks. Un accompagnement au d\u00e9marrage est disponible.<\/li>\n\n\n<li><strong>Importez vos ordres de fabrication.<\/strong> Exportez vos ordres de fabrication ouverts et leurs op\u00e9rations de DELMIAWorks vers Excel, importez-les dans SkyPlanner et comparez le planning obtenu \u00e0 votre planning actuel.<\/li>\n\n\n<li><strong>Connectez DELMIAWorks.<\/strong> L\u2019\u00e9quipe SkyPlanner configure l\u2019int\u00e9gration bidirectionnelle et en assure l\u2019assistance apr\u00e8s la mise en service.<\/li>\n\n<\/ol>\n\n\n<p><strong>Tarifs.<\/strong> Les abonnements sont factur\u00e9s chaque mois par poste de travail. Vous pouvez ajouter ou supprimer des postes de travail, ou r\u00e9silier \u00e0 tout moment. Consultez les <a href=\"\/fr\/tarification\/\">tarifs<\/a> pour en savoir plus, lisez le <a href=\"\/fr\/ressources\/qu-est-ce-que-l-ordonnancement-de-production\/\">guide de l\u2019ordonnancement de la production<\/a> ou d\u00e9couvrez <a href=\"\/fr\/integrations\/erp\/\">toutes les int\u00e9grations ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/essai\/\">D\u00e9marrer l\u2019essai gratuit<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/contacter-les-ventes\/\">Contacter l\u2019\u00e9quipe commerciale<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quel est le meilleur module compl\u00e9mentaire d\u2019ordonnancement pour DELMIAWorks ?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS est un module compl\u00e9mentaire d\u2019ordonnancement de la production qui respecte les capacit\u00e9s r\u00e9elles et s\u2019int\u00e8gre \u00e0 DELMIAWorks dans les deux sens. Il importe les ordres de fabrication, les nomenclatures, les postes de charge, les moules, les articles en stock et les commandes d\u2019achat. En retour, il transmet les dates planifi\u00e9es, les postes de charge, les d\u00e9clarations de production et les temps de main-d\u2019\u0153uvre. Les capacit\u00e9s limit\u00e9es de chaque presse, op\u00e9rateur, moule et mati\u00e8re sont prises en compte. Une matrice des temps de r\u00e9glage distingue le sens de chaque changement de moule et de couleur pour en optimiser l\u2019encha\u00eenement et minimiser les r\u00e9glages. Les tarifs commencent \u00e0 199 \u20ac par mois et l\u2019essai gratuit dure 30 jours.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>L\u2019ordonnancement de la production dans DELMIAWorks tient-il compte des capacit\u00e9s r\u00e9elles ?<\/summary>\n<p class=\"sp-faq__a\">Oui. DELMIAWorks APS propose un planning \u00e0 capacit\u00e9 finie par poste de charge. Auto Load charge les ordres selon leur priorit\u00e9 et les affecte \u00e0 la machine la plus performante pour les r\u00e9aliser. Des horizons de gel et des listes d\u2019anomalies pour les outillages et les mati\u00e8res compl\u00e8tent ces fonctions. SkyPlanner APS y ajoute l\u2019optimisation de l\u2019ensemble du planning en tenant compte simultan\u00e9ment des capacit\u00e9s limit\u00e9es de chaque presse, moule, \u00e9quipe et mati\u00e8re, ainsi que le r\u00e9ordonnancement automatique.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quel logiciel d\u2019ordonnancement s\u2019int\u00e8gre \u00e0 DELMIAWorks ?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS s\u2019int\u00e8gre \u00e0 DELMIAWorks dans les deux sens via la WebAPI DELMIAWorks. SkyPlanner lit les ordres de fabrication, les nomenclatures, les postes de charge, les articles en stock et les commandes d\u2019achat via les contr\u00f4leurs REST. Les dates planifi\u00e9es et les postes de charge sont renvoy\u00e9s aux ordres de fabrication via le contr\u00f4leur Manufacturing WorkOrders, les quantit\u00e9s de pi\u00e8ces bonnes via AddProductionRecords et les temps de main-d\u2019\u0153uvre via les appels de t\u00e2ches Time &amp; Attendance.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Faut-il utiliser DELMIAWorks APS ou SkyPlanner ?<\/summary>\n<p class=\"sp-faq__a\">Choisissez SkyPlanner si le planning doit s\u2019optimiser automatiquement et si les changements de s\u00e9rie, les moules, les \u00e9quipes et les mati\u00e8res limitent tous votre production. DELMIAWorks APS charge les ordres de fabrication selon des r\u00e8gles et signale \u00e0 l\u2019ordonnanceur les probl\u00e8mes d\u2019outillage et de mati\u00e8re sous forme d\u2019anomalies. SkyPlanner les r\u00e9sout dans un m\u00eame planning, le recalcule automatiquement et donne \u00e0 chaque op\u00e9rateur acc\u00e8s \u00e0 sa file d\u2019op\u00e9rations sur t\u00e9l\u00e9phone, sans limite du nombre d\u2019utilisateurs. L\u2019essai gratuit vous permet de le v\u00e9rifier avec vos propres ordres de fabrication DELMIAWorks.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>DELMIAWorks et IQMS sont-ils le m\u00eame produit ?<\/summary>\n<p class=\"sp-faq__a\">Oui. Dassault Systemes a rachet\u00e9 IQMS et renomm\u00e9 son ERP EnterpriseIQ en DELMIAWorks. SkyPlanner fonctionne avec les versions actuelles de DELMIAWorks via la WebAPI.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>SkyPlanner remplace-t-il le MRP ou RealTime de DELMIAWorks ?<\/summary>\n<p class=\"sp-faq__a\">Non, il les compl\u00e8te. DELMIAWorks conserve la gestion des stocks, des nomenclatures, du MRP, des achats, de la qualit\u00e9 et du suivi des presses avec RealTime. SkyPlanner ordonnance vos ordres de fabrication en fonction des capacit\u00e9s r\u00e9elles et renvoie les dates \u00e0 DELMIAWorks.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Combien co\u00fbte SkyPlanner pour une usine \u00e9quip\u00e9e de DELMIAWorks ?<\/summary>\n<p class=\"sp-faq__a\">\u00c0 partir de 199 \u20ac par mois avec 5 postes de travail inclus, puis 20 \u20ac par mois par poste de travail suppl\u00e9mentaire. Un poste de travail est une ressource de production qui poss\u00e8de sa propre file d\u2019op\u00e9rations planifi\u00e9es, par exemple une presse. L\u2019int\u00e9gration fait l\u2019objet d\u2019un devis \u00e9tabli \u00e0 l\u2019avance selon vos processus et vos besoins, avec votre abonnement : vous connaissez ainsi le co\u00fbt total avant de d\u00e9marrer.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Combien de temps prend le d\u00e9ploiement ?<\/summary>\n<p class=\"sp-faq__a\">Le d\u00e9ploiement est normalement achev\u00e9 en quelques semaines apr\u00e8s le d\u00e9but de l\u2019accompagnement. L\u2019\u00e9quipe \u00e9tablit les correspondances pour vos presses, moules et op\u00e9rations, connecte les ordres de fabrication et les commandes d\u2019achat, puis renvoie les dates planifi\u00e9es. L\u2019ensemble est test\u00e9 par comparaison avec votre planning actuel avant la mise en service.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Peut-on tester SkyPlanner avant de l\u2019int\u00e9grer \u00e0 DELMIAWorks ?<\/summary>\n<p class=\"sp-faq__a\">Oui. L\u2019essai de 30 jours utilise un export Excel de vos ordres de fabrication DELMIAWorks ouverts. Vous visualisez un <a href=\"\/fr\/ressources\/ordonnancement-a-capacite-finie\/\">ordonnancement \u00e0 capacit\u00e9 finie<\/a> de vos propres presses avant le d\u00e9but des travaux d\u2019int\u00e9gration.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Int\u00e9grations \/ ERP \/ DELMIAWorks SkyPlanner APS pour DELMIAWorks (IQMS) : un ordonnancement adapt\u00e9 aux capacit\u00e9s r\u00e9elles SkyPlanner APS compl\u00e8te DELMIAWorks, l\u2019ERP anciennement appel\u00e9 IQMS, avec un ordonnancement qui respecte les capacit\u00e9s r\u00e9elles. Il planifie l\u2019utilisation de chaque presse, moule, op\u00e9rateur et mati\u00e8re \u00e0 des horaires pr\u00e9cis. Arcturus optimise l\u2019ensemble du planning en quelques secondes, &#8230; <a title=\"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement \u00e0 capacit\u00e9 finie\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/\" aria-label=\"Read more about SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement \u00e0 capacit\u00e9 finie\">Lire plus<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100676,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106555","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>DELMIAWorks : int\u00e9gration APS, ordonnancement et capacit\u00e9s r\u00e9elles<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement, capacit\u00e9s r\u00e9elles, int\u00e9gration bidirectionnelle. Presses, moules, op\u00e9rateurs. D\u00e8s 199 \u20ac\/mois.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement \u00e0 capacit\u00e9 finie\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement, capacit\u00e9s r\u00e9elles, int\u00e9gration bidirectionnelle. Presses, moules, op\u00e9rateurs. D\u00e8s 199 \u20ac\/mois.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/delmiaworks\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/delmiaworks\\\/\",\"name\":\"DELMIAWorks : int\u00e9gration APS, ordonnancement et capacit\u00e9s r\u00e9elles\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement, capacit\u00e9s r\u00e9elles, int\u00e9gration bidirectionnelle. Presses, moules, op\u00e9rateurs. D\u00e8s 199 \u20ac\\\/mois.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/delmiaworks\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/delmiaworks\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/delmiaworks\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Int\u00e9grations des logiciels ERP et MES avec SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pour votre ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement \u00e0 capacit\u00e9 finie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"DELMIAWorks : int\u00e9gration APS, ordonnancement et capacit\u00e9s r\u00e9elles","description":"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement, capacit\u00e9s r\u00e9elles, int\u00e9gration bidirectionnelle. Presses, moules, op\u00e9rateurs. D\u00e8s 199 \u20ac\/mois.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/","og_locale":"fr_FR","og_type":"article","og_title":"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement \u00e0 capacit\u00e9 finie","og_description":"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement, capacit\u00e9s r\u00e9elles, int\u00e9gration bidirectionnelle. Presses, moules, op\u00e9rateurs. D\u00e8s 199 \u20ac\/mois.","og_url":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/","url":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/","name":"DELMIAWorks : int\u00e9gration APS, ordonnancement et capacit\u00e9s r\u00e9elles","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement, capacit\u00e9s r\u00e9elles, int\u00e9gration bidirectionnelle. Presses, moules, op\u00e9rateurs. D\u00e8s 199 \u20ac\/mois.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/delmiaworks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Int\u00e9grations des logiciels ERP et MES avec SkyPlanner","item":"https:\/\/skyplanner.ai\/fr\/integrations\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pour votre ERP","item":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pour DELMIAWorks (IQMS) : ordonnancement \u00e0 capacit\u00e9 finie"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Int\u00e9grations \/ ERP \/ DELMIAWorks SkyPlanner APS pour DELMIAWorks (IQMS) : un ordonnancement adapt\u00e9 aux capacit\u00e9s r\u00e9elles SkyPlanner APS compl\u00e8te DELMIAWorks, l\u2019ERP anciennement appel\u00e9 IQMS, avec un ordonnancement qui respecte les capacit\u00e9s r\u00e9elles. Il planifie l\u2019utilisation de chaque presse, moule, op\u00e9rateur et mati\u00e8re \u00e0 des horaires pr\u00e9cis. Arcturus optimise l\u2019ensemble du planning en quelques secondes,\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages\/106555","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=106555"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages\/106555\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages\/100676"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=106555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}