{"name":"SkyPlanner","description":"AI-powered production scheduling and planning software","url":"https:\/\/skyplanner.ai","home":"https:\/\/skyplanner.ai\/fr\/","gmt_offset":"0","timezone_string":"","page_for_posts":0,"page_on_front":7740,"show_on_front":"page","namespaces":["oembed\/1.0","sc\/v1","skyplanner\/v1","wpml\/v1","betterdocs\/v1","esab\/v1","generateblocks\/v1","generatepress-pro\/v1","generatepress-site-library\/v1","yoast\/v1","wpml\/st\/v1","wpml\/tm\/v1","wpml\/ate\/v1","spectra\/v1","uag\/v1","wp-mail-smtp\/setup-wizard\/v1","generatepress\/v1","betterdocs","betterdocs-pro\/v1","one-onboarding\/v1","wpforms\/v1","otgs\/installer\/v1","zipwp-images\/v1","nps-survey\/v1","zipwp\/v1","gutenberg-templates\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/skyplanner.ai\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"L\u2019URL de la ressource \u00e0 parcourir pour obtenir les donn\u00e9es oEmbed.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"L\u2019URL de la ressource \u00e0 parcourir pour obtenir les donn\u00e9es oEmbed.","type":"string","format":"uri","required":true},"format":{"description":"Le format oEmbed \u00e0 utiliser.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"La largeur maximale du contenu embarqu\u00e9 en pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"La hauteur maximale du contenu embarqu\u00e9 oEmbed en pixels.","type":"integer","required":false},"discover":{"description":"D\u00e9termine s\u2019il faut ou non effectuer une requ\u00eate de d\u00e9couverte oEmbed vers d\u2019autres fournisseurs non autoris\u00e9s.","type":"boolean","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/oembed\/1.0\/proxy"}]}},"\/sc\/v1":{"namespace":"sc\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"sc\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/sc\/v1"}]}},"\/sc\/v1\/cb-hook":{"namespace":"sc\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/sc\/v1\/cb-hook"}]}},"\/sc\/v1\/cal-hook":{"namespace":"sc\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/sc\/v1\/cal-hook"}]}},"\/sc\/v1\/tid":{"namespace":"sc\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/sc\/v1\/tid"}]}},"\/skyplanner\/v1":{"namespace":"skyplanner\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"skyplanner\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/skyplanner\/v1"}]}},"\/skyplanner\/v1\/geo-context":{"namespace":"skyplanner\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"region":{"default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/skyplanner\/v1\/geo-context"}]}},"\/skyplanner\/v1\/integration-systems":{"namespace":"skyplanner\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"market":{"default":"global","required":false},"category":{"default":"all","required":false},"search":{"default":"","required":false},"page":{"default":1,"required":false},"per_page":{"default":24,"required":false},"lang":{"default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/skyplanner\/v1\/integration-systems"}]}},"\/skyplanner\/v1\/header-integration-logos":{"namespace":"skyplanner\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"market":{"default":"global","required":false},"lang":{"default":"","required":false},"limit":{"default":17,"required":false},"version":{"default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/skyplanner\/v1\/header-integration-logos"}]}},"\/skyplanner\/v1\/selector-decisions":{"namespace":"skyplanner\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/skyplanner\/v1\/selector-decisions"}]}},"\/wpml\/v1":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1"}]}},"\/wpml\/v1\/custom-xml-config":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/custom-xml-config"}]}},"\/wpml\/v1\/custom-xml-config\/validate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/custom-xml-config\/validate"}]}},"\/betterdocs\/v1":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"betterdocs\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1"}]}},"\/betterdocs\/v1\/ai-edit":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"type":"integer","required":true},"action":{"type":"string","required":true},"selection":{"type":"string","default":"","required":false},"selection_type":{"type":"string","default":"block","required":false},"instruction":{"type":"string","default":"","required":false},"option":{"type":"string","default":"","required":false},"instruction_ids":{"type":"array","default":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/ai-edit"}]}},"\/betterdocs\/v1\/ai-faq":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"question":{"type":"string","required":true},"keywords":{"type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/ai-faq"}]}},"\/betterdocs\/v1\/analytics\/view":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"type":"integer","required":true},"u":{"type":"integer","default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/view"}]}},"\/betterdocs\/v1\/customize\/layouts":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/customize\/layouts"}]}},"\/betterdocs\/v1\/doc-categories":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected docs.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/doc-categories"}]}},"\/betterdocs\/v1\/doc-categories-kb":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/doc-categories-kb"}]}},"\/betterdocs\/v1\/search":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected docs.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/search"}]}},"\/betterdocs\/v1\/search-insert":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/search-insert"}]}},"\/betterdocs\/v1\/get-terms":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/get-terms"}]}},"\/betterdocs\/v1\/months-with-posts":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/months-with-posts"}]}},"\/betterdocs\/v1\/order_docs":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected docs.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/order_docs"}]}},"\/betterdocs\/v1\/docs-faq-count":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/docs-faq-count"}]}},"\/betterdocs\/v1\/ai-suggest-terms":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"type":"integer","required":true},"taxonomy":{"type":"string","required":true},"content":{"type":"string","default":"","required":false},"title":{"type":"string","default":"","required":false},"max_suggestions":{"type":"integer","default":6,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/ai-suggest-terms"}]}},"\/betterdocs\/v1\/faq-terms-by-keyword-search":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected FAQs.","type":"string","required":false},"taxonomy":{"description":"The FAQ taxonomy to search within.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/faq-terms-by-keyword-search"}]}},"\/betterdocs\/v1\/faq-accordion-toggle":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/faq-accordion-toggle"}]}},"\/betterdocs\/v1\/feedback\/(?P<id>\\d+)":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","default":null,"required":false},"feelings":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/sample-docs\/detect":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/sample-docs\/detect"}]}},"\/betterdocs\/v1\/sample-docs\/generate":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/sample-docs\/generate"}]}},"\/betterdocs\/v1\/sample-docs\/outline":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/sample-docs\/outline"}]}},"\/betterdocs\/v1\/sample-docs\/article":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/sample-docs\/article"}]}},"\/betterdocs\/v1\/sample-docs\/insert":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/sample-docs\/insert"}]}},"\/betterdocs\/v1\/sample-docs\/undo":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/sample-docs\/undo"}]}},"\/betterdocs\/v1\/settings":{"namespace":"betterdocs\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/settings"}]}},"\/betterdocs\/v1\/dark-mode":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/dark-mode"}]}},"\/betterdocs\/v1\/plugin_insights":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/plugin_insights"}]}},"\/betterdocs\/v1\/create-sample-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/create-sample-docs"}]}},"\/betterdocs\/v1\/reporting-test":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/reporting-test"}]}},"\/betterdocs\/v1\/export-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/export-docs"}]}},"\/betterdocs\/v1\/export-settings":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/export-settings"}]}},"\/betterdocs\/v1\/import-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/import-docs"}]}},"\/betterdocs\/v1\/import-settings":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/import-settings"}]}},"\/betterdocs\/v1\/parse-xml":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/parse-xml"}]}},"\/betterdocs\/v1\/parse-csv":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/parse-csv"}]}},"\/betterdocs\/v1\/migrate":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/migrate"}]}},"\/betterdocs\/v1\/helpscout-migration":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/helpscout-migration"}]}},"\/betterdocs\/v1\/dashboard-mode":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/dashboard-mode"}]}},"\/betterdocs\/v1\/term-translations":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/term-translations"}]}},"\/betterdocs\/v1\/term-language":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/term-language"}]}},"\/betterdocs\/v1\/write-with-ai":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"type":"integer","default":0,"required":false},"action":{"type":"string","required":true},"title":{"type":"string","default":"","required":false},"keywords":{"type":"string","default":"","required":false},"prompt":{"type":"string","default":"","required":false},"source":{"type":"string","default":"","required":false},"source_type":{"type":"string","default":"","required":false},"git_url":{"type":"string","default":"","required":false},"git_action":{"type":"string","default":"","required":false},"repo":{"type":"string","default":"","required":false},"kind":{"type":"string","default":"","required":false},"path":{"type":"string","default":"","required":false},"ref":{"type":"string","default":"","required":false},"outline":{"type":"array","default":[],"required":false},"tone":{"type":"string","default":"","required":false},"doc_size":{"type":"string","default":"any","required":false},"generate_title":{"type":"boolean","default":false,"required":false},"instruction_ids":{"type":"array","default":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/write-with-ai"}]}},"\/esab\/v1":{"namespace":"esab\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"esab\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/esab\/v1"}]}},"\/esab\/v1\/patterns":{"namespace":"esab\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"refresh":{"type":"boolean","default":false,"required":false},"page":{"type":"integer","default":1,"required":false},"per_page":{"type":"integer","default":20,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/esab\/v1\/patterns"}]}},"\/generateblocks\/v1":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generateblocks\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1"}]}},"\/generateblocks\/v1\/settings":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/settings"}]}},"\/generateblocks\/v1\/setting":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/setting"}]}},"\/generateblocks\/v1\/regenerate_css_files":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/regenerate_css_files"}]}},"\/generateblocks\/v1\/onboarding":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/onboarding"}]}},"\/generateblocks\/v1\/get-attachment-by-url":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/get-attachment-by-url"}]}},"\/generateblocks\/v1\/get-wp-query":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/get-wp-query"}]}},"\/generateblocks\/v1\/get-user-query":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/get-user-query"}]}},"\/generateblocks\/v1\/meta\/get-post-meta":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/meta\/get-post-meta"}]}},"\/generateblocks\/v1\/meta\/get-user-meta":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/meta\/get-user-meta"}]}},"\/generateblocks\/v1\/meta\/get-term-meta":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/meta\/get-term-meta"}]}},"\/generateblocks\/v1\/meta\/get-option":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/meta\/get-option"}]}},"\/generateblocks\/v1\/pattern-library\/libraries":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/pattern-library\/libraries"}]}},"\/generateblocks\/v1\/pattern-library\/libraries\/save":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/pattern-library\/libraries\/save"}]}},"\/generateblocks\/v1\/pattern-library\/categories":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/pattern-library\/categories"}]}},"\/generateblocks\/v1\/pattern-library\/patterns":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/pattern-library\/patterns"}]}},"\/generateblocks\/v1\/pattern-library\/get-cache-data":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/pattern-library\/get-cache-data"}]}},"\/generateblocks\/v1\/pattern-library\/clear-cache":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/pattern-library\/clear-cache"}]}},"\/generateblocks\/v1\/dynamic-tag-replacements":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/dynamic-tag-replacements"}]}},"\/generateblocks\/v1\/post-record":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postId":{"required":true},"load":{"required":false},"options":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/post-record"}]}},"\/generateblocks\/v1\/get-user-record":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generateblocks\/v1\/get-user-record"}]}},"\/generatepress-pro\/v1":{"namespace":"generatepress-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generatepress-pro\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-pro\/v1"}]}},"\/generatepress-pro\/v1\/modules":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-pro\/v1\/modules"}]}},"\/generatepress-pro\/v1\/license":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-pro\/v1\/license"}]}},"\/generatepress-pro\/v1\/beta":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-pro\/v1\/beta"}]}},"\/generatepress-pro\/v1\/export":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-pro\/v1\/export"}]}},"\/generatepress-pro\/v1\/import":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-pro\/v1\/import"}]}},"\/generatepress-pro\/v1\/reset":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-pro\/v1\/reset"}]}},"\/generatepress-site-library\/v1":{"namespace":"generatepress-site-library\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generatepress-site-library\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1"}]}},"\/generatepress-site-library\/v1\/get_sites":{"namespace":"generatepress-site-library\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/get_sites"}]}},"\/generatepress-site-library\/v1\/get_site_data":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/get_site_data"}]}},"\/generatepress-site-library\/v1\/import_theme_options":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/import_theme_options"}]}},"\/generatepress-site-library\/v1\/activate_plugins":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/activate_plugins"}]}},"\/generatepress-site-library\/v1\/import_content":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/import_content"}]}},"\/generatepress-site-library\/v1\/import_site_options":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/import_site_options"}]}},"\/generatepress-site-library\/v1\/import_widgets":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/import_widgets"}]}},"\/generatepress-site-library\/v1\/restore_theme_options":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/restore_theme_options"}]}},"\/generatepress-site-library\/v1\/restore_content":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress-site-library\/v1\/restore_content"}]}},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/ai_generator\/callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_generator\/callback"}]}},"\/yoast\/v1\/ai_generator\/refresh_callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_generator\/refresh_callback"}]}},"\/yoast\/v1\/ai_generator\/consent":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"consent":{"type":"boolean","description":"Whether the consent to use AI-based services has been given by the user.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_generator\/consent"}]}},"\/yoast\/v1\/ai_content_planner\/banner_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_content_planner\/banner_permanent_dismissal"}]}},"\/yoast\/v1\/ai_content_planner\/get_outline":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"type":"string","description":"The post type to get a content outline for.","required":true},"language":{"type":"string","description":"The language the content is written in.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true},"title":{"type":"string","description":"The title of the chosen content suggestion.","required":true},"intent":{"type":"string","description":"The intent of the chosen content suggestion.","required":true},"explanation":{"type":"string","description":"The explanation of the chosen content suggestion.","required":true},"keyphrase":{"type":"string","description":"The keyphrase of the chosen content suggestion.","required":true},"meta_description":{"type":"string","description":"The meta description of the chosen content suggestion.","required":true},"category":{"type":"object","properties":{"name":{"type":"string","required":true},"id":{"type":"integer","required":true}},"description":"The category of the chosen content suggestion. Use name \"\" and id -1 to indicate no category.","required":true},"recent_content":{"type":"array","maxItems":100,"items":{"type":"object","properties":{"title":{"type":"string","required":true,"maxLength":500},"description":{"type":"string","required":true,"maxLength":1000}},"additionalProperties":false},"description":"The recent content returned by the get_suggestions response.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_content_planner\/get_outline"}]}},"\/yoast\/v1\/ai_content_planner\/get_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_type":{"type":"string","description":"The post type to get content suggestions for.","required":true},"language":{"type":"string","description":"The language the content is written in.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_content_planner\/get_suggestions"}]}},"\/yoast\/v1\/ai\/free_sparks":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai\/free_sparks"}]}},"\/yoast\/v1\/ai_generator\/bust_subscription_cache":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_generator\/bust_subscription_cache"}]}},"\/yoast\/v1\/ai_generator\/get_suggestions":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"type":"string","enum":["seo-title","meta-description","product-seo-title","product-meta-description","product-taxonomy-seo-title","product-taxonomy-meta-description","taxonomy-seo-title","taxonomy-meta-description"],"description":"The type of suggestion requested.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"platform":{"type":"string","enum":["Google","Facebook","Twitter"],"description":"The platform the post is intended for.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_generator\/get_suggestions"}]}},"\/yoast\/v1\/ai_generator\/get_usage":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_woo_product_entity":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai_generator\/get_usage"}]}},"\/yoast\/v1\/bulk_editor\/posts_content":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"ids":{"type":"array","minItems":1,"maxItems":20,"items":{"type":"integer","minimum":1},"description":"The IDs of the posts to return the content of. Accepts a comma separated list.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/bulk_editor\/posts_content"}]}},"\/yoast\/v1\/bulk_editor\/posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"content_type":{"type":"string","description":"The content type to fetch posts for.","required":true},"per_page":{"type":"integer","default":20,"minimum":1,"maximum":100,"description":"The number of posts to fetch.","required":false},"page":{"type":"integer","default":1,"minimum":1,"description":"The page of posts to fetch.","required":false},"search":{"type":"string","default":"","description":"The term to search posts by.","required":false},"status":{"type":"array","default":["publish","draft","pending","future"],"items":{"type":"string","enum":["publish","draft","pending","future"]},"description":"The post statuses to include.","required":false},"needs_improvement":{"type":"array","default":[],"items":{"type":"string","enum":["seo_title","meta_description","social_title","social_description"]},"description":"The fields to filter posts by; a field matches when it is empty, or (for search fields, while SEO analysis is enabled and the content type shows Yoast's controls and assessments) when its score needs improvement.","required":false},"include":{"type":"array","default":[],"maxItems":100,"items":{"type":"integer","minimum":1},"description":"Limits the posts to these post IDs, e.g. a selection carried over from the posts overview.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/bulk_editor\/posts"}]}},"\/yoast\/v1\/bulk_editor\/update_scores":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post score updates to apply.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/bulk_editor\/update_scores"}]}},"\/yoast\/v1\/bulk_editor\/update_search":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post updates to apply.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/bulk_editor\/update_search"}]}},"\/yoast\/v1\/bulk_editor\/update_social":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"items":{"type":"array","description":"The per-post updates to apply.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/bulk_editor\/update_social"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/site_kit_configuration_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/site_kit_configuration_permanent_dismissal"}]}},"\/yoast\/v1\/readability_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/readability_scores"}]}},"\/yoast\/v1\/seo_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/seo_scores"}]}},"\/yoast\/v1\/setup_steps_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"setup_widget_loaded":{"type":"string","enum":["yes","no"],"required":false},"first_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"last_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"setup_widget_temporarily_dismissed":{"type":"string","enum":["yes","no"],"required":false},"setup_widget_permanently_dismissed":{"type":"string","enum":["yes","no"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/setup_steps_tracking"}]}},"\/yoast\/v1\/introductions\/(?P<introduction_id>[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/available_posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","default":"","required":false},"postType":{"type":"string","default":"page","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/available_posts"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P<plugin>[\\w-]+)\/(?P<type>[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/semrush\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/semrush\/authenticate"}]}},"\/yoast\/v1\/semrush\/country_code":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"country_code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/semrush\/country_code"}]}},"\/yoast\/v1\/semrush\/related_keyphrases":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"keyphrase":{"required":true},"country_code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/semrush\/related_keyphrases"}]}},"\/yoast\/v1\/wincher\/authorization-url":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wincher\/authorization-url"}]}},"\/yoast\/v1\/wincher\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"websiteId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wincher\/authenticate"}]}},"\/yoast\/v1\/wincher\/keyphrases\/track":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wincher\/keyphrases\/track"}]}},"\/yoast\/v1\/wincher\/keyphrases":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":false},"permalink":{"required":false},"startAt":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wincher\/keyphrases"}]}},"\/yoast\/v1\/wincher\/keyphrases\/untrack":{"namespace":"yoast\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wincher\/keyphrases\/untrack"}]}},"\/yoast\/v1\/wincher\/account\/limit":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wincher\/account\/limit"}]}},"\/yoast\/v1\/wincher\/account\/upgrade-campaign":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/wincher\/account\/upgrade-campaign"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"cornerstone":{"required":true},"orphaned":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/workouts"}]}},"\/yoast\/v1\/complete_task":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"options":{"type":"object","properties":{"task":{"type":"string","required":true,"sanitize_callback":"sanitize_text_field"}},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/complete_task"}]}},"\/yoast\/v1\/get_tasks":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"options":{"type":"object","properties":{"filter":{"type":"string","required":false,"sanitize_callback":"sanitize_text_field"},"limit":{"type":"int","required":false,"sanitize_callback":"absint"}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/get_tasks"}]}},"\/yoast\/v1\/action_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/action_tracking"}]}},"\/yoast\/v1\/ai\/bulk_suggestions":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"subjects":{"type":"array","minItems":1,"maxItems":20,"description":"The subjects to fetch suggestions for.","items":{"type":"object","required":["id","type"],"properties":{"id":{"type":"integer","minimum":1,"description":"The post ID."},"type":{"type":"string","enum":["seo-title","meta-description"],"description":"The type of suggestion requested."},"platform":{"type":"string","enum":["Google","Facebook","Twitter"],"description":"The platform the suggestion is intended for."}}},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai\/bulk_suggestions"}]}},"\/yoast\/v1\/ai\/optimize":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"assessment":{"type":"string","enum":["seo-keyphrase-introduction","seo-keyphrase-density","seo-keyphrase-distribution","seo-keyphrase-subheadings","read-sentence-length","read-paragraph-length"],"description":"The assessment.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":false},"synonyms":{"type":"string","description":"The synonyms for the focus keyphrase.","required":false},"editor":{"type":"string","enum":["Classic","Gutenberg"],"description":"The editor type, either Classic or Gutenberg.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai\/optimize"}]}},"\/yoast\/v1\/ai\/summarize":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"language":{"type":"string","description":"The language the post is written in.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for a summary.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/ai\/summarize"}]}},"\/yoast\/v1\/link_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"prominent_words":{"type":"object","description":"Stems of prominent words and their term frequencies we want link suggestions based on","required":true},"object_id":{"type":"integer","description":"The object id of the current indexable.","required":true},"object_type":{"type":"string","description":"The object type of the current indexable.","required":true},"limit":{"default":5,"type":"integer","description":"The maximum number of link suggestions to retrieve","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/link_suggestions"}]}},"\/yoast\/v1\/prominent_words\/get_content":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/prominent_words\/get_content"}]}},"\/yoast\/v1\/prominent_words\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/prominent_words\/complete"}]}},"\/yoast\/v1\/prominent_words\/save":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"array","items":{"type":"object","properties":{"object_id":{"type":"number","required":true},"prominent_words":{"type":"object","required":false}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/prominent_words\/save"}]}},"\/yoast\/v1\/workouts\/noindex":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"object_sub_type":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/workouts\/noindex"}]}},"\/yoast\/v1\/workouts\/remove_redirect":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"object_sub_type":{"type":"string","required":true},"permalink":{"type":"string","required":true},"redirect_url":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/workouts\/remove_redirect"}]}},"\/yoast\/v1\/workouts\/link_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"indexableId":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/workouts\/link_suggestions"}]}},"\/yoast\/v1\/workouts\/last_updated":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postId":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/workouts\/last_updated"}]}},"\/yoast\/v1\/workouts\/cornerstone_data":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/workouts\/cornerstone_data"}]}},"\/yoast\/v1\/workouts\/enable_cornerstone":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/workouts\/enable_cornerstone"}]}},"\/wpml\/st\/v1":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/st\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1"}]}},"\/wpml\/st\/v1\/strings\/settings":{"namespace":"wpml\/st\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"autoregisterType":{"type":"integer","default":0,"required":false},"shouldRegisterBackendStrings":{"type":"integer","default":0,"required":false},"setNoticeThatCachePluginCanBlockAutoregisterAsDismissed":{"type":"integer","default":0,"required":false},"setDetectStringsInJS":{"type":"integer","default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/strings\/settings"}]}},"\/wpml\/st\/v1\/strings\/itemscount":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/strings\/itemscount"}]}},"\/wpml\/st\/v1\/strings":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/strings"}]}},"\/wpml\/st\/v1\/strings\/filters":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/strings\/filters"}]}},"\/wpml\/st\/v1\/string-packages":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/string-packages"}]}},"\/wpml\/st\/v1\/strings\/processstringsqueue":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/strings\/processstringsqueue"}]}},"\/wpml\/tm\/v1":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/tm\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/store":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_job_id":{"type":"string","required":true},"ate_job_data":{"type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/store"}]}},"\/wpml\/tm\/v1\/xliff\/fetch\/(?P<jobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/ams\/register_manager":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ams\/register_manager"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/translators":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/translators"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/managers":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/managers"}]}},"\/wpml\/tm\/v1\/ams\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ams\/status"}]}},"\/wpml\/tm\/v1\/ams\/console":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ams\/console"}]}},"\/wpml\/tm\/v1\/ams\/engines":{"namespace":"wpml\/tm\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ams\/engines"}]}},"\/wpml\/tm\/v1\/ate\/jobs":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ate\/jobs"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/jobs":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"local_job_ids":{"type":"string","required":false},"scope":{"type":"string","required":false},"id":{"type":"integer","required":false},"title":{"type":"string","required":false},"source_language":{"type":"string","required":false},"target_language":{"type":"string","required":false},"status":{"type":"string","required":false},"needs_update":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"sorting":{"required":false},"translated_by":{"type":"string","required":false},"sent_from":{"type":"string","required":false},"sent_to":{"type":"string","required":false},"deadline_from":{"type":"string","required":false},"deadline_to":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/jobs"}]}},"\/wpml\/tm\/v1\/jobs\/assign":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"jobId":{"required":true},"type":{"required":false},"translatorId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/jobs\/assign"}]}},"\/wpml\/tm\/v1\/jobs\/cancel":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/jobs\/cancel"}]}},"\/wpml\/tm\/v1\/tp\/xliff\/download\/(?P<job_id>\\d+)\/(?P<job_type>\\w+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"job_id":{"required":true},"job_type":{"required":true},"json":{"type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/tp\/apply-translations":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/tp\/apply-translations"}]}},"\/wpml\/tm\/v1\/tp\/batches\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/tp\/batches\/sync"}]}},"\/wpml\/tm\/v1\/tp\/batches\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/tp\/batches\/status"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"lockKey":{"type":"string","required":false},"ateToken":{"type":"string","required":false},"page":{"type":"int","required":false},"numberOfPages":{"type":"int","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/sync"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/download":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/download"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/retry":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/retry"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/receive\/(?P<wpmlJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpmlJobId":{"type":"int","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)\/fix":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/ate\/v1":{"namespace":"wpml\/ate\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/ate\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/ate\/v1"}]}},"\/wpml\/ate\/v1\/ate\/proxy":{"namespace":"wpml\/ate\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/ate\/v1\/ate\/proxy"}]}},"\/wpml\/st\/v1\/import_mo_strings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"plugins":{"type":"array","required":false},"themes":{"type":"array","required":false},"other":{"type":"array","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/import_mo_strings"}]}},"\/wpml\/st\/v1\/pre_generate_mo_files":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/pre_generate_mo_files"}]}},"\/wpml\/st\/v1\/settings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"group":{"required":true},"key":{"required":true},"data":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/st\/v1\/settings"}]}},"\/wpml\/v1\/updates":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/updates"}]}},"\/wpml\/v1\/troubleshooting\/posthog":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/troubleshooting\/posthog"}]}},"\/wpml\/v1\/troubleshooting\/enable-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/troubleshooting\/enable-alias-domain"}]}},"\/wpml\/v1\/troubleshooting\/register-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/troubleshooting\/register-alias-domain"}]}},"\/wpml\/v1\/troubleshooting\/reset-alias-domain":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/troubleshooting\/reset-alias-domain"}]}},"\/wpml\/v1\/item-sections\/populated":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/item-sections\/populated"}]}},"\/wpml\/v1\/posts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/posts"}]}},"\/wpml\/v1\/posts\/count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/posts\/count"}]}},"\/wpml\/v1\/send-to-translation\/validate-translation-options":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/send-to-translation\/validate-translation-options"}]}},"\/wpml\/v1\/send-to-translation\/default-batch-name":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/send-to-translation\/default-batch-name"}]}},"\/wpml\/v1\/send-to-translation\/validate-batch-name":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/send-to-translation\/validate-batch-name"}]}},"\/wpml\/v1\/set-review-translation-option":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/set-review-translation-option"}]}},"\/wpml\/v1\/posts\/hierarchical":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/posts\/hierarchical"}]}},"\/wpml\/v1\/posts\/taxonomies":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/posts\/taxonomies"}]}},"\/wpml\/v1\/posts\/terms":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/posts\/terms"}]}},"\/wpml\/v1\/translate-everything\/enable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/translate-everything\/enable"}]}},"\/wpml\/v1\/translate-everything\/disable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/translate-everything\/disable"}]}},"\/wpml\/v1\/cancelallautomaticjobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/cancelallautomaticjobs"}]}},"\/wpml\/v1\/getuntranslatedtypescount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/getuntranslatedtypescount"}]}},"\/wpml\/v1\/save-translator-note":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/save-translator-note"}]}},"\/wpml\/v1\/credits":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/credits"}]}},"\/wpml\/v1\/translation-proxy\/commit-batch":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/translation-proxy\/commit-batch"}]}},"\/wpml\/v1\/tranlsation-proxy\/getlastpickedup":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/tranlsation-proxy\/getlastpickedup"}]}},"\/wpml\/v1\/translation-proxy\/getRemoteJobsCount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/translation-proxy\/getRemoteJobsCount"}]}},"\/wpml\/v1\/gettranslationstatus":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/gettranslationstatus"}]}},"\/wpml\/v1\/getlocaltranslatorbyid":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/getlocaltranslatorbyid"}]}},"\/wpml\/v1\/reloadremotetranslationservice":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/reloadremotetranslationservice"}]}},"\/wpml\/v1\/gettranslationeditortype":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/gettranslationeditortype"}]}},"\/wpml\/v1\/translate-existing-content":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/translate-existing-content"}]}},"\/wpml\/v1\/get-needs-update-count-created-in-cte":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/get-needs-update-count-created-in-cte"}]}},"\/wpml\/v1\/get-engines":{"namespace":"wpml\/v1","methods":["GET","GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/get-engines"}]}},"\/wpml\/v1\/website-contexts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/website-contexts"}]}},"\/wpml\/v1\/has-posts-using-native-editor":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/has-posts-using-native-editor"}]}},"\/wpml\/v1\/get-credits-per-word":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/get-credits-per-word"}]}},"\/wpml\/v1\/get-words-to-translate-for-items":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/get-words-to-translate-for-items"}]}},"\/wpml\/v1\/get-words-to-translate-for-types":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/get-words-to-translate-for-types"}]}},"\/wpml\/v1\/save-automatic-translation-settings":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/save-automatic-translation-settings"}]}},"\/wpml\/v1\/getlocaltranslators":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/getlocaltranslators"}]}},"\/wpml\/v1\/account-balances":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/account-balances"}]}},"\/wpml\/v1\/glossary-count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/glossary-count"}]}},"\/wpml\/v1\/enable-ate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/enable-ate"}]}},"\/wpml\/v1\/get-dismissed-notices":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/get-dismissed-notices"}]}},"\/wpml\/v1\/minimum-requirements":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/minimum-requirements"}]}},"\/wpml\/v1\/rest\/status":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/rest\/status"}]}},"\/wpml\/v1\/posthog\/refresh-cache":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/posthog\/refresh-cache"}]}},"\/wpml\/v1\/dismiss-notice":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/dismiss-notice"}]}},"\/wpml\/v1\/dismiss-notice-per-user":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/dismiss-notice-per-user"}]}},"\/wpml\/v1\/cancel-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/cancel-jobs"}]}},"\/wpml\/v1\/unsolvable-jobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/unsolvable-jobs"}]}},"\/wpml\/v1\/resend-unsolvable-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/resend-unsolvable-jobs"}]}},"\/wpml\/v1\/wpml\/posthog\/capture-event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/wpml\/posthog\/capture-event"}]}},"\/wpml\/v1\/capture\/event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/capture\/event"}]}},"\/wpml\/v1\/wpml-proxy\/status":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/wpml-proxy\/status"}]}},"\/wpml\/v1\/wpml-content-stats":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/wpml-content-stats"}]}},"\/wpml\/v1\/wpml-ph-make-external-request":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpml\/v1\/wpml-ph-make-external-request"}]}},"\/spectra\/v1":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"spectra\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/spectra\/v1"}]}},"\/spectra\/v1\/all_taxonomy":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/spectra\/v1\/all_taxonomy"}]}},"\/spectra\/v1\/editor":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/spectra\/v1\/editor"}]}},"\/spectra\/v1\/check-custom-fields-support":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"post_type":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/spectra\/v1\/check-custom-fields-support"}]}},"\/uag\/v1":{"namespace":"uag\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"uag\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/uag\/v1"}]}},"\/uag\/v1\/admin\/commonsettings":{"namespace":"uag\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/uag\/v1\/admin\/commonsettings"}]}},"\/uag\/v1\/admin\/commonsettings\/get-learn-chapters":{"namespace":"uag\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/uag\/v1\/admin\/commonsettings\/get-learn-chapters"}]}},"\/uag\/v1\/admin\/commonsettings\/update-learn-progress":{"namespace":"uag\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/uag\/v1\/admin\/commonsettings\/update-learn-progress"}]}},"\/wp-mail-smtp\/setup-wizard\/v1":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-mail-smtp\/setup-wizard\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/health":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/health"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/hydrate":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/hydrate"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/update":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/update"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/settings":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/settings"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/import-settings":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/import-settings"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-connected-data":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-connected-data"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-oauth-url":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-oauth-url"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/remove-oauth-connection":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/remove-oauth-connection"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/sendlayer-disconnect":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/sendlayer-disconnect"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/check-mailer-configuration":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/check-mailer-configuration"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/mailer-preflight":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/mailer-preflight"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/install-plugin":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/install-plugin"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/upgrade-plugin":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/upgrade-plugin"}]}},"\/wp-mail-smtp\/setup-wizard\/v1\/get-partner-plugins-info":{"namespace":"wp-mail-smtp\/setup-wizard\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-mail-smtp\/setup-wizard\/v1\/get-partner-plugins-info"}]}},"\/yoast\/v1\/redirects":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"origin":{"type":"string","description":"The origin to redirect","required":true},"target":{"type":"string","description":"The redirect target","required":false},"type":{"type":"integer","description":"The redirect type","required":true},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"Le format de la redirection \u00e0 cr\u00e9er.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/redirects"}]}},"\/yoast\/v1\/redirects\/delete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"origin":{"type":"string","description":"The origin to redirect","required":true},"target":{"type":"string","description":"The redirect target","required":false},"type":{"type":"string","description":"The redirect format","required":false},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"Le format de la redirection \u00e0 cr\u00e9er.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/redirects\/delete"}]}},"\/yoast\/v1\/redirects\/list":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"format":{"description":"Le format des redirections \u00e0 r\u00e9cup\u00e9rer.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/redirects\/list"}]}},"\/yoast\/v1\/redirects\/update":{"namespace":"yoast\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"old_origin":{"type":"string","description":"The origin to redirect (old)","required":true},"old_target":{"type":"string","description":"The redirect target (old)","required":false},"old_type":{"type":"integer","description":"The redirect type (old)","required":true},"new_origin":{"type":"string","description":"The origin to redirect (new)","required":true},"new_target":{"type":"string","description":"The redirect target (new)","required":false},"new_type":{"type":"integer","description":"The redirect type (new)","required":true},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"Le format des redirections \u00e0 r\u00e9cup\u00e9rer.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/redirects\/update"}]}},"\/yoast\/v1\/redirects\/settings":{"namespace":"yoast\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"disable_php_redirect":{"description":"Indiquez si les redirections bas\u00e9es sur PHP doivent \u00eatre d\u00e9sactiv\u00e9es et si .htaccess doit \u00eatre utilis\u00e9 \u00e0 la place.","type":"string","enum":["on","off"],"required":true},"separate_file":{"description":"Indiquer si les redirections doivent \u00eatre \u00e9crites dans un fichier s\u00e9par\u00e9 au lieu du .htaccess.","type":"string","enum":["on","off"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/redirects\/settings"}]}},"\/yoast\/v1\/redirects\/undo-for-object":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"obj_id":{"type":"int","description":"The id of the post or term","required":true},"obj_type":{"type":"string","description":"The object type: post or term","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/yoast\/v1\/redirects\/undo-for-object"}]}},"\/generatepress\/v1":{"namespace":"generatepress\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generatepress\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress\/v1"}]}},"\/generatepress\/v1\/reset":{"namespace":"generatepress\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/generatepress\/v1\/reset"}]}},"\/skyplanner\/v1\/pricing-rates":{"namespace":"skyplanner\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"cached":{"default":"1","required":false},"refresh":{"default":"0","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/skyplanner\/v1\/pricing-rates"}]}},"\/betterdocs":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"betterdocs","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs"}]}},"\/betterdocs\/faq\/sample_data":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/sample_data"}]}},"\/betterdocs\/faq\/posts\/(?P<type>\\S+)":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/faq\/create_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/create_category"}]}},"\/betterdocs\/faq\/update_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/update_category"}]}},"\/betterdocs\/faq\/delete_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/delete_category"}]}},"\/betterdocs\/faq\/create_post":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/create_post"}]}},"\/betterdocs\/faq\/update_post":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/update_post"}]}},"\/betterdocs\/faq\/delete_post":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/delete_post"}]}},"\/betterdocs\/faq\/category_status":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/category_status"}]}},"\/betterdocs\/faq\/category_order":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/category_order"}]}},"\/betterdocs\/faq\/update_order_by_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/update_order_by_category"}]}},"\/betterdocs\/faq\/order":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/order"}]}},"\/betterdocs\/faq\/uncategorised":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/uncategorised"}]}},"\/betterdocs\/faq\/category_search":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"title":{"type":"string","required":true},"taxonomy":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/faq\/category_search"}]}},"\/betterdocs\/v1\/mcp":{"namespace":"betterdocs\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp"}]}},"\/betterdocs\/v1\/mcp\/oauth\/protected-resource":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/oauth\/protected-resource"}]}},"\/betterdocs\/v1\/mcp\/oauth\/authorization-server":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/oauth\/authorization-server"}]}},"\/betterdocs\/v1\/mcp\/oauth\/register":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/oauth\/register"}]}},"\/betterdocs\/v1\/mcp\/oauth\/token":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/oauth\/token"}]}},"\/betterdocs\/v1\/mcp\/connection":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/connection"}]}},"\/betterdocs\/v1\/mcp\/connect":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"read_only":{"type":"boolean","default":false,"description":"Grant read-only access: no doc, term, FAQ or settings changes.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/connect"}]}},"\/betterdocs\/v1\/mcp\/rotate":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"read_only":{"type":"boolean","description":"Optionally set read-only on the new token; omit to keep the current scopes.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/rotate"}]}},"\/betterdocs\/v1\/mcp\/disconnect":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/disconnect"}]}},"\/betterdocs\/v1\/mcp\/apps":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/apps"}]}},"\/betterdocs\/v1\/mcp\/apps\/revoke":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"client_id":{"type":"string","description":"The OAuth client_id to revoke.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/apps\/revoke"}]}},"\/betterdocs\/v1\/mcp\/self-test":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/self-test"}]}},"\/betterdocs\/v1\/mcp\/health":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user":{"type":"integer","description":"Report this user's capabilities instead of the caller's.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/mcp\/health"}]}},"\/betterdocs-pro\/v1":{"namespace":"betterdocs-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"betterdocs-pro\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs-pro\/v1"}]}},"\/betterdocs-pro\/v1\/license\/activate":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"license_key":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs-pro\/v1\/license\/activate"}]}},"\/betterdocs-pro\/v1\/license\/deactivate":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs-pro\/v1\/license\/deactivate"}]}},"\/betterdocs-pro\/v1\/license\/submit-otp":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"license_key":{"required":true},"otp":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs-pro\/v1\/license\/submit-otp"}]}},"\/betterdocs-pro\/v1\/license\/resend-otp":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"license_key":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs-pro\/v1\/license\/resend-otp"}]}},"\/betterdocs-pro\/v1\/license\/get-license":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs-pro\/v1\/license\/get-license"}]}},"\/betterdocs-pro\/v1\/license\/delete-license":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs-pro\/v1\/license\/delete-license"}]}},"\/betterdocs\/v1\/api-ref\/(?P<id>[\\d]+)\/sync":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/overview":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/overview"}]}},"\/betterdocs\/v1\/feedbacks":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/feedbacks"}]}},"\/betterdocs\/v1\/feedbacks\/(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/search\/(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/leading_docs":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/leading_docs"}]}},"\/betterdocs\/v1\/leading_docs\/(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/leading(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/analytics\/ai-traffic":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/ai-traffic"}]}},"\/betterdocs\/v1\/analytics\/ai-traffic\/rescan":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/ai-traffic\/rescan"}]}},"\/betterdocs\/v1\/analytics":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics"}]}},"\/betterdocs\/v1\/analytics\/summary":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/summary"}]}},"\/betterdocs\/v1\/analytics\/articles":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"per_page":{"type":"integer","default":20,"required":false},"page":{"type":"integer","default":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/articles"}]}},"\/betterdocs\/v1\/analytics\/articles\/(?P<id>\\d+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"id":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/analytics\/categories":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"per_page":{"type":"integer","default":20,"required":false},"page":{"type":"integer","default":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/categories"}]}},"\/betterdocs\/v1\/analytics\/knowledge-bases":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"per_page":{"type":"integer","default":20,"required":false},"page":{"type":"integer","default":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/knowledge-bases"}]}},"\/betterdocs\/v1\/analytics\/reactions":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"order":{"type":"string","default":"most","required":false},"per_page":{"type":"integer","default":20,"required":false},"page":{"type":"integer","default":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/reactions"}]}},"\/betterdocs\/v1\/analytics\/search":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"scope":{"type":"string","default":"all","required":false},"per_page":{"type":"integer","default":20,"required":false},"page":{"type":"integer","default":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/search"}]}},"\/betterdocs\/v1\/analytics\/engagement":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/engagement"}]}},"\/betterdocs\/v1\/analytics\/feedback":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"status":{"type":"string","default":"","required":false},"feeling":{"type":"string","default":"","required":false},"per_page":{"type":"integer","default":20,"required":false},"page":{"type":"integer","default":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/feedback"}]}},"\/betterdocs\/v1\/analytics\/feedback\/bulk":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"ids":{"type":"array","items":{"type":"integer"},"required":true},"status":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/feedback\/bulk"}]}},"\/betterdocs\/v1\/analytics\/links":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kb":{"type":"string","default":"","required":false},"per_page":{"type":"integer","default":20,"required":false},"page":{"type":"integer","default":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/links"}]}},"\/betterdocs\/v1\/analytics\/links\/scan":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/links\/scan"}]}},"\/betterdocs\/v1\/analytics\/geoip\/status":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/geoip\/status"}]}},"\/betterdocs\/v1\/analytics\/geoip\/refresh":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/geoip\/refresh"}]}},"\/betterdocs\/v1\/analytics\/ga4\/test":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/ga4\/test"}]}},"\/betterdocs\/v1\/analytics\/authors":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/analytics\/authors"}]}},"\/betterdocs\/v1\/analytics\/export\/(?P<module>[a-z_]+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"days":{"default":30,"required":false},"kb":{"type":"string","default":"","required":false},"module":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/api-ref\/(?P<id>[\\d]+)\/ai-generate":{"namespace":"betterdocs\/v1","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["GET"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/api-ref\/(?P<id>[\\d]+)\/materialize":{"namespace":"betterdocs\/v1","methods":["POST","GET","DELETE"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["GET"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/api-ref\/proxy":{"namespace":"betterdocs\/v1","methods":["GET","POST","PUT","PATCH","DELETE","OPTIONS"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE","OPTIONS"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/api-ref\/proxy"}]}},"\/betterdocs\/v1\/api-ref":{"namespace":"betterdocs\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/api-ref"}]}},"\/betterdocs\/v1\/api-ref\/(?P<id>[\\d]+)":{"namespace":"betterdocs\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/api-ref\/(?P<id>[\\d]+)\/spec-file":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/api-ref\/(?P<id>[\\d]+)\/spec":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/docs_order":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"orderby":{"type":"string","enum":["betterdocs_order","menu_order"],"default":"menu_order","required":false},"order":{"type":"string","enum":["ASC","DESC","asc","desc"],"default":"ASC","required":false},"per_page":{"type":"integer","minimum":1,"maximum":100,"default":10,"required":false},"doc_category":{"type":"integer","minimum":0,"default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/docs_order"}]}},"\/betterdocs\/v1\/knowledge_base":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/knowledge_base"}]}},"\/betterdocs\/v1\/doc_category":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"orderby":{"type":"string","enum":["betterdocs_order","menu_order"],"default":"menu_order","required":false},"order":{"type":"string","enum":["ASC","DESC","asc","desc"],"default":"ASC","required":false},"per_page":{"type":"integer","minimum":1,"maximum":100,"default":10,"required":false},"doc_category":{"type":"integer","minimum":0,"default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/doc_category"}]}},"\/betterdocs\/v1\/ask":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/ask"}]}},"\/betterdocs\/v1\/feedback":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/feedback"}]}},"\/betterdocs\/v1\/plugin_info":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/plugin_info"}]}},"\/betterdocs\/v1\/popular_search_keyword":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/popular_search_keyword"}]}},"\/betterdocs\/v1\/get-related-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/get-related-docs"}]}},"\/betterdocs\/v1\/saved-related-docs":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/saved-related-docs"}]}},"\/betterdocs\/v1\/generate-related-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/generate-related-docs"}]}},"\/betterdocs\/v1\/related-docs-analytics":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/betterdocs\/v1\/related-docs-analytics"}]}},"\/one-onboarding\/v1":{"namespace":"one-onboarding\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"one-onboarding\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/one-onboarding\/v1"}]}},"\/one-onboarding\/v1\/plugin-status\/(?P<plugin>[a-zA-Z0-9_-]+)":{"namespace":"one-onboarding\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/one-onboarding\/v1\/install-plugin":{"namespace":"one-onboarding\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/one-onboarding\/v1\/install-plugin"}]}},"\/one-onboarding\/v1\/activate-plugin":{"namespace":"one-onboarding\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/one-onboarding\/v1\/activate-plugin"}]}},"\/one-onboarding\/v1\/save-onboarding-state":{"namespace":"one-onboarding\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/one-onboarding\/v1\/save-onboarding-state"}]}},"\/one-onboarding\/v1\/onboarding-completion":{"namespace":"one-onboarding\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/one-onboarding\/v1\/onboarding-completion"}]}},"\/wpforms\/v1":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpforms\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1"}]}},"\/wpforms\/v1\/setup-wizard\/hydrate":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1\/setup-wizard\/hydrate"}]}},"\/wpforms\/v1\/setup-wizard\/update":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1\/setup-wizard\/update"}]}},"\/wpforms\/v1\/setup-wizard\/install-plugins":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"plugins":{"type":"array","default":[],"items":{"type":"string"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1\/setup-wizard\/install-plugins"}]}},"\/wpforms\/v1\/setup-wizard\/complete":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"outcome":{"type":"string","default":"build","enum":["build","import","exit","forms"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1\/setup-wizard\/complete"}]}},"\/wpforms\/v1\/setup-wizard\/stripe\/connect-url":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1\/setup-wizard\/stripe\/connect-url"}]}},"\/wpforms\/v1\/setup-wizard\/license\/key":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1\/setup-wizard\/license\/key"}]}},"\/wpforms\/v1\/setup-wizard\/license\/verify":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wpforms\/v1\/setup-wizard\/license\/verify"}]}},"\/otgs\/installer\/v1":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"otgs\/installer\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/otgs\/installer\/v1"}]}},"\/otgs\/installer\/v1\/push\/fetch-subscription":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/otgs\/installer\/v1\/push\/fetch-subscription"}]}},"\/zipwp-images\/v1":{"namespace":"zipwp-images\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"zipwp-images\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/zipwp-images\/v1"}]}},"\/zipwp-images\/v1\/images":{"namespace":"zipwp-images\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keywords":{"type":"string","required":true},"per_page":{"type":"string","required":false},"page":{"type":"string","required":false},"orientation":{"type":"string","required":false},"engine":{"type":"string","required":false},"filter":{"type":"string","required":false},"color":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/zipwp-images\/v1\/images"}]}},"\/nps-survey\/v1":{"namespace":"nps-survey\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"nps-survey\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/nps-survey\/v1"}]}},"\/nps-survey\/v1\/rating":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/nps-survey\/v1\/rating"}]}},"\/nps-survey\/v1\/dismiss-nps-survey":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/nps-survey\/v1\/dismiss-nps-survey"}]}},"\/zipwp\/v1":{"namespace":"zipwp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"zipwp\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/zipwp\/v1"}]}},"\/zipwp\/v1\/search-category":{"namespace":"zipwp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/zipwp\/v1\/search-category"}]}},"\/zipwp\/v1\/site-languages":{"namespace":"zipwp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/zipwp\/v1\/site-languages"}]}},"\/gutenberg-templates\/v1":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"gutenberg-templates\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1"}]}},"\/gutenberg-templates\/v1\/categories":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/categories"}]}},"\/gutenberg-templates\/v1\/description":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"business_name":{"type":"string","required":true},"business_description":{"type":"string","required":false},"category":{"type":"string","required":false},"language_name":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/description"}]}},"\/gutenberg-templates\/v1\/page-description":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"business_name":{"type":"string","required":true},"business_description":{"type":"string","required":false},"page_name":{"type":"string","required":true},"page_description":{"type":"string","required":false},"category":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/page-description"}]}},"\/gutenberg-templates\/v1\/keywords":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"business_name":{"type":"string","required":true},"business_description":{"type":"string","required":false},"category":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/keywords"}]}},"\/gutenberg-templates\/v1\/images":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keywords":{"type":"string","required":true},"per_page":{"type":"integer","required":false},"page":{"type":"integer","required":false},"orientation":{"type":"string","required":false},"engine":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/images"}]}},"\/gutenberg-templates\/v1\/settings":{"namespace":"gutenberg-templates\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"key":{"type":"string","required":true},"value":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/settings"}]}},"\/gutenberg-templates\/v1\/favorite":{"namespace":"gutenberg-templates\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"type":{"type":"string","required":true},"block_id":{"type":"integer","required":true},"status":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/favorite"}]}},"\/gutenberg-templates\/v1\/do-it-later":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/do-it-later"}]}},"\/gutenberg-templates\/v1\/pages-onboarding":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/pages-onboarding"}]}},"\/gutenberg-templates\/v1\/revoke-access":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/revoke-access"}]}},"\/gutenberg-templates\/v1\/blocks":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/blocks"}]}},"\/gutenberg-templates\/v1\/setup":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/setup"}]}},"\/gutenberg-templates\/v1\/sites":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/gutenberg-templates\/v1\/sites"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"author":{"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limiter le jeu de r\u00e9sultats en se basant sur les correspondances entre plusieurs taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie categories.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie categories.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie tags.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie tags.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limiter les r\u00e9sultats aux \u00e9l\u00e9ments qui sont \u00e9pingl\u00e9s.","type":"boolean","required":false},"ignore_sticky":{"description":"Ignorer les publications \u00e9pingl\u00e9es ou non.","type":"boolean","default":true,"required":false},"format":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments auxquels un ou plusieurs formats sont assign\u00e9s.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"Le format pour la publication.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"D\u00e9finit si la publication doit \u00eatre trait\u00e9e en tant que contenu \u00e9pingl\u00e9 ou non.","type":"boolean","required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"categories":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie category.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie post_tag.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"Le format pour la publication.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"D\u00e9finit si la publication doit \u00eatre trait\u00e9e en tant que contenu \u00e9pingl\u00e9 ou non.","type":"boolean","required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"categories":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie category.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie post_tag.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"Le format pour la publication.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"_yoast_wpseo_focuskw":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_title":{"type":"string","title":"","description":"","default":""},"_yoast_wpseo_metadesc":{"type":"string","title":"","description":"","default":""},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"D\u00e9finit si la publication doit \u00eatre trait\u00e9e en tant que contenu \u00e9pingl\u00e9 ou non.","type":"boolean","required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"categories":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie category.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie post_tag.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"author":{"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant une valeur menu_order sp\u00e9cifique.","type":"integer","required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"parent":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments ayant un ID parent particulier.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les r\u00e9sultats, except\u00e9s ceux dont le parent porte un ID sp\u00e9cifique.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"L\u2019ordre de la publication en fonction des autres publications.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"L\u2019ordre de la publication en fonction des autres publications.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"L\u2019ordre de la publication en fonction des autres publications.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"author":{"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments ayant un ID parent particulier.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les r\u00e9sultats, except\u00e9s ceux dont le parent porte un ID sp\u00e9cifique.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limite le jeu de r\u00e9sultats aux fichiers joints d\u2018un type de m\u00e9dia particulier ou de types de m\u00e9dias particuliers.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limite le jeu de r\u00e9sultats aux fichiers joints d\u2018un type de MIME particulier ou de types de MIME particuliers.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_betterdocs_gif_video":{"type":"integer","title":"","description":"","default":0},"_betterdocs_gif_poster":{"type":"integer","title":"","description":"","default":0}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"alt_text":{"description":"Texte alternatif propos\u00e9 si le fichier ne peut pas \u00eatre affich\u00e9.","type":"string","required":false},"caption":{"description":"La l\u00e9gende du fichier joint.","type":"object","properties":{"raw":{"description":"L\u00e9gende pour le fichier joint, telle qu\u2019elle existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"L\u00e9gende HTML pour le fichier joint, transform\u00e9e pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"La description du fichier joint.","type":"object","properties":{"raw":{"description":"Description du fichier joint, telle qu\u2019elle existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Description HTML de la pi\u00e8ce jointe, transform\u00e9e pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"L\u2019ID pour la publication associ\u00e9e au fichier.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_betterdocs_gif_video":{"type":"integer","title":"","description":"","default":0},"_betterdocs_gif_poster":{"type":"integer","title":"","description":"","default":0}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"alt_text":{"description":"Texte alternatif propos\u00e9 si le fichier ne peut pas \u00eatre affich\u00e9.","type":"string","required":false},"caption":{"description":"La l\u00e9gende du fichier joint.","type":"object","properties":{"raw":{"description":"L\u00e9gende pour le fichier joint, telle qu\u2019elle existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"L\u00e9gende HTML pour le fichier joint, transform\u00e9e pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"La description du fichier joint.","type":"object","properties":{"raw":{"description":"Description du fichier joint, telle qu\u2019elle existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Description HTML de la pi\u00e8ce jointe, transform\u00e9e pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"L\u2019ID pour la publication associ\u00e9e au fichier.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Identifiant unique du fichier joint.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL vers le fichier image modifi\u00e9.","type":"string","format":"uri","required":true},"modifiers":{"description":"Tableau des modifications d\u2019images.","type":"array","minItems":1,"items":{"description":"Modification d\u2019image.","type":"object","required":["type","args"],"oneOf":[{"title":"Retourner","properties":{"type":{"description":"Type de retournement.","type":"string","enum":["flip"]},"args":{"description":"Inverser les arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Sens de retournement.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"D\u00e9termine s\u2019il faut retourner dans le sens horizontal.","type":"boolean"},"vertical":{"description":"D\u00e9termine s\u2019il faut retourner dans le sens vertical.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Type de rotation.","type":"string","enum":["rotate"]},"args":{"description":"Arguments de rotation.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle de rotation dans le sens horaire en degr\u00e9s.","type":"number"}}}}},{"title":"Recadrer","properties":{"type":{"description":"Type de recadrage.","type":"string","enum":["crop"]},"args":{"description":"Arguments de recadrage.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Position horizontale \u00e0 partir de la gauche pour commencer le recadrage en pourcentage de la largeur de l\u2019image.","type":"number"},"top":{"description":"En pourcentage de l\u2019image, la position verticale \u00e0 partir du haut \u00e0 laquelle commencer le recadrage de l\u2019image.","type":"number"},"width":{"description":"Largeur du recadrage en pourcentage de la largeur de l\u2019image.","type":"number"},"height":{"description":"Hauteur du recadrage en pourcentage de la hauteur de l\u2019image.","type":"number"}}}}}]},"required":false},"rotation":{"description":"La valeur en degr\u00e9s de la rotation de l\u2019image dans le sens des aiguilles d\u2019une montre. Obsol\u00e8te\u00a0: utilisez `modifiers` \u00e0 la place.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"En pourcentage de l\u2019image, la position X \u00e0 laquelle commencer le recadrage de l\u2019image. Obsol\u00e8te\u00a0: utilisez `modifiers` \u00e0 la place.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"En pourcentage de l\u2019image, la position Y \u00e0 laquelle commencer le recadrage de l\u2019image. Obsol\u00e8te\u00a0: utilisez `modifiers` \u00e0 la place.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"En pourcentage de l\u2019image, la largeur \u00e0 laquelle il faut recadrer l\u2019image. Obsol\u00e8te\u00a0: Utilisez `modifiers` \u00e0 la place.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"En pourcentage de l\u2019image, la hauteur \u00e0 laquelle il faut recadrer l\u2019image. Obsol\u00e8te\u00a0: Utilisez `modifiers` \u00e0 la place.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"La l\u00e9gende du fichier joint.","type":"object","properties":{"raw":{"description":"L\u00e9gende pour le fichier joint, telle qu\u2019elle existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"L\u00e9gende HTML pour le fichier joint, transform\u00e9e pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"La description du fichier joint.","type":"object","properties":{"raw":{"description":"Description du fichier joint, telle qu\u2019elle existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Description HTML de la pi\u00e8ce jointe, transform\u00e9e pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"L\u2019ID pour la publication associ\u00e9e au fichier.","type":"integer","required":false},"alt_text":{"description":"Texte alternatif propos\u00e9 si le fichier ne peut pas \u00eatre affich\u00e9.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limiter le jeu de r\u00e9sultats en se basant sur les correspondances entre plusieurs taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie menus.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie menus.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant une valeur menu_order sp\u00e9cifique.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"Le titre pour l\u2019objet.","type":["string","object"],"properties":{"raw":{"description":"Le titre pour l\u2019objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour l\u2019objet, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"La famille d\u2019objets originellement repr\u00e9sent\u00e9e comme \u00ab\u00a0type de publication\u00a0\u00bb ou \u00ab\u00a0taxonomie\u00a0\u00bb.","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"parent":{"default":0,"description":"L\u2019ID pour le parent de l\u2019objet.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Texte de l\u2019attribut titre de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"string","required":false},"classes":{"description":"Noms de classe de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"La description de cet \u00e9l\u00e9ment de menu.","type":"string","required":false},"menu_order":{"default":1,"description":"L\u2019ID en base de donn\u00e9es due nav_menu_item qui est le parent de l\u2019\u00e9l\u00e9ment de menu, sinon 0.","type":"integer","minimum":1,"required":false},"object":{"description":"Le type d\u2019objet originellement repr\u00e9sent\u00e9 comme \u00ab\u00a0cat\u00e9gorie\u00a0\u00bb, \u00ab\u00a0publication\u00a0\u00bb ou \u00ab\u00a0fichier joint\u00a0\u00bb.","type":"string","required":false},"object_id":{"default":0,"description":"L\u2019ID en base de donn\u00e9es de l\u2019objet original que repr\u00e9sente l\u2019\u00e9l\u00e9ment de menu, comme par exemple l\u2019ID pour les publication et le term_id pour les cat\u00e9gories.","type":"integer","minimum":0,"required":false},"target":{"description":"L\u2019attribut cible de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"L\u2019URL vers laquelle l\u2019\u00e9l\u00e9ment de menu renvoie.","type":"string","format":"uri","required":false},"xfn":{"description":"La relation XFN exprim\u00e9e dans ce lien de l\u2019\u00e9l\u00e9ment de menu.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie nav_menu.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"title":{"description":"Le titre pour l\u2019objet.","type":["string","object"],"properties":{"raw":{"description":"Le titre pour l\u2019objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour l\u2019objet, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"La famille d\u2019objets originellement repr\u00e9sent\u00e9e comme \u00ab\u00a0type de publication\u00a0\u00bb ou \u00ab\u00a0taxonomie\u00a0\u00bb.","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"parent":{"description":"L\u2019ID pour le parent de l\u2019objet.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Texte de l\u2019attribut titre de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"string","required":false},"classes":{"description":"Noms de classe de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"La description de cet \u00e9l\u00e9ment de menu.","type":"string","required":false},"menu_order":{"description":"L\u2019ID en base de donn\u00e9es due nav_menu_item qui est le parent de l\u2019\u00e9l\u00e9ment de menu, sinon 0.","type":"integer","minimum":1,"required":false},"object":{"description":"Le type d\u2019objet originellement repr\u00e9sent\u00e9 comme \u00ab\u00a0cat\u00e9gorie\u00a0\u00bb, \u00ab\u00a0publication\u00a0\u00bb ou \u00ab\u00a0fichier joint\u00a0\u00bb.","type":"string","required":false},"object_id":{"description":"L\u2019ID en base de donn\u00e9es de l\u2019objet original que repr\u00e9sente l\u2019\u00e9l\u00e9ment de menu, comme par exemple l\u2019ID pour les publication et le term_id pour les cat\u00e9gories.","type":"integer","minimum":0,"required":false},"target":{"description":"L\u2019attribut cible de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"L\u2019URL vers laquelle l\u2019\u00e9l\u00e9ment de menu renvoie.","type":"string","format":"uri","required":false},"xfn":{"description":"La relation XFN exprim\u00e9e dans ce lien de l\u2019\u00e9l\u00e9ment de menu.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie nav_menu.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID pour le parent de l\u2019objet.","type":"integer","minimum":0,"required":false},"title":{"description":"Le titre pour l\u2019objet.","type":["string","object"],"properties":{"raw":{"description":"Le titre pour l\u2019objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour l\u2019objet, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"La famille d\u2019objets originellement repr\u00e9sent\u00e9e comme \u00ab\u00a0type de publication\u00a0\u00bb ou \u00ab\u00a0taxonomie\u00a0\u00bb.","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour l\u2019objet.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"attr_title":{"description":"Texte de l\u2019attribut titre de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"string","required":false},"classes":{"description":"Noms de classe de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"La description de cet \u00e9l\u00e9ment de menu.","type":"string","required":false},"menu_order":{"description":"L\u2019ID en base de donn\u00e9es due nav_menu_item qui est le parent de l\u2019\u00e9l\u00e9ment de menu, sinon 0.","type":"integer","minimum":1,"required":false},"object":{"description":"Le type d\u2019objet originellement repr\u00e9sent\u00e9 comme \u00ab\u00a0cat\u00e9gorie\u00a0\u00bb, \u00ab\u00a0publication\u00a0\u00bb ou \u00ab\u00a0fichier joint\u00a0\u00bb.","type":"string","required":false},"object_id":{"description":"L\u2019ID en base de donn\u00e9es de l\u2019objet original que repr\u00e9sente l\u2019\u00e9l\u00e9ment de menu, comme par exemple l\u2019ID pour les publication et le term_id pour les cat\u00e9gories.","type":"integer","minimum":0,"required":false},"target":{"description":"L\u2019attribut cible de l\u2019\u00e9l\u00e9ment lien pour cet \u00e9l\u00e9ment de menu.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"L\u2019URL vers laquelle l\u2019\u00e9l\u00e9ment de menu renvoie.","type":"string","format":"uri","required":false},"xfn":{"description":"La relation XFN exprim\u00e9e dans ce lien de l\u2019\u00e9l\u00e9ment de menu.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"Les termes assign\u00e9s \u00e0 l\u2019objet dans la taxonomie nav_menu.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limiter le jeu de r\u00e9sultats en se basant sur les correspondances entre plusieurs taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie wp_pattern_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie wp_pattern_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wp_pattern_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie wp_pattern_category.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wp_pattern_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie wp_pattern_category.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wp_pattern_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie wp_pattern_category.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"slug":{"description":"Slug unique identifiant le mod\u00e8le.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Identifiant de th\u00e8me pour le mod\u00e8le.","type":"string","required":false},"type":{"description":"Type de mod\u00e8le.","type":"string","required":false},"content":{"description":"Contenu du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Contenu pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par le mod\u00e8le.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Titre du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Titre pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"Titre HTML du mod\u00e8le, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description du mod\u00e8le.","type":"string","required":false},"status":{"description":"\u00c9tat du mod\u00e8le.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"author":{"description":"L\u2019ID de l\u2019auteur\/autrice du mod\u00e8le.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limiter \u00e0 l\u2019ID de publication sp\u00e9cifi\u00e9.","type":"integer","required":false},"area":{"description":"Limite \u00e0 la zone de l\u2019\u00e9l\u00e9ment de mod\u00e8le sp\u00e9cifi\u00e9.","type":"string","required":false},"post_type":{"description":"Type de publication pour lequel obtenir les mod\u00e8les.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Slug unique identifiant le mod\u00e8le.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Identifiant de th\u00e8me pour le mod\u00e8le.","type":"string","required":false},"type":{"description":"Type de mod\u00e8le.","type":"string","required":false},"content":{"default":"","description":"Contenu du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Contenu pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par le mod\u00e8le.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Titre du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Titre pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"Titre HTML du mod\u00e8le, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description du mod\u00e8le.","type":"string","required":false},"status":{"default":"publish","description":"\u00c9tat du mod\u00e8le.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"author":{"description":"L\u2019ID de l\u2019auteur\/autrice du mod\u00e8le.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Le slug du mod\u00e8le doit r\u00e9cup\u00e9rer l\u2019alternative pour","type":"string","required":true},"is_custom":{"description":"Indique si un mod\u00e8le est personnalis\u00e9 ou fait partie de la hi\u00e9rarchie des mod\u00e8les.","type":"boolean","required":false},"template_prefix":{"description":"Le pr\u00e9fixe de mod\u00e8le pour le mod\u00e8le cr\u00e9\u00e9. Ceci est utilis\u00e9 pour extraire le type de mod\u00e8le principal, p.\u00a0ex.\u00a0dans \u00ab\u00a0taxonomy-books\u00a0\u00bb, cela extrait \u00ab\u00a0taxonomy\u00a0\u00bb","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"slug":{"description":"Slug unique identifiant le mod\u00e8le.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Identifiant de th\u00e8me pour le mod\u00e8le.","type":"string","required":false},"type":{"description":"Type de mod\u00e8le.","type":"string","required":false},"content":{"description":"Contenu du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Contenu pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par le mod\u00e8le.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Titre du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Titre pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"Titre HTML du mod\u00e8le, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description du mod\u00e8le.","type":"string","required":false},"status":{"description":"\u00c9tat du mod\u00e8le.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"author":{"description":"L\u2019ID de l\u2019auteur\/autrice du mod\u00e8le.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"slug":{"description":"Slug unique identifiant le mod\u00e8le.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Identifiant de th\u00e8me pour le mod\u00e8le.","type":"string","required":false},"type":{"description":"Type de mod\u00e8le.","type":"string","required":false},"content":{"description":"Contenu du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Contenu pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par le mod\u00e8le.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Titre du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Titre pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"Titre HTML du mod\u00e8le, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description du mod\u00e8le.","type":"string","required":false},"status":{"description":"\u00c9tat du mod\u00e8le.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"author":{"description":"L\u2019ID de l\u2019auteur\/autrice du mod\u00e8le.","type":"integer","required":false},"area":{"description":"L\u2019emplacement o\u00f9 l\u2019\u00e9l\u00e9ment de mod\u00e8le devrait \u00eatre utilis\u00e9 (ent\u00eate, pied de page, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limiter \u00e0 l\u2019ID de publication sp\u00e9cifi\u00e9.","type":"integer","required":false},"area":{"description":"Limite \u00e0 la zone de l\u2019\u00e9l\u00e9ment de mod\u00e8le sp\u00e9cifi\u00e9.","type":"string","required":false},"post_type":{"description":"Type de publication pour lequel obtenir les mod\u00e8les.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Slug unique identifiant le mod\u00e8le.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Identifiant de th\u00e8me pour le mod\u00e8le.","type":"string","required":false},"type":{"description":"Type de mod\u00e8le.","type":"string","required":false},"content":{"default":"","description":"Contenu du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Contenu pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par le mod\u00e8le.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Titre du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Titre pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"Titre HTML du mod\u00e8le, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description du mod\u00e8le.","type":"string","required":false},"status":{"default":"publish","description":"\u00c9tat du mod\u00e8le.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"author":{"description":"L\u2019ID de l\u2019auteur\/autrice du mod\u00e8le.","type":"integer","required":false},"area":{"description":"L\u2019emplacement o\u00f9 l\u2019\u00e9l\u00e9ment de mod\u00e8le devrait \u00eatre utilis\u00e9 (ent\u00eate, pied de page, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Le slug du mod\u00e8le doit r\u00e9cup\u00e9rer l\u2019alternative pour","type":"string","required":true},"is_custom":{"description":"Indique si un mod\u00e8le est personnalis\u00e9 ou fait partie de la hi\u00e9rarchie des mod\u00e8les.","type":"boolean","required":false},"template_prefix":{"description":"Le pr\u00e9fixe de mod\u00e8le pour le mod\u00e8le cr\u00e9\u00e9. Ceci est utilis\u00e9 pour extraire le type de mod\u00e8le principal, p.\u00a0ex.\u00a0dans \u00ab\u00a0taxonomy-books\u00a0\u00bb, cela extrait \u00ab\u00a0taxonomy\u00a0\u00bb","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"slug":{"description":"Slug unique identifiant le mod\u00e8le.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Identifiant de th\u00e8me pour le mod\u00e8le.","type":"string","required":false},"type":{"description":"Type de mod\u00e8le.","type":"string","required":false},"content":{"description":"Contenu du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Contenu pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit"]},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par le mod\u00e8le.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Titre du mod\u00e8le.","type":["object","string"],"properties":{"raw":{"description":"Titre pour le mod\u00e8le, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"Titre HTML du mod\u00e8le, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description du mod\u00e8le.","type":"string","required":false},"status":{"description":"\u00c9tat du mod\u00e8le.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"author":{"description":"L\u2019ID de l\u2019auteur\/autrice du mod\u00e8le.","type":"integer","required":false},"area":{"description":"L\u2019emplacement o\u00f9 l\u2019\u00e9l\u00e9ment de mod\u00e8le devrait \u00eatre utilis\u00e9 (ent\u00eate, pied de page, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"L\u2019ID du mod\u00e8le.","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la r\u00e9vision des styles globaux.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision de styles globaux.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"L\u2018identifiant du th\u00e8me","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"L\u2018identifiant du th\u00e8me","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID de la configuration de styles globaux.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Styles globaux.","type":["object"],"required":false},"settings":{"description":"R\u00e9glages globaux.","type":["object"],"required":false},"title":{"description":"Titre de la variation de styles globaux.","type":["object","string"],"properties":{"raw":{"description":"Titre de la variation de styles globaux, tel qu\u2019il existe en base de donn\u00e9es.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit","embed"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit","embed"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit","embed"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit","embed"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit","embed"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit","embed"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version du sch\u00e9ma theme.json utilis\u00e9 pour les r\u00e9glages de typographie.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"d\u00e9claration font-family dans le format theme.json, encod\u00e9e comme une cha\u00eene.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"theme_json_version":{"description":"Version du sch\u00e9ma theme.json utilis\u00e9 pour les r\u00e9glages de typographie.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"d\u00e9claration font-family dans le format theme.json, encod\u00e9e comme une cha\u00eene.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"L\u2019ID de la famille de polices parente de la police de caract\u00e8res.","type":"integer","required":true},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"id","enum":["id","include"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"L\u2019ID de la famille de polices parente de la police de caract\u00e8res.","type":"integer","required":true},"theme_json_version":{"description":"Version du sch\u00e9ma theme.json utilis\u00e9 pour les r\u00e9glages de typographie.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"D\u00e9claration font-face dans le format theme.json, encod\u00e9e comme une cha\u00eene.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"L\u2019ID de la famille de polices parente de la police de caract\u00e8res.","type":"integer","required":true},"id":{"description":"Identifiant unique de la police de caract\u00e8res.","type":"integer","required":true},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"L\u2019ID de la famille de polices parente de la police de caract\u00e8res.","type":"integer","required":true},"id":{"description":"Identifiant unique de la police de caract\u00e8res.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"author":{"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limiter le jeu de r\u00e9sultats en se basant sur les correspondances entre plusieurs taxonomies.","type":"string","enum":["AND","OR"],"required":false},"doc_category":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie doc_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"doc_category_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie doc_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"doc_tag":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie doc_tag.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"doc_tag_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie doc_tag.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"doc_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie doc_category.","type":"array","items":{"type":"integer"},"required":false},"doc_tag":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie doc_tag.","type":"array","items":{"type":"integer"},"required":false},"year_month":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"word_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_views":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"reactions":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"author_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_category_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_tag_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_slug":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/docs"}]}},"\/wp\/v2\/docs\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"doc_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie doc_category.","type":"array","items":{"type":"integer"},"required":false},"doc_tag":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie doc_tag.","type":"array","items":{"type":"integer"},"required":false},"year_month":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"word_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_views":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"reactions":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"author_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_category_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_tag_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_slug":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"doc_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie doc_category.","type":"array","items":{"type":"integer"},"required":false},"doc_tag":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie doc_tag.","type":"array","items":{"type":"integer"},"required":false},"year_month":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"word_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_views":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"reactions":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"author_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_category_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_tag_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_slug":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sp_integr_system":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limiter le jeu de r\u00e9sultats en se basant sur les correspondances entre plusieurs taxonomies.","type":"string","enum":["AND","OR"],"required":false},"sp_integration_category":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie sp_integration_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"sp_integration_category_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie sp_integration_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sp_integration_market":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie sp_integration_market.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"sp_integration_market_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie sp_integration_market.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"sp_integration_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie sp_integration_category.","type":"array","items":{"type":"integer"},"required":false},"sp_integration_market":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie sp_integration_market.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/sp_integr_system"}]}},"\/wp\/v2\/sp_integr_system\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"sp_integration_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie sp_integration_category.","type":"array","items":{"type":"integer"},"required":false},"sp_integration_market":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie sp_integration_market.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sp_integr_system\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sp_integr_system\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant une valeur menu_order sp\u00e9cifique.","type":"integer","required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments ayant un ID parent particulier.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les r\u00e9sultats, except\u00e9s ceux dont le parent porte un ID sp\u00e9cifique.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"menu_order":{"description":"L\u2019ordre de la publication en fonction des autres publications.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width_unit":{"type":"string","title":"","description":"","default":""},"_generate_block_type":{"type":"string","title":"","description":"","default":""},"_generate_hook":{"type":"string","title":"","description":"","default":""},"_generate_custom_hook":{"type":"string","title":"","description":"","default":""},"_generate_hook_priority":{"type":"string","title":"","description":"","default":""},"_generate_post_meta_location":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_tagname":{"type":"string","title":"","description":"","default":""},"_generate_disable_primary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_secondary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_title":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_featured_image":{"type":"boolean","title":"","description":"","default":false},"_generate_use_theme_post_container":{"type":"boolean","title":"","description":"","default":false},"_generate_use_archive_navigation_container":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_post_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_archive_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_post_loop_item_display":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_tax":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_term":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_post_meta":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/gp_elements"}]}},"\/wp\/v2\/gp_elements\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"menu_order":{"description":"L\u2019ordre de la publication en fonction des autres publications.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width_unit":{"type":"string","title":"","description":"","default":""},"_generate_block_type":{"type":"string","title":"","description":"","default":""},"_generate_hook":{"type":"string","title":"","description":"","default":""},"_generate_custom_hook":{"type":"string","title":"","description":"","default":""},"_generate_hook_priority":{"type":"string","title":"","description":"","default":""},"_generate_post_meta_location":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_tagname":{"type":"string","title":"","description":"","default":""},"_generate_disable_primary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_secondary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_title":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_featured_image":{"type":"boolean","title":"","description":"","default":false},"_generate_use_theme_post_container":{"type":"boolean","title":"","description":"","default":false},"_generate_use_archive_navigation_container":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_post_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_archive_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_post_loop_item_display":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_tax":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_term":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_post_meta":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"menu_order":{"description":"L\u2019ordre de la publication en fonction des autres publications.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width_unit":{"type":"string","title":"","description":"","default":""},"_generate_block_type":{"type":"string","title":"","description":"","default":""},"_generate_hook":{"type":"string","title":"","description":"","default":""},"_generate_custom_hook":{"type":"string","title":"","description":"","default":""},"_generate_hook_priority":{"type":"string","title":"","description":"","default":""},"_generate_post_meta_location":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_tagname":{"type":"string","title":"","description":"","default":""},"_generate_disable_primary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_secondary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_title":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_featured_image":{"type":"boolean","title":"","description":"","default":false},"_generate_use_theme_post_container":{"type":"boolean","title":"","description":"","default":false},"_generate_use_archive_navigation_container":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_post_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_archive_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_post_loop_item_display":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_tax":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_term":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_post_meta":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/spectra-popup":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"author":{"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"spectra-popup-type":{"type":"string","title":"","description":"","default":"unset"},"spectra-popup-enabled":{"type":"boolean","title":"","description":"","default":false},"spectra-popup-repetition":{"type":"number","title":"","description":"","default":1}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/spectra-popup"}]}},"\/wp\/v2\/spectra-popup\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"spectra-popup-type":{"type":"string","title":"","description":"","default":"unset"},"spectra-popup-enabled":{"type":"boolean","title":"","description":"","default":false},"spectra-popup-repetition":{"type":"number","title":"","description":"","default":1}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/spectra-popup\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"spectra-popup-type":{"type":"string","title":"","description":"","default":"unset"},"spectra-popup-enabled":{"type":"boolean","title":"","description":"","default":false},"spectra-popup-repetition":{"type":"number","title":"","description":"","default":1}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/spectra-popup\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_story":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_company":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_customer_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_industry":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_region":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_country":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_production_context":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_erp_context":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_challenge":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_reported_outcomes":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_quote":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_quote_attribution":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_logo_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_image_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_social_image_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_featured_order":{"type":"integer","title":"","description":"","default":0},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/skyplanner_story"}]}},"\/wp\/v2\/skyplanner_story\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_company":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_customer_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_industry":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_region":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_country":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_production_context":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_erp_context":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_challenge":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_reported_outcomes":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_quote":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_quote_attribution":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_logo_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_image_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_social_image_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_featured_order":{"type":"integer","title":"","description":"","default":0},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_story\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_story\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_story\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_company":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_customer_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_industry":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_region":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_country":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_production_context":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_erp_context":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_challenge":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_reported_outcomes":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_quote":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_quote_attribution":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_logo_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_image_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_social_image_url":{"type":"string","title":"","description":"","default":""},"_skyplanner_story_featured_order":{"type":"integer","title":"","description":"","default":0},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_story\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_video":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limiter le jeu de r\u00e9sultats en se basant sur les correspondances entre plusieurs taxonomies.","type":"string","enum":["AND","OR"],"required":false},"video_stage":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie video_stage.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"video_stage_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie video_stage.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"video_role":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie video_role.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"video_role_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie video_role.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"video_topic":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie video_topic.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"video_topic_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie video_topic.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"video_format":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie video_format.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"video_format_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie video_format.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_youtube_id":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_duration":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_upload_date":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_badge":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_best_for":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_what_you_learn":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_stage":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_roles":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_topics":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_format":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_caption_languages":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_duration_seconds":{"type":"integer","title":"","description":"","default":0},"_skyplanner_video_library_order":{"type":"integer","title":"","description":"","default":0},"_skyplanner_video_captioned":{"type":"boolean","title":"","description":"","default":false},"_skyplanner_video_is_full_demo":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"video_stage":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_stage.","type":"array","items":{"type":"integer"},"required":false},"video_role":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_role.","type":"array","items":{"type":"integer"},"required":false},"video_topic":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_topic.","type":"array","items":{"type":"integer"},"required":false},"video_format":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_format.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/skyplanner_video"}]}},"\/wp\/v2\/skyplanner_video\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_youtube_id":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_duration":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_upload_date":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_badge":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_best_for":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_what_you_learn":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_stage":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_roles":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_topics":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_format":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_caption_languages":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_duration_seconds":{"type":"integer","title":"","description":"","default":0},"_skyplanner_video_library_order":{"type":"integer","title":"","description":"","default":0},"_skyplanner_video_captioned":{"type":"boolean","title":"","description":"","default":false},"_skyplanner_video_is_full_demo":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"video_stage":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_stage.","type":"array","items":{"type":"integer"},"required":false},"video_role":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_role.","type":"array","items":{"type":"integer"},"required":false},"video_topic":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_topic.","type":"array","items":{"type":"integer"},"required":false},"video_format":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_format.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_video\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_video\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_video\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_youtube_id":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_duration":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_upload_date":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_badge":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_best_for":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_what_you_learn":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_stage":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_roles":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_topics":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_format":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_caption_languages":{"type":"string","title":"","description":"","default":""},"_skyplanner_video_duration_seconds":{"type":"integer","title":"","description":"","default":0},"_skyplanner_video_library_order":{"type":"integer","title":"","description":"","default":0},"_skyplanner_video_captioned":{"type":"boolean","title":"","description":"","default":false},"_skyplanner_video_is_full_demo":{"type":"boolean","title":"","description":"","default":false},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"video_stage":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_stage.","type":"array","items":{"type":"integer"},"required":false},"video_role":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_role.","type":"array","items":{"type":"integer"},"required":false},"video_topic":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_topic.","type":"array","items":{"type":"integer"},"required":false},"video_format":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie video_format.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/skyplanner_video\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es apr\u00e8s une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"author":{"description":"Limiter les r\u00e9sultats aux publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les publications assign\u00e9es \u00e0 des auteurs ou autrices sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limiter la r\u00e9ponse aux publications mises en ligne avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limiter la r\u00e9ponse aux publications modifi\u00e9es avant une date d\u00e9finie et conforme \u00e0 la norme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"Comment interpr\u00e9ter le terme recherch\u00e9.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments ayant un ID parent particulier.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limiter le jeu de r\u00e9sultats \u00e0 tous les r\u00e9sultats, except\u00e9s ceux dont le parent porte un ID sp\u00e9cifique.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Tableau de nom de colonnes \u00e0 rechercher.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux publications ayant au moins un slug particulier.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limiter le jeu de r\u00e9sultats aux publications associ\u00e9es \u00e0 un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limiter le jeu de r\u00e9sultats en se basant sur les correspondances entre plusieurs taxonomies.","type":"string","enum":["AND","OR"],"required":false},"betterdocs_faq_category":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie betterdocs_faq_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"betterdocs_faq_category_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie betterdocs_faq_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"betterdocs_product_faq_category":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont des termes sp\u00e9cifiquement assign\u00e9s dans la taxonomie betterdocs_product_faq_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false},"operator":{"description":"Si les \u00e9l\u00e9ments doivent \u00eatre assign\u00e9s \u00e0 tous ou \u00e0 certains des termes sp\u00e9cifi\u00e9s.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"betterdocs_product_faq_category_exclude":{"description":"Limiter le jeu de r\u00e9sultats aux \u00e9l\u00e9ments qui ont le terme sp\u00e9cifi\u00e9 assign\u00e9 dans la taxonomie betterdocs_product_faq_category.","type":["object","array"],"oneOf":[{"title":"Listes des ID de termes","description":"Faire correspondre les termes avec les ID list\u00e9s.","type":"array","items":{"type":"integer"}},{"title":"Requ\u00eate sur un ID de terme de taxonomie","description":"Effectuer une recherche de terme avanc\u00e9e.","type":"object","properties":{"terms":{"description":"ID de termes.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Possibilit\u00e9 d\u2019inclure des termes enfants dans les termes limitant le champs de r\u00e9sultats.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"faq_open_by_default":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"betterdocs_faq_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie betterdocs_faq_category.","type":"array","items":{"type":"integer"},"required":false},"betterdocs_product_faq_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie betterdocs_product_faq_category.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/betterdocs_faq"}]}},"\/wp\/v2\/betterdocs_faq\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Surcharger la longueur par d\u00e9faut de l\u2019extrait.","type":"integer","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"faq_open_by_default":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"betterdocs_faq_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie betterdocs_faq_category.","type":"array","items":{"type":"integer"},"required":false},"betterdocs_product_faq_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie betterdocs_product_faq_category.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identifiant unique pour la publication.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut d\u2019objet.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"L\u2019ID pour le parent de la r\u00e9vision.","type":"integer","required":false},"id":{"description":"Identifiant unique pour la r\u00e9vision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les r\u00e9visions ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"L\u2019ID du parent de la publication.","type":"integer","required":false},"date":{"description":"La date de publication de l\u2019article, dans le fuseau horaire du site.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"La date de mise en ligne de la publication, au format GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour la publication, propre au type de la ressource.","type":"string","required":false},"status":{"description":"Un \u00e9tat nomm\u00e9 pour la publication.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","hidden"],"required":false},"password":{"description":"Un mot de passe pour prot\u00e9ger l\u2019acc\u00e8s au contenu et \u00e0 l\u2019extrait.","type":"string","required":false},"title":{"description":"Le titre de la publication.","type":"object","properties":{"raw":{"description":"Le titre pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Le titre HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"Le contenu pour cette publication.","type":"object","properties":{"raw":{"description":"Contenu pour cet objet, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour la publication, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version du format de bloc de contenu utilis\u00e9 par l\u2019objet.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"D\u00e9finit si le contenu est prot\u00e9g\u00e9 par mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"L\u2019ID pour l\u2019auteur ou l\u2019autrice de la publication.","type":"integer","required":false},"excerpt":{"description":"L\u2019extrait pour la publication.","type":"object","properties":{"raw":{"description":"L\u2019extrait pour la publication, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Extrait HTML pour la publication, mis en forme pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"D\u00e9finit si l\u2019extrait est prot\u00e9g\u00e9 par un mot de passe ou non.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"L\u2019ID du m\u00e9dia mis en avant pour la publication.","type":"integer","required":false},"comment_status":{"description":"D\u00e9finit si les commentaires sont ouverts ou non pour cette publication.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"D\u00e9finit si l\u2019objet peut recevoir un ping ou non.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_acf_changed":{"type":"boolean","title":"","description":"","default":false},"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"faq_open_by_default":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"Le fichier de th\u00e8me \u00e0 utiliser pour afficher la publication.","type":"string","required":false},"betterdocs_faq_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie betterdocs_faq_category.","type":"array","items":{"type":"integer"},"required":false},"betterdocs_product_faq_category":{"description":"Les termes assign\u00e9s \u00e0 la publication dans la taxonomie betterdocs_product_faq_category.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"L\u2019ID du parent de la sauvegarde automatique.","type":"integer","required":false},"id":{"description":"L\u2019identifiant de la sauvegarde automatique.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"Un identificateur alphanum\u00e9rique pour le type de publication.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Un identificateur alphanum\u00e9rique pour l\u2019\u00e9tat.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limiter les r\u00e9sultats aux taxonomies associ\u00e9es un type de publication sp\u00e9cifique.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"Un identificateur alphanum\u00e9rique pour la taxonomie.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"parent":{"description":"R\u00e9sultats limit\u00e9s aux termes ayant un parent sp\u00e9cifique.","type":"integer","required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"locations":{"description":"Les emplacements assign\u00e9s au menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Ajouter automatiquement les pages de premier niveau \u00e0 ce menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"locations":{"description":"Les emplacements assign\u00e9s au menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Ajouter automatiquement les pages de premier niveau \u00e0 ce menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/doc_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count","doc_category_order"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"parent":{"description":"R\u00e9sultats limit\u00e9s aux termes ayant un parent sp\u00e9cifique.","type":"integer","required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"doc_category_image-id":{"type":"string","title":"","description":"","default":""},"doc_category_knowledge_base":{"type":"array","title":"","description":"Knowledge Bases this doc category belongs to, by slug.","default":[],"items":{"type":"string"}},"doc_category_thumb-id":{"type":"string","title":"","description":"","default":""}},"required":false},"lang":{"type":["string","null"],"required":false},"doc_category_order":{"description":"BetterDocs doc category display order.","type":["integer","null"],"required":false},"thumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"handbookthumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"subcategories_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_docs_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"last_updated_time":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base":{"description":"Knowledge Base slugs assigned to this doc category","type":"array","items":{"type":"string"},"required":false},"knowledge_base_ids":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_titles":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/doc_category"}]}},"\/wp\/v2\/doc_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"doc_category_image-id":{"type":"string","title":"","description":"","default":""},"doc_category_knowledge_base":{"type":"array","title":"","description":"Knowledge Bases this doc category belongs to, by slug.","default":[],"items":{"type":"string"}},"doc_category_thumb-id":{"type":"string","title":"","description":"","default":""}},"required":false},"lang":{"type":["string","null"],"required":false},"doc_category_order":{"description":"BetterDocs doc category display order.","type":["integer","null"],"required":false},"thumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"handbookthumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"subcategories_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_docs_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"last_updated_time":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base":{"description":"Knowledge Base slugs assigned to this doc category","type":"array","items":{"type":"string"},"required":false},"knowledge_base_ids":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_titles":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/doc_tag":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"parent":{"description":"R\u00e9sultats limit\u00e9s aux termes ayant un parent sp\u00e9cifique.","type":"integer","required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"lang":{"type":["string","null"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/doc_tag"}]}},"\/wp\/v2\/doc_tag\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"lang":{"type":["string","null"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sp_integration_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/sp_integration_category"}]}},"\/wp\/v2\/sp_integration_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sp_integration_market":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/sp_integration_market"}]}},"\/wp\/v2\/sp_integration_market\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/video_stage":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/video_stage"}]}},"\/wp\/v2\/video_stage\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/video_role":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/video_role"}]}},"\/wp\/v2\/video_role\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/video_topic":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/video_topic"}]}},"\/wp\/v2\/video_topic\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/video_format":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/video_format"}]}},"\/wp\/v2\/video_format\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"parent":{"description":"R\u00e9sultats limit\u00e9s aux termes ayant un parent sp\u00e9cifique.","type":"integer","required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"status":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"faq_group_icon":{"type":"array","items":{"type":"string","title":"","description":"","default":""}}},"required":false},"betterdocs_draft_count":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/betterdocs_faq_category"}]}},"\/wp\/v2\/betterdocs_faq_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"status":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"faq_group_icon":{"type":"array","items":{"type":"string","title":"","description":"","default":""}}},"required":false},"betterdocs_draft_count":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_product_faq_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de terme.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"D\u00e9termine s\u2019il faut masquer ou non des termes non affect\u00e9s \u00e0 des publications.","type":"boolean","default":false,"required":false},"parent":{"description":"R\u00e9sultats limit\u00e9s aux termes ayant un parent sp\u00e9cifique.","type":"integer","required":false},"post":{"description":"Limiter le r\u00e9sultat aux termes assign\u00e9s \u00e0 une publication sp\u00e9cifique.","type":"integer","default":null,"required":false},"slug":{"description":"Limiter le jeu de r\u00e9sultats aux termes ayant un ou plusieurs identifiants sp\u00e9cifiques.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":true},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"status":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"faq_group_icon":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_group_product_cats":{"type":"array","title":"","description":"","default":[],"items":{"type":"integer"}},"_betterdocs_faq_group_products":{"type":"array","title":"","description":"","default":[],"items":{"type":"integer"}},"_betterdocs_faq_group_all_products":{"type":"boolean","title":"","description":"","default":false}},"required":false},"betterdocs_draft_count":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/betterdocs_product_faq_category"}]}},"\/wp\/v2\/betterdocs_product_faq_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"description":{"description":"Description HTML du terme.","type":"string","required":false},"name":{"description":"Titre HTML pour le terme.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le terme, propre au type de la ressource.","type":"string","required":false},"parent":{"description":"L\u2019ID du terme parent.","type":"integer","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"status":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"faq_group_icon":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_group_product_cats":{"type":"array","title":"","description":"","default":[],"items":{"type":"integer"}},"_betterdocs_faq_group_products":{"type":"array","title":"","description":"","default":[],"items":{"type":"integer"}},"_betterdocs_faq_group_all_products":{"type":"boolean","title":"","description":"","default":false}},"required":false},"betterdocs_draft_count":{"type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique pour le terme.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les termes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Nom de connexion pour le compte.","type":"string","required":false},"name":{"description":"Nom affich\u00e9 pour le compte.","type":"string","required":false},"first_name":{"description":"Pr\u00e9nom associ\u00e9 au compte.","type":"string","required":false},"last_name":{"description":"Nom du compte.","type":"string","required":false},"email":{"description":"L\u2019adresse e-mail du compte.","type":"string","format":"email","required":false},"url":{"description":"URL de ce compte.","type":"string","format":"uri","required":false},"description":{"description":"Description du compte.","type":"string","required":false},"locale":{"description":"Langue du compte.","type":"string","enum":["","en_US","ar","az","cs_CZ","de_DE","el","es_ES","et","fr_FR","id_ID","it_IT","ja","ko_KR","lt_LT","nb_NO","pl_PL","pt_BR","pt_PT","sk_SK","sl_SI","sv_SE","th","tr_TR","uk","uz_UZ"],"required":false},"nickname":{"description":"Le surnom du compte.","type":"string","required":false},"slug":{"description":"Un identificateur alphanum\u00e9rique pour le compte.","type":"string","required":false},"roles":{"description":"R\u00f4les assign\u00e9s au compte.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Mot de passe pour le compte (jamais inclus).","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"La date et l\u2019heure auxquelles les pr\u00e9f\u00e9rences ont \u00e9t\u00e9 mises \u00e0 jour.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"generateblocks_onboarding":{"type":"object","title":"","description":"","default":[],"properties":{"insert_inner_container":{"type":"boolean"}},"additionalProperties":{"type":"boolean"}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"N\u00e9cessite la valeur \u00ab\u00a0true\u00a0\u00bb, car les comptes ne prennent pas en charge la suppression forc\u00e9e.","required":false},"reassign":{"type":"integer","description":"R\u00e9affectez les publications et les liens du compte supprim\u00e9 \u00e0 cet ID de compte.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"Un UUID fourni par l\u2019application pour l\u2019identifier de mani\u00e8re unique. Il est recommand\u00e9 d\u2019utiliser un UUID v5 avec l\u2019URL ou l\u2019espace de noms DNS.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"Le nom du mot de passe de l\u2019application.","type":"string","minLength":1,"pattern":".*\\S.*","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"Un UUID fourni par l\u2019application pour l\u2019identifier de mani\u00e8re unique. Il est recommand\u00e9 d\u2019utiliser un UUID v5 avec l\u2019URL ou l\u2019espace de noms DNS.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"Le nom du mot de passe de l\u2019application.","type":"string","minLength":1,"pattern":".*\\S.*","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"after":{"description":"Limiter les r\u00e9ponses aux commentaires publi\u00e9s apr\u00e8s une date donn\u00e9e et conforme ISO8601.","type":"string","format":"date-time","required":false},"author":{"description":"Limiter le jeu de r\u00e9sultats aux commentaires assign\u00e9s aux ID de compte sp\u00e9cifi\u00e9s. N\u00e9cessite des droits sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"S\u2019assurer que le jeu de r\u00e9sultats exclut les commentaires assign\u00e9s aux ID des comptes sp\u00e9cifi\u00e9s. N\u00e9cessite des droits sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limiter le jeu de r\u00e9sultats \u00e0 une adresse e-mail d\u2019auteur ou d\u2019autrice sp\u00e9cifique. N\u00e9cessite les droits correspondants.","format":"email","type":"string","required":false},"before":{"description":"Limiter les r\u00e9ponses aux commentaires publi\u00e9s avant une date donn\u00e9e et conforme ISO8601.","type":"string","format":"date-time","required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attribut de commentaire.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limiter le jeu de r\u00e9sultats aux commentaires ayant un ID parent sp\u00e9cifique.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID parents sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limite le jeu de r\u00e9sultats aux commentaires assign\u00e9s \u00e0 des ID de publications sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limiter le jeu de r\u00e9sultats aux commentaires assign\u00e9s \u00e0 un \u00e9tat sp\u00e9cifique. N\u00e9cessite les droits correspondants.","type":"string","required":false},"type":{"default":"comment","description":"Limite le jeu de r\u00e9sultats aux commentaires assign\u00e9s \u00e0 un type sp\u00e9cifique. N\u00e9cessite des droits sp\u00e9cifiques.","type":"string","required":false},"password":{"description":"Le mot de passe pour cette publication, si celle-ci est prot\u00e9g\u00e9e par un mot de passe.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"author":{"description":"L\u2019ID de l\u2019objet <code>user<\/code>, si l\u2019auteur ou l\u2019autrice \u00e9tait un compte.","type":"integer","required":false},"author_email":{"description":"Adresse e-mail de l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","format":"email","required":false},"author_ip":{"description":"Adresse IP de l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","format":"ip","required":false},"author_name":{"description":"Nom affich\u00e9 pour l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","required":false},"author_url":{"description":"URL pour l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"Agent utilisateur pour l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","required":false},"content":{"description":"Le contenu pour le commentaire.","type":"object","properties":{"raw":{"description":"Contenu pour le commentaire, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour le commentaire, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"La date \u00e0 laquelle le commentaire a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"La date \u00e0 laquelle le commentaire a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"L\u2019ID du parent du commentaire.","type":"integer","required":false},"post":{"default":0,"description":"L\u2019ID de l\u2019objet publication associ\u00e9.","type":"integer","required":false},"status":{"description":"\u00c9tat du commentaire.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"\u00c9tat de r\u00e9solution de la note","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Identifiant unique du commentaire.","type":"integer","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"Mot de passe de la publication parente du commentaire (si la publication est prot\u00e9g\u00e9e par un mot de passe).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Identifiant unique du commentaire.","type":"integer","required":false},"author":{"description":"L\u2019ID de l\u2019objet <code>user<\/code>, si l\u2019auteur ou l\u2019autrice \u00e9tait un compte.","type":"integer","required":false},"author_email":{"description":"Adresse e-mail de l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","format":"email","required":false},"author_ip":{"description":"Adresse IP de l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","format":"ip","required":false},"author_name":{"description":"Nom affich\u00e9 pour l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","required":false},"author_url":{"description":"URL pour l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"Agent utilisateur pour l\u2019auteur ou l\u2019autrice du commentaire.","type":"string","required":false},"content":{"description":"Le contenu pour le commentaire.","type":"object","properties":{"raw":{"description":"Contenu pour le commentaire, tel qu\u2019il existe dans la base de donn\u00e9es.","type":"string","context":["edit"]},"rendered":{"description":"Contenu HTML pour le commentaire, transform\u00e9 pour l\u2019affichage.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"La date \u00e0 laquelle le commentaire a \u00e9t\u00e9 publi\u00e9, dans le fuseau horaire du site.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"La date \u00e0 laquelle le commentaire a \u00e9t\u00e9 publi\u00e9, au format GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"L\u2019ID du parent du commentaire.","type":"integer","required":false},"post":{"description":"L\u2019ID de l\u2019objet publication associ\u00e9.","type":"integer","required":false},"status":{"description":"\u00c9tat du commentaire.","type":"string","required":false},"meta":{"description":"Champs m\u00e9tas.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"\u00c9tat de r\u00e9solution de la note","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Identifiant unique du commentaire.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Que ce soit pour \u00e9viter la corbeille ou forcer la suppression.","required":false},"password":{"description":"Mot de passe de la publication parente du commentaire (si la publication est prot\u00e9g\u00e9e par un mot de passe).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"type":{"default":"post","description":"Limiter les r\u00e9sultats aux \u00e9l\u00e9ments d\u2019un type d\u2019objet.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limiter les r\u00e9sultats aux \u00e9l\u00e9ments d\u2019un ou plusieurs sous-types d\u2019objet.","type":"array","items":{"enum":["post","page","docs","skyplanner_story","category","post_tag","doc_category","doc_tag","any"],"type":"string"},"required":false},"exclude":{"description":"S\u2019assure que le jeu de r\u00e9sultats exclut des ID sp\u00e9cifiques.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limiter le groupe de r\u00e9sultats aux ID sp\u00e9cifi\u00e9s.","type":"array","items":{"type":"integer"},"default":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Nom unique enregistr\u00e9 de ce bloc.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributs pour le bloc.","type":"object","default":[],"required":false},"post_id":{"description":"ID de ce contenu\/contexte.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Espace de nom du bloc.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Espace de nom du bloc.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Nom du bloc.","type":"string","required":false},"namespace":{"description":"Espace de nom du bloc.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"Titre","description":"Titre du site.","type":"string","required":false},"description":{"title":"Slogan","description":"Slogan du site.","type":"string","required":false},"url":{"title":"","description":"URL du site.","type":"string","format":"uri","required":false},"email":{"title":"","description":"Cette adresse est utilis\u00e9e \u00e0 des fins d\u2019administration, comme les notifications de nouveaux comptes.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"Une ville dans le m\u00eame fuseau horaire que le v\u00f4tre.","type":"string","required":false},"date_format":{"title":"","description":"Un format de date commun pour tous les r\u00e9glages de dates.","type":"string","required":false},"time_format":{"title":"","description":"Un format d\u2019heure commun pour tous les r\u00e9glages d\u2019heures.","type":"string","required":false},"start_of_week":{"title":"","description":"Le num\u00e9ro du jour de la semaine \u00e0 laquelle la semaine devrait commencer.","type":"integer","required":false},"language":{"title":"","description":"Code local de l\u2019installation WordPress.","type":"string","required":false},"use_smilies":{"title":"","description":"Convertir les \u00e9motic\u00f4nes, comme :-) et :-P, en images lors de l\u2019affichage.","type":"boolean","required":false},"default_category":{"title":"","description":"Cat\u00e9gorie d\u2019article par d\u00e9faut.","type":"integer","required":false},"default_post_format":{"title":"","description":"Format d\u2019article par d\u00e9faut.","type":"string","required":false},"posts_per_page":{"title":"Nombre maximum de publications par page","description":"Les pages de blog affichent au maximum.","type":"integer","required":false},"show_on_front":{"title":"Affichage en page d\u2019accueil","description":"Afficher quoi sur la page d\u2019accueil","type":"string","required":false},"page_on_front":{"title":"Page d\u2019accueil","description":"L\u2019ID de la page qui doit \u00eatre affich\u00e9 sur la page d\u2019accueil","type":"integer","required":false},"page_for_posts":{"title":"","description":"L\u2019ID de la page qui affichera les derniers articles","type":"integer","required":false},"default_ping_status":{"title":"","description":"Autoriser les liens de notification d\u2019autres blogs (pings et r\u00e9troliens) sur les nouveaux articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Autoriser les commentaires sur les nouvelles publications","description":"Autoriser les gens \u00e0 envoyer des commentaires sur les nouvelles publications.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Logo du site.","type":"integer","required":false},"site_icon":{"title":"Ic\u00f4ne","description":"Ic\u00f4ne du site.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limiter les r\u00e9sultats aux th\u00e8mes qui poss\u00e8dent un ou plusieurs \u00e9tats.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"La feuille de style du th\u00e8me. Elle identifie le th\u00e8me de mani\u00e8re unique.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","required":false},"status":{"description":"Limiter les r\u00e9sultats aux extensions ayant l\u2019\u00e9tat sp\u00e9cifi\u00e9.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"Slug sur le r\u00e9pertoire des extensions WordPress.org.","pattern":"[\\w\\-]+","required":true},"status":{"description":"L\u2019\u00e9tat d\u2019activation de l\u2019extension.","type":"string","enum":["inactive","active"],"default":"inactive","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"L\u2019\u00e9tat d\u2019activation de l\u2019extension.","type":"string","enum":["inactive","active"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"L\u2019ID d\u2019une colonne lat\u00e9rale enregistr\u00e9e","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Widgets imbriqu\u00e9s.","type":"array","items":{"type":["object","string"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"L\u2019ID du type de widget.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"L\u2019ID du type de widget.","type":"string","required":true},"instance":{"description":"R\u00e9glages de l\u2019instance courante du widget.","type":"object","required":false},"form_data":{"description":"Les donn\u00e9es s\u00e9rialis\u00e9es du formulaire du widget \u00e0 encoder dans les r\u00e9glages de l\u2019instance.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"L\u2019ID du type de widget.","type":"string","required":true},"instance":{"description":"R\u00e9glages de l\u2019instance courante du widget.","type":"object","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"La colonne lat\u00e9rale pour laquelle renvoyer les widgets.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique du widget.","type":"string","required":false},"id_base":{"description":"Type de widget. Correspond \u00e0 l\u2019ID du point de terminaison widget-types.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"La colonne lat\u00e9rale \u00e0 laquelle appartient le widget.","type":"string","required":true},"instance":{"description":"R\u00e9glages de l\u2019instance du widget, si pris en charge.","type":"object","properties":{"encoded":{"description":"Repr\u00e9sentation des r\u00e9glages de l\u2019instance encod\u00e9e en base64.","type":"string","context":["edit"]},"hash":{"description":"Cl\u00e9 cryptographique hach\u00e9e des r\u00e9glages de l\u2019instance.","type":"string","context":["edit"]},"raw":{"description":"R\u00e9glages de l\u2019instance non encod\u00e9s, si pris en charge.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"Donn\u00e9e de formulaire encod\u00e9e dans une URL pour le formulaire de l\u2019administration des widgets. Utilis\u00e9 pour mettre \u00e0 jour un widget qui ne prend pas en charge les instances. En \u00e9criture uniquement.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Identificateur unique du widget.","type":"string","required":false},"id_base":{"description":"Type de widget. Correspond \u00e0 l\u2019ID du point de terminaison widget-types.","type":"string","required":false},"sidebar":{"description":"La colonne lat\u00e9rale \u00e0 laquelle appartient le widget.","type":"string","required":false},"instance":{"description":"R\u00e9glages de l\u2019instance du widget, si pris en charge.","type":"object","properties":{"encoded":{"description":"Repr\u00e9sentation des r\u00e9glages de l\u2019instance encod\u00e9e en base64.","type":"string","context":["edit"]},"hash":{"description":"Cl\u00e9 cryptographique hach\u00e9e des r\u00e9glages de l\u2019instance.","type":"string","context":["edit"]},"raw":{"description":"R\u00e9glages de l\u2019instance non encod\u00e9s, si pris en charge.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"Donn\u00e9e de formulaire encod\u00e9e dans une URL pour le formulaire de l\u2019administration des widgets. Utilis\u00e9 pour mettre \u00e0 jour un widget qui ne prend pas en charge les instances. En \u00e9criture uniquement.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Indique s\u2019il faut forcer la suppression du widget ou le d\u00e9placer vers la colonne lat\u00e9rale inactive.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limiter les r\u00e9sultats aux blocs correspondant au terme de recherche.","type":"string","minLength":1,"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une cha\u00eene de caract\u00e8res.","type":"string","minLength":1,"required":false},"category":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 l\u2019identifiant d\u2019une cat\u00e9gorie.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 un identifiant de mot-cl\u00e9.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limiter les r\u00e9sultats \u00e0 ceux qui correspondent \u00e0 une composition (slug).","type":"array","required":false},"offset":{"description":"Ignorer un nombre sp\u00e9cifique d\u2019\u00e9l\u00e9ments au sein du jeu de r\u00e9sultats.","type":"integer","required":false},"order":{"description":"Le param\u00e8tre order trie les attributs dans l\u2019ordre croissant ou d\u00e9croissant.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Trier la collection par attributs de publication.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"L\u2019URL \u00e0 traiter.","type":"string","format":"uri","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"Un identificateur alphanum\u00e9rique pour l\u2019emplacement de menu.","type":"string","required":false},"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Identifiant unique de la cat\u00e9gorie de fonctionnalit\u00e9s.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Identifiant unique de l\u2019\u00ab\u00a0ability\u00a0\u00bb.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Param\u00e8tres d\u2019entr\u00e9e pour l\u2019ex\u00e9cution de cette \u00ab\u00a0ability\u00a0\u00bb.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Le contexte dans lequel la demande est faite\u00a0; cela d\u00e9termine les champs renvoy\u00e9s.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Page courante dans la collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Nombre maximal d\u2019\u00e9l\u00e9ments \u00e0 retourner dans le groupe de r\u00e9sultats.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limiter les r\u00e9sultats aux \u00ab\u00a0abilities\u00a0\u00bb d\u2019une cat\u00e9gorie sp\u00e9cifique.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Identifiant unique de l\u2019\u00ab\u00a0ability\u00a0\u00bb.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]}},"site_logo":3308,"site_icon":1849,"site_icon_url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-favicon.svg","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_logo","href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/3308"},{"embeddable":true,"type":"site_icon","href":"https:\/\/skyplanner.ai\/fr\/wp-json\/wp\/v2\/media\/1849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}