{"id":103562,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"ordonnancement-production","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/","title":{"rendered":"IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/fr\/integrations\/\">Int\u00e9grations<\/a> \/ <a href=\"\/fr\/integrations\/erp\/\">ERP<\/a> \/ IFS Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? <span class=\"hl\">Shop Order Scheduling, MSO et SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Dans IFS Cloud, l\u2019ordonnancement des ordres de fabrication et le calcul des besoins en capacit\u00e9 (CRP) se font \u00e0 capacit\u00e9 infinie. L\u2019ordonnancement \u00e0 capacit\u00e9 finie existe, mais il n\u00e9cessite une fonctionnalit\u00e9 distincte : Manufacturing Scheduling and Optimization (MSO), qui s\u2019appuie sur le moteur IFS PSO, ou l\u2019ancien Advanced Planning Board (APB). Les usines qui veulent <a href=\"\/fr\/ressources\/ordonnancement-a-capacite-finie\/\">ordonnancer la production en respectant toutes les contraintes de capacit\u00e9<\/a> sans ajouter MSO utilisent SkyPlanner APS aux c\u00f4t\u00e9s d\u2019IFS Cloud.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/essai\/\">Commencer l\u2019essai gratuit<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/contacter-les-ventes\/\">R\u00e9server une d\u00e9mo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ordonnancement de la production<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagramme de Gantt de SkyPlanner APS montrant les op\u00e9rations ordonnanc\u00e9es par poste de travail, avec une liste des commandes en dessous.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-ifs-cloud-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Comment IFS Cloud planifie les capacit\u00e9s, \u00e9tape par \u00e9tape<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Postes de charge et ressources<\/h3>\n\n\n<p>La capacit\u00e9 est d\u00e9finie sur le <strong>Work Center<\/strong> et ses <strong>Work Center Resources<\/strong>, qui repr\u00e9sentent une machine ou un emplacement physique. Chaque poste de charge poss\u00e8de les param\u00e8tres <strong>Calendar<\/strong>, <strong>Utilization<\/strong>, <strong>Efficiency<\/strong> et <strong>Validity Periods<\/strong>. Le champ <strong>Scheduling Capacity<\/strong> prend la valeur Finite ou Infinite.<\/p>\n\n\n<p>La capacit\u00e9 se calcule dans la bo\u00eete de dialogue <strong>Calculate Work Center Resource Capacity<\/strong>. Le personnel est mod\u00e9lis\u00e9 dans des <strong>Labor Classes<\/strong>, auxquelles sont rattach\u00e9es des personnes. Les outils sont d\u00e9finis comme des <strong>Manufacturing Tools<\/strong>, avec des exemplaires et des groupes d\u2019outils. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">source<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Nomenclatures et gammes de fabrication<\/h3>\n\n\n<p>La nomenclature correspond \u00e0 la <strong>Product Structure<\/strong>, compos\u00e9e d\u2019un en-t\u00eate, de variantes et de lignes. La gamme de fabrication, <strong>Routing<\/strong>, comporte des variantes et des <strong>Routing Operations<\/strong>. IFS pr\u00e9cise : \u00ab\u00a0All time information entered for operations (such as setup time, move time, and efficiency) affects operation scheduling.\u00a0\u00bb (Toutes les donn\u00e9es temporelles saisies pour les op\u00e9rations, comme le temps de r\u00e9glage, le temps de d\u00e9placement et l\u2019efficience, influent sur leur ordonnancement.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutRoutings.htm\">source<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. MRP, CRP et ordres de fabrication<\/h3>\n\n\n<p>Le MRP et le programme directeur de production cr\u00e9ent des <strong>Shop Orders<\/strong> planifi\u00e9s. Un ordre de fabrication passe par des statuts tels que Planned, Released, Reserved, Started et Closed. Chaque <strong>Shop Order Operation<\/strong> contient les temps de r\u00e9glage et d\u2019ex\u00e9cution pour la machine et la main-d\u2019\u0153uvre, l\u2019effectif requis, une <strong>Preferred Resource<\/strong>, ainsi que le chevauchement et les blocs d\u2019op\u00e9rations.<\/p>\n\n\n<p>Le CRP affiche la charge que ces ordres imposent aux postes de charge. Il ne la limite pas. IFS est explicite : \u00ab\u00a0Operations scheduled with CRP and shop order are always scheduled infinite.\u00a0\u00bb (Les op\u00e9rations ordonnanc\u00e9es par le CRP et les ordres de fabrication le sont toujours \u00e0 capacit\u00e9 infinie.) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">source<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Infinite Scheduler pour les ordres de fabrication<\/h3>\n\n\n<p>Infinite Scheduler fixe les dates de chaque op\u00e9ration. Il tient compte du calendrier du poste de charge, du taux d\u2019utilisation, de l\u2019efficience des op\u00e9rations et des ressources, des temps d\u2019attente et de transport, du chevauchement, des op\u00e9rations parall\u00e8les et de Preferred Resource. Il ordonnance au plus t\u00f4t ou au plus tard et s\u00e9lectionne \u00ab\u00a0the least loaded resource for the work center.\u00a0\u00bb (la ressource la moins charg\u00e9e du poste de charge).<\/p>\n\n\n<p>Il \u00ab\u00a0always treats each shop order as if it is the only one in the system, with few constraints on resources and capacity.\u00a0\u00bb (traite toujours chaque ordre de fabrication comme s\u2019il \u00e9tait le seul dans le syst\u00e8me, avec peu de contraintes sur les ressources et la capacit\u00e9). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSOInfiniteScheduling.htm\">source<\/a>) Deux ordres de fabrication peuvent ainsi \u00eatre plac\u00e9s sur la m\u00eame machine \u00e0 la m\u00eame heure.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Premi\u00e8re option pour respecter les capacit\u00e9s : MSO et Smart Manufacturing Planning Board<\/h3>\n\n\n<p>MSO \u00ab\u00a0is a solution designed to generate finite production schedules by optimizing the use of manufacturing resource constraints.\u00a0\u00bb (est une solution con\u00e7ue pour g\u00e9n\u00e9rer des plannings de production respectant les capacit\u00e9s en optimisant l\u2019utilisation des ressources de fabrication sous contraintes). Il \u00ab\u00a0leverages the IFS PSO (Planning, Scheduling, and Optimization) engine.\u00a0\u00bb (s\u2019appuie sur le moteur IFS PSO, Planning, Scheduling, and Optimization). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">source<\/a>) Il traite les postes de charge, les cat\u00e9gories de main-d\u2019\u0153uvre et les outils comme des contraintes d\u2019ordonnancement. Il ne place une op\u00e9ration que lorsque la quantit\u00e9 de mati\u00e8re requise est disponible. Il tient aussi compte des temps de r\u00e9glage propres aux articles, des priorit\u00e9s des ordres de fabrication, des calendriers des ressources et des travaux de maintenance. En mode Automatic, il recalcule l\u2019ordonnancement chaque fois que n\u00e9cessaire, par exemple \u00e0 la cr\u00e9ation d\u2019un nouvel ordre de fabrication.<\/p>\n\n\n<p>Le param\u00e9trage en bref :<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Param\u00e8tre<\/th><th>Fonction<\/th><\/tr><\/thead><tbody><tr><td>Finite Scheduling Basic Data<\/td><td>Active la fonctionnalit\u00e9 pour le site ; \u00ab\u00a0the dataset must be activated\u00a0\u00bb (le jeu de donn\u00e9es doit \u00eatre activ\u00e9)<\/td><\/tr><tr><td>Mode<\/td><td>Ordonnancement en mode Manual ou Automatic<\/td><\/tr><tr><td>Time Horizon (Days), Scheduling Start Time<\/td><td>P\u00e9riode couverte par l\u2019ordonnancement MSO<\/td><\/tr><tr><td>Use Setup Matrices for Scheduling<\/td><td>Temps de r\u00e9glage propres \u00e0 chaque article<\/td><\/tr><tr><td>Exempt Labor, Exempt Tools, Exempt Shop Order Types<\/td><td>Contraintes ignor\u00e9es par MSO<\/td><\/tr><tr><td>MSO Advanced Parameters<\/td><td>Mod\u00e8le standard avec des valeurs par d\u00e9faut valid\u00e9es ; modifications \u00ab\u00a0For modification by PSO\/MSO SMEs only\u00a0\u00bb (r\u00e9serv\u00e9es aux experts du domaine)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Sur l\u2019ordre de fabrication, <strong>Need Date<\/strong> d\u00e9finit la date cible servant \u00e0 mesurer le retard, <strong>Earliest Start Date<\/strong> constitue \u00ab\u00a0a hard time constraint\u00a0\u00bb (une contrainte temporelle imp\u00e9rative), et <strong>Priority Category<\/strong> entre dans le calcul du score de priorit\u00e9 MSO. Les planificateurs travaillent dans le <strong>Smart Manufacturing Planning Board<\/strong>, avec les pages Gantt Resources et Operations, le glisser-d\u00e9poser, le fractionnement des op\u00e9rations et l\u2019optimisation s\u00e9lective. (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutSmartManufacturingPlanningBoard.htm\">source<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Deuxi\u00e8me option pour respecter les capacit\u00e9s : Advanced Planning Board<\/h3>\n\n\n<p>L\u2019APB, d\u00e9j\u00e0 connu dans IFS Applications 10, utilise Constraint Based Scheduling (CBS). Il \u00ab\u00a0allows you to perform finite scheduling of shop orders on sites that have enabled the use of the APB in scheduling basic data.\u00a0\u00bb (permet d\u2019ordonnancer les ordres de fabrication en respectant les capacit\u00e9s sur les sites ayant activ\u00e9 l\u2019APB dans les donn\u00e9es de base d\u2019ordonnancement). (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutCBSSchedulingTheory.htm\">source<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-stays-with-the-planner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce qui reste \u00e0 la charge du planificateur<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Une capacit\u00e9 infinie par d\u00e9faut.<\/strong> L\u2019ordonnancement des ordres de fabrication et le CRP ne v\u00e9rifient jamais la capacit\u00e9 en tenant compte de l\u2019ensemble des ordres. Pour respecter les capacit\u00e9s, il faut configurer s\u00e9par\u00e9ment MSO ou l\u2019APB (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/MfgStandard\/AboutWorkCenter.htm\">\u00c0 propos des postes de charge<\/a>).<\/li>\n\n\n<li><strong>MSO n\u00e9cessite un acc\u00e8s distinct.<\/strong> Il \u00ab\u00a0is available for customers with access to Manufacturing Scheduling and Optimization.\u00a0\u00bb (est disponible pour les clients ayant acc\u00e8s \u00e0 Manufacturing Scheduling and Optimization). Les sites hybrides ou h\u00e9berg\u00e9s ont besoin d\u2019un IFS.ai Activation Pass. Les sites cloud n\u00e9cessitent \u00ab\u00a0PSO sizing and purchase of PSO Cloud Service\u00a0\u00bb (le dimensionnement de PSO et l\u2019achat de PSO Cloud Service) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">MSO 26R2<\/a>).<\/li>\n\n\n<li><strong>Sur les services de plateforme IFS.ai, MSO fonctionne en mode manuel et consomme des jetons.<\/strong> \u00ab\u00a0Automatic scheduling mode is not available for users on the IFS.ai-based platform services.\u00a0\u00bb (Le mode d\u2019ordonnancement automatique n\u2019est pas disponible pour les utilisateurs des services de plateforme bas\u00e9s sur IFS.ai.) Les utilisateurs \u00ab\u00a0must have a number of dedicated tokens on hand to do a finite schedule or to do a simulation in MSO\u00a0\u00bb (doivent disposer d\u2019un certain nombre de jetons d\u00e9di\u00e9s pour effectuer un ordonnancement respectant les capacit\u00e9s ou une simulation dans MSO) (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r1\/lang\/en\/Manufacturing\/AboutMSO.htm\">MSO 26R1<\/a>). Le mode Automatic n\u2019est pas disponible sur les sites hybrides ou h\u00e9berg\u00e9s utilisant un IFS.ai Activation Pass (<a href=\"https:\/\/docs.ifs.com\/ifsclouddocs\/26r2\/lang\/en\/Manufacturing\/AboutIFS.aiManufacturingSchedulingAndOptimization%28MSO%29.htm\">MSO 26R2<\/a>).<\/li>\n\n\n<li><strong>Les param\u00e8tres avanc\u00e9s sont r\u00e9serv\u00e9s aux sp\u00e9cialistes.<\/strong> IFS fournit un mod\u00e8le standard et recommande vivement de conserver ses valeurs par d\u00e9faut. Les modifications sont r\u00e9serv\u00e9es aux experts PSO et MSO.<\/li>\n\n\n<li><strong>Des limites MSO document\u00e9es.<\/strong> \u00ab\u00a0MSO schedules the first operation on a work center using a setup matrix without a setup time.\u00a0\u00bb (Lorsqu\u2019une matrice de r\u00e9glage est utilis\u00e9e, MSO ordonnance la premi\u00e8re op\u00e9ration d\u2019un poste de charge sans temps de r\u00e9glage.) \u00ab\u00a0Parallel shop order operations are not considered for optimization in a compressed manner.\u00a0\u00bb (Les op\u00e9rations parall\u00e8les des ordres de fabrication ne font pas l\u2019objet d\u2019une optimisation par compression.) Avec Exempt Labor, \u00ab\u00a0operations that have only labor time and no machine time will remain untouched.\u00a0\u00bb (les op\u00e9rations comportant uniquement du temps de main-d\u2019\u0153uvre et aucun temps machine restent inchang\u00e9es).<\/li>\n\n\n<li><strong>Un horizon court.<\/strong> IFS positionne MSO sur l\u2019ordonnancement d\u00e9taill\u00e9 \u00e0 court terme et renvoie au CRP, au MRP et au programme directeur de production pour les horizons plus lointains.<\/li>\n\n\n<li><strong>L\u2019APB ne planifie que les donn\u00e9es charg\u00e9es.<\/strong> Il \u00ab\u00a0only considers the constraints placed by shop orders and resources that are actually loaded to the APB at a given time.\u00a0\u00bb (ne tient compte que des contraintes impos\u00e9es par les ordres de fabrication et les ressources effectivement charg\u00e9s dans l\u2019APB \u00e0 un instant donn\u00e9).<\/li>\n\n<\/ul>\n\n\n<p>En pratique, les usines qui utilisent l\u2019ordonnancement standard doivent composer avec des op\u00e9rations qui se chevauchent, des s\u00e9quences revues manuellement et un planning parall\u00e8le sous Excel, issu d\u2019un export d\u2019IFS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-ifs-cloud-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quand l\u2019ordonnancement natif d\u2019IFS Cloud suffit<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>L\u2019ordonnancement standard des ordres de fabrication, associ\u00e9 au CRP, suffit lorsque :<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>L\u2019atelier dispose de capacit\u00e9s inutilis\u00e9es et les v\u00e9ritables goulets d\u2019\u00e9tranglement sont rares.<\/li>\n\n\n<li>Les gammes de fabrication sont courtes et stables, et vous planifiez \u00e0 la semaine.<\/li>\n\n\n<li>Un responsable d\u2019atelier fixe l\u2019ordre de passage sur la machine.<\/li>\n\n\n<li>Les outils partag\u00e9s, les \u00e9quipes et les arriv\u00e9es de mati\u00e8res ne d\u00e9terminent pas l\u2019ordre des op\u00e9rations.<\/li>\n\n<\/ul>\n\n\n<p>MSO convient \u00e0 un site qui ach\u00e8te l\u2019acc\u00e8s \u00e0 MSO et son d\u00e9ploiement sur PSO ou IFS.ai, et qui ordonnance \u00e0 court terme dans IFS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Quand un outil d\u2019ordonnancement respectant les capacit\u00e9s devient n\u00e9cessaire<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>L\u2019ordonnancement standard ne suffit plus lorsque plusieurs de ces situations se pr\u00e9sentent :<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Les dates promises ne sont pas tenues, alors que le CRP ne signalait aucun probl\u00e8me.<\/li>\n\n\n<li>Le temps de changement de s\u00e9rie d\u00e9pend du produit fabriqu\u00e9 pr\u00e9c\u00e9demment.<\/li>\n\n\n<li>Les effectifs, les horaires des \u00e9quipes et les absences contraignent le planning autant que les machines.<\/li>\n\n\n<li>Des moules, des matrices ou des montages sont partag\u00e9s entre plusieurs machines.<\/li>\n\n\n<li>La disponibilit\u00e9 des mati\u00e8res d\u00e9termine quel ordre de fabrication peut d\u00e9marrer.<\/li>\n\n\n<li>Les commandes urgentes et les pannes imposent de revoir le planning plusieurs fois par semaine.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Les crit\u00e8res \u00e0 v\u00e9rifier<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Le respect simultan\u00e9 des capacit\u00e9s de toutes les ressources<\/strong>, et non d\u2019un simple sous-ensemble charg\u00e9 dans un tableau de planification.<\/li>\n\n\n<li><strong>Une matrice des temps de r\u00e9glage<\/strong> : des temps de changement de s\u00e9rie entre produits qui d\u00e9pendent de l\u2019ordre de passage et diff\u00e8rent selon le sens de transition, pour minimiser le temps total de r\u00e9glage.<\/li>\n\n\n<li><strong>Des outils g\u00e9r\u00e9s comme des ressources partag\u00e9es \u00e0 disponibilit\u00e9 limit\u00e9e<\/strong>, pour qu\u2019un m\u00eame moule ne soit jamais affect\u00e9 \u00e0 deux machines en m\u00eame temps.<\/li>\n\n\n<li><strong>Des op\u00e9rations \u00e0 plusieurs op\u00e9rateurs<\/strong> : chaque op\u00e9ration re\u00e7oit le nombre de personnes n\u00e9cessaire, en respectant les horaires de chacune.<\/li>\n\n\n<li><strong>Un ordonnancement tenant compte des mati\u00e8res<\/strong>, qui v\u00e9rifie les stocks et les commandes d\u2019achat attendues.<\/li>\n\n\n<li><strong>Un r\u00e9ordonnancement automatique<\/strong> lorsque l\u2019avancement de la production ou les commandes changent, sans budget de jetons par ex\u00e9cution.<\/li>\n\n\n<li><strong>Une mise \u00e0 jour ma\u00eetris\u00e9e des donn\u00e9es dans IFS<\/strong> via ses propres projections OData, avec une responsabilit\u00e9 clairement d\u00e9finie pour les dates des op\u00e9rations.<\/li>\n\n<\/ul>\n\n\n<p>Les solutions se r\u00e9partissent en quatre groupes :<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>L\u2019ordonnancement standard d\u2019IFS Cloud<\/strong> calcule les dates des ordres de fabrication \u00e0 capacit\u00e9 infinie dans IFS.<\/li>\n\n\n<li><strong>IFS MSO<\/strong> ordonnance la production en respectant les capacit\u00e9s des machines, du personnel et des outils, ainsi que la disponibilit\u00e9 des mati\u00e8res. Ce module repose sur le moteur PSO et n\u00e9cessite un acc\u00e8s distinct.<\/li>\n\n\n<li><strong>Les suites APS d\u2019entreprise<\/strong> sont raccord\u00e9es dans le cadre d\u2019un projet de d\u00e9ploiement et exploit\u00e9es par une \u00e9quipe de planification.<\/li>\n\n\n<li><strong>Les APS cloud avec ex\u00e9cution en atelier<\/strong>, cat\u00e9gorie \u00e0 laquelle appartient SkyPlanner, ordonnancent automatiquement chaque ressource aux c\u00f4t\u00e9s d\u2019IFS Cloud et mettent le planning \u00e0 la disposition des op\u00e9rateurs.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">La place de SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS comble ces lacunes. Chaque poste de travail a une capacit\u00e9 limit\u00e9e, et tous les ordres de fabrication se disputent la m\u00eame capacit\u00e9. Le moteur Arcturus AI \u00e9tablit en quelques secondes un planning d\u00e9taill\u00e9 par op\u00e9ration et organise leur encha\u00eenement selon vos priorit\u00e9s et vos \u00e9ch\u00e9ances.<\/p>\n\n\n<p>Sa matrice des temps de r\u00e9glage enregistre le temps de changement de s\u00e9rie entre chaque paire de produits, dans les deux sens. Le moteur choisit l\u2019encha\u00eenement qui minimise le temps de r\u00e9glage. Les outils sont des ressources partag\u00e9es \u00e0 capacit\u00e9 limit\u00e9e, et une op\u00e9ration peut n\u00e9cessiter plusieurs op\u00e9rateurs \u00e0 la fois. Lorsqu\u2019une machine ou une personne est indisponible, le moteur r\u00e9affecte le travail aux ressources de remplacement que vous avez d\u00e9finies.<\/p>\n\n\n<p>L\u2019ordonnancement selon la disponibilit\u00e9 des mati\u00e8res simule les stocks futurs \u00e0 partir du stock actuel et des commandes fournisseurs attendues. Le travail n\u2019est ainsi planifi\u00e9 que lorsque les mati\u00e8res sont disponibles. Running Time Lock maintient les op\u00e9rations en cours \u00e0 leur place.<\/p>\n\n\n<p>Autopilot recalcule automatiquement le planning lorsque la production change, en respectant vos verrouillages et vos priorit\u00e9s. Les planificateurs ajustent les op\u00e9rations dans un diagramme de Gantt interactif, et les op\u00e9rateurs d\u00e9clarent leur travail sur t\u00e9l\u00e9phone ou tablette avec Mobile Confirmations.<\/p>\n\n\n<p><strong>Choisissez SkyPlanner plut\u00f4t qu\u2019IFS MSO si<\/strong> vous abandonnez les tableurs et souhaitez un planning qui respecte les capacit\u00e9s disponibles et se g\u00e8re de lui-m\u00eame :<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Les ordres de fabrication se chevauchent sur les machines partag\u00e9es et le CRP ne signale la surcharge qu\u2019apr\u00e8s coup.<\/li>\n\n\n<li>Les changements de s\u00e9rie, les outils partag\u00e9s ou les op\u00e9rations n\u00e9cessitant plusieurs op\u00e9rateurs d\u00e9terminent ce qui peut \u00eatre lanc\u00e9 ensuite.<\/li>\n\n\n<li>Le planning doit \u00eatre recalcul\u00e9 \u00e0 chaque changement. Autopilot s\u2019en charge automatiquement, sans budget de jetons par ex\u00e9cution et sans restriction au mode manuel.<\/li>\n\n\n<li>Le service commercial a besoin de dates calcul\u00e9es selon les capacit\u00e9s r\u00e9elles plusieurs mois \u00e0 l\u2019avance, au-del\u00e0 de l\u2019horizon \u00e0 court terme privil\u00e9gi\u00e9 par MSO.<\/li>\n\n\n<li>Vous voulez r\u00e9unir toutes les contraintes dans un seul moteur, \u00e0 un tarif public, sans ajouter d\u2019acc\u00e8s MSO, de PSO Cloud Service ou d\u2019IFS.ai Activation Pass, et sans param\u00e8tres r\u00e9serv\u00e9s aux sp\u00e9cialistes PSO.<\/li>\n\n<\/ul>\n\n\n<p>D\u00e8s l\u2019essai, vous voyez vos propres ordres de fabrication ordonnanc\u00e9s selon les capacit\u00e9s r\u00e9elles. La mise en production intervient quelques semaines apr\u00e8s le d\u00e9but de l\u2019accompagnement.<\/p>\n\n\n<p>Commencez avec un export Excel de vos ordres de fabrication dans le cadre de l\u2019<a href=\"\/fr\/essai\/\">essai gratuit de 30 jours<\/a> (jusqu\u2019\u00e0 20 postes de travail, sans carte bancaire). Les tarifs commencent \u00e0 199 \u20ac par mois, avec 5 postes de travail inclus et une facturation mensuelle. L\u2019int\u00e9gration fait l\u2019objet d\u2019un devis pr\u00e9alable adapt\u00e9 \u00e0 vos processus et \u00e0 vos besoins : vous connaissez ainsi le co\u00fbt total avant de commencer.<\/p>\n\n\n<p>SkyPlanner s\u2019int\u00e8gre \u00e0 IFS Cloud dans les deux sens via les projections OData d\u2019IFS. L\u2019\u00e9quipe SkyPlanner configure cette int\u00e9gration pendant la phase d\u2019accompagnement et en assure le support apr\u00e8s la mise en production. Consultez la page <a href=\"\/fr\/integrations\/erp\/ifs-cloud\/\">SkyPlanner pour IFS Cloud<\/a>, le <a href=\"\/fr\/integrations\/erp\/ifs-cloud\/guide-dintegration\/\">guide d\u2019int\u00e9gration \u00e0 IFS Cloud<\/a>, ou d\u00e9couvrez les autres syst\u00e8mes dans la <a href=\"\/fr\/integrations\/erp\/\">rubrique des int\u00e9grations ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/essai\/\">D\u00e9marrer l\u2019essai gratuit<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/fr\/contacter-les-ventes\/\">R\u00e9server une d\u00e9mo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Les industriels t\u00e9moignent sur SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, sp\u00e9cialiste de la cha\u00eene logistique chez UTU, dans l\u2019atelier de fabrication de tableaux \u00e9lectriques \u00e0 Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>gagn\u00e9es chaque semaine<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab Avec SkyPlanner, nous sommes pass\u00e9s d\u2019une planification de la production sur des feuilles Excel \u00e0 une optimisation de la production en temps r\u00e9el. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, sp\u00e9cialiste de la cha\u00eene logistique<\/b><br>UTU \u00b7 Tableaux et appareillages \u00e9lectriques<\/p>\n\n\n<p class=\"ind-cust__result\">La planification de la production permet de gagner 2 heures de travail par semaine, et une nouvelle file d\u2019op\u00e9rations est transmise \u00e0 la ligne en quelques secondes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/utu\/\">Lire le t\u00e9moignage d\u2019UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Des op\u00e9rateurs en tenue de salle blanche sur une ligne de remplissage de flacons dans l\u2019usine pharmaceutique de Laboratory &amp; Allied \u00e0 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90 %<\/b><span>d\u2019efficacit\u00e9 en production<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab L\u2019efficacit\u00e9 en production a augment\u00e9 de 90 %. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, directeur informatique<\/b><br>Laboratory &amp; Allied \u00b7 Fabrication pharmaceutique<\/p>\n\n\n<p class=\"ind-cust__result\">L\u2019efficacit\u00e9 en production a augment\u00e9 de 90 %, et l\u2019\u00e9laboration d\u2019un planning optimis\u00e9 sur trois mois pour l\u2019ensemble des postes de travail prend moins de 30 minutes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/laboratory-allied\/\">Lire le t\u00e9moignage de Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Un soudeur de KJH-Comp meule une structure en acier soud\u00e9e dans l\u2019usine d\u2019Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98 %<\/b><span>de livraisons dans les d\u00e9lais, contre environ 50 % auparavant<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab SkyPlanner joue un r\u00f4le d\u00e9cisif pour que nous continuions \u00e0 respecter nos d\u00e9lais de livraison. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, directeur g\u00e9n\u00e9ral<\/b><br>KJH-Comp \u00b7 T\u00f4lerie et fabrication en sous-traitance<\/p>\n\n\n<p class=\"ind-cust__result\">Le taux de respect des d\u00e9lais de livraison est pass\u00e9 d\u2019environ 50 % \u00e0 un niveau pouvant atteindre 98 %, et l\u2019ordonnancement ne n\u00e9cessite plus qu\u2019un superviseur au lieu de deux.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/kjh-comp\/\">Lire le t\u00e9moignage de KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100 %<\/b><span>de livraisons dans les d\u00e9lais depuis 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab SkyPlanner nous donne de la visibilit\u00e9 sur la capacit\u00e9 et rend la planification pr\u00e9visible. \u00bb<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Fabrication chimique et agroalimentaire<\/p>\n\n\n<p class=\"ind-cust__result\">Le taux de respect des d\u00e9lais de livraison est de 100 % depuis le d\u00e9but de l\u2019utilisation de SkyPlanner, en 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/fr\/temoignages-clients\/opes-corporation\/\">Lire le t\u00e9moignage d\u2019Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Quelle est la diff\u00e9rence entre IFS MSO et PSO ?<\/summary>\n<p class=\"sp-faq__a\">PSO (Planning and Scheduling Optimization) est le moteur d\u2019ordonnancement d\u2019IFS, \u00e9galement commercialis\u00e9 pour l\u2019ordonnancement des interventions sur le terrain. MSO (Manufacturing Scheduling and Optimization) est le module d\u2019ordonnancement de la production qui repose sur le moteur PSO. Dans la documentation 26R2, il porte le nom IFS.ai Manufacturing Scheduling and Optimization.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>MSO est-il inclus dans IFS Cloud ?<\/summary>\n<p class=\"sp-faq__a\">Selon la documentation IFS, MSO est disponible pour les clients qui disposent des droits d\u2019acc\u00e8s correspondants. Son d\u00e9ploiement n\u00e9cessite un IFS.ai Activation Pass sur les sites hybrides ou h\u00e9berg\u00e9s, ou un dimensionnement PSO et l\u2019achat d\u2019un PSO Cloud Service dans le cloud. Sur les services de la plateforme IFS.ai, MSO fonctionne en mode manuel et consomme des jetons.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>IFS Cloud peut-il ordonnancer le personnel et les outils en respectant leurs capacit\u00e9s r\u00e9elles ?<\/summary>\n<p class=\"sp-faq__a\">Dans MSO, oui : les postes de charge, les cat\u00e9gories de main-d\u2019\u0153uvre et les outils sont trait\u00e9s comme des contraintes d\u2019ordonnancement, sauf si Exempt Labor ou Exempt Tools est activ\u00e9. L\u2019ordonnancement standard des ordres de fabrication ne limite pas l\u2019utilisation des cat\u00e9gories de main-d\u2019\u0153uvre ou des outils entre les diff\u00e9rents ordres. \u00c0 chaque calcul, SkyPlanner ordonnance le personnel et les outils partag\u00e9s selon leurs capacit\u00e9s r\u00e9elles, en tenant compte des \u00e9quipes et des absences.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>IFS Cloud g\u00e8re-t-il les temps de r\u00e9glage qui d\u00e9pendent de l\u2019encha\u00eenement des op\u00e9rations ?<\/summary>\n<p class=\"sp-faq__a\">MSO le permet gr\u00e2ce aux matrices de r\u00e9glage, mais il ordonnance la premi\u00e8re op\u00e9ration d\u2019un poste de charge sans temps de r\u00e9glage. L\u2019ordonnancement standard utilise le temps de r\u00e9glage d\u00e9fini sur l\u2019op\u00e9ration de la gamme de fabrication. La matrice des temps de r\u00e9glage de SkyPlanner enregistre les changements de s\u00e9rie entre paires de produits : par exemple, 30 minutes du bleu au rouge et 60 du rouge au bleu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Puis-je tester SkyPlanner avant de l\u2019int\u00e9grer \u00e0 IFS Cloud ?<\/summary>\n<p class=\"sp-faq__a\">Oui. Exportez les ordres de fabrication ouverts, les op\u00e9rations et les postes de charge d\u2019IFS Cloud vers Excel, importez-les pendant l\u2019essai de 30 jours et comparez le planning obtenu \u00e0 votre planning actuel. Consultez les <a href=\"\/fr\/tarification\/\">tarifs<\/a>, <a href=\"\/fr\/essai\/\">d\u00e9marrez l\u2019essai<\/a> ou <a href=\"\/fr\/contacter-les-ventes\/\">contactez l\u2019\u00e9quipe commerciale<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Int\u00e9grations \/ ERP \/ IFS Cloud IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS Dans IFS Cloud, l\u2019ordonnancement des ordres de fabrication et le calcul des besoins en capacit\u00e9 (CRP) se font \u00e0 capacit\u00e9 infinie. L\u2019ordonnancement \u00e0 capacit\u00e9 finie existe, mais il n\u00e9cessite une fonctionnalit\u00e9 distincte : &#8230; <a title=\"IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/\" aria-label=\"Read more about IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS\">Lire plus<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102879,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103562","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>IFS Cloud : l\u2019ordonnancement respecte-t-il les capacit\u00e9s ?<\/title>\n<meta name=\"description\" content=\"IFS Cloud : ordres et CRP \u00e0 capacit\u00e9 infinie. Pour respecter les capacit\u00e9s : MSO sur PSO ou APB. R\u00f4les, limites et cas n\u00e9cessitant un APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"IFS Cloud : ordres et CRP \u00e0 capacit\u00e9 infinie. Pour respecter les capacit\u00e9s : MSO sur PSO ou APB. R\u00f4les, limites et cas n\u00e9cessitant un APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/ifs-cloud\\\/ordonnancement-production\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/ifs-cloud\\\/ordonnancement-production\\\/\",\"name\":\"IFS Cloud : l\u2019ordonnancement respecte-t-il les capacit\u00e9s ?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"IFS Cloud : ordres et CRP \u00e0 capacit\u00e9 infinie. Pour respecter les capacit\u00e9s : MSO sur PSO ou APB. R\u00f4les, limites et cas n\u00e9cessitant un APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/ifs-cloud\\\/ordonnancement-production\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/ifs-cloud\\\/ordonnancement-production\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/ifs-cloud\\\/ordonnancement-production\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Int\u00e9grations des logiciels ERP et MES avec SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pour votre ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pour IFS Cloud : ordonnancement \u00e0 capacit\u00e9 finie\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/integrations\\\/erp\\\/ifs-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"IFS Cloud : l\u2019ordonnancement respecte-t-il les capacit\u00e9s ?","description":"IFS Cloud : ordres et CRP \u00e0 capacit\u00e9 infinie. Pour respecter les capacit\u00e9s : MSO sur PSO ou APB. R\u00f4les, limites et cas n\u00e9cessitant un APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/","og_locale":"fr_FR","og_type":"article","og_title":"IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS","og_description":"IFS Cloud : ordres et CRP \u00e0 capacit\u00e9 infinie. Pour respecter les capacit\u00e9s : MSO sur PSO ou APB. R\u00f4les, limites et cas n\u00e9cessitant un APS.","og_url":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"17 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/","url":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/","name":"IFS Cloud : l\u2019ordonnancement respecte-t-il les capacit\u00e9s ?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fr\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"IFS Cloud : ordres et CRP \u00e0 capacit\u00e9 infinie. Pour respecter les capacit\u00e9s : MSO sur PSO ou APB. R\u00f4les, limites et cas n\u00e9cessitant un APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/ordonnancement-production\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fr\/"},{"@type":"ListItem","position":2,"name":"Int\u00e9grations des logiciels ERP et MES avec SkyPlanner","item":"https:\/\/skyplanner.ai\/fr\/integrations\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pour votre ERP","item":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pour IFS Cloud : ordonnancement \u00e0 capacit\u00e9 finie","item":"https:\/\/skyplanner.ai\/fr\/integrations\/erp\/ifs-cloud\/"},{"@type":"ListItem","position":5,"name":"IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fr\/#website","url":"https:\/\/skyplanner.ai\/fr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Int\u00e9grations \/ ERP \/ IFS Cloud IFS Cloud propose-t-il un ordonnancement respectant les capacit\u00e9s ? Shop Order Scheduling, MSO et SkyPlanner APS Dans IFS Cloud, l\u2019ordonnancement des ordres de fabrication et le calcul des besoins en capacit\u00e9 (CRP) se font \u00e0 capacit\u00e9 infinie. L\u2019ordonnancement \u00e0 capacit\u00e9 finie existe, mais il n\u00e9cessite une fonctionnalit\u00e9 distincte :\u2026","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages\/103562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments?post=103562"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages\/103562\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages\/102879"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media?parent=103562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}