{"id":99659,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99659"},"modified":"2026-10-16T05:16:12","modified_gmt":"2026-10-16T05:16:12","slug":"configure-to-order","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/","title":{"rendered":"Configure to order: asiakkaan valinnoista toimitukseen"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Configure to order: asiakkaan valinnoista toimitukseen<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/fi\/\">Etusivu<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/\">Resurssit<\/a> &raquo; Configure to order: asiakkaan valinnoista toimitukseen<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Arvioitu lukuaika: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minuuttia<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Configure to order (CTO) tarkoittaa tuotteen valmistamista asiakkaan valitsemista, ennalta m\u00e4\u00e4ritellyist\u00e4 ja yhteensopivista vaihtoehdoista. Asiakas saa tarpeisiinsa sopivan yhdistelm\u00e4n. Valmistaja puolestaan hy\u00f6dynt\u00e4\u00e4 valmiita suunnitelmia ja tuotes\u00e4\u00e4nt\u00f6j\u00e4 sen sijaan, ett\u00e4 suunnittelisi jokaisen tilauksen alusta.<\/p>\n\n\n<p>Menetelm\u00e4n etuna on valinnanvara ilman, ett\u00e4 samoista suunnitteluratkaisuista maksetaan yh\u00e4 uudelleen. Hyv\u00e4ksyttykin yhdistelm\u00e4 tarvitsee silti oikeat materiaalit, valmistuksen ty\u00f6vaiheet ja aikaa tuotannossa. Myyntikelpoinen tuote ei automaattisesti ole toimitettavissa ensi perjantaina.<\/p>\n\n\n<p>SkyPlanner APS auttaa hallitsemaan t\u00e4t\u00e4 j\u00e4lkimm\u00e4ist\u00e4 haastetta. Sen aikataulutusteko\u00e4ly Arcturus laskee, milloin tarvittavat ty\u00f6t voidaan tehd\u00e4 muiden tilausten rinnalla. N\u00e4et tuloksen Gantt-aikataulussa ja ohjaat prioriteetteja sen sijaan, ett\u00e4 rakentaisit jokaisen ty\u00f6pisteen jonon uudelleen aina tuotejakauman muuttuessa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Millainen tuote soveltuu valmiista vaihtoehdoista konfiguroitavaksi?<\/h2>\n\n\n<p>CTO alkaa jo ennen asiakkaan tilausta. Tuotesuunnittelu m\u00e4\u00e4rittelee tuotteen rakennuspalikat, sallitut valinnat ja s\u00e4\u00e4nn\u00f6t, joilla niiden yhteensopivuus varmistetaan. Myynti tekee sitten valinnat n\u00e4ist\u00e4 hyv\u00e4ksytyist\u00e4 vaihtoehdoista.<\/p>\n\n\n<p>Kuvitellaan modulaarisia kuljettimia valmistava yritys. Asiakkaat valitsevat vakioleveyden ja -pituuden, hihnatyypin, rungon materiaalin, k\u00e4ytt\u00f6laitteen ja anturipaketin. S\u00e4\u00e4nn\u00f6t m\u00e4\u00e4ritt\u00e4v\u00e4t, mitk\u00e4 k\u00e4ytt\u00f6laitteet sopivat kullekin kuormalle ja nopeudelle, mitk\u00e4 hihnat soveltuvat kuhunkin k\u00e4ytt\u00f6kohteeseen ja millaisia anturiratkaisuja on saatavilla. Sallittu valinta vastaa valmiiksi suunniteltua ratkaisua, ei avointa suunnittelukysymyst\u00e4.<\/p>\n\n\n<p>N\u00e4ist\u00e4kin valinnoista voi synty\u00e4 huomattavasti valmistusty\u00f6t\u00e4. Ruostumaton ter\u00e4srunko voi vaatia valmistusta ja kiillotusta ennen kuljettimen kokoonpanoa. CTO ei tarkoita, ett\u00e4 jokainen osa olisi jo hyllyss\u00e4 tai ett\u00e4 tilaus vaatisi vain loppukokoonpanon.<\/p>\n\n\n<p>Raja kulkee hyv\u00e4ksyttyjen suunnitteluratkaisujen kohdalla. Jos asiakas pyyt\u00e4\u00e4 niiden ulkopuolelle j\u00e4\u00e4v\u00e4\u00e4 kuormaa tai kaltevuutta, suunnittelun on arvioitava pyynt\u00f6. Voit tarjota vakiovaihtoehtoa tai k\u00e4sitell\u00e4 poikkeuksen suunnitteluty\u00f6n\u00e4 sen sijaan, ett\u00e4 se vain vied\u00e4\u00e4n l\u00e4pi konfigurointiprosessissa.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO ja ATO kuvaavat eri asioita<\/h3>\n\n\n<p>N\u00e4m\u00e4 k\u00e4sitteet auttavat kuvaamaan tilausta, mutta ne eiv\u00e4t aina sulje toisiaan pois:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Configure to order:<\/strong> Mit\u00e4 asiakas voi valita? Tuote konfiguroidaan ennalta m\u00e4\u00e4ritellyist\u00e4, yhteensopivista vaihtoehdoista.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauksesta-suunnittelu\/\">Tilauksesta suunnittelu (ETO)<\/a>:<\/strong> Vaatiiko pyynt\u00f6 uutta suunnittelua? Asiakkaalle on kehitett\u00e4v\u00e4 oma ratkaisu, jossa voidaan hy\u00f6dynt\u00e4\u00e4 my\u00f6s vakio-osia.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilausohjautuva-tuotanto\/\">Tilausohjautuva tuotanto (MTO)<\/a>:<\/strong> Mik\u00e4 k\u00e4ynnist\u00e4\u00e4 valmistuksen? Tuotanto alkaa asiakastilauksen j\u00e4lkeen, ja siin\u00e4 voidaan hy\u00f6dynt\u00e4\u00e4 valmista suunnitelmaa.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/tilauksesta-kokoonpano\/\">Tilauksesta kokoonpano (ATO)<\/a>:<\/strong> Mit\u00e4 valmistellaan etuk\u00e4teen? Komponentit tai osakokoonpanot ovat valmiina ennen tilausta, ja valittu lopputuote kootaan sen j\u00e4lkeen.<\/li><\/ul>\n\n\n<p>Kuljetin voidaan konfiguroida asiakkaan valintojen mukaan ja valmistaa sitten tilauksesta. Toisessa tuoteperheess\u00e4 voidaan noudattaa samaa konfigurointiperiaatetta mutta koota tuote tilauksesta varastoiduista moduuleista. Konfigurointi kuvaa valintaa, kun taas tuotantostrategia ratkaisee, mit\u00e4 ty\u00f6t\u00e4 valinnan j\u00e4lkeen on viel\u00e4 teht\u00e4v\u00e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Milloin configure to order kannattaa?<\/h2>\n\n\n<p>CTO sopii hyvin tilanteisiin, joissa asiakkaat tarvitsevat aidosti erilaisia vaihtoehtoja, mutta suuri osa niiden taustalla olevasta suunnittelusta toistuu. Parhaiten menetelm\u00e4\u00e4n soveltuvat tuoteperheet, joissa hallittavalla m\u00e4\u00e4r\u00e4ll\u00e4 moduuleja ja s\u00e4\u00e4nt\u00f6j\u00e4 voidaan kattaa merkitt\u00e4v\u00e4 osa kysynn\u00e4st\u00e4.<\/p>\n\n\n<p>Tarkastele viimeaikaisia tilauksia. Mitk\u00e4 erot tuovat asiakkaalle todellista arvoa? Mitk\u00e4 saavat samat kysymykset palaamaan yh\u00e4 uudelleen suunnitteluun? Toistuvia koko-, materiaali-, suorituskyky- tai lis\u00e4varustevalintoja kannattaa harkita vakioitaviksi, jos niiden yhdistelm\u00e4t voidaan hyv\u00e4ksy\u00e4 etuk\u00e4teen.<\/p>\n\n\n<p>Hy\u00f6dyt syntyv\u00e4t toistuvan ty\u00f6n poistamisesta. Myynti voi tarjota hyv\u00e4ksyttyj\u00e4 yhdistelmi\u00e4 v\u00e4hemm\u00e4ll\u00e4 edestakaisella selvittelyll\u00e4. Suunnittelu voi k\u00e4ytt\u00e4\u00e4 enemm\u00e4n aikaa uusiin ratkaisuihin ja todellisiin poikkeuksiin. Hankinnan ja tuotannon tarpeet toistuvat samanlaisina useammin. Voit tarjota laajemman valikoiman k\u00e4sittelem\u00e4tt\u00e4 jokaista kauppaa uutena tuotekehitysprojektina.<\/p>\n\n\n<p>Hy\u00f6dyt edellytt\u00e4v\u00e4t my\u00f6s panostusta. Jonkun on suunniteltava moduulit, yll\u00e4pidett\u00e4v\u00e4 yhteensopivuuss\u00e4\u00e4nt\u00f6j\u00e4 ja pidett\u00e4v\u00e4 tuotantotiedot ajan tasalla osien tai suunnitelmien muuttuessa. Harvoin myyt\u00e4v\u00e4 vaihtoehto, joka vaatii oman toimitusketjun ja poikkeavan ty\u00f6vaiheketjun, voi maksaa enemm\u00e4n kuin tuottaa. Suurempi valinnanvara ei automaattisesti tarkoita parempaa tarjontaa.<\/p>\n\n\n<p>Aloita yhdest\u00e4 tuoteperheest\u00e4, jossa toistuvuus on selke\u00e4\u00e4. M\u00e4\u00e4rittele tarjottavat vaihtoehdot ja poikkeusten k\u00e4sittelytapa. Varmista sitten, ett\u00e4 myynti, suunnittelu ja tuotanto tulkitsevat saman valinnan samalla tavalla. Vakioi se, mit\u00e4 asiakkaat ostavat toistuvasti, \u00e4l\u00e4 kaikkia koskaan saamiasi erikoispyynt\u00f6j\u00e4.<\/p>\n\n\n<p>CTO ei ole yht\u00e4 houkutteleva vaihtoehto, jos useimmat tilaukset vaativat aidosti uutta suunnittelua tai asiakkaat eiv\u00e4t hyv\u00e4ksy j\u00e4ljell\u00e4 olevan valmistuksen vaatimaa odotusta. Heti tarvittavat suositut tuotteet voi olla parempi toimittaa valmiiden tuotteiden varastosta. Eri tuoteperheiss\u00e4 voidaan k\u00e4ytt\u00e4\u00e4 eri toimintatapoja ilman, ett\u00e4 tehtaan kokonaisstrategiasta tulee ristiriitainen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Muuta valinnat tuotantovalmiiksi tilaukseksi<\/h2>\n\n\n<p>Konfiguraation pit\u00e4\u00e4 kertoa tuotannolle, mit\u00e4 valmistetaan. Tuotannonsuunnittelijan ei pid\u00e4 joutua p\u00e4\u00e4ttelem\u00e4\u00e4n sit\u00e4 tarjouksesta. Tuotantoon siirrett\u00e4viin tietoihin tarvitaan valittu erittely sek\u00e4 sit\u00e4 vastaavat materiaalitarpeet, ty\u00f6vaiheiden j\u00e4rjestys ja kestot sek\u00e4 ty\u00f6h\u00f6n soveltuvat resurssit.<\/p>\n\n\n<p>Tuotekonfiguraattori tarkistaa valintojen sallittavuuden. Konfigurointiin, hinnoitteluun ja tarjousten laatimiseen tarkoitettu CPQ-ohjelmisto (configure, price, quote) voi lis\u00e4ksi tukea hinnoittelua ja tarjousten laatimista. ERP-j\u00e4rjestelm\u00e4ss\u00e4 voidaan hallita hyv\u00e4ksytty\u00e4 tilausta ja tuotantotietoja. Hienokuormitus sijoittaa sen j\u00e4lkeen tarvittavat ty\u00f6t k\u00e4ytett\u00e4viss\u00e4 olevaan aikaan. N\u00e4m\u00e4 teht\u00e4v\u00e4t liittyv\u00e4t toisiinsa: yhdistelm\u00e4n hyv\u00e4ksyminen ei viel\u00e4 itsess\u00e4\u00e4n varaa valmistuskapasiteettia.<\/p>\n\n\n<p>Kuvitteellisen kuljetinvalmistajan valinnat voisivat vaikuttaa tuotannonsuunnitteluun n\u00e4in:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Asiakkaan valinta<\/th><th>Vaikutus ty\u00f6h\u00f6n tai hankintaan<\/th><th>Aikataulutuksessa tarvittavat tiedot<\/th><\/tr><\/thead><tbody><tr><td>Ruostumaton ter\u00e4srunko<\/td><td>Eri materiaali sek\u00e4 valmistus ja kiillotus<\/td><td>Oikean materiaalin saatavuus ja tarvittavat ty\u00f6vaiheet<\/td><\/tr><tr><td>Pinnoitettu ter\u00e4srunko<\/td><td>Valmistus ja sen j\u00e4lkeen hyv\u00e4ksytty pinnoituksen ty\u00f6vaiheketju<\/td><td>K\u00e4sittely-, asetus- ja mahdolliset odotusajat<\/td><\/tr><tr><td>Suurempi hyv\u00e4ksytty k\u00e4ytt\u00f6laite<\/td><td>Eri ostokomponentti ja erilaiset kokoonpanovaatimukset<\/td><td>Komponentin saatavuus ja sit\u00e4 vastaavat ty\u00f6vaiheiden kestot<\/td><\/tr><tr><td>Valinnainen anturipaketti<\/td><td>Lis\u00e4asennukset ja -tarkistukset<\/td><td>Ennen valmistumista tarvittavat lis\u00e4ty\u00f6t ja resurssit<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Vie jokaisen valinnan vaikutukset tilauksen tietoihin. Jos muutat vain kuvausta mutta j\u00e4t\u00e4t oletusty\u00f6vaiheketjun ennalleen, juuri myym\u00e4si ty\u00f6 j\u00e4\u00e4 piiloon.<\/p>\n\n\n<p>Pid\u00e4 valittu konfiguraatio tunnistettavana tuotantoon vapautuksesta my\u00f6hempiin muutoksiin asti. Sovi, kuka p\u00e4ivitt\u00e4\u00e4 materiaali- ja ty\u00f6tarpeet, jos asiakas vaihtaa valintaansa. Hihnan tai rungon vaihtaminen voi vaikuttaa ostettaviin osiin, jo aloitettuun ty\u00f6h\u00f6n ja valmistumisp\u00e4iv\u00e4\u00e4n. K\u00e4sittele sit\u00e4 arvioitavana tilausmuutoksena, \u00e4l\u00e4 pelkk\u00e4n\u00e4 uutena rivin\u00e4 tarjouksessa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ajoita valittu tuoteversio, \u00e4l\u00e4 keskim\u00e4\u00e4r\u00e4ist\u00e4 tuotetta<\/h2>\n\n\n<p>Palataan kuljetinvalmistajaan. Myynti saa useita tilauksia ruostumattomasta ter\u00e4ksest\u00e4 valmistettavasta versiosta. Kuljettimien m\u00e4\u00e4r\u00e4 on tuttu, mutta aiempaa useampi niist\u00e4 tarvitsee nyt kiillotusta. Tehtaan vakiol\u00e4pimenoaika ei ole muuttunut, mutta kiillotusresurssin kuormitus on.<\/p>\n\n\n<p>Jos tuotannonsuunnittelija ajoittaa jokaisen kuljettimen keskim\u00e4\u00e4r\u00e4isen tuotteen mukaan, ylim\u00e4\u00e4r\u00e4iset ty\u00f6vaiheet voivat j\u00e4\u00e4d\u00e4 n\u00e4kym\u00e4tt\u00f6miin, kunnes tuotanto etenee niihin asti. Rungot voivat valmistua nopeasti mutta j\u00e4\u00e4d\u00e4 sitten odottamaan kiillotusta. Uusien runkojen valmistuksen aloittaminen ei lis\u00e4\u00e4 kiillotuskapasiteettia.<\/p>\n\n\n<p>Toimitusta arvioitaessa olennainen kysymys on siis: milloin t\u00e4m\u00e4n tilauksen todelliset ty\u00f6t voivat valmistua, kun huomioidaan materiaalit ja <a href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/aarellinen-kuormitus\/\">muille asiakkaille jo varattu kapasiteetti<\/a>?<\/p>\n\n\n<p>SkyPlanner sijoittaa n\u00e4m\u00e4 ty\u00f6t yhteiseen tuotantoaikatauluun. M\u00e4\u00e4rittelet ty\u00f6vaiheet, kestot, ty\u00f6pisteet, ty\u00f6vuorot ja resurssitarpeet. Toistuvasti k\u00e4ytett\u00e4ville tuotteille voidaan m\u00e4\u00e4ritell\u00e4 valmiit ty\u00f6vaiheketjut, ja tilausrivit kuvaavat aikataulutettavat ty\u00f6t. Konfiguroidun tilauksen on tultava suunnitteluun valittua tuoteversiota vastaavine ty\u00f6vaiheineen ja materiaaleineen.<\/p>\n\n\n<p>Arcturus laskee tilausten v\u00e4lisen ty\u00f6j\u00e4rjestyksen m\u00e4\u00e4rittelemiesi kapasiteettien, riippuvuuksien ja aikataulutuss\u00e4\u00e4nt\u00f6jen perusteella. Gantt-n\u00e4kym\u00e4ss\u00e4 voit seurata t\u00f6iden etenemist\u00e4 resurssilta toiselle ja n\u00e4hd\u00e4 muiden tilausten vaikutukset. N\u00e4in kiillotusjono tulee mukaan toimitusajan arviointiin ennen kuin se aiheuttaa yll\u00e4tyksi\u00e4 tuotannossa.<\/p>\n\n\n<p>Kun materiaalit huomioiva aikataulutus on k\u00e4yt\u00f6ss\u00e4, my\u00f6s materiaalien saatavuus vaikuttaa laskentaan. My\u00f6hemmin saapuvaksi odotettua ostettua k\u00e4ytt\u00f6laitetta ei voi k\u00e4sitell\u00e4 samoin kuin jo saatavilla olevaa. Pid\u00e4 saatavuustiedot ajan tasalla ja laske aikataulu uudelleen niiden muuttuessa.<\/p>\n\n\n<p>Sin\u00e4 p\u00e4\u00e4t\u00e4t prioriteetit ja suojaat aikataulutusp\u00e4\u00e4t\u00f6ksi\u00e4 lukituksilla. Jos kiireellinen kuljetintilaus asetetaan etusijalle, Arcturus laskee aikataulun uudelleen n\u00e4iden ohjeiden rajoissa. Tarkistat samalla my\u00f6s muiden tilausten uudet p\u00e4iv\u00e4m\u00e4\u00e4r\u00e4t. Hy\u00f6tyn\u00e4 on v\u00e4hemm\u00e4n jonojen k\u00e4sin yll\u00e4pitoa ja selke\u00e4mpi pohja sen p\u00e4\u00e4tt\u00e4miseen, mitk\u00e4 toimituslupaukset turvataan.<\/p>\n\n\n<p>SkyPlanner integroituu mihin tahansa ERP- tai MES-j\u00e4rjestelm\u00e4\u00e4n <a href=\"https:\/\/skyplanner.ai\/fi\/integraatiot\/\">avoimen REST API -rajapintansa<\/a> kautta. Yhdist\u00e4 nykyiset tilaus-, tuote- ja tuotantotiedot hienokuormitukseen sen sijaan, ett\u00e4 aloittaisit ERP-j\u00e4rjestelm\u00e4n vaihtamisesta. CTO-toteutuksessa on m\u00e4\u00e4ritelt\u00e4v\u00e4, miten valittu tuoteversio muuttuu t\u00e4ss\u00e4 tietovirrassa oikeiksi materiaali- ja ty\u00f6vaihetiedoiksi. N\u00e4in myyty tuote kytkeytyy k\u00e4yt\u00e4nn\u00f6ss\u00e4 ty\u00f6h\u00f6n, jonka Arcturus aikatauluttaa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u00e4 yhteinen tuotantoaikataulu muutti UTU:lla<\/h2>\n\n\n<p>UTU valmistaa s\u00e4hk\u00f6keskuksia ja kojeistoja. Ennen SkyPlannerin k\u00e4ytt\u00f6\u00f6nottoa osastot yll\u00e4pitiv\u00e4t omia Excel-suunnitelmiaan, eiv\u00e4tk\u00e4 ERP-j\u00e4rjestelm\u00e4ss\u00e4 tehdyt ty\u00f6j\u00e4rjestyksen muutokset aina v\u00e4littyneet tuotantoon. Todellisesta kapasiteetista oli vaikea saada selke\u00e4\u00e4 kuvaa, joten toimituslupausten pit\u00e4minen vaati jatkuvaa uudelleenj\u00e4rjestely\u00e4.<\/p>\n\n\n<p>SkyPlannerin integrointi Oracle NetSuiteen ja palkanlaskentaj\u00e4rjestelm\u00e4\u00e4n toi UTU:n tehtaan linjat ja osastot yhteiseen suunnitteluj\u00e4rjestelm\u00e4\u00e4n. UTU:n tiimi korostaa automaattisen aikataulutuksen ja Gantt-n\u00e4kym\u00e4n yhdistelm\u00e4\u00e4: kapasiteetti, kuormitus ja ty\u00f6j\u00e4rjestys n\u00e4kyv\u00e4t samassa n\u00e4kym\u00e4ss\u00e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/asiakastarinat\/utu\/\">UTU:n SkyPlanner-k\u00e4ytt\u00f6kokemuksissa<\/a> yritys kertoo s\u00e4\u00e4st\u00e4v\u00e4ns\u00e4 viikoittain noin kaksi tuntia, jotka aiemmin kuluivat taulukoiden p\u00e4ivitt\u00e4miseen. My\u00f6s projektitoimitusten aikataulutus on yrityksen mukaan tarkentunut, ja p\u00e4ivitetyt ty\u00f6jonot v\u00e4littyv\u00e4t tuotantolinjalle sekunneissa. Kun tilaus kytkeytyy tuotannossa teht\u00e4v\u00e4\u00e4n ty\u00f6h\u00f6n, erillisten suunnitelmien yll\u00e4pitoon kuluu v\u00e4hemm\u00e4n aikaa ja muutoksia ty\u00f6j\u00e4rjestykseen on helpompi koordinoida.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Helpota asiakkaan valitseman tuotteen toimittamista<\/h2>\n\n\n<p>CTO:n arvo syntyy siit\u00e4, ett\u00e4 toistuvat asiakastarpeet voidaan t\u00e4ytt\u00e4\u00e4 samoilla, uudelleen k\u00e4ytett\u00e4vill\u00e4 vaihtoehdoilla. S\u00e4ilyt\u00e4 t\u00e4m\u00e4 etu l\u00e4pi tuotannon: m\u00e4\u00e4rit\u00e4 ty\u00f6t valitun tuoteversion vaatimusten mukaan ja arvioi toimituksen toteutettavuutta ottaen huomioon muiden tilausten kanssa jaetut resurssit.<\/p>\n\n\n<p>Valitse SkyPlanner, kun yhteensovittaminen vaatii jo p\u00e4ivitt\u00e4ist\u00e4 aikataulujen uudelleenj\u00e4rjestely\u00e4. Arcturus hoitaa aikataululaskennan, Gantt-n\u00e4kym\u00e4 n\u00e4ytt\u00e4\u00e4 vaikutukset ja sin\u00e4 p\u00e4\u00e4t\u00e4t prioriteeteista. Voit k\u00e4ytt\u00e4\u00e4 enemm\u00e4n aikaa todellisen rajoitteen ratkaisemiseen sen sijaan, ett\u00e4 siirtelisit t\u00f6it\u00e4 pit\u00e4\u00e4ksesi erilliset ty\u00f6jonot kesken\u00e4\u00e4n ajan tasalla.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/fi\/ota-yhteytta\/\">Varaa SkyPlanner-esittely<\/a> ja ota mukaan kaksi tavallista tuotekonfiguraatiota, niiden toisistaan poikkeavat ty\u00f6vaiheet sek\u00e4 yksi yhteinen resurssi. N\u00e4iden pohjalta on hyv\u00e4 tarkastella, miten tuotevalintanne sopisivat realistiseen tuotantoaikatauluun. Jos haluat ensin tutustua itse, <a href=\"https:\/\/skyplanner.ai\/fi\/kokeilu\/\">kokeile SkyPlanneria demodatalla<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Configure to order: asiakkaan valinnoista toimitukseen Etusivu &raquo; Resurssit &raquo; Configure to order: asiakkaan valinnoista toimitukseen Configure to order (CTO) tarkoittaa tuotteen valmistamista asiakkaan valitsemista, ennalta m\u00e4\u00e4ritellyist\u00e4 ja yhteensopivista vaihtoehdoista. Asiakas saa tarpeisiinsa sopivan yhdistelm\u00e4n. Valmistaja puolestaan hy\u00f6dynt\u00e4\u00e4 valmiita suunnitelmia ja tuotes\u00e4\u00e4nt\u00f6j\u00e4 sen sijaan, ett\u00e4 suunnittelisi jokaisen tilauksen alusta. Menetelm\u00e4n etuna on valinnanvara ilman, ett\u00e4 &#8230; <a title=\"Configure to order: asiakkaan valinnoista toimitukseen\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/\" aria-label=\"Lue lis\u00e4\u00e4 aiheesta Configure to order: asiakkaan valinnoista toimitukseen\">Lue lis\u00e4\u00e4<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2522,300],"tags":[],"class_list":["post-99659","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ja-hienokuormitus","category-oppaat","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Configure to order: asiakkaan valinnoista toimitukseen<\/title>\n<meta name=\"description\" content=\"Tarjoa valinnanvaraa suunnittelematta joka tilausta alusta. Katso, milloin CTO sopii ja miten SkyPlanner ajoittaa kunkin tuoteversion vaatimat ty\u00f6t.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/\" \/>\n<meta property=\"og:locale\" content=\"fi_FI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Configure to order: asiakkaan valinnoista toimitukseen\" \/>\n<meta property=\"og:description\" content=\"Tarjoa valinnanvaraa suunnittelematta joka tilausta alusta. Katso, milloin CTO sopii ja miten SkyPlanner ajoittaa kunkin tuoteversion vaatimat ty\u00f6t.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:16:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Kirjoittanut\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Arvioitu lukuaika\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Configure to order: asiakkaan valinnoista toimitukseen\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/\"},\"wordCount\":1639,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS ja hienokuormitus\",\"oppaat\"],\"inLanguage\":\"fi\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/\",\"name\":\"Configure to order: asiakkaan valinnoista toimitukseen\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:12+00:00\",\"description\":\"Tarjoa valinnanvaraa suunnittelematta joka tilausta alusta. Katso, milloin CTO sopii ja miten SkyPlanner ajoittaa kunkin tuoteversion vaatimat ty\u00f6t.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/#breadcrumb\"},\"inLanguage\":\"fi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/oppaat\\\/configure-to-order\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Configure to order: asiakkaan valinnoista toimitukseen\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fi\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/fi\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fi\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Configure to order: asiakkaan valinnoista toimitukseen","description":"Tarjoa valinnanvaraa suunnittelematta joka tilausta alusta. Katso, milloin CTO sopii ja miten SkyPlanner ajoittaa kunkin tuoteversion vaatimat ty\u00f6t.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/","og_locale":"fi_FI","og_type":"article","og_title":"Configure to order: asiakkaan valinnoista toimitukseen","og_description":"Tarjoa valinnanvaraa suunnittelematta joka tilausta alusta. Katso, milloin CTO sopii ja miten SkyPlanner ajoittaa kunkin tuoteversion vaatimat ty\u00f6t.","og_url":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:16:12+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Kirjoittanut":"Jussi M\u00e4ntyl\u00e4","Arvioitu lukuaika":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Configure to order: asiakkaan valinnoista toimitukseen","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:12+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/"},"wordCount":1639,"publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS ja hienokuormitus","oppaat"],"inLanguage":"fi"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/","url":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/","name":"Configure to order: asiakkaan valinnoista toimitukseen","isPartOf":{"@id":"https:\/\/skyplanner.ai\/fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:12+00:00","description":"Tarjoa valinnanvaraa suunnittelematta joka tilausta alusta. Katso, milloin CTO sopii ja miten SkyPlanner ajoittaa kunkin tuoteversion vaatimat ty\u00f6t.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/#breadcrumb"},"inLanguage":"fi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/"]}]},{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/fi\/oppaat\/configure-to-order\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/fi\/"},{"@type":"ListItem","position":2,"name":"Configure to order: asiakkaan valinnoista toimitukseen"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/fi\/#website","url":"https:\/\/skyplanner.ai\/fi\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/fi\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fi"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/fi\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/fi\/","logo":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/fi\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"fi","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/fi\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Configure to order: asiakkaan valinnoista toimitukseen Etusivu &raquo; Resurssit &raquo; Configure to order: asiakkaan valinnoista toimitukseen Configure to order (CTO) tarkoittaa tuotteen valmistamista asiakkaan valitsemista, ennalta m\u00e4\u00e4ritellyist\u00e4 ja yhteensopivista vaihtoehdoista. Asiakas saa tarpeisiinsa sopivan yhdistelm\u00e4n. Valmistaja puolestaan hy\u00f6dynt\u00e4\u00e4 valmiita suunnitelmia ja tuotes\u00e4\u00e4nt\u00f6j\u00e4 sen sijaan, ett\u00e4 suunnittelisi jokaisen tilauksen alusta. Menetelm\u00e4n etuna on valinnanvara ilman, ett\u00e4&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/99659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/comments?post=99659"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/99659\/revisions"}],"predecessor-version":[{"id":99717,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/posts\/99659\/revisions\/99717"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/media?parent=99659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/categories?post=99659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/fi\/wp-json\/wp\/v2\/tags?post=99659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}